WO2013057552A1 - Vehicle combination - Google Patents

Vehicle combination Download PDF

Info

Publication number
WO2013057552A1
WO2013057552A1 PCT/IB2012/001980 IB2012001980W WO2013057552A1 WO 2013057552 A1 WO2013057552 A1 WO 2013057552A1 IB 2012001980 W IB2012001980 W IB 2012001980W WO 2013057552 A1 WO2013057552 A1 WO 2013057552A1
Authority
WO
WIPO (PCT)
Prior art keywords
vehicle
ballast
working
combination according
respect
Prior art date
Application number
PCT/IB2012/001980
Other languages
German (de)
French (fr)
Other versions
WO2013057552A4 (en
Inventor
Jörg Ganz
Original Assignee
Matisa Materiel Industriel Sa
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Matisa Materiel Industriel Sa filed Critical Matisa Materiel Industriel Sa
Priority to ES12791846.4T priority Critical patent/ES2640190T3/en
Priority to PL12791846T priority patent/PL2825701T3/en
Priority to EP12791846.4A priority patent/EP2825701B1/en
Publication of WO2013057552A1 publication Critical patent/WO2013057552A1/en
Publication of WO2013057552A4 publication Critical patent/WO2013057552A4/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B27/00Placing, renewing, working, cleaning, or taking-up the ballast, with or without concurrent work on the track; Devices therefor; Packing sleepers
    • E01B27/06Renewing or cleaning the ballast in situ, with or without concurrent work on the track
    • E01B27/08Renewing or cleaning the ballast in situ, with or without concurrent work on the track the track having been taken-up

Definitions

  • the invention relates to a vehicle combination for receiving gravel a ballast bed, consisting of a Aushubkette having gravel receiving vehicle and connected to this
  • the object of the present invention is now to provide a vehicle combination of the type mentioned, with in a
  • trackless ballast is optimally cleaned or even removed.
  • both vehicles are each equipped with two rail undercarriages and two crawler tracks and the excavation on a - with respect to a working direction - rear
  • Gravel pickup vehicle is arranged.
  • 1 and 2 each show a side view of a vehicle combination in the inoperative position or in labor input.
  • a vehicle combination 1 shown in FIGS. 1 and 2 for receiving ballast 2 of a ballast bed 3 consists of a ballast pickup vehicle 5 having a lifting chain 4 and a storage vehicle 6 connected thereto. Both vehicles 5, 6 are each provided with two rail running gears 7 and equipped with two crawler tracks 8.
  • the excavation chain 4 is on a - with respect to a working direction 9 of the vehicles 5, 6 - rear frame end 14 of a vehicle frame 11 behind the rearmost chassis 7, 8 of the ballast pickup vehicle fifth
  • Vehicle longitudinal 9 arranged behind the rearmost chassis 7 and formed with respect to the rear frame end 14 of the vehicle frame 1 of the ballast pickup vehicle 5.
  • An upper end 15 of the excavation chain 4, designed for a ballast discharge, is positioned in front of the lower end 13 with respect to the working direction 9.
  • conveyor belt 17 is formed projecting beyond the rear frame end 14 and is located between this and the lower end 13 of the excavation 4.
  • the gravel pickup vehicle 5 is provided with a sieve 18, a conveyor belt 19 for the introduction of cleaned ballast 2 and a conveyor belt 20 for removal Of overburden on the connected storage vehicle 6 equipped. This has a running in working or vehicle longitudinal direction 9 and displaceable by a drive 21 in motion bottom conveyor belt 22.
  • both vehicles 5, 6 coupled to one another - after removal of a protective car 23 - are lowered
  • Caterpillars 8 move on the trackless ballast section. After lowering the excavation chain 4 takes a recording of the ballast 2 and its further transport to the screen 18. The cleaned ballast 2 is dropped by the conveyor belt 17 on an exposed planum 24, while the overburden is stored in the connected storage vehicle 6.
  • the entire ballast can be transported in bypassing the screen 18 in the storage vehicle.
  • the vehicle combination 1 can be easily incorporated as a rule vehicle in a train.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Machines For Laying And Maintaining Railways (AREA)

Abstract

The invention relates to a vehicle combination (1) for receiving a ballast (2) of a ballast bed (3), comprising a ballast receiving vehicle (5) having an excavation chain (4), and a storage vehicle (6) connected to said ballast receiving vehicle. Both vehicles (5, 6) are respectively provided with two rail-mounted travel units (7) and with two caterpillar tracks (8). Said excavation chain (4) is arranged, with respect to the working direction (9), at an end of the rear chassis (14), behind the furthest away travel unit (7, 8) of the ballast receiving vehicle (5).

Description

Fahrzeugkombination  vehicle combination
[001] Die Erfindung betrifft eine Fahrzeugkombination zur Aufnahme von Schotter einer Schotterbettung, bestehend aus einem eine Aushubkette aufweisenden Schotteraufnahmefahrzeug und einem an dieses angeschlossenen The invention relates to a vehicle combination for receiving gravel a ballast bed, consisting of a Aushubkette having gravel receiving vehicle and connected to this
Speicherfahrzeug.  Storage vehicle.
[002] Eine derartige Fahrzeugkombination ist durch EP 1 264 933 A2 bekannt, um unter kontinuierlicher Vorfahrt auf einem Gleis den darunter befindlichen Schotter aufzunehmen.  Such a vehicle combination is known by EP 1 264 933 A2 to record under continuous right of way on a track the underlying gravel.
[003] Die Aufgabe der vorliegenden Erfindung liegt nun in der Schaffung einer Fahrzeugkombination der eingangs genannten Art, mit der in einem  The object of the present invention is now to provide a vehicle combination of the type mentioned, with in a
gleislosen Bettungsabschnitt befindlicher Schotter optimal gereinigt oder auch entfernt werden kann.  trackless ballast is optimally cleaned or even removed.
[004] Diese Aufgabe wird erfindungsgemäß mit einem Fahrzeug der  This object is achieved with a vehicle of
gattungsgemäßen Art dadurch gelöst, dass beide Fahrzeuge jeweils mit zwei Schienenfahrwerken und mit zwei Raupenfahrwerken ausgestattet sind und die Aushubkette an einem - bezüglich einer Arbeitsrichtung - hinteren  generic type solved in that both vehicles are each equipped with two rail undercarriages and two crawler tracks and the excavation on a - with respect to a working direction - rear
Rahmenende hinter dem hintersten Fahrwerk des  Frame end behind the rearmost chassis of the
Schotteraufnahmefahrzeuges angeordnet ist.  Gravel pickup vehicle is arranged.
[005] Der besondere Vorteil dieser Ausbildung besteht darin, dass sich die  The particular advantage of this training is that the
Fahrzeugkombination auf dem vor der Aushubkette befindlichen  Vehicle combination on the front of the excavation chain
Schotterabschnitt abstützt. Damit ist eine nachteilige Einwirkung sämtlicher Fahrwerke auf das freigelegte bzw. durch den gereinigten Schotter wiederhergestellte Planum oder auch auf weitere Schutzschichten Supports gravel section. This is an adverse effect of all Landing gears on the excavated or recovered by the cleaned gravel planum or on further protective layers
zuverlässig ausgeschlossen.  reliably excluded.
[006] Weitere Vorteile der Erfindung ergeben sich aus den Unteransprüchen und der Zeichnungsbeschreibung.  Further advantages of the invention will become apparent from the dependent claims and the description of the drawings.
[007] Im Folgenden wird die Erfindung anhand eines in der Zeichnung  In the following the invention with reference to a in the drawing
dargestellten Ausführungsbeispieles näher beschrieben. Es zeigen Fig.1 und 2 je eine Seitenansicht einer Fahrzeugkombination in Außerbetriebstellung bzw. im Arbeitseinsatz.  illustrated embodiment described in more detail. 1 and 2 each show a side view of a vehicle combination in the inoperative position or in labor input.
[008] Eine in den Fig. 1 und 2 dargestellte Fahrzeugkombination 1 zur Aufnahme von Schotter 2 einer Schotterbettung 3 besteht aus einem eine Aushubkette 4 aufweisenden Schotteraufnahmefahrzeug 5 und einem an dieses angeschlossenen Speicherfahrzeug 6. Beide Fahrzeuge 5, 6 sind jeweils mit zwei Schienenfahrwerken 7 und mit zwei Raupenfahrwerken 8 ausgestattet. Die Aushubkette 4 ist an einem - bezüglich einer Arbeitsrichtung 9 der Fahrzeuge 5, 6 - hinteren Rahmenende 14 eines Fahrzeugrahmens 11 hinter dem hintersten Fahrwerk 7, 8 des Schotteraufnahmefahrzeuges 5  A vehicle combination 1 shown in FIGS. 1 and 2 for receiving ballast 2 of a ballast bed 3 consists of a ballast pickup vehicle 5 having a lifting chain 4 and a storage vehicle 6 connected thereto. Both vehicles 5, 6 are each provided with two rail running gears 7 and equipped with two crawler tracks 8. The excavation chain 4 is on a - with respect to a working direction 9 of the vehicles 5, 6 - rear frame end 14 of a vehicle frame 11 behind the rearmost chassis 7, 8 of the ballast pickup vehicle fifth
angeordnet. Die endlos ausgebildete, durch einen Antrieb 12 in Rotation versetzbare Aushubkette 4 ist durch nicht näher dargestellte Antriebe von einer in Fig. 1 ersichtlichen Außerbetriebstellung in eine Arbeitsstellung gem. Fig. 2 absenkbar. [009] Ein zur Aufnahme des Schotters 2 ausgebildetes, im Arbeitseinsatz unteres Ende 13 der Aushubkette 4 ist bezüglich der Arbeits- bzw. einer arranged. The endless trained, displaceable by a drive 12 in rotation Aushubkette 4 is gem by not shown drives from an apparent in Fig. 1 inoperative position in a working position. Fig. 2 lowered. A trained for receiving the ballast 2, in operation lower end 13 of the excavating 4 is with respect to the working or a
Fahrzeuglängsrichtung 9 hinter dem hintersten Fahrwerk 7 angeordnet und in Bezug auf das hintere Rahmenende 14 des Fahrzeugrahmens 1 des Schotteraufnahmefahrzeuges 5 distanziert ausgebildet. Ein im Arbeitseinsatz oberes, für einen Schotterabwurf ausgebildetes Ende 15 der Aushubkette 4 ist bezüglich der Arbeitsrichtung 9 vor dem unteren Ende 13 positioniert.  Vehicle longitudinal 9 arranged behind the rearmost chassis 7 and formed with respect to the rear frame end 14 of the vehicle frame 1 of the ballast pickup vehicle 5. An upper end 15 of the excavation chain 4, designed for a ballast discharge, is positioned in front of the lower end 13 with respect to the working direction 9.
[010] Ein Abwurfende 16 eines zum Abwurf von gereinigtem Schotter 2  [010] A discharge end 16 of a dumping of cleaned ballast 2
vorgesehenen Förderbandes 17 ist über das hintere Rahmenende 14 vorkragend ausgebildet und befindet sich zwischen diesem und dem unteren Ende 13 der Aushubkette 4. Das Schotteraufnahmefahrzeug 5 ist mit einer Siebanlage 18, einem Förderband 19 für die Einbringung von gereinigtem Schotter 2 und einem Förderband 20 zum Abtransport von Abraum auf das angeschlossene Speicherfahrzeug 6 ausgestattet. Dieses weist ein in Arbeits- bzw. Fahrzeuglängsrichtung 9 verlaufendes und durch einen Antrieb 21 in Bewegung versetzbares Bodenförderband 22 auf.  provided conveyor belt 17 is formed projecting beyond the rear frame end 14 and is located between this and the lower end 13 of the excavation 4. The gravel pickup vehicle 5 is provided with a sieve 18, a conveyor belt 19 for the introduction of cleaned ballast 2 and a conveyor belt 20 for removal Of overburden on the connected storage vehicle 6 equipped. This has a running in working or vehicle longitudinal direction 9 and displaceable by a drive 21 in motion bottom conveyor belt 22.
[011] Für den Arbeitseinsatz werden beide miteinander gekoppelten Fahrzeuge 5, 6 - nach Entfernung eines Schutzwagens 23 - unter Absenkung der  [011] For the labor input, both vehicles 5, 6 coupled to one another - after removal of a protective car 23 - are lowered
Raupenfahrwerke 8 auf den gleislosen Bettungsabschnitt verfahren. Nach Absenkung der Aushubkette 4 erfolgt eine Aufnahme des Schotters 2 sowie dessen Weitertransport zur Siebanlage 18. Der gereinigte Schotter 2 wird durch das Förderband 17 auf ein freigelegtes Planum 24 abgeworfen, während der Abraum im angeschlossenen Speicherfahrzeug 6 gespeichert wird. Caterpillars 8 move on the trackless ballast section. After lowering the excavation chain 4 takes a recording of the ballast 2 and its further transport to the screen 18. The cleaned ballast 2 is dropped by the conveyor belt 17 on an exposed planum 24, while the overburden is stored in the connected storage vehicle 6.
Wahlweise kann natürlich auch der gesamte Schotter unter Umgehung der Siebanlage 18 in das Speicherfahrzeug transportiert werden. Durch den Schutzwagen 23 und die endseitigen Fahrzeugkupplungen kann die Fahrzeugkombination 1 problemlos als Regelfahrzeug in einen Zugverband eingegliedert werden. Optionally, of course, the entire ballast can be transported in bypassing the screen 18 in the storage vehicle. By the guard 23 and the end-side vehicle couplings, the vehicle combination 1 can be easily incorporated as a rule vehicle in a train.

Claims

P a t e n t a n s p r ü c h e Patent claims
1. Fahrzeugkombination zur Aufnahme von Schotter (2) einer 1. vehicle combination for receiving gravel (2) one
Schotterbettung (3), bestehend aus einem eine Aushubkette (4) Ballast bed (3), consisting of a excavation chain (4)
aufweisenden Schotteraufnahmefahrzeug (5) und einem an dieses having gravel receiving vehicle (5) and one to this
angeschlossenen Speicherfahrzeug (6), dadurch gekennzeichnet, dass beide Fahrzeuge (5, 6) jeweils mit zwei Schienenfahrwerken (7) und mit zwei Raupenfahrwerken (8) ausgestattet sind und die Aushubkette (4) an einem - bezüglich einer Arbeitsrichtung (9) - hinteren Rahmenende (14) hinter dem hintersten Fahrwerk (7, 8) des Schotteraufnahmefahrzeuges (5) angeordnet ist. connected storage vehicle (6), characterized in that both vehicles (5, 6) are each equipped with two rail bogies (7) and two crawler tracks (8) and the excavation chain (4) on a - with respect to a working direction (9) - rear Frame end (14) behind the rearmost chassis (7, 8) of the ballast pickup vehicle (5) is arranged.
2. Fahrzeugkombination nach Anspruch 1 , dadurch gekennzeichnet, dass das Schotteraufnahmefahrzeug (5) mit einer Siebanlage (18), einem 2. Vehicle combination according to claim 1, characterized in that the ballast receiving vehicle (5) with a sieve (18), a
Förderband ( 7) für die Einbringung von gereinigtem Schotter und einem Förderband (20) zum Abtransport von Abraum auf das angeschlossene Speicherfahrzeug (6) ausgestattet ist. Conveyor belt (7) for the introduction of cleaned ballast and a conveyor belt (20) for the removal of overburden on the connected storage vehicle (6) is equipped.
3. Fahrzeugkombination nach Anspruch 1 , dadurch gekennzeichnet, dass ein zur Aufnahme von Schotter (2) ausgebildetes, im Arbeitseinsatz unteres Ende (13) der Aushubkette (4) bezüglich der Arbeits- bzw. einer Fahrzeuglängsrichtung (9) hinter dem hintersten Fahrwerk (7, 8) angeordnet ist. 3. A vehicle combination according to claim 1, characterized in that a for receiving gravel (2) trained, in the lower working end (13) of the Aushubkette (4) with respect to the working or a Vehicle longitudinal direction (9) behind the rearmost chassis (7, 8) is arranged.
4. Fahrzeugkombination nach Anspruch 3, dadurch gekennzeichnet, dass das untere Ende (13) in Bezug auf das hintere Rahmenende (14) eines Fahrzeugrahmens (1 1 ) des Schotteraufnahmefahrzeuges (5) distanziert ausgebildet ist. 4. Vehicle combination according to claim 3, characterized in that the lower end (13) with respect to the rear frame end (14) of a vehicle frame (1 1) of the ballast pickup vehicle (5) is formed distanced.
5. Fahrzeugkombination nach Anspruch 3 oder 4, dadurch 5. Vehicle combination according to claim 3 or 4, characterized
gekennzeichnet, dass ein im Arbeitseinsatz oberes, für einen Schotterabwurf ausgebildetes Ende (15) der Aushubkette (4) bezüglich der Arbeitsrichtung (9) vor dem unteren Ende (13) positioniert ist. in that an upper end (15) of the excavating chain (4) which is upper in working use and designed for a ballast ejection is positioned with respect to the working direction (9) in front of the lower end (13).
6. Fahrzeugkombination nach Anspruch 2, dadurch gekennzeichnet, dass ein Abwurfende (16) des zum Abwurf von gereinigtem Schotter (2) 6. A vehicle combination according to claim 2, characterized in that a discharge end (16) of the discharge of cleaned ballast (2)
vorgesehenen Förderbandes (17) über das hintere Rahmenende (14) des Schotteraufnahmefahrzeuges (5) vorkragend ausgebildet ist. provided conveyor belt (17) over the rear frame end (14) of the ballast pickup vehicle (5) is formed projecting.
7. Fahrzeugkombination nach Anspruch 1 , dadurch gekennzeichnet, dass das Speicherfahrzeug (6) ein in Arbeits- bzw. Fahrzeuglängsrichtung (9) verlaufendes und durch einen Antrieb (21 ) in Bewegung versetzbares 7. A vehicle combination according to claim 1, characterized in that the storage vehicle (6) in a working or vehicle longitudinal direction (9) extending and displaceable by a drive (21) in motion
Bodenförderband (22) aufweist. Bottom conveyor belt (22).
PCT/IB2012/001980 2011-10-18 2012-10-05 Vehicle combination WO2013057552A1 (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
ES12791846.4T ES2640190T3 (en) 2011-10-18 2012-10-05 Vehicle combination
PL12791846T PL2825701T3 (en) 2011-10-18 2012-10-05 Vehicle combination
EP12791846.4A EP2825701B1 (en) 2011-10-18 2012-10-05 Vehicle combination

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CH01693/11A CH705702B1 (en) 2011-10-18 2011-10-18 Vehicle combination for collecting ballast of a ballast bed.
CHCF/20111693/11 2011-10-18

Publications (2)

Publication Number Publication Date
WO2013057552A1 true WO2013057552A1 (en) 2013-04-25
WO2013057552A4 WO2013057552A4 (en) 2013-06-13

Family

ID=47258035

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/IB2012/001980 WO2013057552A1 (en) 2011-10-18 2012-10-05 Vehicle combination

Country Status (5)

Country Link
EP (1) EP2825701B1 (en)
CH (1) CH705702B1 (en)
ES (1) ES2640190T3 (en)
PL (1) PL2825701T3 (en)
WO (1) WO2013057552A1 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2362966A1 (en) * 1976-08-30 1978-03-24 Secmafer Sa Rail track ballast reconditioning machine - has scraper transporting ballast to reconditioning assembly and belt system returning ballast onto track
EP1264933A2 (en) 2001-06-06 2002-12-11 Franz Plasser Bahnbaumaschinen-Industriegesellschaft m.b.H. Track maintenance machine for removing ballast
WO2007034309A1 (en) * 2005-09-21 2007-03-29 Matisa Materiel Industriel S.A. Bulk material loading wagon
WO2008022475A1 (en) * 2006-08-25 2008-02-28 J. Müller Ag, Maschineller Geleiseunterhalt Method and device for renewing a ballast bed

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2362966A1 (en) * 1976-08-30 1978-03-24 Secmafer Sa Rail track ballast reconditioning machine - has scraper transporting ballast to reconditioning assembly and belt system returning ballast onto track
EP1264933A2 (en) 2001-06-06 2002-12-11 Franz Plasser Bahnbaumaschinen-Industriegesellschaft m.b.H. Track maintenance machine for removing ballast
WO2007034309A1 (en) * 2005-09-21 2007-03-29 Matisa Materiel Industriel S.A. Bulk material loading wagon
WO2008022475A1 (en) * 2006-08-25 2008-02-28 J. Müller Ag, Maschineller Geleiseunterhalt Method and device for renewing a ballast bed

Also Published As

Publication number Publication date
EP2825701A1 (en) 2015-01-21
WO2013057552A4 (en) 2013-06-13
CH705702B1 (en) 2015-06-30
PL2825701T3 (en) 2017-10-31
EP2825701B1 (en) 2017-08-02
CH705702A2 (en) 2013-04-30
ES2640190T3 (en) 2017-11-02

Similar Documents

Publication Publication Date Title
EP1162312B1 (en) Machine for renewing a railway track
EP2179092A1 (en) Machine for the pick-up and storage of track fastenings of a track and method thereof
EP2601350B1 (en) System for cleaning a ballast bed
EP1253247B1 (en) Railway ballast cleaning machine
CH708460B1 (en) Machine for renewing sleepers of a track.
EP1253246A2 (en) Railway ballast cleaning machine
EP2257673B1 (en) Method for refurbishing a ballast bed of a track
EP2880219B1 (en) Ballast plow
EP1179634B1 (en) Railway track renewal machine
DE4441221A1 (en) Machine system for treating the ballast bedding of a track
EP3253922B1 (en) Railway track renewal process
EP2643521B1 (en) Method and machine for cleaning a ballast bed of a track
EP1312715B1 (en) Track maintenance vehicle
WO2007034309A1 (en) Bulk material loading wagon
EP2825701A1 (en) Vehicle combination
EP2931973B1 (en) Method and machine for cleaning ballast of a track
EP1607522B1 (en) A method and a machine for exchanging railway sleepers
EP1994226B1 (en) Method for cleaning a ballast bed
CH708506A1 (en) Vehicle Association and method for renewing a track.
DE102012013442A1 (en) Movable device for cleaning gravel located below railroad track ballast bed, has cleaning device with shell that has perforation whose size is selected such that residue from screening drum is conveyed to return device by conveyors
DE2365160A1 (en) MACHINE FOR PROCESSING TRACK BEDS
AT13243U1 (en) Method for rehabilitating a ballast bed

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 12791846

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

REEP Request for entry into the european phase

Ref document number: 2012791846

Country of ref document: EP

WWE Wipo information: entry into national phase

Ref document number: 2012791846

Country of ref document: EP