WO2013179731A1 - 蓄電池システム - Google Patents

蓄電池システム Download PDF

Info

Publication number
WO2013179731A1
WO2013179731A1 PCT/JP2013/057774 JP2013057774W WO2013179731A1 WO 2013179731 A1 WO2013179731 A1 WO 2013179731A1 JP 2013057774 W JP2013057774 W JP 2013057774W WO 2013179731 A1 WO2013179731 A1 WO 2013179731A1
Authority
WO
WIPO (PCT)
Prior art keywords
power
voltage
storage battery
distribution board
commercial
Prior art date
Application number
PCT/JP2013/057774
Other languages
English (en)
French (fr)
Inventor
宏 松浦
Original Assignee
東芝ライテック株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 東芝ライテック株式会社 filed Critical 東芝ライテック株式会社
Priority to US14/404,360 priority Critical patent/US20150108853A1/en
Priority to EP13797432.5A priority patent/EP2858187A1/en
Publication of WO2013179731A1 publication Critical patent/WO2013179731A1/ja

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02BBOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
    • H02B1/00Frameworks, boards, panels, desks, casings; Details of substations or switching arrangements
    • H02B1/24Circuit arrangements for boards or switchyards
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J9/00Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting
    • H02J9/04Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source
    • H02J9/06Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source with automatic change-over, e.g. UPS systems
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/34Parallel operation in networks using both storage and other dc sources, e.g. providing buffering

Definitions

  • Embodiment of this invention is related with the storage battery system which supplies electric power from the storage battery to the distribution board side.
  • the distribution board includes a protective device such as a limiter or a main breaker to which commercial AC power is input, and a plurality of branch breakers connected to the output side of the protective device, and a load is connected to each branch breaker.
  • a protective device such as a limiter or a main breaker to which commercial AC power is input
  • branch breakers connected to the output side of the protective device, and a load is connected to each branch breaker.
  • the problem to be solved by the present invention is to provide a storage battery system capable of identifying the cause of power interruption and appropriately supplying power from the storage battery to the distribution board according to the cause of power interruption.
  • each voltage is detected by the voltage detection means on the primary side circuit of the protection device of the distribution board to which commercial AC power is input and the secondary side circuit of the protection device to which the branch breaker is connected.
  • Power can be supplied from the storage battery to the distribution board.
  • the control unit Based on the detection of the voltage by the voltage detection means, the control unit causes power to be supplied from the storage battery to the distribution board side only when the voltage on the primary side electric circuit of the protective device is not detected.
  • the storage battery system 10 includes a distribution board 11, a power conditioner 12 as a charge / discharge device, a storage battery 13, and the like.
  • the distribution board 11 includes a limiter 17 as a protective device 16, a main breaker 18, a switch unit 19, a conductive bar 20, a plurality of branch breakers 21, and the like.
  • the limiter 17 has a function of cutting off the electric circuit when the current used in the house exceeds the contract current with the power company.
  • the primary side (input side) of the limiter 17 is connected to a primary side electric circuit 22 that is a power line from a power meter installed outdoors, and commercial AC power is input through the primary side electric circuit 22.
  • a secondary side electric circuit 23 which is an electric wire connected to the main breaker 18 is connected to the secondary side (output side) of the limiter 17.
  • the main breaker 18 has a function of cutting off the electric circuit when a leakage, short circuit, overcurrent, etc. occurs on the load side.
  • the secondary side electric circuit 23 of the limiter 17 is connected to the primary side of the main breaker 18.
  • a secondary side electric circuit 24, which is an electric wire or the like connected to the switch unit 19, is connected.
  • the switch unit 19 switches between connection and disconnection of the electric circuit between the commercial AC power supply side and the load side under the control of the power conditioner 12.
  • the secondary side of the main breaker 18 is connected to the primary side of the switch unit 19, and the secondary side of the switch unit 19 is connected to the conductive bar 20.
  • a series circuit in which two electromagnetic switches 25 are connected in series and an inspection switch are connected in parallel.
  • the two electromagnetic switches 25 are normally turned on by supplying power from the power conditioner 12, and when switching to power supply from the storage battery 13, the power supply from the power conditioner 12 is stopped and turned off.
  • the inspection switch 26 is normally turned off and is turned on by operating the inspection switch 26.
  • the plurality of branch breakers 21 are connected to the conductive bar 20, and a load is connected to each branch breaker 21.
  • the measurement unit 27 for measuring the power consumption of the load connected to each branch breaker 21 is connected to the conductive bar 20.
  • a power conditioner 12 is connected to the conductive bar 20 via a storage battery side breaker 28.
  • the storage battery-side breaker 28 has a function of interrupting the electric circuit when leakage, short circuit, overcurrent, or the like occurs on the load side when power is supplied from the storage battery 13.
  • a voltage sensor CT1 as a voltage detecting means for detecting respective voltages on the primary side circuit 22 of the limiter 17 of the distribution board 11, the secondary side circuit 23 of the limiter 17, and the secondary side circuit 24 of the main breaker 18.
  • CT2 and CT3 are installed.
  • the power conditioner 12 includes a converter 32, a control unit 33, a notification unit 34, and the like.
  • the converter 32 switches between charging and discharging of the storage battery 13 under the control of the control unit 33, charging the storage battery 13 by converting commercial AC power supplied from the conductive bar 20 into DC power during charging, and charging the storage battery 13 during discharging.
  • DC power is converted into AC power and supplied to the conductive bar 20.
  • the controller 33 is connected to a converter 32, voltage sensors CT1, CT2, CT3 and two electromagnetic switches 25.
  • the control unit 33 controls charging / discharging of the storage battery 13 by the converter 32, and based on the detection of the voltage by the voltage sensors CT1, CT2, CT3, only when the voltage in the primary side electric circuit 22 of the limiter 17 is not detected, Power is supplied from the storage battery 13 to the distribution board 11 side, and the voltage on the primary side circuit 22 of the limiter 17 is detected and the voltage on the secondary side circuit 23 of the limiter 17 or the secondary side circuit 24 of the main breaker 18 is When it is not detected, it has a function of notifying power by the notifying means 34 without supplying power from the storage battery 13 to the distribution board 11 side.
  • the information notified by the notification means 34 includes the content of the cause of power interruption.
  • the notifying means 34 includes, for example, a display means such as a segment display and a liquid crystal, a sound generating means for generating sound and an alarm sound, etc. It is possible.
  • a lithium ion battery is used as the storage battery 13, and a storage capacity capable of supplying power to a load in a house during a power failure of a commercial AC power source for a predetermined time such as a planned power failure is secured.
  • the commercial AC power supplied from the electric power company is the limiter 17, the main breaker 18, and the switch unit 19. Is supplied to a load connected to each branch breaker 21 through the electromagnetic switch 25, the conductive bar 20, and the branch breaker 21 in the ON state.
  • the control unit 33 of the power conditioner 12 monitors the charge amount of the storage battery 13, and controls the converter 32 to charge the storage battery 13 when the charge amount falls below a predetermined value.
  • commercial AC power supplied from the conductive bar 20 is converted to DC power and supplied to the storage battery 13 to charge the storage battery 13.
  • the conversion by the converter 32 is stopped and the charging is completed.
  • the controller 33 of the power conditioner 12 monitors whether the voltage is detected by the voltage sensors CT1, CT2, and CT3 (steps 1 to 3). Although voltage detection is determined in the order of voltage sensor CT1, voltage sensor CT2, and voltage sensor CT3, detection of voltage may be determined in order of voltage sensor CT3, voltage sensor CT2, and voltage sensor CT1.
  • Step 4 the control unit 33 determines that the commercial AC power source is a power failure.
  • the control unit 33 determines that the commercial AC power source is a power failure.
  • the control unit 33 determines that the commercial AC power source is a power failure.
  • control unit 33 determines that the commercial AC power supply has failed, the control unit 33 turns off the electromagnetic switch 25 of the switch unit 19 so that the commercial AC power supply side and the load side are connected between the main breaker 18 and the conductive bar 20 (branch breaker 21). After disconnecting (step 5), the converter 32 converts the DC power of the storage battery 13 into AC power and supplies it to the load through the conductive bar 20 and the branch breaker 21 (step 6).
  • control unit 33 informs the notification means 34 that a commercial AC power supply has failed or that power is being supplied from the storage battery 13 (step 7).
  • the resident can grasp that a power failure has occurred in the commercial AC power supply or that power is being supplied from the storage battery 13.
  • the voltage is detected by the voltage sensor CT1 of the primary side circuit 22 of the limiter 17, but the voltage is not detected by the voltage sensor CT2 of the secondary side circuit 23 of the limiter 17.
  • the operation is determined (step 8). Note that since the voltage is not detected by the voltage sensors CT2 and CT3, the operation of the limiter 17 may be determined on the condition that no voltage is detected by the voltage sensors CT2 and CT3.
  • control unit 33 determines that the operation of the limiter 17 is not performed, the control unit 33 does not supply power from the storage battery 13 to the distribution board 11 side. Is notified.
  • the resident who confirmed the cause of the interruption by notification turns off the switch of the limiter 17 after taking measures such as switching off the electrical equipment used or disconnecting it from the outlet. As a result, the supply of commercial AC power is restored.
  • the voltage is detected by the voltage sensor CT1 of the primary circuit 22 of the limiter 17 and the voltage sensor CT2 of the secondary circuit 23, and no voltage is detected by the secondary circuit 24 of the main breaker 18, so that the control unit 33 Is determined to be the operation of the main breaker 18 (step 9).
  • the control unit 33 When determining that the operation of the main breaker 18 is not performed, the control unit 33 does not supply power from the storage battery 13 to the distribution board 11 side, and in step 7, the notification means 34 indicates that a leakage, short circuit, overcurrent, or the like has occurred on the load side. Inform.
  • the cause of power interruption can be specified based on the voltage in the primary side circuit 22 and the secondary side circuits 23, 24 of the protective device 16, and the primary side circuit 22 in the protective device 16 Only when the voltage is not detected, power is supplied from the storage battery 13 to the distribution board 11 side, that is, the voltage on the secondary side electric circuits 23 and 24 of the protective device 16 is the case where the power is interrupted by the protective operation of the protective device 16. If it is not detected, power is not supplied from the storage battery 13 to the distribution board 11 side, and power can be appropriately supplied from the storage battery 13 to the distribution board 11 side in accordance with the cause of power interruption.
  • the protective device 16 when the voltage on the primary side circuit 22 of the protective device 16 is detected and the voltage on the secondary side circuits 23 and 24 of the protective device 16 is not detected, it is determined that the protective device 16 is operating. In order not to supply power from the storage battery 13 to the distribution board 11 side, but to notify by the notification means 34, it is possible to prevent power supply from the storage battery 13 to the distribution board 11 side without eliminating the cause of power interruption.
  • the protective device 16 can be restored by taking measures to eliminate the above.
  • the storage battery system 10 can be applied to a distribution board 11 that is already installed in the house.
  • the protective device 16 is the main breaker 18, and only when the voltage on the primary circuit 22 of the main breaker 18 is not detected, the storage battery 13 is connected to the distribution board 11 side. Try to supply power.

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Business, Economics & Management (AREA)
  • Emergency Management (AREA)
  • Distribution Board (AREA)
  • Secondary Cells (AREA)
  • Stand-By Power Supply Arrangements (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)

Abstract

 電圧センサ(CT1,CT2,CT3)により、商用交流電力が入力される分電盤(11)の保護機器(16)の一次側電路(22)、および分岐ブレーカ(21)が接続される保護機器(16)の二次側電路(23,24)で、それぞれの電圧を検出する。蓄電池(13)から分電盤(11)側に電力供給可能とする。制御部(33)により、電圧センサ(CT1,CT2,CT3)による電圧の検出に基づき、保護機器(16)の一次側電路(22)での電圧が検出されない場合にのみ、蓄電池(13)から分電盤(11)側に電力供給させる。

Description

蓄電池システム
 本発明の実施形態は、蓄電池から分電盤側に電力供給する蓄電池システムに関する。
 従来、一般住宅では、商用交流電力が分電盤を通じて各部屋などの給電場所に供給される。この分電盤は、商用交流電力が入力されるリミッタや主幹ブレーカなどの保護機器、およびこの保護機器の出力側に接続される複数の分岐ブレーカを備え、各分岐ブレーカに負荷が接続される。
 また、商用交流電力の停電時における電力確保のために、太陽光発電の電力を利用することが提案されているが、太陽光発電の電力の利用が不十分あるいは困難な場合がある。そこで、蓄電池を用い、商用交流電力の停電時に蓄電池から電力を供給するようにしている。
特許第3570283号公報
 住宅内に電力が供給されない原因としては、商用交流電力の停電の他、分電盤の保護危機の動作によって遮断している場合もある。例えば電力会社との契約電流を超えた場合にはリミッタが動作して遮断し、漏電などの発生時には主幹ブレーカが動作して遮断する。
 そのため、住宅内に商用交流電力が供給されなくなったときに、直ちに蓄電池から電力供給することは、遮断原因によっては好ましくない場合がある。
 本発明が解決しようとする課題は、電力の遮断原因を特定し、電力の遮断原因に応じて適切に蓄電池から分電盤側に電力供給できる蓄電池システムを提供することである。
 実施形態の蓄電池システムでは、電圧検出手段により、商用交流電力が入力される分電盤の保護機器の一次側電路、および分岐ブレーカが接続される保護機器の二次側電路で、それぞれの電圧を検出する。蓄電池から分電盤側に電力供給可能とする。制御部により、電圧検出手段による電圧の検出に基づき、保護機器の一次側電路での電圧が検出されない場合にのみ、蓄電池から分電盤側に電力供給させる。
一実施形態を示す蓄電池システムのブロック図である。 蓄電池システムによる遮断箇所を判断するフローチャートである。
 以下、一実施形態を、図1および図2を参照して説明する。
 図1において、蓄電池システム10は、分電盤11、充放電装置としてのパワーコンディショナー12、および蓄電池13などを備えている。
 そして、分電盤11は、保護機器16としてのリミッタ17、主幹ブレーカ18、スイッチユニット19、導電バー20および複数の分岐ブレーカ21などを備えている。
 リミッタ17は、住宅内での使用電流が電力会社との契約電流を超えた場合に電路を遮断する機能を有している。リミッタ17の一次側(入力側)には、屋外に設置される電力計から電源線である一次側電路22が接続され、この一次側電路22を通じて商用交流電力が入力される。リミッタ17の二次側(出力側)には、主幹ブレーカ18に接続される電線である二次側電路23が接続されている。
 主幹ブレーカ18は、負荷側で漏電、短絡および過電流などが発生した場合に電路を遮断する機能を有している。主幹ブレーカ18の一次側は、リミッタ17の二次側電路23が接続されている。主幹ブレーカ18の二次側には、スイッチユニット19に接続される電線などである二次側電路24が接続されている。
 スイッチユニット19は、パワーコンディショナー12による制御で、商用交流電源側と負荷側との電路の接続と遮断を切り換えるものである。スイッチユニット19の一次側は主幹ブレーカ18の二次側電路24が接続され、スイッチユニット19の二次側は導電バー20に接続されている。スイッチユニット19の一次側と二次側との間には、2つの電磁スイッチ25が直列に接続された直列回路と点検スイッチとが並列に接続されている。2つの電磁スイッチ25は、通常時にはパワーコンディショナー12からの電力供給によってオンし、蓄電池13からの電力供給に切り換える場合にパワーコンディショナー12からの電力供給が停止されてオフする。点検スイッチ26は、通常時はオフし、点検スイッチ26の操作によってオンする。
 複数の分岐ブレーカ21は導電バー20に接続され、各分岐ブレーカ21に負荷が接続される。
 導電バー20には、各分岐ブレーカ21に接続された負荷の電力使用量を測定するための計測ユニット27が接続されている。
 さらに、導電バー20には、蓄電池側ブレーカ28を介してパワーコンディショナー12が接続されている。蓄電池側ブレーカ28は、蓄電池13からの電力供給時に負荷側で漏電、短絡および過電流などが発生した場合に電路を遮断する機能を有する。
 また、分電盤11のリミッタ17の一次側電路22、リミッタ17の二次側電路23、および主幹ブレーカ18の二次側電路24に、それぞれの電圧を検出する電圧検出手段としての電圧センサCT1,CT2,CT3が装着されている。
 また、パワーコンディショナー12は、コンバータ32、制御部33、および報知手段34などを備えている。
 コンバータ32は、制御部33の制御により蓄電池13の充電と放電とを切り換え、充電時には導電バー20から供給される商用交流電力を直流電力に変換して蓄電池13を充電し、放電時には蓄電池13の直流電力を交流電力に変換して導電バー20に供給する。
 制御部33には、コンバータ32、電圧センサCT1,CT2,CT3および2つの電磁スイッチ25が接続されている。制御部33は、コンバータ32による蓄電池13の充放電を制御するもので、電圧センサCT1,CT2,CT3による電圧の検出に基づき、リミッタ17の一次側電路22での電圧が検出されない場合にのみ、蓄電池13から分電盤11側に電力供給させ、リミッタ17の一次側電路22での電圧が検出されるとともにリミッタ17の二次側電路23または主幹ブレーカ18の二次側電路24での電圧が検出されない場合に、蓄電池13から分電盤11側に電力供給せず、報知手段34によって報知させる機能などを有している。報知手段34によって報知させる情報には、電力の遮断原因の内容が含まれている。
 報知手段34には、例えばセグメント表示器および液晶などの表示手段や、音声および警報音などを発生する音発生手段などが含まれ、制御部33から入力される電力の遮断原因の内容なども報知可能としている。
 また、蓄電池13は、例えばリチウムイオン電池などが用いられ、例えば計画停電などの所定時間の商用交流電源の停電中に住宅内の負荷に電力供給が可能な蓄電容量が確保されている。
 次に、蓄電池システム10の動作を説明する。
 電力会社から商用交流電力が供給されているとともに、リミッタ17および主幹ブレーカ18も動作していない正常時においては、電力会社から供給される商用交流電力が、リミッタ17、主幹ブレーカ18、スイッチユニット19のオン状態にある電磁スイッチ25、導電バー20および分岐ブレーカ21を通じて、各分岐ブレーカ21に接続されている負荷に供給される。
 パワーコンディショナー12の制御部33では、蓄電池13の充電量を監視しており、充電量が所定の値を下回ることにより、コンバータ32を制御して蓄電池13を充電する。充電時には、導電バー20から供給される商用交流電力を直流電力に変換して蓄電池13に供給し、蓄電池13を充電する。蓄電池13の充電量が所定の値に達したら、コンバータ32による変換を停止し、充電を完了する。
 そして、パワーコンディショナー12の動作を図2のフローチャートを参照して説明する。
 パワーコンディショナー12の制御部33は、電圧センサCT1,CT2,CT3で電圧が検出されているか監視する(ステップ1~3)。なお、電圧センサCT1、電圧センサCT2、電圧センサCT3の順に電圧の検出を判断しているが、電圧センサCT3、電圧センサCT2、電圧センサCT1の順に電圧の検出を判断してもよい。
 電力会社から商用交流電力が供給されているとともに、リミッタ17および主幹ブレーカ18も動作していない正常時においては、全ての電圧センサCT1,CT2,CT3で電圧が検出されており、制御部33は正常と判断して監視を継続する。
 また、電力会社から商用交流電力が停止した停電時には、リミッタ17の一次側電路22の電圧センサCT1で電圧が検出されなくなるため、制御部33は商用交流電源の停電と判断する(ステップ4)。なお、この場合、全ての電圧センサCT1,CT2,CT3で電圧が検出されなくなるため、全ての電圧センサCT1,CT2,CT3で電圧が検出されなくなることを条件に、商用交流電源の停電と判断してもよい。
 制御部33は、商用交流電源の停電と判断すると、スイッチユニット19の電磁スイッチ25をオフして主幹ブレーカ18と導電バー20(分岐ブレーカ21)との間で商用交流電源側と負荷側とを解列した後(ステップ5)、コンバータ32により蓄電池13の直流電力を交流電力に変換して導電バー20および分岐ブレーカ21を通じて負荷に供給する(ステップ6)。
 これにより、商用交流電源の停電中にも、住宅内の電気機器を使用できる。
 さらに、制御部33は、報知手段34により、商用交流電源の停電が発生したことや、蓄電池13から電力供給していることなどを報知する(ステップ7)。住居者は、報知を確認することにより、商用交流電源の停電が発生したことや、蓄電池13から電力供給していることなどを把握することができる。
 また、住宅内での使用電流が電力会社との契約電流を超えたためにリミッタ17が動作した場合、リミッタ17で商用交流電力が遮断されて住宅内の電気機器が使用できなくなる。
 この場合、リミッタ17の一次側電路22の電圧センサCT1で電圧が検出されているが、リミッタ17の二次側電路23の電圧センサCT2で電圧が検出されなくなるため、制御部33はリミッタ17の動作と判断する(ステップ8)。なお、電圧センサCT2,CT3で電圧が検出されなくなるため、電圧センサCT2,CT3で電圧が検出されなくなることを条件に、リミッタ17の動作と判断してもよい。
 制御部33は、リミッタ17の動作と判断すると、蓄電池13から分電盤11側に電力供給せず、ステップ7において報知手段34によりリミッタ17の動作であること、すなわち電気の使い過ぎであることを報知する。
 報知により遮断原因を確認した住居者は、使用していた電気機器のスイッチを切ったりコンセントから抜くなどの処置を行った後、リミッタ17のスイッチを再投入する。これにより、商用交流電力の供給が復旧する。
 また、負荷側で漏電、短絡および過電流などが発生したために主幹ブレーカ18が動作した場合、主幹ブレーカ18で商用交流電力が遮断されて住宅内の電気機器が使用できなくなる。
 この場合、リミッタ17の一次側電路22の電圧センサCT1および二次側電路23の電圧センサCT2で電圧が検出され、主幹ブレーカ18の二次側電路24で電圧が検出されなくなるため、制御部33は主幹ブレーカ18の動作と判断する(ステップ9)。
 制御部33は、主幹ブレーカ18の動作と判断すると、蓄電池13から分電盤11側に電力供給せず、ステップ7において報知手段34により負荷側で漏電、短絡および過電流などが発生したことを報知する。
 報知により遮断原因を確認した住居者は、電気機器を点検し、問題がある電気機器があればコンセントから外すなどの処置を行う。電気機器の点検を完了し、問題が解消されれば、主幹ブレーカ18のスイッチを再投入することにより、商用交流電力の供給が復旧する。
 このように、蓄電池システム10では、保護機器16の一次側電路22および二次側電路23,24での電圧に基づいて電力の遮断原因を特定できるとともに、保護機器16の一次側電路22での電圧が検出されない場合にのみ蓄電池13から分電盤11側に電力供給し、つまり保護機器16の保護動作による電力の遮断の場合である保護機器16の二次側電路23,24での電圧が検出されない場合には蓄電池13から分電盤11側に電力供給せず、電力の遮断原因に応じて適切に蓄電池13から分電盤11側に電力供給できる。
 また、保護機器16の一次側電路22での電圧が検出されるとともに保護機器16の二次側電路23,24での電圧が検出されない場合には、保護機器16が動作していると判断し、蓄電池13から分電盤11側に電力供給せず、報知手段34によって報知するため、電力の遮断原因が解消されないまま蓄電池13から分電盤11側に電力供給するのを防止でき、遮断原因を解消する処置をして保護機器16を復旧させることができる。
 また、蓄電池システム10は、住宅に既設の分電盤11に適用することもできる。
 なお、リミッタ17を用いない分電盤11においては、保護機器16は主幹ブレーカ18となり、主幹ブレーカ18の一次側電路22での電圧が検出されない場合にのみ、蓄電池13から分電盤11側に電力供給をするようにする。
 本発明のいくつかの実施形態を説明したが、これらの実施形態は、例として提示したものであり、発明の範囲を限定することは意図していない。これら新規な実施形態は、その他の様々な形態で実施されることが可能であり、発明の要旨を逸脱しない範囲で、種々の省略、置き換え、変更を行うことができる。これら実施形態やその変形は、発明の範囲や要旨に含まれるとともに、特許請求の範囲に記載された発明とその均等の範囲に含まれる。
 10  蓄電池システム
 11  分電盤
 13  蓄電池
 16  保護機器
 21  分岐ブレーカ
 22  一次側電路
 23,24  二次側電路
 33  制御部
 34  報知手段
 CT1,CT2,CT3  電圧検出手段としての電圧センサ

Claims (2)

  1.  商用交流電力が入力される分電盤の保護機器の一次側電路、および分岐ブレーカが接続される前記保護機器の二次側電路で、それぞれの電圧を検出する電圧検出手段と;
     前記分電盤側に電力供給可能とする蓄電池と;
     前記電圧検出手段による電圧の検出に基づき、前記保護機器の前記一次側電路での電圧が検出されない場合にのみ、前記蓄電池から前記分電盤側に電力供給させる制御部と;
     を具備していることを特徴とする蓄電池システム。
  2.  報知手段を具備し、
     前記制御部は、前記保護機器の前記一次側電路での電圧が検出されるとともに前記保護機器の前記二次側電路での電圧が検出されない場合に、前記蓄電池から前記分電盤側に電力供給せず、前記報知手段によって報知させる
     ことを特徴とする請求項1記載の蓄電池システム。
PCT/JP2013/057774 2012-06-01 2013-03-19 蓄電池システム WO2013179731A1 (ja)

Priority Applications (2)

Application Number Priority Date Filing Date Title
US14/404,360 US20150108853A1 (en) 2012-06-01 2013-03-19 Storage Battery System
EP13797432.5A EP2858187A1 (en) 2012-06-01 2013-03-19 Storage cell system

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2012-125955 2012-06-01
JP2012125955A JP5858236B2 (ja) 2012-06-01 2012-06-01 蓄電池システム

Publications (1)

Publication Number Publication Date
WO2013179731A1 true WO2013179731A1 (ja) 2013-12-05

Family

ID=49672939

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2013/057774 WO2013179731A1 (ja) 2012-06-01 2013-03-19 蓄電池システム

Country Status (4)

Country Link
US (1) US20150108853A1 (ja)
EP (1) EP2858187A1 (ja)
JP (1) JP5858236B2 (ja)
WO (1) WO2013179731A1 (ja)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015146719A (ja) * 2012-10-31 2015-08-13 パナソニックIpマネジメント株式会社 分電盤及び電力制御方法

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6340892B2 (ja) * 2014-04-22 2018-06-13 オムロン株式会社 切替装置及び電源システム
JP6840426B2 (ja) * 2016-09-16 2021-03-10 日東工業株式会社 電源監視システム

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3570283B2 (ja) 1999-03-30 2004-09-29 松下電工株式会社 蓄電池充放電装置
JP2007129891A (ja) * 2005-10-03 2007-05-24 Matsushita Electric Works Ltd 住宅用分電盤
JP2008048471A (ja) * 2006-08-10 2008-02-28 Matsushita Electric Works Ltd 配電システム
JP2008283741A (ja) * 2007-05-08 2008-11-20 Matsushita Electric Works Ltd 電力制御システム
JP2009050070A (ja) * 2007-08-17 2009-03-05 Kansai Electric Power Co Inc:The 電力遮断装置
WO2010150706A1 (ja) * 2009-06-23 2010-12-29 パナソニック電工株式会社 直流用分岐回路保護装置
JP2011083074A (ja) * 2009-10-05 2011-04-21 Panasonic Electric Works Co Ltd 直流機器保護装置、これを備えた電源装置、直流機器およびハイブリッド給電住宅用配電システム

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040207266A1 (en) * 2003-04-16 2004-10-21 Abel Stephen G. Standby electrical power generation and storage system and method
US20110175699A1 (en) * 2007-01-05 2011-07-21 Roy Allen Huss Fuse box system and method
CN101765959B (zh) * 2007-05-08 2015-04-15 美国电力转换有限公司 交流电源能量管理
US9083173B2 (en) * 2008-08-28 2015-07-14 Stanton Kee Nethery, III Power generation and control system

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3570283B2 (ja) 1999-03-30 2004-09-29 松下電工株式会社 蓄電池充放電装置
JP2007129891A (ja) * 2005-10-03 2007-05-24 Matsushita Electric Works Ltd 住宅用分電盤
JP2008048471A (ja) * 2006-08-10 2008-02-28 Matsushita Electric Works Ltd 配電システム
JP2008283741A (ja) * 2007-05-08 2008-11-20 Matsushita Electric Works Ltd 電力制御システム
JP2009050070A (ja) * 2007-08-17 2009-03-05 Kansai Electric Power Co Inc:The 電力遮断装置
WO2010150706A1 (ja) * 2009-06-23 2010-12-29 パナソニック電工株式会社 直流用分岐回路保護装置
JP2011083074A (ja) * 2009-10-05 2011-04-21 Panasonic Electric Works Co Ltd 直流機器保護装置、これを備えた電源装置、直流機器およびハイブリッド給電住宅用配電システム

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015146719A (ja) * 2012-10-31 2015-08-13 パナソニックIpマネジメント株式会社 分電盤及び電力制御方法
US9825487B2 (en) 2012-10-31 2017-11-21 Panasonic Intellectual Property Management Co., Ltd. Apparatus and electric power control method

Also Published As

Publication number Publication date
JP5858236B2 (ja) 2016-02-10
EP2858187A1 (en) 2015-04-08
US20150108853A1 (en) 2015-04-23
JP2013252012A (ja) 2013-12-12

Similar Documents

Publication Publication Date Title
KR101741386B1 (ko) 전원 전환 장치, 배전반, 감시 장치, 전원 전환 방법 및 기록 매체
JP5166379B2 (ja) 電力連携システム
JP5838318B2 (ja) 配電システム
JP6288722B2 (ja) 電池システム
JP2008148505A (ja) 過負荷対策電力補償装置
WO2015041249A1 (ja) 蓄電システム及び蓄電システムの保全方法
JPWO2012050207A1 (ja) 蓄電システム
JP2007043802A (ja) 無停電電源装置及び分電盤
JP2012253840A (ja) 電力供給システム
JP2012253841A (ja) 蓄電池制御システム
JP5858236B2 (ja) 蓄電池システム
WO2012132769A1 (ja) 蓄電池の保護システム
JP2018011447A (ja) 大容量蓄電池システム
RU2533204C1 (ru) Модульная система бесперебойного электропитания потребителей постоянным током
JP2014132823A (ja) 配電システム
JP2015220821A (ja) 電力供給システム及び電力供給制御装置
RU2318281C1 (ru) Автоматизированная система гарантированного электроснабжения стационарного объекта
JP5734481B2 (ja) 監視装置、電力切替方法及びプログラム
JP2011160639A (ja) 瞬低対策装置
KR101309009B1 (ko) 순간정전 보상장치 및 방법
JP2013074715A (ja) 充電装置
JP2006050763A (ja) 電力負荷平準化システム
JP6702826B2 (ja) 無停電電源システム
TWM583159U (zh) 支援直流系統的電容跳脫裝置
JP6229971B2 (ja) 電源供給装置

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 13797432

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 2013797432

Country of ref document: EP

WWE Wipo information: entry into national phase

Ref document number: 14404360

Country of ref document: US

NENP Non-entry into the national phase

Ref country code: DE