WO2011058980A1 - 混合ガスハイドレート製造プラントの運転方法 - Google Patents
混合ガスハイドレート製造プラントの運転方法 Download PDFInfo
- Publication number
- WO2011058980A1 WO2011058980A1 PCT/JP2010/069960 JP2010069960W WO2011058980A1 WO 2011058980 A1 WO2011058980 A1 WO 2011058980A1 JP 2010069960 W JP2010069960 W JP 2010069960W WO 2011058980 A1 WO2011058980 A1 WO 2011058980A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- gas
- gas hydrate
- gas phase
- pipe
- pellet
- Prior art date
Links
Images
Classifications
-
- C—CHEMISTRY; METALLURGY
- C10—PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
- C10L—FUELS NOT OTHERWISE PROVIDED FOR; NATURAL GAS; SYNTHETIC NATURAL GAS OBTAINED BY PROCESSES NOT COVERED BY SUBCLASSES C10G, C10K; LIQUEFIED PETROLEUM GAS; ADDING MATERIALS TO FUELS OR FIRES TO REDUCE SMOKE OR UNDESIRABLE DEPOSITS OR TO FACILITATE SOOT REMOVAL; FIRELIGHTERS
- C10L3/00—Gaseous fuels; Natural gas; Synthetic natural gas obtained by processes not covered by subclass C10G, C10K; Liquefied petroleum gas
- C10L3/06—Natural gas; Synthetic natural gas obtained by processes not covered by C10G, C10K3/02 or C10K3/04
-
- C—CHEMISTRY; METALLURGY
- C10—PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
- C10L—FUELS NOT OTHERWISE PROVIDED FOR; NATURAL GAS; SYNTHETIC NATURAL GAS OBTAINED BY PROCESSES NOT COVERED BY SUBCLASSES C10G, C10K; LIQUEFIED PETROLEUM GAS; ADDING MATERIALS TO FUELS OR FIRES TO REDUCE SMOKE OR UNDESIRABLE DEPOSITS OR TO FACILITATE SOOT REMOVAL; FIRELIGHTERS
- C10L3/00—Gaseous fuels; Natural gas; Synthetic natural gas obtained by processes not covered by subclass C10G, C10K; Liquefied petroleum gas
- C10L3/06—Natural gas; Synthetic natural gas obtained by processes not covered by C10G, C10K3/02 or C10K3/04
- C10L3/10—Working-up natural gas or synthetic natural gas
- C10L3/108—Production of gas hydrates
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17C—VESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
- F17C11/00—Use of gas-solvents or gas-sorbents in vessels
- F17C11/007—Use of gas-solvents or gas-sorbents in vessels for hydrocarbon gases, such as methane or natural gas, propane, butane or mixtures thereof [LPG]
Definitions
- the present invention relates to a method for operating a mixed gas hydrate manufacturing plant that generates a mixed gas hydrate by reacting a mixed gas with water.
- gas phase is a natural gas composition in a physical dehydration means or a transportation location
- gas hydrate is newly produced by heavy components (ethane, propane, butane, etc.) contained therein. May happen. In such a case, operation troubles such as poor transportation may occur.
- Patent Document 2 is known as an invention similar to this.
- the present invention requires a large amount of incidental equipment for adjusting the dilution of the mixed gas supplied to the production tank with the main component of the mixed gas, that is, the auxiliary equipment including the control system. Moreover, it is difficult to adjust to an equilibrium composition under the production conditions, and there is a problem that a gas hydrate may be produced in the downstream equipment.
- the present invention has been made in order to solve such problems.
- the object of the present invention is to simplify the equipment without using a source gas dilution equipment, and to provide a gas phase in the downstream process. Is to provide a method of operating a mixed gas hydrate production plant that can stabilize the operation of the gas hydrate production facility by making the composition in the same equilibrium state as the gas phase of the production process.
- the present invention circulates the gas phase of the mixed gas hydrate generation step with the gas phase of the downstream step located downstream of the mixed gas hydrate generation step, thereby generating the gas phase of each step.
- the composition is in the same equilibrium state as the gas phase of the process.
- the present invention is characterized in that the downstream process is a dehydration process.
- the present invention is characterized in that the downstream process includes a dehydration process, a molding process, and a cooling process.
- the present invention circulates the gas phase of the mixed gas hydrate generation step with the gas phase of the downstream step located downstream of the mixed gas hydrate generation step, thereby generating the gas phase of each step. Since the composition is in the same equilibrium state as the gas phase of the process, new generation of mixed gas hydrate is suppressed in the physical dehydration equipment and transport equipment provided downstream from the generation process, resulting from the generation of mixed gas hydrate It is possible to eliminate the possibility of driving troubles such as obstructions and equipment malfunctions. Moreover, the facility for diluting the source gas is not required as in the conventional invention, and the facility can be simplified.
- FIG. 1 is a block diagram showing a basic process of an operation method of a mixed gas hydrate production plant according to the present invention.
- FIG. 2 is a block diagram showing a process for putting the operating method of the mixed gas hydrate production plant according to the present invention into practical use.
- FIG. 3 is a schematic configuration diagram of a mixed gas hydrate production plant according to the present invention.
- a basic mixed gas hydrate production plant A includes a gas hydrate production tank 1 and a dehydration tower 2.
- the gas phase part 1a of the gas hydrate production tank 1 communicates with the gas phase part 2a of the dehydration tower 2 via the first pipe 25a, and the gas phase part 2a of the dehydration tower 2 includes the second pipe 30a and the blower 51. It communicates with the gas phase portion 1 a of the gas hydrate production tank 1 through the circulation pipe 52.
- the solid-liquid part 1b of the gas hydrate production tank 1 communicates with the solid-liquid part 2b of the dehydration tower 2 via the fifth pipe 25b, and the solid-liquid part 2b of the dehydration tower 2 is the sixth It communicates with the equipment of the next process through the pipe 30b.
- the gas hydrate production tank 1 includes a raw material gas supply pipe 7 and a raw material water supply pipe 8 and a stirrer (not shown) for stirring the solid-liquid phase.
- the mixed gas for example, natural gas g
- the mixed gas supplied from the raw material gas supply pipe 7 into the gas hydrate production tank 1 reacts with the water w supplied from the raw material water supply pipe 8 to become natural gas hydrate.
- the natural gas hydrate in the gas hydrate production tank 1 is supplied to the dehydration tower 2 together with the water w and dehydrated.
- the dehydrated natural gas hydrate n is led to the next process equipment through the sixth pipe 30b.
- the gas hydrate production tank 1 is driven by driving the blower 51.
- the unreacted gas in the gas phase portion 1a of the gas phase portion 1a of the gas hydrate production tank 1 a, the first pipe 25a, the gas phase section 2a of the dehydration tower 2, the fourth pipe 30a, the blower 51 and the circulation pipe 52, and then the gas phase section 1a of the gas hydrate production tank 1 Is forced to circulate.
- the gas phase of the gas phase part 2a of the dehydration tower 2 since the gas phase of the gas phase part 2a of the dehydration tower 2 has the same equilibrium composition as the gas phase (unreacted gas) of the gas phase part 1a of the gas hydrate production tank 1, it is downstream of the dehydration tower 2 and the like. Generation of new gas hydrates in the facility is suppressed, and operational troubles such as blockages and equipment failures are suppressed.
- a circulation pipe 52 is connected to the source gas supply pipe 7, and the source gas supply pipe 7 The same effect can be obtained by mixing the unreacted gas circulated by the circulation pipe 52 with the natural gas g supplied by the above.
- the mixed gas hydrate production plant A ′ includes a gas hydrate production tank 1, a dehydration tower 2, a pellet forming device 3, and a pellet cooling tank 4.
- the gas phase part 1a of the gas hydrate production tank 1 communicates with the gas phase part 2a of the dehydration tower 2 via the first pipe 25a.
- the gas phase part 2a of the dehydration tower 2 is connected to the pellet forming apparatus 3 via the second pipe 30a.
- the gas phase part 3a of the pellet forming apparatus 3 communicates with the gas phase part 4a of the pellet cooling tank 4 via the third pipe 34a, and the gas phase part 4a of the pellet cooling tank 4 communicates with the gas phase part 3a of the pellet cooling tank 4
- the gas hydrate production tank 1 communicates with the gas phase part 1a through the fourth pipe 43a, the blower 51 and the circulation pipe 52.
- the solid-liquid part 1b of the gas hydrate production tank 1 communicates with the solid-liquid part 2b of the dehydration tower 2 via the fifth pipe 25b, and the solid-liquid part 2b of the dehydration tower 2 is the sixth
- the solid liquid part 3b of the pellet forming apparatus 3 communicates with the solid liquid part 4b of the pellet cooling tank 4 via the seventh pipe 34b, and communicates with the solid liquid part 3b of the pellet forming apparatus 3 via the pipe 30b.
- the solid-liquid part 4b of the cooling tank 4 communicates with the next process equipment via the eighth pipe 43b.
- the gas hydrate production tank 1 includes a raw material gas supply pipe 7 and a raw material water supply pipe 8 and a stirrer (not shown) for stirring the solid-liquid phase.
- the mixed gas for example, natural gas g
- the mixed gas supplied from the raw material gas supply pipe 7 into the gas hydrate production tank 1 reacts with the water w supplied from the raw material water supply pipe 8 to become natural gas hydrate.
- the natural gas hydrate in the gas hydrate production tank 1 is supplied to the dehydration tower 2 together with the water w and dehydrated.
- the dehydrated natural gas hydrate is supplied to the pellet forming apparatus 3 through the sixth pipe 30b and formed into pellets having a predetermined shape and size.
- the pellets are supplied to the pellet cooling tank 4 through the seventh pipe 34b and cooled to a predetermined temperature.
- the cooled pellet p is led to the next process equipment through the eighth pipe 43b.
- the gas hydrate production tank 1 is driven by driving the blower 51.
- the unreacted gas in the gas phase portion 1a of the gas phase portion 1a of the gas hydrate production tank 1 a, first pipe 25a, gas phase part 2a of dehydration tower 2, second pipe 30a, gas phase part 3a of pellet forming apparatus 3, third pipe 34a, gas phase part 4a of pellet cooling tank 4, and fourth pipe 43a Then, the gas is forcedly circulated through the blower 51 and the circulation pipe 52 to the gas phase portion 1 a of the gas hydrate production tank 1.
- the gas phase part 2a of the dehydration tower 2 and the gas phase part 3 of the pellet forming apparatus 3 a since the gas phase of the gas phase part 4a of the pellet cooling tank 4 has the same composition as the gas phase (unreacted gas) of the gas phase part 1a of the gas hydrate production tank 1, the dehydration tower 2, Generation of new gas hydrate in the downstream equipment such as the pellet forming apparatus 3 and the pellet cooling tank 4 is suppressed, and operational troubles such as blockage and equipment malfunction are suppressed.
- a circulation pipe 52 is connected to the source gas supply pipe 7, and the source gas supply pipe 7 The same effect can be obtained by premixing the unreacted gas circulated by the circulation pipe 52 with the natural gas g supplied by the above.
- the mixed gas hydrate production plant A ′′ of the present invention includes a gas hydrate production tank 1, a dehydration tower 2, a pellet forming device 3, a pellet cooling tank 4, a pellet storage tank 5, The depressurizing device 6 is used.
- the gas hydrate production tank 1 includes a stirrer 12 and a gas ejection nozzle 13 below the stirrer 12.
- This gas hydrate production tank 1 Is provided with a raw material gas supply pipe 7 and a raw water supply pipe 8 at its top 11a.
- the raw material gas supply pipe 7 includes a flow rate adjusting valve 9, and the raw material water supply pipe 8 includes a valve 10.
- the gas hydrate production tank 1 has a top 11a and a gas ejection nozzle 13
- the unreacted gas g ′ in the gas phase section 1a is supplied to the gas ejection nozzle 13 by the first blower 15 and is cooled to a predetermined temperature by the first cooler 16. I have to.
- the gas phase portion 1a of the gas hydrate production tank 1 communicates with the gas phase portion 2a of the dehydration tower 2 via the first pipe 25a.
- the bottom 11b of the gas hydrate production tank 1 is connected to the slurry pump 2 4 is connected to the bottom 21a of the dehydration tower 2 through a fifth pipe (slurry supply pipe) 25b provided with a slurry circulation path 2 branched from the slurry supply pipe 25b. 6 is connected to the side surface of the gas hydrate production tank 1.
- the slurry circulation path 26 includes a second slurry pump 27 and a second cooler 28, and cools the slurry s passing through the slurry circulation path 26.
- the dehydration tower 2 includes a cylindrical vertical tower body 21, a hollow drainage section 22 provided concentrically outside the tower body 21, and a screen 23 provided in a tower section facing the drainage section 22.
- the drainage part 22 communicates with the slurry circulation path 26 via the drainage pipe 29.
- the dehydration tower 2 supplies the gas hydrate n dehydrated by the sixth pipe (screw feeder) 30b to the pellet forming apparatus 3. Further, the gas phase portion 2a of the dehydration tower 2 and the gas phase portion 2a of the drainage portion 22 are communicated with the gas phase portion 3a of the pellet forming apparatus 3 through the second pipe 30a.
- the pellet forming apparatus 3 is a high-pressure pelletizer in which a pair of briquetting rolls 32 and 32 are provided in a pressure-resistant container 31, and powdery gas hydrate is formed into pellets of a predetermined shape (for example, a lens type, an almond type, (Pillow type, etc.) p. Further, the gas phase portion 3a of the pellet forming apparatus 3 communicates with the gas phase portion 4a of the pellet cooling tank 4 through the third pipe 34a. Moreover, the lower end part of the pellet shaping
- the pellet cooling tank 4 is composed of a hopper-like hollow container 41 and a cooling jacket 42 provided on the outside thereof, and the pellet p in the hollow container 41 is cooled by the cooling jacket 42. Moreover, the pellet cooling tank 4 is connected to the top part 11a of the gas hydrate production tank 1 through a circulation pipe 52 provided with a fourth pipe 43a and a second blower 51.
- the depressurization device 6 provided in the middle part of the eighth pipe (duct) 43b that communicates the lower end part of the pellet cooling tank 4 and the upper end part of the pellet storage tank 5 is provided with an upper valve 62 at the upper part of the cylindrical container 61.
- a lower valve 63 is provided below the cylindrical container 61.
- the second slurry pump 27 and the second cooler 28 provided in the slurry circulation path 26 are driven to convert the water w in the gas hydrate production tank 1 to a predetermined temperature (for example, it is cooled to 3 ° C.
- the first blower 15 and the first blower 15 provided in the gas circulation path 14 while supplying a mixed gas, for example, natural gas g, of a predetermined pressure (for example, 5 MPa) from the source gas supply pipe 7 to the gas hydrate generation tank 1 and the first blower 15 are provided.
- the cooler 16 is driven to remove the unreacted gas g ′ in the gas phase portion 1a of the gas hydrate production tank 1 from the gas ejection nozzle 1 3 is supplied.
- the natural gas g supplied to the gas ejection nozzle 13 becomes countless fine bubbles and is ejected into the water w, and further stirred by the agitator 12, It hydrates with water w to form natural gas hydrate.
- the composition of natural gas is 86.88% methane, 5.20% ethane, 1.86% propane, 0.42% i-butane, 0.47% n-butane, 0.15% i-pentane, n- Although pentane 0.08%, carbon dioxide 1%, etc., since the heavy portion such as ethane and propane easily reacts with water, the gas phase in the gas phase portion 1a of the gas hydrate production tank 1 becomes methane-rich.
- the natural gas hydrate constitutes a slurry s together with water w, and is supplied to the bottom 21 a of the dehydration tower 2 by the slurry pump 24.
- the gas hydrate n dehydrated by the dehydration tower 2 is connected to a sixth pipe ( It is supplied to the pellet forming apparatus 3 through the screw feeder 30b and processed into pellets p having a predetermined shape and size.
- the pellet p formed by the pellet forming apparatus 3 is supplied to the pellet cooling tank 4 through the seventh pipe (pellet discharge duct) 34b, It is cooled to a predetermined temperature (for example, ⁇ 20 ° C.).
- the pellet p cooled by the pellet cooling tank 4 is depressurized to a predetermined pressure (for example, slightly higher than atmospheric pressure) by the depressurizing device 6 and stored in the pellet storage tank 5.
- the unreacted gas g ′ in the gas phase part 1a of the gas hydrate production tank 1 is removed from the first pipe 25a, the gas phase part 2a of the dehydration tower 2, and the second pipe. 30a, the gas phase part 3a of the pellet forming apparatus 3, the third The gas 34 is forcibly returned to the gas phase part 1 a of the gas hydrate production tank 1 through the pipe 34 a, the gas phase part 4 a of the pellet cooling tank 4, the fourth pipe 43 a and the circulation pipe 52.
- the gas phase part 2a of the dehydration tower 2 and the gas phase part 3 of the pellet forming apparatus 3 a since the gas phase of the gas phase portion 4a of the pellet cooling tank 4 has the same equilibrium composition as the gas phase (unreacted gas g ′) of the gas phase portion 1a of the gas hydrate generator 1, 2, the generation of new gas hydrate in the downstream equipment such as the pellet forming apparatus 3, the pellet cooling tank 4, or the first to fourth pipes 25a, 30a, 34a, 43a, etc. is suppressed, Operational problems are suppressed.
- a circulation pipe 52 is connected to the source gas supply pipe 7, and the source gas supply pipe 7 The same effect can be obtained by premixing the unreacted gas g ′ returned by the circulation pipe 52 with the natural gas g supplied by the above.
Landscapes
- Chemical & Material Sciences (AREA)
- Engineering & Computer Science (AREA)
- Oil, Petroleum & Natural Gas (AREA)
- Chemical Kinetics & Catalysis (AREA)
- General Chemical & Material Sciences (AREA)
- Organic Chemistry (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Organic Low-Molecular-Weight Compounds And Preparation Thereof (AREA)
- Filling Or Discharging Of Gas Storage Vessels (AREA)
Abstract
Description
る混合ガスハイドレート製造プラントの運転方法に関する。
で反応させ、水を凍らせることなく天然ガスハイドレートを生成し、生
成された天然ガスハイドレートを物理的に脱水し、更に、この物理脱水
の過程、若しくは、脱水後において天然ガスハイドレートに含まれる残
存水分を天然ガスと反応させて天然ガスハイドレートを生成することに
よって天然ガスハイドレートの含水率を低下させ、これを氷点よりも低
温になるまで冷却したのち減圧することが知られている(例えば、特許
文献1参照。)。
、その気相が天然ガス組成である場合、そこに含まれる重質成分(エタ
ン、プロパン、ブタンなど)により、新たにガスハイドレート生成が起
こることもある。そうした場合、輸送不良等の運転トラブルを生ずる虞
れがある。
の設備の気相とハイドレートと水を平衡状態、すなわち、気相を生成槽
のガス組成にしておくことが必要であり、これに類似する発明としては
、例えば、特許文献2が知られている。
で稀釈調整するための付帯設備、すなわち、制御系を含めた付帯設備が
大掛かりになる。また、生成条件下で平衡組成に調整することが困難で
あり、下流設備でガスハイドレートが生成する虞れが依然として残るな
どの課題がある。
の目的とするところは、原料ガスの稀釈設備を用いることなく設備のシ
ンプル化を図ること、また、下流工程の気相を生成工程の気相と同じ平
衡状態の組成にすることにより、ガスハイドレート製造設備の運転を安
定化させることができる混合ガスハイドレート製造プラントの運転方法
を提供することにある。
イドレート生成工程の下流に位置している下流工程の気相との間で循環
させることにより、各工程の気相を生成工程の気相と同じ平衡状態の組
成にすることを特徴とするものである。
のである。
ていることを特徴とするものである。
イドレート生成工程の下流に位置している下流工程の気相との間で循環
させることにより、各工程の気相を生成工程の気相と同じ平衡状態の組
成にするので、生成工程より下流に設けられている物理脱水設備や輸送
設備において混合ガスハイドレートの新たな生成が抑制され、混合ガス
ハイドレートの生成に起因する閉塞や機器の不具合など、運転トラブル
が発生する虞れを未然に解消することができる。また、従来の発明のよ
うに、原料ガスを稀釈する設備が不要になり、設備のシンプル化を図る
ことができる。
(1)実施形態1
図1に示すように、本発明に係る基本的な混合ガスハイドレート生成
プラントAは、ガスハイドレート生成槽1と脱水塔2より構成されてい
る。ガスハイドレート生成槽1の気相部1aは、第1配管25aを介し
て脱水塔2の気相部2aと連通し、脱水塔2の気相部2aは、第2配管
30aとブロア51と循環パイプ52とを介してガスハイドレート生成
槽1の気相部1aと連通している。
介して脱水塔2の固液部2bと連通し、脱水塔2の固液部2bは、第6
配管30bを介して次工程の設備と連通している。また、ガスハイドレ
ート生成槽1は、原料ガス供給管7及び原料水供給管8を具備すると共
に、固液相を攪拌する攪拌機(図示せず)を備えている。
。
原料ガス供給管7からガスハイドレート生成槽1内に供給された混合
ガス、例えば、天然ガスgは、原料水供給管8から供給された水wと反
応して天然ガスハイドレートになる。ガスハイドレート生成槽1内の天
然ガスハイドレートは、水wと一緒に脱水塔2に供給されて脱水される
。脱水された天然ガスハイドレートnは、第6配管30bを経て次工程
の設備に導出される。
の気相部1a内の未反応ガスは、ガスハイドレート生成槽1の気相部1
a、第1配管25a、脱水塔2の気相部2a、第4配管30a、ブロア
51及び循環パイプ52を経てガスハイドレート生成槽1の気相部1a
に強制的に循環される。
1の気相部1aの気相(未反応ガス)と同じ平衡状態の組成になること
から、脱水塔2などの下流設備における新たなガスハイドレートの生成
が抑制され、閉塞や機器の不具合など、運転上のトラブルが抑制される
。
によって供給される天然ガスgに循環パイプ52によって循環される未
反応ガスを混合しても同様の効果が得られる。
図2に示すように、本発明に係る混合ガスハイドレート生成プラント
A’は、ガスハイドレート生成槽1、脱水塔2、ペレット成形装置3及
びペレット冷却槽4により構成される。ガスハイドレート生成槽1の気
相部1aは、第1配管25aを介して脱水塔2の気相部2aと連通し、
脱水塔2の気相部2aは、第2配管30aを介してペレット成形装置3
の気相部3aと連通し、ペレット成形装置3の気相部3aは、第3配管
34aを介してペレット冷却槽4の気相部4aと連通し、ペレット冷却
槽4の気相部4aは、第4配管43aとブロア51と循環パイプ52と
を介してガスハイドレート生成槽1の気相部1aと連通している。
介して脱水塔2の固液部2bと連通し、脱水塔2の固液部2bは、第6
配管30bを介してペレット成形装置3の固液部3bと連通し、ペレッ
ト成形装置3の固液部3bは、第7配管34bを介してペレット冷却槽
4の固液部4bと連通し、ペレット冷却槽4の固液部4bは、第8配管
43bを介して次工程の設備と連通している。
給管8を具備すると共に、固液相を攪拌する攪拌機(図示せず)を備え
ている。
。
原料ガス供給管7からガスハイドレート生成槽1内に供給された混合
ガス、例えば、天然ガスgは、原料水供給管8から供給された水wと反
応して天然ガスハイドレートになる。ガスハイドレート生成槽1内の天
然ガスハイドレートは、水wと一緒に脱水塔2に供給されて脱水される
。脱水された天然ガスハイドレートは、第6配管30bを経てペレット
成形装置3に供給されて所定の形状及び寸法のペレットに成形される。
ペレットは、第7配管34bを経てペレット冷却槽4に供給されて所定
の温度に冷却される。冷却されたペレットpは、第8配管43bを経て
次工程の設備に導出される。
の気相部1a内の未反応ガスは、ガスハイドレート生成槽1の気相部1
a、第1配管25a、脱水塔2の気相部2a、第2配管30a、ペレッ
ト成形装置3の気相部3a、第3配管34a、ペレット冷却槽4の気相
部4a、第4配管43a、ブロア51及び循環パイプ52を経てガスハ
イドレート生成槽1の気相部1aに強制的に循環される。
a、ペレット冷却槽4の気相部4aの気相が、ガスハイドレート生成槽
1の気相部1aの気相(未反応ガス)と同じ平衡状態の組成になること
から、脱水塔2、ペレット成形装置3、ペレット冷却槽4などの下流設
備における新たなガスハイドレートの生成が抑制され、閉塞や機器の不
具合など、運転上のトラブルが抑制される。
によって供給される天然ガスgに循環パイプ52によって循環される未
反応ガスを予混合しても同様の効果が得られる。
本発明の混合ガスハイドレート生成プラントA”は、図3に示すよう
に、ガスハイドレート生成槽1と、脱水塔2と、ペレット成形装置3と
、ペレット冷却槽4と、ペレット貯槽5と、脱圧装置6により構成され
ている。
方にガス噴出ノズル13を備えている。このガスハイドレート生成槽1
は、その頂部11aに原料ガス供給管7及び原料水供給管8を備えてい
る。原料ガス供給管7は、流量調整弁9を備え、原料水供給管8は、バ
ルブ10を備えている。
とを連通するガス循環路14を具備し、気相部1aの未反応ガスg’を
第1ブロワ15によってガス噴出ノズル13に供給すると共に、第1冷
却器16によって所定の温度に冷却するようにしている。ガスハイドレ
ート生成槽1の気相部1aは、第1配管25aを介して脱水塔2の気相
部2aと連通している。
4を備えた第5配管(スラリー供給管)25bを介して脱水塔2の底部
21aと連通し、スラリー供給管25bから分岐したスラリー循環路2
6は、ガスハイドレート生成槽1の側面に接続している。スラリー循環
路26は、第2のスラリーポンプ27及び第2冷却器28を備え、スラ
リー循環路26を通過するスラリーsを冷却するようになっている。
に設けた中空状の排水部22と、排水部22に対峙する塔体部分に設け
たスクリーン23によって構成され、排水部22は、排水管29を介し
てスラリー循環路26に連通している。脱水塔2は、第6配管(スクリ
ューフィーダー)30bによって脱水されたガスハイドレートnをペレ
ット成形装置3に供給するようになっている。また、脱水塔2の気相部
2a及び排水部22の気相部2aは、第2配管30aを介してペレット
成形装置3の気相部3aと連通している。
グロール32,32を設けた高圧ペレタイザであり、粉末状のガスハイ
ドレートを所定の形状のペレット(例えば、レンズ型、アーモンド型、
ピロー型など)pに形成するようになっている。また、ペレット成形装
置3の気相部3aは、第3配管34aを介してペレット冷却槽4の気相
部4aと連通している。また、ペレット成形装置3の下端部は、第7配
管(ペレット払い出しダクト)34bを介してペレット冷却槽4の上端
部に接続している。
設けた冷却ジャケット42より構成され、冷却ジャケット42によって
中空容器41内のペレットpを冷却するようになっている。また、ペレ
ット冷却槽4は、第4配管43a及び第2ブロワ51を備えた循環パイ
プ52を介してガスハイドレート生成槽1の頂部11aに接続している
。
る第8配管(ダクト)43bの中間部に設けた脱圧装置6は、筒状容器
61の上部に上部バルブ62を設け、筒状容器61の下部に下部バルブ
63を設けている。
る。
先ず、スラリー循環路26に設けた第2スラリーポンプ27と第2冷
却器28を駆動してガスハイドレート生成槽1内の水wを所定の温度(
例えば、3℃)に冷却する。
、例えば、天然ガスgをガスハイドレート生成槽1に供給しながらガス
循環路14に設けた第1ブロワ15と第1冷却器16を駆動してガスハ
イドレート生成槽1の気相部1aの未反応ガスg’をガス噴出ノズル1
3に供給する。
なって水w内に噴出され、更に、攪拌機12によって攪拌されるため、
水wと水和反応して天然ガスハイドレートに成る。
ン1.86%、i-ブタン0.42%、n-ブタン0.47%、i-ペ
ンタン0.15%、n-ペンタン0.08%、二酸化炭素1%・・・で
あるが、エタン、プロパンなどの重質部は、水と反応し易いために、ガ
スハイドレート生成槽1の気相部1a内の気相は、メタンリッチになる
。
ポンプ24によって脱水塔2の底部21aに供給される。脱水塔2によ
って脱水されたガスハイドレートnは、脱水塔2の上部から第6配管(
スクリューフィーダー)30bを通ってペレット成形装置3に供給され
、所定の形状寸法のペレットpに加工される。
レット払い出しダクト)34bを通ってペレット冷却槽4に供給され、
所定の温度(例えば、-20℃)に冷却される。ペレット冷却槽4によ
って冷却されたペレットpは、脱圧装置6によって所定圧(例えば、大
気圧より少し高圧)まで脱圧されてペレット貯槽5に貯蔵される。
槽1の気相部1a内の未反応ガスg’は、第1配管25a、脱水塔2の
気相部2a、第2配管30a、ペレット成形装置3の気相部3a、第3
配管34a、ペレット冷却槽4の気相部4a、第4配管43a及び循環
パイプ52を経てガスハイドレート生成槽1の気相部1aに強制的に戻
される。
a、ペレット冷却槽4の気相部4aの気相が、ガスハイドレート生成器
1の気相部1aの気相(未反応ガスg’)と同じ平衡状態の組成になる
ことから、脱水塔2、ペレット成形装置3、ペレット冷却槽4、或いは
、第1~第4配管25a,30a,34a,43aなどの下流設備にお
ける新たなガスハイドレートの生成が抑制され、閉塞や機器の不具合な
ど、運転上のトラブルが抑制される。
によって供給される天然ガスgに循環パイプ52によって戻される未反
応ガスg’を予混合しても同様の効果が得られる。
2 脱水塔
3 ペレット成形装置
4 ペレット冷却槽
Claims (3)
- 混合ガスハイドレート生成工程の気相を、前記混合ガスハイドレート生成工程の下流に位置している下流工程の気相との間で循環させることにより、各工程の気相を生成工程の気相と同じ平衡状態の組成にすることを特徴とする混合ガスハイドレート製造プラントの運転方法。
- 下流工程が脱水工程を構成することを特徴とする請求項1記載の混合ガスハイドレート製造プラントの運転方法。
- 下流工程が脱水工程と、成形工程及び冷却工程を構成することを特徴とする請求項1記載の混合ガスハイドレート製造プラントの運転方法。
Priority Applications (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
BR112012010935-9A BR112012010935A2 (pt) | 2009-11-13 | 2010-11-09 | Método para operar instalações para produção de hidrato de gás misturado |
US13/509,229 US8921626B2 (en) | 2009-11-13 | 2010-11-09 | Method for operating plant for producing mixed-gas hydrate |
AU2010319101A AU2010319101A1 (en) | 2009-11-13 | 2010-11-09 | Method for operating plant for producing mixed-gas hydrate |
EP10829939.7A EP2500403A4 (en) | 2009-11-13 | 2010-11-09 | METHOD FOR OPERATING A FACTORY FOR PRODUCING A MIXED GAS HYDRATE |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2009-259469 | 2009-11-13 | ||
JP2009259469A JP5529504B2 (ja) | 2009-11-13 | 2009-11-13 | 混合ガスハイドレート製造プラントの運転方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2011058980A1 true WO2011058980A1 (ja) | 2011-05-19 |
Family
ID=43991638
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/JP2010/069960 WO2011058980A1 (ja) | 2009-11-13 | 2010-11-09 | 混合ガスハイドレート製造プラントの運転方法 |
Country Status (7)
Country | Link |
---|---|
US (1) | US8921626B2 (ja) |
EP (1) | EP2500403A4 (ja) |
JP (1) | JP5529504B2 (ja) |
AU (1) | AU2010319101A1 (ja) |
BR (1) | BR112012010935A2 (ja) |
MY (1) | MY162835A (ja) |
WO (1) | WO2011058980A1 (ja) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103571557B (zh) * | 2013-11-12 | 2014-12-24 | 北京化工大学 | 一种制造天然气水合物的方法 |
CN104437290B (zh) * | 2014-11-24 | 2017-01-11 | 常州大学 | 一种复配型气体水合物生成促进剂及其制备方法 |
CN105717271B (zh) * | 2016-03-11 | 2018-01-16 | 西南石油大学 | 一种海洋天然气水合物固态流化开采实验回路系统 |
FR3062657B1 (fr) | 2017-02-03 | 2021-05-07 | Engie | Installation de production de bio-methane et procede de pilotage d'une telle installation |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2003105362A (ja) | 2001-07-24 | 2003-04-09 | Mitsubishi Heavy Ind Ltd | 天然ガスハイドレートの生成方法および生成システム |
JP2005320454A (ja) * | 2004-05-10 | 2005-11-17 | Mitsui Eng & Shipbuild Co Ltd | 天然ガスハイドレートの製造方法及び製造装置 |
JP2008248192A (ja) * | 2007-03-30 | 2008-10-16 | Mitsui Eng & Shipbuild Co Ltd | ガスハイドレートの脱水方法および装置 |
JP2008248190A (ja) | 2007-03-30 | 2008-10-16 | Mitsui Eng & Shipbuild Co Ltd | 混合ガスハイドレート製造方法 |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20030004434A (ko) * | 2001-03-29 | 2003-01-14 | 미츠비시 쥬고교 가부시키가이샤 | 가스 하이드레이트 제조 장치 및 가스 하이드레이트 탈수장치 |
MY134335A (en) * | 2002-09-11 | 2007-12-31 | Jfe Eng Corp | Process for producing gas clathrate and production apparatus |
US20040143145A1 (en) * | 2003-01-07 | 2004-07-22 | Servio Phillip D. | Formation of gas hydrates by fluidized bed granulation |
JP5334576B2 (ja) * | 2005-06-27 | 2013-11-06 | ソリッド・ガス・テクノロジーズ・リミテッド・ライアビリティ・カンパニー | クラスレートハイドレート生成および解離モジュールを用いたガス流の処理方法 |
EP1956071A4 (en) * | 2005-11-29 | 2010-08-18 | Mitsui Shipbuilding Eng | METHOD FOR PRODUCING A GAS HYDROTH |
WO2007113912A1 (ja) * | 2006-04-05 | 2007-10-11 | Mitsui Engineering & Shipbuilding Co., Ltd. | ガスハイドレート製造装置及び脱水装置 |
EP2218766A4 (en) * | 2007-10-03 | 2012-08-22 | Mitsui Shipbuilding Eng | METHOD AND DEVICE FOR PREPARING GASHYDRATE PELLET |
-
2009
- 2009-11-13 JP JP2009259469A patent/JP5529504B2/ja active Active
-
2010
- 2010-11-09 WO PCT/JP2010/069960 patent/WO2011058980A1/ja active Application Filing
- 2010-11-09 EP EP10829939.7A patent/EP2500403A4/en not_active Withdrawn
- 2010-11-09 US US13/509,229 patent/US8921626B2/en not_active Expired - Fee Related
- 2010-11-09 BR BR112012010935-9A patent/BR112012010935A2/pt not_active IP Right Cessation
- 2010-11-09 AU AU2010319101A patent/AU2010319101A1/en not_active Abandoned
- 2010-11-09 MY MYPI2012001806A patent/MY162835A/en unknown
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2003105362A (ja) | 2001-07-24 | 2003-04-09 | Mitsubishi Heavy Ind Ltd | 天然ガスハイドレートの生成方法および生成システム |
JP2005320454A (ja) * | 2004-05-10 | 2005-11-17 | Mitsui Eng & Shipbuild Co Ltd | 天然ガスハイドレートの製造方法及び製造装置 |
JP2008248192A (ja) * | 2007-03-30 | 2008-10-16 | Mitsui Eng & Shipbuild Co Ltd | ガスハイドレートの脱水方法および装置 |
JP2008248190A (ja) | 2007-03-30 | 2008-10-16 | Mitsui Eng & Shipbuild Co Ltd | 混合ガスハイドレート製造方法 |
Non-Patent Citations (1)
Title |
---|
See also references of EP2500403A4 * |
Also Published As
Publication number | Publication date |
---|---|
JP2011105794A (ja) | 2011-06-02 |
US8921626B2 (en) | 2014-12-30 |
JP5529504B2 (ja) | 2014-06-25 |
EP2500403A4 (en) | 2013-04-17 |
AU2010319101A1 (en) | 2012-05-10 |
BR112012010935A2 (pt) | 2020-12-29 |
EP2500403A1 (en) | 2012-09-19 |
MY162835A (en) | 2017-07-31 |
US20120232318A1 (en) | 2012-09-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2011058980A1 (ja) | 混合ガスハイドレート製造プラントの運転方法 | |
JP2008248190A (ja) | 混合ガスハイドレート製造方法 | |
KR101495221B1 (ko) | 천연가스 하이드레이트 제조 장치 및 천연가스 하이드레이트 제조 방법 | |
US20150218469A1 (en) | System and method for slurry preparation | |
JP4285600B2 (ja) | ガスハイドレート製造装置 | |
US9447337B2 (en) | Fuel slurry heating system and method | |
JP2005248124A (ja) | ガスハイドレートの製造方法及び装置 | |
JP2006052261A (ja) | ガスハイドレート製造プロセスにおける脱圧方法及び装置 | |
JP2004035840A (ja) | ガスハイドレート脱水機 | |
US8597386B2 (en) | Method and system for continuously pumping a solid material and method and system for hydrogen formation | |
JP4745024B2 (ja) | ガスハイドレートペレットの払い出し方法及び装置 | |
JP2007254503A (ja) | ガスハイドレートペレット製造装置 | |
KR102349518B1 (ko) | 액상 프로판의 기화 방법 및 이에 사용되는 기화 장치 | |
JP4625355B2 (ja) | ガスハイドレート製造時におけるパージガス発生防止方法 | |
JP2007024198A (ja) | ボイルオフガスの処理方法及び装置 | |
JP2007002119A (ja) | 二酸化炭素−dme混合ガスの製造方法 | |
JP2007262372A (ja) | 混合ガスハイドレートの製造方法 | |
JP2007238850A (ja) | ガスハイドレート生成方法及び装置 | |
JP2010235718A (ja) | ガスハイドレート製造装置及びその制御方法 | |
JP4039619B2 (ja) | 天然ガス水和物ペレットの分解装置 | |
JP2007270031A (ja) | ガスハイドレート生成装置 | |
JP5027988B2 (ja) | ガスハイドレートの払い出し方法および払い出し装置 | |
JP2007177233A (ja) | ガスハイドレートの製造方法 | |
JP4039628B2 (ja) | ガスハイドレートの再ガス化方法及び装置 | |
JP2006110507A (ja) | ガスハイドレート脱水装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 10829939 Country of ref document: EP Kind code of ref document: A1 |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2010319101 Country of ref document: AU |
|
ENP | Entry into the national phase |
Ref document number: 2010319101 Country of ref document: AU Date of ref document: 20101109 Kind code of ref document: A |
|
WWE | Wipo information: entry into national phase |
Ref document number: 13509229 Country of ref document: US |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2010829939 Country of ref document: EP |
|
REG | Reference to national code |
Ref country code: BR Ref legal event code: B01A Ref document number: 112012010935 Country of ref document: BR |
|
REG | Reference to national code |
Ref country code: BR Ref legal event code: B01E Ref document number: 112012010935 Country of ref document: BR Free format text: APRESENTE AS TRADUCOES SIMPLES DAS FOLHAS DE ROSTO DAS CERTIDOES DE DEPOSITO DA PRIORIDADEJP 2009-259469 DE 13.11.2009; OU DECLARACOES DE QUE OS DADOS DO PEDIDO INTERNACIONAL ESTAO FIELMENTE CONTIDOS NAS PRIORIDADES REIVINDICADAS, CONTENDO TODOS OS DADOS IDENTIFICADORES DESTAS (TITULARES, NUMERO DE REGISTRO, DATA E TITULO). CABE SALIENTAR QUE NAO FOI POSSIVEL IDENTIFICAR OS TITULARES DOS PEDIDOS NOS DOCUMENTOS JUNTADOS AO PROCESSO, TAMPOUCO NOS APRESENTADOS NA OMPI, POIS SE ENCONTRAM EM JAPONES. |
|
ENP | Entry into the national phase |
Ref document number: 112012010935 Country of ref document: BR Kind code of ref document: A2 Effective date: 20120509 |