WO2013073203A1 PCT/JP2012/050944 JP2012050944W WO2013073203A1 WO 2013073203 A1 WO2013073203 A1 WO 2013073203A1 JP 2012050944 W JP2012050944 W JP 2012050944W WO 2013073203 A1 WO2013073203 A1 WO 2013073203A1
Authority
WO
WIPO (PCT)
Prior art keywords
converter
power
inverter
crane
switching
Prior art date
Application number
PCT/JP2012/050944
Other languages
English (en)
French (fr)
Inventor
昇 藤澤
靖隆 須磨
Original Assignee
三菱重工マシナリーテクノロジー株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 三菱重工マシナリーテクノロジー株式会社 filed Critical 三菱重工マシナリーテクノロジー株式会社
Priority to CN201280012654.5A priority Critical patent/CN103429521B/zh
Publication of WO2013073203A1 publication Critical patent/WO2013073203A1/ja

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C13/00Other constructional features or details
    • B66C13/18Control systems or devices
    • B66C13/22Control systems or devices for electric drives

Definitions

  • the present invention relates to a crane, a control method thereof, and a control program.
  • FIG. 4 is a schematic diagram showing an example of the crane inverter device described in Patent Document 2 below.
  • the inverter control circuit 290 turns on the contact element 210 only during the charging period of the smoothing capacitor 260, and releases (cuts off) the contact element 210 during the operation of the inverter 270, and causes an abnormality during the inverter operation. When it occurs, the main contactor 240 is released.
  • a technique has been proposed in which the current limiting resistor 250, the smoothing capacitor 260, and the inverter 270 are disconnected from the power supply circuit and the inverter 270 is stopped when the main contactor 240 is urgently cut off when an abnormality occurs.
  • the present invention has been made in view of such circumstances, and an object thereof is to provide a crane capable of quickly stopping an inverter when an abnormality occurs, a control method thereof, and a control program.
  • a first aspect of the present invention includes a motor, an inverter provided corresponding to the motor, a converter that converts AC power supplied from an AC power source into DC power, and supplies the DC power to the inverter.
  • a power consuming means connected between the converter and the inverter for consuming DC power of the converter, and connected between the power consuming means and the converter, and based on a state of the inverter, the power It is a crane provided with the 1st switching means which switches connection and disconnection with a consumption means and the said converter.
  • the converter that converts AC power supplied from the AC power source into DC power is When the converted DC power is supplied to the inverter and the first switching means is in the connected state, the converter supplies DC power to the power consuming means.
  • the connection and disconnection of the first switching means are made based on the state of the inverter.
  • the supply destination of the DC power supplied from the converter can be easily switched. If the inverter fails, the inverter cannot be disconnected from the converter until there is no remaining charge on the capacitor provided in the converter, but the first switching means is connected and the remaining charge on the capacitor is supplied to the power consuming means. As a result, the residual charge can be consumed more quickly than in the case of waiting for spontaneous discharge, so that the inverter can be quickly disconnected from the converter. Thereby, the recovery time of a crane can be shortened. In particular, in the case of a ladle crane, there is a danger that the crane will become hot due to heating from the blast furnace, causing equipment failure, and enormous loss will occur when the crane is stopped. Shortening the time taken to reduce the recovery time can contribute to reducing the loss.
  • the first switching means of the crane is in a connected state when the inverter needs to be disconnected from the converter side, and is in a failed state where the inverter does not need to be disconnected from the converter side. In some cases, it is preferable to be separated.
  • the inverter When the inverter is in a fault state that needs to be disconnected from the converter side, the DC power from the converter is supplied to the current consumption means via the first switching means, so that the residual charge of the capacitor provided in the converter Can be quickly discharged to the current consuming means, whereby the inverter can be disconnected quickly.
  • the failure of the inverter or converter indicates that the numerical information such as the current value and voltage value on the secondary side is greater than or equal to a predetermined value (or less than the predetermined value), or signal information such as a signal answerback has been acquired. Judgment is made based on whether or not a desired value is obtained.
  • failure state that needs to be disconnected from the converter side and the failure state that does not need to be disconnected may be sequentially determined (determined) manually by an operator who operates the crane or the like. It may be determined (determined) automatically by the system (program) based on correspondence information that associates the state with the necessity of separation.
  • the crane includes second switching means for switching between connection and disconnection of the AC power source and the converter, and the second switching means is in a fault state where the inverter needs to be disconnected from the converter side. In some cases, it is preferable to be in a disconnected state.
  • the first switching unit When the inverter is in a failure state that needs to be disconnected from the converter side, the first switching unit is connected. However, by disconnecting the second switching unit, the power of the AC power supply is continuously increased. It is possible to prevent a failure of the power consuming means caused by being supplied to the power consuming means.
  • the crane includes an interlock unit that prevents the first switching unit and the second switching unit from being connected simultaneously. Since the first switching unit and the second switching unit are not simultaneously connected by the interlock unit, it is possible to prevent a failure of the power consuming unit.
  • an electric power measurement unit may be provided between the converter and the first switching unit. Thereby, an operator can grasp
  • a motor an inverter provided corresponding to the motor, a converter that converts AC power supplied from an AC power source into DC power, and supplies the DC power to the inverter.
  • a first switching means connected between the converter and a power consuming means connected between the converter and the inverter and consuming DC power of the converter.
  • a crane control method that switches connection and disconnection between the power consuming means and the converter based on the state of the inverter.
  • a motor an inverter provided corresponding to the motor, a converter that converts AC power supplied from an AC power source into DC power, and supplies the DC power to the inverter.
  • a control program for a crane comprising: a first switching means connected between the converter and a power consumption means connected between the converter and the inverter and consuming DC power of the converter; And a crane control program for causing a computer to switch connection and disconnection between the power consuming means and the converter based on the state of the inverter.
  • the present invention has an effect that when the abnormality occurs, the crane inverter is quickly stopped and can be quickly disconnected from the circuit.
  • FIG. 1 is a circuit diagram showing an example of a circuit configuration of a crane according to the first embodiment of the present invention.
  • Second switching units (second switching means) MC2a and MC2b that are turned on and off, and the control device 20 are provided.
  • the circuit configuration is connected to a power supply 10 that supplies power from the upstream side of the second switching units MC2a and MC2b.
  • the motors 11a to 11f are described as the motor 11, the inverters 12a to 12f as the inverter 12, the converters 13a and 13b as the converter 13, and the second switching units MC2a and MC2b as the second switching unit MC2. .
  • the motor 11 is provided corresponding to various devices (main winding device, traversing device, auxiliary winding device, traveling device).
  • the inverter 12 is provided in association with each motor 11.
  • the second switching unit MC2 switches between connection and disconnection between the AC power supply 10 and the converter 13, and is in a disconnected state when the inverter 12 is in a failure state that needs to be disconnected from the converter 13 side.
  • Converter 13 converts AC power supplied from power supply 10 into DC power, and supplies DC power to inverter 12. Further, the converter 13 has a smoothing capacitor (not shown).
  • main winding motors 11a and 11b are motors for driving the main winding device
  • a traversing motor 11c is a motor for driving the traversing device
  • an auxiliary winding motor 11d is a motor for driving the auxiliary winding device.
  • the traveling motors 11e and 11f are motors that drive the traveling device. Since the main winding device and the traveling device require a large output, two motors 11 are provided in each of the ladle cranes described in the present embodiment.
  • the inverter 12a converts the voltage supplied from the power supply 10 into an AC voltage having a frequency suitable for rotating the main winding motor 11a.
  • the inverter 12b converts the voltage supplied from the power supply 10 into an AC voltage having a frequency suitable for rotating the main winding motor 11b.
  • the inverter 12c converts the voltage supplied from the power supply 10 into an AC voltage having a frequency suitable for rotating the traverse motor 11c.
  • the inverter 12d converts the voltage supplied from the power source 10 into an AC voltage having a frequency suitable for rotating the auxiliary winding motor 11d.
  • the inverters 12e and 12f convert the voltage supplied from the power source 10 into an AC voltage having a frequency suitable for rotating the traveling motors 11e and 11f.
  • the control device 20 includes a first switching unit (first switching unit) MC1, a power consumption unit (power consumption unit) 21, an interlock (interlock unit) 22, and a power measurement unit (power measurement unit) 23.
  • First switching unit MC ⁇ b> 1 is connected between power consumption unit 21 and converter 13, and switches connection and disconnection between power consumption unit 21 and converter 13 based on the state of inverter 12. Specifically, the first switching unit MC1 is brought into a connected state when the inverter 12 is in a fault state that needs to be disconnected from the converter 13 side. In addition, the first switching unit MC1 is in a disconnected state when the inverter 12 does not need to be disconnected from the converter 13 side, and when the inverter 12 is in operation (that is, not in failure).
  • the failure is desired such as whether the numerical information such as the current value and voltage value on the secondary side is greater than or equal to a predetermined value (or less than the predetermined value), or signal information such as a signal answerback has been acquired. Judgment is made based on whether or not the information is obtained.
  • the failure state that needs to be disconnected from the converter side and the failure state that does not need to be disconnected may be sequentially judged (determined) manually by an operator who operates the crane, It may be determined (determined) automatically by the system (program) based on correspondence information that associates the state with the necessity of separation. Further, the failure state that needs to be disconnected from the converter side is, for example, a failure such as an internal ground fault or a fuse blown.
  • the power consumption unit 21 is connected between the converter 13 and the inverter 12 and consumes the DC power of the converter 13.
  • Examples of the power consuming unit 21 include a resistor, a capacitor, a projector connected via an inverter provided for a projector, a storage battery, and the like.
  • the case where the resistor is a resistor will be described as an example.
  • the interlock unit 22 prevents the first switching unit MC1 and the second switching unit MC2 from being connected at the same time. Thereby, when the second switching unit MC2 and the first switching unit MC1 are both connected, the power from the power source 10 is continuously supplied to the resistor (power consumption unit 21), so that the resistor is Prevent damage.
  • the power measuring unit 23 is provided between the converter 13 and the first switching unit MC1, and measures power information (current value, voltage value, power value, etc.) between the converter 13 and the first switching unit MC1. Further, the power measuring unit 23 outputs the measurement result to the output device 30 such as a monitoring device monitored by the operator. Thereby, the operator can grasp the progress of the discharge, the state of voltage drop, etc. by confirming the contents presented on the output device 30 (for example, numerical values and diagrams displayed on the display). This leads to prevention of electric shock.
  • the output device 30 such as a monitoring device monitored by the operator.
  • control device 20 When the control device 20 acquires the disconnection command, the control device 20 proceeds to a step of disconnecting the inverter 12 from the converter 13 side, and sets the second switching unit MC2 on the upstream side of the converter 13 to the disconnection state (off state) (step SA2). The power supply from the upstream side of the converter 13 is stopped.
  • the first switching unit MC1 is brought into a connected state (on state) (step SA3).
  • the power consuming unit 21 and the converter 13 are connected, and the charge accumulated in the capacitor on the capacitor 13 side is supplied to the resistor via the first switching unit MC1 and discharged.
  • the measurement result of the power information of the power measuring unit 23 is output to the output device 30 (step SA4), and this process is terminated.
  • the output device 30 power information between the converter 13 and the power consumption unit 21 is presented. Based on the power information such as the voltage value presented to the output device 30, the operator can grasp whether or not the discharge has been completed, the voltage drop state, and the like.
  • the control device 20 includes a main storage device such as a CPU and a RAM, and a computer-readable recording medium in which a program for realizing all or part of the above processing is recorded.
  • the CPU reads out the program recorded in the storage medium and executes information processing / arithmetic processing, thereby realizing processing similar to that of the control device described above.
  • the computer-readable recording medium means a magnetic disk, a magneto-optical disk, a CD-ROM, a DVD-ROM, a semiconductor memory, or the like.
  • the computer program may be distributed to the computer via a communication line, and the computer that has received the distribution may execute the program.
  • Step SB2 the control device 20 determines whether or not it is necessary to disconnect the inverter 12 from the converter 13 side based on the failure signal.
  • Step SB3 the second switching unit MC2 is disconnected (off state)
  • step SB3 the power supply 10 on the upstream side of the converter 13 is turned off. Stop the power supply.
  • the first switching unit MC1 is set in the connected state, and the power consuming unit 21 and the converter 13 are connected (step SB4). If it does so, the electric charge accumulate
  • the determination as to whether or not to disconnect the inverter 12 from the converter 13 side is performed when it is determined that the failure needs to be disconnected by the operator. It may be performed manually by a member or may be performed automatically by a control program. Further, when the inverter 12 is automatically disconnected from the converter 13 side, correspondence information that associates the failure signal (failure content) of the inverter 12 with the necessity of disconnection from the converter 13 side is provided, and the correspondence information is provided. By determining whether or not to detach based on the above, quick control can be performed.
  • the supply destination of the DC power supplied from the converter 13 is switched by switching the connection and disconnection of the first switching unit MC1. Easy switching. If the inverter 12 fails, the inverter 12 cannot be disconnected from the converter 13 until the capacitor 13 provided with the converter 13 has no residual charge. However, the first switching unit MC1 is connected to reduce the residual charge of the capacitor. By supplying power to the power consuming unit 21, it is possible to quickly consume residual charges as compared with the case of waiting for spontaneous discharge, and thus the inverter 12 can be quickly disconnected from the converter 13 side. In addition, it takes 15 minutes or more to make the charge in the capacitor zero by natural discharge, although it depends on the device configuration. When discharged by the power consuming unit 21 according to the present embodiment, the process is completed in about several seconds, so that it is possible to shorten the time from the detection of the inverter failure until the disconnection.
  • This control can shorten the crane recovery time.
  • the time taken to disconnect the inverter is shortened and restored. Shortening the time can contribute to reducing the loss.

Landscapes

  • Engineering & Computer Science (AREA)
  • Automation & Control Theory (AREA)
  • Mechanical Engineering (AREA)
  • Control And Safety Of Cranes (AREA)
  • Inverter Devices (AREA)

Abstract

異常発生時においてクレーン用インバータを速やかに停止し、回路から速やかに切り離すこと。モータ(11)と、モータ(11)に対応して設けられたインバータ(12)と、交流電源から供給される交流電力を直流電力に変換し、直流電力をインバータ(12)に供給するコンバータ(13)と、コンバータ(13)とインバータ(12)との間に接続され、コンバータ(13)の直流電力を消費させる電力消費部(21)と、電力消費部(21)とコンバータ(13)との間に接続され、インバータ(12)の状態に基づいて、電力消費部(21)とコンバータ(13)との接続及び切り離しの切り替えを行う第1切替部(MC1)とを具備する。

Description

クレーン及びその制御方法並びに制御プログラム
 本発明は、クレーン及びその制御方法並びに制御プログラムに関するものである。
 例えば、製鉄所で使用されるレードルクレーンは、従来、サイリスタ制御やリアクトル制御が採用されてきたが、機器手配の困難性、及び価格高騰などの理由により、近年インバータを使用するインバータ制御が用いられるようになっている。
 クレーンの制御でインバータを使用する場合には、受電した商用電圧をコンバータにより一度直流電圧に変換し、変換された直流電圧をインバータにより所望の周波数の交流電圧に変換している(例えば、特許文献1)。
 図4は、下記特許文献2に記載されるクレーン用インバータ装置の一例を示した概略図である。下記特許文献2では、インバータ制御回路290は、平滑コンデンサ260の充電期間中のみ接点要素210を投入し、インバータ270の運転中には接点要素210を解放(遮断)するとともに、インバータ運転中の異常発生時には主接触器240を解放する。上記構成により、異常発生時の主接触器240の緊急遮断時において、限流抵抗器250、平滑コンデンサ260、及びインバータ270を電源回路から切り離し、インバータ270を停止させる技術が提案されている。
特開2007-267504号公報 特開2002-78353号公報
 しかしながら、上記特許文献2の方法では、主接触器240が解放されても、平滑コンデンサ260に電荷が残留していることから直流電圧がインバータ270に供給されるので、残留電荷が完全に放電するまでインバータ270が停止されず、インバータ270の停止に時間がかかるという問題があった。
 本発明は、このような事情に鑑みてなされたものであって、異常発生時においてインバータを速やかに停止させることのできるクレーン及びその制御方法並びに制御プログラムを提供することを目的とする。
 上記課題を解決するために、本発明は以下の手段を採用する。
 本発明の第1の態様は、モータと、前記モータに対応して設けられたインバータと、交流電源から供給される交流電力を直流電力に変換し、前記直流電力を前記インバータに供給するコンバータと、前記コンバータと前記インバータとの間に接続され、前記コンバータの直流電力を消費させる電力消費手段と、前記電力消費手段と前記コンバータとの間に接続され、前記インバータの状態に基づいて、前記電力消費手段と前記コンバータとの接続及び切り離しの切り替えを行う第1切替手段とを具備するクレーンである。
 このような構成によれば、電力消費手段とコンバータとの間に接続される第1切替手段が切り離し状態とされる場合には、交流電源から供給される交流電力を直流電力に変換するコンバータは、変換後の直流電力をインバータに供給し、第1切替手段が、接続状態とされる場合には、コンバータから電力消費手段に直流電力を供給する。また、第1切替手段の接続と切り離しは、インバータの状態に基づいてなされる。
 このように、第1切替手段の接続及び切り離しを切り替えることにより、コンバータから供給される直流電力の供給先を簡便に切り替えられる。また、インバータが故障した場合には、コンバータに設けられるコンデンサの残留電荷がなくなるまで、インバータをコンバータから切り離すことができないが、第1切替手段が接続されコンデンサの残留電荷が電力消費手段に供給されることにより、自然放電を待機する場合と比較して、速やかに残留電荷を消費させることができるので、インバータをコンバータから速やかに切り離せるようになる。これにより、クレーンの復旧時間を短縮することができる。特に、レードルクレーンの場合には、溶鉱炉からの加熱によりクレーンが高温になり機器の故障が発生してしまう危険があり、また、クレーンを停止することにより莫大な損失が発生するので、インバータの切り離しにかかる時間を短縮し、復旧時間を短縮することは、損失の低減に寄与できる。
 上記クレーンの前記第1切替手段は、前記インバータが前記コンバータ側から切り離される必要性がある故障状態である場合に接続状態とされ、前記インバータが前記コンバータ側から切り離される必要性がない故障状態である場合に切り離し状態とされることが好ましい。
 インバータが、コンバータ側から切り離される必要性のある故障状態である場合に、コンバータからの直流電力が第1切替手段を介して電流消費手段に供給されるので、コンバータ内に設けられるコンデンサの残留電荷を電流消費手段に速やかに放電させることができ、これにより、インバータの切り離しを速やかに行うことができる。
 ここで、インバータ、コンバータの故障は、2次側の電流値、電圧値等の数値情報が所定値以上(または所定値以下)であるか、或いは、信号のアンサーバック等の信号情報を取得したか等の所望の値が得られたか否かに基づいて、判断される。また、コンバータ側から切り離される必要性がある故障状態と切り離される必要性がない故障状態とは、クレーンを操作する操作員等により手動で逐次判断(決定)されることとしてもよいし、予め故障状態と切り離しの必要性有無とを対応づけた対応情報に基づいて、自動的にシステム(プログラム)によって判断(決定)されることとしてもよい。
 上記クレーンは、前記交流電源と前記コンバータとの接続及び切り離しの切り替えを行う第2切替手段を具備し、前記第2切替手段は、前記インバータが前記コンバータ側から切り離される必要性がある故障状態である場合に、切り離し状態とされることが好ましい。
 インバータがコンバータ側から切り離される必要性のある故障状態である場合には、第1切替手段が接続状態とされるが、第2切替手段が切り離されることにより、交流電源の電力が、継続的に電力消費手段に供給されることにより生じる電力消費手段の故障を防ぐことができる。
 上記クレーンの前記第1切替手段と前記第2切替手段とが同時に接続状態とならないようにするインターロック手段を具備することが好ましい。
 インターロック手段により、第1切替手段と第2切替手段とが同時に接続状態になることがないので、電力消費手段の故障を防ぐことができる。
 上記クレーンにおいて、前記コンバータと前記第1切替手段との間に、電力計測手段を具備することとしてもよい。
 これにより、作業員が電圧の低下を確実に把握することができ、感電を防止することができる。
 本発明の第2の態様は、モータと、前記モータに対応して設けられたインバータと、交流電源から供給される交流電力を直流電力に変換し、前記直流電力を前記インバータに供給するコンバータと、を具備するクレーンの制御方法であって、前記コンバータと前記インバータとの間に接続され、前記コンバータの直流電力を消費させる電力消費手段と前記コンバータとの間に接続される第1切替手段によって、前記インバータの状態に基づいて、前記電力消費手段と前記コンバータとの接続及び切り離しを切り替えるクレーンの制御方法である。
 本発明の第3の態様は、モータと、前記モータに対応して設けられたインバータと、交流電源から供給される交流電力を直流電力に変換し、前記直流電力を前記インバータに供給するコンバータと、を具備するクレーンの制御プログラムであって、前記コンバータと前記インバータとの間に接続され、前記コンバータの直流電力を消費させる電力消費手段と前記コンバータとの間に接続される第1切替手段によって、前記インバータの状態に基づいて、前記電力消費手段と前記コンバータとの接続及び切り離しを切り替えることをコンピュータに実行させるためのクレーンの制御プログラムである。
 本発明は、異常発生時においてクレーン用インバータを速やかに停止し、回路から速やかに切り離すことができるという効果を奏する。
本発明の第1の実施形態に係るクレーンの回路構成の一例を示す回路図である。 本発明の第1の実施形態に係るクレーンの制御装置を手動制御する場合の動作フローである。 本発明の第1の実施形態に係るクレーンの制御装置を自動制御する場合の動作フローである。 従来のクレーン用インバータ装置の一例を示す図である。
 以下に、本発明に係るクレーン及びその制御方法並びに制御プログラムの実施形態について、図面を参照して説明する。
〔第1の実施形態〕
 本発明は、天井クレーンやコンテナクレーン、トランスファークレーン等、各種クレーンに適用可能であるが、本実施形態におけるクレーンは、製鉄所で使用される天井クレーン(レードルクレーン)に適用する場合を例に挙げて説明する。図1は、本発明の第1の実施形態に係るクレーンの回路構成の一例を示す回路図である。
 図1に示されるようにクレーンの回路構成においては、モータ11a~11fと、各モータ11a~11fのそれぞれに対応するインバータ12a~12f、コンバータ13a,13b、各コンバータ13a,13bへの電源電力をオンオフさせる第2切替部(第2切替手段)MC2a,MC2b、及び制御装置20を備えている。また、上記回路構成は、第2切替部MC2a,MC2bの上流側から電源電力を供給する電源10と接続されている。ここで、特に明記しない場合には、モータ11a~11fはモータ11、インバータ12a~12fはインバータ12、コンバータ13a,13bはコンバータ13、第2切替部MC2a,MC2bは第2切替部MC2として記載する。
 モータ11は、各種装置(主巻装置、横行装置、補巻装置、走行装置)に対応して設けられる。
 インバータ12は、モータ11にそれぞれ対応づけて設けられている。
 第2切替部MC2は、交流電源10とコンバータ13との接続及び切り離しを切り替え、インバータ12がコンバータ13側から切り離される必要性がある故障状態である場合に、切り離し状態とされる。
 コンバータ13は、電源10から供給される交流電力を直流電力に変換し、直流電力をインバータ12に供給する。また、コンバータ13は、平滑用のコンデンサ(図示略)を有している。
 図1において、主巻モータ11a,11bは、主巻装置を駆動するモータであり、横行モータ11cは、横行装置を駆動するモータであり、補巻モータ11dは、補巻装置を駆動するモータであり、走行モータ11e,11fは、走行装置を駆動するモータである。主巻装置及び走行装置は、大きな出力を必要とするので、本実施形態で説明するレードルクレーンにおいては、それぞれ2つずつモータ11が設けられている。
 インバータ12aは、電源10から供給される電圧を、主巻モータ11aを回転させるのに適切な周波数の交流電圧に変換する。同様に、インバータ12bは、電源10から供給される電圧を、主巻モータ11bを回転させるのに適切な周波数の交流電圧に変換する。また、インバータ12cは、電源10から供給される電圧を、横行モータ11cを回転させるのに適切な周波数の交流電圧に変換する。インバータ12dは、電源10から供給される電圧を、補巻モータ11dを回転させるのに適切な周波数の交流電圧に変換する。インバータ12e,12fは、電源10から供給される電圧を、走行モータ11e,11fを回転させるのに適切な周波数の交流電圧に変換する。
 制御装置20は、第1切替部(第1切替手段)MC1、電力消費部(電力消費手段)21、インターロック(インターロック手段)22、及び電力計測部(電力計測手段)23を備えている。
 第1切替部MC1は、電力消費部21とコンバータ13との間に接続され、インバータ12の状態に基づいて、電力消費部21とコンバータ13との接続及び切り離しを切り替える。具体的には、第1切替部MC1は、インバータ12がコンバータ13側から切り離される必要性がある故障状態である場合に接続状態とされる。また第1切替部MC1は、インバータ12がコンバータ13側から切り離される必要性がない故障状態、及びインバータ12が運転中(即ち、故障していない状態)である場合に切り離し状態とされる。
 ここで、故障は、2次側の電流値、電圧値等の数値情報が所定値以上(または所定値以下)であるか、或いは、信号のアンサーバック等の信号情報を取得したか等の所望の情報が得られたか否かに基づいて、判断される。また、コンバータ側から切り離される必要性がある故障状態と切り離される必要性がない故障状態とは、クレーンを操作する操作員等により手動で逐次判断(決定)されることとしてもよいし、予め故障状態と切り離しの必要性有無とを対応づけた対応情報に基づいて、自動的にシステム(プログラム)によって判断(決定)されることとしてもよい。また、コンバータ側から切り離される必要性がある故障状態とは、例えば、内部地絡やヒューズ断のような故障である。
 電力消費部21は、コンバータ13とインバータ12との間に接続され、コンバータ13の直流電力を消費させる。電力消費部21は、例えば、抵抗器、キャパシタ、投光器用に設けられるインバータを介して接続される投光器、蓄電池等が挙げられるが、本実施形態では、抵抗器である場合を例に挙げて説明する。
 インターロック部22は、第1切替部MC1と第2切替部MC2とが同時に接続状態とならないようにする。これにより、第2切替部MC2及び第1切替部MC1が共に接続状態となることにより、電源10からの電力が、抵抗器(電力消費部21)に継続的に供給されることにより抵抗器が損傷することを防ぐ。
 電力計測部23は、コンバータ13と第1切替部MC1との間に設けられ、コンバータ13と第1切替部MC1との間の電力情報(電流値、電圧値、電力値等)を計測する。また、電力計測部23は、計測結果を操作員が監視する監視装置等の出力装置30に出力する。これにより、操作員が出力装置30に提示される内容(例えば、ディスプレイに表示される数値や図)を確認することで、放電の進捗状況や電圧低下の状態等を把握することができ、操作員の感電防止に繋がる。
 次に、本実施形態に係るクレーン及びその制御方法並びに制御プログラムの作用について、インバータ12の切り離し作業を手動で有効にする場合と、自動で有効にする場合について、図2及び図3を用いて説明する。
 手動で有効にする場合において、図2に示されるように、インバータ12に故障が発生した場合には、インバータ12から故障信号が出力される。故障信号に基づいて、操作員によってコンバータ13側からインバータ12を切り離す必要性のある故障であるか否かが判断され、判断結果に応じてインバータ12のコンバータ13側からの切り離し指令または接続指令が、制御装置20に入力される(図2のステップSA1)。制御装置20は、切り離し指令を取得した場合には、コンバータ13側からインバータ12を切り離すステップに移行し、コンバータ13の上流側の第2切替部MC2を切り離し状態(オフ状態)にし(ステップSA2)、コンバータ13の上流側からの電力供給を停止させる。
 続いて、第1切替部MC1が接続状態(オン状態)にされる(ステップSA3)。そうすると、電力消費部21とコンバータ13とが接続状態となり、コンデンサ13側のコンデンサに蓄積された電荷が第1切替部MC1を介して抵抗器に供給され、放電される。また、電力計測部23の電力情報の計測結果が出力装置30に出力され(ステップSA4)、本処理を終了する。出力装置30では、コンバータ13と電力消費部21との間の電力情報が提示される。操作員は、出力装置30に提示される電圧値等の電力情報に基づいて、放電を完了したか否か、電圧低下の状態等を把握できる。
 上述した実施形態に係るクレーンの制御装置20においては、上記処理の全て或いは一部を別途ソフトウェアを用いて処理する構成としてもよい。この場合、制御装置20は、CPU、RAM等の主記憶装置、及び上記処理の全て或いは一部を実現させるためのプログラムが記録されたコンピュータ読み取り可能な記録媒体を備えている。そして、CPUが上記記憶媒体に記録されているプログラムを読み出して、情報の加工・演算処理を実行することにより、上述の制御装置と同様の処理を実現させる。
 ここでコンピュータ読み取り可能な記録媒体とは、磁気ディスク、光磁気ディスク、CD-ROM、DVD-ROM、半導体メモリ等をいう。また、このコンピュータプログラムを通信回線によってコンピュータに配信し、この配信を受けたコンピュータが当該プログラムを実行するようにしても良い。
 以下、CPUが制御プログラムを実行することにより実現される制御方法の処理手順(自動で有効にする場合)について図3を参照して説明する。
 制御装置20は、インバータ12から出力されるインバータ12の故障信号を取得すると(図3のステップSB1)、故障信号に基づいて、インバータ12をコンバータ13側から切り離す必要性があるか否かを判定する(ステップSB2)。インバータ12をコンバータ13側から切り離す必要性がある故障であると判定された場合には、第2切替部MC2を切り離し状態(オフ状態)にし(ステップSB3)、コンバータ13の上流側の電源10からの電源供給を停止させる。
 続いて、第1切替部MC1を接続状態にし、電力消費部21とコンバータ13とを接続させる(ステップSB4)。そうすると、コンデンサ13側のコンデンサに蓄積された電荷は、第1切替部MC1を介して抵抗器(電力消費部21)に供給され、放電される。また、電力計測部23の電力情報の計測結果が出力装置30に出力し(ステップSB5)、本処理を終了する。
 上述したように、インバータ12の故障が発生した場合に、インバータ12をコンバータ13側から切り離すか否かの決定は、操作員によって切り離される必要性のある故障であると判断された場合に、操作員により手動で行われることとしてもよいし、制御プログラムによって自動で行われることとしてもよい。また、自動でインバータ12をコンバータ13側から切り離す場合には、インバータ12の故障信号(故障内容)とコンバータ13側から切り離しの必要性の有無とを対応づけた対応情報を設けておき、対応情報に基づいて切り離しするか否かを判定することにより、速やかな制御ができる。
 以上説明してきたように、本実施形態に係るクレーン及びその制御方法並びに制御プログラムによれば、第1切替部MC1の接続及び切り離しを切り替えることにより、コンバータ13から供給される直流電力の供給先を簡便に切り替えられる。また、インバータ12が故障した場合には、コンバータ13に設けられるコンデンサの残留電荷がなくなるまで、インバータ12をコンバータ13側から切り離すことができないが、第1切替部MC1が接続されコンデンサの残留電荷を電力消費部21に供給させることにより、自然放電を待機する場合と比較して、速やかに残留電荷を消費させることができるので、インバータ12をコンバータ13側から速やかに切り離せるようになる。また、自然放電によってコンデンサ内の電荷をゼロにするには、機器構成にも依存するが15分以上の時間がかかる。本実施形態に係る電力消費部21によって放電させた場合には、数秒程度の時間で完了するので、インバータの故障が検出されてから切り離しまでの時間を短縮することができる。
 このように制御することにより、クレーンの復旧時間を短縮することができる。特に、レードルクレーンの場合には、溶鉱炉からの加熱によりクレーンが焼けてしまう危険があり、また、クレーンを停止することにより莫大な損失が発生するので、インバータの切り離しにかかる時間を短縮し、復旧時間を短縮することは、損失の低減に寄与できる。
10 電源
12、12a~12f インバータ
13、13a、13b コンバータ
20 制御装置
21 電力消費部(電力消費手段)
22 インターロック(インターロック手段)
23 電力計測部(電力計測手段)
30 出力装置
MC1 第1切替部(第1切替手段)
MC2、MC2a、MC2b 第2切替部(第2切替手段)
 

Claims (7)

  1.  モータと、
     前記モータに対応して設けられたインバータと、
     交流電源から供給される交流電力を直流電力に変換し、前記直流電力を前記インバータに供給するコンバータと、
     前記コンバータと前記インバータとの間に接続され、前記コンバータの直流電力を消費させる電力消費手段と、
     前記電力消費手段と前記コンバータとの間に接続され、前記インバータの状態に基づいて、前記電力消費手段と前記コンバータとの接続及び切り離しの切り替えを行う第1切替手段と
    を具備するクレーン。
  2.  前記第1切替手段は、前記インバータが前記コンバータ側から切り離される必要性がある故障状態である場合に接続状態とされ、前記インバータが前記コンバータ側から切り離される必要性がない故障状態である場合に切り離し状態とされる請求項1に記載のクレーン。
  3.  前記交流電源と前記コンバータとの接続及び切り離しの切り替えを行う第2切替手段を具備し、
     前記第2切替手段は、前記インバータが前記コンバータ側から切り離される必要性がある故障状態である場合に、切り離し状態とされる請求項1または請求項2に記載のクレーン。
  4.  前記第1切替手段と前記第2切替手段とが同時に接続状態とならないようにするインターロック手段を具備する請求項3に記載のクレーン。
  5.  前記コンバータと前記第1切替手段との間に、電力計測手段を具備する請求項1から請求項4のいずれかに記載のクレーン。
  6.  モータと、前記モータに対応して設けられたインバータと、交流電源から供給される交流電力を直流電力に変換し、前記直流電力を前記インバータに供給するコンバータと、を具備するクレーンの制御方法であって、
     前記コンバータと前記インバータとの間に接続され、前記コンバータの直流電力を消費させる電力消費手段と前記コンバータとの間に接続される第1切替手段によって、前記インバータの状態に基づいて、前記電力消費手段と前記コンバータとの接続及び切り離しを切り替えるクレーンの制御方法。
  7.  モータと、前記モータに対応して設けられたインバータと、交流電源から供給される交流電力を直流電力に変換し、前記直流電力を前記インバータに供給するコンバータと、を具備するクレーンの制御プログラムであって、
     前記コンバータと前記インバータとの間に接続され、前記コンバータの直流電力を消費させる電力消費手段と前記コンバータとの間に接続される第1切替手段によって、前記インバータの状態に基づいて、前記電力消費手段と前記コンバータとの接続及び切り離しを切り替えることをコンピュータに実行させるためのクレーンの制御プログラム。
     
PCT/JP2012/050944 2011-11-17 2012-01-18 クレーン及びその制御方法並びに制御プログラム WO2013073203A1 (ja)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201280012654.5A CN103429521B (zh) 2011-11-17 2012-01-18 起重机及其控制方法、控制程序

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2011251499A JP5872857B2 (ja) 2011-11-17 2011-11-17 クレーン及びその制御方法並びに制御プログラム
JP2011-251499 2011-11-17

Publications (1)

Publication Number Publication Date
WO2013073203A1 true WO2013073203A1 (ja) 2013-05-23

Family

ID=48429292

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2012/050944 WO2013073203A1 (ja) 2011-11-17 2012-01-18 クレーン及びその制御方法並びに制御プログラム

Country Status (4)

Country Link
JP (1) JP5872857B2 (ja)
CN (1) CN103429521B (ja)
TW (1) TWI483891B (ja)
WO (1) WO2013073203A1 (ja)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107601284B (zh) * 2017-10-19 2024-05-14 江苏众建达丰机械工程有限公司 塔式起重机回转控制单元

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6395855A (ja) * 1986-10-08 1988-04-26 Fuji Electric Co Ltd Pam方式インバ−タ装置の電流制御回路
JP2002078353A (ja) * 2000-08-24 2002-03-15 Mitsubishi Electric Engineering Co Ltd クレーン用インバータ装置
JP2010178414A (ja) * 2009-01-27 2010-08-12 Daikin Ind Ltd 電源装置、空気調和機
JP2011188627A (ja) * 2010-03-09 2011-09-22 Panasonic Corp インバータ装置

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0398472A (ja) * 1989-09-08 1991-04-24 Toyo Electric Mfg Co Ltd インバータ放電回路の保護方式
JPH03212167A (ja) * 1990-01-10 1991-09-17 Mitsubishi Electric Corp インバータの過電圧検出装置
JP2007267504A (ja) * 2006-03-28 2007-10-11 Mitsubishi Heavy Ind Ltd クレーン用蓄電装置及びクレーン電源装置並びにクレーン用電源設備
FI120665B (fi) * 2007-06-20 2010-01-15 Kone Corp Kuljetusjärjestelmän tehonohjaus
CN201224669Y (zh) * 2008-06-06 2009-04-22 招商局重工(深圳)有限公司 可用于传统控制的起重机调速装置
CN101654208A (zh) * 2009-08-31 2010-02-24 长沙中联重工科技发展股份有限公司 塔机串接电抗器调速系统
CN201560061U (zh) * 2009-09-09 2010-08-25 湖北华声机电有限公司 一种新型的起重机速度自动控制装置

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6395855A (ja) * 1986-10-08 1988-04-26 Fuji Electric Co Ltd Pam方式インバ−タ装置の電流制御回路
JP2002078353A (ja) * 2000-08-24 2002-03-15 Mitsubishi Electric Engineering Co Ltd クレーン用インバータ装置
JP2010178414A (ja) * 2009-01-27 2010-08-12 Daikin Ind Ltd 電源装置、空気調和機
JP2011188627A (ja) * 2010-03-09 2011-09-22 Panasonic Corp インバータ装置

Also Published As

Publication number Publication date
CN103429521B (zh) 2015-05-13
CN103429521A (zh) 2013-12-04
TWI483891B (zh) 2015-05-11
TW201321295A (zh) 2013-06-01
JP2013110781A (ja) 2013-06-06
JP5872857B2 (ja) 2016-03-01

Similar Documents

Publication Publication Date Title
US8587243B2 (en) Drive control system
JP5875214B2 (ja) 電力変換システム
TW201438366A (zh) 高可靠的不斷電系統用靜態切換開關電路
US20140021789A1 (en) Apparatus and methods for backfeed detection in and control of uninterruptible power systems
JP5578972B2 (ja) 交流電車のコンバータ制御装置
CN105406580A (zh) 一种供电系统和方法
CN104539039A (zh) 一种用于石化企业110kV电力系统的快速切换装置
WO2013128713A1 (ja) 駆動装置、クレーン、及び駆動装置の制御方法
CN201374667Y (zh) 一种多电机变频切换控制系统
CN103117592A (zh) 220kV备自投系统及备自投装置母联备投方式的判断方法
CN107181414A (zh) 一种电能质量综合高频整流逆变控制系统
JP5872857B2 (ja) クレーン及びその制御方法並びに制御プログラム
JP2013192392A (ja) インバータ装置
CN203434917U (zh) 一种故障自修复的电机容错驱动控制系统
JP2008278666A (ja) 無停電電源装置
CN104767441A (zh) 电源控制系统及方法
CN207053247U (zh) 一种基于三相四桥臂变流器的在线式不间断电源系统
CN102832798B (zh) 一种上电缓冲控制电路及其控制方法
CN102916482A (zh) 一种低压切换电路
WO2019044979A1 (ja) 分散電源装置、および分散電源装置の制御方法
JP2002218674A (ja) 無停電電源システムおよびその運転方法
CN103560558A (zh) 一种电梯停电应急电源
CN104104289B (zh) 船用晶闸管可逆直流调速控制系统
JP2004282812A (ja) 無停電電源装置用バイパス開閉器の異常診断方法
JP5662229B2 (ja) 移動用変圧器装置

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 12849543

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 12849543

Country of ref document: EP

Kind code of ref document: A1