CN100507174C - 预应力空心楼板吊杆pvc套管预埋施工方法 - Google Patents

预应力空心楼板吊杆pvc套管预埋施工方法 Download PDF

Info

Publication number
CN100507174C
CN100507174C CNB2007102033550A CN200710203355A CN100507174C CN 100507174 C CN100507174 C CN 100507174C CN B2007102033550 A CNB2007102033550 A CN B2007102033550A CN 200710203355 A CN200710203355 A CN 200710203355A CN 100507174 C CN100507174 C CN 100507174C
Authority
CN
China
Prior art keywords
suspension rod
sleeve
sleeve pipe
prestressed hollow
hollow slab
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNB2007102033550A
Other languages
English (en)
Other versions
CN101200950A (zh
Inventor
洪学工
赵春国
杨国
秦国岩
董建伟
马建萍
庄青松
孙健
云洪翔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Third Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd, Third Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CNB2007102033550A priority Critical patent/CN100507174C/zh
Publication of CN101200950A publication Critical patent/CN101200950A/zh
Application granted granted Critical
Publication of CN100507174C publication Critical patent/CN100507174C/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

一种预应力空心楼板吊杆PVC套管预埋施工方法,其步骤为:在预应力空心楼板制作时首先综合考虑并设计各专业设备的位置;在模板上标出设备管线安装用吊杆的位置;在模板内铺设结构钢筋后,将套管与模板垂直设置在上述标出的吊杆的位置,将套管与结构钢筋固定;然后浇筑混凝土,将套管预埋在预应力空心楼板内;待混凝土强度达到所需要求后拆除模板,将吊杆穿入套管内,吊杆的上端通过紧固装置固定在楼板的上表面;最后进行楼板面层的施工。利用钢筋插杆防止柔性套管的变形,并保证套管的垂直度,正式吊杆安装前取出钢筋插杆。此方法不会对结构造成损伤,不会影响结构质量和美观。解决了楼板与管线快速安装的问题。

Description

预应力空心楼板吊杆PVC套管预埋施工方法
技术领域:
本发明涉及一种预应力空心楼板的施工方法。建筑工程楼板上的用于专业设备的吊杆安装的预设结构和其具体的施工方法。
背景技术:
目前,预应力结构形式在工程中得到越来越广泛的应用,但同时也给生根于预应力结构上的机电设备管线安装带来了困难。机电设备管线一般包括线槽、导管、风管、喷淋管等等,这些管线一般由吊杆固定在楼板下方。但是,现有的预应力空心楼板的施工方法在施工未考虑机电设备管线安装问题,只能在装修工程中使用电气工具将吊杆与楼板固定,这样不仅削弱了结构强度、影响结构质量和美观,还费工费时、延误了工期,使后续机电设备管线安装十分不便。
发明内容:
本发明的目的是提供一种预应力空心楼板吊杆PVC套管预埋施工方法,要解决预应力空心楼板与机电设备管线快速安装的问题。
本发明的技术方案:
这种预应力空心楼板吊杆PVC套管预埋施工方法,其特征在于施工步骤为:在预应力空心楼板制作时首先综合考虑并设计各专业设备的位置;在模板上标出专业设备管线安装用吊杆的位置,该位置要避开楼板内的孔洞;在模板内铺设结构钢筋后,将套管1与模板垂直设置在上述标出的吊杆的位置,将套管1与结构钢筋固定,作为正式吊杆安装时的穿入孔;然后浇筑混凝土,将套管1预埋在预应力空心楼板内;待混凝土强度达到所需要求后拆除模板,将吊杆3穿入套管1内,吊杆3从楼板上经套管1穿至楼板下,吊杆3的上端通过紧固装置固定在预应力空心楼板5的上表面;最后进行楼板面层4的施工。
上述紧固装置可为垫板6、垫圈7、螺母8,吊杆3的上端部有丝扣,垫板、垫圈依次穿过吊杆后,用螺母拧在吊杆上端部的丝扣上。
上述套管1可为或柔性套管或刚性金属套管。
上述柔性套管可为PVC套管或橡胶套管。
上述当套管为柔性套管时,在套管与结构钢筋固定后,在套管中插入钢筋插杆2,并在拆除模板之前将钢筋插杆拔出。
本发明是基于预应力楼板对吊杆施工要求高,不能造成结构损伤的工程特点,并借鉴传统的吊杆施工方法而进行的一项改进和创新。其施工方法是将要预埋的套管在结构施工时放入,做为正式吊杆安装时的穿入孔,吊杆从楼板上经套管穿至楼板下,其上端固定于楼板上。其工艺原理是根据吊杆安装特点,并结合预应力楼板的结构特征,综合预应力楼板下所有机电管线的布置情况,按照施工图和施工规范要求,对机电各专业管线进行必要的综合排布和深化设计,根据深化设计图精确确定出这些管线的安装位置,从而确定出吊杆的位置,再根据所有吊杆的位置绘制吊杆的综合排布图,并按图纸位置在预应力楼板施工的同时,预埋出吊杆的套管,为管线施工时的吊杆安装打下基础。吊杆套管施工法为一种新型的吊杆生根施工方法,尤其适用于吊杆生根于预应力楼板的情况。方法中,套管为正式吊杆安装时的穿入孔,吊杆从板上经套管穿至楼板下,固定于板上;钢筋插杆用于防止柔性套管的变形,并保证套管的垂直度,正式吊杆安装前将插杆取出。
本发明的施工方法适用于预应力楼板以及对结构工程质量要求较高的工程上的吊杆施工,吊杆下端可用于连接线槽、导管、风管、喷淋管等机电设备管线,应用此方法进行机电吊杆作业,不会对结构造成损伤,不会影响结构质量和美观。
附图说明:
图1是预应力空心楼板中套管和钢筋插杆示意图;
图2是预应力空心楼板安装吊杆后的示意图。
1—套管,2—钢筋插杆,3—吊杆,4—楼板面层,5—预应力空心楼板,6—垫板,7—垫圈,8—螺母。
具体实施方式:
参见图1、图2,这种预应力空心楼板吊杆PVC套管预埋施工方法,其特征在于施工步骤为:
在预应力空心楼板制作时首先综合考虑并设计各专业设备的位置;在模板上标出专业设备管线安装用吊杆的位置;在模板内铺设结构钢筋后,将套管1与模板垂直设置在上述标出的吊杆的位置,该位置要避开楼板内的孔洞。预应力楼板施工前,应认真分析施工图和施工规范规定,对涉及的部分管线进行必要的优化设计并绘制综合图。综合图绘制完成后,进行认真细致的审核,及时修正,确保综合图的严密性和可实施性,并最终确定正式综合排布图,根据综合排布图确定出所有吊杆的预埋位置。
按综合排布图的要求将其它专业用的套管和钢筋插杆全部加工完成。
套管正式预埋前,在土建铺好楼板模板后进入施工现场在模板上使用测量仪和钢卷尺进行放线作业以确定套管预埋点,放线参照点为预埋点最近处墙体、梁或柱体的中心线,而后用弹出十字定位线,并在预埋点旁标注好套管规格和专业。施工过程中,严格定位操作,确保定位精确。
而后,将套管1与结构钢筋固定,作为正式吊杆安装时的穿入孔。在土建绑扎楼板钢筋同时进行吊杆套管的预埋作业。首先,按照模板上的定位点确定预埋位置,然后,采用将套管与结构钢筋进行固定,对于柔性套管要在其中插入钢筋插杆2,并封堵好管口。
全部预埋作业完成后,浇筑混凝土,将套管1预埋在预应力空心楼板内。在楼板浇注混凝土过程中应全程进行监控,以防浇注混凝土过程中损坏套管。
待混凝土强度达到所需要求后拆除模板,对于柔性套管在拆掉模板前,应取出套管内的钢筋插杆,在以后的结构施工时循环使用。
参见图2,进入安装阶段后,根据前述综合管线排布图仔细核对,在楼板面层施工之前,将加工好的吊杆3插入预留的套管1中,吊杆3从楼板上经套管1穿至楼板下,吊杆3的上端通过紧固装置固定在预应力空心楼板5的上表面,并使用紧固装置固定。
上述紧固装置为垫板6、垫圈7、螺母8等,吊杆3的上端部有与螺母配合的丝扣,垫板、垫圈依次穿过吊杆后,用螺母拧在吊杆上端部的丝扣上。这样就把吊杆固定在了楼板上。
最后进行楼板面层4的施工,吊杆3的上端和紧固装置均被隐蔽于楼板面层内。
上述套管1可为或柔性套管或刚性金属套管。柔性套管为PVC套管、橡胶套管或其它高分子塑料套管。
当套管1为柔性套管时,在套管与结构钢筋固定后,在套管中插入钢筋插杆2,以保证套管的垂直,并在拆除模板之前将钢筋插杆2拔出。
本发明的工艺流程是,绘制综合图——材料准备——预制加工——结构施工时配合预埋套管——验收保护。

Claims (5)

  1. 【权利要求1】一种预应力空心楼板吊杆PVC套管预埋施工方法,其特征在于施工步骤为:在预应力空心楼板制作时首先综合考虑并设计各专业设备的位置;在模板上标出专业设备管线安装用吊杆的位置,该位置要避开楼板内的孔洞;在模板内铺设结构钢筋后,将套管(1)与模板垂直设置在上述标出的吊杆的位置,将套管(1)与结构钢筋固定,作为正式吊杆安装时的穿入孔;然后浇筑混凝土,将套管(1)预埋在预应力空心楼板内;待混凝土强度达到所需要求后拆除模板,将吊杆(3)穿入套管(1)内,吊杆(3)从楼板上经套管(1)穿至楼板下,吊杆(3)的上端通过紧固装置固定在预应力空心楼板(5)的上表面;最后进行楼板面层(4)的施工。
  2. 【权利要求2】如权利要求1所述的预应力空心楼板吊杆PVC套管预埋施工方法,其特征在于:上述紧固装置为垫板(6)、垫圈(7)、螺母(8),吊杆(3)的上端部有丝扣,垫板、垫圈、螺母依次穿过吊杆后,用螺母拧在吊杆上端部的丝扣上。
  3. 【权利要求3】如权利要求1所述的预应力空心楼板吊杆PVC套管预埋施工方法,其特征在于:上述套管(1)为或柔性套管或刚性金属套管。
  4. 【权利要求4】如权利要求3所述的预应力空心楼板吊杆PVC套管预埋施工方法,其特征在于:上述柔性套管为PVC套管或橡胶套管。
  5. 【权利要求5】如权利要求1所述的预应力空心楼板吊杆PVC套管预埋施工方法,其特征在于:上述当套管为柔性套管时,在套管与结构钢筋固定后,在套管中插入钢筋插杆(2),并在拆除模板之前将钢筋插杆拔出。
CNB2007102033550A 2007-12-24 2007-12-24 预应力空心楼板吊杆pvc套管预埋施工方法 Expired - Fee Related CN100507174C (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2007102033550A CN100507174C (zh) 2007-12-24 2007-12-24 预应力空心楼板吊杆pvc套管预埋施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2007102033550A CN100507174C (zh) 2007-12-24 2007-12-24 预应力空心楼板吊杆pvc套管预埋施工方法

Publications (2)

Publication Number Publication Date
CN101200950A CN101200950A (zh) 2008-06-18
CN100507174C true CN100507174C (zh) 2009-07-01

Family

ID=39516290

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2007102033550A Expired - Fee Related CN100507174C (zh) 2007-12-24 2007-12-24 预应力空心楼板吊杆pvc套管预埋施工方法

Country Status (1)

Country Link
CN (1) CN100507174C (zh)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107905527A (zh) * 2017-11-30 2018-04-13 上海宝冶集团有限公司 装配箱式楼板预留洞口吊模封堵方法
CN111236441B (zh) * 2020-01-14 2021-06-11 中国建筑第八工程局有限公司 墙板与主体结构的连接结构及其施工方法
CN111155698A (zh) * 2020-01-17 2020-05-15 南京金星宇节能技术有限公司 天棚辐射系统吊顶预埋件及其施工方法
CN113309284B (zh) * 2021-04-25 2022-11-01 广州地铁设计研究院股份有限公司 高容差度多重组合悬挂连接节点与实施方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001173211A (ja) * 1999-12-13 2001-06-26 Nippon Steel Metal Prod Co Ltd フリーアクセスフロアパネル用支持脚
JP2006508396A (ja) * 2002-11-27 2006-03-09 デザイン アンド デリバー、インコーポレイテッド 引込可能な自己水平化式の天井サイン懸吊装置
CN1827968A (zh) * 2002-04-30 2006-09-06 邱则有 一种钢筋砼用立体承力模壳

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001173211A (ja) * 1999-12-13 2001-06-26 Nippon Steel Metal Prod Co Ltd フリーアクセスフロアパネル用支持脚
CN1827968A (zh) * 2002-04-30 2006-09-06 邱则有 一种钢筋砼用立体承力模壳
JP2006508396A (ja) * 2002-11-27 2006-03-09 デザイン アンド デリバー、インコーポレイテッド 引込可能な自己水平化式の天井サイン懸吊装置

Also Published As

Publication number Publication date
CN101200950A (zh) 2008-06-18

Similar Documents

Publication Publication Date Title
CN103410332B (zh) 一种混凝土空心砌块加筋墙施工工艺
CN103061504B (zh) 混凝土板管道安装预留洞施工模具及施工方法
CN103485537B (zh) 超高层水平二次结构预埋钢筋施工方法及其结构
CN205296798U (zh) 挑架型钢预埋固定装置
CN103643971B (zh) 隧道仰拱定型端模快速施工方法
CN100507174C (zh) 预应力空心楼板吊杆pvc套管预埋施工方法
CN102758451A (zh) 混凝土电缆沟施工工艺
CN105019651B (zh) 空心砖填充墙成排线盒高效安装施工工法
CN103397658A (zh) 一种背靠砖混挡土墙的单侧支模体系及施工方法
CN110821156A (zh) 一种下沉式卫生间吊模结构及其施工方法
RU83517U1 (ru) Грунтовый анкер
CN110552370A (zh) 基于逆作法的环形内衬墙整体单边支模施工方法
CN205654089U (zh) 一种管道穿楼板预留洞定位装置
CN103510537A (zh) 塔式起重机基础与建筑地下室底板结合的施工方法
CN102865087B (zh) 一种硐室衬砌混凝土内预埋灌浆导管装置及施工方法
CN205822792U (zh) 一种用于砌体直埋的调节支架
CN104727339A (zh) 电力设备基础两步式施工方法
CN107288341A (zh) 一种预留孔洞成形装置及施工方法
CN106284978A (zh) 一种变形缝两侧剪力墙同步施工工艺及定型化模板
CN108979205B (zh) 超高层住宅结构错层流水施工方法
CN210190135U (zh) 一种预制板吊装预埋件定位装置
CN105735487A (zh) 一种墙拉筋组件
CN205343431U (zh) 预制墙体灌浆套筒条状密排外露钢筋精确定位模具
CN105256931A (zh) 现浇钢筋混凝土板裂缝控制方法
CN211817000U (zh) 一种构造柱钢筋定位机构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: ZHONGJIAN 8TH BUREAU 3ED CONSTRUCTION CO., LTD.;

Free format text: FORMER OWNER: ZHONGJIAN 8TH BUREAU 3ED CONSTRUCTION CO., LTD.

Effective date: 20080912

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20080912

Address after: Beijing city Fengtai District Haiying Road No. 6 Building No. 30 hospital post encoding: 100070

Applicant after: Zhongjian two Bureau Third Construction Engineering Co., Ltd.

Co-applicant after: China Construction Second Engineering Bureau Co., Ltd.

Address before: Beijing city Fengtai District Haiying Road No. 6 Building No. 30 hospital post encoding: 100070

Applicant before: Third Construction Engineering Co., Ltd. of China Construction Second Engineering Bureau

C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: Beijing layered construction decoration Engineering Technology Co., Ltd.

Assignor: Third Construction Engineering Co., Ltd. of China Construction Second Engineering Bureau|China Construction Second Engineering Bureau Co., Ltd.

Contract fulfillment period: 2009.10.15 to 2015.10.15

Contract record no.: 2009110000247

Denomination of invention: Pre-embedded construction method for PVC casing pipe of prestressed hollow slab hanger rod

Granted publication date: 20090701

License type: Exclusive license

Record date: 20091021

LIC Patent licence contract for exploitation submitted for record

Free format text: EXCLUSIVE LICENSE; TIME LIMIT OF IMPLEMENTING CONTACT: 2009.10.15 TO 2015.10.15; CHANGE OF CONTRACT

Name of requester: BEIJING JINBI CONSTRUCTION ENGINEERING TECHNOLOGY

Effective date: 20091021

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090701

Termination date: 20171224