WO2015008837A1 - 圧力変動吸着式水素製造方法 - Google Patents

圧力変動吸着式水素製造方法 Download PDF

Info

Publication number
WO2015008837A1
WO2015008837A1 PCT/JP2014/069066 JP2014069066W WO2015008837A1 WO 2015008837 A1 WO2015008837 A1 WO 2015008837A1 JP 2014069066 W JP2014069066 W JP 2014069066W WO 2015008837 A1 WO2015008837 A1 WO 2015008837A1
Authority
WO
WIPO (PCT)
Prior art keywords
tank
gas
pressure
adsorption
adsorption tower
Prior art date
Application number
PCT/JP2014/069066
Other languages
English (en)
French (fr)
Inventor
清水翼
池田耕一郎
川嶋祥太
平中幸男
森理嗣
Original Assignee
大阪瓦斯株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 大阪瓦斯株式会社 filed Critical 大阪瓦斯株式会社
Priority to KR1020167004423A priority Critical patent/KR101961233B1/ko
Priority to US14/905,571 priority patent/US9675927B2/en
Publication of WO2015008837A1 publication Critical patent/WO2015008837A1/ja

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D53/00Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols
    • B01D53/02Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols by adsorption, e.g. preparative gas chromatography
    • B01D53/04Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols by adsorption, e.g. preparative gas chromatography with stationary adsorbents
    • B01D53/047Pressure swing adsorption
    • B01D53/0476Vacuum pressure swing adsorption
    • CCHEMISTRY; METALLURGY
    • C01INORGANIC CHEMISTRY
    • C01BNON-METALLIC ELEMENTS; COMPOUNDS THEREOF; METALLOIDS OR COMPOUNDS THEREOF NOT COVERED BY SUBCLASS C01C
    • C01B3/00Hydrogen; Gaseous mixtures containing hydrogen; Separation of hydrogen from mixtures containing it; Purification of hydrogen
    • C01B3/50Separation of hydrogen or hydrogen containing gases from gaseous mixtures, e.g. purification
    • C01B3/56Separation of hydrogen or hydrogen containing gases from gaseous mixtures, e.g. purification by contacting with solids; Regeneration of used solids
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D53/00Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols
    • B01D53/02Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols by adsorption, e.g. preparative gas chromatography
    • B01D53/04Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols by adsorption, e.g. preparative gas chromatography with stationary adsorbents
    • B01D53/047Pressure swing adsorption
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D2253/00Adsorbents used in seperation treatment of gases and vapours
    • B01D2253/10Inorganic adsorbents
    • B01D2253/104Alumina
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D2253/00Adsorbents used in seperation treatment of gases and vapours
    • B01D2253/10Inorganic adsorbents
    • B01D2253/106Silica or silicates
    • B01D2253/108Zeolites
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D2256/00Main component in the product gas stream after treatment
    • B01D2256/16Hydrogen
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D2257/00Components to be removed
    • B01D2257/50Carbon oxides
    • B01D2257/504Carbon dioxide
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D2257/00Components to be removed
    • B01D2257/70Organic compounds not provided for in groups B01D2257/00 - B01D2257/602
    • B01D2257/702Hydrocarbons
    • B01D2257/7022Aliphatic hydrocarbons
    • B01D2257/7025Methane
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D2257/00Components to be removed
    • B01D2257/80Water
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D2259/00Type of treatment
    • B01D2259/40Further details for adsorption processes and devices
    • B01D2259/40011Methods relating to the process cycle in pressure or temperature swing adsorption
    • B01D2259/40035Equalization
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D2259/00Type of treatment
    • B01D2259/40Further details for adsorption processes and devices
    • B01D2259/404Further details for adsorption processes and devices using four beds
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D2259/00Type of treatment
    • B01D2259/40Further details for adsorption processes and devices
    • B01D2259/414Further details for adsorption processes and devices using different types of adsorbents
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D53/00Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols
    • B01D53/02Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols by adsorption, e.g. preparative gas chromatography
    • B01D53/04Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols by adsorption, e.g. preparative gas chromatography with stationary adsorbents
    • B01D53/047Pressure swing adsorption
    • B01D53/053Pressure swing adsorption with storage or buffer vessel
    • CCHEMISTRY; METALLURGY
    • C01INORGANIC CHEMISTRY
    • C01BNON-METALLIC ELEMENTS; COMPOUNDS THEREOF; METALLOIDS OR COMPOUNDS THEREOF NOT COVERED BY SUBCLASS C01C
    • C01B2203/00Integrated processes for the production of hydrogen or synthesis gas
    • C01B2203/04Integrated processes for the production of hydrogen or synthesis gas containing a purification step for the hydrogen or the synthesis gas
    • C01B2203/042Purification by adsorption on solids
    • CCHEMISTRY; METALLURGY
    • C01INORGANIC CHEMISTRY
    • C01BNON-METALLIC ELEMENTS; COMPOUNDS THEREOF; METALLOIDS OR COMPOUNDS THEREOF NOT COVERED BY SUBCLASS C01C
    • C01B2203/00Integrated processes for the production of hydrogen or synthesis gas
    • C01B2203/04Integrated processes for the production of hydrogen or synthesis gas containing a purification step for the hydrogen or the synthesis gas
    • C01B2203/0465Composition of the impurity
    • CCHEMISTRY; METALLURGY
    • C01INORGANIC CHEMISTRY
    • C01BNON-METALLIC ELEMENTS; COMPOUNDS THEREOF; METALLOIDS OR COMPOUNDS THEREOF NOT COVERED BY SUBCLASS C01C
    • C01B2203/00Integrated processes for the production of hydrogen or synthesis gas
    • C01B2203/04Integrated processes for the production of hydrogen or synthesis gas containing a purification step for the hydrogen or the synthesis gas
    • C01B2203/0465Composition of the impurity
    • C01B2203/047Composition of the impurity the impurity being carbon monoxide
    • CCHEMISTRY; METALLURGY
    • C01INORGANIC CHEMISTRY
    • C01BNON-METALLIC ELEMENTS; COMPOUNDS THEREOF; METALLOIDS OR COMPOUNDS THEREOF NOT COVERED BY SUBCLASS C01C
    • C01B2203/00Integrated processes for the production of hydrogen or synthesis gas
    • C01B2203/04Integrated processes for the production of hydrogen or synthesis gas containing a purification step for the hydrogen or the synthesis gas
    • C01B2203/0465Composition of the impurity
    • C01B2203/0475Composition of the impurity the impurity being carbon dioxide
    • CCHEMISTRY; METALLURGY
    • C01INORGANIC CHEMISTRY
    • C01BNON-METALLIC ELEMENTS; COMPOUNDS THEREOF; METALLOIDS OR COMPOUNDS THEREOF NOT COVERED BY SUBCLASS C01C
    • C01B2203/00Integrated processes for the production of hydrogen or synthesis gas
    • C01B2203/04Integrated processes for the production of hydrogen or synthesis gas containing a purification step for the hydrogen or the synthesis gas
    • C01B2203/0465Composition of the impurity
    • C01B2203/0495Composition of the impurity the impurity being water
    • CCHEMISTRY; METALLURGY
    • C01INORGANIC CHEMISTRY
    • C01BNON-METALLIC ELEMENTS; COMPOUNDS THEREOF; METALLOIDS OR COMPOUNDS THEREOF NOT COVERED BY SUBCLASS C01C
    • C01B2203/00Integrated processes for the production of hydrogen or synthesis gas
    • C01B2203/16Controlling the process
    • C01B2203/1628Controlling the pressure
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02CCAPTURE, STORAGE, SEQUESTRATION OR DISPOSAL OF GREENHOUSE GASES [GHG]
    • Y02C20/00Capture or disposal of greenhouse gases
    • Y02C20/20Capture or disposal of greenhouse gases of methane
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02CCAPTURE, STORAGE, SEQUESTRATION OR DISPOSAL OF GREENHOUSE GASES [GHG]
    • Y02C20/00Capture or disposal of greenhouse gases
    • Y02C20/40Capture or disposal of greenhouse gases of CO2
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P20/00Technologies relating to chemical industry
    • Y02P20/151Reduction of greenhouse gas [GHG] emissions, e.g. CO2
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P20/00Technologies relating to chemical industry
    • Y02P20/151Reduction of greenhouse gas [GHG] emissions, e.g. CO2
    • Y02P20/156Methane [CH4]

Definitions

  • the present invention includes four adsorption towers that generate a product gas by adsorbing an adsorption target component other than a hydrogen component to an adsorbent from a raw material gas containing a hydrogen component and a combustible component other than the hydrogen component, and discharging from the adsorption tower
  • An off-gas tank is provided that collects the off-gas that is collected and supplies the collected off-gas to the combustion device.
  • an adsorption step is performed during a unit treatment period, and the adsorption step is performed.
  • a pressure equalizing discharge step is performed during the unit treatment period, and for the adsorption tower that is performed following the pressure equalizing discharge process, a desorption process is performed during the unit treatment period.
  • the adsorption tower that performs the process following the desorption process the adsorption tower that performs a re-pressure process as a pre-process of the adsorption process and performs the desorption process during the unit treatment period
  • the offgas et discharged relates to a pressure swing adsorption hydrogen production method of recovering the off gas tank.
  • Such a pressure fluctuation adsorption hydrogen production method (PSA method: Pressure Swing Adsorption) is performed by adsorbing an adsorbent component other than a hydrogen component on an adsorbent from a raw material gas containing a flammable component other than a hydrogen component and a hydrogen component.
  • PSA method Pressure Swing Adsorption
  • This product produces high-concentration product gas, and the off-gas discharged from the adsorption tower contains flammable components. Therefore, the off-gas collected in the off-gas tank is supplied to the combustion device for combustion. It is a thing.
  • a product gas is produced using a reformed gas supplied from a reformer for reforming a city gas as a raw material gas, and the product gas is supplied to a fuel cell.
  • a reformer for reforming a city gas as a raw material gas
  • off-gas is supplied to a combustion apparatus that heats the reformer (see, for example, Patent Document 1).
  • an internal gas of the adsorption tower in the desorption process is discharged to an off-gas tank as an internal gas of the adsorption tower in the desorption process, and an internal gas of the adsorption tower in the pressure equalization discharge process is used.
  • a purge process is performed in order, which is caused to flow through an adsorption tower in the desorption process and is discharged as an offgas to an offgas tank.
  • the desorption step it is desired to improve the recovery efficiency of the adsorption target component by accurately desorbing the adsorption target component adsorbed by the adsorbent of the adsorption tower in the desorption step. It is.
  • a pressure fluctuation adsorption type hydrogen production method is conceivable in which a vacuum pump that sucks the adsorption tower in the desorption step is provided so that the adsorption target component is accurately separated. There is a possibility that off-gas may not be properly supplied to the combustion device.
  • the inventor of the present application has considered a pressure fluctuation adsorption type hydrogen production method in which the adsorption tower in the desorption process is sucked by a vacuum pump.
  • the suction tower is simply sucked by the vacuum pump, It has been found that there is a possibility that it cannot be properly supplied.
  • an A tower, a B tower, a C tower, and a D tower are provided, and a raw material gas G compressed by a compressor 2 is disposed below the four adsorption towers 1.
  • a raw material gas G compressed by a compressor 2 is disposed below the four adsorption towers 1.
  • the source gas supply path 3 for supplying the gas
  • the offgas discharge path 4 for discharging the offgas.
  • source gas supply valves A1, B1, C1, D1 for opening and closing the source gas supply path 3, and off gas discharge valves A5, B5 for opening and closing the off gas discharge path 4, C5 and D5 are provided.
  • An original gas valve 3 ⁇ / b> A that is closed when the hydrogen gas production operation is stopped is provided at the downstream side of the compressor 2 in the raw material gas supply path 3.
  • the product gas delivery path 5 for delivering the product gas H and a part of the product gas H branched from the product gas delivery path 5 and flowing through the product gas delivery path 5 are adsorbed to the adsorption tower 1.
  • a reflux path 6 that returns to 1 and a tower communication path 7 for connecting the four adsorption towers 1 to each other are connected.
  • D3 and communication on / off valves A4, B4, C4, D4 for opening and closing the tower communication passage 7 are provided.
  • the offgas discharge passage 4 is provided with an offgas tank T that collects offgas and supplies the collected offgas to a burner 8 as a combustion device.
  • the first tank T1 and the second tank T2 are provided as the offgas tank T, and the tank installation portion in which the offgas tank T is installed in the offgas discharge path 4 is the first discharge path 4a and the second tank T2.
  • a discharge path 4b is provided in parallel, and the first tank T1 is disposed in the first discharge path 4a, and the second tank T2 is disposed in the second discharge path 4b.
  • a pump disposition flow path 9 is provided in a state of connecting a location upstream of the tank installation portion in the off-gas discharge passage 4 and a location upstream of the second tank T2 in the second discharge passage 4b.
  • a vacuum pump P is disposed in the path 9.
  • the 1st on-off valve V1 is installed in the upstream part rather than the vacuum pump P of the pump arrangement
  • positioning flow path 9 in the off gas discharge path 4 and in the upstream part rather than the 1st tank T1 of the 1st discharge path 4a,
  • the second on-off valve V2 is installed, and the third on-off valve V3 is installed on the upstream side of the connection portion of the pump disposition channel 9 in the second discharge path 4b.
  • the off-gas from the adsorption tower 1 is recovered in the first tank T1 as shown in FIG.
  • the first flow state supplied to the burner 8 can appear.
  • the off-gas from the adsorption tower 1 is recovered in the second tank T2 as shown in FIG.
  • the 2nd flow state supplied to the burner 8 can appear.
  • the suction tower 1 is sucked by the vacuum pump P as shown in FIG.
  • the third flow state of supplying the burner 8 while the off-gas supplied at the second tank T2 is recovered can be realized.
  • a first flow rate control valve R1 is installed in the downstream portion of the first discharge path 4a relative to the first tank T1, and a second flow rate control is positioned in the downstream portion of the second discharge path 4b relative to the second tank T2.
  • the valve R2 is installed, and the flow rate control of the first flow rate control valve R1 and the second flow rate control valve R2 suppresses the flow rate of the off gas supplied to the burner 8 from being excessively high or low.
  • the flow rate of the off gas is controlled by the first flow control valve R1
  • the second flow state and the third flow state basically, the off flow rate of the off gas is controlled by the second flow control valve R2.
  • the first flow rate control valve R1 is controlled to supply the recovered off gas to the first tank T1.
  • the operation cycle shown in FIG. 12 was adopted.
  • the adsorption process is performed during the unit treatment period, and for the adsorption tower 1 that performs the process following the adsorption process, the pressure equalizing discharge process is performed during the unit treatment period.
  • the desorption process is performed during the unit treatment period, and for the adsorption tower 1 that performs the process subsequent to the desorption process, the adsorption process is performed during the unit treatment period.
  • a re-pressure process as a previous process is performed.
  • each of the four adsorption towers 1 is sequentially performed in such a manner that the adsorption process, the pressure equalizing discharge process, the desorption process, and the return pressure process are switched to the next process every time the unit processing period elapses.
  • each of the four adsorption towers 1 sequentially performs an adsorption process, a pressure equalizing discharge process, a desorption process, and a decompression process.
  • A The case where the tower performs the adsorption process, the B tower performs the return pressure process, the C tower performs the desorption process, and the D tower performs the pressure equalizing discharge process will be described.
  • the source gas supply valve A1 and the product gas delivery valve A2 corresponding to the tower A are opened, and the adsorption process is performed for the tower A during the unit processing period.
  • a pressure equalization discharge process a pre-stage discharge process is performed in the initial stage of the unit treatment period to supply the gas inside the tower D of the pressure equalization discharge process to the tower B of the return pressure process, and the pressure equalization discharge is performed at the end of the unit treatment period.
  • a post-discharge process is performed in which the internal gas of the tower D in the process is supplied to the tower C in the desorption process.
  • the communication on / off valves A4, B4, C4, and D4 are selectively opened.
  • a depressurization step of discharging the internal gas of the C tower in the desorption step to the off-gas tank T as an off-gas is performed as described later in the initial stage of the unit treatment period.
  • the vacuum pump P performs a pump suction process for sucking the C tower in the desorption process (see FIG. 15), and desorbs the gas supplied from the D tower of the pressure equalization discharge process in the latter stage discharge process at the end of the unit treatment period.
  • a subsequent-stage receiving process is performed in the C tower of the process (see FIG. 16).
  • the depressurization step As the depressurization step, the first depressurization step (see FIG. 13) for communicating the C tower and the first tank T1 in the desorption step in the first flow state as described above, and the second flow state as described above.
  • the second depressurization step (see FIG. 14) for connecting the C tower in the desorption step and the second tank T2 is sequentially performed, and then the above-described tank suction step is performed.
  • a pre-stage receiving process is performed in which the gas supplied by the pre-stage discharging process from column D of the pressure equalizing discharge process is received in tower B of the pressure reducing process.
  • a pressure raising step is performed in which a part of the product gas H generated in step B is received in the B tower of the pressure reduction step.
  • product gas recirculation valve B3 corresponding to B tower is opened among product gas recirculation valves A3, B3, C3, D3.
  • the unit processing period is divided into the first step to the fifth step.
  • the pre-stage receiving process and the pre-stage discharging process are performed in the first step and the second step, the pressure increasing process and the pump suction process are performed in the third step and the fourth step, and the first pressure reducing process is performed.
  • the first step is performed, the second decompression step is performed in the second step, and the subsequent receiving step and the subsequent discharging step are performed in the fifth step.
  • a special process is not performed in the fifth step.
  • a special process is performed in the third and fourth steps. It will be in the dormant state which does not implement a process. It should be noted that the time length of each step from the first step to the fifth step is not necessarily the same length, but is set to a length suitable for performing each step.
  • FIG. 17 shows the change in the pressure of the first tank T1 and the second tank T2, the change in the off-gas flow rate flowing toward the burner 8 through the off-gas discharge path 4, and the adsorption tower 1 when the comparison method described above is performed. It shows a change in pressure of (C tower).
  • the pressure in the second tank T2 corresponds to the discharge pressure of the vacuum pump P.
  • the start of the first pressure reduction process is described as “first pressure reduction start”
  • the start of the second pressure reduction process is described as “second pressure reduction start”
  • the start of the pump suction process is referred to as “vacuum process”.
  • “Start” is described
  • the end of the pump suction process is described as "End of vacuum process”.
  • FIG. 17 shows the change in the case where the internal pressure of the adsorption tower 1 in the adsorption process is about 750 kPaG and the internal pressure of the adsorption tower 1 (C tower) in the stage where the post-discharge process is performed is about 150 kPaG. It is shown. Then, when the first pressure reduction process is performed, the internal pressure (about 150 kPaG) of the adsorption tower 1 (C tower) when starting the desorption process decreases from about 150 kPaG to about 70 kPaG, and the second pressure reduction process is performed.
  • the internal pressure of the adsorption tower 1 (C tower) decreases to near atmospheric pressure (about 10 kPaG), and when the pump suction process is performed, the internal pressure of the adsorption tower 1 (C tower) becomes about ⁇ It shows a decrease near 90 kPaG.
  • the amount of off gas is extremely small even though the amount of off gas recovered in the first tank T1 and the second tank T2 is decreased. This is because the off gas is not supplied to the tank T1 and the second tank T2.
  • the off gas recovered in the first tank T1 and the second tank T2 is supplied to the burner 8 in a state where the amount of recovered off gas in the first tank T1 and the second tank T2 is reduced.
  • the off-gas amount is extremely reduced.
  • the combustion state of the burner 8 becomes unstable when the off-gas amount suddenly increases due to the start of the pump suction process or when the off-gas amount becomes extremely small at the end of the fifth step of the unit processing period. There is a fear.
  • the pressure fluctuation adsorption hydrogen production method of the comparative method there is a possibility that the off-gas cannot be properly supplied to the combustion apparatus, and there is a need for improvement.
  • the present invention has been made in view of the above circumstances, and the purpose thereof is pressure fluctuation adsorption capable of increasing the recovery efficiency of the adsorption target component while appropriately supplying off-gas to the combustion apparatus. It is in providing a formula hydrogen production method.
  • the pressure fluctuation adsorption-type hydrogen production method of the present invention includes four adsorption towers that produce a product gas by adsorbing an adsorbent component other than a hydrogen component to an adsorbent from a raw material gas containing a hydrogen component and a combustible component other than the hydrogen component. And an off-gas tank for collecting off-gas discharged from the adsorption tower and supplying the collected off-gas to the combustion device is provided, For one of the four adsorption towers, an adsorption process is performed during the unit treatment period, and for the adsorption tower that performs the process following the adsorption process, a pressure equalizing discharge process is performed during the unit treatment period.
  • the adsorption tower that performs the step following the pressure equalizing discharge step is performed during the unit treatment period, the desorption step is performed, and the adsorption tower that performs the step subsequent to the desorption step is performed during the unit treatment period.
  • the first characteristic method is A vacuum pump for supplying off-gas sucked from the adsorption tower to the combustion device is provided so as to be switchable between an adsorption tower working state that sucks the adsorption tower and a tank working state that sucks the vacuum tank.
  • the vacuum tank is provided so as to be switchable between a communication state communicating with the adsorption tower and a shut-off state where communication with the adsorption tower is blocked,
  • a pre-stage discharge step of supplying the gas in the adsorption tower of the pressure equalization discharge step to the adsorption tower of the return pressure step is performed, and the unit treatment period
  • a post-stage discharge step of supplying the internal gas of the adsorption tower of the pressure equalization discharge step to the adsorption tower of the desorption step.
  • the vacuum pump switched to the shut-off state is suctioned by the vacuum pump switched to the tank operating state, and the off-gas discharge in the vacuum tank and the negative of the vacuum tank are performed.
  • a depressurization step of discharging the internal gas of the adsorption tower in the desorption step to the off-gas tank as an off-gas at the initial stage of the unit treatment period is performed, and the negative pressure state is set in the middle period of the unit treatment period.
  • the vacuum pump that has been switched to the vacuum pump sequentially performs the pump suction process of sucking the adsorption tower of the desorption process, and is supplied from the adsorption tower of the pressure equalization discharge process by the post-stage discharge process at the end of the unit treatment period.
  • a subsequent receiving step for receiving the gas to be absorbed into the adsorption tower in the desorption step In the initial stage of the unit treatment period, as the re-pressure process, a pre-stage receiving process for receiving the gas supplied by the pre-stage discharge process from the adsorption tower of the pressure equalizing discharge process into the adsorption tower of the re-pressure process, Thereafter, a pressure raising step is performed in which a part of the product gas generated in the adsorption tower in the adsorption step is received in the adsorption tower in the return pressure step.
  • a pre-discharge process is performed in the initial stage of the unit treatment period, in which a gas inside the adsorption tower of the pressure equalizing discharge process is supplied to the adsorption tower of the return pressure process, and at the end of the unit treatment period.
  • a post-stage discharge process for supplying the internal gas of the adsorption tower in the pressure discharge process to the adsorption tower in the desorption process is performed.
  • a pre-stage receiving process is performed in which the gas supplied by the pre-stage discharge process from the adsorption tower of the pressure equalization discharge process is received in the adsorption tower of the re-pressure process.
  • a pressurization process is performed in which part of the product gas generated in the adsorption tower is received in the adsorption tower in the decompression process.
  • the vacuum pump switched to the shut-off state blocking communication with the adsorption tower with the vacuum pump switched to the tank acting state sucking acting on the vacuum tank,
  • the off-gas is discharged from the vacuum tank and the vacuum tank is adjusted to a negative pressure state.
  • the off gas discharged from the vacuum tank by the suction action of the vacuum pump is supplied to the combustion device.
  • a depressurization process is performed in which the internal gas of the adsorption tower in the desorption process is discharged as an off-gas tank to the off-gas tank at an early stage of the unit treatment period, and a tank suction process and a pump suction process are performed in the middle period of the unit treatment period.
  • a post-stage receiving process for receiving the gas supplied by the post-stage discharge process from the adsorption tower of the pressure equalizing discharge process into the adsorption tower of the desorption process is performed.
  • the tank suction process in the desorption process is performed by switching the vacuum tank adjusted to the negative pressure state by the suction of the vacuum pump at the end of the unit processing period to the communication state communicating with the adsorption tower in the desorption process.
  • This is a process of sucking the internal gas of the adsorption tower into the vacuum tank, and the pump suction process switches the vacuum tank to a shut-off state that shuts off the communication with the adsorption tower, and enters a communication state that communicates with the adsorption tower in the desorption process.
  • the adsorption tower in the desorption process is sucked by the switched vacuum pump.
  • the off gas from the adsorption tower in the desorption process can be appropriately supplied to the combustion apparatus. That is, in the initial stage of the unit treatment period, the internal gas of the adsorption tower in the desorption process is discharged as an offgas to the offgas tank by the depressurization process in the desorption process, so that the offgas collected in the offgas tank is supplied to the combustion device as appropriate. be able to.
  • the vacuum tank in the negative pressure state acts on the adsorption tower in the desorption process, and the off-gas discharged from the adsorption tower in the desorption process is removed.
  • the combustion device a large amount of offgas is recovered in the offgas tank by the initial decompression process in the unit processing period. Therefore, by supplying the recovered offgas to the combustion device, the offgas Can be properly supplied to the combustion apparatus.
  • the vacuum pump sucks the adsorption tower in the desorption process, so that the off-gas discharged from the adsorption tower in the desorption process is supplied to the combustion device. Since it will be in the supply state, off-gas can be supplied to a combustion apparatus as appropriate.
  • the off-gas is not discharged from the adsorption tower in the desorption process, but at the end of the unit treatment period, the tank action state in which suction acts on the vacuum tank With the vacuum pump switched to, the vacuum tank switched to the shut-off state that shuts off the communication with the adsorption tower is suctioned to discharge the off-gas in the vacuum tank and adjust the vacuum tank to the negative pressure state Therefore, since the off gas collected in the vacuum tank in the tank suction step is in a state of being supplied to the combustion device, the off gas can be supplied to the combustion device as appropriate.
  • the pump suction process is performed after the tank suction process is performed, when the pump suction process is started, the internal pressure of the adsorption tower in the desorption process is changed to the first. Since the tank suction process performed in the step 1 can be adjusted to a pressure lower than the atmospheric pressure, immediately after starting the pump suction process, the amount of off-gas supplied to the combustion device is suppressed from increasing rapidly, Can be properly supplied to the combustion apparatus.
  • the inside of the adsorption tower in the desorption step is sucked so that the internal pressure of the adsorption tower in the desorption step is higher than the atmospheric pressure. Since the pressure is low, the adsorption target component adsorbed by the adsorbent of the adsorption tower can be accurately separated, so that the recovery efficiency of the adsorption target component can be increased.
  • the first characteristic method of the present invention it is possible to provide a pressure fluctuation adsorption type hydrogen production method capable of increasing the recovery efficiency of the adsorption target component while appropriately supplying off-gas to the combustion apparatus.
  • a first tank and a second tank are provided as the off-gas tank, and the desorption is performed as the depressurization step.
  • the first depressurization step for communicating the adsorption tower and the first tank in the step, and the second depressurization step for communicating the adsorption tower and the second tank in the desorption step are sequentially performed, and then the tank It is characterized in that a suction process is performed.
  • the first tank recovers the internal gas of the adsorption tower in the desorption process as off-gas in the first tank, and the internal gas of the adsorption tower in the desorption process as the off-gas in the second tank.
  • the second decompression step is sequentially performed, and the tank suction step is performed subsequent to the second decompression step.
  • the internal gas of the adsorption tower in the desorption process is sequentially collected in the first tank and the second tank, the first tank and the second tank are collected rather than collecting the offgas using one offgas tank.
  • the internal gas of the adsorption tower in the desorption process can be properly recovered while avoiding the two tanks from becoming large capacity tanks.
  • the internal pressure at the start of the depressurization process of the adsorption tower in the desorption process is determined by the internal pressure in the adsorption process (for example, , About 750 kPaG), but at a fairly high pressure (eg, about 150 kPaG).
  • the inside of the adsorption tower in the desorption process Since the offgas tank has a capacity that allows the gas to expand from a high pressure (for example, about 150 kPaG) to a target pressure (for example, about 40 kPaG), there is a disadvantage that the offgas tank becomes an extremely large capacity tank. .
  • the internal pressure of the adsorption tower in the desorption step is considerably higher than the atmospheric pressure from the initial pressure when the pressure reduction step is started (when the desorption step is started) (for example, about Until the internal pressure of the adsorption tower in the desorption process reaches a target pressure higher than the atmospheric pressure (for example, about 40 kPaG).
  • the inside of the adsorption tower in the desorption step can be avoided while avoiding the provision of an extremely large capacity tank as an off-gas tank. It is possible to provide a pressure fluctuation adsorption type hydrogen production method capable of appropriately recovering gas.
  • a third characteristic method of the pressure fluctuation adsorption hydrogen production method of the present invention is characterized in that, in addition to the second characteristic method, the vacuum pump is configured to supply an off gas to the second tank. To do.
  • the off-gas discharged from the vacuum pump is temporarily stored in the second tank and then supplied to the combustion device. Therefore, the high-pressure off-gas discharged from the vacuum pump is stabilized at an appropriate pressure. Therefore, off-gas having a stable pressure at an appropriate pressure is supplied to the combustion device.
  • the off-gas discharged from the vacuum pump is supplied to the combustion device in a state where the pressure is stable at an appropriate pressure, the combustion state of the combustion device can be stabilized.
  • a pressure fluctuation adsorption type hydrogen production method capable of stabilizing the combustion state of the combustion apparatus can be provided.
  • the fourth feature method of the pressure fluctuation adsorption hydrogen production method of the present invention includes: When performing the first decompression step, the vacuum pump in the shut-off state is suctioned by the vacuum pump switched to the tank action state.
  • the vacuum tank switched to the shut-off state that shuts off the communication with the adsorption tower is sucked by the vacuum pump that is switched to the tank action state that sucks the vacuum tank.
  • the vacuum tank switched to the shut-off state is sucked by the vacuum pump switched to the tank operating state, and the off-gas is discharged from the vacuum tank and the vacuum tank is adjusted to the negative pressure state.
  • the vacuum tank switched to the shut-off state is suctioned by the vacuum pump switched to the tank operation state. Let it continue.
  • the vacuum tank switched to the shut-off state by the vacuum pump switched to the tank operating state is also suctioned when performing the first decompression step in the initial stage of the unit processing period. Therefore, it is possible to appropriately adjust the vacuum tank to the negative pressure state and appropriately perform the tank suction step.
  • the tank suction process is appropriately performed by accurately adjusting the vacuum tank to the negative pressure state.
  • a pressure fluctuation adsorption type hydrogen production method that can be performed can be provided.
  • the fifth feature method of the pressure fluctuation adsorption hydrogen production method of the present invention includes: By the depressurization step, the internal pressure of the adsorption tower in the desorption step is reduced to 40-60% from the initial pressure when the desorption step is started, The tank suction step is performed following the decompression step.
  • the internal pressure of the adsorption tower in the desorption process is reduced to 40 to 60% from the initial pressure when the desorption process is started by the depressurization process, and the tank suction process is performed following this depressurization process.
  • the internal pressure of the adsorption tower in the desorption process is reduced to 60 to 90 kPaG by the depressurization process, and the internal pressure of the adsorption tower in the desorption process is large by the tank suction process.
  • the pressure is reduced to a negative pressure state lower than the atmospheric pressure.
  • the internal pressure of the adsorption tower in the desorption step is reduced to 40 to 60% from the initial pressure at the start of the desorption step by the depressurization step, so that the offgas tank has a large capacity.
  • the tank suction step can be performed appropriately.
  • the capacity of the offgas tank becomes extremely large. There is an inconvenience.
  • the internal pressure of the adsorption tower in the desorption process is reduced by a pressure that is less than 40% from the initial pressure when the desorption process is started, the capacity of the offgas tank becomes extremely large.
  • the tank suction step makes it difficult to reduce the internal pressure of the adsorption tower in the desorption step to a negative pressure state.
  • the sixth characteristic method of the pressure fluctuation adsorption hydrogen production method of the present invention includes: When performing the decompression step, the vacuum pump in the shut-off state is suctioned by the vacuum pump switched to the tank action state.
  • the vacuum tank switched to the shut-off state that shuts off the communication with the adsorption tower is sucked by the vacuum pump that is switched to the tank action state that sucks the vacuum tank.
  • the vacuum tank switched to the shut-off state is sucked by the vacuum pump switched to the tank operating state, and the off-gas is discharged from the vacuum tank and the vacuum tank is adjusted to the negative pressure state. Subsequently, even when the initial pressure reduction process in the unit processing period is performed, the vacuum pump switched to the shut-off state is continuously operated by the vacuum pump switched to the tank operation state. .
  • the vacuum tank switched to the shut-off state is suctioned by the vacuum pump switched to the tank operating state. Therefore, the tank suction step can be appropriately performed by accurately adjusting the vacuum tank to the negative pressure state.
  • the vacuum suction of the vacuum tank is accurately adjusted and the tank suction process is appropriately performed. It is possible to provide a pressure fluctuation adsorption type hydrogen production method capable of
  • the seventh characteristic method of the pressure fluctuation adsorption-type hydrogen production method of the present invention is a method in which the off-gas tank is connected to the adsorption tower in the desorption step in the depressurization step.
  • One tank and a second tank are provided, and the vacuum pump is configured to supply off gas to the second tank.
  • a first tank and a second tank are provided as off-gas tanks.
  • a 1st tank will be connected to the adsorption tower of a desorption process in a pressure reduction process, and will collect
  • the off-gas from the adsorption tower in the desorption process is recovered in the depressurization process. Therefore, the initial pressure when the internal pressure of the adsorption tower in the desorption process starts the desorption process by the depressurization process. It is possible to appropriately recover off-gas while the pressure is reduced from 40 to 60%.
  • the off gas discharged from the vacuum pump is temporarily stored in the second tank and then supplied to the combustion device, the high pressure off gas discharged from the vacuum pump is stabilized at an appropriate pressure. Since the gas can be adjusted to an appropriate gas, an off-gas having a stable pressure at an appropriate pressure is supplied to the combustion device, and the combustion state of the combustion device can be stabilized.
  • off-gas is appropriately recovered in the decompression step, and the combustion state of the combustion device is stabilized. It is possible to provide a pressure fluctuation adsorption type hydrogen production method that can be used.
  • the eighth characteristic method of the pressure fluctuation adsorption type hydrogen production method of the present invention is for off gas that adsorbs off gas discharged from the adsorption tower to the vacuum tank. It is characterized in that an adsorbent is loaded.
  • the vacuum tank repeats a state where the pressure is reduced by being sucked by the vacuum pump and a state where the pressure is increased when the off-gas discharged from the adsorption tower is introduced.
  • the off-gas discharged from the adsorption tower is adsorbed by the off-gas adsorbent when introduced into the vacuum tank.
  • the off gas adsorbed by the off gas adsorbent is separated from the off gas adsorbent and discharged from the vacuum tank when the vacuum pump sucks the vacuum tank.
  • the off gas discharged from the adsorption tower is stored in the vacuum tank while being adsorbed by the off gas adsorbent, the volume of the vacuum tank is smaller than when no off gas adsorbent is loaded. Even if this is reduced, the off-gas can be stored in the vacuum tank in a predetermined manner, and therefore the vacuum tank can be reduced in size.
  • the eighth characteristic method of the present invention in addition to the operational effects of the first to seventh characteristic methods, it is possible to provide a pressure fluctuation adsorption type hydrogen production method capable of reducing the size of the vacuum tank.
  • the ninth characteristic method of the pressure fluctuation adsorption hydrogen production method of the present invention includes:
  • the source gas is reformed from the gas to be treated mainly composed of methane, and is generated to contain hydrogen, methane as a combustible component other than hydrogen, carbon monoxide, nitrogen, carbon dioxide, and moisture.
  • the adsorbent loaded in the adsorption tower is configured to include a zeolite that adsorbs carbon monoxide and nitrogen, a carbon molecular sieve that adsorbs methane and carbon dioxide, and an activated alumina that adsorbs moisture.
  • the off-gas adsorbent is a carbon molecular sieve that adsorbs methane and carbon dioxide.
  • the adsorbent loaded into the adsorption tower in accordance with the fact that the source gas contains methane, carbon monoxide, nitrogen, carbon dioxide, and moisture as flammable components other than the hydrogen component and the hydrogen component is carbon monoxide.
  • the source gas contains methane, carbon monoxide, nitrogen, carbon dioxide, and moisture as flammable components other than the hydrogen component and the hydrogen component is carbon monoxide.
  • it is configured to include a zeolite that adsorbs nitrogen, a carbon molecular sieve that adsorbs methane and carbon dioxide, and activated alumina that adsorbs moisture.
  • a product gas with a high hydrogen concentration can be produced accurately.
  • the off-gas When the raw material gas is generated by reforming the gas to be treated mainly composed of methane, the off-gas will contain a large amount of methane and carbon dioxide. In view of this, since the off-gas adsorbent loaded in the vacuum tank is a carbon molecular sieve that adsorbs methane and carbon dioxide, the off-gas adsorbent loaded in the vacuum tank can be simplified.
  • the ninth characteristic method of the present invention it is possible to provide a pressure fluctuation adsorption type hydrogen production method capable of simplifying the off-gas adsorbent loaded in the vacuum tank.
  • Schematic showing an apparatus for carrying out the pressure fluctuation adsorption hydrogen production method Diagram showing operating cycle
  • the figure which shows a 1st pressure reduction process The figure which shows a 2nd pressure reduction process Diagram showing tank suction process Diagram showing pump suction process Diagram showing the latter stage acceptance process Graph showing changes in off-gas flow rate, changes in adsorption tower pressure, etc.
  • the raw material gas is a reformed gas generated by reforming city gas as a gas to be treated mainly composed of methane, and includes methane, carbon dioxide, methane as flammable components other than hydrogen and hydrogen gas.
  • Carbon dioxide, moisture, and nitrogen are included, and methane, carbon dioxide, carbon monoxide, moisture, and nitrogen are adsorbed by the adsorbent of the adsorption tower 1 as components to be adsorbed other than hydrogen.
  • the adsorbent is configured to include a zeolite that adsorbs carbon monoxide and nitrogen, a carbon molecular sieve that adsorbs methane and carbon dioxide, and activated alumina that adsorbs moisture.
  • the four adsorption towers 1 are provided with an A tower, a B tower, a C tower, and a D tower.
  • the offgas tank T is a first tank T1
  • a second tank T2 having a smaller capacity than one tank T1 is provided, and a vacuum pump P is provided.
  • positioning flow path 10 is a part upstream from the connection location of the pump arrangement
  • a vacuum tank S is disposed in the tank disposition channel 10, and a fourth on-off valve V ⁇ b> 4 is disposed on the upstream side of the vacuum tank S in the tank disposition channel 10.
  • a fifth on-off valve V5 is disposed on the downstream side of the vacuum tank S in FIG.
  • the off gas from the adsorption tower 1 is recovered in the first tank T1 as shown in FIG.
  • the first flow state supplied to the burner 8 can appear.
  • FIG. 3 shows a state in which, in addition to the second on-off valve V2, the fifth on-off valve V5 is opened and the vacuum pump P is operated for suction.
  • the vacuum tank S is accurately adjusted to a negative pressure state.
  • the off-gas from the adsorption tower 1 is recovered in the second tank T2 as shown in FIG.
  • the 2nd flow state supplied to the burner 8 can appear.
  • the first on-off valve V1 is opened, the others are closed, and the vacuum pump P is operated by suction, as shown in FIG.
  • a third flow state in which the tower 1 is sucked and the off-gas supplied by the vacuum pump P is supplied to the burner 8 while being collected in the second tank T2 can appear.
  • the fifth on-off valve V5 is opened, the others are closed, and the vacuum pump P is operated by suction to collect in the vacuum tank S as shown in FIG.
  • a fifth flow state in which the off gas is sucked by the vacuum pump P and is supplied to the burner 8 while the off gas supplied by the vacuum pump P is recovered in the second tank T2 can appear.
  • the vacuum tank S is continuously sucked by the vacuum pump P even after the collected off-gas is discharged, so that the negative pressure state is adjusted.
  • the third flow state corresponds to the adsorption tower action state in which the vacuum pump P sucks the adsorption tower 1
  • the fifth flow state corresponds to the vacuum pump P with respect to the vacuum tank S.
  • This corresponds to the tank action state in which the suction action is performed. That is, in the present embodiment, the first on-off valve V1 to the fifth on-off valve V5 are selectively opened and closed to switch between the adsorption tower action state and the tank action state.
  • the fourth flow state corresponds to a communication state where the vacuum tank S communicates with the adsorption tower 1
  • the first to third flow states and the fifth flow state correspond to the vacuum tank S.
  • This corresponds to a blocked state in which communication with the adsorption tower 1 is blocked.
  • the first on-off valve V1 to the fifth on-off valve V5 can be selectively opened and closed to switch between the communication state and the cutoff state.
  • the first flow rate control valve R1 is installed in the downstream portion of the first discharge path 4a from the first tank T1, and the second discharge path 4b
  • a second flow rate control valve R2 is installed downstream of the two tanks, and the flow rate of the off-gas supplied to the burner 8 is excessive due to the flow rate control of the first flow rate control valve R1 and the second flow rate control valve R2. It will be suppressed from becoming too small.
  • the flow rate of the off gas is controlled by the first flow rate control valve R1, and basically in the second flow state to the fifth flow state, the off gas flow is basically controlled by the second flow rate control valve R2.
  • the first flow rate control valve R1 is controlled to supply the recovered off gas to the first tank T1.
  • each of the four adsorption towers 1 sequentially performs the adsorption process, the pressure equalizing discharge process, the desorption process, and the return pressure process by switching to the next process every time the unit treatment period elapses.
  • the tower A performs the adsorption process
  • the tower B performs the return pressure process
  • the tower C performs the desorption process
  • the tower D performs the pressure equalization discharge process. explain.
  • the source gas supply valve A1 and the product gas delivery valve A2 corresponding to the tower A are opened, and the adsorption process is performed for the tower A during the unit processing period.
  • a pressure equalization discharge process a pre-stage discharge process is performed in the initial stage of the unit treatment period to supply the gas inside the tower D of the pressure equalization discharge process to the tower B of the return pressure process, and the pressure equalization discharge is performed at the end of the unit treatment period.
  • a downstream discharge step is performed in which the internal gas of the tower D in the process is supplied to the tower C in the desorption process.
  • the communication on / off valves A4, B4, C4, and D4 are selectively opened.
  • a depressurization process for discharging the internal gas of the C tower in the desorption process to the offgas tank T as an off-gas is performed as described later in the initial stage of the unit treatment period.
  • the tank suction process (see FIG. 5) for sucking the C tower in the desorption process with the vacuum tank S and the pump suction process for sucking the C tower in the desorption process with the vacuum pump P in the above-described third flow state ( 6) are sequentially performed, and at the end of the unit processing period, a post-stage receiving process is performed in which the gas supplied by the post-stage discharge process from column D of the pressure equalizing discharge process is received in column C of the desorption process (FIG. 7). reference).
  • the first depressurization step for communicating the C tower and the first tank T1 in the desorption step in the first flow state described above, and the second flow state as described above.
  • the second depressurization step for connecting the C tower in the desorption step and the second tank T2 is sequentially performed, and then the tank suction step is performed.
  • the off-gas in the vacuum tank S is removed in the fifth flow state.
  • the two tanks T2 are discharged and the vacuum tank S is adjusted to a negative pressure state (see FIG. 7).
  • a pre-stage receiving process is performed in which the gas supplied by the pre-stage discharging process from column D of the pressure equalizing discharge process is received in tower B of the pressure reducing process.
  • a pressure raising step is performed in which a part of the product gas H generated in step B is received in the B tower of the pressure reduction step.
  • product gas recirculation valve B3 corresponding to B tower is opened among product gas recirculation valves A3, B3, C3, D3.
  • the unit processing period is divided into the first step to the fifth step.
  • the pre-stage receiving process and the pre-stage discharging process are performed in the first step and the second step
  • the pressure increasing process is performed in the third step and the fourth step
  • the tank suction process is performed in the third step.
  • the pump suction process is performed in the fourth step
  • the first decompression process is performed in the first step
  • the second decompression process is performed in the second step
  • the subsequent receiving process and the subsequent discharging process are performed in the fifth step. Done.
  • a special process is not performed in the fifth step.
  • a special process is performed in the third and fourth steps. It will be in the dormant state which does not implement a process. Note that the time length of each of the first to fifth steps is not the same length, but is set to a length suitable for performing each step.
  • FIG. 8 shows the change in pressure of the first tank T1 and the second tank T2, the offgas flowing toward the burner 8 through the offgas discharge passage 4 when the pressure fluctuation adsorption type hydrogen production method of the present embodiment is carried out. It shows changes in the flow rate, changes in the pressure in the adsorption tower 1 (C tower), and changes in the pressure in the vacuum tank S.
  • the pressure in the second tank T2 corresponds to the discharge pressure of the vacuum pump P.
  • the start of the first depressurization process is described as “first depressurization start”
  • the start of the second depressurization process is described as “second depressurization start”
  • the start of the tank suction process is described as “vacuum equalization”.
  • the start of the pump suction process is described as “start of vacuum process”
  • the end of the pump suction process is described as “end of vacuum process”.
  • FIG. 8 shows the change in the case where the internal pressure of the adsorption tower 1 in the adsorption process is about 750 kPaG and the internal pressure of the adsorption tower 1 (C tower) in the stage where the post-discharge process is performed is about 150 kPaG. It is shown.
  • the internal pressure of the adsorption tower 1 (C tower) decreases from the pressure (about 150 kPaG) at the start of the desorption step to about 70 kPaG, and the second depressurization step is performed.
  • the internal pressure of the adsorption tower 1 (C tower) decreases to about 40 kPaG, and when the tank suction step is performed, the internal pressure of the adsorption tower 1 (C tower) decreases to a pressure lower than the atmospheric pressure. When the pump suction process is performed, the internal pressure of the adsorption tower 1 (C tower) decreases to about ⁇ 90 kPaG.
  • the off gas amount is maintained at a sufficiently large amount because the off gas collected in the vacuum tank S in the tank suction process is discharged to the second tank in the fifth step. Because.
  • the off-gas recovered from the adsorption tower 1 (C tower) is not discharged to the off-gas discharge path 4, but in the third step in which the tank suction process is performed, the first step and the first step By flowing the off gas recovered in the first tank T1 and the second tank T2 in two steps to the off gas discharge path 4, the amount of off gas does not decrease.
  • each of the four adsorption towers 1 sequentially performs the adsorption process, the pressure equalizing discharge process, the desorption process, and the return pressure process by switching to the next process every time the unit treatment period elapses.
  • the tower A performs the adsorption process
  • the tower B performs the return pressure process
  • the tower C performs the desorption process
  • the tower D performs the pressure equalization discharge process. explain.
  • the adsorption step, the return pressure step, and the pressure equalizing discharge step are performed in the same manner as in the above embodiment, but the desorption step is performed in a form different from that in the above embodiment.
  • the desorption step is performed in a form different from that in the above embodiment.
  • a step for connecting the C tower of the desorption step and the first tank T1 in the first fluid state described above is performed.
  • a suction process is performed.
  • the internal pressure of the C column in the desorption process is reduced to 40 to 60% from the initial pressure when the desorption process is started by the depressurization process.
  • the fourth on-off valve V4 and the second discharge passage 4b in which the fourth on-off valve V4 is disposed are provided.
  • the upstream part can be omitted.
  • the upstream portion of the second discharge path 4b is an upstream portion of the second discharge path 4b where the pump arrangement flow path 9 is connected.
  • the unit processing period is divided into the first step to the fifth step. Then, the pre-stage receiving process and the pre-stage discharging process are performed in the first step and the second step, the pressure increasing process is performed in the third step and the fourth step, and the post-stage receiving process and the post-stage discharging process are performed.
  • the points performed in the fifth step are the same as in the above embodiment.
  • the decompression process is performed in the first step
  • the tank suction process is performed in the second step
  • the pump suction process is performed in the third step and the fourth step.
  • the time length of each of the first to fifth steps is not the same length, but is set to a length suitable for performing each step.
  • FIG. 10 shows changes in pressure of the first tank T1 and the second tank T2 when the pressure fluctuation adsorption type hydrogen production method of another embodiment is carried out.
  • the figure shows the change in the flow rate of the off gas flowing through the off gas discharge passage 4 toward the burner 8, the change in the pressure in the adsorption tower 1 (C tower), and the change in the pressure in the vacuum tank S.
  • the start of the decompression process is described as “decompression start”
  • the start of the tank suction process is described as “start of vacuum equalization”
  • the start of the pump suction process is described as “start of vacuum process”.
  • the end of the pump suction process is referred to as “vacuum process end”.
  • FIG. 10 shows the change when the internal pressure of the adsorption tower 1 in the adsorption process is 750 kPaG and the internal pressure of the adsorption tower 1 (C tower) at the stage where the post-discharge process is performed is 150 kPaG. It is.
  • the internal pressure of the adsorption tower 1 (C tower) is reduced from the initial pressure (150 kPaG) at the start of the desorption step to 70 kPaG as a pressure of 40 to 60%. Yes.
  • the internal pressure of the adsorption tower 1 (C tower) decreases below the atmospheric pressure
  • the pump suction step is performed, the internal pressure of the adsorption tower 1 (C tower). Shows a decrease near ⁇ 90 kPaG.
  • the off gas amount is maintained at a sufficiently large amount because the off gas collected in the vacuum tank S in the tank suction process passes through the second tank T2 in the fifth step. It is because it supplies it.
  • the adsorbing tower 1 is loaded as described above in response to the fact that the source gas contains hydrogen, methane, carbon monoxide, nitrogen, carbon dioxide, and moisture as combustible components other than hydrogen.
  • the adsorbent is configured to include a zeolite that adsorbs carbon monoxide and nitrogen, a carbon molecular sieve that adsorbs methane and carbon dioxide, and activated alumina that adsorbs moisture.
  • off gas may contain up to about 70% of methane and carbon dioxide
  • an adsorbent for off gas composed of a carbon molecular sieve that adsorbs methane and carbon dioxide
  • the off-gas adsorbent When the off-gas adsorbent is loaded into the vacuum tank S, the off-gas discharged from the adsorption tower 1 is adsorbed by the off-gas adsorbent when introduced into the vacuum tank S, and the off-gas adsorbent.
  • the vacuum pump P sucks the vacuum tank S, the off-gas adsorbed on the gas is released from the off-gas adsorbent and discharged from the vacuum tank S.
  • the vacuum tank repeats a state where the pressure is reduced by being sucked by the vacuum pump P and a state where the pressure is increased when the off-gas discharged from the adsorption tower 1 is introduced.
  • the agent When the agent is loaded in the vacuum tank S, the offgas discharged from the adsorption tower 1 is adsorbed by the offgas adsorbent when introduced into the vacuum tank S.
  • the offgas adsorbed by the offgas adsorbent is separated from the offgas adsorbent and discharged from the vacuum tank S when the vacuum pump P sucks the vacuum tank S.
  • the vacuum tank S is compared with a case where no off gas adsorbent is loaded. Even if the volume of S is reduced, the off-gas can be stored in the vacuum tank S as predetermined, so that the vacuum tank S can be downsized. That is, as a result of the methane and carbon dioxide contained in the off gas being adsorbed by the off gas adsorbent, the volume of the vacuum tank S is reduced (for example, reduced by about 60%) as compared with the case where no off gas adsorbent is loaded. However, the off-gas can be recovered in the vacuum tank S as prescribed.
  • the case where the raw material gas contains methane, carbon dioxide, carbon monoxide, and nitrogen as flammable components other than hydrogen and hydrogen gas is exemplified.
  • the pressure fluctuation adsorption type hydrogen production method of the invention is applicable to various gases containing flammable components other than hydrogen and hydrogen components as a raw material gas.
  • an apparatus including four adsorption towers 1 has been described as an apparatus for carrying out the pressure fluctuation adsorption type hydrogen production method according to the present invention, but the pressure fluctuation adsorption type according to the present invention.
  • an apparatus for carrying out the hydrogen production method four or more adsorption towers 1 are provided, and in the specific four adsorption towers 1 among those adsorption towers 1, an adsorption process, a pressure equalizing discharge process, a desorption process,
  • the pressure fluctuation adsorption-type hydrogen production method according to the present invention may be carried out in a form in which a re-pressure process is performed.
  • the vacuum tank S In the modified configuration of the vacuum tank S described above, the case where the vacuum tank S is loaded with the off-gas adsorbent configured by the carbon molecular sieve that adsorbs methane and carbon dioxide is exemplified. Similarly, the vacuum tank S is loaded with an adsorbent for offgas, such as zeolite adsorbing carbon monoxide and nitrogen, carbon molecular sieve adsorbing methane and carbon dioxide, and activated alumina adsorbing moisture. Also good.
  • an adsorbent for offgas such as zeolite adsorbing carbon monoxide and nitrogen, carbon molecular sieve adsorbing methane and carbon dioxide, and activated alumina adsorbing moisture. Also good.
  • Adsorption Tower 8 Combustion Device P Vacuum Pump S Vacuum Tank T Off Gas Tank T1 First Tank T2 Second Tank

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Organic Chemistry (AREA)
  • Analytical Chemistry (AREA)
  • General Chemical & Material Sciences (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Combustion & Propulsion (AREA)
  • Inorganic Chemistry (AREA)
  • Separation Of Gases By Adsorption (AREA)
  • Hydrogen, Water And Hydrids (AREA)
  • Industrial Gases (AREA)

Abstract

 燃焼装置に対してオフガスを適切に供給するようにしながら、吸着対象成分の回収効率を高めることができる圧力変動吸着式水素製造方法を提供する低廉化や燃焼運転の効率化を図ることができる管状バーナを提供する。脱着工程として、単位処理期間の初期において、吸着塔1の内部ガスをオフガスとしてオフガスタンクTに排出する減圧工程を行い、単位処理期間の中期において、負圧状態に調整された真空タンクSにて、吸着塔1の内部ガスを吸引するタンク吸引工程、及び、真空ポンプPにて吸着塔1を吸引するポンプ吸引工程を順次行い、単位処理期間の終期において、真空ポンプPにて真空タンクSを吸引作用して、真空タンクS内のオフガスの排出及び真空タンクSの負圧状態への調整を行う。

Description

圧力変動吸着式水素製造方法
 本発明は、水素成分及び水素成分以外の可燃性成分を含む原料ガスから水素成分以外の吸着対象成分を吸着剤に吸着して製品ガスを生成する4つの吸着塔、及び、前記吸着塔から排出されるオフガスを回収しかつ回収したオフガスを燃焼装置に供給するオフガスタンクが設けられ、4つの前記吸着塔のうちの1つについては、単位処理期間の間は吸着工程を行い、前記吸着工程に続く工程を行う前記吸着塔については、前記単位処理期間の間は均圧用排出工程を行い、前記均圧用排出工程に続く工程を行う前記吸着塔については、前記単位処理期間の間は脱着工程を行い、前記脱着工程に続く工程を行う前記吸着塔については、前記単位処理期間の間は前記吸着工程の前工程としての復圧工程を行い、且つ、前記脱着工程を行う前記吸着塔から排出されるオフガスを前記オフガスタンクに回収する圧力変動吸着式水素製造方法に関する。
 かかる圧力変動吸着式水素製造方法(PSA法:Pressure Swing Adsorption)は、水素成分及び水素成分以外の可燃性成分を含む原料ガスから水素成分以外の吸着対象成分を吸着剤に吸着することにより、水素濃度の高い製品ガスを製造するものであり、また、吸着塔から排出されるオフガスには、可燃性成分が含まれているため、オフガスタンクに回収したオフガスを燃焼装置に供給して燃焼させるようにしたものである。
 このような圧力変動吸着式水素製造方法の従来例として、都市ガスを改質処理する改質器から供給される改質ガスを原料ガスとして製品ガスを製造し、製品ガスを燃料電池に供給し、改質器を加熱する燃焼装置にオフガスを供給するようにしたものがある(例えば、特許文献1参照。)。
 特許文献1の圧力変動吸着式水素製造方法においては、脱着工程として、脱着工程の吸着塔の内部ガスをオフガスとしてオフガスタンクに排出するブロー工程、及び、均圧用排出工程の吸着塔の内部ガスを脱着工程の吸着塔を通して流動させて、オフガスとしてオフガスタンクに排出するパージ工程を順次行うようになっている。
 ちなみに、特許文献1には記載されてはいないが、パージ工程において、吸着工程の吸着塔から供給される製品ガスの一部を脱着工程の吸着塔を通して流動させて、オフガスとしてオフガスタンクに排出するようにする例もある。
特開2002-355522号公報
 圧力変動吸着式水素製造方法においては、脱着工程において、脱着工程の吸着塔の吸着剤に吸着された吸着対象成分を的確に離脱させることによって、吸着対象成分の回収効率を高めることが望まれるものである。
 そのための方法として、脱着工程の吸着塔に対して吸引作用する真空ポンプを設けることによって、吸着対象成分を的確に離脱させるようにする圧力変動吸着式水素製造方法が考えられるが、この方法においては、燃焼装置に対してオフガスを適切に供給できない虞があった。
 すなわち、本願の発明者は、真空ポンプによって脱着工程の吸着塔を吸引する圧力変動吸着式水素製造方法を考えたが、単に、真空ポンプによって吸着塔を吸引するだけでは、燃焼装置に対してオフガスを適切に供給できない虞があることを見出した。
 以下、真空ポンプを利用した圧力変動吸着式水素製造方法において、燃焼装置に対してオフガスを適切に供給できない虞があることについて、本願の発明者が創出した圧力変動吸着式水素製造方法(以下、比較方法と呼称する)を具体的に説明しながら詳述する。なお、比較方法は、本願の出願時において公然知られた発明ではない。
 図11に示すように、4つの吸着塔1として、A塔、B塔、C塔、D塔が設けられ、4つの吸着塔1の下部には、圧縮機2にて圧縮された原料ガスGを供給する原料ガス供給路3、及び、オフガスを排出するオフガス排出路4が接続されている。
 そして、4つの吸着塔1の夫々に対応して、原料ガス供給路3を開閉する原料ガス供給弁A1、B1、C1、D1、及び、オフガス排出路4を開閉するオフガス排出弁A5、B5、C5、D5が設けられている。
 尚、原料ガス供給路3における圧縮機2の下流側箇所には、水素ガス製造運転を停止する際に閉じる元ガス弁3Aが設けられている。
 4つの吸着塔1の上部には、製品ガスHを送出する製品ガス送出路5、その製品ガス送出路5から分岐して、製品ガス送出路5を流動する製品ガスHの一部を吸着塔1に還流する還流路6、及び、4つの吸着塔1を互いに連通接続するための塔連通路7が接続されている。
 そして、4つの吸着塔1の夫々に対応して、製品ガス送出路5を開閉する製品ガス送出弁A2、B2、C2、D2、還流路6を開閉する製品ガス還流弁A3、B3、C3、D3、及び、塔連通路7を開閉する連通断続弁A4、B4、C4、D4が設けられている。
 オフガス排出路4には、オフガスを回収しかつ回収したオフガスを燃焼装置としてのバーナ8に供給するオフガスタンクTが設けられている。
 この比較方法においては、オフガスタンクTとして、第1タンクT1と、第2タンクT2とが設けられ、オフガス排出路4におけるオフガスタンクTを設置するタンク設置部分が、第1排出路4aと第2排出路4bとを並列形態で備え、第1タンクT1が、第1排出路4aに配設され、第2タンクT2が、第2排出路4bに配設されている。
 ポンプ配設流路9が、オフガス排出路4におけるタンク設置部分よりも上流側箇所と第2排出路4bにおける第2タンクT2の上流側箇所とを接続する状態で設けられ、このポンプ配設流路9に、真空ポンプPが配設されている。
 そして、オフガス排出路4におけるポンプ配設流路9の真空ポンプPよりも上流側部分に、第1開閉弁V1が設置され、第1排出路4aの第1タンクT1よりも上流側部分に、第2開閉弁V2が設置され、第2排出路4bにおけるポンプ配設流路9の接続箇所よりも上流側部分に、第3開閉弁V3が設置されている。
 したがって、第1開閉弁V1~第3開閉弁V3のうち、第2開閉弁V2を開き、その他を閉じることによって、図13に示すように、吸着塔1からのオフガスを第1タンクT1に回収しながらバーナ8に供給する第1流動状態を現出できる。
 第1開閉弁V1~第3開閉弁V3のうち、第3開閉弁V3を開き、その他を閉じることによって、図14に示すように、吸着塔1からのオフガスを第2タンクT2に回収しながらバーナ8に供給する第2流動状態を現出できる。
 第1開閉弁V1~第3開閉弁V3のうち、第1開閉弁V1を開き、その他を閉じることによって、図15に示すように、真空ポンプPによって吸着塔1を吸引して、真空ポンプPにて供給されるオフガスを第2タンクT2に回収しながらバーナ8に供給する第3流動状態を現出できる。
 また、第1排出路4aにおける第1タンクT1よりも下流側部分に、第1流量制御弁R1が設置され、第2排出路4bにおける第2タンクT2よりも下流側部分に、第2流量制御弁R2が設置されており、これら第1流量制御弁R1及び第2流量制御弁R2の流量制御によって、バーナ8へ供給するオフガスの流量が過大や過少になることが抑制される。
 つまり、第1流動状態においては、第1流量制御弁R1によって、オフガスの流量が制御され、第2流動状態及び第3流動状態においては、基本的には、第2流量制御弁R2によってオフガスの流量が制御され、オフガスの流量が不足するときには、第1タンクT1に回収したオフガスを補給すべく、第1流量制御弁R1が制御されることになる。
 そして、この比較方法においては、図12に示す運転サイクルを採用した。
 ちなみに、4つの吸着塔1のうちの1つについては、単位処理期間の間は吸着工程を行い、吸着工程に続く工程を行う吸着塔1については、単位処理期間の間は均圧用排出工程を行い、均圧用排出工程に続く工程を行う吸着塔1については、単位処理期間の間は脱着工程を行い、脱着工程に続く工程を行う吸着塔1については、単位処理期間の間は吸着工程の前工程としての復圧工程を行うことになる。
 つまり、4つの吸着塔1の夫々は、吸着工程、均圧用排出工程、脱着工程、復圧工程を、単位処理期間が経過するごとに次の工程に切換える形態で、順次行うことになる。
 このように、4つの吸着塔1の夫々は、吸着工程、均圧用排出工程、脱着工程、復圧工程を順次行うことになるが、以下の説明においては、4つの吸着塔1のうち、A塔が吸着工程を行い、B塔が復圧工程を行い、C塔が脱着工程を行い、D塔が均圧用排出工程を行う場合を説明する。
 すなわち、A塔に対応する原料ガス供給弁A1及び製品ガス送出弁A2を開いて、A塔については、単位処理期間の間は吸着工程を行う。
 均圧用排出工程として、単位処理期間の初期において、均圧用排出工程のD塔の内部のガスを復圧工程のB塔に供給する前段排出工程を行い、単位処理期間の終期において、均圧用排出工程のD塔の内部ガスを脱着工程のC塔に供給する後段排出工程を行う。
 ちなみに、前段排出工程や後段排出工程においては、連通断続弁A4、B4、C4、D4を選択的に開くことになる。
 脱着工程として、単位処理期間の初期において、脱着工程のC塔の内部ガスをオフガスとしてオフガスタンクTに排出する減圧工程を後述の如く行い、単位処理期間の中期において、上記した第3流動状態で、真空ポンプPにて脱着工程のC塔を吸引するポンプ吸引工程を行い(図15参照)、単位処理期間の終期において、均圧用排出工程のD塔から後段排出工程によって供給されるガスを脱着工程のC塔に受入れる後段受入工程を行う(図16参照)。
 この比較方法においては、減圧工程として、上記した第1流動状態で、脱着工程のC塔と第1タンクT1とを連通させる第1減圧工程(図13参照)、及び、上記した第2流動状態で、脱着工程のC塔と第2タンクT2とを連通させる第2減圧工程(図14参照)を順次行い、続いて、上述のタンク吸引工程を行うことになる。
 復圧工程として、単位処理期間の初期において、均圧用排出工程のD塔から前段排出工程によって供給されるガスを復圧工程のB塔に受入れる前段受入工程を行い、その後、吸着工程のA塔にて生成された製品ガスHの一部を復圧工程のB塔に受入れる昇圧工程を行う。
 ちなみに、昇圧工程を行う場合には、製品ガス還流弁A3、B3、C3、D3のうち、B塔に対応する製品ガス還流弁B3を開くことになる。
 ちなみに、この比較方法においては、図12に示すように、単位処理期間が、第1ステップから第5ステップに区分けされている。
 そして、前段受入工程と前段排出工程とが、第1ステップと第2ステップとで行われ、昇圧工程とポンプ吸引工程とが、第3ステップと第4ステップとで行われ、第1減圧工程が第1ステップで行われ、第2減圧工程が第2ステップで行われ、後段受入工程と後段排出工程とが、第5ステップで行われる。
 また、B塔の復圧工程では、第5ステップにおいては、特別な工程を実施しない休止状態となり、同様に、D塔の均圧用排出工程では、第3ステップ及び第4ステップにおいては、特別な工程を実施しない休止状態となる。
 尚、第1ステップ~第5ステップの各ステップの時間的な長さは、必ずしも同じ長さではなく、各工程を行うのに適する長さに設定する。
 図17は、上記した比較方法を実施した場合における、第1タンクT1や第2タンクT2の圧力の変化、オフガス排出路4を通してバーナ8に向けて流動するオフガス流量の変化、及び、吸着塔1(C塔)の圧力の変化を示すものである。ちなみに、第2タンクT2の圧力は、真空ポンプPの吐出圧力に対応する。
 尚、図17においては、第1減圧工程の開始を「第1減圧開始」と記載し、第2減圧工程の開始を「第2減圧開始」と記載し、ポンプ吸引工程の開始を「真空工程開始」と記載し、ポンプ吸引工程の終了を「真空工程終了」と記載する。
 ちなみに、図17は、吸着工程の吸着塔1の内部圧力が、約750kPaGであり、後段排出工程を行った段階の吸着塔1(C塔)の内部圧力が、約150kPaGである場合の変化を示すものである。
 そして、脱着工程を開始する際の吸着塔1(C塔)の内部圧力(約150kPaG)が、第1減圧工程を行うと、約150kPaGから約70kPaGの近くに減少し、第2減圧工程を行うと、吸着塔1(C塔)の内部圧力が、大気圧の近く(約10kPaG程度)に減少し、そして、ポンプ吸引工程を行うと、吸着塔1(C塔)の内部圧力が、約-90kPaGの近くに減少することを示している。
 図17において、オフガス量の変化に着目すると、ポンプ吸引工程を開始すると、オフガス量が急激に増加することになり、また、単位処理期間の第5ステップの終期においては、オフガス量が極端に少なくなることが分かる。
 ポンプ吸引工程を開始することによって、オフガス量が急激に増加するのは、吸着塔1(C塔)の内部圧力が大気圧よりも高い(約10kPaG程度)状態で、吸着塔1(C塔)に対して真空ポンプPが吸引作用することが原因である。
 また、単位処理期間の第5ステップの終期において、オフガス量が極端に少なくなるのは、第1タンクT1及び第2タンクT2におけるオフガスの回収量が減少しているのにもかかわらず、第1タンクT1及び第2タンクT2に対してオフガスが供給されない状態であるからである。
 つまり、第1タンクT1及び第2タンクT2におけるオフガスの回収量が減少している状態で、第1タンクT1及び第2タンクT2に回収しているオフガスをバーナ8に供給することになるため、単位処理期間の第5ステップの終期において、オフガス量が極端に少なくなるのである。
 そして、ポンプ吸引工程の開始によって、オフガス量が急激に増加するときや、単位処理期間の第5ステップの終期において、オフガス量が極端に少なくなるときに、バーナ8の燃焼状態が不安定になる虞がある。
 要するに、比較方法の圧力変動吸着式水素製造方法においては、燃焼装置に対してオフガスを適切に供給できない虞があり、改善する必要がある。
 本発明は、上記実状に鑑みて為されたものであって、その目的は、燃焼装置に対してオフガスを適切に供給するようにしながら、吸着対象成分の回収効率を高めることができる圧力変動吸着式水素製造方法を提供する点にある。
 本発明の圧力変動吸着式水素製造方法は、水素成分及び水素成分以外の可燃性成分を含む原料ガスから水素成分以外の吸着対象成分を吸着剤に吸着して製品ガスを生成する4つの吸着塔、及び、前記吸着塔から排出されるオフガスを回収しかつ回収したオフガスを燃焼装置に供給するオフガスタンクが設けられ、
 4つの前記吸着塔のうちの1つについては、単位処理期間の間は吸着工程を行い、前記吸着工程に続く工程を行う前記吸着塔については、前記単位処理期間の間は均圧用排出工程を行い、前記均圧用排出工程に続く工程を行う前記吸着塔については、前記単位処理期間の間は脱着工程を行い、前記脱着工程に続く工程を行う前記吸着塔については、前記単位処理期間の間は前記吸着工程の前工程としての復圧工程を行い、且つ、前記脱着工程を行う前記吸着塔から排出されるオフガスを前記オフガスタンクに回収する方法であって、その第1特徴方法は、
 前記吸着塔から吸引したオフガスを前記燃焼装置に供給する真空ポンプが、前記吸着塔に対して吸引作用する吸着塔作用状態と、真空タンクに対して吸引作用するタンク作用状態とに切換え自在に設けられ、
 前記真空タンクが、前記吸着塔に連通する連通状態と前記吸着塔との連通が遮断された遮断状態とに切換え自在に設けられ、
 前記均圧用排出工程として、前記単位処理期間の初期において、前記均圧用排出工程の前記吸着塔の内部のガスを前記復圧工程の前記吸着塔に供給する前段排出工程を行い、前記単位処理期間の終期において、前記均圧用排出工程の前記吸着塔の内部ガスを前記脱着工程の前記吸着塔に供給する後段排出工程を行い、
 前記単位処理期間の終期において、前記タンク作用状態に切換えられた前記真空ポンプにて前記遮断状態に切換えた前記真空タンクを吸引作用して、前記真空タンク内のオフガスの排出及び前記真空タンクの負圧状態への調整を行い、
 前記脱着工程として、前記単位処理期間の初期において、前記脱着工程の前記吸着塔の内部ガスをオフガスとして前記オフガスタンクに排出する減圧工程を行い、前記単位処理期間の中期において、前記負圧状態に調整された前記真空タンクを前記連通状態に切換えて、前記脱着工程の前記吸着塔の内部ガスを前記真空タンクに吸引するタンク吸引工程、及び、前記真空タンクを前記遮断状態に切換えかつ前記連通状態に切換えた前記真空ポンプにて前記脱着工程の前記吸着塔を吸引するポンプ吸引工程を順次実行し、前記単位処理期間の終期において、前記均圧用排出工程の前記吸着塔から前記後段排出工程によって供給されるガスを前記脱着工程の前記吸着塔に受入れる後段受入工程を行い、
 前記復圧工程として、前記単位処理期間の初期において、前記均圧用排出工程の前記吸着塔から前記前段排出工程によって供給されるガスを前記復圧工程の前記吸着塔に受入れる前段受入工程を行い、その後、前記吸着工程の前記吸着塔にて生成された前記製品ガスの一部を前記復圧工程の前記吸着塔に受入れる昇圧工程を行う点を特徴とする。
 すなわち、均圧用排出工程として、単位処理期間の初期において、均圧用排出工程の吸着塔の内部のガスを復圧工程の吸着塔に供給する前段排出工程を行い、単位処理期間の終期において、均圧用排出工程の吸着塔の内部ガスを脱着工程の吸着塔に供給する後段排出工程を行うことになる。
 また、復圧工程として、単位処理期間の初期において、均圧用排出工程の吸着塔から前段排出工程によって供給されるガスを復圧工程の吸着塔に受入れる前段受入工程を行い、その後、吸着工程の前記吸着塔にて生成された製品ガスの一部を復圧工程の吸着塔に受入れる昇圧工程を行うことになる。
 そして、単位処理期間の終期において、真空タンクに対して吸引作用するタンク作用状態に切換えられた真空ポンプにて、吸着塔との連通を遮断する遮断状態に切換えた真空タンクを吸引作用して、真空タンク内のオフガスの排出及び真空タンクの負圧状態への調整を行うことになる。
 ちなみに、真空ポンプの吸引作用によって真空タンクから排出されるオフガスは、燃焼装置に供給されることになる。
 また、脱着工程として、単位処理期間の初期において、脱着工程の吸着塔の内部ガスをオフガスとしてオフガスタンクに排出する減圧工程を行い、単位処理期間の中期において、タンク吸引工程、及び、ポンプ吸引工程を順次行い、単位処理期間の終期において、均圧用排出工程の吸着塔から後段排出工程によって供給されるガスを脱着工程の前記吸着塔に受入れる後段受入工程を行うことになる。
 脱着工程におけるタンク吸引工程は、上述の如く、単位処理期間の終期において真空ポンプの吸引により負圧状態に調整された真空タンクを、脱着工程の吸着塔に連通する連通状態に切換えて、脱着工程の吸着塔の内部ガスを真空タンクに吸引する工程であり、ポンプ吸引工程は、真空タンクを吸着塔との連通を遮断する遮断状態に切換え、かつ、脱着工程の吸着塔に連通する連通状態に切換えた真空ポンプにて脱着工程の吸着塔を吸引する工程である。
 したがって、本発明の第1特徴方法によれば、脱着工程の吸着塔からのオフガスを燃焼装置に適正通り供給することができるのである。
 つまり、単位処理期間の初期においては、脱着工程における減圧工程によって、脱着工程の吸着塔の内部ガスをオフガスとしてオフガスタンクに排出するため、オフガスタンクに回収されたオフガスを燃焼装置に適正通り供給することができる。
 単位処理期間の中期において、脱着工程におけるタンク吸引工程を行うときには、負圧状態の真空タンクが脱着工程の吸着塔に対して吸引作用することになり、脱着工程の吸着塔から排出されるオフガスを燃焼装置に供給することはできないものの、単位処理期間の初期の減圧工程によってオフガスタンクには、多量のオフガスが回収されているため、その回収されているオフガスを燃焼装置に供給することにより、オフガスを燃焼装置に適正通り供給することができる。
 また、単位処理期間の中期において、脱着工程におけるポンプ吸引工程を行うときには、脱着工程の吸着塔に対して真空ポンプが吸引作用することによって、脱着工程の吸着塔から排出されるオフガスを燃焼装置に供給する状態となるため、オフガスを燃焼装置に適正通り供給することができる。
 単位処理期間の終期において、脱着工程における後段受入工程を行うときには、脱着工程の吸着塔からはオフガスが排出されないものの、この単位処理期間の終期においては、真空タンクに対して吸引作用するタンク作用状態に切換えられた真空ポンプにて、吸着塔との連通を遮断する遮断状態に切換えた真空タンクを吸引作用して、真空タンク内のオフガスの排出及び真空タンクの負圧状態への調整を行うことになるから、タンク吸引工程において真空タンク内に回収したオフガスを燃焼装置に供給する状態となるため、オフガスを燃焼装置に適正通り供給することができる。
 また、単位処理期間の中期においては、タンク吸引工程が行われた後で、ポンプ吸引工程が行われるものであるから、ポンプ吸引工程を開始するときには、脱着工程の吸着塔の内部圧力を、先に行われたタンク吸引工程によって、大気圧よりも低い圧力に調整することができるため、ポンプ吸引工程を開始した直後において、燃焼装置に供給するオフガスの量が急増することを抑制して、オフガスを燃焼装置に適正通り供給することができる。
 また、本発明の第1特徴方法によれば、脱着工程におけるタンク吸引工程及びポンプ吸引工程において、脱着工程の吸着塔の内部を吸引して、脱着工程の吸着塔の内部圧力を大気圧よりも低い圧力にするから、吸着塔の吸着剤に吸着された吸着対象成分を的確に離脱させることができものとなるため、吸着対象成分の回収効率を高めることができる。
 要するに、本発明の第1特徴方法によれば、燃焼装置に対してオフガスを適切に供給するようにしながら、吸着対象成分の回収効率を高めることができる圧力変動吸着式水素製造方法を提供できる。
 本発明の圧力変動吸着式水素製造方法の第2特徴方法は、上記第1特徴方法に加えて、前記オフガスタンクとして、第1タンクと第2タンクとが設けられ、前記減圧工程として、前記脱着工程の前記吸着塔と前記第1タンクとを連通させる第1減圧工程、及び、前記脱着工程の前記吸着塔と前記第2タンクとを連通させる第2減圧工程を順次行い、続いて、前記タンク吸引工程を行う点を特徴とする。
 すなわち、脱着工程における減圧工程として、第1タンクに、脱着工程の吸着塔の内部ガスをオフガスとして回収する第1減圧工程と、第2タンクに、脱着工程の吸着塔の内部ガスをオフガスとして回収する第2減圧工程とを順次行い、この第2減圧工程に続いて、タンク吸引工程を行うことになる。
 このように、脱着工程の吸着塔の内部ガスを、第1タンクと第2タンクとに順次回収するものであるから、一つのオフガスタンクを用いてオフガスを回収するよりも、第1タンクや第2タンクが大きな容量のタンクになることを回避しながら、脱着工程の吸着塔の内部ガスを適切に回収させことができる。
 説明を加えると、脱着工程の吸着塔の減圧工程を開始するときの内部圧、換言すれば、脱着工程を開始するときの内部圧は、均圧用排出工程によって、吸着工程での内部圧(例えば、約750kPaG)よりも低下されてはいるものの、かなりの高圧(例えば、約150kPaG)である。
 したがって、脱着工程の吸着塔の内部圧が大気圧よりも高い目標圧力(例えば、約40kPaG)に低下するまで、一つのオフガスタンクにてオフガスを回収する場合には、脱着工程の吸着塔の内部ガスが高圧(例えば、約150kPaG)から目標圧力(例えば、約40kPaG)に膨張することを許容する容量を、オフガスタンクに備えさせるために、オフガスタンクが極端に大きな容量のタンクになる不都合がある。
 本発明の第2特徴方法によれば、脱着工程の吸着塔の内部圧が、減圧工程を開始するとき(脱着工程を開始するとき)の初期圧から大気圧よりもかなり高い圧力(例えば、約70kPaG)になるまでは、第1タンクにてオフガスを回収し、その後、脱着工程の吸着塔の内部圧が、大気圧よりも高い目標圧力(例えば、約40kPaG)になるまでは、第2タンクにてオフガスを回収することによって、第1タンクや第2タンクが大きな容量のタンクになることを回避しながら、脱着工程の吸着塔の内部ガスを適切に回収させことができる。
 要するに、本発明の第2特徴方法によれば、上記第1特徴方法による作用効果に加えて、オフガスタンクとして極端に大きな容量のタンクを備えさせることを回避しながら、脱着工程の吸着塔の内部ガスを適切に回収させことができる圧力変動吸着式水素製造方法を提供できる。
 本発明の圧力変動吸着式水素製造方法の第3特徴方法は、上記第2特徴方法に加えて、前記真空ポンプが、前記第2タンクにオフガスを供給するように構成されている点を特徴とする。
 すなわち、真空ポンプから吐出されるオフガスが、第2タンクにて一旦貯留されてから燃焼装置に供給されることになるから、真空ポンプから吐出される高圧のオフガスを、適正な圧力で圧力の安定したガスに調整することができるため、適正な圧力で圧力の安定したオフガスが燃焼装置に供給されることになる。
 このように、真空ポンプから吐出されるオフガスが、適正な圧力で圧力が安定した状態で燃焼装置に供給されることになるので、燃焼装置の燃焼状態の安定化を図ることができる。
 要するに、本発明の第3特徴方法によれば、燃焼装置の燃焼状態の安定化を図ることができる圧力変動吸着式水素製造方法を提供できる。
 本発明の圧力変動吸着式水素製造方法の第4特徴方法は、上記第2又は第3特徴方法に加えて、
 前記第1減圧工程を行うときに、前記タンク作用状態に切換えられた前記真空ポンプにて前記遮断状態の前記真空タンクを吸引作用するようにする点を特徴とする。
 すなわち、第1減圧工程を行うときに、真空タンクに対して吸引作用するタンク作用状態に切換えられた真空ポンプにて、吸着塔との連通を遮断する遮断状態に切換えた真空タンクを吸引作用する。
 つまり、単位処理期間の終期において、タンク作用状態に切換えられた真空ポンプにて遮断状態に切換えた真空タンクを吸引作用して、真空タンク内のオフガスの排出及び真空タンクの負圧状態への調整を行うことになるが、続いて、単位処理期間の初期の第1減圧工程を行うときにも、タンク作用状態に切換えられた真空ポンプにて遮断状態に切換えた真空タンクを吸引作用することを継続させる。
 このように、単位処理期間の終期に加えて、単位処理期間の初期の第1減圧工程を行うときにも、タンク作用状態に切換えられた真空ポンプにて遮断状態に切換えた真空タンクを吸引作用することを継続させるものであるから、真空タンクの負圧状態への調整を的確に行わせて、タンク吸引工程を適切に行わせることができる。
 要するに、本発明の第4特徴方法によれば、上記第2又は第3特徴方法による作用効果に加えて、真空タンクの負圧状態への調整を的確に行わせて、タンク吸引工程を適切に行わせることができる圧力変動吸着式水素製造方法を提供できる。
 本発明の圧力変動吸着式水素製造方法の第5特徴方法は、上記第1特徴方法に加えて、
 前記減圧工程によって、前記脱着工程の前記吸着塔の内部圧が前記脱着工程を開始したときの初期圧から40~60%の圧力に低下され、
 前記減圧工程に続いて、前記タンク吸引工程を行う点を特徴とする。
 すなわち、減圧工程によって、脱着工程の吸着塔の内部圧が脱着工程を開始したときの初期圧から40~60%の圧力に低下され、この減圧工程に続いて、タンク吸引工程が行われることになる。
 例えば、初期圧が、150kPaGである場合には、減圧工程によって、脱着工程の吸着塔の内部圧が、60~90kPaGに減圧され、タンク吸引工程によって、脱着工程の吸着塔の内部圧が、大気圧よりも低い負圧状態に減圧されることになる。
 このように、減圧工程によって、脱着工程の前記吸着塔の内部圧が脱着工程を開始したときの初期圧から40~60%の圧力に低下させるものであるから、オフガスタンクが大きな容量になることを回避しながら、タンク吸引工程を適切に行うことができる。
 つまり、減圧工程によって、脱着工程の前記吸着塔の内部圧を、脱着工程を開始したときの初期圧から60%を超えた低い圧力に低下させる場合には、オフガスタンクの容量が極端に大きくなる不都合がある。
 また、減圧工程によって、脱着工程の前記吸着塔の内部圧を、脱着工程を開始したときの初期圧から40%未満となる圧力で低下させる場合には、オフガスタンクの容量が極端に大きくなること回避できるものの、タンク吸引工程によって、脱着工程の吸着塔の内部圧を負圧状態に減圧させ難いものとなる。
 ちなみに、減圧工程によって、脱着工程の前記吸着塔の内部圧を、脱着工程を開始したときの初期圧から40%未満となる圧力で低下させる場合においても、大きな容量の真空タンクや大きな能力の吸引ポンプを用意すれば、タンク吸引工程において脱着工程の吸着塔の内部圧を負圧状態に減圧させることができるものであるが、設備コストが増大する不都合がある。
 要するに、本発明の第5特徴方法によれば、上記第1特徴方法による作用効果に加えて、オフガスタンクが大きな容量になることを回避しながら、タンク吸引工程を適切に行うことができる圧力変動吸着式水素製造方法を提供できる。
 本発明の圧力変動吸着式水素製造方法の第6特徴方法は、上記第5特徴方法に加えて、
 前記減圧工程を行うときに、前記タンク作用状態に切換えられた前記真空ポンプにて前記遮断状態の前記真空タンクを吸引作用するようにする点を特徴とする。
 すなわち、減圧工程を行うときに、真空タンクに対して吸引作用するタンク作用状態に切換えられた真空ポンプにて、吸着塔との連通を遮断する遮断状態に切換えた真空タンクを吸引作用する。
 つまり、単位処理期間の終期において、タンク作用状態に切換えられた真空ポンプにて遮断状態に切換えた真空タンクを吸引作用して、真空タンク内のオフガスの排出及び真空タンクの負圧状態への調整を行うことになるが、続いて、単位処理期間の初期の減圧工程を行うときにも、タンク作用状態に切換えられた真空ポンプにて遮断状態に切換えた真空タンクを吸引作用することを継続させる。
 このように、単位処理期間の終期に加えて、単位処理期間の初期の減圧工程を行うときにも、タンク作用状態に切換えられた真空ポンプにて遮断状態に切換えた真空タンクを吸引作用することを継続させるものであるから、真空タンクの負圧状態への調整を的確に行わせて、タンク吸引工程を適切に行わせることができる。
 要するに、本発明の第6特徴方法によれば、上記第5特徴方法による作用効果に加えて、真空タンクの負圧状態への調整を的確に行わせて、タンク吸引工程を適切に行わせることができる圧力変動吸着式水素製造方法を提供できる。
 本発明の圧力変動吸着式水素製造方法の第7特徴方法は、上記第5又は第6特徴方法に加えて、前記オフガスタンクとして、前記減圧工程において前記脱着工程の前記吸着塔に接続される第1タンクと、第2タンクとが設けられ、前記真空ポンプが、前記第2タンクにオフガスを供給するように構成されている点を特徴する。
 すなわち、オフガスタンクとして、第1タンクと、第2タンクとが設けられる。そして、第1タンクが、減圧工程において脱着工程の吸着塔に接続されて、オフガスの回収を行うことになり、真空ポンプが第2タンクにオフガスを供給することになる。
 このように、第1タンクにて、減圧工程において脱着工程の吸着塔からのオフガスを回収するものであるから、減圧工程によって、脱着工程の吸着塔の内部圧が脱着工程を開始したときの初期圧から40~60%の圧力に低下する状態で、オフガスを回収することを適切に行うことができる。
 また、真空ポンプから吐出されるオフガスが、第2タンクにて一旦貯留されてから燃焼装置に供給されることになるから、真空ポンプから吐出される高圧のオフガスを、適正な圧力で圧力の安定したガスに調整することができるため、適正な圧力で圧力の安定したオフガスが燃焼装置に供給されることになり、燃焼装置の燃焼状態の安定化を図ることができる。
 要するに、本発明の第7特徴方法によれば、上記第5又は第6特徴方法による作用効果に加えて、減圧工程においてオフガスを適切に回収し、しかも、燃焼装置の燃焼状態の安定化を図ることができる圧力変動吸着式水素製造方法を提供できる。
 本発明の圧力変動吸着式水素製造方法の第8特徴方法は、上記第1~第7特徴方法のいずれかに加えて、前記真空タンクに、前記吸着塔から排出されるオフガスを吸着するオフガス用吸着剤が装填されている点を特徴とする。
 すなわち、真空タンクは、真空ポンプに吸引されることにより低圧になる状態と、吸着塔から排出されるオフガスが導入されることにより高圧になる状態とを繰り返すものであるから、オフガス用吸着剤が真空タンクに装填されていると、吸着塔から排出されるオフガスは、真空タンクに導入される際に、オフガス用吸着剤に吸着されることになる。
 そして、オフガス用吸着剤に吸着されたオフガスは、真空ポンプが真空タンクを吸引する際に、オフガス用吸着剤から離脱して、真空タンクから排出されることになる。
 このように、吸着塔から排出されるオフガスが、オフガス用吸着剤に吸着された状態で真空タンクに収納されるものとなるから、オフガス用吸着剤を装填しない場合に較べて、真空タンクの容積を減少させても、オフガスを真空タンクに所定通り収納させることができるため、真空タンクの小型化を図ることができるのである。
 要するに、本発明の第8特徴方法によれば、上記第1~第7特徴方法による作用効果に加えて、真空タンクの小型化を図ることができる圧力変動吸着式水素製造方法を提供できる。
 本発明の圧力変動吸着式水素製造方法の第9特徴方法は、上記第8特徴方法に加えて、
 前記原料ガスが、メタンを主成分とする被処理ガスを改質処理して、水素成分、水素成分以外の可燃性成分としてのメタン、一酸化炭素、窒素、二酸化炭素、水分を含む状態に生成されたものであり、
 前記吸着塔に装填される前記吸着剤が、一酸化炭素及び窒素を吸着するゼオライト、メタン及び二酸化炭素を吸着するカーボンモレキュラーシーブ、及び、水分を吸着する活性アルミナを含む形態に構成され、
 前記オフガス用吸着剤が、メタン及び二酸化炭素を吸着するカーボンモレキュラーシーブである点を特徴とする。
 すなわち、原料ガスが、水素成分、水素成分以外の可燃性成分としてのメタン、一酸化炭素、窒素、二酸化炭素、水分を含むことに対応させて、吸着塔に装填する吸着剤が、一酸化炭素及び窒素を吸着するゼオライト、メタン及び二酸化炭素を吸着するカーボンモレキュラーシーブ、及び、水分を吸着する活性アルミナを含む形態に構成されているから、水素以外の吸着対象成分を吸着剤にて適切に吸着させて、水素濃度の高い製品ガスを的確に製造することができる。
 そして、原料ガスが、メタンを主成分とする被処理ガスを改質処理して生成されたものである場合には、オフガスには、メタン及び二酸化炭素が多く含まれることになることになることに鑑みて、真空タンクに装填するオフガス用吸着剤を、メタン及び二酸化炭素を吸着するカーボンモレキュラーシーブとするから、真空タンクに装填するオフガス用吸着剤の簡素化を図ることができる。
 要するに、本発明の第9特徴方法によれば、真空タンクに装填するオフガス用吸着剤の簡素化を図ることができる圧力変動吸着式水素製造方法を提供できる。
圧力変動吸着式水素製造方法を実施する装置を示す概略図 運転サイクルを示す図 第1減圧工程を示す図 第2減圧工程を示す図 タンク吸引工程を示す図 ポンプ吸引工程を示す図 後段受入工程を示す図 オフガス流量の変化、吸着塔圧力の変化等を示すグラフ 別実施形態の運転サイクルを示す図 別実施形態のオフガス流量の変化、吸着塔圧力変化等を示すグラフ 比較方法を実施する装置を示す概略図 比較方法の運転サイクルを示す図 比較方法の第1減圧工程を示す図 比較方法の第2減圧工程を示す図 比較方法のポンプ吸引工程を示す図 比較方法の後段受入工程を示す図 比較方法のオフガス流量の変化、吸着塔圧力の変化等を示すグラフ
 以下、本発明の実施形態を図面に基づいて説明する。
 (圧力変動吸着式水素製造方法を実施する装置の全体構成)
 本発明の実施形態は、上述した比較方法を改造したものであるため、上述した比較方法と同様な構成については、同じ符号を図面に付して、詳細な説明を省略し、比較方法と異なる部分について詳述する。
 ちなみに、原料ガスは、メタンを主成分とする被処理ガスとしての都市ガスを改質処理して生成した改質ガスであり、水素、水素ガス以外の可燃性成分としてのメタン、二酸化炭素、一酸化炭素、水分、及び、窒素を含むものであり、水素以外の吸着対象成分として、メタン、二酸化炭素、一酸化炭素、水分、及び、窒素が、吸着塔1の吸着剤に吸着されることになる。
 つまり、吸着剤が、一酸化炭素及び窒素を吸着するゼオライト、メタン及び二酸化炭素を吸着するカーボンモレキュラーシーブ、及び、水分を吸着する活性アルミナを含む形態に構成されている。
 図1に示すように、上述した比較方法と同様に、4つの吸着塔1として、A塔、B塔、C塔、D塔が設けられ、オフガスタンクTとして、第1タンクT1と、この第1タンクT1よりも容量が小さな第2タンクT2とが設けられ、真空ポンプPが設けられている。
 そして、本実施形態においては、タンク配設流路10が、オフガス排出路4におけるポンプ配設流路9の接続箇所よりも上流側部分と、ポンプ配設流路9における真空ポンプPと第1開閉弁V1との間の流路部分とを接続する状態で設けられている。
 タンク配設流路10には、真空タンクSが配設され、タンク配設流路10における真空タンクSよりも上流側部分には、第4開閉弁V4が配設され、タンク配設流路10における真空タンクSよりも下流側部分には、第5開閉弁V5が配設されている。
 したがって、第1開閉弁V1~第5開閉弁V5のうち、第2開閉弁V2を開き、その他を閉じることによって、図3に示すように、吸着塔1からのオフガスを第1タンクT1に回収しながらバーナ8に供給する第1流動状態を現出できる。
 ちなみに、図3においては、第2開閉弁V2に加えて、第5開閉弁V5を開きかつ真空ポンプPを吸引作動させる状態を示しており、後述の如く、真空ポンプPにて真空タンクSを吸引作動させることにより、真空タンクSを的確に負圧状態に調整するようになっている。
 第1開閉弁V1~第5開閉弁V5のうち、第3開閉弁V3を開き、その他を閉じることによって、図4に示すように、吸着塔1からのオフガスを第2タンクT2に回収しながらバーナ8に供給する第2流動状態を現出できる。
 第1開閉弁V1~第5開閉弁V5のうち、第1開閉弁V1を開き、その他を閉じ、かつ、真空ポンプPを吸引作動させることによって、図6に示すように、真空ポンプPによって吸着塔1を吸引して、真空ポンプPにて供給されるオフガスを第2タンクT2に回収しながらバーナ8に供給する第3流動状態を現出できる。
 第1開閉弁V1~第5開閉弁V5のうち、第4開閉弁V4を開き、その他を閉じることによって、図5に示すように、後述の如く負圧状態に調整された真空タンクSにて吸着塔1を吸引して、吸着塔1からのオフガスを真空タンクSに回収し、かつ、第1タンクT1や第2タンクT2に回収したオフガスをバーナ8に供給する第4流動状態を現出できる。
 第1開閉弁V1~第5開閉弁V5のうち、第5開閉弁V5を開き、その他を閉じ、かつ、真空ポンプPを吸引作動させることによって、図7に示すように、真空タンクSに回収されたオフガスを真空ポンプPによって吸引して、真空ポンプPにて供給されるオフガスを第2タンクT2に回収しながらバーナ8に供給する第5流動状態を現出できる。
 また、この第5流動状態においては、真空タンクSが、回収したオフガスを排出した後においても、引き続き、真空ポンプPにて吸引されることによって、負圧状態に調整されることになる。
 ちなみに、本実施形態においては、第3流動状態が、真空ポンプPが吸着塔1に対して吸引作用する吸着塔作用状態に対応し、第5流動状態が、真空ポンプPが真空タンクSに対して吸引作用するタンク作用状態に対応することになる。
 つまり、本実施形態においては、第1開閉弁V1~第5開閉弁V5を選択的に開閉作動させることによって、吸着塔作用状態とタンク作用状態とに切換えることができるようになっている。
 また、本実施形態においては、第4流動状態が、真空タンクSを吸着塔1に連通させる連通状態に対応し、第1~第3流動状態、及び、第5流動状態が、真空タンクSと吸着塔1との連通を遮断する遮断状態に対応することになる。
 つまり、本実施形態においては、第1開閉弁V1~第5開閉弁V5を選択的に開閉作動させることによって、連通状態と遮断状態とに切換えることができるようになっている。
 また、本実施形態においては、上述の比較方法と同様に、第1排出路4aにおける第1タンクT1よりも下流側部分に、第1流量制御弁R1が設置され、第2排出路4bにおける第2タンクよりも下流側部分に、第2流量制御弁R2が設置されて、これら第1流量制御弁R1及び第2流量制御弁R2の流量制御によって、バーナ8へ供給するオフガスの流量が過大や過少になることが抑制されることになる。
 つまり、第1流動状態においては、第1流量制御弁R1によって、オフガスの流量が制御され、第2流動状態~第5流動状態においては、基本的には、第2流量制御弁R2によってオフガスの流量が制御され、オフガスの流量が不足するときには、第1タンクT1に回収したオフガスを補給すべく、第1流量制御弁R1が制御されることになる。
 (圧力変動吸着式水素製造方法の運転サイクル)
 本実施形態の圧力変動吸着式水素製造方法においては、図2に示す運転サイクルが行われることになる。
 ちなみに、4つの吸着塔1の夫々は、吸着工程、均圧用排出工程、脱着工程、復圧工程を、単位処理期間が経過するごとに次の工程に切換える形態で、順次行うものであるが、以下の説明においては、4つの吸着塔1のうち、A塔が吸着工程を行い、B塔が復圧工程を行い、C塔が脱着工程を行い、D塔が均圧用排出工程を行う場合を説明する。
 すなわち、A塔に対応する原料ガス供給弁A1及び製品ガス送出弁A2を開いて、A塔については、単位処理期間の間は吸着工程を行う。
 均圧用排出工程として、単位処理期間の初期において、均圧用排出工程のD塔の内部のガスを復圧工程のB塔に供給する前段排出工程を行い、単位処理期間の終期において、均圧用排出工程のD塔の内部ガスを脱着工程のC塔に供給する後段排出工程を行なう。
 ちなみに、前段排出工程や後段排出工程においては、連通断続弁A4、B4、C4、D4を選択的に開くことになる。
 脱着工程として、単位処理期間の初期において、脱着工程のC塔の内部ガスをオフガスとしてオフガスタンクTに排出する減圧工程を後述の如く行ない、単位処理期間の中期において、上記した第4流動状態で、真空タンクSにて脱着工程のC塔を吸引するタンク吸引工程(図5参照)、及び、上記した第3流動状態で、真空ポンプPにて脱着工程のC塔を吸引するポンプ吸引工程(図6参照)を順次行い、単位処理期間の終期において、均圧用排出工程のD塔から後段排出工程によって供給されるガスを脱着工程のC塔に受入れる後段受入工程を行うことになる(図7参照)。
 本実施形態においては、減圧工程として、上記した第1流動状態で、脱着工程のC塔と第1タンクT1とを連通させる第1減圧工程(図3参照)、及び、上記した第2流動状態で、脱着工程のC塔と第2タンクT2とを連通させる第2減圧工程(図4参照)を順次行い、続いて、タンク吸引工程を行うことになる。
 また、本実施形態においては、単位処理期間の終期、つまり、均圧用排出工程における後段排出工程や脱着工程における後段受入工程を行うときに、第5流動状態で、真空タンクS内のオフガスを第2タンクT2に排出すること及び真空タンクSを負圧状態に調整することを行うことになる(図7参照)。
 さらに、本実施形態では、単位処理期間の初期において、上記した第1流動状態で、脱着工程のC塔と第1タンクT1とを連通させる第1減圧工程を行うときに、図3に示すように、第5流動状態を現出させて、真空タンクSを的確に負圧状態に調整するようにしてある。
 復圧工程として、単位処理期間の初期において、均圧用排出工程のD塔から前段排出工程によって供給されるガスを復圧工程のB塔に受入れる前段受入工程を行い、その後、吸着工程のA塔にて生成された製品ガスHの一部を復圧工程のB塔に受入れる昇圧工程を行う。
 ちなみに、昇圧工程を行う場合には、製品ガス還流弁A3、B3、C3、D3のうち、B塔に対応する製品ガス還流弁B3を開くことになる。
 ちなみに、本実施形態においては、図2に示すように、単位処理期間が、第1ステップから第5ステップに区分けされている。
 そして、前段受入工程と前段排出工程とが、第1ステップと第2ステップとで行われ、昇圧工程が、第3ステップと第4ステップとで行われ、タンク吸引工程が第3ステップで行われ、ポンプ吸引工程が第4ステップで行われ、第1減圧工程が第1ステップで行われ、第2減圧工程が第2ステップで行われ、後段受入工程と後段排出工程とが、第5ステップで行われる。
 また、B塔の復圧工程では、第5ステップにおいては、特別な工程を実施しない休止状態となり、同様に、D塔の均圧用排出工程では、第3ステップ及び第4ステップにおいては、特別な工程を実施しない休止状態となる。
 尚、第1ステップ~第5ステップの各ステップの時間的な長さは同じ長さではなく、各工程を行うのに適する長さに設定される。
 (圧力変動吸着式水素製造方法の考察)
 図8は、本実施形態の圧力変動吸着式水素製造方法を実施した場合における、第1タンクT1や第2タンクT2の圧力の変化、オフガス排出路4と通してバーナ8に向けて流動するオフガス流量の変化、吸着塔1(C塔)の圧力の変化、及び、真空タンクSの圧力の変化を示すものである。ちなみに、第2タンクT2の圧力は、真空ポンプPの吐出圧力に対応する。
 尚、図8においては、第1減圧工程の開始を「第1減圧開始」と記載し、第2減圧工程の開始を「第2減圧開始」と記載し、タンク吸引工程の開始を「真空均圧開始」と記載し、また、ポンプ吸引工程の開始を「真空工程開始」と記載し、ポンプ吸引工程の終了を「真空工程終了」と記載する。
 ちなみに、図8は、吸着工程の吸着塔1の内部圧力が、約750kPaGであり、後段排出工程を行った段階の吸着塔1(C塔)の内部圧力が、約150kPaGである場合の変化を示すものである。
 そして、第1減圧工程を行うと、吸着塔1(C塔)の内部圧力が、脱着工程を開始したときの圧力(約150kPaG)から約70kPaGの近くに減少し、第2減圧工程を行うと、吸着塔1(C塔)の内部圧力が、約40kPaG程度に減少し、そして、タンク吸引工程を行うと、吸着塔1(C塔)の内部圧力が、大気圧よりも低い圧力に低下し、ポンプ吸引工程を行うと、吸着塔1(C塔)の内部圧力が、約-90kPaGの近くに減少することを示している。
 図8において、オフガス量の変化に着目すると、ポンプ吸引工程を開始しても、オフガス量が急激に増加することが抑制され、また、単位処理期間の第5ステップの終期においても、オフガス量が十分に大きな量に維持されていることが分かる。
 ポンプ吸引工程を開始しても、オフガス量が急激に増加しないのは、吸着塔1(C塔)の内部圧力が大気圧よりも低い状態で、吸着塔1(C塔)に対して真空ポンプPが吸引作用することになるからである。
 また、単位処理期間の第5ステップの終期において、オフガス量が十分に大きな量に維持されるのは、タンク吸引工程において真空タンクSに回収したオフガスを、第5ステップにおいて第2タンクに排出するからである。
 ちなみに、タンク吸引工程においては、吸着塔1(C塔)から回収するオフガスがオフガス排出路4には排出されないものとなるが、タンク吸引工程が行わる第3ステップにおいては、第1ステップや第2ステップにて第1タンクT1や第2タンクT2に回収されているオフガスを、オフガス排出路4に流動させることによって、オフガス量が少なくなることはない。
 〔別実施形態〕
 次に、圧力変動吸着式水素製造方法の別実施形態を説明するが、この別実施形態は、上記実施形態の運転サイクルの変形例を示すものであって、基本的な構成は上記実施形態と同様であるから、以下の説明においては、上記実施形態と異なる点を詳述する。
 この別施形態の圧力変動吸着式水素製造方法においては、図9に示す運転サイクルが行われることになる。
 ちなみに、4つの吸着塔1の夫々は、吸着工程、均圧用排出工程、脱着工程、復圧工程を、単位処理期間が経過するごとに次の工程に切換える形態で、順次行うものであるが、以下の説明においては、4つの吸着塔1のうち、A塔が吸着工程を行い、B塔が復圧工程を行い、C塔が脱着工程を行い、D塔が均圧用排出工程を行う場合を説明する。
 この別実施形態においては、吸着工程、復圧工程、均圧用排出工程が、上記実施形態と同様に行われるが、脱着工程が、上記実施形態とは異なる形態で行われることになる。
 また、この別実施形態においては、上記実施形態と同様に、単位処理期間の終期、つまり、均圧用排出工程における後段排出工程や脱着工程における後段受入工程を行うときに、第5流動状態で、真空タンクS内のオフガスを第2タンクT2に排出すること及び真空タンクSを負圧状態に調整することが行われる(図7参照)。
 (別実施形態の脱着工程)
 以下、この別実施形態における脱着工程について説明する。
 すなわち、脱着工程として、単位処理期間の初期において、脱着工程のC塔の内部ガスをオフガスとしてオフガスタンクTに排出する減圧工程を行ない、単位処理期間の中期において、上記した第4流動状態で、真空タンクSにて脱着工程のC塔を吸引するタンク吸引工程(図5参照)、及び、上記した第3流動状態で、真空ポンプPにて脱着工程のC塔を吸引するポンプ吸引工程(図6参照)を順次行い、単位処理期間の終期において、均圧用排出工程のD塔から後段排出工程によって供給されるガスを脱着工程のC塔に受入れる後段受入工程を行うことになる(図7参照)。
 この別実施形態においては、減圧工程として、上記した第1流動状態で、脱着工程のC塔と第1タンクT1とを連通させる工程(図3参照)を行い、この減圧工程に続いて、タンク吸引工程を行うことになる。
 また、減圧工程によって、脱着工程のC塔の内部圧が脱着工程を開始したときの初期圧から40~60%の圧力に低下されるようになっている。
 さらに、この別実施形態では、単位処理期間の初期において、上記した第1流動状態で、脱着工程のC塔と第1タンクT1とを連通させる減圧工程を行うときに、図3に示すように、真空タンクSを真空ポンプPにて吸引することにより、真空タンクSを的確に負圧状態に調整するようにしてある。
 ちなみに、この別実施形態では、上記実施形態における第2減圧工程が省略されるものであるから、第4開閉弁V4、及び、この第4開閉弁V4が配設された第2排出路4bの上流側部分を省略できる。
 尚、第2排出路4bの上流側部分とは、第2排出路4bにおけるポンプ配設流路9が接続される箇所よりも上流側部分である。
 この別実施形態においても、図9に示すように、単位処理期間が、第1ステップから第5ステップに区分けされている。
 そして、前段受入工程と前段排出工程とが、第1ステップと第2ステップとで行われ、昇圧工程が、第3ステップと第4ステップとで行われ、後段受入工程と後段排出工程とが、第5ステップで行われる点は、上記実施形態と同様である。
 また、B塔の復圧工程では、第5ステップにおいては、特別な工程を実施しない休止状態となり、同様に、D塔の均圧用排出工程では、第3ステップ及び第4ステップにおいては、特別な工程を実施しない休止状態となる点も、上記実施形態と同様である。
 この別実施形態においては、減圧工程が第1ステップで行われ、タンク吸引工程が第2ステップで行われ、ポンプ吸引工程が第3ステップ及び第4ステップで行われることになる。
 尚、第1ステップ~第5ステップの各ステップの時間的な長さは同じ長さではなく、各工程を行うのに適する長さに設定される。
 (別実施形態の圧力変動吸着式水素製造方法の考察) 図10は、別実施形態の圧力変動吸着式水素製造方法を実施した場合における、第1タンクT1や第2タンクT2の圧力の変化、オフガス排出路4と通してバーナ8に向けて流動するオフガス流量の変化、吸着塔1(C塔)の圧力の変化、及び、真空タンクSの圧力の変化を示すものである。
 尚、図10においては、減圧工程の開始を「減圧開始」と記載し、タンク吸引工程の開始を「真空均圧開始」と記載し、ポンプ吸引工程の開始を「真空工程開始」と記載し、ポンプ吸引工程の終了を「真空工程終了」と記載する。
 ちなみに、図10は、吸着工程の吸着塔1の内部圧力が、750kPaGであり、後段排出工程を行った段階の吸着塔1(C塔)の内部圧力が、150kPaGである場合の変化を示すものである。
 そして、減圧工程を行うと、吸着塔1(C塔)の内部圧力が、脱着工程を開始したときの初期圧(150kPaG)から40~60%の圧力としての70kPaGに低下されるようになっている。
 また、減圧工程に続いてタンク吸引工程を行うと、吸着塔1(C塔)の内部圧力が、大気圧よりも低下し、ポンプ吸引工程を行うと、吸着塔1(C塔)の内部圧力が、-90kPaGの近くに減少することを示している。
 図10において、オフガス量の変化に着目すると、ポンプ吸引工程を開始しても、オフガス量が急激に増加することが抑制され、また、単位処理期間の第5ステップの終期においても、オフガス量が十分に大きな量に維持されていることが分かる。
 ポンプ吸引工程を開始しても、オフガス量が急激に増加しないのは、吸着塔1(C塔)の内部圧力が大気圧よりも低い状態で、吸着塔1(C塔)に対して真空ポンプPが吸引作用することになるからである。
 また、単位処理期間の第5ステップの終期において、オフガス量が十分に大きな量に維持されるのは、タンク吸引工程において真空タンクSに回収したオフガスを、第5ステップにおいて第2タンクT2を経由して供給するからである。
 〔真空タンクの改造構成〕
 次に、真空タンクSを改造した構成について説明する。
 すなわち、真空タンクSに、吸着塔1から排出されるオフガスを吸着するオフガス用吸着剤が装填されている。
 具体的には、原料ガスが、水素、水素以外の可燃性成分としてのメタン、一酸化炭素、窒素、二酸化炭素、水分を含むものであることに対応して、上述の如く、吸着塔1に装填する吸着剤が、一酸化炭素及び窒素を吸着するゼオライト、メタン及び二酸化炭素を吸着するカーボンモレキュラーシーブ、及び、水分を吸着する活性アルミナを含む形態に構成されている。
 これに対して、オフガスには、メタン及び二酸化炭素が70%程度まで含まれることがあることに対応して、メタン及び二酸化炭素を吸着するカーボンモレキュラーシーブにて構成されたオフガス用吸着剤が、真空タンクSに装填されている。
 オフガス用吸着剤を真空タンクSに装填すると、吸着塔1から排出されるオフガスは、真空タンクSに導入される際に、オフガス用吸着剤に吸着されることになり、そして、オフガス用吸着剤に吸着されたオフガスは、真空ポンプPが真空タンクSを吸引する際に、オフガス用吸着剤から離脱して、真空タンクSから排出されることになる。
 つまり、真空タンクは、真空ポンプPに吸引されることにより低圧になる状態と、吸着塔1から排出されるオフガスが導入されることにより高圧になる状態とを繰り返すものであるから、オフガス用吸着剤が真空タンクSに装填されていると、吸着塔1から排出されるオフガスは、真空タンクSに導入される際に、オフガス用吸着剤に吸着されることになる。
 そして、オフガス用吸着剤に吸着されたオフガスは、真空ポンプPが真空タンクSを吸引する際に、オフガス用吸着剤から離脱して、真空タンクSから排出されることになる。
 このように、吸着塔1から排出されるオフガスが、オフガス用吸着剤に吸着された状態で真空タンクSに収納されるものとなるから、オフガス用吸着剤を装填しない場合に較べて、真空タンクSの容積を減少させても、オフガスを真空タンクSに所定通り収納させることができるため、真空タンクSの小型化を図ることができるのである。
 つまり、オフガスに含まれるメタン及び二酸化炭素がオフガス用吸着剤に吸着される結果、オフガス用吸着剤を装填しない場合に較べて、真空タンクSの容積を減少(例えば、60%程度減少)させても、オフガスを所定通り真空タンクSに回収できるのである。
 〔その他の別実施形態〕
 次に、その他の別実施形態を列記する。
(1)上記実施形態においては、脱着工程における第1減圧工程を行うときに、タンク作用状態に切換えられた真空ポンプPにて遮断状態の真空タンクSを吸引作用する場合を例示したが、これを省略する形態で実施してもよい。
(2)上記別実施形態においては、脱着工程における減圧工程を行うときに、タンク作用状態に切換えられた真空ポンプPにて遮断状態の真空タンクSを吸引作用する場合を例示したが、これを省略する形態で実施してもよい。
(3)上記実施形態及び別の実施形態においては、原料ガスが、水素、水素ガス以外の可燃性成分としてのメタン、二酸化炭素、一酸化炭素、及び、窒素を含む場合を例示したが、本発明の圧力変動吸着式水素製造方法は、水素及び水素成分以外の可燃性成分を含む種々のガスを原料ガスとして適用できるものである。
(4)上記実施形態及び別実施形態では、本発明に係る圧力変動吸着式水素製造方法を実施する装置として、4つの吸着塔1を備える装置を説明したが、本発明に係る圧力変動吸着式水素製造方法を実施する装置として、4つ以上の吸着塔1を備えさせて、それらの吸着塔1のうちの特定の4つの吸着塔1にて、吸着工程、均圧用排出工程、脱着工程、復圧工程を行わせる形態で、本発明に係る圧力変動吸着式水素製造方法を実施してもよい。
(5)上記の真空タンクSの改造構成においては、メタン及び二酸化炭素を吸着するカーボンモレキュラーシーブにて構成されたオフガス用吸着剤を、真空タンクSに装填する場合を例示したが、吸着塔1と同様に、一酸化炭素及び窒素を吸着するゼオライト、メタン及び二酸化炭素を吸着するカーボンモレキュラーシーブ、及び、水分を吸着する活性アルミナを、オフガス用吸着剤として、真空タンクSに装填するようにしてもよい。
1    吸着塔
8    燃焼装置
P    真空ポンプ
S    真空タンク
T    オフガスタンク
T1   第1タンク
T2   第2タンク

Claims (9)

  1.  水素成分及び水素成分以外の可燃性成分を含む原料ガスから水素成分以外の吸着対象成分を吸着剤に吸着して製品ガスを生成する4つの吸着塔、及び、前記吸着塔から排出されるオフガスを回収しかつ回収したオフガスを燃焼装置に供給するオフガスタンクが設けられ、
     4つの前記吸着塔のうちの1つについては、単位処理期間の間は吸着工程を行い、前記吸着工程に続く工程を行う前記吸着塔については、前記単位処理期間の間は均圧用排出工程を行い、前記均圧用排出工程に続く工程を行う前記吸着塔については、前記単位処理期間の間は脱着工程を行い、前記脱着工程に続く工程を行う前記吸着塔については、前記単位処理期間の間は前記吸着工程の前工程としての復圧工程を行い、且つ、前記脱着工程を行う前記吸着塔から排出されるオフガスを前記オフガスタンクに回収する圧力変動吸着式水素製造方法であって、
     前記吸着塔から吸引したオフガスを前記燃焼装置に供給する真空ポンプが、前記吸着塔に対して吸引作用する吸着塔作用状態と、真空タンクに対して吸引作用するタンク作用状態とに切換え自在に設けられ、
     前記真空タンクが、前記吸着塔に連通する連通状態と前記吸着塔との連通が遮断された遮断状態とに切換え自在に設けられ、
     前記均圧用排出工程として、前記単位処理期間の初期において、前記均圧用排出工程の前記吸着塔の内部のガスを前記復圧工程の前記吸着塔に供給する前段排出工程を行い、前記単位処理期間の終期において、前記均圧用排出工程の前記吸着塔の内部ガスを前記脱着工程の前記吸着塔に供給する後段排出工程を行い、
     前記単位処理期間の終期において、前記タンク作用状態に切換えられた前記真空ポンプにて前記遮断状態に切換えた前記真空タンクを吸引作用して、前記真空タンク内のオフガスの排出及び前記真空タンクの負圧状態への調整を行い、
     前記脱着工程として、前記単位処理期間の初期において、前記脱着工程の前記吸着塔の内部ガスをオフガスとして前記オフガスタンクに排出する減圧工程を行い、前記単位処理期間の中期において、前記負圧状態に調整された前記真空タンクを前記連通状態に切換えて、前記脱着工程の前記吸着塔の内部ガスを前記真空タンクに吸引するタンク吸引工程、及び、前記真空タンクを前記遮断状態に切換えかつ前記連通状態に切換えた前記真空ポンプにて前記脱着工程の前記吸着塔を吸引するポンプ吸引工程を順次行い、前記単位処理期間の終期において、前記均圧用排出工程の前記吸着塔から前記後段排出工程によって供給されるガスを前記脱着工程の前記吸着塔に受入れる後段受入工程を行い、
     前記復圧工程として、前記単位処理期間の初期において、前記均圧用排出工程の前記吸着塔から前記前段排出工程によって供給されるガスを前記復圧工程の前記吸着塔に受入れる前段受入工程を行い、その後、前記吸着工程の前記吸着塔にて生成された前記製品ガスの一部を前記復圧工程の前記吸着塔に受入れる昇圧工程を行う圧力変動吸着式水素製造方法。
  2.  前記オフガスタンクとして、第1タンクと第2タンクとが設けられ、
     前記減圧工程として、前記脱着工程の前記吸着塔と前記第1タンクとを連通させる第1減圧工程、及び、前記脱着工程の前記吸着塔と前記第2タンクとを連通させる第2減圧工程を順次行い、続いて、前記タンク吸引工程を行う請求項1記載の圧力変動吸着式水素製造方法。
  3.  前記真空ポンプが、前記第2タンクにオフガスを供給するように構成されている請求項2記載の圧力変動吸着式水素製造方法。
  4.  前記第1減圧工程を行うときに、前記タンク作用状態に切換えられた前記真空ポンプにて前記遮断状態の前記真空タンクを吸引作用するようにする請求項2又は3記載の圧力変動吸着式水素製造方法。
  5.  前記減圧工程によって、前記脱着工程の前記吸着塔の内部圧が前記脱着工程を開始したときの初期圧から40~60%の圧力に低下され、
     前記減圧工程に続いて、前記タンク吸引工程を行う請求項1記載の圧力変動吸着式水素製造方法。
  6.  前記減圧工程を行うときに、前記タンク作用状態に切換えられた前記真空ポンプにて前記遮断状態の前記真空タンクを吸引作用するようにする請求項5記載の圧力変動吸着式水素製造方法。
  7.  前記オフガスタンクとして、前記減圧工程において前記脱着工程の前記吸着塔に接続される第1タンクと、第2タンクとが設けられ、
     前記真空ポンプが、前記第2タンクにオフガスを供給するように構成されている請求項5又は6に記載の圧力変動吸着式水素製造方法。
  8.  前記真空タンクに、前記吸着塔から排出されるオフガスを吸着するオフガス用吸着剤が装填されている請求項1~7のいずれか1項に記載の圧力変動吸着式水素製造方法。
  9.  前記原料ガスが、メタンを主成分とする被処理ガスを改質処理して、水素成分、水素成分以外の可燃性成分としてのメタン、一酸化炭素、窒素、二酸化炭素、水分を含む状態に生成されたものであり、
     前記吸着塔に装填される前記吸着剤が、一酸化炭素及び窒素を吸着するゼオライト、メタン及び二酸化炭素を吸着するカーボンモレキュラーシーブ、及び、水分を吸着する活性アルミナを含む形態に構成され、
     前記オフガス用吸着剤が、メタン及び二酸化炭素を吸着するカーボンモレキュラーシーブである請求項8記載の圧力変動吸着式水素製造方法。
PCT/JP2014/069066 2013-07-19 2014-07-17 圧力変動吸着式水素製造方法 WO2015008837A1 (ja)

Priority Applications (2)

Application Number Priority Date Filing Date Title
KR1020167004423A KR101961233B1 (ko) 2013-07-19 2014-07-17 압력 변동 흡착식 수소 제조 방법
US14/905,571 US9675927B2 (en) 2013-07-19 2014-07-17 Method for hydrogen production by pressure swing adsorption

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
JP2013150798 2013-07-19
JP2013-150798 2013-07-19
JP2014053883A JP6198646B2 (ja) 2013-07-19 2014-03-17 圧力変動吸着式水素製造方法
JP2014-053883 2014-03-17

Publications (1)

Publication Number Publication Date
WO2015008837A1 true WO2015008837A1 (ja) 2015-01-22

Family

ID=52346279

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2014/069066 WO2015008837A1 (ja) 2013-07-19 2014-07-17 圧力変動吸着式水素製造方法

Country Status (4)

Country Link
US (1) US9675927B2 (ja)
JP (1) JP6198646B2 (ja)
KR (1) KR101961233B1 (ja)
WO (1) WO2015008837A1 (ja)

Families Citing this family (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL2010072C2 (en) * 2012-12-28 2014-07-03 Green Vision Holding B V Method and device for separating a gas mixture by means of pressure swing adsorption.
JP6275562B2 (ja) * 2014-06-18 2018-02-07 株式会社神戸製鋼所 Psa装置及びpsa装置を用いた吸着除去方法
US11285428B2 (en) * 2016-02-02 2022-03-29 Sabic Global Technologies B.V. Process for separation of hydrogen and oxygen
JP6692315B2 (ja) 2017-03-16 2020-05-13 大阪瓦斯株式会社 圧力変動吸着式水素製造装置
JP6837375B2 (ja) * 2017-04-07 2021-03-03 大陽日酸株式会社 水素ガス精製装置、及び水素ガス精製装置の運転方法
CN107158884B (zh) * 2017-05-23 2019-10-22 成都赛普瑞兴科技有限公司 一种变压吸附装置及有效气回收方法
JP7082939B2 (ja) * 2018-12-14 2022-06-09 東京瓦斯株式会社 水素製造装置
CN111545013B (zh) * 2020-05-11 2022-03-18 杭州和利时自动化有限公司 一种变压吸附系统的控制方法及控制系统
KR20220043468A (ko) 2020-09-29 2022-04-05 현대자동차주식회사 압력흡착시스템 및 방법
CN112941287A (zh) * 2021-01-26 2021-06-11 中冶南方工程技术有限公司 冷轧退火炉废氢回收利用系统及冷轧退火炉氢气供应系统
KR102292426B1 (ko) * 2021-05-31 2021-08-25 주식회사 아스페 수소생산을 위한 석유코크스 합성가스화 공정 중 wgs 후단의 수소 및 이산화탄소 동시 분리 방법
CN115105925B (zh) * 2022-05-25 2023-10-31 山西皆利气体科技有限公司 双回流多塔真空变压吸附方法与吸附系统
KR102466732B1 (ko) * 2022-06-07 2022-11-17 주식회사 아스페 수소회수율을 증가시키기 위한 vpsa를 적용한 h2 및 co2 분리방법

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10212102A (ja) * 1997-01-27 1998-08-11 Osaka Gas Eng Kk 水素発生装置
JP2000317245A (ja) * 1999-05-07 2000-11-21 Nippon Steel Corp ガスの分離精製方法
JP2001010806A (ja) * 1999-06-21 2001-01-16 Tokyo Gas Co Ltd 水素精製用3塔式psa装置におけるオフガスタンクからのオフガス圧力の制御方法
JP2002355522A (ja) * 2001-05-31 2002-12-10 Tokyo Gas Co Ltd 水素精製用4塔式psa装置におけるオフガスタンクからのオフガス圧力の制御方法
JP2005293949A (ja) * 2004-03-31 2005-10-20 Honda Motor Co Ltd 燃料ガス製造システム及びその運転方法
JP2005289704A (ja) * 2004-03-31 2005-10-20 Honda Motor Co Ltd 燃料ガス製造システム及びその停止方法

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4915711A (en) * 1989-05-18 1990-04-10 Air Products And Chemicals, Inc. Adsorptive process for producing two gas streams from a gas mixture
US6007606A (en) * 1997-12-09 1999-12-28 Praxair Technology, Inc. PSA process and system
US7947118B2 (en) * 2007-05-15 2011-05-24 Air Products And Chemicals, Inc. Containerized gas separation system
US7780764B2 (en) * 2008-06-27 2010-08-24 Praxair Technology, Inc. Methods and systems for helium recovery

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10212102A (ja) * 1997-01-27 1998-08-11 Osaka Gas Eng Kk 水素発生装置
JP2000317245A (ja) * 1999-05-07 2000-11-21 Nippon Steel Corp ガスの分離精製方法
JP2001010806A (ja) * 1999-06-21 2001-01-16 Tokyo Gas Co Ltd 水素精製用3塔式psa装置におけるオフガスタンクからのオフガス圧力の制御方法
JP2002355522A (ja) * 2001-05-31 2002-12-10 Tokyo Gas Co Ltd 水素精製用4塔式psa装置におけるオフガスタンクからのオフガス圧力の制御方法
JP2005293949A (ja) * 2004-03-31 2005-10-20 Honda Motor Co Ltd 燃料ガス製造システム及びその運転方法
JP2005289704A (ja) * 2004-03-31 2005-10-20 Honda Motor Co Ltd 燃料ガス製造システム及びその停止方法

Also Published As

Publication number Publication date
US20160175761A1 (en) 2016-06-23
JP2015038015A (ja) 2015-02-26
US9675927B2 (en) 2017-06-13
KR101961233B1 (ko) 2019-03-22
KR20160047472A (ko) 2016-05-02
JP6198646B2 (ja) 2017-09-20

Similar Documents

Publication Publication Date Title
JP6198646B2 (ja) 圧力変動吸着式水素製造方法
AU2018232927B2 (en) Gas purification method
KR101681543B1 (ko) 질소 농축 가스 제조 방법, 가스 분리 방법 및 질소 농축 가스 제조 장치
US9944575B2 (en) Methane gas concentration method
CN110382408B (zh) 压力变动吸附式氢制造装置
JP6811538B2 (ja) 圧力変動吸着式水素製造装置の運転方法
WO2014104196A1 (ja) ガス精製装置
JP2008238076A (ja) 圧力スイング吸着型酸素濃縮器
JP4799454B2 (ja) 圧力スイング吸着型酸素濃縮器
WO2017170983A1 (ja) 圧力変動吸着式ガス製造装置
JP6452206B2 (ja) 炭酸ガスの精製方法および精製システム
JP2001269532A (ja) 圧力変動吸着式空気分離方法
JP2013078734A (ja) 気体分離装置および方法
AU2011211029B2 (en) Enrichment system for combustible gas
JP6905508B2 (ja) 濃縮された目的ガスの製造方法
JP4171392B2 (ja) ガスの分離回収方法および圧力スイング吸着式ガス分離回収システム
JP2005040677A (ja) ガス分離装置及びその運転方法
JP2018177567A (ja) 水素ガス精製装置、及び水素ガス精製装置の運転方法
JP2020142180A (ja) 高酸素ガスの供給装置および方法
JP2018051447A (ja) ガス分離装置の運転方法および、制御装置

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 14826972

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 14905571

Country of ref document: US

NENP Non-entry into the national phase

Ref country code: DE

WWE Wipo information: entry into national phase

Ref document number: IDP00201600972

Country of ref document: ID

ENP Entry into the national phase

Ref document number: 20167004423

Country of ref document: KR

Kind code of ref document: A

122 Ep: pct application non-entry in european phase

Ref document number: 14826972

Country of ref document: EP

Kind code of ref document: A1