WO2014001048A2 - Einrichtung zur prüfung und aufarbeitung eines weichenantriebs für eine eisenbahnweiche - Google Patents
Einrichtung zur prüfung und aufarbeitung eines weichenantriebs für eine eisenbahnweiche Download PDFInfo
- Publication number
- WO2014001048A2 WO2014001048A2 PCT/EP2013/061633 EP2013061633W WO2014001048A2 WO 2014001048 A2 WO2014001048 A2 WO 2014001048A2 EP 2013061633 W EP2013061633 W EP 2013061633W WO 2014001048 A2 WO2014001048 A2 WO 2014001048A2
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- test
- prüfanläge
- drive
- testing
- capacity container
- Prior art date
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L5/00—Local operating mechanisms for points or track-mounted scotch-blocks; Visible or audible signals; Local operating mechanisms for visible or audible signals
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L27/00—Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
- B61L27/60—Testing or simulation
Definitions
- the invention relates to a device for testing and processing a point machine for a railway switch according to the preamble of claim 1.
- a railway switch allows a rail vehicle to break the transition from one track to another track without his drive.
- At a tip of the switch a turnout drive is mounted, provided with the switch blades and held in their final position.
- the soft-lock serves to hold the adjoining switch blade against a stock rail, in order to prevent it from being moved by stresses in the switch blade or by external forces; On the other hand, it serves to keep the remote switch blade at a sufficient distance from the other stock rail.
- Electric point machines are equipped with a coupling device that prevents damage when the Umstellwiderstand is too large or when the movement is hindered by foreign matter between switch blade and stock rail.
- a point machine may, for example, have a housing with a cover, in which an electric motor with a flanged gear, locking slide with closing curve, a switching device and a monitoring slide are arranged.
- the rotary motion of the electric motor can be converted via the gearbox into a straight-line adjusting movement of the adjusting slide.
- the adjusting rods drive the adjusting rods, which transmit the adjusting movement to the switch blades.
- the monitoring Serve slide For monitoring the switch end positions, the monitoring Serve slide.
- an adjustable transmission clutch To limit the force can be provided an adjustable transmission clutch.
- the invention has for its object to provide a device of the type mentioned, with a processing and testing of overhauled point drives cost and time-optimized feasible.
- the object is achieved by a generic device for testing and reconditioning a points drive for a railway switch, which has the features specified in the characterizing part of claim 1. Accordingly, the test bed for mechanical and electrical testing of the functionality of the points drive is arranged according to specifiable test instructions in a transportable and walk-in large capacity container and
- the invention provides a mobile testing and processing device for point machines, which has all testing and workshop means to a
- the test stand has a linear drive for functional testing of various forces.
- the linear drive has, for example, a movable carriage on which a coupling rod is attached for coupling to a rack of the actuator to be tested. About the coupling rod, the forces to be tested in different operating situations of the points drive are transmitted.
- the test bench can be made comparatively slim, so that it can be accommodated in the large-capacity container.
- the linear drive forms the forces which occur during operation on a railway switch and which act on the switch drive.
- the test bench has integrated test equipment for a high-voltage test.
- the test stand has a set of interchangeable mounting modules for testing different types of switch drives.
- Point machines differ in design and size as well as the arrangement of the control slide. So that the test bench can quickly test for a given Switch drive can be retrofitted, a mounting module is kept ready for each type of point machine, which is designed to be quickly exchangeable and fixed on a test bench of the test rig.
- the test stand has a protective cover for covering an actuator to be tested.
- the test table and linear drive can be replaced by a
- the large-capacity container on a swivel crane for loading and unloading a points drive is advantageously mounted on a side wall in the access area of a test area of the large-capacity container and has a pivoting area, which covers the near outdoor area and the test table of the strigStandes.
- the large-capacity container has computing and control means for the automatic execution of test sequences.
- computing and control means are arranged next to the test stand, which are connected to the linear drive and to a drive unit of the points machine to be tested and via an input / output interface on a Operating panel operable, which may be formed for example by a keyboard and a screen or a touch screen.
- the large-capacity container has a voltage adjustment module for providing an operating voltage for the points drive on. So that the test and reprocessing device according to the invention can be operated in countries with different state-supply networks, a voltage adjustment module is provided which can convert the respective primary-side supply voltage into a secondary-side operating voltage for the device.
- the large-capacity container is thermally insulated and air-conditioned.
- These measures also serve to replace the test facility at sites of different climates and seasons.
- an air conditioning system can be arranged in the large-capacity container.
- These measures serve to produce uniform reference conditions for, for example, ambient temperature and humidity.
- the large-capacity container has a test area in which the test stand is arranged, and a workshop area for processing a point machine is allocated to it.
- the areas can be separated by a space-saving sliding door.
- In the workshop area all tools and office equipment for a processing of a points drive are arranged.
- FIG. 2 shows a test stand of the device shown in Figure 1 are shown schematically in perspective view.
- the large-capacity container has a Test area with test bench and divided therefrom a workshop area for processing an actuator on.
- the test system according to the invention for testing turnout drives for railway turnouts on a large container 1 for example, as transportable and walkable so-called 40-foot high-cube container to ISO 668 with a length of 12.040 m, a width of 2.345 m and a height of 2,690 m can be designed as internal dimensions.
- the designed as an overseas container large capacity container 1 is divided by a partition wall 2 in a test area 3 for functional tests and a workshop area 4 for processing activities of a point to be overtaken points drive.
- the partition wall 2 has a sliding door 5 in a space-saving manner in order to allow the testing and maintenance personnel a direct change between the test area 3 and the workshop area 4.
- the large-capacity container 1 has on its outer end face a double turntable 6 in order to spend in the test area 3 point machines supplied for overhauling.
- a swivel crane 7 is arranged in the test area 3, whose swivel arm has a semicircular swivel area 8 and carries a movable trolley with chain and crane hook.
- the test stand 9 is associated with a first control cabinet, are arranged in the control means and computing means 10 connected to the test means for the automated execution ofjansstrichkeits- tests according to specifiable test instructions.
- a voltage adjustment module 11 is arranged to provide the operating voltage of the points drive.
- an operating panel 12 is provided, on which a keyboard and a screen are arranged as input and output means.
- the large-capacity container 1 has heat-insulated walls and an air conditioning unit 13, for example, suspended from the ceiling for cooling or heating the test area 3 and the workshop area 4. Furthermore, for this purpose, the container opening in the region of the double hinged doors 6 is closed by a transparent curtain 14.
- the workshop area 4 is accessible from the outside by a frontally arranged revolving door 15.
- a pallet truck 17 ready.
- a third carriage 19 contains all the special tools, such as a set of torque wrenches, and associated testing equipment for daily inspection.
- a work bench 20 is used for the mechanical processing of parts of the point machine drive or the execution of repairs.
- a compressor 21 for providing compressed air is provided in the workshop area 4.
- Drawers are kept small and standard parts needed for a turnout drive and all devices and tools for a part replacement.
- a mobile office with desk 23, pin board 24 and a cabinet 25 is set up in the workshop area 4, which is provided for the creation and storage of test records, for the production of test badges and related documentation, drawings and the like.
- a test stand 9 of a device has a test table 91 which rests on a frame 90 and is firmly connected thereto.
- a set of at the test table 91 quickly interchangeable and fixed settable fastening modules 92.
- an electric linear drive 93 is arranged, with the carriage a coupling rod 94 is linearly movable.
- the coupling rod 94 serves to couple a control slide 27 of the switch drive 26 to be tested to the linear drive 93.
- linear drive 93 for controlled generation and transmission of a defined force prescribed in the respective test instruction on the switch drive 26 to be tested enables the particularly slender one Execution of the test stand 9 and thus its space-saving placement in a transportable large capacity container 1 (see FIG 1).
- the linear drive 93 and the test table 91 are provided by a protective cover 96 which is resistant to breakdown and impact
- test stand 9 Not shown supply and control lines of the test stand 9 are connected to the voltage converter 11 and the control and computing means 10 (see FIG 1) and connected to the electric motor of the switch drive 26.
- the voltage converter 11 is designed in conjunction with the control and calculation means 10 to also perform a high-voltage test at the points drive 26. Integration of the high voltage test in or on the test bench 9 space is saved for an otherwise additional high voltage tester.
- a visual assembly test of the points drive 26 takes place according to an associated parts list. Subsequently, electrical testing of the wiring in the points drive 26 including a high-voltage test is performed. Subsequently, on the test bench 9, the functional test takes place, in which the actuating stroke, various forces - such as holding force, Auffahrwiderstand, Auffahr- locking force, restoring forces, tripping and sliding force - and the control time of the points drive 26 are determined and logged. In a subsequent mechanical test, the function of test slides is checked. In another high-voltage test, the breakdown resistance of connection forks to ground is tested. Finally, a general my quality check of the points drive 26 by inspection.
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Testing Electric Properties And Detecting Electric Faults (AREA)
- Electric Propulsion And Braking For Vehicles (AREA)
- Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)
- Testing Of Engines (AREA)
Abstract
Description
Claims
Priority Applications (7)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
ES13731297T ES2758440T3 (es) | 2012-06-29 | 2013-06-06 | Dispositivo para probar y reacondicionar un accionamiento de aguja para una aguja de ferrocarril |
EP13731297.1A EP2841665B1 (de) | 2012-06-29 | 2013-06-06 | Einrichtung zur prüfung und aufarbeitung eines weichenantriebs für eine eisenbahnweiche |
CN201390000590.7U CN204804394U (zh) | 2012-06-29 | 2013-06-06 | 用于检查和翻修用于铁路道岔的道岔驱动器的装置 |
RU2015102828/11U RU159010U1 (ru) | 2012-06-29 | 2013-06-06 | Установка для проверки и ремонта стрелочного привода для железнодорожного стрелочного перевода |
AU2013283711A AU2013283711B2 (en) | 2012-06-29 | 2013-06-06 | Device for testing and refurbishing a switch mechanism for a railway switch |
IN9984DEN2014 IN2014DN09984A (de) | 2012-06-29 | 2013-06-06 | |
ZA2014/08971A ZA201408971B (en) | 2012-06-29 | 2014-12-05 | Device for testing and refurbishing a switch mechanism for a railway switch |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE102012211377.0A DE102012211377B4 (de) | 2012-06-29 | 2012-06-29 | Einrichtung zur Prüfung und Aufarbeitung eines Weichenantriebs für eine Eisenbahnweiche |
DE102012211377.0 | 2012-06-29 |
Publications (2)
Publication Number | Publication Date |
---|---|
WO2014001048A2 true WO2014001048A2 (de) | 2014-01-03 |
WO2014001048A3 WO2014001048A3 (de) | 2014-02-27 |
Family
ID=48698992
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/EP2013/061633 WO2014001048A2 (de) | 2012-06-29 | 2013-06-06 | Einrichtung zur prüfung und aufarbeitung eines weichenantriebs für eine eisenbahnweiche |
Country Status (9)
Country | Link |
---|---|
EP (1) | EP2841665B1 (de) |
CN (1) | CN204804394U (de) |
AU (1) | AU2013283711B2 (de) |
DE (1) | DE102012211377B4 (de) |
ES (1) | ES2758440T3 (de) |
IN (1) | IN2014DN09984A (de) |
RU (1) | RU159010U1 (de) |
WO (1) | WO2014001048A2 (de) |
ZA (1) | ZA201408971B (de) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114169051A (zh) * | 2021-11-30 | 2022-03-11 | 一重集团大连工程技术有限公司 | 一种用于高压容器法兰盖回转臂的设计校核方法 |
CN116279650A (zh) * | 2023-05-25 | 2023-06-23 | 中铁四局集团有限公司 | 一种道岔尖轨密贴检测方法及系统 |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102014206412A1 (de) * | 2014-04-03 | 2015-10-08 | Siemens Aktiengesellschaft | Vorrichtung zur Aufnahme eines Prüflings, Anordnung und Verfahren zur Prüfung eines Prüflings |
DE102014207457A1 (de) | 2014-04-08 | 2015-10-08 | Siemens Aktiengesellschaft | Anordnung, Prüfstand und Verfahren zur Prüfung eines Weichenantriebs |
CN111896158A (zh) * | 2019-05-05 | 2020-11-06 | 陕西英泰和电子科技有限责任公司 | 自对中道岔转换阻力传感器 |
CN111572593B (zh) * | 2020-05-05 | 2024-09-20 | 中铁宝桥集团有限公司 | 高速磁浮道岔浮动式支承驱动装置及驱动方法 |
RU2750306C1 (ru) * | 2020-11-12 | 2021-06-25 | Открытое Акционерное Общество "Российские Железные Дороги" | Стенд для испытания электроприводов стрелочных переводов |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102009020182A1 (de) * | 2009-05-06 | 2010-11-11 | Horiba Europe Gmbh | Mobiler Prüfstand |
-
2012
- 2012-06-29 DE DE102012211377.0A patent/DE102012211377B4/de active Active
-
2013
- 2013-06-06 CN CN201390000590.7U patent/CN204804394U/zh not_active Expired - Lifetime
- 2013-06-06 EP EP13731297.1A patent/EP2841665B1/de active Active
- 2013-06-06 RU RU2015102828/11U patent/RU159010U1/ru active
- 2013-06-06 WO PCT/EP2013/061633 patent/WO2014001048A2/de active Application Filing
- 2013-06-06 IN IN9984DEN2014 patent/IN2014DN09984A/en unknown
- 2013-06-06 AU AU2013283711A patent/AU2013283711B2/en active Active
- 2013-06-06 ES ES13731297T patent/ES2758440T3/es active Active
-
2014
- 2014-12-05 ZA ZA2014/08971A patent/ZA201408971B/en unknown
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102009020182A1 (de) * | 2009-05-06 | 2010-11-11 | Horiba Europe Gmbh | Mobiler Prüfstand |
Non-Patent Citations (3)
Title |
---|
"hastema Bahntechnik Schulung", , 6. Oktober 2006 (2006-10-06), Seiten 1-13, XP055094672, Gefunden im Internet: URL:http://www.transmetra.ch/images/stories/pdf/sensorik/kraftsensoren/dokumente/a06.applikation_weichenantrieb.pdf [gefunden am 2014-01-02] * |
"PT 10K Multi", , 1. September 2008 (2008-09-01), Seiten 1-2, XP055094675, Gefunden im Internet: URL:http://www.probitron.de/fileadmin/pdf/datenblatt_multi.pdf [gefunden am 2014-01-02] * |
"Weichenstellsysteme - Richtungsweisende Technik von HANNING & KAHL", , 1. August 2010 (2010-08-01), Seiten 1-16, XP055094669, Gefunden im Internet: URL:http://www.hanning-kahl.de/fileadmin/huk/Inhalte/Abbildungen/Produkte_Service/Bahntechnik/Weichenstellsystem/Weichenstellsysteme_01.pdf [gefunden am 2014-01-02] * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114169051A (zh) * | 2021-11-30 | 2022-03-11 | 一重集团大连工程技术有限公司 | 一种用于高压容器法兰盖回转臂的设计校核方法 |
CN116279650A (zh) * | 2023-05-25 | 2023-06-23 | 中铁四局集团有限公司 | 一种道岔尖轨密贴检测方法及系统 |
CN116279650B (zh) * | 2023-05-25 | 2023-08-18 | 中铁四局集团有限公司 | 一种道岔尖轨密贴检测方法及系统 |
Also Published As
Publication number | Publication date |
---|---|
CN204804394U (zh) | 2015-11-25 |
EP2841665A2 (de) | 2015-03-04 |
IN2014DN09984A (de) | 2015-08-14 |
DE102012211377B4 (de) | 2018-03-01 |
DE102012211377A1 (de) | 2014-01-02 |
AU2013283711A1 (en) | 2015-01-15 |
ZA201408971B (en) | 2015-12-23 |
EP2841665B1 (de) | 2019-08-21 |
RU159010U1 (ru) | 2016-01-20 |
ES2758440T3 (es) | 2020-05-05 |
WO2014001048A3 (de) | 2014-02-27 |
AU2013283711B2 (en) | 2018-11-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2841665B1 (de) | Einrichtung zur prüfung und aufarbeitung eines weichenantriebs für eine eisenbahnweiche | |
EP3505466B1 (de) | Automatisiertes regallagersystem und verfahren zum sicheren betreiben desselben | |
DE102013001675A1 (de) | Vorrichtung zur Montage und Demontage von Hydraulikzylindern | |
DE102009053050A1 (de) | Verfahren und Vorrichtung zum Austauschen einer Batterie in einem Fahrzeug | |
EP1346911A1 (de) | Frachtladesystem in einem Laderaum eines Flugzeugs | |
EP2916995B1 (de) | Fertigungsanlage zur herstellung einer baugruppe aus mehreren teilen | |
DE102013203885A1 (de) | Arbeitsgerät mit Stationärmast und Drehkopf | |
DE102014113731A1 (de) | Fahrzeugmontagesystem eines Türscharniers für ein Fahrzeug und Verfahren davon | |
DE102019205765A1 (de) | Vorrichtung und Verfahren zur Instandhaltung einer Oberleitungsanlage eines Gleises | |
DE202006015098U1 (de) | Werkzeugmaschine mit Rundkabine | |
DE102019211452A1 (de) | Lagereinheit zum mehrschichtigen Lagern von Schienen auf einem Schienenladezug sowie modulares Baukastensystem und Verfahren zur Herstellung einer Lagereinheit zum mehrschichtigen Lagern von Schienen auf einem Schienenladezug | |
DE102017220934A1 (de) | Bearbeitungsanlage für Platten und dergleichen und mit dieser Anlage verwirklichte Produktionslinie | |
DE102012202979A1 (de) | Windenergieanlage | |
DE102013108003A1 (de) | Zentrieranordnung für einen Bauteilträger | |
EP2772589B1 (de) | Baumaschine | |
EP2777871B1 (de) | Bearbeitungszentrum mit einer Maschinenumhausung | |
DE102009050216A1 (de) | Robotergestützter Abstichschieberwechsel an Stahlgießpfannen | |
DE202020100534U1 (de) | Monoblock-Aufzugssteuereinheit | |
DE102015209923A1 (de) | Werkzeugmaschine | |
WO2014019923A1 (de) | Schaltschrank für ein pitchsystem | |
EP1561659A1 (de) | Vorrichtung zum Austauschen einer Batterie für ein Fahrzeug, insbesondere gepanzertes Transportfahrzeug | |
DE19805394C2 (de) | Kühleinrichtung für Werkzeugmaschinen | |
DE102013203886A1 (de) | Arbeitsgerät mit Stationärmast und Drehkopf | |
DE102010011475B4 (de) | Maschinentür und Verfahren zum Betrieb | |
EP2792602A1 (de) | Etikettiermaschine mit Schaltschrank |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
WWE | Wipo information: entry into national phase |
Ref document number: 201390000590.7 Country of ref document: CN |
|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 13731297 Country of ref document: EP Kind code of ref document: A2 |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2013731297 Country of ref document: EP |
|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 13731297 Country of ref document: EP Kind code of ref document: A2 |
|
ENP | Entry into the national phase |
Ref document number: 2013283711 Country of ref document: AU Date of ref document: 20130606 Kind code of ref document: A |