WO2013084955A1 - 剥離装置 - Google Patents

剥離装置 Download PDF

Info

Publication number
WO2013084955A1
WO2013084955A1 PCT/JP2012/081553 JP2012081553W WO2013084955A1 WO 2013084955 A1 WO2013084955 A1 WO 2013084955A1 JP 2012081553 W JP2012081553 W JP 2012081553W WO 2013084955 A1 WO2013084955 A1 WO 2013084955A1
Authority
WO
WIPO (PCT)
Prior art keywords
peeling
guide member
mortar
cutter
anchor
Prior art date
Application number
PCT/JP2012/081553
Other languages
English (en)
French (fr)
Inventor
一昌 高木
栄造 高木
昌志 朝倉
達哉 位田
Original Assignee
株式会社丸高工業
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社丸高工業 filed Critical 株式会社丸高工業
Priority to KR1020147014932A priority Critical patent/KR101794395B1/ko
Priority to CN201280058301.9A priority patent/CN104066908B/zh
Priority to US14/361,815 priority patent/US20140345589A1/en
Priority to EP12855517.4A priority patent/EP2789773A4/en
Publication of WO2013084955A1 publication Critical patent/WO2013084955A1/ja

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F21/00Implements for finishing work on buildings
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28DWORKING STONE OR STONE-LIKE MATERIALS
    • B28D1/00Working stone or stone-like materials, e.g. brick, concrete or glass, not provided for elsewhere; Machines, devices, tools therefor
    • B28D1/20Working stone or stone-like materials, e.g. brick, concrete or glass, not provided for elsewhere; Machines, devices, tools therefor by planing, e.g. channelling by means of planing tools
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28DWORKING STONE OR STONE-LIKE MATERIALS
    • B28D1/00Working stone or stone-like materials, e.g. brick, concrete or glass, not provided for elsewhere; Machines, devices, tools therefor

Definitions

  • This invention relates to the peeling apparatus which peels the cement hardened
  • finishing is carried out by constructing a mortar with a predetermined thickness on the surface of the concrete frame.
  • the mortar applied to the surface of the concrete frame is removed prior to new finishing work or thickening.
  • an operator uses a small rock drill or a hammer drill to directly chop the existing mortar.
  • the chiseling machines such as small rock drills and hammer drills destroy the mortar by sending compressed air from the compressor and applying vibration and hammering to the mortar. There was a problem of being bad.
  • the building to be constructed has a 24-hour business system or is a hospital or school where quietness is required, the working hours will be greatly limited due to the noise associated with the peeling work. A long time was required to complete the work, and problems such as high labor costs for the peeling work occurred.
  • This mortar peeling method is intended for a mortar finished surface in which mortar is constructed with a specified thickness on the surface of the concrete frame. Bring a disk-shaped concrete cutter held on the rotating shaft, and turn the rotating shaft to the concrete surface. The mortar is cut and separated by inserting a concrete cutter at the boundary between the concrete frame and the mortar while moving the concrete cutter parallel to the surface of the concrete frame while being held orthogonally. This method has an effect that the mortar constructed on the surface of the concrete frame can be disassembled in a short construction period with low noise.
  • the mortar peeling method disclosed in Patent Document 1 moves the cutter while rotating the concrete cutter to cut the mortar, the cutting surface of the mortar and the blade edge of the cutter rub against each other to generate a large cutting sound. Although it is possible to suppress the noise generated compared to the case where the chipping operation is performed by the chipping machine, it is difficult to bring the sound generated in the peeling operation close to an acceptable quiet sound. Also, in this mortar peeling method, a wedge-shaped chip piece is installed on the periphery of the concrete cutter, and the mortar is cut by the rotation of the wedge-shaped chip piece as the concrete cutter rotates. The peeling force is difficult to concentrate, and a large peeling force cannot be transmitted to the mortar. In the case of a mortar that is firmly applied, the mortar may not be smoothly peeled off.
  • the premise of the present invention for solving the above-mentioned problem is a peeling device for peeling a hardened cement material applied at a predetermined location of a structure.
  • the feature of the present invention in the premise is that the peeling device is spaced from the outer surface of the hardened cement by a predetermined dimension and extends in one direction in parallel with the outer surface of the hardened cement, and from the outer surface of the hardened cement of the guide member.
  • a first fixing means for preventing movement in a separating direction, a jack rod that can be extended forward in one direction, a jack positioned between the hardened cement and the guide member, and the jack can be attached to and detached from the guide member
  • the first connecting means for connecting to the piston rod and the cutter for peeling the cement hardened material from the structure located at the tip of the piston rod.
  • the piston rod of the jack gradually extends forward in one direction.
  • the cutter gradually advances forward in one direction, and the cutter is to peel the hardened cement of a predetermined thickness from the structure.
  • the peeling device in the peeling device, after the piston rod of the jack is extended forward in one direction, the piston rod is retracted backward in one direction to complete each peeling step, and the first peeling step is performed. Then, the connection between the jack and the guide member is released, and the jack is moved forward in one direction to reconnect the jack to the guide member, and the next peeling step is performed.
  • the first fixing means is detachably fixed to the first anchor fixed to the anchor hole drilled in the structure and the free end of the first anchor exposed from the anchor hole. And a pressing plate that presses the guide member toward the hardened cement material.
  • the first connecting means is connected to the rear end of the jack and is movable in one direction along the guide member, and the guide member is perforated in one direction and spaced apart by a predetermined dimension.
  • the peeling device includes a second connecting means for detachably connecting the cutter to the tip of the piston rod, and the second connecting means includes a through-hole drilled in the tip of the piston rod.
  • the through holes are formed in the cutter, and the connecting pins are inserted into the through holes in a detachable manner.
  • the peeling device includes a second fixing means that is installed at a front end portion of the guide member and prevents the guide member from moving forward in one direction, and the second fixing means is a front end of the guide member.
  • a first front end plate abutting on the part, a second front end plate connected to the first front end plate and abutting the structure, and being inserted into an anchor hole drilled in the structure to fix the second front end plate to the structure
  • the second anchor is formed.
  • the peeling device includes a third fixing means that is installed at a rear end portion of the guide member and prevents the guide member from moving backward in one direction.
  • a first rear end plate contacting the rear end, a second rear end plate connected to the first rear end plate and contacting the structure, and a second rear end plate inserted into an anchor hole drilled in the structure Is formed from a third anchor for fixing to the structure.
  • the cutter is formed of a blade edge located at a predetermined depth from the outer surface of the hardened cement material and a mounting seat connected to the blade edge, and the top of the mounting seat slides on the guide member. It abuts as much as possible and prevents the cutter from moving away from the outer surface of the hardened cement.
  • the peeling dimension in the direction intersecting with one direction of the hardened cement peeled from the structure can be adjusted by adjusting the dimension in the direction intersecting with one direction of the blade edge. It is.
  • Another example of the present invention is a metal pipe having a length dimension equal to or longer than the peeling length of the hardened cement material from which the guide member peels and extending in one direction.
  • the cement hardened material is a mortar having a predetermined thickness applied to a concrete concrete body, and the peeling device peels the mortar from the concrete body.
  • the sound pressure level generated when the hardened cement material is peeled is in the range of 20 to 40 dB.
  • Another example of the present invention is a hydraulic jack in which a jack is connected to an electric hydraulic pump.
  • the cutter As the piston rod of the jack is gradually extended forward in one direction, the cutter is gradually advanced forward in one direction, and the cutter is cemented to a predetermined thickness from the structure. Since the hardened material is peeled off, there is no generation of a loud cutting sound due to friction between the cutting surface of the hardened cement material and the cutter, and the sound generated during the peeling operation can be made an acceptable quiet sound.
  • force torque
  • the straight running force of the cutter can be concentrated on the peeling site of the hardened cement material, so that a large peeling force is applied to the hardened cement material.
  • the peeling device can smoothly peel the hardened cement from the structure, so not only can the work of peeling the hardened cement be completed efficiently in a short period of time, Therefore, the hardened cement can be peeled over a wide range at a time, and the peeling work can be performed inexpensively. Since the peeling device does not transmit unnecessary vibrations to the structure, the hardened cement can be peeled from the structure without damaging the structure. Further, the hardened cement can be uniformly peeled from the structure in a short time with high accuracy, and the peeling work can be performed in a favorable environment with less dust and dust generation.
  • the peeling device After extending the jack piston rod in one direction forward, the piston rod is retracted backward in one direction to complete each peeling process.
  • the jack and guide member After releasing the connection, moving the jack forward in one direction and reconnecting the jack to the guide member, and performing the next peeling step, the peeling device performs peeling for the extension dimension of the piston rod, Since the jack can be moved forward in one direction and connected to the guide member again, and the piston rod can be peeled off for the extension dimension, the peeling process can be repeated, and the peel length of the hardened cement material Even if it is long, all the cement hardened
  • the peeling device only moves the jack forward in one direction as an operation of repeatedly performing the peeling process, and connects the jack to the guide member, and does not involve other operations. Peeling of the hardened cement can be completed efficiently.
  • the peeling device in which the first fixing means is detachably fixed to the first anchor and the free end of the first anchor and presses the guide member against the hardened cement material, the cutter is unidirectional During the peeling operation of moving forward, the force that moves the guide member in the direction away from the outer surface of the hardened cement material acts on the guide member from the cutter, but the first anchor and the pressing plate cause the cement hardened material of the guide member to move. Since the movement in the direction away from the outer surface is prevented, the cutter can be surely bitten into the hardened cement material, and the hardened cement material of a predetermined thickness can be reliably peeled from the structure.
  • the first connecting means is formed of a slider connected to the rear end of the jack, a plurality of through holes drilled in the guide member, a through hole drilled in the slider, and a connecting pin inserted in the through hole so as to be detachable.
  • the peeling device is capable of easily connecting the jack and the guide member via the slider and the connecting pin, and can easily release the connection between the jack and the guide member by removing the connecting pin. A plurality of peeling steps by the peeling device can be easily repeated.
  • the peeling device moves the jack forward in one direction as an operation to repeat the peeling process, and only connects the jack and the guide member via the slider and the connecting pin, and does not involve other operations. Peeling work can be completed efficiently in a short period of time without trouble.
  • the peeling device formed from the detachable connecting pin can easily connect the piston rod and the cutter via the connecting pin, and the piston rod and the cutter can be connected by extracting the connecting pin. Can be easily released, and a cutter damaged by long-term use can be quickly replaced. Since the peeling device can easily replace the damaged cutter with a new one, it is possible to efficiently perform the peeling work, and always use the cutter with the peeling function to ensure the hardened cement from the structure. Can be peeled off.
  • the peeling device formed by the second front end plate connected to the plate and contacting the structure and the second anchor for fixing the second front end plate to the structure is a work for moving the cutter (piston rod) backward in one direction.
  • the force that moves the guide member forward in one direction acts on the guide member from the cutter, but the first and second front end plates and the second anchor prevent the guide member from moving forward in one direction. Therefore, it is possible to prevent the guide member and the cutter from being displaced relative to the hardened cement material, and after performing the peeling process, the cutter can be smoothly moved backward in one direction and the next peeling process can be smoothly performed. Door can be.
  • the peeling device formed of a second rear end plate connected to the first rear end plate and contacting the structure and a third anchor for fixing the second rear end plate to the structure is provided with a cutter (piston rod).
  • the cutter is formed of a blade edge located at a predetermined depth from the outer surface of the hardened cement material and a mounting seat connected to the blade edge, and the guide member slidably contacts the top of the mounting seat to
  • the peeling device that prevents movement in the direction away from the outer surface is such that the force that moves the cutter in the direction away from the outer surface of the hardened cement material during the peeling operation that moves the cutter (piston rod) forward in one direction.
  • the guide member fixed by the first anchor and the pressing plate prevents the cutter from moving in the direction away from the outer surface of the cement hardened material, the cutter blade can be securely bited into the cement hardened material. It is possible to reliably peel the cement hardened material having a predetermined thickness from the structure.
  • the peeling device that can adjust the peeling dimension in the direction intersecting with one direction of the hardened cement that peels from the structure by adjusting the dimension in the direction intersecting with one direction of the cutter blade edge is By reducing the size, it is possible to reduce the peel size of the hardened cement material that peels from the structure. By increasing the size of the cutter blade edge, the peel size of the hardened cement material that peels from the structure is increased. Therefore, it is possible to cope with the peel size (peel area) of the hardened cement product peeled from the structure, and to peel the hardened cement product from the structure by a desired peel size.
  • the peeling device which is a metal pipe having a length dimension equal to or greater than the peeling length of the hardened cement material and extending in one direction, is a cement hardening that peels from the structure by changing the length dimension of the guiding member. Since the peel length of the object can be changed, it can correspond to the peel length of the cement hardened material peeled from the structure, and the cement hardened material can be peeled from the structure by a desired length.
  • the peeling device prevents the movement of the guide member of a predetermined length fixed by the first anchor and the pressing plate in a direction away from the outer surface of the cement hardened material of the cutter, so that the cutter is securely bited into the hardened cement material. This makes it possible to reliably peel the hardened cement of a predetermined thickness from the structure.
  • the peeling device that peels the mortar from the concrete frame is a mortar with a predetermined thickness, and the hardened cement is applied to the concrete frame of the structure. Since the cutter peels off the mortar having a predetermined thickness from the concrete housing while gradually moving forward in one direction, the mortar can be peeled off from the concrete housing without generating a large noise.
  • the peeling device linearly transmits the force (torque) from the piston rod of the jack to the cutter, so that the straight running force of the cutter can be concentrated on the mortar's peeling location, thereby exerting a large peeling force on the mortar. Even if the mortar is firmly constructed, the mortar can be peeled off smoothly and reliably.
  • the peeling device can smoothly peel mortar from the concrete frame, so that not only can the stripping work be completed efficiently in a short period of time, but also unnecessary vibration is transmitted to the concrete frame. Therefore, the mortar can be peeled off without damaging the concrete frame. In addition, the mortar can be uniformly peeled from the concrete frame in a short period of time with high accuracy, and the peeling work can be performed in a favorable environment with less dust and dust.
  • the peeling device in which the sound pressure level generated at the time of peeling of the hardened cement is in the range of 20 to 40 dB is within the above range, so that the hardened cement from the structure without generating large noise.
  • the sound generated during the peeling operation can be made an acceptable quiet sound.
  • the peeling device can perform the peeling work of the hardened cement on the structure made in a place where a quiet environment is required, and the working time zone of the peeling work is not limited, and it can be done in a short time. Peeling of the hardened cement can be completed.
  • the peeling device which is a hydraulic jack with a jack connected to an electric hydraulic pump, can transmit a large force (torque) from the piston rod to the cutter by using it that operates hydraulically as a jack. Therefore, the hardened cement can be peeled off smoothly and reliably from the structure.
  • FIG. 2 is a cross-sectional view taken along line LL in FIG. 1.
  • the figure which shows the peeling method which continues from FIG. The figure which shows the peeling method which continues from FIG.
  • the side view of the peeling apparatus of FIG. FIG. 12 is a cross-sectional view taken along line MM in FIG. 11.
  • the figure which shows the peeling method which continues from FIG. The figure which shows the peeling method which continues from FIG
  • FIG. 1 is a top view of the peeling apparatus 10A shown as an example.
  • 2 is a perspective view of the peeling apparatus 10A
  • FIG. 3 is a side view of the peeling apparatus 10A.
  • 4 is a cross-sectional view taken along line LL in FIG. 1, and
  • FIG. 5 is an enlarged perspective view of the cutter 14.
  • FIG. 1 one direction (front-rear direction in the building shown in FIG. 1) is indicated by an arrow A, and a width direction intersecting with one direction (up and down direction in the building shown in FIG. 1) is indicated by an arrow B.
  • 1 to 4 show the peeling device 10A installed on the upper part of the inner wall 11 of the building. 2, illustrations of the front and rear end portions 29 and 35 of the guide member 12 and the first fixing means 15 are omitted, and illustration of the hydraulic tube 43 is omitted in FIGS.
  • the guide member 12 and the piston rod 42 are indicated by a one-dot chain line.
  • This peeling device 10A is used for peeling the mortar 21 (hardened cement material) constructed on the outer surface of the concrete casing 20 of the structure. Note that the peeling device 10A can be used not only for peeling the mortar 21 but also for peeling concrete.
  • Structures include all buildings such as office buildings, intelligent buildings, housing complexes, hospitals, schools, nuclear power plants, indoor parking lots, underground parking lots, etc., and all types of structures such as dams, bridges, roads, and outer walls. Constructs are included.
  • the peeling apparatus 10A is installed on the inner wall 11 of the reinforced concrete building.
  • the peeling device 10A is installed not only on the inner wall 11 of the building but also on the floor slab, cantilever slab, ceiling slab, column, and beam of the building, and may be used for peeling the mortar 21 constructed on them. it can.
  • the peeling device 10A is installed in the front-rear direction on the inner wall 11 of the building (structure), but there is no particular limitation on the installation direction of the device 10A (the direction in which the guide member extends) on the inner wall 11 of the building, If a space for installing the device 10A can be secured, the device 10A can be installed in any direction.
  • the peeling apparatus 10A includes a guide member 12 extending in one direction, a hydraulic jack 13 and a cutter 14, first to third fixing means 15 to 17, and first to second connecting means 18 and 19.
  • the guide member 12 is a hollow cylindrical metal pipe (iron pipe, aluminum pipe, stainless steel pipe or the like) extending in one direction, and its cross-sectional shape is formed in a circular shape.
  • the guide member 12 may be formed not only in a circular shape but also in a quadrangular cross-sectional shape.
  • the guide member 12 is installed on the inner wall 11 of the building so as to be spaced apart from the outer surface of the mortar 21 by a predetermined dimension and in parallel with the outer surface of the mortar 21.
  • the guide member 12 only needs to have a length dimension equal to or greater than the peeling length of the mortar 21 to be peeled, and the length dimension is not particularly limited.
  • the guide member 12 has a plurality of through holes 22 (first connecting means 18) which are penetrated through the guide member 12 and are arranged at equal intervals (a predetermined dimension apart) in one direction.
  • the guide member 12 is installed and fixed to the inner wall 11 by first to third fixing means 15 to 17.
  • the first fixing means 15 are arranged at a predetermined distance in one direction and prevent the guide member 12 from moving in a direction away from the outer surface of the mortar 21.
  • two first fixing means 15 are illustrated, but the number of fixing means 15 is not particularly limited, and three or more fixing means 15 are installed according to the length of the guide member 12. May be.
  • the first fixing means 15 is inserted into the anchor hole 23 drilled in the inner wall 11 (concrete frame 20 and mortar 21), and fixed to the free anchor 25 and the free end 25 of the anchor 24 exposed from the anchor hole 23.
  • the holding plate 26 is detachably fixed.
  • the first anchors 24 are arranged on both sides of the member 12 with the two anchors sandwiching the guide member 12.
  • the 1st anchor 24 either a capsule type anchor, a resin injection anchor, an all anchor, or a cut anchor can be used.
  • the 1st anchor 24 is made from steel, you may be made from metals, such as stainless steel, an aluminum alloy, a titanium alloy, or a synthetic resin other than steel.
  • the pressing plate 26 is a metal plate that is long in the width direction, and an opening 27 extending in the width direction is formed at the center thereof.
  • the free end portion 25 of the first anchor 24 is inserted into the opening 27 of the holding plate 26 so as to be detachable.
  • a hex nut 28 is screwed onto the male screw formed at the free end 25 of the first anchor 24.
  • the holding plate 26 is pressed toward the outer surface of the mortar 21 by the nut 28, the holding plate 26 is fixed by the first anchor 24 and the nut 28, and the guide member 12 is directed toward the outer surface of the mortar 21 by the holding plate 26. Is pressed.
  • the second fixing means 16 is installed at the front end portion 29 of the guide member 12.
  • the second fixing means 16 includes a first front end plate 30 that contacts the front end portion 29 of the guide member 12, a second front end plate 31 that connects to the first front end plate 30 and contacts the inner wall 11 (mortar 21), and the inner wall 11. It is formed from a second anchor 33 inserted into an anchor hole 32 drilled in (concrete frame 20 and mortar 21).
  • the first front end plate 30 and the second front end plate 31 are made of metal such as iron, aluminum, and stainless steel, and these plates 30 and 31 integrally form an L-shaped stopper.
  • a through hole penetrating the plate 31 is formed at the center of the second front end plate 31.
  • a free end portion 34 of the second anchor 33 exposed from the anchor hole 32 is inserted into the through hole so as to be detachable.
  • a hexagon nut 28 is screwed onto the male screw formed at the free end 34 of the second anchor 33 exposed from the through hole.
  • any of a capsule anchor, a resin injection anchor, an all anchor, and a cut anchor can be used as in the first anchor 24.
  • the first and second front end plates 30 and 31 are fixed to the inner wall 11 (mortar 21) by the second anchor 33 and the hexagon nut 28, and the movement of the guide member 12 in one direction forward is the second fixing means 16 ( It is blocked by the first front end plate 30).
  • the third fixing means 17 is installed at the rear end portion 35 of the guide member 12.
  • the third fixing means 17 includes a first rear end plate 36 that contacts the rear end portion 35 of the guide member 12, and a second rear end plate 37 that connects to the first rear end plate 36 and contacts the inner wall 11 (mortar 21). And a third anchor 39 inserted into an anchor hole 38 drilled in the inner wall 11 (concrete frame 20 and mortar 21).
  • the first rear end plate 36 and the second rear end plate 37 are made of metal such as iron, aluminum, and stainless steel, and these plates 36 and 37 integrally form an L-shaped stopper.
  • a through hole penetrating the plate 38 is formed at the center of the second rear end plate 37.
  • the free end 40 of the third anchor 39 exposed from the anchor hole 38 is inserted into the through hole so as to be removable.
  • a hexagon nut 28 is screwed to the male screw formed at the free end 40 of the third anchor 39 exposed from the through hole.
  • any of a capsule anchor, a resin injection anchor, an all anchor, and a cut anchor can be used as in the first anchor 24.
  • the first and second rear end plates 36, 37 are fixed to the inner wall 11 (mortar 21) by the third anchor 39 and the hexagon nut 28, and the movement of the guide member 12 in one direction rearward is the third fixing means 17. It is blocked by (first rear end plate 36).
  • the front end portion 29 and the rear end portion 35 of the guide member 12 are brought into contact with the outer surfaces of the pillars and beams of the building, and the columns and beams are fixed to the second fixing means 16 and the third fixing means 17.
  • the second fixing means 16 (the first front end plate 30, the second front end plate 31, the second anchor 33).
  • the third fixing means 17 (the first rear end plate 36, the second rear end plate 37, and the third anchor 39) can be omitted.
  • the hydraulic jack 13 is located between the guide member 12 and the mortar 21.
  • the hydraulic jack 13 is detachably connected to the rear end portion of the guide member 12 via the first connecting means 18.
  • the hydraulic jack 13 includes a cylindrical hydraulic cylinder 41 and a columnar piston rod 42.
  • a hydraulic tube 43 is attached to the peripheral walls of the front end portion and the intermediate portion of the hydraulic cylinder 41.
  • the hydraulic tube 43 is connected to the electric hydraulic pump 44.
  • the piston rod 42 extends (advances) forward in one direction and retreats backward in one direction by the hydraulic oil (hydraulic hydraulic oil) delivered from the hydraulic pump 44.
  • a hydraulic jack can be used as the jack.
  • the first connecting means 18 is drilled in the slider 45 coupled to the rear end of the hydraulic jack 13 (hydraulic cylinder 41), the through hole 22 drilled in the guide member 12, and the slider 45 (cylindrical member 48 described later).
  • the through-hole 46 and the connecting pin 47 inserted in the through-holes 22 and 46 so as to be detachable are formed.
  • the slider 45 is made of metal such as iron, aluminum, and stainless steel.
  • the slider 45 is formed of a cylindrical tube member 48 that is detachably fitted to the outer peripheral surface of the guide member 12, and a pedestal 49 that is connected to the rear end portion of the tube member 48.
  • the cylindrical member 48 and the pedestal 49 are fixed by welding and integrated.
  • the cylindrical member 48 is slidable in one direction forward and one direction rear on the outer peripheral surface of the guide member 12.
  • the pedestal 49 is molded into a quadrangular prism shape and has both side walls and a bottom wall.
  • the rear end portion of the hydraulic cylinder 41 is housed inside the pedestal 49, and the rear end portion of the cylinder 41 is fixed to the pedestal 49 by welding.
  • the bottom wall (bottom surface) of the pedestal 49 is in contact with the outer surface of the inner wall 11 (mortar 21).
  • the through-holes 46 are formed in the peripheral surface of the cylindrical member 48, penetrate through in the width direction, and are lined up with a predetermined dimension in one direction.
  • the connecting pin 47 is made of metal such as iron, aluminum, and stainless steel.
  • the cylindrical member 48 is fitted into the outer peripheral surface of the guide member 12, and the through hole 22 formed in the guide member 12 and the through hole 46 formed in the cylindrical member 48 are made to coincide with each other.
  • the hydraulic jack 13 can be connected to the guide member 12.
  • the connection between the hydraulic jack 13 and the guide member 12 can be released by removing the connection pin 47 from the through holes 22 and 46.
  • the slider 45 is slid forward in one direction or backward in one direction, and the connecting pin 47 is inserted into the through holes 22 and 46, whereby the jack 13 is inserted into the guide member. It can be installed at 12 predetermined locations.
  • the cutter 14 is made of steel and, as shown in FIG. 5, is formed from a blade edge 50 for peeling the mortar 21 and a mounting seat 51 connected to the blade edge 50.
  • the cutter 14 is detachably connected to the tip of the piston rod 42 via the second connecting means 19.
  • the second connecting means 19 is inserted into and removed from the two through holes 52 drilled in the tip of the piston rod 42, the two through holes 53 drilled in the mounting seat 51 of the cutter 14, and the through holes 52, 53. It is formed from a connecting pin 54 that can be inserted.
  • the connecting pin 54 is made of metal such as iron, aluminum, and stainless steel.
  • the blade edge 50 is located at a predetermined depth from the outer surface of the mortar 21 and is in contact with the outer surface of the concrete housing 20. In the cutter 14 of FIG. 5, the blade edge 50 and the mounting seat 51 are integrated, but the blade having the blade edge 50 and the mounting seat 51 can be separated, and the blade can be attached to and detached from the mounting seat 51. It can also be fixed as possible.
  • the mounting seat 51 has a top portion 55 and a bottom portion 57, and an intermediate portion 56 located between the top bottom portions 55, 57.
  • the top portion 55 of the mounting seat 51 is formed in a semicircular shape substantially the same as the shape of the outer peripheral surface of the guide member 12, and slidably contacts the outer peripheral surface of the guide member 12.
  • the top portion 55 of the mounting seat 51 abuts against the outer peripheral surface of the guide member 12, so that the cutter 14 (blade 50) is prevented from moving in a direction away from the outer surface of the concrete housing 20.
  • the intermediate portion 56 of the mounting seat 51 is formed with an insertion hole 58 through which the tip of the piston rod 42 is detachably inserted, and a contact surface 59 with which the tip of the rod 42 abuts.
  • the insertion hole 58 penetrates in one direction.
  • the through hole 52 forming the second connecting means 19 is formed in the intermediate portion 56 of the mounting seat 51 and penetrates in the width direction.
  • the bottom 57 of the mounting seat 51 is in contact with the outer surface of the mortar 21.
  • the through hole 52 drilled in the tip of the rod 42 The through hole 53 drilled in the mounting seat 51 matches.
  • the cutter 14 can be connected to the tip of the piston rod 42 by inserting the connecting pin 54 into the through holes 52 and 53 in a state where the through holes 52 and 53 are made to coincide.
  • connection between the cutter 14 and the piston rod 42 can be released by extracting the connection pin 54 from the through holes 52 and 53.
  • the cutter 14 blade port 50
  • the cutter 14 blade port 50
  • the piston rod 42 moves backward in one direction
  • the cutter 14 moves in one direction. Move backwards.
  • FIG. 6 is a view showing an example of a peeling method (peeling procedure) of the mortar 21 using the peeling apparatus 10A
  • FIG. 7 is a view showing a peeling method continued from FIG.
  • one direction front-rear direction in the building shown in FIG. 6
  • a width direction intersecting with one direction up-down direction in the building shown in FIG. 6) is indicated by an arrow B.
  • the peeling method of the mortar 21 using the peeling apparatus 10A includes an apparatus installation process, a first peeling process, a first moving process, a second peeling process, a second moving process, an nth moving process, an nth peeling process, and an apparatus. This is performed by performing each step of the removal step.
  • the apparatus installation process includes an apparatus preparation process, a guide groove creation process, a cutter installation hole creation process, an anchor fixing process, and an apparatus fixing process
  • the apparatus removal process includes an apparatus fixing release process and an anchor cutting process.
  • the peeling method of the mortar 21 will be described based on these drawings as follows. First, as a preliminary preparation for carrying out these steps, the peeling location of the inner wall 11 from which the mortar 21 is peeled is determined, and the peeling width dimension of the mortar 21 (the dimension in the width direction of the mortar 21 to be peeled) is determined. A peeling length dimension (a dimension in one direction of the mortar 21 to be peeled) is determined, and a peeling depth dimension of the mortar 21 (a depth dimension of the mortar 21 to be peeled toward the concrete casing 20) is determined.
  • the width dimension of the blade edge 50 of the cutter 14 is determined by the peel width dimension of the mortar 21. Specifically, when the peel width dimension of the mortar 21 is large, the cutter 14 having a large width dimension of the blade edge 50 is used, and when the peel width dimension of the mortar 21 is small, the cutter 14 having a small width dimension of the blade edge 50 is used. used. In the peeling apparatus 10A, by adjusting the width dimension of the blade edge 50 (dimension in the direction intersecting with one direction), the peeling width dimension of the mortar 21 that peels from the concrete housing 20 (peeling dimension in the direction intersecting with one direction). Can be adjusted.
  • an apparatus installation step of installing the peeling apparatus 10A at the peeling location of the mortar 21 is performed.
  • the tip of the piston rod 42 is inserted into the insertion hole 58 of the mounting seat 51, the tip of the rod 42 is brought into contact with the contact surface 59 of the mounting seat 51, and the through holes 52, 53 are aligned with each other.
  • the connecting pin 54 is inserted into the holes 52 and 53, and the cutter 14 is connected to the tip of the rod 42 by the second connecting means 19.
  • the piston rod 42 and the cutter 14 can be easily connected via the connecting pin 54, and the connection between the rod 42 and the cutter 14 can be easily released by removing the connecting pin 54. It is possible to quickly replace the damaged cutter 14 (blade 50) due to long-term use.
  • the cylindrical member 48 of the slider 45 is fitted into the outer peripheral surface of the guide member 12, and the connecting pins 47 are inserted into the through holes 22 and 46 in a state where the through holes 22 and 46 are aligned with each other.
  • the hydraulic jack 13 is coupled to the guide member 12 (device preparation step).
  • the hydraulic jack 13 and the guide member 12 can be easily connected via the slider 45 and the connecting pin 47, and the jack 13 and the guide member 12 are connected by removing the connecting pin 47. It can be released easily.
  • two guides extending straight in one direction along the outer edge of the peeling width of the mortar 21 Groove 60 is inserted (guide groove creation step). Specifically, using a concrete cutter, the mortar 21 is cut along the outer edge of the peeling width to make the guide groove 60.
  • the groove depths of the guide grooves 60 are the same as the peeling depth of the mortar 21.
  • the guide groove 60 is formed to peel only the mortar 21 constructed inside the guide groove 60 and prevent the mortar 21 constructed outside the guide groove 60 from peeling. Note that when the mortar 21 is peeled over the entire inner wall 11, the creation of the guide groove 60 can be omitted.
  • the mortar 21 between the guide grooves 60 is inserted, and a cutter installation hole 61 into which the cutter 14 is inserted is drilled at that position (cutter installation hole creation step).
  • a cutter installation hole 61 having substantially the same length and width as the length and width of the cutter 14 is made using a core drill.
  • cylindrical anchor holes 23, 32 and 38 are drilled at the locations where the first to third fixing members 15 to 17 are installed, as shown in FIG.
  • the first to third anchors 24, 33, 39 are installed and fixed in the anchor holes 23, 32, 38 (anchor fixing step).
  • These anchor holes 23, 32, and 38 are drilled by a vibration drill (power tool) (not shown).
  • the anchor holes 23, 32 and 38 penetrate the mortar 21 (mortar layer) and reach the concrete frame 20.
  • the depth dimensions of the anchor holes 23, 32, 38 are not particularly limited.
  • the first to third anchors 24, 33, 39 are inserted and fixed in the anchor holes 23, 32, 38.
  • the first to third fixing means 15-17 are connected to the guide member 12 connected to the hydraulic jack 14 in the center in the width direction of the guide grooves 60. To be installed and fixed (device fixing step).
  • the guide member 12 is positioned in the center in the width direction of the guide groove 60, the cutter 14 is positioned in the cutter installation hole 61, and the bottom wall of the base 49 of the slider 45 is placed on the mortar 21 between the guide grooves 60. Make contact.
  • the free end 25 of the first anchor 24 is inserted into the opening 27 of the presser plate 26, and the hexagonal nut 28 is screwed into the free end 25 so that the presser plate 26 is firmly fixed by the first anchor 24 and the nut 28. Fix it.
  • the presser plate 26 When the presser plate 26 is fixed, the presser plate 26 is pressed toward the outer surface of the mortar 21 by the nut 28, the guide member 12 is pressed toward the outer surface of the mortar 21 by the presser plate 26, and the member 12 is pressed. (Fixed by the first fixing means).
  • a force that moves the guide member 12 in a direction away from the outer surface of the mortar 21 acts on the guide member 12 from the cutter 14. Since the movement of the guide member 12 in the direction away from the outer surface of the mortar 21 is blocked by the pressing plate 26 and the pressing plate 26, the blade edge 50 of the cutter 14 can be reliably bited into the mortar 21.
  • the free end portion 34 of the second anchor 33 is inserted into the through hole of the second front end plate 31, and the first front end plate 30 is inserted into the front end portion 29 (
  • the hexagon nut 28 is screwed onto the free end 34 of the second anchor 33 exposed from the through hole, and the first and second front end plates 30 and 31 are moved by the second anchor 33 and the hexagon nut 28. Fix to the outer surface of the mortar 21.
  • the front end portion 29 of the guide member 12 is fixed by the first and second front end plates 30 and 31 (fixed by the second fixing means).
  • the force that moves the guide member 12 forward in one direction acts on the guide member 12 from the cutter 14, Since the second front end plates 30 and 31 and the second anchor 33 prevent the guide member 12 from moving forward in one direction, it is possible to prevent the guide member 12 and the cutter 14 from moving with respect to the mortar 21, and the peeling step. After performing the above, the cutter 14 can be smoothly moved backward in one direction.
  • the free end portion 40 of the third anchor 39 is inserted into the through hole of the second rear end plate 37, and the first rear end plate 36 is inserted into the guide member.
  • a hexagonal nut 28 is screwed onto the free end 40 of the third anchor 39 exposed from the through-hole, and the first and the third anchors 39 and The second rear end plates 36 and 37 are fixed to the outer surface of the mortar 21.
  • the rear end portion 35 of the guide member 12 is fixed by the first and second rear end plates 36 and 37 (fixed by the third fixing means).
  • the force for moving the guide member 12 backward in one direction acts on the guide member 12 from the cutter 14. Further, since the second rear end plates 36 and 37 and the third anchor 39 prevent the guide member 12 from moving backward in one direction, the displacement of the guide member 12 and the cutter 14 with respect to the mortar 21 during the peeling operation is prevented. In addition, the cutting edge 50 of the cutter 14 can be surely bitten into the mortar 21.
  • FIG. 8 is a diagram showing a peeling method continued from FIG. 7
  • FIG. 9 is a diagram showing a peeling method continuing from FIG.
  • FIG. 10 is a diagram illustrating a peeling method continued from FIG. 9.
  • the hydraulic jack 13 is operated by a remote controller, and the piston rod 42 of the jack 13 is moved as shown in FIG. Is moved backward in one direction indicated by an arrow A2.
  • the first peeling step one peeling step
  • the sound pressure level generated when the mortar 21 (cured cement) is peeled is in the range of 50 to 80 dB.
  • the sound pressure level is a value obtained by using a sound level meter and measuring the sound level meter 1.2 m away from the peeling device 10A.
  • the peeling device 10A acts so that the blade edge 50 of the cutter 14 moves straight forward in one direction and the blade edge 50 peels off the mortar 21, so that the cutting surface of the mortar 21 and the cutter 14 (blade edge 50) rub against each other. There is no occurrence of loud cutting noise.
  • the connecting pin 47 is removed from the through holes 22 and 46, and the connection between the guide member 12 and the hydraulic jack 13 is released.
  • the cylinder member 48 of the slider 45 is moved forward in one direction indicated by an arrow A1 in FIG. 9 on the outer peripheral surface of the guide member 12, and the hydraulic jack 13 is moved forward in one direction. (First moving step).
  • the maximum moving distance in one direction forward of the jack 13 is a distance until the blade edge 50 of the cutter 14 comes into contact with the mortar 21 to be peeled next.
  • the cutter 14 When the piston rod 42 is extended forward in one direction, the cutter 14 gradually advances forward in one direction, and the blade edge 50 of the cutter 14 gradually peels the mortar 21 having a predetermined thickness from the concrete housing 20 (first). 2 peeling process).
  • the hydraulic jack 13 After the piston rod 42 of the hydraulic jack 13 is extended to the maximum in one direction and the mortar 21 corresponding to the extension of the rod 42 is peeled off, the hydraulic jack 13 is operated by a remote controller, and the piston rod 42 of the jack 13 is moved as shown in FIG. Is moved backward in one direction indicated by an arrow A2.
  • the second peeling step (next one peeling step) is completed by pushing the rod 42 backward.
  • connection pin 47 is removed from the through holes 22 and 46, and the connection between the guide member 12 and the hydraulic jack 13 is released.
  • the cylinder member 48 of the slider 45 is moved forward in one direction on the outer peripheral surface of the guide member 12, and the hydraulic jack 13 is moved forward in one direction (second movement). Process).
  • the mortar 21 is peeled again by the procedure described above. The moving process and the peeling process are repeated according to the peeling length of the mortar 21 (the nth moving process and the nth peeling process), and all of the mortars 21 to be peeled are peeled to complete the moving process and the peeling process.
  • the hex nut 28 screwed to the free end portion 34 of the second anchor 33 is removed from the free end portion 34, and the first and second front end plates 30, 31 with respect to the mortar 21 by the second anchor 33 and the hex nut 28 are removed.
  • the fixing of the front end portion 29 of the guide member 12 by the first and second front end plates 30 and 31 is released (release of fixing by the second fixing means) (device fixing releasing step).
  • the hexagon nut 28 screwed to the free end portion 40 of the third anchor 39 is removed from the free end portion 40, and the first and second rear end plates 36, 37 by the third anchor 39 and the hexagon nut 28 with respect to the mortar 21 are removed.
  • the fixing of the rear end portion 35 of the guide member 12 by the first and second rear end plates 36 and 37 is released (fixing release by the third fixing means) (device fixing releasing step). After releasing the fixation by the first to third fixing means 15 to 17, the guide member 12 is lowered from the inner wall 11, and the peeling device 10A is removed from the peeling location (device removal step).
  • the anchor cutting process is performed.
  • the anchor cutting step the free ends 25, 34 and 40 of the first to third anchors 24, 33 and 39 exposed from the anchor holes 23, 32 and 38 are cut using a cutter.
  • the peeling operation of the mortar 21 is completed by completing the above steps.
  • an apparatus removing step is performed immediately after the first peeling step is completed.
  • the blade edge 50 of the cutter 14 is gradually advanced forward in one direction, and the blade edge 50 is moved to the concrete housing 20. Since the mortar 21 having a predetermined thickness is peeled off, there is no generation of a loud cutting sound due to friction between the cutting surface of the mortar 21 and the cutter 14 (blade 50), and the sound generated during the peeling operation can be allowed. Sound (sound pressure level of 50 to 80 dB) can be made.
  • the peeling device 10A can transmit force (torque) linearly from the piston rod 42 of the hydraulic jack 13 to the blade edge 50 of the cutter 14, and can concentrate the straight running force of the blade edge 50 on the peeling portion of the mortar 21, As a result, a large peeling force acts on the mortar 21, so that the peeling width, peeling length and peeling depth of the mortar 21 to be peeled are large, and even if the mortar 21 is firmly constructed, the mortar 21 can be smoothly and reliably applied. Can be peeled off.
  • the peeling apparatus 10A can smoothly peel the mortar 21 from the concrete housing 20 by using the hydraulic jack 13 and the cutter 14, the peeling work can be completed efficiently in a short period (short work period).
  • the mortar 21 can be peeled from the concrete housing 20 over a wide range at a time, and the peeling work can be performed at low cost.
  • the peeling device 10A can peel the mortar 21 without damaging the concrete housing 20 because unnecessary vibration is not transmitted to the concrete housing 20 during the mortar 21 peeling work.
  • the mortar 21 can be uniformly peeled from the concrete housing 20 with high accuracy in a short period of time, and the peeling work can be performed in a favorable environment with less dust and dust.
  • the peeling device 10A peels off the piston rod 42 by the maximum extension dimension, then moves the removed hydraulic jack 13 forward in one direction and connects it to the guide member 12 again, and further the maximum extension dimension of the piston rod 42.
  • the peeling process can be repeated, and even if the peeling length of the mortar 21 on the inner wall 11 is long, all the mortar 21 is peeled from the concrete housing 20. Can do.
  • the peeling apparatus 10A merely moves and connects the hydraulic jack 13 forward in one direction as an operation for repeatedly performing the peeling process, and does not involve other operations. The peeling work can be completed.
  • FIG. 11 is a top view of a peeling apparatus 10B shown as another example
  • FIG. 12 is a perspective view of the peeling apparatus 10B of FIG. 13 is a side view of the peeling apparatus 10B of FIG. 11, and
  • FIG. 14 is a cross-sectional view taken along line MM of FIG.
  • one direction vertical direction in the building shown in FIG. 11
  • a direction intersecting with one direction is indicated by an arrow B.
  • the peeling device 10 ⁇ / b> B is shown installed on the inner wall 11.
  • illustration of the first fixing means 15 and the front end portion 29 of the guide member 12 is omitted.
  • This peeling device 10B is used for peeling mortar 21 (cured cement) which is constructed on the outer surface of the concrete frame 20 of the inner wall 11 of the reinforced concrete building.
  • the peeling device 10B includes two guide members 12 extending in one direction, two hydraulic jacks 13 and two cutters 14, first to second fixing means 15, 16 and first to second connecting means 18, 19. And.
  • the guide member 12 is a hollow cylindrical metal pipe (iron pipe, aluminum pipe, stainless steel pipe, or the like) extending in one direction, as in FIG.
  • the guide member 12 is installed on the inner wall 11 of the building so as to be spaced apart from the outer surface of the mortar 21 by a predetermined dimension and in parallel with the outer surface of the mortar 21.
  • the guide member 12 has a length dimension equal to or greater than the peeling length of the mortar 21 to be peeled off.
  • the guide members 12 have a plurality of through holes 22 (first connecting means 18) that are penetrated through the guide members 12 and arranged at equal intervals (a predetermined dimension apart) in one direction.
  • the guide member 12 is installed and fixed to the inner wall 11 by first and second fixing means 15 and 16.
  • the first fixing means 15 are arranged so as to be spaced apart from each other by a predetermined dimension in one direction, and prevent the guide member 12 from moving in a direction away from the outer surface of the mortar 21.
  • the first fixing means 15 includes a first anchor 24 inserted and fixed in an anchor hole 23 drilled in the inner wall 11, and a pressing plate detachably fixed to a free end 25 of the anchor 24 exposed from the anchor hole 23. 26.
  • One first anchor 24 is disposed between the guide members 12.
  • the pressing plate 26 is the same as that used in the peeling apparatus 10A of FIG. 1, and the free end 25 of the first anchor 24 is inserted through the opening 27 thereof. A hex nut 28 is screwed onto the male screw formed at the free end 25 of the first anchor 24.
  • the holding plate 26 is pressed toward the outer surface of the mortar 21 by the nut 28, the holding plate 26 is fixed by the first anchor 24 and the nut 28, and the guide member 12 is brought to the outer surface of the mortar 21 by the holding plate 26. It is pressed toward.
  • the second fixing means 16 is installed at the front end portion 29 of the guide member 12, and prevents the guide member 12 from moving forward in one direction.
  • the second fixing means 16 includes a first front end plate 30 that contacts the front end portion 29 of the guide member 12, a second front end plate 31 that connects to the first front end plate 30 and contacts the inner wall 11 (mortar 21), and the inner wall 11. It is formed from a second anchor 33 inserted into an anchor hole 32 drilled in (concrete frame 20 and mortar 21).
  • the first and second front end plates 30 and 31 are the same as those used in the peeling apparatus 10 ⁇ / b> A, and the free end portion 34 of the second anchor 33 is inserted into the through hole of the second front end plate 31.
  • a hexagon nut 28 is screwed onto the male screw formed on the free end 34 of the second anchor 33.
  • the first and second front end plates 30 and 31 are fixed to the inner wall 11 by a second anchor 33 and a hexagon nut 28. Since the rear end portion 35 (rear end) of the guide member 12 is in contact with the floor slab and the backward movement of the guide member 12 in one direction is prevented by the floor slab, the peeling device 10A in FIG. Unlikely, the installation of the third fixing means 17 is omitted.
  • the hydraulic jacks 13 are located between the guide member 12 and the mortar 21 and are detachably connected to the rear end portion of the guide member 12 via the first connecting means 18.
  • the hydraulic jack 13 is the same as that used in the peeling apparatus 10A of FIG.
  • the first connecting means 18 includes a slider 45 connected to the rear end portion of the hydraulic cylinder 41, a through hole 22 drilled in the guide member 12, a through hole 46 drilled in the slider 45, and a connecting pin 47. Is formed.
  • the slider 45 is formed of a cylindrical tube member 48 that is detachably fitted to the outer peripheral surface of the guide member 12, and a pedestal 49 that is connected to the rear end portion of the tube member 48.
  • the cylindrical member 48 is slidable in one direction forward and one direction rear on the outer peripheral surface of the guide member 12.
  • the rear end portion of the hydraulic cylinder 41 is housed inside the pedestal 49, and the rear end portion of the cylinder 41 is fixed to the pedestal 49 by welding.
  • the bottom wall of the pedestal 49 is in contact with the outer surface of the mortar 21.
  • the connecting pin 47 is inserted into the through holes 22 and 46 so that the hydraulic jack 13 is guided. 12 can be connected.
  • the connection between the hydraulic jack 13 and the guide member 12 can be released by removing the connection pin 47 from the through holes 22 and 46.
  • the slider 45 is slid forward in one direction or backward in one direction, and the connecting pin 47 is inserted into the through holes 22 and 46 to guide the hydraulic jack 13. It can be installed at a predetermined location on the member 12.
  • the cutter 14 is formed of a blade edge 50 and a mounting seat 51, and is detachably connected to the tip of the piston rod 42 through the second connecting means 19 (see FIG. 5).
  • the second connecting means 19 is formed by two through holes 52 drilled in the tip of the piston rod 42, two through holes 53 drilled in the mounting seat 51 of the cutter 14, and a connecting pin 54.
  • the blade edge 50 is located at a predetermined depth from the outer surface of the mortar 21 and is in contact with the outer surface of the concrete housing 20.
  • the top portion 55 of the mounting seat 51 is slidably brought into contact with the outer peripheral surface of the guide member 12, thereby preventing the blade edge 50 from moving in a direction away from the outer surface of the concrete housing 20.
  • An insertion hole 58 through which the tip of the piston rod 42 is detachably inserted and a contact surface 59 with which the tip of the rod 42 abuts are formed in the intermediate portion 56 of the mounting seat 51.
  • the bottom 59 of the mounting seat 51 is in contact with the outer surface of the mortar 21.
  • the tip of the piston rod 42 is inserted into the insertion hole 58 of the mounting seat 51, the tip of the rod 42 is brought into contact with the contact surface 59 of the mounting seat 51, and the through holes 52 and 53 are aligned with each other.
  • the cutter 14 can be connected to the tip of the piston rod 42 by inserting the connecting pin 54 into the through holes 52 and 53. On the contrary, the connection between the cutter 14 and the piston rod 42 can be released by extracting the connection pin 54 from the through holes 52 and 53.
  • FIG. 15 is a view showing an example of a peeling method (peeling procedure) of the mortar 21 using the peeling device 10B
  • FIG. 16 is a view showing a peeling method continued from FIG.
  • FIG. 17 is a diagram illustrating a peeling method continued from FIG. 16
  • FIG. 18 is a diagram illustrating a peeling method continued from FIG.
  • one direction vertical direction in the building shown in FIG. 15
  • a direction intersecting one direction (lateral direction in the building shown in FIG. 15) is indicated by an arrow B.
  • the method for peeling the mortar 21 will be described based on these drawings as follows.
  • the peeling location of the inner wall 11 from which the mortar 21 is peeled is determined in advance
  • the peeling width dimension of the mortar 21 is determined
  • the peeling length dimension of the mortar 21 is determined
  • the mortar 21 Determine the peel depth dimension.
  • an apparatus installation step of installing the peeling apparatus 10B at the peeling location of the mortar 21 is performed.
  • the tip of the piston rod 42 is inserted into the insertion hole 58 of the mounting seat 51, the tip of the rod 42 is brought into contact with the contact surface 59 of the mounting seat 51, and the through holes 52, 53 are aligned with each other.
  • the connecting pin 54 is inserted into the holes 52 and 53, and the cutter 14 is connected to the tip of the rod 42 by the second connecting means 19.
  • the cylindrical member 48 of the slider 45 is fitted to the outer peripheral surface of the guide member 12, and the connecting pins 47 are inserted into the through holes 22 and 46 in a state where the through holes 22 and 46 are aligned. 12 is connected to the hydraulic jack 13 (device preparation step).
  • the mortar 21 has a straight shape in one direction along the outer edge of the peeling width.
  • Two guide grooves 60 extending in the direction are inserted (guide groove creation step).
  • a core drill is used, the mortar 21 between the guide grooves 60 is inserted, and the cutter installation holes 61 into which the cutters 14 enter are drilled (cutter installation hole creating step).
  • cylindrical anchor holes 22 and 32 are drilled at the positions where the first and second fixing members 15 and 16 are installed, and the anchor holes 22 and 32 are provided with the first holes.
  • the first and second anchors 24 and 33 are installed and fixed (anchor fixing step).
  • the guide members 12 to which the hydraulic jack 14 is connected are placed in the center of the guide groove 60 in the lateral direction, and the first and second fixing means 15 and 16. Install and fix through (device fixing process).
  • the guide members 12 are positioned in the center in the lateral direction of the guide groove 60, the cutter 14 is positioned in the cutter installation hole 61, and the bottom wall of the base 49 of the slider 45 is brought into contact with the mortar 21 between the guide grooves 60.
  • the free end 25 of the first anchor 24 is inserted into the opening 27 of the presser plate 26, and the hexagonal nut 28 is screwed into the free end 25 so that the presser plate 26 is firmly fixed by the first anchor 24 and the nut 28. Fix it.
  • the presser plate 26 is fixed, the presser plate 26 is pressed toward the outer surface of the mortar 21 by the nut 28, the guide member 12 is pressed toward the outer surface of the mortar 21 by the presser plate 26, and the member 12 is pressed. (Fixed by the first fixing means).
  • the free end portion 34 of the second anchor 33 is inserted into the through hole of the second front end plate 31, and the first front end plate 30 is inserted into the front end portion 29 (
  • the hexagon nut 28 is screwed onto the free end 34 of the second anchor 33 exposed from the through hole, and the first and second front end plates 30 and 31 are moved by the second anchor 33 and the hexagon nut 28. Fix to the outer surface of the mortar 21.
  • the front end portion 29 of the guide member 12 is fixed by the first and second front end plates 30 and 31 (fixed by the second fixing means).
  • the blade edges 50 of the cutters 14 connected to the jack 13 are aligned in the horizontal direction.
  • the switch of the electric hydraulic pump 44 is turned on, the hydraulic jacks 13 are operated by the remote controller, and the piston rod 42 of the jack 13 extends forward in one direction indicated by an arrow A1 in FIG. )
  • the piston rods 42 are extended synchronously, and the cutters 14 are extended (advanced) forward in one direction at the same speed with the blade edges 50 of the cutter 13 aligned in the horizontal direction. Accordingly, the cutters 14 are gradually advanced forward in one direction in synchronization with each other, and each blade edge 50 of the cutter 14 gradually peels the mortar 21 having a predetermined thickness from the concrete housing 20 (first peeling step).
  • the piston rods 42 of the hydraulic jacks 13 are extended to the maximum in one direction while being synchronized, and the mortar 21 corresponding to the extension of the rods 42 is peeled off, and then the rods 42 of the jacks 13 are indicated by an arrow A2 in FIG. Move backward in the direction.
  • the first peeling step one peeling step
  • the sound pressure level generated when the mortar 21 (cured cement) is peeled is in the range of 50 to 80 dB.
  • the sound pressure level is a value measured by using a sound level meter and separating the sound level meter by 1.2 m from the peeling device 10B.
  • the peeling device 10B acts so that the blade edges 50 of the cutters 14 move straight forward in one direction and the blade edges 50 peel off the mortar 21, so the cutting surface of the mortar 21 and the cutter 14 (the blade edge 50). ) Does not rub against each other, and no loud cutting noise is generated.
  • the connecting pin 47 is removed from the through holes 22 and 46, the connection between the guide member 12 and the hydraulic jack 13 is released, and the cylindrical member 48 of the slider 45 is illustrated on the outer peripheral surface of the guide member 12. 17 is moved forward in one direction indicated by an arrow A1, and the hydraulic jack 13 is moved forward in one direction (first moving step). After the hydraulic jack 13 is moved forward in one direction, the connecting pin 47 is reinserted into the through holes 22 and 46, the hydraulic jack 13 is reconnected to the guide member 12, and the jack 13 is operated by the remote controller.
  • the 13 piston rods 42 are extended (advanced) forward in one direction indicated by an arrow in FIG.
  • the piston rods 42 are operated synchronously, and the cutters 14 extend forward in one direction at the same speed with the blade edges 50 of the cutters 14 aligned in the lateral direction.
  • the cutters 14 are gradually advanced forward in one direction in synchronization with each other, and each blade edge 50 of the cutter 14 gradually peels the mortar 21 having a predetermined thickness from the concrete housing 20 (second peeling step).
  • the hydraulic jack 13 is operated by a remote controller to synchronize the rod 42 of the jack 13. While moving backward in one direction indicated by an arrow A2 in FIG. By retracting these rods 42, the second peeling step is completed.
  • the connecting pin 47 is removed from the through holes 23 and 46, the connection between the guide member 12 and the hydraulic jack 13 is released, and the cylindrical member 48 of the slider 45 is placed on the outer peripheral surface of the guide member 12.
  • the hydraulic jack 13 is moved forward in one direction (second movement step). After the hydraulic jack 13 is moved forward in one direction, the mortar 21 is peeled again by the procedure described above. The moving process and the peeling process are repeated according to the peeling length of the mortar 21 (the nth moving process and the nth peeling process), and all of the mortars 21 to be peeled are peeled to complete the moving process and the peeling process.
  • the hexagon nut 28 screwed to the free end portion 25 of the first anchor 24 is removed, the fixing of the holding plate 26 by the first anchor 24 and the nut 28 is released, and the first The pressing plate 26 is removed from the free end 25 of the anchor 24, and the fixing of the guide member 12 by the pressing plate 26 is released (fixing release by the first fixing means) (device fixing releasing step).
  • the hexagon nut 28 screwed to the free end 34 of the second anchor 33 is removed, and the first and second front end plates 30 and 31 are fixed to the mortar 21 by the second anchor 33 and the hexagon nut 28.
  • the fixing of the front end portion 29 of the guide member 12 by the first and second front end plates 30 and 31 is released (fixing release by the second fixing means) (device fixing releasing step).
  • the guide member 12 is lowered from the inner wall 11, and the peeling device 10B is removed from the peeling location (device removal step).
  • the anchor cutting process is performed.
  • the anchor cutting step the free ends 25 and 34 of the first to third anchors 24 and 33 exposed from the anchor holes 23 and 32 are cut using a cutter.
  • the peeling operation of the mortar 21 is completed by completing the above steps.
  • an apparatus removing step is performed immediately after the first peeling step is completed.
  • the peeling device 10 ⁇ / b> B linearly transmits a force (torque) from the piston rod 42 of the hydraulic jack 13 to each blade edge 50 of the cutter 14, and concentrates the straight running force of the blade edge 50 on the peeling portion of the mortar 21.
  • a large peeling force acts on the mortar 21, so that the peeling width, peeling length, and peeling depth of the mortar 21 to be peeled are large, and even if the mortar 21 is firmly constructed, the mortar 21 is smooth. And it can peel reliably.
  • the peeling device 10B synchronizes the blades 50 of the cutters 14 installed on the guide member 12 and advances them forward in one direction, the linear force of the blades 50 is evenly transmitted from the blades 50 to the mortar 21,
  • the mortar 21 can be peeled at once over a wide range in the lateral direction, and many mortars 21 can be peeled off by a single peeling operation.
  • the peeling device 10B can smoothly peel the mortar 21 having a predetermined thickness from the concrete housing 20 by using the hydraulic jack 13, the peeling device 10B can efficiently perform the peeling work in a short period (short work period). In addition, since unnecessary vibration is not transmitted to the concrete housing 20, the mortar 21 can be peeled without damaging the concrete housing 20. In addition, the mortar 21 having a large area can be uniformly peeled from the concrete housing 20 with high accuracy in a short time, and the peeling work can be performed in a favorable environment with less dust and dust.
  • the peeling device 10B peels off the piston rod 42 by the maximum extension dimension, and then moves the removed hydraulic jack 13 forward in one direction to connect to the guide member 12 again. Since peeling can be performed for the extended dimension, the peeling process can be repeated, and even if the peeling length of the mortar 21 on the inner wall 11 is long, all the mortar 21 is peeled from the concrete housing 20. be able to.
  • the peeling device 10B only moves the hydraulic jack 13 forward in one direction as an operation of repeatedly performing the mortar peeling process, and connects the jack 13 to the guide member 12, and does not involve other operations. Therefore, the mortar 21 can be efficiently removed in a short time.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Mechanical Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

【課題】剥離作業時に発生する音を許容可能な静かな音にでき、コンクリート躯体からモルタルをスムースに剥離可能な剥離装置を提供する。 【解決手段】剥離装置10Aは、モルタル21の外面と並行して一方向へ延びる案内部材12と、モルタル21の外面から離間する方向への移動を阻止する第1固定手段15と、一方向前方へ伸長可能なピストンロッド42を有してモルタル21と案内部材12との間に位置する油圧ジャッキ13と、ジャッキ13を案内部材12に着脱可能に連結する第1連結手段18と、ピストンロッド42の先端部に位置してコンクリート躯体20からモルタル21を剥離するカッター14とから形成されている。剥離装置10Aでは、ジャッキ13のロッド42が一方向前方へ次第に伸長することに伴って、カッター14が一方向前方へ次第に前進しつつ、カッター14の刃口50がコンクリート躯体20から所定厚さのモルタル21を剥離する。

Description

剥離装置
 本発明は、構造物の所定の箇所に施工されたセメント硬化物を剥離する剥離装置に関する。
 建築物では、コンクリート躯体の表面に所定厚さのモルタルを施工することによって仕上げが行われているが、経年後のモルタルの改修工事、壁や天井の増厚による耐震補強工事等の必要が生じた場合、新たな仕上げ施工や増厚に先立ってコンクリート躯体の表面に施工されたモルタルの剥離作業が行われる。従来、モルタル剥離作業は、小型削岩機やハンマードリルを使用して作業員が直接ハツリ作業を行って既設のモルタルの解体を行っていた。しかしながら、小型削岩機やハンマードリル等のハツリ機械は、コンプレッサーによる圧縮空気を送り込んで、モルタルに振動および打撃を加えることによってモルタルの破壊を行うものであるため、打撃音が大きく、作業効率が悪いという問題があった。特に、工事対象の建築物が24時間の営業体制であったり、静寂が要求される病院や学校等である場合には、剥離作業にともなう騒音のために作業時間帯が大幅に制限され、剥離作業の完了までに長期間を要するとともに、剥離作業に高い人件費がかかる等の問題が発生していた。
 これらの打撃・振動系のハツリ機械の場合には、打撃および振動が躯体にも伝達されるため、躯体にクラック等の損傷が誘発されるおそれがある。また、耐震補強工事では、強度が低いモルタルを完全に除去してコンクリート躯体のみを露出させる必要があるが、局所的にハツリを行うそれらハツリ機械では満遍なくモルタルを剥離するのに長時間を要するとともに、高い精度でモルタルを剥離することができないという問題があった。さらに、これらのハツリ機械を利用した場合、解体されたモルタルが細かな破砕片となり、多くの粉塵や塵埃が発生し、作業環境が悪化するという問題があった。
 前記各問題点を解決するために、以下に示すモルタル剥離方法が提案されている(特許文献1参照)。このモルタル剥離方法は、コンクリート躯体の表面にモルタルが所定の厚み寸法で施工されたモルタル仕上げ面を対象とし、回転軸に保持された円板状のコンクリートカッターを持ち込み、回転軸をコンクリート躯体面に対して直交的に保持しつつ、コンクリート躯体とモルタルとの境界部にコンクリートカッターを挿入し、コンクリートカッターをコンクリート躯体面に対して平行的に移動させることによってモルタルを切削分離する。この方法は、騒音が小さく、短い工期でコンクリート躯体の表面に施工されたモルタルを解体することができるという効果を有する。
特開2001-81975号公報
 前記特許文献1に開示のモルタル剥離方法は、コンクリートカッターを回転させてモルタルを切削しつつそのカッターを移動させるから、モルタルの切削面とカッターの刃口とが擦れ合って大きな切削音が発生し、ハツリ機械によってハツリ作業を行う場合と比較して発生する騒音を低く押さえることができるものの、剥離作業において発生する音を許容可能な静かな音に近づけることが難しい。また、このモルタル剥離方法は、コンクリートカッターの周縁に楔状チップ片が設置され、コンクリートカッターの回転にともなう楔状チップ片の回転動作でモルタルを割り取るから、モルタルの剥離方向に対して楔状チップ片の剥離力が集中し難く、モルタルに大きな剥離力を伝えることができず、強固に施工されたモルタルの場合、そのモルタルをスムースに剥離することができない場合がある。
 本発明の目的は、剥離作業時に発生する音を許容可能な静かな音にすることができ、セメント硬化物をスムースに剥離することができる剥離装置を提供することにある。本発明の他の目的は、構造物にダメージを与えることがなく、短期間に効率よく剥離作業を完了することができる剥離装置を提供することにある。
 前記課題を解決するための本発明の前提は、構造物の所定の箇所に施工されたセメント硬化物を剥離する剥離装置である。
 前記前提における本発明の特徴は、剥離装置が、セメント硬化物の外面から所定寸法離間するとともにセメント硬化物の外面と並行して一方向へ延びる案内部材と、案内部材のセメント硬化物の外面から離間する方向への移動を阻止する第1固定手段と、一方向前方へ伸長可能なピストンロッドを有してセメント硬化物と案内部材との間に位置するジャッキと、ジャッキを案内部材に着脱可能に連結する第1連結手段と、ピストンロッドの先端部に位置して構造物からセメント硬化物を剥離するカッターとから形成され、剥離装置では、ジャッキのピストンロッドが一方向前方へ次第に伸長することにともなって、カッターが一方向前方へ向かって次第に前進しつつ、カッターが構造物から所定厚さのセメント硬化物を剥離することにある。
 本発明の一例として、剥離装置では、ジャッキのピストンロッドを一方向前方へ伸長させた後、ピストンロッドを一方向後方へ後退させることで1回毎の剥離工程が完了し、最初の剥離工程を行った後、ジャッキと案内部材との連結を解除するとともに、ジャッキを一方向前方へ移動させてそのジャッキを案内部材に再び連結し、次回の剥離工程を行う。
 本発明の他の一例としては、第1固定手段が、構造物に穿孔されたアンカーホールに固定された第1アンカーと、アンカーホールから露出する第1アンカーの自由端部に着脱可能に固定されて案内部材をセメント硬化物に向かって押圧する押さえ板とから形成されている。
 本発明の他の一例としては、第1連結手段が、ジャッキの後端部に連結されて案内部材に沿って一方向へ移動可能なスライダーと、案内部材に穿孔されて一方向へ所定寸法離間して並ぶ複数の貫通孔と、スライダーに穿孔された貫通孔と、それら貫通孔に挿脱可能に挿入された連結ピンとから形成されている。
 本発明の他の一例としては、剥離装置がカッターをピストンロッドの先端部に着脱可能に連結する第2連結手段を含み、第2連結手段が、ピストンロッドの先端部に穿孔された貫通孔と、カッターに穿孔された貫通孔と、それら貫通孔に挿脱可能に挿入される連結ピンとから形成されている。
 本発明の他の一例としては、剥離装置が案内部材の前端部に設置されて案内部材の一方向前方への移動を阻止する第2固定手段を含み、第2固定手段が、案内部材の前端部に当接する第1前端板と、第1前端板につながって構造物に当接する第2前端板と、構造物に穿孔されたアンカーホールに挿入されて第2前端板を構造物に固定する第2アンカーとから形成されている。
 本発明の他の一例としては、剥離装置が案内部材の後端部に設置されて案内部材の一方向後方への移動を阻止する第3固定手段を含み、第3固定手段が、案内部材の後端部に当接する第1後端板と、第1後端板につながって構造物に当接する第2後端板と、構造物に穿孔されたアンカーホールに挿入されて第2後端板を構造物に固定する第3アンカーとから形成されている。
 本発明の他の一例としては、カッターが、セメント硬化物の外面から所定深さに位置する刃口と、刃口につながる取付座とから形成され、取付座の頂部が、案内部材に摺動可能に当接し、カッターのセメント硬化物の外面から離間する方向への移動を阻止する。
 本発明の他の一例として、剥離装置では、刃口の一方向と交差する方向の寸法を調節することで、構造物から剥離するセメント硬化物の一方向と交差する方向の剥離寸法を調節可能である。
 本発明の他の一例としては、案内部材が剥離する前記セメント硬化物のその剥離長さ以上の長さ寸法を有して一方向へ延びる金属パイプである。
 本発明の他の一例としては、セメント硬化物が構造物のコンクリート躯体に施工された所定厚さのモルタルであり、剥離装置がコンクリート躯体からモルタルを剥離する。
 本発明の他の一例として、剥離装置では、セメント硬化物の剥離時に発生する音圧レベルが20~40dBの範囲にある。
 本発明の他の一例としては、ジャッキが電動油圧ポンプに接続された油圧ジャッキである。
 本発明にかかる剥離装置によれば、ジャッキのピストンロッドが一方向前方へ次第に伸長することにともなって、カッターが一方向前方へ向かって次第に前進しつつ、カッターが構造物から所定厚さのセメント硬化物を剥がし取るから、セメント硬化物の切削面とカッターとが擦れ合うことによる大きな切削音の発生がなく、剥離作業時に発生する音を許容可能な静かな音にすることができる。剥離装置は、ジャッキのピストンロッドからカッターに直線的に力(トルク)が伝達され、カッターの直進力をセメント硬化物の剥離箇所に集中させることができ、それによってセメント硬化物に大きな剥離力が作用するから、強固に施工されたセメント硬化物であってもその硬化物を円滑かつ確実に剥離することができる。剥離装置は、ジャッキを利用することで、構造物からセメント硬化物をスムースに剥離することができるから、短期間に効率よくセメント硬化物の剥離作業を完了することができるのみならず、構造物から一度に広い範囲にわたってセメント硬化物の剥離を行うことができ、剥離作業を廉価に行うことができる。剥離装置は、構造物に不要な振動が伝わることがないから、構造物にダメージを与えることなく、構造物からセメント硬化物を剥離することができる。また、構造物からセメント硬化物を高い精度で短期間に満遍なく剥離することができ、剥離作業において粉塵や塵埃の発生が少なく、良好な環境で剥離作業を行うことができる。
 ジャッキのピストンロッドを一方向前方へ伸長させた後、ピストンロッドを一方向後方へ後退させることで1回毎の剥離工程が完了し、最初の剥離工程を行った後、ジャッキと案内部材との連結を解除するとともに、ジャッキを一方向前方へ移動させてそのジャッキを案内部材に再び連結し、次回の剥離工程を行う剥離装置は、ピストンロッドのその伸長寸法の分の剥離を行った後、ジャッキを一方向前方へ移動させて再び案内部材に連結し、さらにピストンロッドのその伸長寸法の分の剥離を行うことができるから、剥離工程を繰り返し行うことができ、セメント硬化物の剥離長さが長い場合であっても、構造物から剥離対象の全てのセメント硬化物を剥離することができる。剥離装置は、剥離工程を繰り返し行う作業としてジャッキを一方向前方へ移動させ、そのジャッキを案内部材に連結するだけであり、他の作業を伴うことがないから、手間がかからず短期間に効率よくセメント硬化物の剥離を完了することができる。
 第1固定手段が第1アンカーと第1アンカーの自由端部に着脱可能に固定されて案内部材をセメント硬化物に向かって押圧する押さえ板とから形成されている剥離装置は、カッターを一方向前方へ移動させる剥離作業中に、案内部材をセメント硬化物の外面から離間する方向へ移動させる力がカッターから案内部材に作用するが、第1アンカーと押さえ板とによって案内部材のセメント硬化物の外面から離間する方向への移動が阻止されるから、カッターをセメント硬化物に確実に食い込ませることができ、構造物から所定厚さのセメント硬化物を確実に剥離することができる。
 第1連結手段がジャッキの後端部に連結されたスライダーと案内部材に穿孔された複数の貫通孔とスライダーに穿孔された貫通孔とそれら貫通孔に挿脱可能に挿入された連結ピンとから形成されている剥離装置は、スライダーと連結ピンとを介してジャッキと案内部材とを容易に連結することができるとともに、連結ピンを抜き取ることでジャッキと案内部材との連結を容易に解除することができ、剥離装置による複数回の剥離工程を容易に繰り返すことができる。剥離装置は、剥離工程を繰り返して行う作業としてジャッキを一方向前方へ移動させ、スライダーと連結ピンとを介してジャッキと案内部材とを連結するだけであり、他の作業を伴うことがないから、手間がかからず短期間に効率よく剥離作業を完了することができる。
 カッターをピストンロッドの先端部に着脱可能に連結する第2連結手段を含み、第2連結手段がピストンロッドの先端部に穿孔された貫通孔とカッターに穿孔された貫通孔とそれら貫通孔に挿脱可能に挿入される連結ピンとから形成されている剥離装置は、連結ピンを介してピストンロッドとカッターとを容易に連結することができるとともに、連結ピンを抜き取ることでピストンロッドとカッターとの連結を容易に解除することができ、長期間の使用によって痛んだカッターを迅速に交換することができる。剥離装置は、痛んだカッターを新しいそれと簡単に交換することができるから、剥離作業を効率よく行うことができるとともに、常に剥離機能を有するカッターを使用することによって構造物からセメント硬化物を確実に剥離することができる。
 案内部材の前端部に設置されてその案内部材の一方向前方への移動を阻止する第2固定手段を含み、第2固定手段が案内部材の前端部に当接する第1前端板と第1前端板につながって構造物に当接する第2前端板と第2前端板を構造物に固定する第2アンカーとから形成されている剥離装置は、カッター(ピストンロッド)を一方向後方へ移動させる作業中に、案内部材をその一方向前方へ移動させる力がカッターから案内部材に作用するが、第1および第2前端板と第2アンカーとによって案内部材の一方向前方への移動が阻止されるから、案内部材やカッターのセメント硬化物に対するずれ動きを防ぐことができ、剥離工程を行った後にカッターを一方向後方へスムースに後退させることができるとともに、次の剥離工程を円滑に行うことができる。
 案内部材の後端部に設置されてその案内部材の一方向後方への移動を阻止する第3固定手段を含み、第3固定手段が案内部材の後端部に当接する第1後端板と第1後端板につながって構造物に当接する第2後端板と第2後端板を構造物に固定する第3アンカーとから形成されている剥離装置は、カッター(ピストンロッド)を一方向前方へ移動させる剥離作業中に、案内部材をその一方向後方へ移動させる力がカッターから案内部材に作用するが、第1および第2後端板と第3アンカーとによって案内部材の一方向後方への移動が阻止されるから、剥離作業中における案内部材やカッターのセメント硬化物に対するずれ動きを防ぐことができるとともに、カッターをセメント硬化物に確実に食い込ませることができ、構造物から所定厚さのセメント硬化物を確実に剥離することができる。
 カッターがセメント硬化物の外面から所定深さに位置する刃口とその刃口につながる取付座とから形成され、案内部材が取付座の頂部に摺動可能に当接してカッターのセメント硬化物の外面から離間する方向への移動を阻止する剥離装置は、カッター(ピストンロッド)を一方向前方へ移動させる剥離作業中に、カッターをセメント硬化物の外面から離間する方向へ移動させる力がそのカッターに作用するが、第1アンカーおよび押さえ板によって固定された案内部材がカッターのセメント硬化物の外面から離間する方向への移動を阻止するから、カッターの刃口をセメント硬化物に確実に食い込ませることができ、構造物から所定厚さのセメント硬化物を確実に剥離することができる。
 カッターの刃口の一方向と交差する方向の寸法を調節することで、構造物から剥離するセメント硬化物の一方向と交差する方向の剥離寸法を調節可能な剥離装置は、カッターの刃口の寸法を小さくすることで、構造物から剥離するセメント硬化物の剥離寸法を小さくすることができ、カッターの刃口の寸法を大きくすることで、構造物から剥離するセメント硬化物の剥離寸法を大きくすることができるから、構造物から剥離するセメント硬化物の剥離寸法(剥離面積)に対応することができ、構造物からセメント硬化物を所望の剥離寸法だけ剥離することができる。
 案内部材がセメント硬化物の剥離長さ以上の長さ寸法を有して一方向へ延びる金属パイプである剥離装置は、案内部材の長さ寸法を変更することにより、構造物から剥離するセメント硬化物の剥離長さを変えることができるから、構造物から剥離するセメント硬化物の剥離長さに対応することができ、構造物からセメント硬化物を所望の長さだけ剥離することができる。剥離装置は、第1アンカーおよび押さえ板によって固定された所定長さ寸法の案内部材がカッターのセメント硬化物の外面から離間する方向への移動を阻止するから、カッターをセメント硬化物に確実に食い込ませることができ、構造物から所定厚さのセメント硬化物を確実に剥離することができる。
 セメント硬化物が構造物のコンクリート躯体に施工された所定厚さのモルタルであり、コンクリート躯体からモルタルを剥離する剥離装置は、ジャッキのピストンロッドが一方向前方へ次第に伸長することにともなって、カッターが一方向前方へ向かって次第に前進しつつ、カッターがコンクリート躯体から所定厚さのモルタルを剥離するから、大きな騒音を発生させることなくコンクリート躯体からモルタルを剥離することができる。剥離装置は、ジャッキのピストンロッドからカッターに直線的に力(トルク)が伝達され、カッターの直進力をモルタルの剥離箇所に集中させることができ、それによってモルタルに大きな剥離力が作用するから、強固に施工されたモルタルであってもそのモルタルを円滑かつ確実に剥離することができる。剥離装置は、ジャッキを利用することで、コンクリート躯体からモルタルをスムースに剥離することができるから、短期間に効率よく剥離作業を完了することができるのみならず、コンクリート躯体に不要な振動が伝わることがないから、コンクリート躯体にダメージを与えることなく、モルタルを剥離することができる。また、コンクリート躯体からモルタルを高い精度で短期間に満遍なく剥離することができ、剥離作業において粉塵や塵埃の発生が少なく、良好な環境で剥離作業を行うことができる。
 セメント硬化物の剥離時に発生する音圧レベルが20~40dBの範囲にある剥離装置は、剥離時に発生する音圧レベルが前記範囲にあるから、大きな騒音を発生させることなく構造物からセメント硬化物を剥離することができ、剥離作業時に発生する音を許容可能な静かな音にすることができる。剥離装置は、静寂な環境が要求される場所に作られた構造物に対してセメント硬化物の剥離作業を行うことができ、剥離作業の作業時間帯が制限されることはなく、短期間にセメント硬化物の剥離を完了することができる。
 ジャッキが電動油圧ポンプに接続された油圧ジャッキである剥離装置は、ジャッキとして油圧で作動するそれを使用することで、ピストンロッドからカッターに大きな力(トルク)を伝達することができ、セメント硬化物に大きな剥離力が作用するから、構造物からセメント硬化物を円滑かつ確実に剥離することができる。
一例として示す剥離装置の上面図。 剥離装置の斜視図。 剥離装置の側面図。 図1のL-L線矢視断面図。 カッターの拡大斜視図。 剥離装置を使用したモルタルの剥離方法の一例を示す図。 図6から続く剥離方法を示す図。 図7から続く剥離方法を示す図。 図8から続く剥離方法を示す図。 図9から続く剥離方法を示す図。 他の一例として示す剥離装置の上面図。 図11の剥離装置の斜視図。 図11の剥離装置の側面図。 図11のM-M線矢視断面図。 剥離装置を使用したモルタルの剥離方法の一例を示す図。 図15から続く剥離方法を示す図。 図16から続く剥離方法を示す図。 図17から続く剥離方法を示す図。
 一例として示す剥離装置10Aの上面図である図1等の添付の図面を参照し、本発明にかかる剥離装置の詳細を説明すると、以下のとおりである。なお、図2は、剥離装置10Aの斜視図であり、図3は、剥離装置10Aの側面図である。図4は、図1のL-L線矢視断面図であり、図5は、カッター14の拡大斜視図である。
 図1では、一方向(図1に示す建築物では前後方向)を矢印Aで示し、一方向と交差する幅方向(図1に示す建築物では上下方向)を矢印Bで示す。図1~図4では、剥離装置10Aを建築物の内壁11の上部に設置した状態で示す。図2では、案内部材12の前後端部29,35や第1固定手段15の図示を省略し、図2,3では、油圧チューブ43の図示を省略している。図5では、案内部材12やピストンロッド42を一点鎖線で示す。
 この剥離装置10Aは、構造物のコンクリート躯体20の外面に施工されたモルタル21(セメント硬化物)の剥離に使用される。なお、剥離装置10Aは、モルタル21の剥離のみならず、コンクリートの剥離にも使用することができる。構造物には、オフィスビルやインテリジェントビル、集合住宅、病院、学校、原子力発電所、屋内駐車場、地下駐車場等のあらゆる建築物が含まれ、また、ダムや橋、道路、外壁等のあらゆる構築物が含まれる。
 以下、剥離装置10Aが鉄筋コンクリート建築物の内壁11に設置された場合を例として装置を説明する。なお、剥離装置10Aは、建築物の内壁11のみならず、建築物の床スラブや片持ちスラブ、天井スラブ、柱、梁に設置し、それらに施工されたモルタル21の剥離に使用することもできる。それら図では剥離装置10Aが建築物(構造物)の内壁11において前後方向へ設置されているが、建築物の内壁11における装置10Aの設置方向(案内部材の延びる方向)について特に限定はなく、装置10Aを設置するスペースを確保することができれば、装置10Aをあらゆる方向に設置することができる。剥離装置10Aは、一方向へ延びる案内部材12と、油圧ジャッキ13およびカッター14と、第1~第3固定手段15~17および第1~第2連結手段18,19とを備えている。
 案内部材12は、一方向へ延びる中空筒状の金属パイプ(鉄パイプやアルミパイプ、ステンレスパイプ等)であり、その断面形状が円形に成形されている。なお、案内部材12は、円形のみならず、その断面形状が四角形に成型されていてもよい。案内部材12は、モルタル21の外面から所定寸法離間するとともにモルタル21の外面と並行するように建築物の内壁11に設置されている。案内部材12は、剥離するモルタル21のその剥離長さ以上の長さ寸法を有していればよく、その長さ寸法に特に限定はない。案内部材12には、それを貫通して一方向へ等間隔離間(所定寸法離間)して並ぶ複数の貫通孔22(第1連結手段18)が穿孔されている。案内部材12は、第1~第3固定手段15~17によって内壁11に設置、固定されている。
 第1固定手段15は、一方向へ所定寸法離間して並び、モルタル21の外面から離間する方向への案内部材12の移動を阻止する。なお、図1では、第1固定手段15が2つ図示されているが、固定手段15の数に特に限定はなく、案内部材12の長さ寸法に応じて3つ以上の固定手段15が設置されていてもよい。第1固定手段15は、内壁11(コンクリート躯体20およびモルタル21)に穿孔されたアンカーホール23に挿入、固定された第1アンカー24と、アンカーホール23から露出するアンカー24の自由端部25に着脱可能に固定された押さえ板26とから形成されている。
 第1アンカー24は、2本のそれが案内部材12を挟んだ状態で部材12の両側に配置されている。第1アンカー24としては、その詳細な図示はしていないが、カプセル式アンカーや樹脂注入アンカー、オールアンカー、カットアンカーのいずれかを使用することができる。第1アンカー24は、鋼から作られているが、鋼の他に、ステンレスやアルミ合金、チタン合金等の金属、または、合成樹脂から作られていてもよい。
 押さえ板26は、幅方向へ長い金属板であり、その中央部に幅方向へ延びる開口27が形成されている。押さえ板26の開口27には、第1アンカー24の自由端部25が挿脱可能に挿通されている。第1アンカー24の自由端部25に形成された雄螺子には、六角ナット28が螺着されている。ナット28によって押さえ板26がモルタル21の外面に向かって押圧され、押さえ板26が第1アンカー24とナット28とによって固定されているとともに、押さえ板26によって案内部材12がモルタル21の外面に向かって押圧されている。
 第2固定手段16は、案内部材12の前端部29に設置されている。第2固定手段16は、案内部材12の前端部29に当接する第1前端板30と、第1前端板30につながって内壁11(モルタル21)に当接する第2前端板31と、内壁11(コンクリート躯体20およびモルタル21)に穿孔されたアンカーホール32に挿入された第2アンカー33とから形成されている。第1前端板30と第2前端板31とは、鉄やアルミ、ステンレス等の金属から作られ、それら板30,31が一体となってL字状のストッパーを形成している。
 第2前端板31の中央部には、板31を貫通する貫通孔が形成されている。貫通孔には、アンカーホール32から露出する第2アンカー33の自由端部34が挿脱可能に挿通されている。貫通孔から露出する第2アンカー33の自由端部34に形成された雄螺子には、六角ナット28が螺着されている。なお、第2アンカー33としては、第1アンカー24と同様に、カプセル式アンカーや樹脂注入アンカー、オールアンカー、カットアンカーのいずれかを使用することができる。第1および第2前端板30,31が第2アンカー33と六角ナット28とによって内壁11(モルタル21)に固定されるとともに、案内部材12の一方向前方への移動が第2固定手段16(第1前端板30)によって阻止される。
 第3固定手段17は、案内部材12の後端部35に設置されている。第3固定手段17は、案内部材12の後端部35に当接する第1後端板36と、第1後端板36につながって内壁11(モルタル21)に当接する第2後端板37と、内壁11(コンクリート躯体20およびモルタル21)に穿孔されたアンカーホール38に挿入された第3アンカー39とから形成されている。第1後端板36と第2後端板37とは、鉄やアルミ、ステンレス等の金属から作られ、それら板36,37が一体となってL字状のストッパーを形成している。
 第2後端板37の中央部には、板38を貫通する貫通孔が形成されている。貫通孔には、アンカーホール38から露出する第3アンカー39の自由端部40が挿脱可能に挿通されている。貫通孔から露出する第3アンカー39の自由端部40に形成された雄螺子には、六角ナット28が螺着されている。なお、第3アンカー39としては、第1アンカー24と同様に、カプセル式アンカーや樹脂注入アンカー、オールアンカー、カットアンカーのいずれかを使用することができる。第1および第2後端板36,37が第3アンカー39と六角ナット28とによって内壁11(モルタル21)に固定されるとともに、案内部材12の一方向後方への移動が第3固定手段17(第1後端板36)によって阻止される。
 なお、図示はしていないが、建築物の柱や梁の外面に案内部材12の前端部29や後端部35を当接させ、柱や梁を第2固定手段16や第3固定手段17として利用し、柱や梁によって部材12の一方向前方や一方向後方への移動を阻止することができれば、第2固定手段16(第1前端板30、第2前端板31、第2アンカー33)や第3固定手段17(第1後端板36、第2後端板37、第3アンカー39)の設置を省くことができる。
 油圧ジャッキ13は、案内部材12とモルタル21との間に位置している。図1において油圧ジャッキ13は、案内部材12の後端部に第1連結手段18を介して着脱可能に連結されている。油圧ジャッキ13は、円筒状の油圧シリンダー41と円柱状のピストンロッド42とを有する。油圧シリンダー41の前端部と中間部とにおける周壁には、油圧チューブ43が取り付けられている。油圧チューブ43は、電動油圧ポンプ44に接続されている。油圧ジャッキ13では、油圧ポンプ44から送出される油圧オイル(油圧作動油)によってピストンロッド42が一方向前方へ伸長(前進)するとともに一方向後方へ後退する。なお、ジャッキとして油圧ジャッキ13の他に、水圧ジャッキを使用することもできる。
 第1連結手段18は、油圧ジャッキ13(油圧シリンダー41)の後端部に連結されたスライダー45と、案内部材12に穿孔された貫通孔22およびスライダー45(後記する筒部材48)に穿孔された貫通孔46と、それら貫通孔22,46に挿脱可能に挿入された連結ピン47とから形成されている。スライダー45は、鉄やアルミ、ステンレス等の金属から作られている。スライダー45は、案内部材12の外周面に着脱可能に嵌め込まれた円筒状の筒部材48と、筒部材48の後端部に連結された台座49とから形成されている。筒部材48と台座49とは、溶接によって固定され、一体になっている。筒部材48は、案内部材12の外周面において一方向前方と一方向後方とへ摺動可能である。
 台座49は、四角柱状に成型され、両側壁と底壁とを有する。台座49の内側には油圧シリンダー41の後端部が収納され、溶接によってシリンダー41の後端部が台座49に固定されている。台座49の底壁(底面)は、内壁11(モルタル21)の外面に当接している。貫通孔46は、筒部材48の周面に形成され、幅方向へ貫通するとともに一方向へ所定寸法離間して並んでいる。連結ピン47は、鉄やアルミ、ステンレス等の金属から作られている。
 筒部材48を案内部材12の外周面に嵌め込み、案内部材12に形成された貫通孔22と筒部材48に形成された貫通孔46とを一致させた後、それら貫通孔22,46に連結ピン47を挿入することで、油圧ジャッキ13を案内部材12に連結することができる。逆に、連結ピン47をそれら貫通孔22,46から抜き取ることで、油圧ジャッキ13と案内部材12との連結を解除することができる。油圧ジャッキ13と案内部材12との連結を解除した後、スライダー45を一方向前方または一方向後方へスライドさせ、それら貫通孔22,46に連結ピン47を挿入することで、ジャッキ13を案内部材12の所定の箇所に設置することができる。
 カッター14は、鋼から作られ、図5に示すように、モルタル21を剥離する刃口50と、刃口50につながる取付座51とから形成されている。カッター14は、第2連結手段19を介してピストンロッド42の先端部に着脱可能に連結されている。第2連結手段19は、ピストンロッド42の先端部に穿孔された2つの貫通孔52と、カッター14の取付座51に穿孔された2つの貫通孔53と、それら貫通孔52,53に挿脱可能に挿入される連結ピン54とから形成されている。
 連結ピン54は、鉄やアルミ、ステンレス等の金属から作られている。刃口50は、モルタル21の外面から所定深さに位置し、コンクリート躯体20の外面に当接している。なお、図5のカッター14では、刃口50と取付座51とが一体になっているが、刃口50を有する刃物と取付座51とが分離可能であって、取付座51に刃物を着脱可能に固定することもできる。
 取付座51は、頂部55および底部57と、頂底部55,57の間に位置する中間部56とを有する。取付座51の頂部55は、案内部材12の外周面の形状と略同一の半円形状に成型され、案内部材12の外周面に摺動可能に当接している。取付座51の頂部55が案内部材12の外周面に当接することで、コンクリート躯体20の外面から離間する方向へのカッター14(刃口50)の移動が阻止されている。
 取付座51の中間部56には、ピストンロッド42の先端部を挿脱可能に挿通する挿通孔58と、ロッド42の先端が当接する当接面59とが形成されている。挿通孔58は、一方向へ貫通している。なお、第2連結手段19を形成する貫通孔52は、取付座51の中間部56に形成され、幅方向へ貫通している。取付座51の底部57は、モルタル21の外面に当接している。
 ピストンロッド42の先端部を取付座51の挿通孔58に挿入し、ロッド42の先端を取付座51の当接面59に当接させると、ロッド42の先端部に穿孔された貫通孔52と取付座51に穿孔された貫通孔53とが一致する。それら貫通孔52,53を一致させた状態で、それら貫通孔52,53に連結ピン54を挿入することで、カッター14をピストンロッド42の先端部に連結することができる。
 逆に、連結ピン54をそれら貫通孔52,53から抜き取ることで、カッター14とピストンロッド42との連結を解除することができる。カッター14(刃口50)は、油圧ジャッキ13のピストンロッド42が一方向前方に伸長すると、それにともなって一方向前方へ移動し、ピストンロッド42が一方向後方に後退すると、それにともなって一方向後方へ移動する。
 図6は、剥離装置10Aを使用したモルタル21の剥離方法(剥離手順)の一例を示す図であり、図7は、図6から続く剥離方法を示す図である。図6では、一方向(図6に示す建築物では前後方向)を矢印Aで示し、一方向と交差する幅方向(図6に示す建築物では上下方向)を矢印Bで示す。
 剥離装置10Aを利用したモルタル21の剥離方法は、装置設置工程、第1剥離工程、第1移動工程、第2剥離工程、第2移動工程・・・第n移動工程、第n剥離工程、装置取り外し工程の各工程を実施することによって行われる。なお、装置設置工程は、装置準備工程、案内溝作成工程、カッター設置穴作成工程、アンカー固定工程、装置固定工程を含み、装置取り外し工程は、装置固定解除工程、アンカー切断工程を含む。
 それら図に基づいてモルタル21の剥離方法を説明すると、以下のとおりである。最初にそれら工程を実施する事前準備として、モルタル21を剥離する内壁11の剥離箇所を決定し、モルタル21の剥離幅寸法(剥離するモルタル21の幅方向の寸法)を決定するとともに、モルタル21の剥離長さ寸法(剥離するモルタル21の一方向の寸法)を決定し、モルタル21の剥離深さ寸法(剥離するモルタル21のコンクリート躯体20に向かった深さ寸法)を決定する。
 なお、モルタル21の剥離幅寸法によって、カッター14の刃口50の幅寸法が決定される。具体的には、モルタル21の剥離幅寸法が大きい場合、刃口50の幅寸法の大きなカッター14が使用され、モルタル21の剥離幅寸法が小さい場合、刃口50の幅寸法の小さなカッター14が使用される。剥離装置10Aでは、刃口50の幅寸法(一方向と交差する方向の寸法)を調節することで、コンクリート躯体20から剥離するモルタル21の剥離幅寸法(一方向と交差する方向の剥離寸法)を調節することができる。
 それら寸法を決定した後、モルタル21の剥離箇所に剥離装置10Aを設置する装置設置工程を実施する。ピストンロッド42の先端部を取付座51の挿通孔58に挿入し、ロッド42の先端を取付座51の当接面59に当接させ、貫通孔52,53を一致させた状態で、それら貫通孔52,53に連結ピン54を挿入し、第2連結手段19によってロッド42の先端部にカッター14を連結する。剥離装置10Aでは、連結ピン54を介してピストンロッド42とカッター14とを容易に連結することができるとともに、連結ピン54を抜き取ることでロッド42とカッター14との連結を容易に解除することができ、長期間の使用によって痛んだカッター14(刃口50)を迅速に交換することができる。
 次に、スライダー45の筒部材48を案内部材12の外周面に嵌め込み、貫通孔22,46を一致させた状態で、それら貫通孔22,46に連結ピン47を挿入し、第1連結手段18によって案内部材12に油圧ジャッキ13を連結する(装置準備工程)。剥離装置10Aでは、スライダー45と連結ピン47とを介して油圧ジャッキ13と案内部材12とを容易に連結することができるとともに、連結ピン47を抜き取ることでジャッキ13と案内部材12との連結を容易に解除することができる。
 装置準備工程と並行し、または、装置準備工程によってモルタル剥離装置10Aを準備した後、図6に示すように、モルタル21の剥離幅の外縁に沿って一方向へ直状に延びる2条の案内溝60を入れる(案内溝作成工程)。具体的には、コンクリートカッターを利用し、剥離幅の外縁に沿ってモルタル21を切削して案内溝60を作る。それら案内溝60の溝深さは、モルタル21の剥離深さと同一である。
 案内溝60は、それら案内溝60の内側に施工されているモルタル21のみを剥離し、案内溝60の外側に施工されているモルタル21の剥離を防ぐために作られる。なお、内壁11の全域においてモルタル21を剥離する場合、案内溝60の作成を省くことができる。案内溝60を作った後、案内溝60の間の箇所のモルタル21をはつり、その箇所にカッター14が入るカッター設置穴61を穿つ(カッター設置穴作成工程)。具体的には、コアドリルを利用してカッター14の長さ寸法および幅寸法と略同一の長さおよび幅のカッター設置穴61を作る。
 案内溝60を作り、カッター設置穴61を作った後、第1~第3固定部材15~17を設置する箇所に円筒状のアンカーホール23,32,38を穿孔し、図7に示すように、それらアンカーホール23,32,38に第1~第3アンカー24,33,39を設置、固定する(アンカー固定工程)。それらアンカーホール23,32,38は、振動ドリル(電動工具)(図示せず)によって穿孔する。アンカーホール23,32,38は、モルタル21(モルタル層)を貫通し、コンクリート躯体20に達している。
 第1~第3アンカー24,33,39を強固に固定することができれば、アンカーホール23,32,38の深さ寸法について特に限定はない。アンカーホール23,32,38を穿孔した後、第1~第3アンカー24,33,39をそのアンカーホール23,32,38に挿入、固定する。アンカー24,33,39を各アンカーホール23,32,38に固定した後、油圧ジャッキ14を連結した案内部材12をそれら案内溝60の幅方向中央に第1~第3固定手段15~17を介して設置、固定する(装置固定工程)。
 装置固定工程では、案内部材12を案内溝60の幅方向中央に位置させ、カッター14をカッター設置穴61に位置させるとともに、スライダー45の台座49の底壁を案内溝60の間のモルタル21に当接させる。次に、押さえ板26の開口27に第1アンカー24の自由端部25を挿通し、自由端部25に六角ナット28を螺着して押さえ板26を第1アンカー24およびナット28によって強固に固定する。
 押さえ板26を固定すると、ナット28によって押さえ板26がモルタル21の外面に向かって押圧されるとともに、押さえ板26によって案内部材12がモルタル21の外面に向かって押圧され、部材12が押さえ板26によって固定される(第1固定手段による固定)。剥離装置10Aでは、カッター14を一方向前方へ移動させる剥離作業中に、案内部材12をモルタル21の外面から離間する方向へ移動させる力がカッター14から案内部材12に作用するが、第1アンカー24と押さえ板26とによって案内部材12のモルタル21の外面から離間する方向への移動が阻止されるから、カッター14の刃口50をモルタル21に確実に食い込ませることができる。
 第1固定手段15によって案内部材12を固定した後、第2前端板31の貫通孔に第2アンカー33の自由端部34を挿通し、第1前端板30を案内部材12の前端部29(前端)に当接させ、貫通孔から露出する第2アンカー33の自由端部34に六角ナット28を螺着し、第2アンカー33および六角ナット28によって第1および第2前端板30,31をモルタル21の外面に固定する。案内部材12の前端部29は、第1および第2前端板30,31によって固定される(第2固定手段による固定)。
 剥離装置10Aでは、カッター14(ピストンロッド42)を一方向後方へ移動させる作業中に、案内部材12をその一方向前方へ移動させる力がカッター14から案内部材12に作用するが、第1および第2前端板30,31と第2アンカー33とによって案内部材12の一方向前方への移動が阻止されるから、案内部材12やカッター14のモルタル21に対するずれ動きを防ぐことができ、剥離工程を行った後にカッター14を一方向後方へスムースに後退させることができる。
 第2固定手段16によって案内部材12の前端部29を固定した後、第2後端板37の貫通孔に第3アンカー39の自由端部40を挿通し、第1後端板36を案内部材12の後端部35(後端)に当接させ、貫通孔から露出する第3アンカー39の自由端部40に六角ナット28を螺着し、第3アンカー39および六角ナット28によって第1および第2後端板36,37をモルタル21の外面に固定する。案内部材12の後端部35は、第1および第2後端板36,37によって固定される(第3固定手段による固定)。
 剥離装置10Aでは、カッター14(ピストンロッド42)を一方向前方へ移動させる剥離作業中に、案内部材12をその一方向後方へ移動させる力がカッター14から案内部材12に作用するが、第1および第2後端板36,37と第3アンカー39とによって案内部材12の一方向後方への移動が阻止されるから、剥離作業中における案内部材12やカッター14のモルタル21に対するずれ動きを防ぐことができるとともに、カッター14の刃口50をモルタル21に確実に食い込ませることができる。
 図8は、図7から続く剥離方法を示す図であり、図9は、図8から続く剥離方法を示す図である。図10は、図9から続く剥離方法を示す図である。装置固定工程が完了した後、第1剥離工程を実施する。第1剥離工程では、電動油圧ポンプ44のスイッチをONにし、図示しないリモートコントローラによって油圧ジャッキ13を稼働させ、ジャッキ13のピストンロッド42を図8に矢印A1で示す一方向前方へ伸長(前進)させる。ピストンロッド42を一方向前方へ伸長させると、それによってカッター14が一方向前方へ向かって次第に前進し、カッター14の刃口50がコンクリート躯体20から所定厚さのモルタル21を次第に剥離する(第1剥離工程)。
 油圧ジャッキ13のピストンロッド42を一方向前方へ最大に伸長させ、ロッド42が伸長した分のモルタル21を剥離した後、リモートコントローラによって油圧ジャッキ13を稼働させ、ジャッキ13のピストンロッド42を図8に矢印A2で示す一方向後方へ後退させる。ロッド42を後退させることで、第1剥離工程(1回の剥離工程)が完了する。なお、モルタル21(セメント硬化物)の剥離時に発生する音圧レベルは、50~80dBの範囲にある。その音圧レベルは、騒音計を使用し、その騒音計を剥離装置10Aから1.2m離して測定した値である。剥離装置10Aは、カッター14の刃口50が一方向前方へ直進し、刃口50がモルタル21を剥がし取るように作用するから、モルタル21の切削面とカッター14(刃口50)とが擦れ合うことはなく、大きな切削音の発生もない。
 第1剥離工程が完了した後、貫通孔22,46から連結ピン47を抜き取り、案内部材12と油圧ジャッキ13との連結を解除する。案内部材12と油圧ジャッキ13との連結を解除した後、スライダー45の筒部材48を案内部材12の外周面において図9に矢印A1で示す一方向前方へ移動させ、油圧ジャッキ13を一方向前方へ移動させる(第1移動工程)。ジャッキ13の一方向前方への最大移動距離は、カッター14の刃口50が次に剥離するモルタル21に当接するまでの距離である。
 油圧ジャッキ13を一方向前方へ移動させた後、貫通孔22,46を一致させた状態で、それら貫通孔22,46に連結ピン47を再び挿入し、案内部材12に油圧ジャッキ13を再度連結して第2剥離工程を実施する。第2剥離工程では、電動油圧ポンプ44のスイッチをONにし、リモートコントローラによって油圧ジャッキ13を稼働させ、ジャッキ13のピストンロッド42を図10に矢印A1で示す一方向前方へ伸長(前進)させる。
 ピストンロッド42を一方向前方へ伸長させると、それによってカッター14が一方向前方へ向かって次第に前進し、カッター14の刃口50がコンクリート躯体20から所定厚さのモルタル21を次第に剥離する(第2剥離工程)。油圧ジャッキ13のピストンロッド42を一方向前方へ最大に伸長させ、ロッド42が伸長した分のモルタル21を剥離した後、リモートコントローラによって油圧ジャッキ13を稼働させ、ジャッキ13のピストンロッド42を図10に矢印A2で示す一方向後方へ後退させる。ロッド42を後退押させることで、第2剥離工程(次の1回の剥離工程)が完了する。
 第2剥離工程が完了した後、貫通孔22,46から連結ピン47を抜き取り、案内部材12と油圧ジャッキ13との連結を解除する。案内部材12と油圧ジャッキ13との連結を解除した後、スライダー45の筒部材48を案内部材12の外周面において一方向前方へ移動させ、油圧ジャッキ13を一方向前方へ移動させる(第2移動工程)。油圧ジャッキ13を一方向前方へ移動させた後、既述の手順で再びモルタル21の剥離作業を行う。モルタル21の剥離長さに応じて移動工程と剥離工程とを繰り返し(第n移動工程、第n剥離工程)、剥離対象のモルタル21の全てを剥離して移動工程と剥離工程とが完了する。
 移動工程と剥離工程とが完了した後、装置取り外し工程を実施する。第1アンカー24の自由端部25に螺着した六角ナット28を自由端部25から取り外し、第1アンカー24およびナット28による押さえ板26の固定を解除するとともに、第1アンカー24の自由端部25から押さえ板26を抜き取り、押さえ板26による案内部材12の固定を解除する(第1固定手段による固定の解除)(装置固定解除工程)。
 次に、第2アンカー33の自由端部34に螺着した六角ナット28を自由端部34から取り外し、第2アンカー33および六角ナット28による第1および第2前端板30,31のモルタル21に対する固定を解除するとともに、第1および第2前端板30,31による案内部材12の前端部29の固定を解除する(第2固定手段による固定の解除)(装置固定解除工程)。
 さらに、第3アンカー39の自由端部40に螺着した六角ナット28を自由端部40から取り外し、第3アンカー39および六角ナット28による第1および第2後端板36,37のモルタル21に対する固定を解除するとともに、第1および第2後端板36,37による案内部材12の後端部35の固定を解除する(第3固定手段による固定の解除)(装置固定解除工程)。第1~第3固定手段15~17による固定の解除した後、案内部材12を内壁11から降ろし、剥離装置10Aを剥離箇所から取り外す(装置取り外し工程)。
 装置取り外し工程が完了した後、アンカー切断工程を実施する。アンカー切断工程では、アンカーホール23,32,38から露出する第1~第3アンカー24,33,39の自由端部25,34,40をカッターを使用して切断する。以上の各工程を完了することでモルタル21の剥離作業が完了する。なお、1回目の剥離工程で剥離作業が完了する場合は、第1剥離工程完了後、直ちに装置取り外し工程を実施する。
 剥離装置10Aは、油圧ジャッキ13のピストンロッド42が一方向前方へ次第に伸長することにともなって、カッター14の刃口50が一方向前方へ向かって次第に前進しつつ、刃口50がコンクリート躯体20から所定厚さのモルタル21を剥がし取るから、モルタル21の切削面とカッター14(刃口50)とが擦れ合うことによる大きな切削音の発生がなく、剥離作業時に発生する音を許容可能な静かな音(音圧レベルが50~80dBの音)にすることができる。
 剥離装置10Aは、油圧ジャッキ13のピストンロッド42からカッター14の刃口50に直線的に力(トルク)が伝達され、刃口50の直進力をモルタル21の剥離箇所に集中させることができ、それによってモルタル21に大きな剥離力が作用するから、剥離するモルタル21の剥離幅や剥離長さ、剥離深さが大きく、強固に施工されたモルタル21であってもそのモルタル21を円滑かつ確実に剥離することができる。
 剥離装置10Aは、油圧ジャッキ13とカッター14とを利用することで、コンクリート躯体20からモルタル21をスムースに剥離することができるから、短期間(短い工期)に効率よく剥離作業を完了することができるのみならず、コンクリート躯体20から一度に広い範囲にわたってモルタル21の剥離を行うことができ、剥離作業を廉価に行うことができる。
 剥離装置10Aは、モルタル21の剥離作業中にコンクリート躯体20に不要な振動が伝わることがないから、コンクリート躯体20にダメージを与えることなく、モルタル21を剥離することができる。また、コンクリート躯体20からモルタル21を高い精度で短期間に満遍なく剥離することができ、剥離作業において粉塵や塵埃の発生が少なく、良好な環境で剥離作業を行うことができる。
 剥離装置10Aは、ピストンロッド42の最大伸長寸法の分の剥離を行った後、取り外した油圧ジャッキ13を一方向前方へ移動させて再び案内部材12に連結し、さらにピストンロッド42の最大伸長寸法の分の剥離を行うことができるから、剥離工程を繰り返して行うことができ、内壁11におけるモルタル21の剥離長さが長い場合であっても、コンクリート躯体20から全てのモルタル21を剥離することができる。剥離装置10Aは、剥離工程を繰り返し行う作業として油圧ジャッキ13を一方向前方へ移動かつ連結させるだけであり、他の作業を伴うことがないから、手間がかからず短期間に効率よくモルタル21の剥離作業を完了することができる。
 図11は、他の一例として示す剥離装置10Bの上面図であり、図12は、図11の剥離装置10Bの斜視図である。図13は、図11の剥離装置10Bの側面図であり、図14は、図11のM-M線矢視断面図である。図11では、一方向(図11に示す建築物では上下方向)を矢印Aで示し、一方向と交差する方向(図11に示す建築物では横方向)を矢印Bで示す。図11,12では、剥離装置10Bを内壁11に設置した状態で示す。図12では、第1固定手段15や案内部材12の前端部29の図示を省略している。
 この剥離装置10Bは、鉄筋コンクリート建築物の内壁11のコンクリート躯体20の外面に施工されたモルタル21(セメント硬化物)の剥離に使用される。剥離装置10Bは、一方向へ延びる2本の案内部材12と、2つの油圧ジャッキ13および2つのカッター14と、第1~第2固定手段15,16および第1~第2連結手段18,19とを備えている。
 それら案内部材12は、横方向へ離間並行して並んでいる。案内部材12は、図1のそれと同様に、一方向へ延びる中空筒状の金属パイプ(鉄パイプやアルミパイプ、ステンレスパイプ等)であり、その断面形状が円形に成形されている。案内部材12は、モルタル21の外面から所定寸法離間するとともにモルタル21の外面と並行するように建築物の内壁11に設置されている。案内部材12は、剥離するモルタル21のその剥離長さ以上の長さ寸法を有する。それら案内部材12には、それを貫通して一方向へ等間隔離間(所定寸法離間)して並ぶ複数の貫通孔22(第1連結手段18)が穿孔されている。案内部材12は、第1および第2固定手段15,16によって内壁11に設置、固定されている。
 第1固定手段15は、一方向へ所定寸法離間して並び、案内部材12のモルタル21の外面から離間する方向への移動を阻止する。第1固定手段15は、内壁11に穿孔されたアンカー穴23に挿入、固定された第1アンカー24と、アンカー穴23から露出するアンカー24の自由端部25に着脱可能に固定された押さえ板26とから形成されている。第1アンカー24は、1本のそれが案内部材12の間に配置されている。
 押さえ板26は、図1の剥離装置10Aに使用したそれと同一であり、その開口27に第1アンカー24の自由端部25が挿通されている。第1アンカー24の自由端部25に形成された雄螺子には、六角ナット28が螺着されている。ナット28によって押さえ板26がモルタル21の外面に向かって押圧され、押さえ板26が第1アンカー24とナット28とによって固定されているとともに、押さえ板26によってそれら案内部材12がモルタル21の外面に向かって押圧されている。
 第2固定手段16は、案内部材12の前端部29に設置され、案内部材12の一方向前方への移動を阻止する。第2固定手段16は、案内部材12の前端部29に当接する第1前端板30と、第1前端板30につながって内壁11(モルタル21)に当接する第2前端板31と、内壁11(コンクリート躯体20およびモルタル21)に穿孔されたアンカーホール32に挿入された第2アンカー33とから形成されている。第1および第2前端板30,31は、剥離装置10Aに使用したそれと同一であり、第2前端板31の貫通孔に第2アンカー33の自由端部34が挿通されている。
 第2アンカー33の自由端部34に形成された雄螺子には、六角ナット28が螺着されている。第1および第2前端板30,31が第2アンカー33と六角ナット28とによって内壁11に固定されている。なお、案内部材12の後端部35(後端)が床スラブに当接しており、案内部材12の一方向後方への移動が床スラブによって阻止されているから、図1の剥離装置10Aと異なり、第3固定手段17の設置が省略されている。
 それら油圧ジャッキ13は、案内部材12とモルタル21との間に位置し、案内部材12の後端部に第1連結手段18を介して着脱可能に連結されている。油圧ジャッキ13は、図1の剥離装置10Aに使用したそれと同一であるから、その説明は省略する。それら第1連結手段18は、油圧シリンダー41の後端部に連結されたスライダー45と、案内部材12に穿孔された貫通孔22およびスライダー45に穿孔された貫通孔46と、連結ピン47とから形成されている。
 スライダー45は、案内部材12の外周面に着脱可能に嵌め込まれた円筒状の筒部材48と、筒部材48の後端部に連結された台座49とから形成されている。筒部材48は、案内部材12の外周面において一方向前方と一方向後方とへ摺動可能である。台座49の内側には油圧シリンダー41の後端部が収納され、溶接によってシリンダー41の後端部が台座49に固定されている。台座49の底壁は、モルタル21の外面に当接している。
 スライダー45の筒部材48を案内部材12の外周面に嵌め込み、貫通孔22,46どうしを一致させた後、それら貫通孔22,46に連結ピン47を挿入することで、油圧ジャッキ13を案内部材12に連結することができる。逆に、連結ピン47をそれら貫通孔22,46から抜き取ることで、油圧ジャッキ13と案内部材12との連結を解除することができる。油圧ジャッキ13と案内部材12との連結を解除した後、スライダー45を一方向前方または一方向後方へスライドさせ、それら貫通孔22,46に連結ピン47を挿入することで、油圧ジャッキ13を案内部材12の所定の箇所に設置することができる。
 カッター14は、刃口50および取付座51から形成され、第2連結手段19を介してピストンロッド42の先端部に着脱可能に連結されている(図5参照)。第2連結手段19は、ピストンロッド42の先端部に穿孔された2つの貫通孔52と、カッター14の取付座51に穿孔された2つの貫通孔53と、連結ピン54とから形成されている。刃口50は、モルタル21の外面から所定深さに位置し、コンクリート躯体20の外面に当接している。
 取付座51の頂部55が案内部材12の外周面に摺動可能に当接し、それによって刃口50のコンクリート躯体20の外面から離間する方向への移動が阻止されている。取付座51の中間部56には、ピストンロッド42の先端部を挿脱可能に挿通する挿通孔58と、ロッド42の先端が当接する当接面59とが形成されている。取付座51の底部59は、モルタル21の外面に当接している。
 ピストンロッド42の先端部を取付座51の挿通孔58に挿入し、ロッド42の先端を取付座51の当接面59に当接させ、貫通孔52,53どうしを一致させた状態で、それら貫通孔52,53に連結ピン54を挿入することで、カッター14をピストンロッド42の先端部に連結することができる。逆に、連結ピン54をそれら貫通孔52,53から抜き取ることで、カッター14とピストンロッド42との連結を解除することができる。カッター14(刃口50)は、油圧ジャッキ13のピストンロッド42が一方向前方に伸長すると、それにともなって一方向前方へ移動し、ロッド42が一方向後方に後退すると、それにともなって一方向後方へ移動する。
 図15は、剥離装置10Bを使用したモルタル21の剥離方法(剥離手順)の一例を示す図であり、図16は、図15から続く剥離方法を示す図である。図17は、図16から続く剥離方法を示す図であり、図18は、図17から続く剥離方法を示す図である。図15では、一方向(図15に示す建築物では上下方向)を矢印Aで示し、一方向と交差する方向(図15に示す建築物では横方向)を矢印Bで示す。それら図に基づいてモルタル21の剥離方法を説明すると、以下のとおりである。図1の剥離装置10Aと同様に、事前にモルタル21を剥離する内壁11の剥離箇所を決定し、モルタル21の剥離幅寸法を決定するとともに、モルタル21の剥離長さ寸法を決定し、モルタル21の剥離深さ寸法を決定する。
 それら寸法を決定した後、モルタル21の剥離箇所にそれら剥離装置10Bを設置する装置設置工程を実施する。ピストンロッド42の先端部を取付座51の挿通孔58に挿入し、ロッド42の先端を取付座51の当接面59に当接させ、貫通孔52,53を一致させた状態で、それら貫通孔52,53に連結ピン54を挿入し、第2連結手段19によってロッド42の先端部にカッター14を連結する。スライダー45の筒部材48を案内部材12の外周面に嵌め込み、貫通孔22,46を一致させた状態で、それら貫通孔22,46に連結ピン47を挿入し、第1連結手段18によって案内部材12に油圧ジャッキ13を連結する(装置準備工程)。
 装置準備工程と並行し、または、装置準備工程によってモルタル剥離装置10Aを準備した後、図15に示すように、コンクリートカッターを利用し、モルタル21の剥離幅の外縁に沿って一方向へ直状に延びる2条の案内溝60を入れる(案内溝作成工程)。案内溝60を作った後、コアドリルを利用し、案内溝60の間の箇所のモルタル21をはつり、その箇所にそれらカッター14が入るカッター設置穴61を穿つ(カッター設置穴作成工程)。案内溝60を作り、カッター設置穴61を作った後、第1および第2固定部材15,16を設置する箇所に円筒状のアンカーホール22,32を穿孔し、それらアンカーホール22,32に第1および第2アンカー24,33を設置、固定する(アンカー固定工程)。
 第1および第2アンカー24,33を各アンカーホール23,32に固定した後、油圧ジャッキ14を連結したそれら案内部材12を案内溝60の横方向中央に第1および第2固定手段15,16を介して設置、固定する(装置固定工程)。それら案内部材12を案内溝60の横方向中央に位置させ、カッター14をカッター設置穴61に位置させるとともに、スライダー45の台座49の底壁を案内溝60の間のモルタル21に当接させる。
 次に、押さえ板26の開口27に第1アンカー24の自由端部25を挿通し、自由端部25に六角ナット28を螺着して押さえ板26を第1アンカー24およびナット28によって強固に固定する。押さえ板26を固定すると、ナット28によって押さえ板26がモルタル21の外面に向かって押圧されるとともに、押さえ板26によって案内部材12がモルタル21の外面に向かって押圧され、部材12が押さえ板26によって固定される(第1固定手段による固定)。
 第1固定手段15によって案内部材12を固定した後、第2前端板31の貫通孔に第2アンカー33の自由端部34を挿通し、第1前端板30を案内部材12の前端部29(前端)に当接させ、貫通孔から露出する第2アンカー33の自由端部34に六角ナット28を螺着し、第2アンカー33および六角ナット28によって第1および第2前端板30,31をモルタル21の外面に固定する。案内部材12の前端部29は、第1および第2前端板30,31によって固定される(第2固定手段による固定)。油圧ジャッキ13を連結した案内部材12を内壁11に固定した図16の状態では、それらジャッキ13に連結されたカッター14の各刃口50が横方向へ揃って並んでいる。
 装置固定工程が完了した後、電動油圧ポンプ44のスイッチをONにし、リモートコントローラによってそれら油圧ジャッキ13を稼働させ、ジャッキ13のピストンロッド42を図16に矢印A1で示す一方向前方へ伸長(前進)させる。このとき、それらピストンロッド42が同期して伸長し、カッター13の各刃口50が横方向へ揃った状態でそれらカッター14が同一の速度で一方向前方へ伸長(前進)する。それによってそれらカッター14が同期して一方向前方へ向かって次第に前進し、カッター14の各刃口50がコンクリート躯体20から所定厚さのモルタル21を次第に剥離する(第1剥離工程)。
 それら油圧ジャッキ13のピストンロッド42を同期させつつ一方向前方へ最大に伸長させ、それらロッド42が伸長した分のモルタル21を剥離した後、ジャッキ13のロッド42を図16に矢印A2で示す一方向後方へ後退させる。それらピストンロッド42を後退させることで、第1剥離工程(1回の剥離工程)が完了する。なお、モルタル21(セメント硬化物)の剥離時に発生する音圧レベルは、50~80dBの範囲にある。その音圧レベルは、騒音計を使用し、その騒音計を剥離装置10Bから1.2m離して測定した値である。剥離装置10Bは、それらカッター14の刃口50が一方向前方へ同期して直進し、刃口50がモルタル21を剥がし取るように作用するから、モルタル21の切削面とカッター14(刃口50)とが擦れ合うことはなく、大きな切削音の発生もない。
 第1剥離工程が完了した後、貫通孔22,46から連結ピン47を抜き取り、案内部材12と油圧ジャッキ13との連結を解除し、スライダー45の筒部材48を案内部材12の外周面において図17に矢印A1で示す一方向前方へ移動させ、油圧ジャッキ13を一方向前方へ移動させる(第1移動工程)。油圧ジャッキ13を一方向前方へ移動させた後、貫通孔22,46に連結ピン47を再び挿入し、案内部材12に油圧ジャッキ13を再度連結し、リモートコントローラによってジャッキ13を稼働させ、それらジャッキ13のピストンロッド42を図18に矢印で示す一方向前方へ伸長(前進)させる。
 このとき、第1剥離工程と同様に、それらピストンロッド42が同期して稼働し、カッター14の各刃口50が横方向へ揃った状態でそれらカッター14が同一の速度で一方向前方へ伸長(前進)する。それによってそれらカッター14が同期して一方向前方へ向かって次第に前進し、カッター14の各刃口50がコンクリート躯体20から所定厚さのモルタル21を次第に剥離する(第2剥離工程)。
 油圧ジャッキ13のピストンロッド42を一方向前方へ最大に伸長させ、それらロッド42が伸長した分のモルタル21を剥離した後、リモートコントローラによって油圧ジャッキ13を稼働させ、ジャッキ13のロッド42を同期させつつ図18に矢印A2で示す一方向後方へ後退させる。それらロッド42を後退させることで、第2剥離工程が完了する。
 第2剥離工程が完了した後、貫通孔23,46から連結ピン47を抜き取り、案内部材12と油圧ジャッキ13との連結を解除し、スライダー45の筒部材48を案内部材12の外周面において一方向前方へ移動させ、油圧ジャッキ13を一方向前方へ移動させる(第2移動工程)。油圧ジャッキ13を一方向前方へ移動させた後、既述の手順で再びモルタル21の剥離作業を行う。モルタル21の剥離長さに応じて移動工程と剥離工程とを繰り返し(第n移動工程、第n剥離工程)、剥離対象のモルタル21の全てを剥離して移動工程と剥離工程とが完了する。
 移動工程と剥離工程とが完了した後、第1アンカー24の自由端部25に螺着した六角ナット28を取り外し、第1アンカー24およびナット28による押さえ板26の固定を解除するとともに、第1アンカー24の自由端部25から押さえ板26を抜き取り、押さえ板26による案内部材12の固定を解除する(第1固定手段による固定の解除)(装置固定解除工程)。
 次に、第2アンカー33の自由端部34に螺着した六角ナット28を取り外し、第2アンカー33および六角ナット28による第1および第2前端板30,31のモルタル21に対する固定を解除するとともに、第1および第2前端板30,31による案内部材12の前端部29の固定を解除する(第2固定手段による固定の解除)(装置固定解除工程)。第1および第2固定手段15,16による固定の解除した後、案内部材12を内壁11から降ろし、剥離装置10Bを剥離箇所から取り外す(装置取り外し工程)。
 装置取り外し工程が完了した後、アンカー切断工程を実施する。アンカー切断工程では、アンカーホール23,32から露出する第1~第3アンカー24,33の自由端部25,34をカッターを使用して切断する。以上の各工程を完了することでモルタル21の剥離作業が完了する。なお、1回目の剥離工程で剥離作業が完了する場合は、第1剥離工程完了後、直ちに装置取り外し工程を実施する。
 剥離装置10Bは、それら油圧ジャッキ13のピストンロッド42が一方向前方へ同期しつつ次第に伸長することにともなって、カッター14の各刃口50が一方向前方へ向かって次第に前進しつつ、それら刃口50がコンクリート躯体20から所定厚さのモルタル21を剥がし取るから、モルタル21の切削面とカッター14(刃口50)とが擦れ合うことによる大きな切削音の発生がなく、剥離作業時に発生する音を許容可能な静かな音にすることができる。
 剥離装置10Bは、それら油圧ジャッキ13のピストンロッド42からカッター14の各刃口50に直線的に力(トルク)が伝達され、それら刃口50の直進力をモルタル21の剥離箇所に集中させることができ、それによってモルタル21に大きな剥離力が作用するから、剥離するモルタル21の剥離幅や剥離長さ、剥離深さが大きく、強固に施工されたモルタル21であってもそのモルタル21を円滑かつ確実に剥離することができる。
 剥離装置10Bは、案内部材12に設置されたそれらカッター14の刃口50を同期させて一方向前方へ前進させるから、刃口50の直進力がそれら刃口50からモルタル21に満遍なく伝達され、横方向の広い範囲にわたってモルタル21を一度に剥離することができ、一度の剥離作業で多くのモルタル21を剥がし取ることができる。
 剥離装置10Bは、それら油圧ジャッキ13を利用することで、コンクリート躯体20から所定厚さのモルタル21をスムースに剥離することができるから、短期間(短い工期)に効率よく剥離作業を行うことができるのみならず、コンクリート躯体20に不要な振動が伝わることがないから、コンクリート躯体20にダメージを与えることなく、モルタル21を剥離することができる。また、コンクリート躯体20から広い面積のモルタル21を高い精度で短期間に満遍なく剥離することができ、剥離作業において粉塵や塵埃の発生が少なく、良好な環境で剥離作業を行うことができる。
 剥離装置10Bは、それらピストンロッド42の最大伸長寸法の分の剥離を行った後、取り外したそれら油圧ジャッキ13を一方向前方へ移動させて再び案内部材12に連結し、さらにピストンロッド42の最大伸長寸法の分の剥離を行うことができるから、剥離工程を繰り返し行うことができ、内壁11におけるモルタル21の剥離長さが長い場合であっても、コンクリート躯体20から全てのモルタル21を剥離することができる。剥離装置10Bは、モルタル剥離工程を繰り返し行う作業としてそれら油圧ジャッキ13を一方向前方へ移動させ、ジャッキ13を案内部材12に連結させるだけであり、他の作業を伴うことがないから、手間がかからず短期間に効率よくモルタル21の剥離作業を完了することができる。
 10A 剥離装置
 10B 剥離装置
 11  内壁
 12  案内部材
 13  油圧ジャッキ(ジャッキ)
 14  カッター
 15  第1固定手段
 16  第2固定手段
 17  第3固定手段
 18  第1連結手段
 19  第2連結手段
 20  コンクリート躯体
 21  モルタル
 22  貫通孔
 23  アンカー穴
 24  第1アンカー
 25  自由端部
 26  押さえ板
 29  前端部
 30  第1前端板
 31  第2前端板
 32  アンカーホール
 33  第2アンカー
 34  自由端部
 35  後端部
 36  第1後端板
 37  第2後端板
 38  アンカーホール
 39  第3アンカー
 40  自由端部
 41  シリンダー
 42  ピストンロッド
 44  電動油圧ポンプ
 45  スライダー
 46  貫通孔
 47  連結ピン
 48  筒部材
 49  台座
 50  刃口
 51  取付座
 52  貫通孔
 53  貫通孔
 54  連結ピン
 60  案内溝
 61  カッター設置穴
 

Claims (13)

  1.  構造物の所定の箇所に施工されたセメント硬化物を剥離する剥離装置において、
     前記剥離装置が、前記セメント硬化物の外面から所定寸法離間するとともに該セメント硬化物の外面と並行して一方向へ延びる案内部材と、前記案内部材の前記セメント硬化物の外面から離間する方向への移動を阻止する第1固定手段と、一方向前方へ伸長可能なピストンロッドを有して前記セメント硬化物と前記案内部材との間に位置するジャッキと、前記ジャッキを前記案内部材に着脱可能に連結する第1連結手段と、前記ピストンロッドの先端部に位置して前記構造物からセメント硬化物を剥離するカッターとから形成され、
     前記剥離装置では、前記ジャッキのピストンロッドが一方向前方へ次第に伸長することにともなって、前記カッターが一方向前方へ向かって次第に前進しつつ、該カッターが前記構造物から所定厚さの前記セメント硬化物を剥離することを特徴とする剥離装置。
  2.  前記剥離装置では、前記ジャッキのピストンロッドを一方向前方へ伸長させた後、該ピストンロッドを一方向後方へ後退させることで1回毎の剥離工程が完了し、最初の剥離工程を行った後、前記ジャッキと前記案内部材との連結を解除するとともに、前記ジャッキを一方向前方へ移動させてそのジャッキを案内部材に再び連結し、次回の剥離工程を行う請求項1に記載の剥離装置。
  3.  前記第1固定手段が、前記構造物に穿孔されたアンカーホールに固定された第1アンカーと、前記アンカーホールから露出する前記第1アンカーの自由端部に着脱可能に固定されて前記案内部材を前記セメント硬化物に向かって押圧する押さえ板とから形成されている請求項1または請求項2に記載の剥離装置。
  4.  前記第1連結手段が、前記ジャッキの後端部に連結されて前記案内部材に沿って一方向へ移動可能なスライダーと、前記案内部材に穿孔されて一方向へ所定寸法離間して並ぶ複数の貫通孔と、前記スライダーに穿孔された貫通孔と、それら貫通孔に挿脱可能に挿入された連結ピンとから形成されている請求項1ないし請求項3いずれかに記載の剥離装置。
  5.  前記剥離装置が、前記カッターを前記ピストンロッドの先端部に着脱可能に連結する第2連結手段を含み、前記第2連結手段が、前記ピストンロッドの先端部に穿孔された貫通孔と、前記カッターに穿孔された貫通孔と、それら貫通孔に挿脱可能に挿入される連結ピンとから形成されている請求項1ないし請求項4いずれかに記載の剥離装置。
  6.  前記剥離装置が、前記案内部材の前端部に設置されて該案内部材の一方向前方への移動を阻止する第2固定手段を含み、前記第2固定手段が、前記案内部材の前端部に当接する第1前端板と、前記第1前端板につながって前記構造物に当接する第2前端板と、前記構造物に穿孔されたアンカーホールに挿入されて前記第2前端板を該構造物に固定する第2アンカーとから形成されている請求項1ないし請求項5いずれかに記載の剥離装置。
  7.  前記剥離装置が、前記案内部材の後端部に設置されて該案内部材の一方向後方への移動を阻止する第3固定手段を含み、前記第3固定手段が、前記案内部材の後端部に当接する第1後端板と、前記第1後端板につながって前記構造物に当接する第2後端板と、前記構造物に穿孔されたアンカーホールに挿入されて前記第2後端板を該構造物に固定する第3アンカーとから形成されている請求項1ないし請求項6いずれかに記載の剥離装置。
  8.  前記カッターが、前記セメント硬化物の外面から所定深さに位置する刃口と、前記刃口につながる取付座とから形成され、前記取付座の頂部が、前記案内部材に摺動可能に当接し、前記カッターの前記セメント硬化物の外面から離間する方向への移動を阻止する請求項1ないし請求項7いずれかに記載の剥離装置。
  9.  前記剥離装置では、前記刃口の一方向と交差する方向の寸法を調節することで、前記構造物から剥離するセメント硬化物の一方向と交差する方向の剥離寸法を調節可能である請求項8に記載の剥離装置。
  10.  前記案内部材が、剥離する前記セメント硬化物のその剥離長さ以上の長さ寸法を有して一方向へ延びる金属パイプである請求項1ないし請求項9いずれかに記載の剥離装置。
  11.  前記セメント硬化物が、前記構造物のコンクリート躯体に施工された所定厚さのモルタルであり、前記剥離装置が、前記コンクリート躯体から前記モルタルを剥離する請求項1ないし請求項10いずれかに記載の剥離装置。
  12.  前記剥離装置では、前記セメント硬化物の剥離時に発生する音圧レベルが50~80dBの範囲にある請求項1ないし請求項11いずれかに記載の剥離装置。
  13.  前記ジャッキが、電動油圧ポンプに接続された油圧ジャッキである請求項1ないし請求項12いずれかに記載の剥離装置。
     
PCT/JP2012/081553 2011-12-06 2012-12-05 剥離装置 WO2013084955A1 (ja)

Priority Applications (4)

Application Number Priority Date Filing Date Title
KR1020147014932A KR101794395B1 (ko) 2011-12-06 2012-12-05 박리 장치
CN201280058301.9A CN104066908B (zh) 2011-12-06 2012-12-05 剥离装置
US14/361,815 US20140345589A1 (en) 2011-12-06 2012-12-05 Peeling device
EP12855517.4A EP2789773A4 (en) 2011-12-06 2012-12-05 PEELING DEVICE

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2011266734A JP5635484B2 (ja) 2011-12-06 2011-12-06 剥離装置
JP2011-266734 2011-12-06

Publications (1)

Publication Number Publication Date
WO2013084955A1 true WO2013084955A1 (ja) 2013-06-13

Family

ID=48574313

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2012/081553 WO2013084955A1 (ja) 2011-12-06 2012-12-05 剥離装置

Country Status (6)

Country Link
US (1) US20140345589A1 (ja)
EP (1) EP2789773A4 (ja)
JP (1) JP5635484B2 (ja)
KR (1) KR101794395B1 (ja)
CN (1) CN104066908B (ja)
WO (1) WO2013084955A1 (ja)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106639264A (zh) * 2016-12-28 2017-05-10 田国华 一种环保型墙面水泥拉毛机

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105888204A (zh) * 2014-12-05 2016-08-24 遵义市美仑空间个性艺术装饰材料中心 一种壁纸剥离刀
JP6562399B2 (ja) * 2015-11-20 2019-08-21 株式会社丸高工業 壁材剥離装置
CN108242273A (zh) * 2017-12-28 2018-07-03 中核四0四有限公司 一种用于放射性混凝土构筑物浅层剥离的装置
CN112081403B (zh) * 2020-09-17 2022-12-09 四川省第一建筑工程有限公司 一种智能建筑外墙清理机

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001081975A (ja) 1999-09-09 2001-03-27 Sato Kogyo Co Ltd コンクリート表面のモルタル剥離方法及びそのためのコンクリートカッター
JP2005002756A (ja) * 2003-06-11 2005-01-06 Misumi Tokushu:Kk モルタル、シリンダーコンクリート層等の仕上材の除去装置
JP2011153500A (ja) * 2010-01-28 2011-08-11 Nippon Project Kk モルタル層の剥離方法

Family Cites Families (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2967364A (en) * 1959-10-23 1961-01-10 Caterpillar Tractor Co Bulldozer blade support and angling adjustment
DE2254525A1 (de) * 1972-11-08 1974-05-09 Karl M Mayer Vorrichtung zum saeubern, ent-, verputzen und bemalen der aussenfassaden von bauwerken
DE2356527A1 (de) * 1973-11-13 1975-05-22 Voegele Ag J Vorrichtung zur herstellung von nuten, insbesondere zur aufnahme von dauermarkierungen, in strassendecken
US4484559A (en) * 1982-03-01 1984-11-27 Mcdermott Incorporated Apparatus for removing material such as concrete from underwater pipelines
CN85102514B (zh) * 1985-04-08 1986-11-05 核工业部建筑机械开发公司 预应力混凝土空心板单板成型挤压机
DE3722546A1 (de) * 1987-07-08 1989-01-26 Singh Amar Jit Verfahren zum schneiden, ritzen oder abloesen von stoffen, z. b. bauteilen
JPH0696914B2 (ja) * 1988-06-16 1994-11-30 東京オートマック株式会社 高速振動を利用した剥離方法及びその装置
DE3916186A1 (de) * 1989-05-18 1990-11-29 Siemens Ag Vorrichtung und verfahren zum entfernen einer schicht an einer behaelterwand
JP4284693B2 (ja) * 2000-08-28 2009-06-24 株式会社大林組 コンクリート躯体表面のモルタル層の剥離装置
KR20020045175A (ko) * 2000-12-08 2002-06-19 조대연 고강도 긴장재를 이용한 콘크리트 구조물의 보수, 보강 방법
CN2535212Y (zh) * 2002-04-02 2003-02-12 曹利华 墙体切割机
JP2005067143A (ja) * 2003-08-27 2005-03-17 Ohbayashi Corp 表面剥離装置
CN201808129U (zh) * 2010-09-15 2011-04-27 山东省交通规划设计院 混凝土衬砌切割装置

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001081975A (ja) 1999-09-09 2001-03-27 Sato Kogyo Co Ltd コンクリート表面のモルタル剥離方法及びそのためのコンクリートカッター
JP2005002756A (ja) * 2003-06-11 2005-01-06 Misumi Tokushu:Kk モルタル、シリンダーコンクリート層等の仕上材の除去装置
JP2011153500A (ja) * 2010-01-28 2011-08-11 Nippon Project Kk モルタル層の剥離方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP2789773A4

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106639264A (zh) * 2016-12-28 2017-05-10 田国华 一种环保型墙面水泥拉毛机

Also Published As

Publication number Publication date
US20140345589A1 (en) 2014-11-27
EP2789773A1 (en) 2014-10-15
KR101794395B1 (ko) 2017-11-06
CN104066908A (zh) 2014-09-24
JP5635484B2 (ja) 2014-12-03
KR20140096102A (ko) 2014-08-04
EP2789773A4 (en) 2015-10-21
JP2013119707A (ja) 2013-06-17
CN104066908B (zh) 2016-05-18

Similar Documents

Publication Publication Date Title
JP5635484B2 (ja) 剥離装置
JP7092288B2 (ja) 構造物の補強工法
CN104669449B (zh) 一种钻孔装置和钢筋混凝土支撑梁的切割方法
CN203626615U (zh) 直扩型扩孔钻
JP5635485B2 (ja) モルタル剥離方法
KR102120971B1 (ko) 회동 암파쇄장치 및 이를 이용한 암파쇄 방법
CN100507174C (zh) 预应力空心楼板吊杆pvc套管预埋施工方法
JP3867197B2 (ja) 地中壁の打ち継ぎ部施工方法、並びに地中壁の打ち継ぎ部形成具撤去装置
CN102288466B (zh) 岩体试样的制备方法
JP2009235807A (ja) 地下構造物の解体撤去工法
CN211647234U (zh) 悬挑式脚手架
WO2014065180A1 (ja) 剥離装置
CN219638369U (zh) 一种盘扣式外架连墙件
CN204622344U (zh) 一种用于切割钢筋混凝土支撑梁的钻孔装置
CN100410451C (zh) 新老混凝土结合面人工键槽施工方法
CN221053753U (zh) 一种水渠模板隔距装置
JP2006070582A (ja) 建物の免震化工法
CN217840851U (zh) 一种混凝土结构预埋螺杆的定位装置
JP6488493B2 (ja) 接着剤剥離装置
JP2003211313A (ja) ロックリング挿入孔穿孔機
CN202141623U (zh) 多功能岩体试验制件机
CN105735631A (zh) 一种悬挑脚手架钢梁锚固装置
WO2023094114A1 (en) Drilling device
JP2000017658A (ja) 既製杭建込み工法およびその装置
CN114215055A (zh) 一种扩大头锚索/杆施工装置及方法

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 12855517

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 14361815

Country of ref document: US

ENP Entry into the national phase

Ref document number: 20147014932

Country of ref document: KR

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

REEP Request for entry into the european phase

Ref document number: 2012855517

Country of ref document: EP