WO2015019585A1 - 電力調整装置、電力調整方法、プログラム - Google Patents
電力調整装置、電力調整方法、プログラム Download PDFInfo
- Publication number
- WO2015019585A1 WO2015019585A1 PCT/JP2014/004016 JP2014004016W WO2015019585A1 WO 2015019585 A1 WO2015019585 A1 WO 2015019585A1 JP 2014004016 W JP2014004016 W JP 2014004016W WO 2015019585 A1 WO2015019585 A1 WO 2015019585A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- power
- unit
- amount
- transaction
- facility
- Prior art date
Links
- 238000000034 method Methods 0.000 title claims description 14
- 238000010248 power generation Methods 0.000 claims abstract description 78
- 230000007704 transition Effects 0.000 claims description 33
- 238000004364 calculation method Methods 0.000 claims description 24
- 238000005303 weighing Methods 0.000 claims description 24
- 230000008859 change Effects 0.000 claims description 22
- 238000007599 discharging Methods 0.000 description 3
- 230000005855 radiation Effects 0.000 description 3
- 230000004044 response Effects 0.000 description 3
- 238000004891 communication Methods 0.000 description 2
- 230000003750 conditioning effect Effects 0.000 description 2
- 230000007423 decrease Effects 0.000 description 2
- 230000007812 deficiency Effects 0.000 description 2
- 230000002950 deficient Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 230000007613 environmental effect Effects 0.000 description 2
- 230000006870 function Effects 0.000 description 2
- 230000008901 benefit Effects 0.000 description 1
- 239000003990 capacitor Substances 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 239000000446 fuel Substances 0.000 description 1
- 230000002068 genetic effect Effects 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q40/00—Finance; Insurance; Tax strategies; Processing of corporate or income taxes
- G06Q40/04—Trading; Exchange, e.g. stocks, commodities, derivatives or currency exchange
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q30/00—Commerce
- G06Q30/02—Marketing; Price estimation or determination; Fundraising
- G06Q30/0201—Market modelling; Market analysis; Collecting market data
- G06Q30/0206—Price or cost determination based on market factors
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q30/00—Commerce
- G06Q30/06—Buying, selling or leasing transactions
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J13/00—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
- H02J13/00006—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment
- H02J13/00028—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment involving the use of Internet protocols
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/28—Arrangements for balancing of the load in a network by storage of energy
- H02J3/32—Arrangements for balancing of the load in a network by storage of energy using batteries with converting means
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/38—Arrangements for parallely feeding a single network by two or more generators, converters or transformers
- H02J3/381—Dispersed generators
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2300/00—Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation
- H02J2300/20—The dispersed energy generation being of renewable origin
- H02J2300/22—The renewable source being solar energy
- H02J2300/24—The renewable source being solar energy of photovoltaic origin
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/50—Photovoltaic [PV] energy
- Y02E10/56—Power conversion systems, e.g. maximum power point trackers
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E40/00—Technologies for an efficient electrical power generation, transmission or distribution
- Y02E40/70—Smart grids as climate change mitigation technology in the energy generation sector
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E70/00—Other energy conversion or management systems reducing GHG emissions
- Y02E70/30—Systems combining energy storage with energy generation of non-fossil origin
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/90—Financial instruments for climate change mitigation, e.g. environmental taxes, subsidies or financing
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/12—Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation
- Y04S10/123—Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation the energy generation units being or involving renewable energy sources
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/14—Energy storage units
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S50/00—Market activities related to the operation of systems integrating technologies related to power network operation or related to communication or information technologies
- Y04S50/10—Energy trading, including energy flowing from end-user application to grid
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S50/00—Market activities related to the operation of systems integrating technologies related to power network operation or related to communication or information technologies
- Y04S50/14—Marketing, i.e. market research and analysis, surveying, promotions, advertising, buyer profiling, customer management or rewards
Definitions
- the present invention generally relates to a power adjustment device, a power adjustment method for the power adjustment device, and a program for realizing the power adjustment device. More specifically, the present invention relates to a power adjustment device that supplies power to a power system from a power supply facility installed at a consumer, a power adjustment method for the power adjustment device, and a program that implements the power adjustment device.
- Document 1 describes that by charging a storage battery at a late-night charge and selling the charged power to an electric power company at a daytime charge, a consumer can acquire a profit corresponding to the difference. Further, it is described that when a consumer supplies power from a storage battery to a power system, merits such as load leveling, response to steep demand, and improvement in quality of distribution line power can be obtained. Furthermore, it is described that an electric power company may return part of the merit to the customer as an incentive.
- Document 1 describes that a consumer brings merit to an electric power company by charging and discharging a storage battery provided in the consumer.
- the merit for the consumer described in Document 1 is the difference between the electricity charges at the time of charging and discharging and the incentive to the merit obtained by the power company, and the consumer gains more positively No configuration is envisaged.
- An object of the present invention is to provide a power adjustment device that improves profits when a customer having a power storage facility supplies power to a power system. Furthermore, this invention aims at providing the program which implement
- the power conditioner according to the present invention is a power conditioner that performs a transaction as to whether or not to supply power to a power system from a power supply facility provided by a consumer according to a transaction condition.
- the power supply facility includes a power generation facility and a power storage facility including a storage battery.
- the power adjustment apparatus includes a first prediction unit, a second prediction unit, a power purchase cost calculation unit, a control unit, and a determination unit.
- the first prediction unit is configured to predict first power generated by the power generation facility during a target period.
- the second prediction unit is configured to predict the second power consumed by the electric load in the target period in the consumer.
- the power purchase cost calculation unit is configured such that when the first power predicted by the first prediction unit is insufficient with respect to the second power predicted by the second prediction unit, the consumer
- the system is configured to calculate a cost to be paid for receiving the third power that is insufficient from the power system.
- the control unit is configured to select a first state in which power is supplied from the power storage facility to the power system and a second state in which power is supplied from the power storage facility to the electric load.
- the determination unit includes a first amount that can be received by the customer according to the transaction conditions when the first state is selected, and a cost calculated by the power purchase cost calculation unit. It is configured to compare the amount of money.
- the control unit is configured to select the second state when the first amount is equal to or less than the second amount in the comparison result of the determination unit.
- the power adjustment apparatus further includes a transaction participation unit.
- the transaction participation unit bids on the transaction device, and determines whether or not a contract has been established. It is configured to receive from a transaction device.
- the control unit is configured to select the first state when the contract is established.
- the power storage facility has a remaining capacity of the first power before the target period in which the first power is predicted to be insufficient with respect to the second power. It is comprised so that it may be charged so that the electric power of 3 may be exceeded.
- the first prediction unit receives the power generated by the power generation facility from the first weighing device, and the time elapsed of the power measured by the first weighing device.
- the power generated by the power generation facility in the target period is predicted based on the transition accompanying the.
- the second prediction unit receives the power consumed by the electrical load at the consumer from a second metering device, and based on the transition of the power metered by the second metering device over time.
- the power consumed by the electrical load in the target period is predicted.
- the power generation facility is a solar power generation facility.
- the first prediction unit includes a weather acquisition unit, a first history storage unit, and a first classification unit.
- the weather acquisition unit is configured to acquire information for predicting the weather.
- the first history storage unit is configured to store the information acquired by the weather acquisition unit in association with the transition of the power generated by the solar power generation facility over time.
- the first classifying unit is configured to classify a power change pattern based on a transition of power stored in the first history storage unit.
- the first prediction unit compares the change of the power received from the first metering device with the passage of time with the change pattern classified by the first classification unit, so that the sunlight in the target period.
- the power generation facility is configured to predict the power generated.
- the second prediction unit includes a second history storage unit and a second classification unit.
- the second history storage unit is configured to store a transition of the power consumed by the electric load with time.
- the second classifying unit is configured to classify a power change pattern based on a transition of power stored in the second history storage unit.
- the second prediction unit is configured to check the electric load in the target period by collating a transition of the power received from the second weighing device with time and a change pattern classified by the second classification unit. Is configured to predict the power consumed.
- the power adjustment method is a power adjustment method in which a transaction as to whether or not to supply power to a power system from a power supply facility provided by a consumer is performed with a transaction device in accordance with transaction conditions.
- the power supply facility includes a power generation facility and a power storage facility including a storage battery.
- the first prediction unit predicts the first power generated by the power generation facility during the target period.
- the second prediction unit predicts the second power consumed by the electrical load in the target period in the consumer.
- the power purchase cost calculation unit calculates the cost to be paid for receiving the third power.
- the power purchase cost calculation unit calculates the first amount that can be received by the customer according to the transaction conditions
- the determination unit compares the second amount, which is the calculated cost.
- the control unit is configured to select a second state in which power is supplied from the power storage facility to the electric load. Yes.
- the program according to the present invention causes a computer to function as any of the above-described power adjustment devices.
- the present invention is not limited to a program, and may be a computer-readable recording medium.
- FIG. 1 It is a block diagram which shows embodiment. It is a figure which shows the example of a setting of the price in embodiment. It is a figure which shows the example of a setting of the price in embodiment. It is a figure which shows the example of a transaction in embodiment. It is a figure which shows the example of a transaction in embodiment. It is a figure which shows the example of establishment of a contract in embodiment.
- the power adjustment device 10 described below deals with a transaction device 40 as to whether or not to supply power to the power system 30 from the power supply facility 20 included in the customer 1. Perform according to conditions.
- Transaction device 40 is constructed by, for example, a web server or a cloud computer system operated by an electric power company.
- the power supply facility 20 includes a power generation facility 21 and a power storage facility 22 including a storage battery.
- the power adjustment apparatus 10 includes a first prediction unit 11, a second prediction unit 12, a power purchase cost calculation unit 13, a control unit 15, and a determination unit 16.
- the power generation facility 21 can be selected from a solar power generation facility, a wind power generation facility, a fuel cell, and the like.
- the power generation facility 21 is the solar power generation facility 211 .
- the power in the transaction condition is represented by either an instantaneous value of power (amount of power per unit time) or a power amount during a period in which power supply is required.
- the first prediction unit 11 predicts the first power generated by the power generation facility 21 during the target period.
- the 2nd prediction part 12 predicts the 2nd electric power which electric load 2 consumes in the object period in consumer 1.
- the power purchase cost calculation unit 13 determines that the customer 1 A cost to be paid for receiving the third power that is insufficient from 30 is calculated.
- the control unit 15 selects a first state in which power is supplied from the power storage facility 22 to the power system 30 and a second state in which power is supplied from the power storage facility 22 to the electric load 2.
- the determination unit 16 includes a first amount that can be received by the customer 1 according to the transaction conditions when the first state is selected, and a second amount that is the cost calculated by the power purchase cost calculation unit 13. And compare.
- the control unit 15 selects the second state so that the third power is satisfied when the first amount is equal to or less than the second amount in the comparison result of the determination unit 16. In other words, when the determination unit 16 determines that the first amount is equal to or less than the second amount, the control unit 15 controls the power supply facility 20 so that the power supply facility 20 operates in the second state. To do.
- the power adjustment device has an advantage of improving profits provided to a consumer when a consumer having a power supply facility such as a storage battery supplies power to the power system.
- the power adjustment device 10 bids on the transaction device 40, and determines the determination result as to whether or not the contract has been established. It is preferable to further include a transaction participation unit 17 for receiving from.
- the control unit 15 selects the first state when the contract is established.
- the storage facility 22 is charged so that the remaining capacity exceeds the third power by the start of the target period in which the first power is predicted to be insufficient with respect to the second power. Is preferred.
- the first prediction unit 11 receives the power generated by the power generation facility 21 from the first weighing device 311, and the target period based on the transition of the power measured by the first weighing device 311 over time. It is preferable to predict the power generated by the power generation facility 21 in FIG.
- the second predicting unit 12 receives the power consumed by the electrical load 2 in the customer 1 from the second weighing device 312, and changes with the passage of time of the power metered by the second weighing device 312. It is preferable to predict the power consumed by the electrical load 2 during the target period.
- the power generation facility 21 is a solar power generation facility 211
- the first prediction unit 11 preferably includes a weather acquisition unit 111, a first history storage unit 112, and a first classification unit 113.
- the weather acquisition unit 111 acquires information for predicting the weather.
- storage part 112 matches and memorize
- the first classification unit 113 classifies the power change pattern based on the transition of the power stored in the first history storage unit 112.
- the first predicting unit 11 collates the transition of the power received from the first weighing device 311 with the passage of time with the change pattern classified by the first classifying unit 113, so that the photovoltaic power generation facility in the target period The power generated by 211 is predicted.
- the second prediction unit 12 includes a second history storage unit 121 and a second classification unit 122.
- the second history storage unit 121 stores the transition of the power consumed by the electrical load 2 over time.
- the second classification unit 122 classifies the power change pattern based on the transition of the power stored in the second history storage unit 121.
- the second prediction unit 12 collates the transition of the power received from the second weighing device 312 with the passage of time with the change pattern classified by the second classification unit 122, whereby the electric load 2 is detected in the target period. Predict power consumption.
- the power adjustment method described below performs a transaction as to whether or not to supply power to the power system 30 from the power supply facility 20 included in the customer 1 with the transaction device 40 according to the transaction conditions.
- the first prediction unit 11 predicts the first power generated by the power generation facility 21 in the target period, and the second power consumed by the electric load 2 in the target period in the consumer 1 is the first power.
- 2 prediction units 12 predict. Furthermore, when the first power predicted by the first prediction unit 11 is insufficient with respect to the second power predicted by the second prediction unit 12, the customer 1 is insufficient from the power system 30.
- the power purchase cost calculation unit 13 calculates a cost to be paid for receiving the third power.
- the power purchase cost calculation unit 13 calculates the first amount that can be received by the customer 1 according to the transaction conditions.
- the determination unit 16 compares the second amount that is an expense. In the comparison result of the determination unit 16, when the first amount is equal to or less than the second amount, the control unit 15 sets the second state in which the electrical load 2 is fed from the power storage facility 22 so as to satisfy the third power. Select.
- the program described below causes a computer to function as the power adjustment device 10.
- This program is provided through a telecommunication line NT such as the Internet, or is provided by a computer-readable storage medium.
- the consumer 1 that receives power from the power system 30 includes the power supply facility 20, and the power supplied from the power supply facility 20 is supplied to the power system 30, and the demand It is assumed that the second state supplied to the electrical load 2 of the house 1 is selected.
- the power supply facility 20 is assumed to have a configuration including a solar power generation facility 211 as the power generation facility 21 and a power storage facility 22 including a storage battery.
- the solar power generation facility 211 generates power using sunlight energy, and the generated power varies depending on the weather including the amount of solar radiation and the outside temperature.
- the power storage facility 22 charges the storage battery using at least one of the power received from the power system 30 and the power generated by the solar power generation facility 211.
- the solar power generation equipment 211 and the power storage equipment 22 include a power converter (not shown) that converts DC power into AC power equivalent to AC power received by the customer 1 from the power system 30.
- the power storage facility 22 may have a configuration including a large-capacity capacitor instead of a storage battery, a configuration in which electric power is converted into other energy and stored.
- Customer 1 is assumed to be a hospital, hotel, factory, etc. Further, even when the customer 1 is an apartment house, an office building, a commercial building, or the like and a plurality of customers 1 exist in the building, The techniques described can be applied. For example, a distribution board may be arranged for each consumer, and a main distribution board that distributes power for the entire building may be arranged in an administrator room or an electrical room. Alternatively, when high-voltage collective power reception is performed in a building, a watt-hour meter for performing high-voltage collective power reception is installed as the metering device 31, so that the power received by the entire building can be measured.
- the output power of the solar power generation equipment 211 is 100 kW or more, and the power capacity of the power storage equipment 22 is 100 kWh or more.
- the power capacity of the power storage facility 22 may exceed 1000 kWh.
- the power supply facility 20 is shared in an area where a plurality of detached houses are gathered, it is possible to install a large-capacity power supply facility 20.
- an electric power company that supplies power to the consumers 1 through the power system 30 can treat the consumers 1 in the set as one consumer 1 at a time.
- a service provider that supervises a plurality of consumers 1.
- This type of service provider provides a service to a set of a plurality of consumers 1 on behalf of an electric power company that performs a power generation business.
- Such a service provider may be a demand response provider including a power aggregator, for example.
- electric power companies can be selected from wholesalers, specified electric power companies, specific electric power companies, etc.
- the service provider who purchases and sells it to the consumer 1 may be used.
- the output power of the solar power generation equipment 211 is 1 kW to 5 kW
- the power capacity of the power storage equipment 22 is about 1 kW to 10 kWh. Even in such a small-scale photovoltaic power generation equipment 211 and power storage equipment 22, the technology described below can be adopted when power trading is possible.
- the customer 1 includes not only the electric load 2 that consumes power but also the solar power generation equipment 211 and the power storage equipment 22 that enable power supply to the power system 30 as described above.
- the consumer also includes a distribution board 32, to which the power system 30, the photovoltaic power generation equipment 211, the power storage equipment 22, and the electric load 2 are connected.
- the distribution board 32 forms a main circuit (not shown) that receives power from the power system 30 and a branch circuit (not shown) branched from the main circuit into a plurality of systems. That is, the distribution board 32 forms a wiring network for supplying the electric power received from the electric power system 30 to the electric loads 2 of a plurality of systems in the building of the customer 1.
- the solar power generation equipment 211 supplies the generated power to the electric load 2.
- the power generated by the photovoltaic power generation equipment 211 exceeds the power consumed by the electric load 2 and surplus power is generated, the storage battery of the power storage equipment 22 is charged with the surplus power or the power system 30 is surplus. Supply power.
- the solar power generation facility 211 can supply the surplus power to the power system 30 when surplus power is generated.
- the surplus power is charged to the power storage facility 22.
- surplus power is supplied to the power system 30 when the remaining capacity of the power storage facility 22 has reached a predetermined amount of power.
- the power generation amount of the solar power generation equipment 211 depends on the weather including the amount of solar radiation and the outside temperature, as long as the above-described rules are followed, surplus power is charged in the power storage equipment 22 or supplied to the power system 30. .
- the surplus power of the solar power generation equipment 211 cannot be used for charging the power storage equipment 22 and cannot be supplied to the power system 30, the power from the solar power generation equipment 211 to the power system 30 Supply is stopped.
- control unit 15 performs control of the charging period and discharging period of the storage battery provided in the power storage facility 22 and control of the amount of electric power stored in the storage battery.
- the selection between the first state in which power is supplied (reverse power flow) from the power storage facility 22 to the power system 30 and the second state in which power is supplied from the power storage facility 22 to the electrical load 2 is built in the distribution board 32. This is performed by the control unit 15 switching a switch (not shown).
- the first state is selected mainly for the purpose of causing the power grid 30 to reversely flow power in response to a request from an electric power company or the like.
- the consumer 1 can receive a price commensurate with the amount of power that has flowed backward from the power storage facility 22 to the power system 30 from the electric power company or service provider.
- the second state is selected mainly for the purpose of reducing the amount of power received from the power system 30. That is, when the amount of power generated by the photovoltaic power generation facility 211 is insufficient with respect to the amount of power consumed by the electrical load 2, the insufficient amount of power is supplied from the power storage facility 22 to the electrical load 2. It becomes possible to supply electric power to the electric load 2 without receiving power from the system 30.
- a limit value is set for the amount of power received from the power system 30. In this case, power may be supplied from the power storage facility 22 to the electric load 2 so that the amount of power received from the power system 30 does not exceed the limit value.
- the distribution board 32 is provided with a measuring device 31 for measuring the amount of electric power that has passed through the main circuit and the branch circuits of a plurality of systems.
- the metering device 31 includes a first metering device 311 that meters the amount of power generated by the photovoltaic power generation facility 211 and a second metering device 312 that measures the amount of power consumed by the electrical load 2.
- the value of the electric energy that has passed through each branch circuit may be a value measured by a measurement unit (not shown) provided separately from the distribution board 32.
- the weighing device 31 calculates the amount of power using a current sensor (not shown) that measures a current passing through the circuit of interest, a voltage value between lines of the circuit of interest, and a current value measured by the current sensor. It is desirable that the electronic watt hour meter includes a calculation unit (not shown). In addition, it is not essential for the measuring device 31 of this embodiment to measure the amount of electric power that has passed for each branch circuit, and at least the amount of electric power generated by the photovoltaic power generation equipment 211 and the total amount of electric power consumed by the electric load 2. We just need to be able to weigh.
- the amount of power generated by the photovoltaic power generation equipment 211 and the amount of power consumed by the electric load 2 change every moment, the amount of power consumed by the electric load 2 only by the amount of power generated by the photovoltaic power generation equipment 211. There is a period during which it cannot be satisfied. For example, the solar power generation facility 211 does not generate power at night, and the amount of power generated by the solar power generation facility 211 is smaller when it is cloudy than when it is fine.
- the amount of power generated by the solar power generation equipment 211 per unit time gradually increases from the sunrise, reaches a maximum during the day, and then decreases toward sunset.
- the amount of power consumed by the electric load 2 per unit time varies depending on the usage state of the electric load 2 in the customer 1, and the amount of power per unit time is maximized in the morning and at night, or even during the daytime. There may be cases where it becomes maximal.
- one day is divided into relatively short periods (select from 10 minutes, 30 minutes, 1 hour, etc.), each divided period is determined as a target period, and the amount of power is compared for each target period.
- a relatively short period is defined as a target period, and a plurality of target periods are set in the weighing device 31 over an arbitrary period of one day.
- the weighing device 31 compares the amount of power for each target period.
- the target period does not need to be set for the entire period of one day (that is, 24 hours), and may be set for a limited period such as a period from sunrise to sunset in one day. For example, when sunrise is 6:00 and sunset is 18:00 and a target period is set every 30 minutes, the target period per day is 24 periods.
- the target period is set in order to compare the amount of power generated by the photovoltaic power generation equipment 211 and the amount of power consumed by the electric load 2. However, even if the amount of power measured by the measuring device 31 during the target period is determined as excess or deficiency, the obtained excess or deficiency is a past event, and it is determined whether power should be supplied from the power storage facility 22 in the future. I can't.
- the 1st prediction part 11 which predicts the electric energy (1st electric energy) which the solar power generation equipment 211 produces
- the first prediction unit 11 and the second prediction unit 12 predict the amount of power in the same target period.
- the power must be received from the power storage device 22 or supplied from the power storage facility 22.
- the third electric energy is an absolute value of a value obtained by subtracting the first electric energy from the second electric energy.
- the power adjustment device 10 includes a power purchase cost calculation unit 13 that calculates a cost to be paid when the third power amount is received from the power system 30.
- the power purchase cost calculation unit 13 determines that, in any target period, when the amount of power scheduled to be generated by the solar power generation facility 211 is insufficient with respect to the amount of power scheduled to be consumed by the electric load 2, The cost when receiving the insufficient amount of power from the power system 30 is calculated.
- the cost calculated by the power purchase cost calculation unit 13 is a cost that the customer 1 pays when receiving a third amount of power from the power system 30.
- this cost is referred to as a second cost. Call the amount of money. That is, when the power purchase cost calculation unit 13 determines that the first power amount is insufficient with respect to the second power amount, the power purchase cost calculation unit 13 calculates, as the second amount, the cost for purchasing the third power amount that is insufficient. To do.
- the power supply facility 20 provided in the consumer 1 can supply power to the power system 30 and can receive compensation for the reverse power flow from the electric power company.
- Consideration obtained by reverse power flow may be set to a constant value, but here, it is assumed that the value obtained by reverse power flow is determined according to the relationship between power demand and supply.
- transaction power amount a required power amount
- unit price a consideration for a unit amount of power
- power supply Information about the period (hereinafter referred to as “target period”) is obtained from the transaction apparatus 40. Based on this information, power is bought and sold. These pieces of information are registered in the transaction apparatus 40 operated by the electric power company. Information registered in the transaction apparatus 40 (hereinafter referred to as “transaction conditions”) is updated every moment. It is desirable that the transaction conditions are updated by the day before the target period starts or by the morning of the day when the target period starts. Moreover, the transaction apparatus 40 may permit registration of transaction conditions immediately before the start of the target period when the demand for power is urgent. In addition, it is desirable for the electric power company which manages the transaction apparatus 40 to be a service provider which provides the service regarding electric power transaction.
- the power adjustment device 10 includes an information acquisition unit 14 that communicates with the transaction device 40 through an electric communication line NT such as the Internet.
- the information acquisition unit 14 acquires transaction conditions including the transaction power amount, the unit price, and the target period from the transaction apparatus 40. Since the transaction conditions registered in the transaction apparatus 40 are updated every moment, the information acquisition unit 14 monitors changes in the transaction conditions and acquires necessary transaction conditions.
- the demand House 1 costs money.
- the third amount of power is supplied from the power storage facility 22 to the electrical load 2
- the determination unit 16 provides the consideration (revenue) obtained when the third power amount is supplied from the power storage facility 22 to the power system 30 and the cost for receiving the third power amount from the power system 30. And the control unit 15 is controlled so that the loss is less for the consumer 1. That is, the power adjustment device 10 includes a control unit 15 that selects a first state in which the power of the power storage facility 22 is supplied to the power system 30 and a second state in which the electric load 2 is fed, and the first state and the first state. And a determination unit 16 for determining loss or gain by selection of the second state.
- the determination unit 16 is configured to receive revenue (first amount) that can be received when the control unit 15 selects the first state and the power storage facility 22 supplies a third amount of power to the power system 30, demand The cost (second amount) to be paid when the house 1 receives the third power amount from the power system 30 is compared.
- the control unit 15 selects the second state in which the determination unit 16 supplies power to the electrical load 2 from the power storage facility 22 when the first amount is equal to or less than the second amount. In short, the control unit 15 selects the second state in which the first amount expected when the first state in which power is supplied from the power storage facility 22 to the power system 30 is received from the power system 30 is selected. If it is less than or equal to the second amount to pay, the second state is selected.
- the determination unit 16 compares the profit (first amount) when selling the third power amount with the cost (second amount) when buying the third power amount. As a result of the comparison, if the cost is higher than the profit, a monetary loss will occur. Therefore, the determination unit 16 uses the power of the power storage facility 22 to compensate for the shortage of power. 15 is selected (the second state is selected).
- the transaction participation unit 17 applies to the transaction apparatus 40 through the telecommunication line NT. In other words, when it is expected that it would be more profitable for the customer 1 to supply the third power amount from the power storage facility 22 to the power grid 30 under the transaction conditions that the transaction apparatus 40 is recruiting, the transaction participation unit 17 bids for the transaction.
- the transaction apparatus 40 When there is an application for the transaction conditions, the transaction apparatus 40 establishes a contract with the customer 1 including the storage facility 22 when there is one storage facility 22 corresponding to the application. On the other hand, when there are a plurality of applications for the transaction conditions, the transaction apparatus 40 negotiates the price with the transaction participation unit 17 and, when the price becomes a reasonable amount, establishes a contract for the corresponding transaction condition. The transaction device 40 notifies the transaction participation unit 17 of the determination result as to whether or not the contract has been established through the telecommunication line NT.
- the transaction participation unit 17 receives a determination result as to whether or not the contract has been established from the transaction apparatus 40, and when the agreement is established, selects the first state in which power is supplied from the power storage facility 22 to the power system 30.
- the control unit 15 is instructed as follows. In this case, the consumer 1 can receive compensation from the electric power supplier by supplying the power of the third power amount from the power storage facility 22 to the power system 30. On the other hand, if the contract is not established, the transaction participation unit 17 instructs the control unit 15 to select the second state in which the electric power of the power storage facility 22 is supplied to the electric load 2.
- the first prediction unit 11 predicts the amount of power that the photovoltaic power generation equipment 211 generates during the target period, and the amount of power that the electric load 2 consumes during the target period.
- Two prediction units 12 are predicting.
- the first prediction unit 11 and the second prediction unit 12 predict the amount of power in the target period using the transition of the actually measured amount of power over time.
- a first metering device 311 for metering the amount of power generated by the solar power generation equipment 211 and a second metering device 312 for metering the amount of power consumed by the electric load 2 are provided.
- the first metering device 311 and the second metering device 312 meter the amount of power at a relatively short time interval (for example, selected from 30 seconds, 1 minute, 5 minutes, etc.).
- An average value per second of this electric energy may be regarded as instantaneous electric power.
- the first prediction unit 11 receives the transition of power from the first weighing device 311 and predicts the amount of power generated by the photovoltaic power generation facility 211 in the target period.
- the second prediction unit 12 receives the transition of power from the second weighing device 312 and predicts the amount of power consumed by the electrical load 2 in the target period.
- the first prediction unit 11 and the second prediction unit 12 are simplified such as linear prediction.
- the amount of power consumed in the target period can be estimated using a simple prediction technique.
- the first prediction unit 11 and the second prediction unit 12 use the transition of the amount of power over time instead of the linear prediction. It is desirable to predict the amount of power in the target period.
- the first prediction unit 11 associates the weather acquisition unit 111 that acquires information for predicting the weather, the information acquired by the weather acquisition unit 111, and the transition of the power generated by the solar power generation facility 211 with the passage of time. And a first history storage unit 112 for storing. Furthermore, the first prediction unit 11 includes a first classification unit 113 that classifies the power change pattern based on the transition of the power stored in the first history storage unit 112.
- the weather acquisition unit 111 acquires information for predicting the weather through the telecommunication line NT such as the Internet.
- the weather acquisition unit 111 may acquire not only the predicted information but also the past actual weather information.
- the weather information includes at least information on the amount of solar radiation and the outside air temperature.
- the first history storage unit 112 stores the predicted weather information in association with the power and time zone history measured by the first weighing device 311. Based on the information stored in the first history storage unit 112, it is possible to extract the relationship between the transition of the electric power actually generated by the photovoltaic power generation facility 211 over time and the predicted weather information.
- the first classification unit 113 uses the information stored in the first history storage unit 112 to classify the power change pattern for each daily time zone corresponding to the target period. For example, the relationship between the power change tendency and the weather information is classified for each time zone such as 11:30 to 12:00 and 12:00 to 12:30.
- the first prediction unit 11 collates the transition of the power received from the first weighing device 311 with the passage of time with the change pattern classified by the first classification unit 113, and the photovoltaic power generation equipment 211 in the target period. Predicts the power that will be generated.
- the second prediction unit 12 is based on a second history storage unit 121 that stores a transition of the power consumed by the electric load 2 with time, and a transition of the power stored in the second history storage unit 121.
- a second classification unit 122 that classifies the power change pattern is provided. That is, the first prediction unit 11 includes a weather acquisition unit 111 that acquires information on the predicted weather, whereas the second prediction unit 12 is different in that it does not use information related to the weather.
- the second history storage unit 121 stores the power and time zone history measured by the second weighing device 312 in association with each other. Further, the second classification unit 122 classifies the power change pattern for each daily time zone corresponding to the target period by using the information stored in the second history storage unit 121.
- the second prediction unit 12 collates the transition of the power received from the second weighing device 312 with the passage of time and the change pattern classified by the second classification unit 122, and the electric load 2 is consumed in the target period. Predict the amount of power to be used.
- the control unit 15 selects the first state in which power is supplied from the power storage facility 22 to the power system 30, it must be ensured that the third power amount can be supplied from the power storage facility 22. Therefore, the power storage facility 22 has the remaining capacity of the power storage facility 22 exceeding the third power amount by the start of the target period in which the first power amount is predicted to be insufficient with respect to the second power amount. It is desirable to be charged. That is, the power supply facility 20 has the remaining capacity of the storage battery provided in the power storage facility 22 before the start of the target period in which the amount of power consumed by the electrical load 2 cannot be satisfied by the amount of power generated by the solar power generation facility 211. Charges the power storage facility 22 so as to exceed the third power amount.
- the power supply facility 20 estimates the necessary amount of power from the amount of power that is deficient in the entire continuous target period (that is, the total amount of power that is deficient in each period of the continuous target period) to the power storage facility 22. Determine the amount of power to store.
- the power generated by the photovoltaic power generation facility 211 when storing the power in the power storage facility 22, there is no cost associated with charging, but the power received from the power system 30 is stored in the power storage facility 22. It is also necessary to consider the price for the amount of power received.
- the power supply facility 20 also stores the power in the power storage facility 22 using the power received from the power system 30.
- the power amount received from the power system 30 is included in the third power amount, and the power purchase cost calculation unit 13 calculates the cost.
- the cost calculated by the power purchase cost calculation unit 13 is calculated in consideration of the power purchase unit price at the time of receiving power. Even if the power purchase cost calculation unit 13 stores the power received from the power system 30 in the power storage facility 22, it is not included in the third power amount, and the consideration for the received power amount is ignored. Rules may be established.
- the transaction apparatus 40 includes an information storage unit (transaction table) configured as shown in FIG. 2 in order to register transaction conditions.
- the information storage unit stores transaction conditions obtained by combining three types of data: a target period, a unit price, and a transaction power amount.
- the unit price and the amount of transaction power are associated and registered as a pair in the information storage unit, and a plurality of pairs can be registered for each target period.
- the information storage unit includes a plurality (for example, 15 or 30) of storage areas for registering a plurality of pairs of unit price and transaction power amount for each target period. Note that the storage area does not have to be filled with the target period in which the pair of unit price and transaction energy is registered, even if there is a target period in which the pair of unit price and transaction energy is not registered. Good.
- a target period in units of 30 minutes is registered. In the illustrated example, one day is divided into 48 target periods. Moreover, in FIG. 3, the upper stage shows a unit price and the lower stage shows the amount of transaction power. The amount of transaction power represents 1000 kWh per hour, and the unit price represents the price per kWh in units of yen. Therefore, the lower value is a half value for 30 minutes. Participants who wish to trade in power register the amount of power and unit price in the information storage unit.
- a participant who wants to purchase power registers the necessary power amount and unit price, and a participant who wants to sell power registers the amount of power that can be supplied and the unit price.
- the transaction power amount becomes a positive value in the case of purchase and a negative value in the case of sale.
- a numerical value with “ ⁇ ⁇ ” added represents a negative value. That is, it indicates that reverse flow is possible during the target period to which “ ⁇ ” is added.
- the transaction apparatus 40 includes an information storage unit allocated to each participant in the power transaction.
- the participants are A, B, and C.
- participant A and participant B want to buy because the transaction power amount is a positive value
- participant C sells because the transaction energy amount is a negative value. I hope.
- the target period is shown only for 30 minutes from 14:00 to 14:30.
- the amount of transaction power set in the information storage unit means, for the buyer of power, the amount of power purchased when the price is equal to or less than the pair price, and for the power seller, sells when the price is equal to or higher than the price of the pair. It means electric energy.
- the buyers of power are the participant A and the participant B, so the value of the information storage unit of the participant A and the information storage unit of the participant B is used for the relationship between the transaction power amount and the unit price. Determined.
- the relationship between the transaction power amount and the unit price of the participant A and the participant B is as shown in FIG.
- the amount of transaction power that can be purchased per hour is 28000 kWh.
- the amount of transaction power that can be purchased per hour is 22000 kWh.
- the amount of transaction power is 13000 kWh.
- the transaction power amount is 7000 kWh. If the unit price is over 8.50 yen and under 9.00 yen, it is 5000 kWh. If the unit price exceeds 9.00 yen, the purchase of power will be abandoned.
- the participant C who is a seller can sell it per hour as long as the unit price is over 7.00 yen and under 7.20 yen.
- Transaction power is up to 7000 kWh.
- the unit price exceeds 7.20 yen and below 9.00 yen the transaction power amount is up to 12000 kWh
- the unit price exceeds 9.00 yen the transaction power amount is up to 25000 kWh.
- the participant C does not sell power.
- FIG. 6 shows the relationship between the unit price with respect to the amount of transaction power purchased by the buyers A and B and the unit price with respect to the amount of transaction power sold by the participant C as a seller.
- the graph representing the buyer is referred to as a demand line L1
- the graph representing the seller is referred to as a supply line L2.
- the point where the amount of transaction power requested by the buyer matches the amount of transaction power that can be supplied by the seller is represented by the intersection P1 between the demand line L1 and the supply line L2. That is, in the relationship shown in FIG. 6, the amount of transaction power for which the contract is established is 12000 kWh per hour, and the unit price per kWh at this time is 8.10 yen.
- the above-mentioned transaction example is an example, and it is assumed that there are actually a larger number of participants. Therefore, there is a possibility that the number of combinations that make a promise is enormous. Therefore, it is desirable to extract an appropriate combination by an algorithm that can obtain a relatively good solution in a finite time, such as a stochastic algorithm or a genetic algorithm.
- the demand line L1 and the supply line L2 are both expressed as discontinuous lines by a combination of straight lines, but may be expressed as smoothly continuous curves. Further, the relationship between the demand line L1 and the supply line L2 is variously set according to the environmental conditions of the buyer and the seller.
- the environmental conditions here mean the financial power of the buyer or seller, the urgency of power demand, and the like.
- the case where the amount of transaction power is relatively large is described.
- a customer including a small-scale power storage facility 22 of about 5 kWh participates in a power transaction, such as a detached house. It is desirable for the power aggregator to handle the power of a plurality of consumers at once.
- the power to be used for the shortage is supplied from the small-scale power storage facility 22. You may do it.
- the first prediction unit 11, the second prediction unit 12, the power purchase cost calculation unit 13, the information acquisition unit 14, the control unit 15, the determination unit 16, and the transaction participation unit 17 are connected to the customer 1. It is possible to provide. However, the configuration excluding the control unit 15 can be provided separately from the customer 1. Alternatively, the power purchase cost calculation unit 13, the information acquisition unit 14, and the transaction participation unit 17 can be provided separately from the customer 1.
- the configuration provided separately from the customer 1 may be provided in a web server or a cloud computer system. In this case, a communication interface unit is provided in order to transmit information between a configuration provided in the consumer 1 and a configuration provided separately from the customer 1.
- a participant who desires to trade electric power registers the amount of electric power and the unit price in the information storage unit of the transaction apparatus 40, but registers the power value and the unit price in the information storage unit. It may be configured.
- the power value registered in the information storage unit represents the power that can be supplied per unit time from the power supply facility 20 in the target period.
- the power storage facility 22 is deferred to a consumer.
- the storage battery of the power storage facility 22 may be a storage battery mounted on an electric vehicle.
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Economics (AREA)
- Accounting & Taxation (AREA)
- Finance (AREA)
- Development Economics (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Marketing (AREA)
- Human Resources & Organizations (AREA)
- Entrepreneurship & Innovation (AREA)
- Power Engineering (AREA)
- Health & Medical Sciences (AREA)
- Tourism & Hospitality (AREA)
- Game Theory and Decision Science (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Technology Law (AREA)
- Water Supply & Treatment (AREA)
- Public Health (AREA)
- Data Mining & Analysis (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- Charge And Discharge Circuits For Batteries Or The Like (AREA)
Abstract
蓄電設備を備える需要家が電力系統に電力を供給した場合の利益を向上させる。第1の予測部(11)は、太陽光発電設備(211)が対象期間に発電する第1の電力を予測する。第2の予測部(12)は、電気負荷(2)が対象期間に消費する第2の電力を予測する。買電費用算定部(13)は、第1の電力が第2の電力に対して不足する場合に電力系統(30)から不足分の電力を受電する費用を算定する。判断部(16)は、蓄電設備(22)から電力系統(30)に電力を供給する場合に、取引条件に応じて需要家(1)が受取可能な金額と、買電費用算定部(13)が算定した費用とを比較し、受取可能な金額が費用以下であるときに、制御部(15)は蓄電設備(22)から電気負荷(2)に電力を供給する。
Description
本発明は一般に、電力調整装置、この電力調整装置の電力調整方法、電力調整装置を実現するプログラムに関する。より詳細には、需要家に設置された電力供給設備から電力系統に電力を供給する電力調整装置、この電力調整装置の電力調整方法、電力調整装置を実現するプログラムに関する。
従来から、蓄電池の電力を、電力系統と電気負荷との双方に供給可能とする技術が知られている(例えば、日本国特許出願公開番号2000-224769(以下「文献1」という))。文献1には、深夜料金で蓄電池を充電し、充電した電力を昼間料金で電力会社に販売することによって、差額に相当する収益を需要家が獲得可能になることが記載されている。また、需要家が蓄電池からの電力を電力系統に供給することによって、負荷平準化、急峻需要への対応、配電線電力の品質向上などのメリットが得られることが記載されている。さらに、電力会社がメリットの一部をインセンティブとして需要家に還元してもよいことが記載されている。
文献1には、需要家に設けられた蓄電池の充電と放電とを行うことによって、需要家が電力会社にメリットをもたらすことが記載されている。しかしながら、文献1に記載された需要家にとってのメリットは、充電時と放電時との電気料金の差額と、電力会社が得たメリットに対するインセンティブとであり、需要家がより積極的に利益を得る構成は想定されていない。
本発明は、蓄電設備を備える需要家が電力系統に電力を供給した場合の利益を向上させる電力調整装置を提供することを目的とする。さらに、本発明は、この電力調整装置の電力調整方法、電力調整装置を実現するプログラムを提供することを目的とする。
本発明に係る電力調整装置は、需要家が備える電力供給設備から電力系統に電力を供給するか否かの取引を、取引装置との間で取引条件に従って行う電力調整装置である。前記電力供給設備は、発電設備と、蓄電池を備えた蓄電設備とを含んでいる。前記電力調整装置は、第1の予測部と、第2の予測部と、買電費用算定部と、制御部と、判断部とを備えている。前記第1の予測部は、前記発電設備が対象期間に発電する第1の電力を予測するように構成されている。前記第2の予測部は、前記需要家において電気負荷が前記対象期間に消費する第2の電力を予測するように構成されている。前記買電費用算定部は、前記第1の予測部が予測した前記第1の電力が、前記第2の予測部が予測した前記第2の電力に対して不足する場合に、前記需要家が前記電力系統から不足分である第3の電力を受電することに対して支払う費用を算定するように構成されている。前記制御部は、前記蓄電設備から前記電力系統に電力を供給する第1の状態と前記蓄電設備から前記電気負荷に給電する第2の状態とを選択するように構成されている。前記判断部は、前記第1の状態が選択された場合に前記取引条件に応じて前記需要家が受取可能である第1の金額と、前記買電費用算定部が算定した費用である第2の金額とを比較するように構成されている。前記制御部は、前記判断部の比較結果において、前記第1の金額が前記第2の金額以下であるときに、前記第2の状態を選択するように構成されていることを特徴とする。
望ましくは、この電力調整装置は、取引参加部をさらに備えている。前記取引参加部は、前記判断部の比較結果において、前記第1の金額が前記第2の金額を超えるときに、前記取引装置に入札を行い、約定が成立したか否かの判断結果を前記取引装置から受け取るように構成されている。前記制御部は、前記約定が成立すると前記第1の状態を選択するように構成されている。
望ましくは、この電力調整装置において、前記蓄電設備は、前記第1の電力が前記第2の電力に対して不足することが予測される前記対象期間が開始されるまでに、残容量が前記第3の電力を超えているように充電されるように構成されている。
望ましくは、この電力調整装置において、前記第1の予測部は、前記発電設備が発電している電力を第1の計量装置から受け取り、前記第1の計量装置が計量している電力の時間経過に伴う推移に基づいて前記対象期間において前記発電設備が発電する電力を予測するように構成されている。前記第2の予測部は、前記需要家において前記電気負荷が消費している電力を第2の計量装置から受け取り、前記第2の計量装置が計量している電力の時間経過に伴う推移に基づいて前記対象期間において前記電気負荷が消費する電力を予測するように構成されている。
望ましくは、この電力調整装置において、前記発電設備は太陽光発電設備である。前記第1の予測部は、天候取得部と、第1の履歴記憶部と、第1の分類部とを備えている。天候取得部は、天候を予測する情報を取得するように構成されている。前記第1の履歴記憶部は、前記天候取得部が取得した前記情報と前記太陽光発電設備が発電する電力の時間経過に伴う推移とを対応付けて記憶するように構成されている。前記第1の分類部は、前記第1の履歴記憶部に記憶された電力の推移に基づいて電力の変化パターンを分類するように構成されている。前記第1の予測部は、前記第1の計量装置から受け取った電力の時間経過に伴う推移と前記第1の分類部が分類した変化パターンとを照合することにより、前記対象期間において前記太陽光発電設備が発電する電力を予測するように構成されている。前記第2の予測部は、第2の履歴記憶部と、第2の分類部とを備えている。前記第2の履歴記憶部は、前記電気負荷が消費する電力の時間経過に伴う推移を記憶するように構成されている。前記第2の分類部は、前記第2の履歴記憶部に記憶された電力の推移に基づいて電力の変化パターンを分類するように構成されている。前記第2の予測部は、前記第2の計量装置から受け取った電力の時間経過に伴う推移と前記第2の分類部が分類した変化パターンとを照合することにより、前記対象期間において前記電気負荷が消費する電力を予測するように構成されている。
本発明に係る電力調整方法は、需要家が備える電力供給設備から電力系統に電力を供給するか否かの取引を、取引装置との間で取引条件に従って行う電力調整方法である。前記電力供給設備は、発電設備と、蓄電池を備えた蓄電設備とを含んでいる。この電力調整方法において、前記発電設備が対象期間に発電する第1の電力を第1の予測部が予測する。前記需要家において電気負荷が前記対象期間に消費する第2の電力を第2の予測部が予測する。前記第1の予測部が予測した前記第1の電力が、前記第2の予測部が予測した前記第2の電力に対して不足する場合に、前記需要家が前記電力系統から不足分である第3の電力を受電することに対して支払う費用を買電費用算定部が算定する。前記蓄電設備から前記電力系統に電力を供給する第1の状態が選択された場合に前記取引条件に応じて前記需要家が受取可能である第1の金額と、前記買電費用算定部が算定した費用である第2の金額とを判断部が比較する。前記判断部の比較結果において、前記第1の金額が前記第2の金額以下であるときに、前記蓄電設備から前記電気負荷に給電する第2の状態を制御部が選択するように構成されている。
本発明に係るプログラムは、コンピュータを、上述したいずれかの電力調整装置として機能させる。本発明は、プログラムに限らず、コンピュータ読み取り可能な記録媒体であってもよい。
図1に示すように、以下に説明する電力調整装置10は、需要家1が備える電力供給設備20から電力系統30に電力を供給するか否かの取引を、取引装置40との間で取引条件に従って行う。取引装置40は、たとえば、電気事業者が運営するウェブサーバあるいはクラウドコンピュータシステムにより構築される。電力供給設備20は、発電設備21と、蓄電池を備えた蓄電設備22とを含んでいる。電力調整装置10は、第1の予測部11と第2の予測部12と買電費用算定部13と制御部15と判断部16とを備える。発電設備21は、太陽光発電設備、風力発電設備、燃料電池などから選択可能である。ただし、以下に説明する実施形態では、発電設備21が太陽光発電設備211である場合を想定して説明する。また、取引条件における電力は、電力の瞬時値(単位時間の電力量)と、電力の供給が要求される期間における電力量とのいずれかで表される。
第1の予測部11は、発電設備21が対象期間に発電する第1の電力を予測する。第2の予測部12は、需要家1において電気負荷2が対象期間に消費する第2の電力を予測する。買電費用算定部13は、第1の予測部11が予測した第1の電力が、第2の予測部12が予測した第2の電力に対して不足する場合に、需要家1が電力系統30から不足分である第3の電力を受電することに対して支払う費用を算定する。
制御部15は、蓄電設備22から電力系統30に電力を供給する第1の状態と、蓄電設備22から電気負荷2に給電する第2の状態とを選択する。判断部16は、第1の状態が選択された場合に取引条件に応じて需要家1が受取可能である第1の金額と、買電費用算定部13が算定した費用である第2の金額とを比較する。制御部15は、判断部16の比較結果において、第1の金額が第2の金額以下であるときに、第3の電力を充足させるように第2の状態を選択する。言い換えると、第1の金額が第2の金額以下であると判断部16が判断したときに、制御部15は、電力供給設備20が第2の状態で動作するように電力供給設備20を制御する。
本実施形態の電力調整装置では、蓄電池のような電力供給設備を備える需要家が電力系統に電力を供給した場合に、需要家にもたらされる利益を向上させるという利点を有する。
電力調整装置10は、判断部16の比較結果において、第1の金額が第2の金額を超えるときに、取引装置40に入札を行い、約定が成立したか否かの判断結果を取引装置40から受け取る取引参加部17をさらに備えることが好ましい。制御部15は、約定が成立すると第1の状態を選択する。
蓄電設備22は、第1の電力が第2の電力に対して不足することが予測される対象期間が開始されるまでに、残容量が第3の電力を超えているように充電されることが好ましい。
第1の予測部11は、発電設備21が発電している電力を第1の計量装置311から受け取り、第1の計量装置311が計量している電力の時間経過に伴う推移に基づいて対象期間において前記発電設備21が発電する電力を予測することが好ましい。第2の予測部12は、需要家1において電気負荷2が消費している電力を第2の計量装置312から受け取り、第2の計量装置312が計量している電力の時間経過に伴う推移に基づいて対象期間において電気負荷2が消費する電力を予測することが好ましい。
また、発電設備21は、太陽光発電設備211であり、第1の予測部11は、天候取得部111と第1の履歴記憶部112と第1の分類部113とを備えることが好ましい。天候取得部111は、天候を予測する情報を取得する。第1の履歴記憶部112は、天候取得部111が取得した情報と太陽光発電設備211が発電する電力の時間経過に伴う推移とを対応付けて記憶する。第1の分類部113は、第1の履歴記憶部112に記憶された電力の推移に基づいて電力の変化パターンを分類する。第1の予測部11は、第1の計量装置311から受け取った電力の時間経過に伴う推移と第1の分類部113が分類した変化パターンとを照合することにより、対象期間において太陽光発電設備211が発電する電力を予測する。
第2の予測部12は、第2の履歴記憶部121と第2の分類部122とを備える。第2の履歴記憶部121は、電気負荷2が消費する電力の時間経過に伴う推移を記憶する。第2の分類部122は、第2の履歴記憶部121に記憶された電力の推移に基づいて電力の変化パターンを分類する。第2の予測部12は、第2の計量装置312から受け取った電力の時間経過に伴う推移と第2の分類部122が分類した変化パターンとを照合することにより、対象期間において電気負荷2が消費する電力を予測する。
以下に説明する電力調整方法は、需要家1が備える電力供給設備20から電力系統30に電力を供給するか否かの取引を、取引装置40との間で取引条件に従って行う。この電力調整方法において、発電設備21が対象期間に発電する第1の電力を第1の予測部11が予測し、需要家1において電気負荷2が前記対象期間に消費する第2の電力を第2の予測部12が予測する。さらに、第1の予測部11が予測した第1の電力が、第2の予測部12が予測した第2の電力に対して不足する場合に、需要家1が電力系統30から不足分である第3の電力を受電することに対して支払う費用を買電費用算定部13が算定する。蓄電設備22から電力系統30に電力を供給する第1の状態が選択された場合に取引条件に応じて需要家1が受取可能である第1の金額と、買電費用算定部13が算定した費用である第2の金額とを判断部16が比較する。判断部16の比較結果において、第1の金額が第2の金額以下であるときに、第3の電力を充足させるように蓄電設備22から電気負荷2に給電する第2の状態を制御部15が選択する。
以下に説明するプログラムは、コンピュータを、電力調整装置10として機能させる。このプログラムは、インターネットのような電気通信回線NTを通して提供されるか、あるいは、コンピュータで読み取りが可能な記憶媒体により提供される。
以下、本実施形態について詳述する。本実施形態は、電力系統30から電力を受電する需要家1が電力供給設備20を備え、かつ電力供給設備20から供給される電力が、電力系統30に供給される第1の状態と、需要家1の電気負荷2に供給される第2の状態とが選択されることを前提とする。
電力供給設備20は、発電設備21である太陽光発電設備211と、蓄電池を備える蓄電設備22とを備える構成を想定する。太陽光発電設備211は、太陽光のエネルギーにより発電し、発電される電力は、日射量、外気温を含む天候により変動する。蓄電設備22は、電力系統30から受電した電力と太陽光発電設備211が発電した電力との少なくとも一方を用いて蓄電池を充電する。太陽光発電設備211および蓄電設備22は、直流電力を電力系統30から需要家1が受電する交流電力と等価な交流電力に変換する電力変換器(図示せず)を備える。蓄電設備22は、蓄電池に代えて、大容量のキャパシタを備える構成や、電力を他のエネルギーに変換して蓄える構成などでもよい。
需要家1は、病院、ホテル、工場などを想定する。また、需要家1は、集合住宅、オフィスビル、商業ビルなどであって複数の需要家1が建物内に存在する場合であっても、建物全体の電力をまとめて扱える場合には、以下に説明する技術を適用可能である。たとえば、個々の需要家に分電盤が配置され、建物全体の配電を行う主分電盤が管理人室あるいは電気室などに配置されていてもよい。あるいは、建物において、高圧一括受電が行われる場合、高圧一括受電を行うための電力量計が計量装置31として設置されるから、建物全体で受電した電力を計量可能である。さらに、戸建て住宅であっても、地域内の複数の需要家1を集合として一括して扱うことができる場合、それぞれの需要家1が備える蓄電設備22の電力をまとめて扱う電力アグリゲータが存在すれば以下に説明する技術を採用可能である。
需要家1が病院、ホテル、工場、集合住宅、オフィスビル、商業ビルなどであれば、太陽光発電設備211の出力電力は100kW以上になり、蓄電設備22の電力容量は100kWh以上になる。蓄電設備22の電力容量は1000kWhを超える場合もある。同様に、複数の戸建て住宅が集合している地域において、電力供給設備20が共有される場合、大容量の電力供給設備20を設置することが可能である。
複数の需要家1の集合が電力供給設備20を共用する場合、電力系統30を通して需要家1に電力を供給する電気事業者が集合内の需要家1を一括して1つの需要家1として扱えるように、複数の需要家1を統括するサービス事業者が存在することが望ましい。この種のサービス事業者は、発電事業を行う電気事業者の代行として複数の需要家1の集合に対してサービスを提供する。この種のサービス事業者は、たとえば、電力アグリゲータを含むデマンドレスポンス事業者が考えられる。
電気事業者は、一般電気事業者(いわゆる電力会社)のほか、卸供給事業者、特定電気事業者、特定規模電気事業者などから選択される電気事業者、発電事業を行わずに他社から電力を購入して需要家1に販売するサービス事業者であってもよい。
なお、需要家1が戸建て住宅の場合、太陽光発電設備211の出力電力は1kW~5kWであり、蓄電設備22の電力容量は1kW~10kWh程度である。この程度の小規模の太陽光発電設備211および蓄電設備22であっても、電力取引が可能である場合には、以下に説明する技術を採用可能である。
需要家1は、電力を消費する電気負荷2を備えるだけではなく、上述のように、電力系統30への電力供給を可能にした太陽光発電設備211と蓄電設備22とを備える。また、需要家は分電盤32を備え、分電盤32には電力系統30と太陽光発電設備211と蓄電設備22と電気負荷2とが接続される。分電盤32は、電力系統30から受電する主幹回路(図示せず)と、主幹回路から複数系統に分岐された分岐回路(図示せず)とを形成する。すなわち、分電盤32は、電力系統30から受電した電力を複数系統の電気負荷2に供給する配線網を需要家1の建物内に形成する。
太陽光発電設備211は、発電した電力を電気負荷2に供給する。太陽光発電設備211が発電した電力が電気負荷2で消費される電力を超えて、余剰電力が発生する場合には、蓄電設備22の蓄電池を余剰電力により充電するか、または電力系統30に余剰電力を供給する。このように、太陽光発電設備211は、余剰電力が生じる場合に、余剰電力を電力系統30に供給することが可能であるが、以下に説明する実施形態では、余剰電力を蓄電設備22の充電用に優先的に用いる例について説明する。ただし、蓄電設備22の残容量が予定された電力量に達している場合、余剰電力は電力系統30に供給される。
太陽光発電設備211の発電量は、日射量、外気温を含む天候に依存するから、上述した規則に従う限り、余剰電力は、蓄電設備22に充電されるか、または電力系統30に供給される。なお、太陽光発電設備211の余剰電力が、蓄電設備22の充電に用いることができず、かつ電力系統30に供給することもできない場合には、太陽光発電設備211から電力系統30への電力供給は停止される。
一方、蓄電設備22が備える蓄電池の充電期間と放電期間の制御、およびその蓄電池が蓄えている電力量の制御は、制御部15が行っている。蓄電設備22から電力系統30に電力を供給(逆潮流)する第1の状態と、蓄電設備22から電気負荷2に電力を供給する第2の状態との選択は、分電盤32に内蔵した切替器(図示せず)を制御部15が切り替えることによって行われる。
第1の状態は、主として電気事業者などからの要求に応じて、電力系統30に電力を逆潮流させる目的で選択される。ここに、需要家1は、蓄電設備22から電力系統30に逆潮流を行った電力量に見合う対価を電気事業者あるいはサービス事業者から受け取ることが可能である。
第2の状態は、主として電力系統30から受電する電力量を低減させる目的で選択される。すなわち、太陽光発電設備211が発電する電力量が、電気負荷2で消費される電力量に対して不足する場合に、不足する電力量を蓄電設備22から電気負荷2に供給することによって、電力系統30から受電せずに電気負荷2に電力を供給することが可能になる。また、電力系統30から受電する電力について電力量に制限値が設定されている場合がある。この場合、電力系統30から受電する電力量が制限値を超えないように、蓄電設備22から電気負荷2に電力を供給するようにしてもよい。
分電盤32には、主幹回路と複数系統の分岐回路とのそれぞれを通過した電力量を計量する計量装置31が付設される。計量装置31は、太陽光発電設備211が発電した電力量を計量する第1の計量装置311と、電気負荷2が消費している電力量を計測する第2の計量装置312とを備える。なお、それぞれの分岐回路を通過した電力量の値は、分電盤32とは別に設けられる計測ユニット(図示せず)で計量された値でもよい。
計量装置31は、着目する回路を通過する電流を計測する電流センサ(図示せず)と、着目する回路の線間の電圧値と電流センサが計測した電流値とを用いて電力量を算出する算出部(図示せず)とを備えた電子式の電力量計であることが望ましい。なお、本実施形態の計量装置31は、分岐回路ごとに通過した電力量を計量することは必須ではなく、少なくとも太陽光発電設備211が発電した電力量と、電気負荷2が消費した総電力量とを計量できればよい。
ところで、太陽光発電設備211が発電する電力量と、電気負荷2が消費する電力量とは時々刻々と変化するから、太陽光発電設備211の発電量だけでは、電気負荷2が消費する電力量を充足させることができない期間が生じる。たとえば、夜間には太陽光発電設備211は発電せず、また、曇天であると晴天の場合よりも太陽光発電設備211が発電する電力量は少なくなる。
したがって、電気負荷2が消費する電力量に対して、太陽光発電設備211が発電する電力量が不足する時間帯には、電力系統30あるいは蓄電設備22から電気負荷2に電力を供給する必要がある。ただし、電力系統30から受電すると、買電に伴う費用が発生するから、可能であれば蓄電設備22から電気負荷2に電力を供給することが望ましい。
太陽光発電設備211が単位時間に発電する電力量は、日の出頃から徐々に増加し、日中に最大になった後、日没に向かって減少するという傾向を示す。一方、電気負荷2が単位時間に消費する電力量は、需要家1における電気負荷2の使用状況によって異なり、単位時間当たりの電力量が、朝方と夜とに極大になる場合や、さらに日中にも極大になる場合などがある。
そこで、1日が比較的短い期間(10分、30分、1時間などから選択する)に分割され、分割された各期間が対象期間に定められ、対象期間ごとに電力量が比較される。言い換えると、比較的短い期間を対象期間と定義し、1日のうち任意の期間にわたって複数の対象期間が計量装置31に設定されている。計量装置31は、対象期間ごとに電力量を比較する。対象期間は、1日の全期間(つまり24時間)について設定される必要はなく、1日のうち日の出から日没までの期間などの限定された期間について設定してもよい。たとえば、日の出が6:00であり日没が18:00であって、30分ごとの対象期間を設定する場合、1日当たり対象期間は24期間になる。
対象期間は、太陽光発電設備211が発電する電力量と電気負荷2が消費する電力量とを比較するために設定される。ただし、対象期間において計量装置31が計量した電力量について過不足を求めたとしても、求められた過不足は過去の事象であって、今後、蓄電設備22から電力を供給すべきか否かは決められない。
そのため、太陽光発電設備211が対象期間に発電する電力量(第1の電力量)を予測する第1の予測部11と、需要家1において電気負荷2が対象期間に消費する電力量(第2の電力量)を予測する第2の予測部12とが設けられる。第1の予測部11と第2の予測部12とは、同じ対象期間における電力量を予測する。
第1の電力量が第2の電力量に対して不足する場合、不足する電力量(第3の電力量=第2の電力量-第1の電力量)を充足するには、電力系統30から受電するか、蓄電設備22から電力を供給しなければならない。第3の電力量とは、第2の電力量から第1の電力量を引いた値の絶対値である。
ここで、第3の電力量を電力系統30から受電する場合には、需要家1は受電した電力量に対する対価を支払うことになる。また、電力系統30から受電する電力量に制限値が設定されている場合、受電した電力量に対する対価以外に超過金の支払いが必要になる場合もある。そのため、電力調整装置10は、第3の電力量を電力系統30から受電することになった場合に支払う費用を算定する買電費用算定部13を備える。要するに、買電費用算定部13はいずれかの対象期間において、太陽光発電設備211が発電する予定の電力量が電気負荷2で消費する予定の電力量に対して不足する場合、当該対象期間において、電力系統30から不足する電力量を受電したときの費用を算定する。ここで言ういずれかの対象期間とは、第1の予測部11と第2の予測部12とが電力量を予測している各対象期間のことである。買電費用算定部13が算定する費用とは、需要家1が電力系統30から第3の電力量の電力を受電した場合に支払う費用のことであり、以下では、この費用のことを第2の金額と呼ぶ。つまり買電費用算定部13は、第2の電力量に対して第1の電力量が不足すると判断した場合に、不足分である第3の電力量を買う費用を、第2の金額として算定する。
ところで、需要家1に設けられた電力供給設備20は、電力系統30に電力を供給することが可能であり、電気事業者からは逆潮流に対する対価を受け取ることができる。逆潮流によって得られる対価は、一定値に定められる場合もあるが、ここでは、逆潮流によって得られる対価が、電力の需要と供給との関係に応じて定められる場合を想定している。
この場合、電力の需要があると、要求される電力量(以下、「取引電力量」という)と、電力の単位量に対する対価(以下、「単価」という)と、電力の供給が要求される期間(以下、「対象期間」という)との情報が取引装置40から得られる。この情報に基づいて電力の売買が行われる。これらの情報は、電気事業者が運営する取引装置40に登録される。取引装置40に登録される情報(以下、「取引条件」という)は時々刻々と更新される。取引条件の更新は、対象期間が開始される前日までか、あるいは対象期間が開始される当日の午前中までに行われることが望ましい。また、取引装置40は、電力の需要に緊急性がある場合に、対象期間の開始直前に取引条件を登録することを許容していてもよい。なお、取引装置40を運営する電気事業者は、電力の取引に関するサービスを提供するサービス事業者であることが望ましい。
電力調整装置10は、インターネットのような電気通信回線NTを通して取引装置40と通信する情報取得部14を備える。情報取得部14は、取引電力量と単価と対象期間とを含む取引条件を取引装置40から取得する。取引装置40に登録される取引条件は時々刻々と更新されるから、情報取得部14は取引条件の変化を監視し、必要な取引条件を取得する。
上述したように太陽光発電設備211が発電する電力量が電気負荷2で消費される電力量に対して不足する場合、不足分である第3の電力量を電力系統30から受電すれば、需要家1には費用が発生する。一方、第3の電力量を蓄電設備22から電気負荷2に供給すれば、費用は発生しないが蓄電設備22に蓄えた電力量を電力系統30に供給した場合に得られる対価が得られない。
本実施形態における判断部16は、第3の電力量を蓄電設備22から電力系統30に供給した場合に得られる対価(収益)と、第3の電力量を電力系統30から受電する場合の費用とを比較し、需要家1にとってより損失が少なくなるように制御部15を制御する。すなわち、電力調整装置10は、蓄電設備22の電力を電力系統30に供給する第1の状態と電気負荷2に給電する第2の状態とを選択する制御部15と、第1の状態と第2の状態との選択による損得を判断する判断部16とを備える。
判断部16は、制御部15が第1の状態を選択し蓄電設備22が電力系統30に第3の電力量の電力を供給した場合に受取可能である収益(第1の金額)と、需要家1が電力系統30から第3の電力量の電力を受電した場合に支払う費用(第2の金額)とを比較する。制御部15は、判断部16が、第1の金額が第2の金額以下であるときに、蓄電設備22から電気負荷2に給電する第2の状態を選択する。要するに、制御部15は、蓄電設備22から電力系統30に電力を供給する第1の状態を選択した場合に期待される第1の金額が、電力系統30から受電する第2の状態を選択した場合に支払う第2の金額以下であるとき、第2の状態を選択する。第2の状態が選択されると、電気負荷2が消費する電力のうち少なくとも一部は、蓄電設備22の電力により充足される。言い換えると、判断部16は、第3の電力量を売った場合の収益(第1の金額)と、第3の電力量を買った場合の費用(第2の金額)とを比較する。その比較結果について、費用が収益以上になる場合には金銭的な損失が発生することになるため、判断部16は、蓄電設備22の電力を使用して電力の不足分を補うように制御部15を制御する(第2の状態を選択する)。
判断部16の判断結果において、第1の金額が第2の金額を超えるときには、取引参加部17が電気通信回線NTを通して取引装置40に応募する。すなわち、取引装置40が募集している取引条件で、蓄電設備22から第3の電力量の電力を電力系統30に供給するほうが需要家1にとって利益が生じることが期待されるときには、取引参加部17が取引に入札する。
取引装置40は、取引条件に対する応募があると、応募に対応する蓄電設備22が1台の場合には、当該蓄電設備22を備える需要家1との約定を成立させる。一方、取引条件に対して複数の応募があると、取引装置40は、取引参加部17との間で対価を協議し、対価が妥当な金額になると、該当する取引条件に対する約定を成立させる。取引装置40は、約定が成立したか否かの判断結果を、電気通信回線NTを通して取引参加部17に通知する。
取引参加部17は、約定が成立したか否かの判断結果を取引装置40から受け取り、約定が成立した場合には、蓄電設備22から電力系統30に電力を供給する第1の状態を選択するように制御部15に指示する。この場合、需要家1は、蓄電設備22から第3の電力量の電力を電力系統30に供給することにより、電気事業者から対価を受け取ることが可能になる。一方、約定が成立しなければ、取引参加部17は、蓄電設備22の電力を電気負荷2に供給する第2の状態を選択するように制御部15に指示する。
ところで、上述した第2の金額を見積もるために、太陽光発電設備211が対象期間に発電する電力量を第1の予測部11が予測し、電気負荷2が対象期間に消費する電力量を第2の予測部12が予測している。第1の予測部11および第2の予測部12は、実測した電力量の時間経過に伴う推移を用いて対象期間における電力量を予測する。
そのため、太陽光発電設備211が発電している電力量を計量する第1の計量装置311と、電気負荷2が消費している電力量を計量する第2の計量装置312とが設けられる。第1の計量装置311および第2の計量装置312は、比較的短い時間間隔(たとえば、30秒、1分、5分などから選択される)で電力量を計量する。この電力量の1秒当たりの平均値を瞬時電力とみなしてもよい。
第1の予測部11は第1の計量装置311から電力の推移を受け取り、太陽光発電設備211が対象期間において発電する電力量を予測する。また、第2の予測部12は第2の計量装置312から電力の推移を受け取り、電気負荷2が対象期間において消費する電力量を予測する。第1の計量装置311および第2の計量装置312で電力量を計量した期間が対象期間に近接している場合、第1の予測部11および第2の予測部12は、線形予測などの簡易な予測技術を用いて、対象期間において消費される電力量を推定可能である。
ただし、線形予測は、条件が大きく変化する場合には誤差が大きくなるから、第1の予測部11および第2の予測部12は、線形予測ではなく、電力量の時間経過に伴う推移を用いて対象期間における電力量を予測することが望ましい。
第1の予測部11は、天候を予測する情報を取得する天候取得部111と、天候取得部111が取得した情報と太陽光発電設備211が発電する電力の時間経過に伴う推移とを対応付けて記憶する第1の履歴記憶部112とを備える。さらに、第1の予測部11は、第1の履歴記憶部112に記憶された電力の推移に基づいて電力の変化パターンを分類する第1の分類部113を備える。
天候取得部111は、インターネットのような電気通信回線NTを通して天候を予測する情報を取得することが望ましい。なお、天候取得部111は、過去の実際の天候に関する情報を取得できる場合には、予測される情報だけではなく、過去の実際の天候の情報も併せて取得するようにしてもよい。また、天候の情報は、少なくとも日射量、外気温の情報を含んでいることが望ましい。
第1の履歴記憶部112は、予測された天候の情報を、第1の計量装置311が計量した電力および時間帯の履歴に対応付けて記憶する。第1の履歴記憶部112に記憶されている情報により、太陽光発電設備211で実際に発電された電力の時間経過に伴う推移と、予測された天候の情報との関係が抽出可能になる。
第1の分類部113は、第1の履歴記憶部112が記憶している情報を用いることにより、対象期間に対応した日々の時間帯ごとに電力の変化パターンを分類する。たとえば、11:30~12:00、12:00~12:30などの時間帯ごとに、電力の変化の傾向と天候の情報との関係が分類される。
第1の予測部11は、第1の計量装置311から受け取った電力の時間経過に伴う推移と、第1の分類部113が分類した変化パターンとを照合し、対象期間において太陽光発電設備211が発電する電力を予測する。
第2の予測部12は、電気負荷2が消費する電力の時間経過に伴う推移を記憶する第2の履歴記憶部121と、第2の履歴記憶部121に記憶された電力の推移に基づいて電力の変化パターンを分類する第2の分類部122を備える。すなわち、第1の予測部11は予測された天候の情報を取得する天候取得部111を備えるのに対して、第2の予測部12は、天候に関する情報を用いない点で相違する。
第2の履歴記憶部121は、第2の計量装置312が計量した電力および時間帯の履歴に対応付けて記憶する。また、第2の分類部122は、第2の履歴記憶部121が記憶している情報を用いることにより、対象期間に対応した日々の時間帯ごとに電力の変化パターンを分類する。第2の予測部12は、第2の計量装置312から受け取った電力の時間経過に伴う推移と、第2の分類部122が分類した変化パターンとを照合し、対象期間において電気負荷2が消費する電力量を予測する。
ところで、蓄電設備22から電力系統30に電力を供給する第1の状態を制御部15が選択する場合、蓄電設備22から第3の電力量を供給可能であることが保証されていなければならない。そのため、蓄電設備22は、第1の電力量が第2の電力量に対して不足することが予測される対象期間の開始までに、蓄電設備22の残容量が第3の電力量を超えているように充電されていることが望ましい。つまり、電力供給設備20は、電気負荷2が消費する電力量を太陽光発電設備211の発電する電力量では充足できない対象期間が開始されるまでに、蓄電設備22に設けられた蓄電池の残容量が第3の電力量を超えるように蓄電設備22を充電する。
ここに、太陽光発電設備211の発電する電力量では電気負荷2が消費する電力量を充足できない複数の対象期間が連続して生じる可能性がある。電力供給設備20は、これらの連続した対象期間全体で不足する電力量(つまり連続した対象期間のうち各期間で不足する電力量の合計値)から、必要な電力量を見積もって蓄電設備22に蓄える電力量を決定する。加えて、蓄電設備22に電力を蓄える際に太陽光発電設備211が発電した電力を用いる場合には、充電に伴う費用は発生しないが、電力系統30から受電した電力を蓄電設備22に蓄える場合には、受電した電力量に対する対価も考慮する必要がある。
すなわち、太陽光発電設備211が発電した電力のみで、必要な電力量を蓄電設備22に蓄えることができる場合は、太陽光発電設備211のみを用いて蓄電設備22に電力を蓄える。太陽光発電設備211が発電した電力のみでは電気負荷2が消費する電力量を充足できない場合には、電力供給設備20は電力系統30から受電した電力も併用して蓄電設備22に電力を蓄える。この場合、電力系統30から受電した電力量を第3の電力量に含めるようにし、買電費用算定部13で費用を算定する。買電費用算定部13で算定する費用は、受電時の買電単価を考慮して算定する。なお、買電費用算定部13は、電力系統30から受電した電力を蓄電設備22に蓄える場合であっても、第3の電力量に含めないようにし、受電した電力量に対する対価は無視するようにルールを定めてもよい。
以下に取引装置40について簡単に説明する。取引装置40は、取引条件を登録するために、たとえば図2に示すような構成の情報記憶部(取引テーブル)を備える。情報記憶部は、対象期間、単価、取引電力量の3種類のデータを組み合わせた取引条件を記憶している。単価と取引電力量とは対応付けられて対として情報記憶部に登録され、対象期間ごとに複数の対が登録可能になっている。言い換えると、情報記憶部は、対象期間ごとに、単価と取引電力量との対を複数ずつ登録するための複数(たとえば、15あるいは30)の記憶領域を備える。なお、記憶領域は、単価と取引電力量との対が登録されている対象期間ですべて埋められている必要はなく、単価と取引電力量との対が登録されない対象期間が存在していてもよい。
情報記憶部には、図3に示すように、30分を単位とする対象期間が登録される。図示例では、1日が48個の対象期間に区分されている。また、図3では、上段が単価を示し、下段が取引電力量を示している。取引電力量は1時間当たり1000kWhを単位とし、単価は円を単位として1kWh当たりの価格を表している。したがって、下段の値は、30分間については2分の1の数値になる。電力の取引を行うことを希望する参加者は、電力量と単価とを情報記憶部に登録する。
情報記憶部には、電力の買い取りを希望する参加者は、必要な電力量および単価を登録し、電力の売り渡しを希望する参加者は、供給可能な電力量と単価とを登録する。取引電力量は、買い取りの場合に正の値になり、売り渡しの場合に負の値になる。図3において、「▲」を付加した数値が負の値を表す。すなわち、「▲」が付加されている対象期間は逆潮流が可能であることを示している。
1つの対象期間について取引電力量と単価との対が複数登録される場合、買い取りを希望する参加者は、単価が高額になるほど取引電力量を減少するように取引電力量と単価との対を設定する。また、1つの対象期間について取引電力量と単価との対が複数登録される場合、売り渡しを希望する参加者は、単価が高額になるほど取引電力量を増加させるように対を設定する。すなわち、電力の買い手は、単価が高額になるほど買い取る電力量を少なくして費用を低減しようとし、電力の売り手は、単価が高額になるほど売り渡す電力量を多くして利益を増加させようとする。
取引装置40は、電力取引への参加者ごとに割り当てた情報記憶部を備える。ここでは、簡単に説明するために、参加者は、A、B、Cの3者であると仮定する。図4に示す例において、参加者Aおよび参加者Bは、取引電力量が正の値であるから買い取りを希望しており、参加者Cは、取引電力量が負の値であるから売り渡しを希望している。また、図示例では、対象期間は14:00~14:30の30分間のみを示している。
上述したように、電力の買い手は費用を低減しようとし、電力の売り手は利益を増加させようとする。したがって、情報記憶部に設定された取引電力量は、電力の買い手にとっては、対である単価以下の場合に買い取る電力量を意味し、電力の売り手にとっては、対である単価以上の場合に売り渡す電力量を意味する。
図示例では、電力の買い手は参加者Aと参加者Bとであるから、取引電力量と単価との関係は、参加者Aの情報記憶部と参加者Bの情報記憶部との値を用いて定められる。参加者Aと参加者Bとを合わせた取引電力量と単価との関係は図5のようになる。
すなわち、図6の実線L1(需要線L1)に示すように、単価が7.00円以下であれば、1時間当たりに買い取り可能である取引電力量は28000kWhである。以下同様に、単価が7.00円を超え7.50円以下であれば、1時間当たりに買い取り可能な取引電力量は22000kWhである。単価が7.50円を超え8.10円以下では、取引電力量は13000kWhである。単価が8.10円を超え8.50円以下では、取引電力量は7000kWhである。単価が8.50円を超え9.00円以下では、5000kWhである。単価が9.00円を超えると、電力の買い取りは断念される。
一方、売り手である参加者Cは、図6の実線L2(供給線L2)に示すように、単価が7.00円を超え7.20円以下であれば、1時間当たりに売り渡し可能である取引電力量は7000kWhまでである。同様に、単価が7.20円を超え9.00円以下では、取引電力量は12000kWhまで、単価が9.00円を超えれば、取引電力量は25000kWhまでである。単価が7.00円以下の場合には、参加者Cは電力の売り渡しを行わない。
上述した関係をまとめると、買い手である参加者Aおよび参加者Bが買い取る取引電力量に対する単価の関係と、売り手である参加者Cが売り渡す取引電力量に対する単価の関係とは、図6に示すように変化する。以下では、取引電力量と単価との関係を表すグラフのうち、買い手を表すグラフを需要線L1と呼び、売り手を表すグラフを供給線L2と呼ぶ。このグラフを用いると、買い手が要求する取引電力量と売り手が供給可能な取引電力量とが一致する点は、需要線L1と供給線L2との交点P1で表される。すなわち、図6に示す関係では、約定が成立する取引電力量は1時間当たり12000kWhであり、このときの1kWh当たりの単価は8.10円である。
すなわち、参加者A、参加者B、参加者Cの3者の間では、14:00~14:30の時間帯において、1時間当たり12000kWhの取引電力量を、1kWh当たり8.10円で売買するという約定が成立する。ここに、買い手である参加者Aと参加者Bとが要求する取引電力量の合計は、1時間当たり13000kWhであって、参加者Cが売り渡し可能な電力量は12000kWhであるから、1000kWhだけ不足しているが、この不足分は別途に調達される。
上述した取引例は一例であり、実際にはさらに多数の参加者が存在することが想定されるから、約定を成立させる組み合わせは、膨大な数になる可能性がある。そのため、確率的アルゴリズムあるいは遺伝的アルゴリズムのように、比較的良好な解を有限時間で求めることが可能なアルゴリズムによって、適切な組み合わせを抽出することが望ましい。
また、上述した例では、需要線L1と供給線L2とが、ともに直線の組み合わせによる不連続線で表現されているが、滑らかに連続した曲線で表現されていてもよい。また、需要線L1と供給線L2との関係は、買い手と売り手とのそれぞれの環境条件に応じて様々に設定される。ここでの環境条件は、買い手あるいは売り手の資金力、電力需要の緊急度などを意味する。
上述の例において、取引電力量が比較的大きい場合について説明しているが、戸建住宅のように、5kWh程度の小規模の蓄電設備22を備える需要家が電力の取引に参加する場合には、電力アグリゲータが複数の需要家の電力を一括して扱うことが望ましい。あるいはまた、上述のように買い手が買い取りを要求する取引電力量に対して売り手が引き渡し可能な取引電力量に不足が生じる場合に、不足分に充当する電力を小規模の蓄電設備22から供給するようにしてもよい。
上述した構成例において、第1の予測部11、第2の予測部12、買電費用算定部13、情報取得部14、制御部15、判断部16、取引参加部17は、需要家1に設けることが可能である。ただし、制御部15を除く構成を需要家1とは別に設けることも可能である。あるいは買電費用算定部13、情報取得部14、取引参加部17を需要家1とは別に設けることも可能である。需要家1とは別に設けられる構成は、ウェブサーバあるいはクラウドコンピュータシステムに設けてもよい。この場合、需要家1に設けた構成と需要家1とは別に設けた構成との間で情報を伝送するために、通信インターフェイス部が設けられる。
なお、上述した実施形態において、電力の取引を希望する参加者が、電力量と単価とを取引装置40の情報記憶部に登録しているが、電力値と単価とを情報記憶部に登録する構成でもよい。この場合、情報記憶部に登録された電力値は、対象期間において電力供給設備20から単位時間に供給可能な電力を表す。上述した構成例では、蓄電設備22は、需要家に据え置かれる構成を想定しているが、蓄電設備22の蓄電池は、電動車両に搭載された蓄電池であってもよい。
上述した構成例は、対象期間において、蓄電設備22の電力を電力系統30に供給した場合に受取可能である収益が、電力系統30から受電することにより支払う費用以下であるという条件の下に、蓄電設備22から電気負荷2に電力を供給している。なお、蓄電設備22の動作状態、および蓄電設備22から電力を供給する場合の供給先を最終的に判断するには、他の条件が考慮される場合もある。
Claims (7)
- 需要家が備える電力供給設備から電力系統に電力を供給するか否かの取引を、取引装置との間で取引条件に従って行う電力調整装置であって、
前記電力供給設備は、発電設備と、蓄電池を備えた蓄電設備とを含んでおり、
前記発電設備が対象期間に発電する第1の電力を予測する第1の予測部と、
前記需要家において電気負荷が前記対象期間に消費する第2の電力を予測する第2の予測部と、
前記第1の予測部が予測した前記第1の電力が、前記第2の予測部が予測した前記第2の電力に対して不足する場合に、前記需要家が前記電力系統から不足分である第3の電力を受電することに対して支払う費用を算定する買電費用算定部と、
前記蓄電設備から前記電力系統に電力を供給する第1の状態と前記蓄電設備から前記電気負荷に給電する第2の状態とを選択する制御部と、
前記第1の状態が選択された場合に前記取引条件に応じて前記需要家が受取可能である第1の金額と、前記買電費用算定部が算定した費用である第2の金額とを比較する判断部とを備え、
前記制御部は、前記判断部の比較結果において、前記第1の金額が前記第2の金額以下であるときに、前記第2の状態を選択する
電力調整装置。 - 前記判断部の比較結果において、前記第1の金額が前記第2の金額を超えるときに、前記取引装置に入札を行い、約定が成立したか否かの判断結果を前記取引装置から受け取る取引参加部をさらに備え、
前記制御部は、前記約定が成立すると前記第1の状態を選択する請求項1記載の電力調整装置。 - 前記蓄電設備は、前記第1の電力が前記第2の電力に対して不足することが予測される前記対象期間が開始されるまでに、残容量が前記第3の電力を超えているように充電される
請求項1又は2記載の電力調整装置。 - 前記第1の予測部は、
前記発電設備が発電している電力を第1の計量装置から受け取り、前記第1の計量装置が計量している電力の時間経過に伴う推移に基づいて前記対象期間において前記発電設備が発電する電力を予測し、
前記第2の予測部は、
前記需要家において前記電気負荷が消費している電力を第2の計量装置から受け取り、前記第2の計量装置が計量している電力の時間経過に伴う推移に基づいて前記対象期間において前記電気負荷が消費する電力を予測する
請求項1~3のいずれか1項に記載の電力調整装置。 - 前記発電設備は太陽光発電設備であって、
前記第1の予測部は、
天候を予測する情報を取得する天候取得部と、
前記天候取得部が取得した前記情報と前記太陽光発電設備が発電する電力の時間経過に伴う推移とを対応付けて記憶する第1の履歴記憶部と、
前記第1の履歴記憶部に記憶された電力の推移に基づいて電力の変化パターンを分類する第1の分類部とを備え、
前記第1の計量装置から受け取った電力の時間経過に伴う推移と前記第1の分類部が分類した変化パターンとを照合することにより、前記対象期間において前記太陽光発電設
備が発電する電力を予測し、
前記第2の予測部は、
前記電気負荷が消費する電力の時間経過に伴う推移を記憶する第2の履歴記憶部と、
前記第2の履歴記憶部に記憶された電力の推移に基づいて電力の変化パターンを分類する第2の分類部とを備え、
前記第2の計量装置から受け取った電力の時間経過に伴う推移と前記第2の分類部が分類した変化パターンとを照合することにより、前記対象期間において前記電気負荷が消費する電力を予測する
請求項4記載の電力調整装置。 - 需要家が備える電力供給設備から電力系統に電力を供給するか否かの取引を、取引装置との間で取引条件に従って行う電力調整方法であって、
前記電力供給設備は、発電設備と、蓄電池を備えた蓄電設備とを含んでおり、
前記発電設備が対象期間に発電する第1の電力を第1の予測部が予測し、
前記需要家において電気負荷が前記対象期間に消費する第2の電力を第2の予測部が予測し、
前記第1の予測部が予測した前記第1の電力が、前記第2の予測部が予測した前記第2の電力に対して不足する場合に、前記需要家が前記電力系統から不足分である第3の電力を受電することに対して支払う費用を買電費用算定部が算定し、
前記蓄電設備から前記電力系統に電力を供給する第1の状態が選択された場合に前記取引条件に応じて前記需要家が受取可能である第1の金額と、前記買電費用算定部が算定した費用である第2の金額とを判断部が比較し、
前記判断部の比較結果において、前記第1の金額が前記第2の金額以下であるときに、前記蓄電設備から前記電気負荷に給電する第2の状態を制御部が選択する
電力調整方法。 - コンピュータを、
請求項1~5のいずれか1項に記載の電力調整装置として機能させるプログラム。
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP14835226.3A EP3032691A4 (en) | 2013-08-09 | 2014-07-31 | ENERGY ADJUSTING DEVICE, POWER ADJUSTING METHOD, AND PROGRAM |
US14/910,524 US10339602B2 (en) | 2013-08-09 | 2014-07-31 | Power adjustment system, power adjustment method, and computer program |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2013-166523 | 2013-08-09 | ||
JP2013166523A JP6512503B2 (ja) | 2013-08-09 | 2013-08-09 | 電力調整装置、電力調整方法、プログラム |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2015019585A1 true WO2015019585A1 (ja) | 2015-02-12 |
Family
ID=52460942
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/JP2014/004016 WO2015019585A1 (ja) | 2013-08-09 | 2014-07-31 | 電力調整装置、電力調整方法、プログラム |
Country Status (4)
Country | Link |
---|---|
US (1) | US10339602B2 (ja) |
EP (1) | EP3032691A4 (ja) |
JP (1) | JP6512503B2 (ja) |
WO (1) | WO2015019585A1 (ja) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113283931A (zh) * | 2021-05-19 | 2021-08-20 | 广东电力交易中心有限责任公司 | 一种提高电力系统机组运行补偿计算准确性的方法及系统 |
EP3885182A1 (en) | 2020-03-27 | 2021-09-29 | Honda Motor Co., Ltd. | Power calculation apparatus and power calculation method |
EP3885774A1 (en) | 2020-03-27 | 2021-09-29 | Honda Motor Co., Ltd. | Power calculation apparatus and power calculation method |
EP3886008A1 (en) | 2020-03-27 | 2021-09-29 | Honda Motor Co., Ltd. | Power calculation apparatus and power calculation method |
EP3886033A1 (en) | 2020-03-27 | 2021-09-29 | Honda Motor Co., Ltd. | Bid management apparatus and bid management method in a power transaction market |
EP3889856A1 (en) | 2020-03-27 | 2021-10-06 | Honda Motor Co., Ltd. | Power calculation apparatus and power calculation method |
Families Citing this family (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US10346934B2 (en) * | 2014-08-01 | 2019-07-09 | Amrita Vishwa Vidyapeetham | Apparatus for power theft detection on an electrical power grid |
WO2016084282A1 (ja) * | 2014-11-27 | 2016-06-02 | 日本電気株式会社 | 電力調整装置、電力流通システム、電力調整方法及びプログラムが格納された非一時的なコンピュータ可読媒体 |
JP6755682B2 (ja) * | 2016-03-10 | 2020-09-16 | 大和ハウス工業株式会社 | 電力供給システム |
US10559035B2 (en) * | 2017-03-09 | 2020-02-11 | International Business Machines Corporation | Uncertainty-flexibility matching engine for inter-temporal electric energy products |
GB2564389A (en) | 2017-07-04 | 2019-01-16 | Green Running Ltd | A system and method for utility management |
JP7129662B2 (ja) * | 2019-03-29 | 2022-09-02 | パナソニックIpマネジメント株式会社 | 計測システム、計測方法、プログラム及び連携システム |
JP2021149331A (ja) * | 2020-03-17 | 2021-09-27 | トヨタ自動車株式会社 | 電動車両の電力取引システム及び充放電装置 |
JP7201930B2 (ja) * | 2020-08-03 | 2023-01-11 | ダイキン工業株式会社 | 生成装置、システムおよびプログラム |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000224769A (ja) | 1999-01-28 | 2000-08-11 | Shikoku Electric Power Co Inc | 分散型蓄電システム |
JP2002233053A (ja) * | 2001-02-05 | 2002-08-16 | Hitachi Ltd | 蓄電システム及び方法 |
JP2006280154A (ja) * | 2005-03-30 | 2006-10-12 | Tokyo Electric Power Co Inc:The | 分散電源制御システム |
JP2011130618A (ja) * | 2009-12-18 | 2011-06-30 | Panasonic Corp | 電力制御装置および電力制御方法 |
JP2012060761A (ja) * | 2010-09-08 | 2012-03-22 | Sekisui Chem Co Ltd | 地域内電力融通システム |
JP2012222860A (ja) * | 2011-04-04 | 2012-11-12 | Denso Corp | 電力供給システム |
Family Cites Families (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH1042472A (ja) * | 1996-07-23 | 1998-02-13 | Toshiba Corp | 自家発電システム |
JP2003189477A (ja) | 2001-12-14 | 2003-07-04 | Daikin Ind Ltd | 電力制御装置 |
US8406933B2 (en) * | 2009-08-18 | 2013-03-26 | Control4 Corporation | Systems and methods for estimating the effects of a request to change power usage |
EP2473958A1 (en) * | 2009-09-03 | 2012-07-11 | Essence Security International Ltd. | Methods and systems for managing electricity delivery and commerce |
US8457802B1 (en) * | 2009-10-23 | 2013-06-04 | Viridity Energy, Inc. | System and method for energy management |
JP5592182B2 (ja) | 2010-07-15 | 2014-09-17 | トヨタホーム株式会社 | 住宅用エネルギー管理システム |
JP2012053721A (ja) | 2010-09-02 | 2012-03-15 | Hitachi Ltd | 電力小売支援システム |
JP5563949B2 (ja) * | 2010-10-25 | 2014-07-30 | パナソニック株式会社 | 電力管理システム |
JP2012125063A (ja) * | 2010-12-08 | 2012-06-28 | Sony Corp | 電力マネジメントシステム |
JP5565351B2 (ja) | 2011-03-21 | 2014-08-06 | 株式会社デンソー | エネルギ輸送システム |
JP5899640B2 (ja) | 2011-03-30 | 2016-04-06 | ソニー株式会社 | 電力管理装置、電力管理方法および電力管理システム |
JP5232266B2 (ja) | 2011-04-21 | 2013-07-10 | 積水化学工業株式会社 | 電力制御システム |
JP5662877B2 (ja) * | 2011-06-03 | 2015-02-04 | ルネサスエレクトロニクス株式会社 | 蓄電池システム |
JP5719716B2 (ja) * | 2011-07-26 | 2015-05-20 | 京セラ株式会社 | 通信装置及び通信方法 |
JP5480216B2 (ja) * | 2011-09-09 | 2014-04-23 | 株式会社東芝 | 蓄電池貸出容量決定装置および蓄電池貸出容量決定方法 |
-
2013
- 2013-08-09 JP JP2013166523A patent/JP6512503B2/ja active Active
-
2014
- 2014-07-31 US US14/910,524 patent/US10339602B2/en active Active
- 2014-07-31 WO PCT/JP2014/004016 patent/WO2015019585A1/ja active Application Filing
- 2014-07-31 EP EP14835226.3A patent/EP3032691A4/en not_active Withdrawn
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000224769A (ja) | 1999-01-28 | 2000-08-11 | Shikoku Electric Power Co Inc | 分散型蓄電システム |
JP2002233053A (ja) * | 2001-02-05 | 2002-08-16 | Hitachi Ltd | 蓄電システム及び方法 |
JP2006280154A (ja) * | 2005-03-30 | 2006-10-12 | Tokyo Electric Power Co Inc:The | 分散電源制御システム |
JP2011130618A (ja) * | 2009-12-18 | 2011-06-30 | Panasonic Corp | 電力制御装置および電力制御方法 |
JP2012060761A (ja) * | 2010-09-08 | 2012-03-22 | Sekisui Chem Co Ltd | 地域内電力融通システム |
JP2012222860A (ja) * | 2011-04-04 | 2012-11-12 | Denso Corp | 電力供給システム |
Non-Patent Citations (1)
Title |
---|
See also references of EP3032691A4 |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP3885182A1 (en) | 2020-03-27 | 2021-09-29 | Honda Motor Co., Ltd. | Power calculation apparatus and power calculation method |
EP3885774A1 (en) | 2020-03-27 | 2021-09-29 | Honda Motor Co., Ltd. | Power calculation apparatus and power calculation method |
EP3886008A1 (en) | 2020-03-27 | 2021-09-29 | Honda Motor Co., Ltd. | Power calculation apparatus and power calculation method |
EP3886033A1 (en) | 2020-03-27 | 2021-09-29 | Honda Motor Co., Ltd. | Bid management apparatus and bid management method in a power transaction market |
EP3889856A1 (en) | 2020-03-27 | 2021-10-06 | Honda Motor Co., Ltd. | Power calculation apparatus and power calculation method |
US11698397B2 (en) | 2020-03-27 | 2023-07-11 | Honda Motor Co., Ltd. | Power calculation apparatus and power calculation method |
US11794605B2 (en) | 2020-03-27 | 2023-10-24 | Honda Motor Co., Ltd. | Power calculation apparatus and power calculation method |
US11796575B2 (en) | 2020-03-27 | 2023-10-24 | Honda Motor Co., Ltd. | Power calculation apparatus and power calculation method |
US11897361B2 (en) | 2020-03-27 | 2024-02-13 | Honda Motor Co., Ltd. | Power calculation apparatus and power calculation method |
CN113283931A (zh) * | 2021-05-19 | 2021-08-20 | 广东电力交易中心有限责任公司 | 一种提高电力系统机组运行补偿计算准确性的方法及系统 |
CN113283931B (zh) * | 2021-05-19 | 2023-07-25 | 广东电力交易中心有限责任公司 | 一种提高电力系统机组运行补偿计算准确性的方法及系统 |
Also Published As
Publication number | Publication date |
---|---|
JP2015035917A (ja) | 2015-02-19 |
JP6512503B2 (ja) | 2019-05-15 |
US20160189298A1 (en) | 2016-06-30 |
EP3032691A4 (en) | 2016-08-03 |
US10339602B2 (en) | 2019-07-02 |
EP3032691A1 (en) | 2016-06-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2015019585A1 (ja) | 電力調整装置、電力調整方法、プログラム | |
JP6160957B2 (ja) | 電力管理装置、電力管理方法、プログラム | |
JP6233686B2 (ja) | 電力調整装置、プログラム | |
Taşcıkaraoğlu | Economic and operational benefits of energy storage sharing for a neighborhood of prosumers in a dynamic pricing environment | |
Zhang et al. | A novel peer-to-peer local electricity market for joint trading of energy and uncertainty | |
JP3631967B2 (ja) | 余剰電力管理システムおよびその制御方法 | |
JP6268633B2 (ja) | 電力管理装置、電力管理方法、プログラム | |
EP2387776A1 (en) | Optimization of microgrid energy use and distribution | |
JP6226282B2 (ja) | 電力調整装置、電力調整方法、プログラム | |
JP2017028986A (ja) | 電力データ管理システム、需要家集合体及び電力融通街区 | |
JP6384502B2 (ja) | 売電タイミング最適制御システム、売電タイミング最適制御方法および売電タイミング最適制御プログラム | |
JP7297004B2 (ja) | 電力供給システム及び、電力管理方法 | |
JP2021040403A (ja) | 電力供給システム及び、電気料金の管理方法 | |
JP6698371B2 (ja) | 電気料金管理装置、電気料金管理方法及びプログラム | |
JP2002064934A (ja) | 電力供給管理システムおよび方法 | |
JP2018169860A (ja) | 電力供給システム及び電力料金算出装置 | |
JP2023054543A (ja) | 電力取引装置 | |
Mathieu et al. | Harnessing the flexibility of energy management systems: a retailer perspective | |
JP2005333751A (ja) | 電力供給システム及び電力供給方法 | |
US20230281733A1 (en) | Information processing apparatus for smart grid | |
Hashmi | P2P framework for alleviating network issues |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 14835226 Country of ref document: EP Kind code of ref document: A1 |
|
WWE | Wipo information: entry into national phase |
Ref document number: 14910524 Country of ref document: US |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2014835226 Country of ref document: EP |