WO2010106625A1 - 乾式排ガス処理装置 - Google Patents

乾式排ガス処理装置 Download PDF

Info

Publication number
WO2010106625A1
WO2010106625A1 PCT/JP2009/055078 JP2009055078W WO2010106625A1 WO 2010106625 A1 WO2010106625 A1 WO 2010106625A1 JP 2009055078 W JP2009055078 W JP 2009055078W WO 2010106625 A1 WO2010106625 A1 WO 2010106625A1
Authority
WO
WIPO (PCT)
Prior art keywords
adsorbent
tower
regeneration tower
exhaust gas
differential pressure
Prior art date
Application number
PCT/JP2009/055078
Other languages
English (en)
French (fr)
Inventor
邦則 古山
正浩 宮
亮 鈴木
Original Assignee
ジェイパワー・エンテック株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ジェイパワー・エンテック株式会社 filed Critical ジェイパワー・エンテック株式会社
Priority to JP2011504637A priority Critical patent/JP5396464B2/ja
Priority to US13/255,078 priority patent/US8518165B2/en
Priority to PCT/JP2009/055078 priority patent/WO2010106625A1/ja
Priority to CN200980158086.8A priority patent/CN102348490B/zh
Publication of WO2010106625A1 publication Critical patent/WO2010106625A1/ja

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D53/00Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols
    • B01D53/02Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols by adsorption, e.g. preparative gas chromatography
    • B01D53/06Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols by adsorption, e.g. preparative gas chromatography with moving adsorbents, e.g. rotating beds
    • B01D53/08Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols by adsorption, e.g. preparative gas chromatography with moving adsorbents, e.g. rotating beds according to the "moving bed" method
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D53/00Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols
    • B01D53/34Chemical or biological purification of waste gases
    • B01D53/46Removing components of defined structure
    • B01D53/48Sulfur compounds
    • B01D53/50Sulfur oxides
    • B01D53/508Sulfur oxides by treating the gases with solids
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D53/00Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols
    • B01D53/34Chemical or biological purification of waste gases
    • B01D53/46Removing components of defined structure
    • B01D53/54Nitrogen compounds
    • B01D53/56Nitrogen oxides
    • B01D53/565Nitrogen oxides by treating the gases with solids
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D53/00Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols
    • B01D53/34Chemical or biological purification of waste gases
    • B01D53/74General processes for purification of waste gases; Apparatus or devices specially adapted therefor
    • B01D53/81Solid phase processes
    • B01D53/83Solid phase processes with moving reactants
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D2251/00Reactants
    • B01D2251/20Reductants
    • B01D2251/206Ammonium compounds
    • B01D2251/2062Ammonia
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D2253/00Adsorbents used in seperation treatment of gases and vapours
    • B01D2253/10Inorganic adsorbents
    • B01D2253/102Carbon
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D2253/00Adsorbents used in seperation treatment of gases and vapours
    • B01D2253/10Inorganic adsorbents
    • B01D2253/104Alumina
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D2253/00Adsorbents used in seperation treatment of gases and vapours
    • B01D2253/10Inorganic adsorbents
    • B01D2253/106Silica or silicates
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D2257/00Components to be removed
    • B01D2257/30Sulfur compounds
    • B01D2257/302Sulfur oxides
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D2257/00Components to be removed
    • B01D2257/40Nitrogen compounds
    • B01D2257/404Nitrogen oxides other than dinitrogen oxide
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D2259/00Type of treatment
    • B01D2259/40Further details for adsorption processes and devices
    • B01D2259/40083Regeneration of adsorbents in processes other than pressure or temperature swing adsorption
    • B01D2259/40088Regeneration of adsorbents in processes other than pressure or temperature swing adsorption by heating
    • B01D2259/4009Regeneration of adsorbents in processes other than pressure or temperature swing adsorption by heating using hot gas
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D2259/00Type of treatment
    • B01D2259/40Further details for adsorption processes and devices
    • B01D2259/401Further details for adsorption processes and devices using a single bed
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D2259/00Type of treatment
    • B01D2259/40Further details for adsorption processes and devices
    • B01D2259/402Further details for adsorption processes and devices using two beds

Definitions

  • the present invention relates to a dry exhaust gas treatment apparatus.
  • exhaust gas such as SOx (sulfur oxide) or NOx (nitrogen oxide) is brought into contact with the adsorbent introduced into the adsorption tower.
  • SOx sulfur oxide
  • NOx nitrogen oxide
  • a dry exhaust gas treatment apparatus for removing various harmful substances therein is known.
  • adsorbents include carbonaceous adsorbents, alumina adsorbents, siliceous adsorbents, etc., but carbonaceous materials can be processed at a relatively low temperature, and various harmful substances can be removed simultaneously. Are better.
  • the carbonaceous adsorbent include activated carbon, activated coke and the like, and in particular, pelletized adsorbent of about 0.5 to 4 cm is preferable, and these adsorbents are publicly known.
  • SOx in the exhaust gas is adsorbed and removed by the adsorbent as sulfuric acid.
  • SOx is adsorbed as an ammonium salt, and NOx is reduced to nitrogen and water by the adsorbent's catalytic action and rendered harmless.
  • Other harmful components are mainly adsorbed and removed by the adsorbent.
  • a large amount of various substances such as sulfuric acid and ammonium salt are adhered to the adsorbent used for exhaust gas treatment in the adsorption tower, and its activity is reduced. Therefore, such an adsorbent is sent to a regeneration tower through a transfer path such as a conveyor and regenerated by heating to desorb the adsorbed material and restore the activity.
  • the adsorbent whose activity has been recovered is returned to the adsorption tower again through a transfer path such as a conveyor.
  • a gas (carrier gas) for purging the desorbed material from the adsorbent may be used.
  • an inert gas such as nitrogen is used.
  • the pressure inside the regeneration tower depends on the amount of desorbed gas generated.
  • the amount of desorbed gas generated varies depending on the amount of adsorption to the adsorbent in the adsorption tower and the adsorbent transfer speed.
  • the pressure inside the adsorption tower depends on the amount of exhaust gas, the concentration of dust in the exhaust gas, and the adsorbent transfer speed in the adsorption tower.
  • the present invention has been made in view of the above circumstances, and further secures a degree of freedom relating to the height of the regeneration tower, and follows an excessive or secular change in the sealing performance between the transfer path and the regeneration tower.
  • An object of the present invention is to provide a possible dry exhaust gas treatment apparatus.
  • the present invention employs the following means in order to solve the above problems.
  • the dry exhaust gas treatment apparatus includes an adsorption tower that removes harmful substances in exhaust gas using an adsorbent, a regeneration tower that desorbs adsorbate from the adsorbent, and the adsorbent from the adsorption tower.
  • a lock hopper that is connected to one end of the regeneration tower on the larger differential pressure side of the second differential pressure between the regeneration tower and the second transfer path to ensure airtightness, and the differential pressure
  • a sealing portion that is connected to the other end of the regeneration tower on the smaller side of the regenerative tower to ensure airtightness, and an adjustment portion for maintaining the differential pressure in the sealing portion within a certain range.
  • the height of the entire apparatus can be made lower than when the lock hopper is disposed at both end portions.
  • voltage in a sealing part is maintained in the fixed range by the adjustment part, the pressure concerning a sealing part can be restrained in a fixed range. Therefore, the airtightness before and after the sealing portion can be maintained regardless of excessive or aging of the sealing portion.
  • the dry exhaust gas treatment apparatus is the dry exhaust gas treatment apparatus, wherein the adjusting unit discharges the desorbed gas containing the desorbed material from the adsorbent from the regeneration tower. It is arranged on the road.
  • the pressure in the regeneration tower when the pressure in the regeneration tower increases and the first differential pressure or the second differential pressure exceeds a certain range, the pressure in the regeneration tower is changed by adjusting the adjustment section, The differential pressure can be maintained within a certain range.
  • the degree of freedom regarding the height of the regeneration tower can be further secured.
  • the sealing performance can be maintained over a long period by following the excessive or aging change of the sealing performance between the transfer path and the regeneration tower. Furthermore, it is possible to reduce components such as a lock hopper, a rotary valve, and an inert gas line for rotary valve sealing.
  • FIG. 1 is a functional block diagram showing a dry exhaust gas treatment apparatus according to the first embodiment.
  • the dry exhaust gas treatment apparatus 1 includes an adsorption tower 2, a regeneration tower 3, a first transport path 4A and a second transport path 4B that transport the adsorbent by connecting the adsorption tower 2 and the regeneration tower 3, and
  • the lock hopper 5 connected to the lower end side of the regeneration tower 3, the rotary valve (sealing part) 6 connected to the upper end side of the regeneration tower 3, and the desorbed gas G containing the desorbed material from the adsorbent are washed.
  • a cleaning tower 7 7.
  • the adsorption tower 2 performs a process of adsorbing and removing various substances in a gas such as SOx (sulfur oxide) using an adsorbent (for example, a carbonaceous adsorbent, an alumina adsorbent, a siliceous adsorbent, etc.). It is.
  • an exhaust gas introduction port 8 through which exhaust gas is introduced, an adsorption tower body 9 in contact with an adsorbent, and an exhaust gas outlet 10 through which exhaust gas from which various substances have been adsorbed and removed are led out from the adsorption tower body 9. And are arranged.
  • the regeneration tower 3 includes a cylindrical regeneration tower main body 11, a preheating gas introduction path 12, a preheating gas lead-out path 13, a desorption gas lead-out path 15, a heating gas introduction path 16, and a heating gas lead-out connected to the regeneration tower main body 11.
  • a passage 17, an inert gas introduction passage 18, a cooling medium introduction passage 20, and a cooling medium outlet passage 21 are provided.
  • the regenerator main body 11 includes a storage chamber 22, a preheating chamber 23, a separation chamber 25, a heating chamber 26, and a cooling chamber 27 as in the prior art, and the separation chamber 25 is arranged above the heating chamber 26 ( Desorption gas top-down mold).
  • the adsorbent used for exhaust gas treatment in the adsorption tower 2 and adsorbing various substances is temporarily stored.
  • the preheating chamber 23 is connected to a preheating gas introduction path 12 for introducing a preheating gas into the preheating chamber 23 and a preheating gas outlet path 13 for discharging the preheating gas after preheating from the preheating chamber 23.
  • the adsorbent is gradually heated to about 180 ° C. (in the case of a carbonaceous material) by heat exchange with the preheating gas.
  • a desorbed gas lead-out path 15 for discharging the desorbed material separated from the adsorbent as the desorbed gas G together with the inert gas I.
  • the heating chamber 26 is connected to a heating gas introduction path 16 for introducing a heating gas into the heating chamber 26 and a heating gas outlet path 17 for discharging the heated heating gas from the heating chamber 26.
  • the adsorbent on which various substances are adsorbed is heated to a high temperature of 400 ° C. or higher, preferably around 450 ° C. (in the case of a carbonaceous material) via the heating gas, and the adsorbate is desorbed.
  • the cooling chamber 27 is connected to a cooling medium introduction path 20 for introducing the cooling medium into the cooling chamber 27 and a cooling medium outlet path 21 through which the cooled cooling medium is discharged. Air, water or the like is used as the cooling medium.
  • the adsorbent from which the desorbed material has been desorbed is cooled by heat exchange with the cooling medium.
  • the first transfer path 4A transfers the adsorbent from the adsorption tower 2 to the regeneration tower 3.
  • the second transfer path 4 ⁇ / b> B transfers the adsorbent from the regeneration tower 3 to the adsorption tower 2.
  • a pressure gauge 28 for detecting the internal pressure is disposed in the desorbed gas lead-out path 15.
  • a pressure gauge 30 for detecting the internal pressure is disposed in the storage chamber 22.
  • a pressure gauge 31 for detecting the internal pressure is disposed on the lower end side of the regeneration tower main body 11.
  • a pressure gauge 32 that detects the internal pressure is disposed in the first transfer path 4A.
  • a pressure gauge 33 for detecting the internal pressure is disposed in the second transfer path 4B.
  • the pressure in the desorbed gas lead-out path 15 is P0
  • the pressure in the storage chamber 22 is P1
  • the pressure in the lower end side of the regeneration tower body 11 is P2
  • the pressure in the first transfer path 4A is P3
  • the second The pressure in the transfer path 4B is P4
  • the differential pressure between the regeneration tower 3 and the first transfer path 4A is the first differential pressure
  • the differential pressure between the regeneration tower 3 and the second transfer path 4B is
  • the first differential pressure is expressed as P1-P3
  • the second differential pressure is expressed as P2-P4.
  • the magnitude relationship between the pressures is P0 ⁇ P1 ⁇ P2, and P3 and P4 are substantially equal.
  • P3 ⁇ P1 In order to prevent oxygen from flowing into the regeneration tower, it is desirable to set P3 ⁇ P1, and hereinafter, when the second differential pressure is larger than the first differential pressure (mainly when the pressure in the regeneration tower is positive). State.
  • the lock hopper 5 is connected to one end of the regeneration tower 3 on the second transport path 4B side in a known configuration in order to ensure airtightness between the second transport path 4B and the regeneration tower 3.
  • the rotary valve 6 is connected to the other end of the regeneration tower 3 on the first transfer path 4A side in order to ensure airtightness between the first transfer path 4A and the regeneration tower 3.
  • the cleaning tower 7 is connected to the desorbed gas outlet path 15 and cleans the desorbed gas G.
  • a gas pipe 35 for discharging the desorbed gas G after cleaning is connected to the cleaning tower 7.
  • the gas pipe 35 is connected with a control valve (adjustment unit) 36 for maintaining the first differential pressure within a certain range, and a fan 37.
  • the control valve 36 is electrically connected to the pressure gauges 30 and 32 via the control unit 38.
  • the transferred adsorbent is introduced into the storage chamber 22 and further moved to the preheating chamber 23. Then, the preheating gas introduced into the preheating chamber 23 from the preheating gas introduction path 12 and the adsorbent are subjected to heat exchange, and the adsorbent on which the adsorbed material is adsorbed is preheated to about 180 ° C. (in the case of a carbonaceous material). The The preheated gas after preheating is discharged from the preheating chamber 23 through the preheated gas outlet passage 13.
  • the adsorbent that has moved from the preheating chamber 23 to the heating chamber 26 is heated to 400 ° C. or more (in the case of a carbonaceous material) by heat exchange with the heating gas introduced into the heating chamber 26 from the heating gas introduction path 16 and adsorbed. Things are desorbed.
  • the heated gas after heating is discharged from the heating chamber 26 via the heated gas outlet path 17.
  • the desorbed material desorbed from the adsorbent rises with the inert gas I and is discharged as desorbed gas G from the separation chamber 25 via the desorbed gas lead-out path 15.
  • the adsorbent is then moved to the cooling chamber 27 and is cooled by exchanging heat with the cooling medium introduced from the cooling medium introduction path 20.
  • the cooled cooling medium is discharged from the cooling chamber 27 through the cooling medium outlet path 21.
  • the desorbed gas G discharged from the separation chamber 25 through the desorbed gas lead-out path 15 is sent to the cleaning tower 7.
  • the opening degree of the control valve 36 is adjusted according to an instruction from the control unit 38.
  • P1 decreases and the first differential pressure falls within a predetermined range.
  • the lock hopper 5 ensures airtightness between the second transfer path 4B and the regeneration tower 3 against fluctuations in the second differential pressure. There is no oxygen inflow.
  • the first differential pressure in the rotary valve 6 is maintained within a certain range by the adjusting valve 36, so that the pressure applied to the rotary valve 6 is within a certain range. Can be suppressed. Therefore, it is possible to minimize the possibility that the desorbed gas rises from the separation chamber 25 to the preheating chamber 23 and the storage chamber 22. Even when the desorption gas rises upward from the separation chamber 25 in this way, the desorption gas rises very little. In addition, since the desorbed material is sufficiently re-adsorbed by the adsorbent stored in the storage chamber 22 and the adsorbent descending the preheater 23, leakage of the desorbed gas from the regeneration tower 3 does not occur.
  • the airtightness around the rotary valve 6 can be maintained following an excessive change in the sealing performance of the rotary valve 6. Further, the rotary valve 6 can follow the secular change although the sealing performance is deteriorated due to the aging of the rotor.
  • the first differential pressure is maintained within a certain range, only one rotary valve is required, and the number of devices such as a rotary valve and an inert gas line for sealing the rotary valve is reduced as compared with Patent Document 2. can do.
  • the lock hopper 5 is disposed only at the lower end side of the regeneration tower 3, the height of the entire apparatus can be made lower than when disposed at the upper and lower ends of the regeneration tower 3. Therefore, the freedom degree regarding the height of the regeneration tower 3 can be ensured more.
  • control valve 36 is arranged in the desorbed gas lead-out path 15, when the pressure in the regeneration tower 3 increases and the first differential pressure exceeds a certain range, regeneration is performed by adjusting the control valve 36.
  • the pressure in the tower 3 can be easily changed, and the first differential pressure can be maintained within a certain range.
  • FIG. 2 is a functional block diagram showing a dry exhaust gas treatment apparatus according to the second embodiment.
  • symbol is attached
  • the difference between the second embodiment and the first embodiment is that the separation chamber 25 and the heating chamber 26 in the regeneration tower 3 of the dry exhaust gas treatment apparatus 40 according to this embodiment are inverted upside down from those of the first embodiment. This is the point that it is arranged at the position (the desorption gas bottom-out mold).
  • the magnitude relationship between the pressures is P0 ⁇ P2 ⁇ P1
  • P3 is substantially the same as P4, and other configurations are the same as those in the first embodiment.
  • FIG. 3 is a functional block diagram showing a dry exhaust gas treatment apparatus according to the third embodiment.
  • symbol is attached
  • the difference between the third embodiment and the first embodiment is that the adsorption tower 51 of the dry exhaust gas treatment apparatus 50 according to this embodiment is composed of upper and lower stages of a first adsorption tower 52 and a second adsorption tower 53. It is a point that has been done.
  • the first adsorption tower 52 has an exhaust gas introduction port 8A through which exhaust gas is introduced, an adsorption tower body 9A that comes into contact with the adsorbent, and an exhaust gas guide through which exhaust gas from which various substances have been adsorbed and removed is led out from the adsorption tower body 9A.
  • An outlet 10A is arranged.
  • the second adsorption tower 53 adsorbs the exhaust gas inlet 8B into which the exhaust gas discharged from the first adsorption tower 52 is introduced, the adsorption tower body 9B in contact with the adsorbent, and the exhaust gas from which various substances are further removed.
  • An exhaust gas outlet 10B led out from the tower body 9B is disposed.
  • P3 has a higher pressure than P4.
  • the exhaust gas is discharged directly or after being subjected to another gas treatment from a chimney (not shown) into the atmosphere.
  • the adsorbent on which the adsorbate has been adsorbed is transferred to the regeneration tower 3 via the first transfer path 4A. Thereafter, the same processing as in the first embodiment is performed.
  • This dry exhaust gas treatment device 50 can also provide the same effects as those of the first embodiment.
  • the adsorption tower has two upper and lower stages, but the same effect can be obtained even if the adsorption tower is constituted by two stages, front and rear.
  • FIG. 4 is a functional block diagram showing a dry exhaust gas treatment apparatus according to the fourth embodiment.
  • symbol is attached
  • the difference between the fourth embodiment and the first embodiment is that the lock hopper 5 of the dry exhaust gas treatment apparatus 60 according to this embodiment is connected to the upper end side of the regeneration tower 3, and the rotary valve 6 is The point is that it is connected to the lower end side.
  • This embodiment is applied when the first differential pressure is larger than the second differential pressure (mainly when the inside of the regeneration tower is set to a negative pressure) with a desorption gas top-down type.
  • the arrangement positions of the lock hopper 5 and the rotary valve 6 are arranged upside down with respect to the first embodiment.
  • the relationship between the pressures is the same as in the first embodiment.
  • P2 ⁇ P4 but the introduction of the inert gas I prevents oxygen from flowing into the regeneration tower.
  • the adsorbent adsorbing various harmful substances such as sulfur oxides in the adsorption tower 2 is transferred to the regeneration tower 3 via the first transfer path 4A. And it heat-regenerates in the regeneration tower 3 by the process similar to 1st Embodiment.
  • the lock hopper 5 ensures airtightness between the first transfer path 4A and the regeneration tower 3 against fluctuations in the first differential pressure. There is no oxygen inflow.
  • the second differential pressure in the rotary valve 6 is maintained within a certain range by the adjustment valve 36, so that the pressure applied to the rotary valve 6 is within a certain range. Can be suppressed. Therefore, the possibility that the desorbed gas descends from the heating chamber 26 to the cooling chamber 27 can be minimized. In addition, even when the desorption gas descends from the heating chamber 26 toward the lower portion in this way, the desorption gas has a slight decrease amount, and the inert gas I is introduced from the lower portion. The desorbed gas does not leak from the regeneration tower 3 to the lower part.
  • the airtightness around the rotary valve 6 can be maintained following an excessive change in the sealing performance of the rotary valve 6. Further, it is possible to follow the secular change of the sealing performance of the rotary valve 6.
  • the second differential pressure is maintained within a certain range, only one rotary valve is required, and the number of devices such as a rotary valve and an inert gas line for sealing the rotary valve is reduced as compared with Patent Document 2. can do.
  • the dry exhaust gas treatment apparatus is applied to an apparatus for treating exhaust gas from a boiler, an incinerator, or a sintering furnace, making it easier to ensure the degree of freedom related to the height of the regeneration tower, and the transfer path and regeneration. It is possible to follow an excessive or secular change in the sealing performance with the tower.

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Analytical Chemistry (AREA)
  • General Chemical & Material Sciences (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Health & Medical Sciences (AREA)
  • Biomedical Technology (AREA)
  • Treating Waste Gases (AREA)
  • Separation Of Gases By Adsorption (AREA)

Abstract

 この排ガス処理装置は、排ガス内の各種有害物質を吸着材を用いて除去させる吸着塔(2)と、吸着材から吸着物を脱離させる再生塔(3)と、吸着材を吸着塔(2)から再生塔(3)へ移送する第一移送路(4A)と、吸着材を再生塔(3)から吸着塔(2)へ移送する第二移送路(4B)と、再生塔(3)内と第一移送路(4A)内との間の第一差圧、又は再生塔(3)内と第二移送路(4B)内との間の第二差圧のうち、差圧の大きい側の再生塔(3)の一端と接続されて気密性を確保するロックホッパ(5)と、差圧の小さい側の再生塔(3)の他端と接続されて気密性を確保する封止部(6)と、封止部(6)における差圧を一定の範囲内に維持するための調節部(36)と、を備える。

Description

乾式排ガス処理装置
 本発明は、乾式排ガス処理装置に関する。
 ボイラー、焼却炉あるいは焼結炉からの排ガス等を処理する装置として、吸着塔内に導入された吸着材に排ガスを接触させて、SOx(硫黄酸化物)やNOx(窒素酸化物)等といった排ガス中の各種有害物質を除去する乾式排ガス処理装置が知られている。
 吸着材としては、炭素質吸着材、アルミナ質吸着材、シリカ質吸着材等が例示されるが、炭素質ものが比較的低温での処理が可能であり、各種の有害物質を同時に除去できるので優れている。炭素質吸着材としては、活性炭、活性コークス等が例示され、特に、0.5~4cm程度のペレット化した吸着材が好ましく、これらの吸着材は、公知である。
 この装置において、排ガス中のSOxは、硫酸として吸着材に吸着されて除去される。また、前処理として、排ガス中にアンモニアが注入された場合には、SOxはアンモニウム塩として吸着されるとともに、吸着材の触媒作用によってNOxは窒素と水に還元されて無害化される。その他の有害成分は、主に吸着材に吸着されて除去される。
 吸着塔において排ガス処理に使用された吸着材には、硫酸、アンモニウム塩等の各種物質が多量に付着しており、その活性度が低下している。そのため、コンベヤ等の移送路を介してこうした吸着材を再生塔に送って加熱再生し、吸着物質を脱離させて活性度を元に戻している。
 活性度が回復した吸着材は、コンベヤ等の移送路を介して再び吸着塔に戻される。加熱再生する際には、吸着材からの脱離物をパージするためのガス(キャリアガス)が用いられることがあり、例えば窒素等の不活性ガス等が用いられる。
 再生塔において加熱再生する方式として、筒状に立設された再生塔内を流下する吸着材の流れ方向と逆方向に吸着材から吸着物が脱離した脱離ガスを流す向流方式が知られている。この向流方式は、一旦脱離したアンモニア等が吸着材に再吸着されるために、脱離ガス中に殆ど存在しないという利点がある(例えば、特許文献1,2参照)。
 そのため、脱離ガスを副生品回収設備へ送出して硫酸又は石膏といった副生品を生成する場合に、洗浄設備の負荷を低減できるため、この方式が優れている。この際、脱離ガスの圧力が一定となるように調節されている。
 特許文献1に記載の乾式排ガス処理装置においては、再生塔の上下両端側には、再生塔内への吸着材の導入・導出を規制するとともに、再生塔からの脱離ガスの漏出や再生塔への酸素の流入を規制して、シール性に優れるロックホッパが設けられている。
 また、特許文献2に記載の乾式排ガス処理装置においては、再生塔の上下両端には、二連のロータリーバルブが配されている。各二連のロータリーバルブ間には、不活性ガスが注入され、特許文献1の場合と同様に、封止部として再生塔からの脱離ガスの漏出や再生塔への酸素の流入を規制している。
特開2000-61253号公報 特許第3725013号公報
 しかしながら、上記特許文献1に記載の乾式排ガス処理装置は、再生塔の上下両端にロックホッパが配されているので、高いシール性を確保できるものの、ロックホッパ2個分の高さが必要になり、再生塔の高さの制約となる場合がある。
 ここで、再生塔の内部の圧力は、脱離ガスの発生量に依存する。そして、脱離ガスの発生量は、吸着塔での吸着材への吸着量や、吸着材移送速度により変化する。
 一方、吸着塔の内部の圧力は、排ガス量や、排ガス中のばいじん濃度、吸着塔内の吸着材移送速度に依存する。ただし、排ガス量や、排ガス組成の変化による吸着塔での吸着材への吸着量の変化が、再生塔における脱離ガスの発生量に影響を及ぼすまでには、吸着材が吸着塔からコンベヤ等の移送路を経て再生塔まで移送されるまでの時間を要し、通常数時間から数十時間を要する。そのため、脱離ガスの圧力が一定であっても、再生塔と前後のコンベヤ等の移送路との圧力差が変動してしまうことがある。
 この場合、特許文献2に記載の乾式排ガス処理装置では、ロータリーバルブ前後の圧力の変動状態が長時間にわたることになり、シール性が不完全となり、再生塔からの脱離ガスの漏出や再生塔への酸素の流入を防ぐことができない。再生塔から移送路に脱離ガスが漏出すると移送路の腐食を引き起こすだけでなく、更に移送路から脱離ガスが外部へ漏出すると安全上の問題となる。
 また、再生塔へ多量に酸素が流入すると、吸着材の異常加熱、燃焼によって吸着材が必要以上に消費されるだけでなく、吸着材の異常燃焼が再生塔内部の損傷を引き起こす可能性を生じ、問題となる。
 また、ロータリーバルブはロータの経年的摩耗によってシール性が低下するため、脱離ガスの漏洩量が増加するにつれ、多量のシール用の不活性ガスを注入する必要があり、その経年的な摩耗を見込んだシール量に相当する不活性ガス供給設備を備えなければならない。
 本発明は上記事情に鑑みて成されたものであり、再生塔の高さに関する自由度をより確保するとともに、移送路と再生塔との間のシール性の過度的または経年変化に対して追従可能な乾式排ガス処理装置を提供することを目的とする。
 本発明は、上記課題を解決するため、以下の手段を採用する。
 本発明に係る乾式排ガス処理装置は、排ガス内の有害物質を吸着材を用いて除去させる吸着塔と、前記吸着材から吸着物を脱離させる再生塔と、前記吸着材を前記吸着塔から前記再生塔へ移送する第一移送路と、前記吸着材を前記再生塔から前記吸着塔へ移送する第二移送路と、前記再生塔内と前記第一移送路内との間の第一差圧、又は前記再生塔内と前記第二移送路内との間の第二差圧のうち、差圧の大きい側の前記再生塔の一端と接続されて気密性を確保するロックホッパと、差圧の小さい側の前記再生塔の他端と接続されて気密性を確保する封止部と、該封止部における差圧を一定の範囲内に維持するための調節部と、を備えることを特徴とする。
 この発明は、ロックホッパが再生塔の端部の何れか一方のみに配されているので、両端部に配される場合より装置全体の高さを低くすることができる。
 また、調節部によって封止部における差圧が一定の範囲内に維持されるので、封止部にかかる圧力を一定の範囲内に抑えることができる。したがって、封止部の過度的または経年変化にかかわらず封止部前後の気密性を維持することができる。
 また、本発明に係る乾式排ガス処理装置は、前記乾式排ガス処理装置であって、前記調節部が、前記吸着材からの脱離物を含む脱離ガスを前記再生塔から排出する脱離ガス導出路に配されることを特徴とする。
 この発明は、再生塔内の圧力が高まって第一差圧又は第二差圧が一定の範囲を超えたとき、調節部を調整することによって再生塔内の圧力を変動させ、封止部における差圧を一定の範囲内に維持することができる。
 本発明によれば、再生塔の高さに関する自由度をより確保することができる。そして、移送路と再生塔との間のシール性の過度的または経年変化に対して追従することによってシール性を長期にわたって維持することができる。更には、ロックホッパ、ロータリーバルブ、ロータリーバルブシール用の不活性ガスライン等の構成機器を低減することができる。
本発明の第1の実施形態に係る乾式排ガス処理装置を示す機能ブロック図である。 本発明の第2の実施形態に係る乾式排ガス処理装置を示す機能ブロック図である。 本発明の第3の実施形態に係る乾式排ガス処理装置を示す機能ブロック図である。 本発明の第4の実施形態に係る乾式排ガス処理装置を示す機能ブロック図である。
符号の説明
 1,40,50,60  乾式排ガス処理装置
 2,51  吸着塔
 3  再生塔
 4A  第一移送路
 4B  第二移送路
 5  ロックホッパ
 6  ロータリーバルブ(封止部)
 15  脱離ガス導出路
 36  調節弁(調節部)
 以下、本発明に係る乾式排ガス処理装置の実施形態について、図を参照して説明する。
 図1は、第1の実施形態に係る乾式排ガス処理装置を示す機能ブロック図である。
 本実施形態に係る乾式排ガス処理装置1は、吸着塔2と、再生塔3と、吸着塔2及び再生塔3を結んで吸着材を移送する第一移送路4A及び第二移送路4Bと、再生塔3の下端側と接続されたロックホッパ5と、再生塔3の上端側と接続されたロータリーバルブ(封止部)6と、吸着材からの脱離物を含む脱離ガスGを洗浄する洗浄塔7と、を備えている。
 吸着塔2は、SOx(硫黄酸化物)等のガス中の各種物質を吸着材(例えば、炭素質吸着材、アルミナ質吸着材、シリカ質吸着材等)を用いて吸着除去する処理を行うものである。吸着塔2には、排ガスが導入される排ガス導入口8と、吸着材と接触される吸着塔本体9と、各種物質が吸着除去された排ガスが吸着塔本体9から導出される排ガス導出口10と、が配されている。
 再生塔3は、筒状の再生塔本体11と、再生塔本体11と接続された予熱ガス導入路12、予熱ガス導出路13、脱離ガス導出路15、加熱ガス導入路16、加熱ガス導出路17、不活性ガス導入路18、冷却媒体導入路20、及び冷却媒体導出路21を備えている。
 再生塔本体11は、従来と同様、貯留室22、予熱室23、分離室25、加熱室26、及び冷却室27を備えており、分離室25が加熱室26の上部に配されている(脱離ガスの上抜き型)。
 貯留室22は、吸着塔2にて排ガス処理に使用され各種物質を吸着している吸着材が一旦貯留される。
 予熱室23は、予熱室23内に予熱ガスを導入する予熱ガス導入路12と、予熱後の予熱ガスを予熱室23から排出する予熱ガス導出路13と、が接続されている。予熱室23では、吸着材が予熱ガスとの熱交換によって180℃程度(炭素質材の場合)まで漸次温度上昇される。
 分離室25には、吸着材から分離した脱離物を不活性ガスIとともに脱離ガスGとして排出させる脱離ガス導出路15が接続されている。
 加熱室26は、加熱室26内に加熱ガスを導入する加熱ガス導入路16と、加熱後の加熱ガスを加熱室26内から排出する加熱ガス導出路17と、が接続されている。加熱室26内では、各種物質が吸着された吸着材が、加熱ガスを介して400℃以上、好ましくは450℃前後(炭素質材の場合)の高温まで加熱され、吸着物が脱離される。
 冷却室27は、冷却室27内に冷却媒体を導入する冷却媒体導入路20と、冷却後の冷却媒体が排出される冷却媒体導出路21と、が接続されている。
 冷却媒体としては空気、水等が使用される。冷却室27では、脱離物が脱離された吸着材が冷却媒体との熱交換によって冷却される。
 第一移送路4Aは、吸着材を吸着塔2から再生塔3へ移送する。一方、第二移送路4Bは、吸着材を再生塔3から吸着塔2に移送する。
 脱離ガス導出路15には、内部の圧力を検出する圧力計28が配されている。貯留室22には、内部の圧力を検出する圧力計30が配されている。再生塔本体11の下端側には、内部の圧力を検出する圧力計31が配されている。第一移送路4Aには、内部の圧力を検出する圧力計32が配されている。第二移送路4Bには、内部の圧力を検出する圧力計33が配されている。
 ここで、脱離ガス導出路15内の圧力をP0、貯留室22内の圧力をP1、再生塔本体11の下端側内の圧力をP2、第一移送路4A内の圧力をP3、第二移送路4B内の圧力をP4、再生塔3内と第一移送路4A内との間の差圧を第一差圧、再生塔3内と第二移送路4B内との間の差圧を第二差圧としたとき、第一差圧はP1-P3、第二差圧はP2-P4と表される。
 各圧力の大小関係は、P0<P1<P2となり、P3とP4とは略同等となっている。
 再生塔への酸素の流入を防ぐため、P3<P1としておくことが望ましく、以下、第二差圧のほうが第一差圧よりも大きい場合(主に再生塔内を正圧とする場合)について述べる。
 ロックホッパ5は、第二移送路4Bと再生塔3との間の気密性を確保するため、公知の構成にて第二移送路4B側の再生塔3の一端と接続されている。また、ロータリーバルブ6は、第一移送路4Aと再生塔3との間の気密性を確保するため、第一移送路4A側の再生塔3の他端と接続されている。
 洗浄塔7は、脱離ガス導出路15と接続されており、脱離ガスGを洗浄する。洗浄塔7には洗浄後の脱離ガスGを排出するガス管35が接続されている。このガス管35には、第一差圧を一定の範囲内に維持するための調節弁(調節部)36と、ファン37と、が接続されている。調節弁36は、圧力計30,32と制御部38を介して電気的に接続されている。
 次に、本実施形態に係る乾式排ガス処理装置1の作用について説明する。
 排ガス導入口8から吸着塔2内に導入された排ガスは、吸着塔本体9内で排ガス中の硫黄酸化物等の各種有害物質が吸着材に吸着除去される。
 そして、排ガスは、直接あるいは他のガス処理が施された後、排ガス導出口10から図示しない煙突を介して大気中へと放出される。
 一方、吸着物が吸着された吸着材は、第一移送路4Aを介して再生塔3に移送される。
 移送された吸着材は、貯留室22に導入され、さらに予熱室23に移動される。そして、予熱ガス導入路12から予熱室23内に導入された予熱ガスと吸着材とが熱交換されて、吸着物が吸着された吸着材が180℃程度(炭素質材の場合)まで予熱される。予熱後の予熱ガスは、予熱室23から予熱ガス導出路13を通して排出される。
 予熱室23から加熱室26に移動した吸着材は、加熱ガス導入路16から加熱室26内に導入された加熱ガスとの熱交換によって400℃以上(炭素質材の場合)に加熱され、吸着物が脱離される。加熱後の加熱ガスは、加熱室26から加熱ガス導出路17を介して排出される。
 吸着材から脱離された脱離物は不活性ガスIに伴って上昇し、脱離ガスGとして分離室25から脱離ガス導出路15を介して排出される。
 吸着材は、その後、冷却室27に移動され、冷却媒体導入路20から導入された冷却媒体と熱交換されて冷却される。冷却後の冷却媒体は、冷却室27から冷却媒体導出路21を介して排出される。
 分離室25から脱離ガス導出路15を介して排出された脱離ガスGは、洗浄塔7に送出される。
 排ガス量の変化による吸着材の吸着量の変化にともない、再生塔3での脱離ガスGの発生量が変動してP1が高まり第一差圧(P1-P3)が所定の範囲を超えた場合、制御部38の指示により調節弁36の開度を調整する。
 これによって、P1が低下して、第一差圧が所定の範囲内となる。また、第二差圧の変動に対しては、ロックホッパ5が第二移送路4Bと再生塔3との間の気密性を確保しており、再生塔下部から脱離ガスの漏出や再生塔への酸素の流入は生じない。
 この乾式排ガス処理装置1によれば、上述のように、調節弁36によってロータリーバルブ6における第一差圧が一定の範囲内に維持されるので、ロータリーバルブ6にかかる圧力を一定の範囲内に抑えることができる。したがって、分離室25から予熱室23、貯留室22へと脱離ガスが上昇する可能性を最小限に抑えることができる。
 このように分離室25から上部に向かって脱離ガスの上昇が生じた場合にも、脱離ガスの上昇量は微少である。また、貯留室22に貯留されている吸着材及び予熱器23を降下する吸着材にて脱離物は十分再吸着されるため、再生塔3から上部への脱離ガスの漏出は生じない。
 すなわち、ロータリーバルブ6のシール性の過度的変化に対して追従してロータリーバルブ6前後の気密性を維持することができる。また、ロータリーバルブ6は、ロータの経年的摩耗によってシール性が低下するが、このような経年変化に対しても追従することができる。また、第一差圧が一定の範囲内に維持されることからロータリーバルブは1個で良く、特許文献2の場合よりもロータリーバルブ、ロータリーバルブシール用の不活性ガスライン等の機器数を低減することができる。
 さらに、ロックホッパ5が再生塔3の下端側のみに配されているので、再生塔3の上下両端に配される場合よりも装置全体の高さを低くすることができる。したがって、再生塔3の高さに関する自由度をより確保することができる。
 特に、調節弁36が脱離ガス導出路15に配されているので、再生塔3内の圧力が高まって第一差圧が一定の範囲を超えたとき、調節弁36を調整することによって再生塔3内の圧力を容易に変動させることができ、第一差圧を一定の範囲内に維持することができる。
 次に、第2の実施形態について図2を参照しながら説明する。
 図2は、第2の実施形態に係る乾式排ガス処理装置を示す機能ブロック図である。
 なお、上述した第1の実施形態と同様の構成要素には同一符号を付すとともに説明を省略する。
 第2の実施形態と第1の実施形態との異なる点は、本実施形態に係る乾式排ガス処理装置40の再生塔3における分離室25と加熱室26とが、第1の実施形態の上下反転した位置に配されている(脱離ガスの下抜き型)とした点である。
 この場合、各圧力の大小関係は、P0<P2<P1となり、P3はP4とは略同等となっており、その他の構成は第1の実施形態と同様となっている。
 この乾式排ガス処理装置40によれば、第二差圧のほうが第一差圧よりも大きい場合、第1の実施形態と同様の作用・効果を奏することができる。
 次に、第3の実施形態について図3を参照しながら説明する。
 図3は、第3の実施形態に係る乾式排ガス処理装置を示す機能ブロック図である。
 なお、上述した他の実施形態と同様の構成要素には同一符号を付すとともに説明を省略する。
 第3の実施形態と第1の実施形態との異なる点は、本実施形態に係る乾式排ガス処理装置50の吸着塔51が、第一吸着塔52及び第二吸着塔53の上下二段で構成されているとした点である。
 第一吸着塔52には、排ガスが導入される排ガス導入口8Aと、吸着材と接触される吸着塔本体9Aと、各種物質が吸着除去された排ガスが吸着塔本体9Aから導出される排ガス導出口10Aと、が配されている。
 第二吸着塔53には、第一吸着塔52から排出された排ガスが導入される排ガス導入口8Bと、吸着材と接触される吸着塔本体9Bと、各種物質がさらに除去された排ガスが吸着塔本体9Bから導出される排ガス導出口10Bと、が配されている。この場合、P3はP4よりも高い圧力となっている。
 次に、本実施形態に係る乾式排ガス処理装置50の作用について説明する。
 排ガス導入口8Aから第一吸着塔52内に導入された排ガスは、吸着塔本体9A内で排ガス中の硫黄酸化物等の各種有害物質が吸着材に吸着除去される。その後、排ガスは、排ガス導出口10Aから排ガス導入口8Bを介して第二吸着塔53の吸着塔本体9B内で、さらに各種有害物質が吸着材によって除去される。特に、第一吸着塔52内で硫黄酸化物が十分に除去されている場合には、排ガス中にアンモニアが注入されることで、第二吸着塔53内では、窒素酸化物の分解が促進される。
 そして、排ガスは、直接あるいは他のガス処理が施された後、図示しない煙突から大気中へと放出される。
 一方、吸着物が吸着された吸着材は、第一移送路4Aを介して再生塔3に移送される。以降は、第1の実施形態と同様の処理がなされる。
 この乾式排ガス処理装置50によっても、第1の実施形態と同様の効果を奏することができる。尚、図3では吸着塔を上下二段としているが、前後、左右二段で構成しても同様の効果が得られる。
 次に、第4の実施形態について図4を参照しながら説明する。
 図4は、第4の実施形態に係る乾式排ガス処理装置を示す機能ブロック図である。
 なお、上述した他の実施形態と同様の構成要素には同一符号を付すとともに説明を省略する。
 第4の実施形態と第1の実施形態との異なる点は、本実施形態に係る乾式排ガス処理装置60のロックホッパ5が再生塔3の上端側と接続され、ロータリーバルブ6が再生塔3の下端側と接続されているとした点である。
 本実施形態は、脱離ガスの上抜き型で、第一差圧のほうが第二差圧よりも大きい場合(主に再生塔内を負圧とする場合)に適用する。この場合には、ロックホッパ5とロータリーバルブ6の配設位置が、第1の実施形態と上下反転した位置に配される。各圧力の関係は第一の実施形態と同じであり、この場合にはP2<P4となっているが、不活性ガスIの導入にて再生塔への酸素の流入を防いでいる。
 この乾式排ガス処理装置60の作用について説明する。
 第1の実施形態と同様に、吸着塔2で硫黄酸化物等の各種有害物質を吸着した吸着材は、第一移送路4Aを介して再生塔3に移送される。そして、第1の実施形態と同様の処理にて、再生塔3内で加熱再生される。
 この際、排ガス量の変化による吸着材の吸着量の変化にともない、再生塔3での脱離ガスGの発生量が変動してP2が高まり第二差圧(P2-P4)が所定の範囲を超えた場合、調節弁36の開度を調整する。これによって、P2が低下して、第二差圧が所定の範囲内となる。
 また、第一差圧の変動に対しては、ロックホッパ5が第一移送路4Aと再生塔3との間の気密性を確保しており、再生塔上部から脱離ガスの漏出や再生塔への酸素の流入は生じない。
 この乾式排ガス処理装置60によれば、上述のように、調節弁36によってロータリーバルブ6における第二差圧が一定の範囲内に維持されるので、ロータリーバルブ6にかかる圧力を一定の範囲内に抑えることができる。したがって、加熱室26から冷却室27へと脱離ガスが下降する可能性を最小限に抑えることができる。
 また、このように加熱室26から下部に向かって脱離ガスの下降が生じた場合にも、脱離ガスの下降量は微少であり、また、下部から不活性ガスIが導入されているため、再生塔3から下部への脱離ガスの漏出は生じない。
 すなわち、ロータリーバルブ6のシール性の過度的変化に対して追従してロータリーバルブ6前後の気密性を維持することができる。また、ロータリーバルブ6のシール性の経年的変化に対しても追従することができる。また、第二差圧が一定の範囲内に維持されることからロータリーバルブは1個で良く、特許文献2の場合よりもロータリーバルブ、ロータリーバルブシール用の不活性ガスライン等の機器数を低減することができる。
 なお、本発明の技術範囲は上記実施の形態に限定されるものではなく、本発明の趣旨を逸脱しない範囲において種々の変更を加えることが可能である。
 本発明に係る乾式排ガス処理装置は、ボイラー、焼却炉あるいは焼結炉からの排ガス等を処理する装置に適用され、再生塔の高さに関する自由度をより確保しやすくするとともに、移送路と再生塔との間のシール性の過度的または経年変化に対して追従することができる。

Claims (2)

  1.  排ガス内の有害物質を吸着材を用いて除去させる吸着塔と、
     前記吸着材から吸着物を脱離させる再生塔と、
     前記吸着材を前記吸着塔から前記再生塔へ移送する第一移送路と、
     前記吸着材を前記再生塔から前記吸着塔へ移送する第二移送路と、
     前記再生塔内と前記第一移送路内との間の第一差圧、又は前記再生塔内と前記第二移送路内との間の第二差圧のうち、差圧の大きい側の前記再生塔の一端と接続されて気密性を確保するロックホッパと、
     差圧の小さい側の前記再生塔の他端と接続されて気密性を確保する封止部と、
     該封止部における差圧を一定の範囲内に維持するための調節部と、
    を備えることを特徴とする乾式排ガス処理装置。
  2.  前記調節部は、前記吸着材からの脱離物を含む脱離ガスを前記再生塔から排出する脱離ガス導出路に配されることを特徴とする請求項1に記載の乾式排ガス処理装置。
PCT/JP2009/055078 2009-03-16 2009-03-16 乾式排ガス処理装置 WO2010106625A1 (ja)

Priority Applications (4)

Application Number Priority Date Filing Date Title
JP2011504637A JP5396464B2 (ja) 2009-03-16 2009-03-16 乾式排ガス処理装置
US13/255,078 US8518165B2 (en) 2009-03-16 2009-03-16 Dry exhaust-gas treating apparatus
PCT/JP2009/055078 WO2010106625A1 (ja) 2009-03-16 2009-03-16 乾式排ガス処理装置
CN200980158086.8A CN102348490B (zh) 2009-03-16 2009-03-16 干式废气处理装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2009/055078 WO2010106625A1 (ja) 2009-03-16 2009-03-16 乾式排ガス処理装置

Publications (1)

Publication Number Publication Date
WO2010106625A1 true WO2010106625A1 (ja) 2010-09-23

Family

ID=42739296

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2009/055078 WO2010106625A1 (ja) 2009-03-16 2009-03-16 乾式排ガス処理装置

Country Status (4)

Country Link
US (1) US8518165B2 (ja)
JP (1) JP5396464B2 (ja)
CN (1) CN102348490B (ja)
WO (1) WO2010106625A1 (ja)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8500888B2 (en) * 2009-03-16 2013-08-06 J-Power Entech, Inc. Regeneration tower and dry apparatus for exhaust-gas treatment
US10065176B2 (en) * 2016-05-20 2018-09-04 General Electric Technology Gmbh System and method for reducing carbon dioxide emissions from a flue gas generated via combusting a fossil fuel
CN108465360B (zh) * 2018-04-08 2020-12-04 中冶长天国际工程有限责任公司 一种高效脱硝喷氨系统
CN108939807B (zh) * 2018-07-12 2020-10-27 中冶长天国际工程有限责任公司 一种提高余热利用率及脱硝率的烟气净化装置及其使用方法
CN110075664B (zh) * 2019-06-12 2024-04-02 中冶北方(大连)工程技术有限公司 气柱式活性焦再生气气封装置
CN113155349B (zh) * 2021-04-26 2023-07-18 中国石油天然气股份有限公司 一种再生塔差压测量装置、再生塔差压测量系统
CN113786708A (zh) * 2021-08-31 2021-12-14 深圳市金华泰实验室科技发展有限公司 废气处理装置及工艺
CN116371142B (zh) * 2023-06-01 2023-10-03 中国华能集团清洁能源技术研究院有限公司 烟气低温吸附再生系统和吸附剂加热输送装置
CN117225124B (zh) * 2023-11-02 2024-03-15 济宁三才塑料有限公司 一种色母粒生产废气处理设备
CN117902668B (zh) * 2024-03-20 2024-06-18 安徽科欣环保股份有限公司 一种活性炭连续吸附再生设备

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5645743A (en) * 1979-09-20 1981-04-25 Hitachi Ltd Exhaust gas desulfurization equipment using carbonaceous adsorbent
JP2000061253A (ja) * 1998-08-24 2000-02-29 Mitsui Mining Co Ltd 乾式排ガス処理方法及び処理装置
JP3725013B2 (ja) * 2000-08-25 2005-12-07 住友重機械工業株式会社 媒体再生塔、媒体再生方法、排ガス処理装置及び排ガス処理方法

Family Cites Families (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2723300A (en) * 1951-10-01 1955-11-08 Exxon Research Engineering Co Quenching method for short-time, hightemperature gas-phase reactions
US3459306A (en) * 1964-04-18 1969-08-05 Ebara Infilco Continuous ion exchange apparatus
US3913253A (en) * 1970-10-16 1975-10-21 Bergwerksverband Gmbh Process of removing sulfur oxide from exhaust gases
US3864102A (en) * 1973-06-25 1975-02-04 Pipeline Dehydrators Inc Dehydration of a pipeline with a portable dry air generating plant
US4017278A (en) * 1974-09-30 1977-04-12 Combustion Power Company, Inc. Method and apparatus for removing finely divided solids from gas
JPS5329308B2 (ja) * 1975-02-27 1978-08-19
DE2843627A1 (de) * 1978-10-06 1980-04-17 Babcock Ag Vorrichtung zur temperaturueberwachung von adsorbern
US4306886A (en) * 1978-12-01 1981-12-22 Berg Clyde Multiple stage high temperature stripping zone in a hypersorption process
JPS59127632A (ja) * 1983-01-12 1984-07-23 Babcock Hitachi Kk 硫黄酸化物脱離塔
JPS60172330A (ja) * 1984-02-16 1985-09-05 Mitsui Miike Kakoki Kk 乾式移動層式吸着塔におけるプレ脱塵方法
DE3844422A1 (de) * 1988-12-30 1990-07-05 Steag Ag Verfahren und vorrichtung zum abtrennen unerwuenschter bestandteile aus einem abgas
EP0525521A1 (en) * 1991-08-01 1993-02-03 Mitsubishi Jukogyo Kabushiki Kaisha Gas separator system
JP3268155B2 (ja) * 1995-02-16 2002-03-25 三菱重工業株式会社 粉体気密弁
US6395664B1 (en) * 1998-02-19 2002-05-28 Uop Llc Process for reactivating a deactivated dehydrocyclodimerization catalyst with water
JP2001113116A (ja) * 1999-10-19 2001-04-24 Fujitsu Ltd 排気処理方法及び排気処理装置
JP3994605B2 (ja) * 1999-11-26 2007-10-24 株式会社日立製作所 Pfcガスの処理方法及び処理装置
JP3891834B2 (ja) * 2001-12-04 2007-03-14 大陽日酸株式会社 ガス供給方法及び装置
US20040129605A1 (en) * 2002-10-29 2004-07-08 Goldstein Stuart S. Method for revamping fixed-bed catalytic reformers
KR100635283B1 (ko) * 2003-03-04 2006-10-17 주식회사 엘지화학 배출가스 흡착 시스템 및 휘발성유기화합물 회수 방법
US7014682B2 (en) * 2003-08-07 2006-03-21 Hickerson Steven A Apparatus and process for removing contaminants from a flowing gas stream
JP4690659B2 (ja) * 2004-03-15 2011-06-01 三菱重工業株式会社 Co2回収装置
JP5230080B2 (ja) * 2006-06-06 2013-07-10 三菱重工業株式会社 吸収液、co2の除去装置及び方法
JP2008222867A (ja) * 2007-03-13 2008-09-25 Nippon Steel Engineering Co Ltd ガス化ガスの浄化方法及び浄化装置
JP5293099B2 (ja) * 2007-11-14 2013-09-18 株式会社Ihi Co2回収ガス化方法及び装置

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5645743A (en) * 1979-09-20 1981-04-25 Hitachi Ltd Exhaust gas desulfurization equipment using carbonaceous adsorbent
JP2000061253A (ja) * 1998-08-24 2000-02-29 Mitsui Mining Co Ltd 乾式排ガス処理方法及び処理装置
JP3725013B2 (ja) * 2000-08-25 2005-12-07 住友重機械工業株式会社 媒体再生塔、媒体再生方法、排ガス処理装置及び排ガス処理方法

Also Published As

Publication number Publication date
US8518165B2 (en) 2013-08-27
JP5396464B2 (ja) 2014-01-22
JPWO2010106625A1 (ja) 2012-09-20
CN102348490B (zh) 2014-01-22
US20110315016A1 (en) 2011-12-29
CN102348490A (zh) 2012-02-08

Similar Documents

Publication Publication Date Title
JP5396464B2 (ja) 乾式排ガス処理装置
CN103958029B (zh) 硫化氢分离方法及装置以及使用该装置的氢制造系统
US20110198861A1 (en) Method for producing energy and capturing co2
CN104168978B (zh) 用于从气流中去除二氧化碳的工艺
JP2009536876A (ja) 活性炭触媒床の再生方法及びシステム
TW201241366A (en) Apparatus and system for NOx reduction in wet flue gas
WO2009099040A1 (ja) 排ガス中のn2o除去方法
CN107551756A (zh) 防止腐蚀的烟气脱硫脱硝方法和装置
CN105435600A (zh) 一种污染气体的净化系统及净化方法
CN109174070B (zh) 一种活性炭解析塔及活性炭解析方法
JP2010069371A (ja) 火力発電プラントにおける石炭ボイラ排ガス中の二酸化炭素回収装置、及び二酸化炭素回収方法
WO2010061920A1 (ja) 乾式排ガス処理装置用の再生塔
CN113019094A (zh) 一种利用含硫废气高效脱汞装置及方法
CA2828644A1 (en) Method for low nox emitting regeneration of desiccants
JP5291794B2 (ja) 再生塔及び乾式排ガス処理装置
JP4772307B2 (ja) 乾式脱硫装置、乾式脱硫装置内からの水銀除去方法、及び再生塔
CN109260949B (zh) 一种防火防腐蚀再生塔
JP4970230B2 (ja) 燃焼・排ガス処理装置及び燃焼・排ガス処理方法
WO2010106624A1 (ja) 再生塔、乾式脱硫装置、吸着材の再生方法及び乾式脱硫方法
CN208082173U (zh) 运用制硫酸系统处理活性焦法焦炉烟气脱硫脱硝酸汽的处理系统
JP2009262086A (ja) 石炭ボイラ排ガスの二酸化炭素回収方法及び石炭ボイラ排ガスの二酸化炭素回収システム
JP2007063476A (ja) 燃料ガス精製システム
JP6965169B2 (ja) 気体精製装置及び気体精製方法
JP2015010211A (ja) 不純物除去方法及び脱硫方法
CN107890755A (zh) 运用制硫酸系统处理活性焦法焦炉烟气脱硫脱硝酸汽的生产工艺及处理系统

Legal Events

Date Code Title Description
WWE Wipo information: entry into national phase

Ref document number: 200980158086.8

Country of ref document: CN

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 09841831

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2011504637

Country of ref document: JP

Kind code of ref document: A

WWE Wipo information: entry into national phase

Ref document number: 13255078

Country of ref document: US

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 09841831

Country of ref document: EP

Kind code of ref document: A1