WO2008052643A2 - Verfahren und einrichtung zum auswerten von messdaten in eisenbahngleisstromkreisen - Google Patents

Verfahren und einrichtung zum auswerten von messdaten in eisenbahngleisstromkreisen Download PDF

Info

Publication number
WO2008052643A2
WO2008052643A2 PCT/EP2007/008808 EP2007008808W WO2008052643A2 WO 2008052643 A2 WO2008052643 A2 WO 2008052643A2 EP 2007008808 W EP2007008808 W EP 2007008808W WO 2008052643 A2 WO2008052643 A2 WO 2008052643A2
Authority
WO
WIPO (PCT)
Prior art keywords
frequency
track
frequencies
channel
output signal
Prior art date
Application number
PCT/EP2007/008808
Other languages
German (de)
English (en)
French (fr)
Other versions
WO2008052643A3 (de
Inventor
Peter Ellenberger
Tobias Schluer
Original Assignee
Siemens Schweiz Ag
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Siemens Schweiz Ag filed Critical Siemens Schweiz Ag
Priority to EP07818881.0A priority Critical patent/EP2084048B1/de
Publication of WO2008052643A2 publication Critical patent/WO2008052643A2/de
Publication of WO2008052643A3 publication Critical patent/WO2008052643A3/de

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L1/00Devices along the route controlled by interaction with the vehicle or train
    • B61L1/18Railway track circuits
    • B61L1/181Details
    • B61L1/187Use of alternating current
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L23/00Control, warning or like safety means along the route or between vehicles or trains
    • B61L23/08Control, warning or like safety means along the route or between vehicles or trains for controlling traffic in one direction only
    • B61L23/14Control, warning or like safety means along the route or between vehicles or trains for controlling traffic in one direction only automatically operated
    • B61L23/16Track circuits specially adapted for section blocking
    • B61L23/166Track circuits specially adapted for section blocking using alternating current

Definitions

  • the present invention relates to a method and apparatus for evaluating measurement data in railway track circuits. Further, the invention relates to a method and apparatus for track vacancy using track circuits.
  • the starting point of this invention is the widely used track circuit with the classical technical approach of the circuit.
  • the functional principle is relatively simple and will be briefly introduced.
  • a rail of the track to be monitored is separated and insulated at two points.
  • the transmitter applies voltage to one end of the isolated section.
  • the receiver at the other end of the section evaluates this voltage.
  • the received signal is thereby suppressed.
  • the evaluation after the receiver reports the section as occupied.
  • Another known embodiment provides for the supply of the GSK (track circuit) by means of a three-phase network. It comes in a driving to a detuning a device of a kind of differential transformer or a kind of electric shaft or motor. At the manufacturer Siemens, such a product is referred to as a motor relay.
  • a motor relay When driving, there is a change in the circle with respect to the following parameters, namely frequency spectrum, phase, power.
  • the mass of the motor rotor acts as an inertia filter with a pick-up delay to suppress short-term interference.
  • this object is achieved by a system and a method for track release of a section of a track section, in which: a) a length of the section is defined by a rail track interrupted at two ends; b) at one end of the rail line an alternating voltage with two alternating frequencies is fed as an input signal; c) an output signal is tapped off at the other end of the rail track; d) the tapped output signal is analyzed for its components in the two frequencies; and e) it is decided in dependence on the analysis by means of limit comparisons which state the track section has.
  • the defined AC voltage fed with a defined pulse duty factor is used, which preferably has no frequency matching with the harmonics to the frequencies of the traction supply used.
  • the selected sampling frequency may be set in response to the required response times for providing the fuse-technical operating conditions.
  • the method can be further improved in one embodiment of the invention in that the very powerful signal processing based on mathematical calculation of processes is used. Processing takes place in real time with a signal-data acquisition grid suitable for the task. The digitized values are specifically fed to the evaluation channels designed for the respective task.
  • Figure 1 shows a schematic representation of the basic principle of a track circuit
  • Figure 2 shows a received and filtered signal with interval division
  • Figure 3 threshold and a schematic level profile for a track occupancy
  • Figure 4 in a schematic representation of the emergence of maximum interference voltages by rail currents
  • FIG. 6 shows an FFT of the previous and the adapted transmission frequencies
  • FIG. 7 is a schematic representation of the functional blocks of the evaluation device
  • FIG. 8 shows an IIR receive filter
  • Figure 9 shows the effect of coefficient change on the output signal
  • Figure 11 is a schematic representation of the evaluation of the digitized received signal
  • FIG. 12 shows the functional blocks in a third receiving channel
  • FIG. 13 shows a state graph of a general free-field system
  • FIG. 14 shows a sinusoidal interference signal
  • FIG. 15 noise as interference signal
  • FIG. 16 shows a Gaussian pulse as a short-term interference
  • FIG. 17 shows the simulation of a free undisturbed section
  • FIG. 18 shows the course of the coefficients at the selected observation times (sampling times).
  • Figure 19 shows the time course of the coefficients in a regular occupancy
  • Figure 20 shows the influence of an adjacent track circuit in a Isolierstossminus
  • FIG. 21 the influence of a sinusoidal disturbance
  • FIG. 22 shows the influence of a further sinusoidal disturbance
  • FIG. 23 shows the influence of a further sinusoidal disturbance.
  • the system consists of two parts: the part “outdoor installation”, which establishes the physical connection to the infrastructure, ie the track section, and the part “indoor installation” in the signal box with the associated electronics for signal generation and evaluation of the free resp. Busy condition.
  • the outdoor unit essentially consists of the power transformers with wiring at both ends of the section transforming the transmitted high voltage on the cable to the interlocking into a track voltage of a few volts and equipped with a high-pass filter to protect the electronics of the transmitter and receiver against the high-energy interference effects of the traction currents from the 16.7 Hz or 50 Hz traction networks of the railways.
  • the part "indoor unit” consists of a strictly two-channel version of the power supply, a microcontroller for the monitoring of the functions as well as a DSP for the signal processing as well as the user interfaces A potential separation of the transmitting and receiving line is realized
  • the transmitter and receiver are physically located next to each other for reasons of noise control.
  • the UGSK uses a pause-modulated sinusoidal signal with a selectable fundamental frequency of 137.5 Hz, 175 Hz or 225 Hz.
  • the system must always be set so that the transmitter never uses the same frequency as that of the neighboring section.
  • the level of the transmitter is adjustable and can be adapted to the external conditions.
  • the ratio between transmission phase and transmission pause is 3: 2 with a period of 200 ms.
  • the receiver has a 99th order digital FIR filter at the input.
  • Figure 2 shows the timing of the transmission signal and the received signal after the filter in the undisturbed state.
  • the burst intervals 2 and 3 are used to detect an occupancy.
  • the gap interval 5 allows the detection of disturbances due to currents in the rail.
  • the two ramp intervals 1 and 4 are in the Evaluation not taken into account, since their information content is not usable.
  • the total division of intervals 1 to 5 is compared to the cycle of the transmitter due to the lead times in the track circuit shifted by 11 ms. The shift better places the gap interval over the signal pause.
  • FIG. 3 schematically shows the threshold values which serve to evaluate the calculated level P.
  • this interval is considered free. If a certain number of burst intervals are detected as free, the track section is considered free. If the level of some intervals falls below a lower limit, the section is occupied.
  • the evaluation of the gap intervals is used for fault detection. If an inadmissibly high level is detected within a gap, the interval is considered disturbed.
  • the use of a pause modulated signal has indisputable advantages in detecting interference, especially in the case of perturbations in the passband of the filter. Nevertheless, the selectivity of the filter must be compromised because the on / off-swing phases can not be used for evaluation.
  • a busy message must be delivered according to Table 1 after 300 ms. This requirement limits the order of the filter and thus the Störimmuntician.
  • Another method also consists of the two main functions sender and receiver.
  • u f (t)
  • two or more frequencies are advantageously transmitted alternately or simultaneously from sinusoidal sources. Other functions are conceivable.
  • the receiver side the signal influenced by the transmission characteristics of the track section and the respective voyage is received.
  • the received signal is now fed to an A / D converter, which converts the input signal into digital values at a relatively high sampling rate.
  • the result is fed in the form of discrete amplitude values from the monitored frequency range to the available evaluation units, which are then able to evaluate the temporal course of the amplitude and / or frequency according to their predefined criteria specific decision such as for occupancy.
  • Static disturbances include all extraordinary operating cases that are related to faults in the infrastructure (track system and safety device) and are not necessarily triggered by a vehicle.
  • the disturbances can occur suddenly, but remain for a long time. They usually require an intervention of the staff.
  • the dynamic disturbances result from the energy consumption and acceptance of the vehicles with the accompanying electrical and electromagnetic influences in the regular railway operation.
  • the ballast disorder For the operation of the track circuit is considered as a critical fault, the ballast disorder. It is detected when the receive level is between the occupancy threshold and the idle state. The system can no longer determine with certainty whether the section is free or busy. The reason for this may be that the modulus of conduction has risen impermissibly, so that the level without vehicle in the track is too much damped. On the other hand, the axle shunt resistance caused by rust-applied wheel treads or rail running surfaces can be so great that the axle shunt and thus the level are not sufficiently small despite their occupancy.
  • Another critical disorder is the override. It occurs when the transmitter level is set too high. The receiver can in this case also make no certain statement about the occupancy state of the track, since the level does not fall below the threshold for poor occupancy. This error can also be corrected only by user intervention on the transmitter.
  • An isolating shock bypass means that two adjacent track sections are no longer separated.
  • the track circuit will detect the transmitter of the neighboring section in the unused frequency band and thus detect the fault. This disruption requires intervention of the staff in the infrastructure. These disturbances can be detected solely by evaluating the burst intervals by means of threshold values. The consideration of the gap interval is not necessary.
  • the dynamic disturbance critical to a track circuit is traction current disturbance.
  • the traction current flows via the overhead line, through the vehicle and then back to the feed. Part of the stream flows back over the rail, another part through the earth cable to the catenary masts and a small part through the soil.
  • the return current can also flow back through the neighboring tracks and cause disturbances there without the neighboring track being traveled.
  • a railway system thus acts as a multi-conductor system for the return flow.
  • the entire traction current should only flow back through the rail, as the existence of a ground wire and a consistent grounding is not guaranteed.
  • the voltage at the receiver results in:
  • the disturbance is primarily a function of the disturbance current amplitude Tr and the section length 1.
  • the interference voltage is divided according to the impedances on transmitter and receiver.
  • the resistance and inductance coating from the equivalent circuit diagram in Figure 4 must be halved since these values apply to both rails together.
  • the interference is difficult to detect.
  • the disturbance can consequently occur in a broad frequency band and thus also in the passband of the filter in the track circuit.
  • the disturbance in the passband of the filter is a real threat to the integrity of the occupancy statement.
  • the transmission signal can be canceled and a wrong assignment can be generated.
  • the level can be so large despite actual occupancy at the receiver, that a false free message arises. Consequently, the receiver can not make a reliable statement about the occupancy state under this disturbance.
  • the fault can only be detected by evaluating additional information. In the solution explained above, the level of the gap interval was evaluated for this purpose. A fault is detected if the level exceeds a threshold (install disturbance current limits).
  • a threshold install disturbance current limits
  • the aim of the object / invention is therefore to achieve increased immunity to traction influences. This improves availability and reduces the likelihood of safety-critical interventions, or it can increase the allowable intercept length while maintaining consistent availability and security.
  • the characteristic of the receiver is a central point for the improvement of the interference immunity.
  • the transmission signal contains no information in the sense of communications engineering.
  • the receiver need not be able to decode and transmit information from a broadcast channel. Rather, in the received signal a fault must be reliably detected and reasonably evaluated.
  • the evaluation criteria are based on the required minimum security and on a high availability of the system.
  • the amplitude of the transmission signal is largely fixed. It has to be big enough to ensure reliable detection in poor bedding. The other limit is given up, so as not to overload the recipient with good bedding and thus small losses. However, a modulation of amplitude and frequency is conceivable.
  • time limits are imposed on the track circuits with regard to recognition of the occupancy state. The evaluation must reliably recognize the change of an occupancy status from the time of admission within the specified time limit. The operator defines this time, which may pass from the occurrence of the event to the message to the signal box. The detection must therefore be such that the output units, such as e.g. the safety relays can be controlled reliably and read out again. The specified 50 ms are sufficient for experience.
  • the occupancy of a track section by a short circuit with a metallic construction part between the two rails has the consequence that the information about an occupancy only in the ampere Litude of the received signal is included.
  • the assessment of the occupancy state is only effective by comparing the signal size at the receiver with fixed threshold values.
  • the threshold p max is the highest threshold.
  • the condition Pl> P2 defines the forbidden intermediate range between the free message FM and the busy message BM.
  • the track circuit electronics include the circuit
  • a signal transmitter which feeds a transmission signal (frequency and amplitude) suitable for the network of the track and the traction influences at one end of the section via the launching network, and the
  • Output unit for the output of the FREI, BELEGT or ERROR message to the signal box, by means of safety relays for easy read back of the output status.
  • the transmitter The transmitter
  • the transmission signal and the selective evaluation methods are matched to one another.
  • the method consists in the generation of a quasi-continuous transmission signal, which nevertheless allows a reliable detection of interference, it is described below.
  • the transmitter uses, in contrast to the previous methods, two frequencies, which are alternately output in a symmetrical grid. These two frequencies are determined from usually three or more frequencies determined by the infrastructure manager.
  • the transmission signal is parameterized as follows.
  • the transmission duration for the two frequencies is set to 170 ms by way of example.
  • the transmission frequencies are adjusted accordingly with regard to the signal evaluation method, that is, they may be slightly shifted to the specifications of the railway operators.
  • the three predefined frequencies (two are used in a section) are shifted into the discrete grid of the Fourier transformation.
  • FIG. 6 clarifies the advantages of the adapted definition.
  • the transmitted from the section taken by the respective occupancy state and by the traction current transmitted signal is fed to an A / D converter.
  • the conversion works fast and over-sampling at a rate of about 10: 1 according to the characteristics of the input signal.
  • the method used combines the approaches of various methods to produce a quasi-continuous transmission signal, which nevertheless allows a reliable detection of interference.
  • the transmitter uses two frequencies, which are used alternately.
  • the currently transmitted and received signal in each case one of the two frequencies associated with the system is able to represent the current occupancy state or its time history. On the currently not sent frequency it is possible to evaluate the incident disturbances. Furthermore, the failure of track isolations between the sections may result in non-GSK frequencies of the adjacent circuits being detected.
  • the difference between the methods used to date is that filters are not switched on and off, but only just accessed and used in a parameterized set to the current transmission frequency in a timed interval in the evaluation algorithm.
  • the received signal is generally discretized by means of an A / D converter and the current signal course in one Time window analyzed by means of an FFT.
  • the duration of the window is matched to the frequency spectrum that is important for occupancy detection.
  • two methods are used, the continuous method of evaluation and the discontinuous. If a short decision time is required for the reliable detection of a state such as that of the section occupancy, the continuous evaluation is applied.
  • the discontinuous evaluation is advantageous.
  • the discontinuous method allows evaluation of the frequency spectrum in any number n of resolution steps from the continuous process.
  • An advantageous definition is the analysis of the waveform of a time window with a defined time position for the transmission frequency switching.
  • a 256-point FFT window advances step by step with each arrival of a digital input signal value, adds the currently-converted instantaneous peak value, and eliminates the oldest value (FILO). After each forward step, an FFT is performed. With respect to the currently evaluated window, the two frequency components occur in variable proportions, the sum of the two components being constant. As a result, the periodic change of the transmission frequency without any effect on the processing, the continuity is maintained.
  • the FFT window of the continuous evaluation is also used unchanged for the discontinuous evaluation as a data source. However, data is not taken in each step, but after N steps or at a defined time relative to the transmission interval for the two different frequencies. This evaluation over time allows the detailed detection of all events that have no synchronicity with the system timing and temporally incurred in relation to the system timing only short-term (transient).
  • Evaluation Algorithm 1 Section occupancy (continuous) The amplitude value of the currently transmitted frequency is taken continuously from the frequency components calculated by FFT from each generated FFT window and evaluated according to the allocation information. The two alternately transmitted frequencies have no influence on the evaluation method.
  • the time profile of the amplitude of the transmission signal is determined by means of an amplitude evaluation for the recognition of the states 1 and 2 listed in Table 1, the occupancy and the free message), taking into account the time criteria defined in Table 2 (see also FIG. 19).
  • Algorithm 1 allows an assessment of the disturbing effects of this frequency at the current time. Since such disruptive effects due to traction are usually significantly greater than the pause time of the sampling raster in terms of time, there is also a requirement for the evaluation of the influence of the transmission signal.
  • the penetration of working frequencies from neighboring zones can also be detected as an error when an isolating shock bypass occurs.
  • the disclosure of such an error is not time critical and can be reported further.
  • the shift of the amplitude response of a digital filter can be done in two ways. For one thing, the characteristic of constant sampling frequency can be adjusted by changing the filter coefficients during operation. On the other hand, the sampling frequency can be changed without modifying the coefficients.
  • the quasi-continuous transmission signal enables the same selective filters as are possible with only one transmission frequency.
  • the immunity against interference by the reduction of the bandwidth is therefore maximum.
  • the detection of disturbances is permanently possible. Neither for occupancy detection nor for fault detection therefore worst-case cases must be assumed for the occupancy time.
  • the safety in the detection of a noise voltage is comparable or better than the described UGSK system. Simulations show that the use of two filters is not without problems. All switching operations during operation lead to reactions in the output signal of the filter. In addition, the complexity in the field of A / D conversion is increased, since at worst two separate transducers must be used for one signal. Function block A / D conversion
  • the transducer system can be designed as follows.
  • the oversampling frequency is 12.8 kHz and the useful sampling frequency is 1600 Hz.
  • the necessary oversampling frequencies can be obtained from the high system clock of the DSP.
  • the purpose of the filter 1 is to isolate the transmission signal as well as possible, so that only its amplitude is evaluated.
  • Such a filter has been designed for a continuous transmission signal.
  • This filter can be adopted in this method, since the time requirements are identical when using the quasi-continuous transmission signal.
  • the filter has to be adapted to the transmission frequency in each interval. The filter.
  • the receive filter can alternatively be designed as a feedback system.
  • the filter order is much smaller than in a FIR system.
  • the filter order has little effect on the delay of the filter. This is mainly determined by the required width of the transition area.
  • the blocking attenuation is determined analogously with - 4OdB.
  • the desired smooth amplitude response in the pass band is achieved by the design as Chebyshev II filter. The result of the design is shown for each transmit frequency in FIG.
  • the IIR filters have a -6dB bandwidth of 12 Hz. Two approaches are conceivable for this.
  • the amplitude response of the filter is shifted by replacing the coefficients in operation on the frequency axis.
  • This technique is known by adaptive filters.
  • an algorithm is designed which changes the coefficients of a filter online to realize a desired behavior.
  • Such Systems are used, for example, for system identification or echo cancellation.
  • the input signal was switched from 208.1 Hz to 224.2 Hz and the filter was loaded with the corresponding coefficients.
  • the filter shows a transient behavior after the transition, which renders the evaluation of the amplitude useless.
  • adaptive solutions always require a costly safety case if security requirements are met.
  • the adaptation to the signal frequency is already carried out in the function block A / D conversion.
  • the sampling rate must be raised or lowered accordingly.
  • the filter which, like any digital system, is referenced to the sampling frequency will not detect a change in frequency in the corresponding sampled input signal and will consequently produce an output signal as in the continuous transmit signal method.
  • the designed filters can be taken over.
  • the purpose of the filter 2 is to isolate interferences in the range of the transmission frequencies and make them assessable.
  • the filter is always set to the currently unused transmit frequency. Since the transmission frequency changes periodically, interference on both frequencies used can be detected. The information obtained corresponds to that of the gap interval in the previous system UGSK.
  • the problem with switching filter 2 is that the direction of the shift on the frequency axis is exactly the opposite of that of filter 1. This relationship is shown in FIG. When switching to the higher sampling frequency, both filters are shifted in the direction of higher frequencies. However, the filter 2 should be tuned to the lower frequency.
  • a first approach is to use a different sampling rate for both frequencies. However, it follows that at least the entire digital part of the A / D conversion must be dual-channel.
  • simplifications can be assumed. For example, it is not absolutely necessary for the noise level to be continuously monitored. It is sufficient if an impermissible interference voltage can be detected at the end of an interval. The filter 2 can thus be reset every time it is switched. The system is then allowed to settle and the amplitude is evaluated. This approach requires a new determination of the length of the transmission phase with a frequency.
  • the filter 1 For the filter 1, the length of the transmission intervals until switching does not matter because the change is compensated by the sampling. If the same order as for filter 1 is appropriately set for filter 2, a settling time of about 170 ms results. For the subsequent evaluation again two intervals of 40 ms each can be assumed. Each frequency can therefore be examined for a fault within 250 ms. The requirement that a fault message can be issued after approx. 500 ms is almost fulfilled.
  • the evaluation of the amplitude can be performed as follows. To detect the occupancy state of a section, an evaluation of the amplitude of the filtered signal is sufficient. The summation of the magnitude of the signal over a given interval is easy to implement. The length of the viewing interval must correspond to at least the period of the transmission signal, but should include several vibrations for safety reasons. The interval length of the existing system of 40ms is adopted. An appendix However, adaptation is conceivable on the basis of new findings or measurement results. The result of the summation is shown in FIG. Each shift of the window gives a new point. It can be seen that the points are subject to a slight vibration. The narrower the viewing window is chosen, the more pronounced the vibration. For this reason, the window must not be too small. From 32 samples the results are satisfactory.
  • Method III pursues an approach which promises the theoretically maximum immunity and can nevertheless detect disturbances as reliably as the previous system by evaluating a gap interval. Instead of the transmission pause of the existing system is transmitted in this method on another frequency and tracked a filter in the receiver of the transmission frequency. Another filter is tuned to the unused frequency and allows the evaluation of interference signals. From the various approaches presented and discussed above, the use of a variable sampling rate and a non-continuous filter 2 promises the greatest success. It avoids the need for a second A / D converter and avoids the problems of online tracking of the coefficients of filter 1.
  • the transmission duration of a frequency is set to 250 ms.
  • Table 4 Process parameters The spectrum analysis method uses, in contrast to all other methods presented, additional information in the frequency domain of the received signal.
  • the signal processors and fast transformation algorithms available today make a fundamental analysis of the received signals seem sensible.
  • the receiver of this method has a simple structure consisting of three functional blocks (FIG. 12).
  • a discrete transformation is applied to the received digitized signal.
  • the calculated coefficients contain all the necessary information to be able to evaluate the occupancy status and fault of the section. For example, short-time discrete Fourier transformation and wavelet transformation are used as transformations.
  • the definition of the parameters of the STFT has an effect on the transmission signal to be selected. This mechanism is described below.
  • the output of the function block Transformation provides, independent of the selected transformation, a set of coefficients representing the original signal.
  • the amplitude in the time domain is not averaged and evaluated, but the calculated coefficients are compared with threshold values.
  • the coefficients 34, 37 and 40 represent exactly the proportions of the transmission frequencies. More information is usually not necessary for the transition decision.
  • the coefficients must be evaluated permanently. The detection of an isolator surge requires this continuous information as well because the adjacent track circuits are not synchronized.
  • the time te are chosen so that the FFT window is completely within a transmitter interval and consequently only one coefficient contains the information about the transmission signal.
  • a further advantage is that the temporal transition region occurring during run-time effects when switching between the channels can be avoided.
  • the interval is used, which begins 10 ms after the switching of the transmission frequency.
  • Figures 17, 19 and 20 illustrate the timing of the evaluation in the undisturbed state.
  • the marked coefficients represent the values at the fixed times.
  • the FFT coefficients serve to trigger one of the transitions shown in FIG. They are calculated on an ongoing basis, but in most cases are only taken into account at specific points for the evaluation. The exceptions are the transition Tl and T3 in the Isolierstoss bridging.
  • the respective active frequency is hereinafter referred to as channel A with the associated coefficient Ca.
  • the frequency not currently being transmitted is channel B with the coefficient Cb.
  • the frequencies of channel A and B are thus interchanged with each interval.
  • the coefficients correspond to the reception level in the remaining methods and are also compared with threshold values.
  • the time condition is maintained at all times.
  • the occupancy should not be reported immediately after the detection, but should be monitored for the remaining 100 ms to reduce the influence of short-term disturbances.
  • the request to the transition is not very restrictive because S2 is the safe state. In the event of a malfunction, it may become a short-term zen occupancy come. In the next fixed interval, however, the fault is detected reliably. This procedure is allowed.
  • the transition T2 becomes active when the GSK is in state S2 and applies in two consecutive fixed intervals:
  • T2 is therefore more restrictive than T5. It is ensured that at neither of the two frequencies used a disturbance can lead to an incorrect FM without it being detected.
  • Transition T3 becomes active when the GSK is in state S1 and one of the following occurs: Override is detected when
  • the level is too high on both frequencies. If the level is too high on only one frequency, it is a constructive interference with an interference voltage. The section can remain free, as occupancy detection via the undisturbed frequency is still possible.
  • a ballast disturbance is recognized when the coefficient of channel A is at two consecutive intervals:
  • the neighboring GSKs are not synchronized, it must be ensured that the level is sufficiently high even in the event of an unfavorable shift between the intervals of the two GSKs. This is ensured by the continuous evaluation of the unused channel.
  • the Transition T4 describes the release of the GSK from the disorder into a regular occupancy. For this transition more than 250 ms of the transition Tl are available. To trigger T4, must be in two consecutive intervals
  • T5 The transition T5 is triggered when the GSK is in state S2 and the same conditions as at T3 are fulfilled.
  • Such punctual measurements can be used to analyze basic properties of the expected disturbances.
  • a representative overview of all possible sturgeon scenarios by all traction vehicles, trains and special operating cases is not possible with reasonable effort.
  • the measurements made so far considered only parts of the expected disturbances.
  • the following characteristics of the disturbances can be derived from the available measurement results:
  • the traction return currents of converter vehicles contain a high harmonic content at low speeds. However, the amplitudes clearly fall below the limits. In measurements below 15 kV / 16.7 Hz, there are no significant harmonics above 200 Hz. With regard to the 25 kV / 50 Hz network there are currently no measurements available.
  • the traction return currents of converter vehicles contain at high speeds a comparable harmonic content as at low speeds. The amplitude of the fundamental wave is correspondingly larger due to the converted active power. In this case, the shares above 200 Hz are also negligible.
  • the length of passenger trains can not be excessively increased due to the limited infrastructure.
  • the power consumption via the Switzerlandsammeischiene and the associated interference will increase due to the growing comfort and service demands of customers with certainty.
  • Another trend is flexible, fast trainsets with a distributed drive concept, the performance of which can significantly exceed that of a single traction unit.
  • lacking vehicles also lacks meaningful measurements.
  • the disturbances in the real operating environment will increase in intensity in the future, they will not significantly change their basic characteristics.
  • test signals described in this section are chosen so that all theoretically possible faults are covered.
  • a sinusoidal signal having a single frequency is added to the transmission signal. All parameters of the signal are variable.
  • the frequency should be in the passband of the filter.
  • the amplitude is chosen in the examples so that an extinction of the transmission signal is possible.
  • the calculation of the interference voltage from the maximum permissible rail current for long sections shows that the interference voltage can assume the same amplitude as the transmission signal.
  • a traction current with the fundamental frequency of 16.7 Hz and the first 15 harmonics simulate the effects of a moving train.
  • the specified transmission frequencies are next to the harmonics, but a too wide receive filter can include them.
  • the noise can be described in the passband like a sinusoidal signal of a frequency because the filters of Method I and III are sufficiently narrow.
  • This signal is used to investigate how long a disturbance must at least act to produce an incorrect FM or BM.
  • the results can be used to improve the strategy for troubleshooting in detailed planning. It is conceivable, for example, that a too short, reported occupancy is subsequently treated as a disorder.
  • Figure 17 shows the basic operation of this method.
  • the upper graph shows the sampled receive signal during 400 samples. At the marked times, the switching between the frequencies fl and f2 takes place.
  • the 256 samples within the marked FFT window serve as input to the transformation. They are shown in the following illustrations.
  • the lower graph shows the associated time profile of the three selected coefficients of the FFT. Since the transmission period on a channel is longer than the FFT window, there are selected times at which only one frequency of the transmitter occurs in the transformation result. These times are marked.
  • Figure 18 shows the coefficients at the excellent times over a longer time.
  • the coefficient In the undisturbed state, the coefficient reaches approximately the normal value, while cb disappears. If this situation persists for at least two intervals, the section is certainly considered free.
  • the system recognizes an occupancy by means of the continuously calculated coefficients. A sufficiently good occupancy produces the course of the coefficients shown in FIG. From the 960th sample the section is occupied. During the next 160 ms, the coefficients are smaller and then the occupancy is detected, since both cl and c2 have fallen below P2. This situation can be monitored for another 100 ms before the occupancy is reported.
  • These operating cases show that the evaluation can fulfill the basic function.
  • the oversteer and ballast disturbance are detected with the same information and other thresholds.
  • the IsolierstossGermanbrückung as remaining static interference requires separate consideration.
  • the neighboring UGSK must be set so that they always differ in a transmission frequency.
  • the simulated GSK uses frequencies 11 and 12, and the neighbor uses frequencies 12 and 13.
  • the receiver After 400 samples, there is a shock bypass and the receiver also receives the signal from the neighboring GSK.
  • the ratio of the Amplitudes from the parameters of the infrastructure Their change is not taken into account in this example.
  • the phase and switching times of the frequency are also random because the timing sources of the GSK are not synchronized.
  • an advantageous embodiment of the method according to the invention evaluates the coefficients of a fast Fourier transformation of the received signal. It offers the following advantages:
  • the effective noise bandwidth of 12.5 Hz is comparable to that of Method I, which is a factor of 2 better than the existing system.
  • the changing transmission frequency creates artificial transmission pauses. They allow a comparable fault detection as the well-known in the art track circuit UGSK 95 Siemens Siemens AG.
  • the FFT is well studied and can be implemented digitally.
  • the safety case can be provided closed.
  • the FFT requires slightly more computing power than the three method I-FIR filters.
  • the time limits for fault detection can only be kept to a minimum in the worst case scenario. However, these limits are not absolute limits, but are rather indicative. Operating parameters of the method are:

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Automation & Control Theory (AREA)
  • Train Traffic Observation, Control, And Security (AREA)
  • Electric Propulsion And Braking For Vehicles (AREA)
PCT/EP2007/008808 2006-10-30 2007-10-10 Verfahren und einrichtung zum auswerten von messdaten in eisenbahngleisstromkreisen WO2008052643A2 (de)

Priority Applications (1)

Application Number Priority Date Filing Date Title
EP07818881.0A EP2084048B1 (de) 2006-10-30 2007-10-10 Verfahren und einrichtung zum auswerten von messdaten in eisenbahngleisstromkreisen

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
EP06022614 2006-10-30
EP06022614.9 2006-10-30

Publications (2)

Publication Number Publication Date
WO2008052643A2 true WO2008052643A2 (de) 2008-05-08
WO2008052643A3 WO2008052643A3 (de) 2008-06-26

Family

ID=39223028

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/EP2007/008808 WO2008052643A2 (de) 2006-10-30 2007-10-10 Verfahren und einrichtung zum auswerten von messdaten in eisenbahngleisstromkreisen

Country Status (3)

Country Link
EP (1) EP2084048B1 (zh)
TW (1) TWI393648B (zh)
WO (1) WO2008052643A2 (zh)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2009089195A1 (en) * 2008-01-08 2009-07-16 General Electric Company Methods and system of automating track circuit calibration
EP2100793A2 (de) 2008-03-13 2009-09-16 Siemens Schweiz AG Verfahren und Einrichtung zum kontinuierlichen Auswerten von Empfangssignalen in Eisenbahngleisstromkreisen
CN103063256A (zh) * 2013-01-18 2013-04-24 深圳市速普瑞科技有限公司 一种铁路信号测量智能终端
EP2749470A1 (fr) * 2012-12-28 2014-07-02 Société Nationale des Chemins de Fer Français - SNCF Procédé et dispositif de contrôle de l'isolation électrique entre deux portions de voies ferrées, et voie ferrée équipée d'un tel dispositif
US9254852B2 (en) 2008-01-08 2016-02-09 Richard Lee Lawson Methods and system of automating track circuit calibration
DE102017221777A1 (de) * 2017-12-04 2019-06-06 Siemens Aktiengesellschaft Einrichtung zur Erzeugung eines Besetztzustandssignals für eine Eisenbahngleisanlage
EP3653465A1 (en) * 2018-11-16 2020-05-20 ALSTOM Transport Technologies Method and system for health assessment of a track circuit and/or of a track section
CN113602317A (zh) * 2021-08-24 2021-11-05 中铁建电气化局集团南方工程有限公司 一种zpw2000轨道电路调试实施方法

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3428035A1 (de) 2017-07-11 2019-01-16 Siemens Schweiz AG Verfahren zur feststellung eines belegungszustandes eines gleisabschnitts im schienenverkehr
JP6680818B2 (ja) * 2018-02-26 2020-04-15 株式会社京三製作所 軌道回路状態判定装置
RU206413U1 (ru) * 2021-03-22 2021-09-13 Федеральное государственное бюджетное образовательное учреждение высшего образования "Самарский государственный университет путей сообщения" (СамГУПС) Самонастраивающийся классификатор рельсовой цепи
CN115208321B (zh) * 2022-07-12 2023-04-11 固安信通信号技术股份有限公司 轨道电路特征信号的相位调制方法、解调算法及用途
IT202200019755A1 (it) * 2022-09-26 2024-03-26 Giuseppe Fazio Sistema ausiliario per cdb a conta-assi

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1349651A (en) * 1970-12-21 1974-04-10 Ml Eng Plymouth Electrical signalling for railways
DE2445397A1 (de) * 1974-09-23 1976-04-08 Siemens Ag Gleisstromkreis, insbesondere fuer gleichstrombahnen mit chopper-gesteuerten triebfahrzeugen
EP0539046A2 (en) * 1991-10-23 1993-04-28 Westinghouse Brake And Signal Holdings Limited Railway track circuits
FR2758301A1 (fr) * 1997-01-10 1998-07-17 Cogifer Systeme de surveillance d'au moins un canton d'un reseau ferroviaire
WO2004071839A1 (en) * 2003-02-13 2004-08-26 General Electric Company (A New York Corporation) Digital train system for automatically detecting trains approaching a crossing

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1349651A (en) * 1970-12-21 1974-04-10 Ml Eng Plymouth Electrical signalling for railways
DE2445397A1 (de) * 1974-09-23 1976-04-08 Siemens Ag Gleisstromkreis, insbesondere fuer gleichstrombahnen mit chopper-gesteuerten triebfahrzeugen
EP0539046A2 (en) * 1991-10-23 1993-04-28 Westinghouse Brake And Signal Holdings Limited Railway track circuits
FR2758301A1 (fr) * 1997-01-10 1998-07-17 Cogifer Systeme de surveillance d'au moins un canton d'un reseau ferroviaire
WO2004071839A1 (en) * 2003-02-13 2004-08-26 General Electric Company (A New York Corporation) Digital train system for automatically detecting trains approaching a crossing

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2009089195A1 (en) * 2008-01-08 2009-07-16 General Electric Company Methods and system of automating track circuit calibration
US9254852B2 (en) 2008-01-08 2016-02-09 Richard Lee Lawson Methods and system of automating track circuit calibration
EP2100793A2 (de) 2008-03-13 2009-09-16 Siemens Schweiz AG Verfahren und Einrichtung zum kontinuierlichen Auswerten von Empfangssignalen in Eisenbahngleisstromkreisen
EP2100793A3 (de) * 2008-03-13 2010-01-13 Siemens Schweiz AG Verfahren und Einrichtung zum kontinuierlichen Auswerten von Empfangssignalen in Eisenbahngleisstromkreisen
EP2749470A1 (fr) * 2012-12-28 2014-07-02 Société Nationale des Chemins de Fer Français - SNCF Procédé et dispositif de contrôle de l'isolation électrique entre deux portions de voies ferrées, et voie ferrée équipée d'un tel dispositif
FR3000457A1 (fr) * 2012-12-28 2014-07-04 Sncf Procede et dispositif de controle de l'isolation electrique entre deux portions de voies ferrees, et voie ferree equipee d'un tel dispositif
CN103063256A (zh) * 2013-01-18 2013-04-24 深圳市速普瑞科技有限公司 一种铁路信号测量智能终端
DE102017221777A1 (de) * 2017-12-04 2019-06-06 Siemens Aktiengesellschaft Einrichtung zur Erzeugung eines Besetztzustandssignals für eine Eisenbahngleisanlage
EP3653465A1 (en) * 2018-11-16 2020-05-20 ALSTOM Transport Technologies Method and system for health assessment of a track circuit and/or of a track section
AU2019264513B2 (en) * 2018-11-16 2023-01-05 Alstom Holdings Method and system for health assessment of a track circuit and/or of a track section
CN113602317A (zh) * 2021-08-24 2021-11-05 中铁建电气化局集团南方工程有限公司 一种zpw2000轨道电路调试实施方法

Also Published As

Publication number Publication date
EP2084048A2 (de) 2009-08-05
WO2008052643A3 (de) 2008-06-26
TW200831336A (en) 2008-08-01
TWI393648B (zh) 2013-04-21
EP2084048B1 (de) 2016-11-30

Similar Documents

Publication Publication Date Title
EP2084048B1 (de) Verfahren und einrichtung zum auswerten von messdaten in eisenbahngleisstromkreisen
EP2403745B1 (de) Vorrichtungen zur detektion des belegt- oder freizustandes eines gleisabschnitts sowie verfahren zum betreiben solcher vorrichtungen
EP3053176B1 (de) Verfahren und vorrichtung zum überwachen zumindest eines elektronischen schaltkontakts für ein fahrzeug
EP2673179B1 (de) Vorrichtung zur detektion des belegt- oder freizustandes eines gleisabschnitts sowie verfahren zum betreiben einer solchen vorrichtung
EP3538905B1 (de) Verfahren, anordnung und computerprogrammprodukt für eine zustandsüberwachung von elektrischen leitungen
WO1984003672A1 (fr) Procede pour augmenter le nombre de signaux pouvant etre transmis d'une station au sol a un vehicule sur rails
EP3643579A1 (de) Vorrichtung und verfahren zur überwachung einer weiche
EP2868548B1 (de) Verfahren zur Überwachung eines Schaltungszustandes eines Schalters eines Zugsicherungssystem, sowie Zugsicherungssystem
EP2866041A1 (de) Messknoten, System und Verfahren zur Überwachung des Zustands eines Energieversorgungsnetzwerks
DE602005005207T2 (de) Betätigungs- und Überwachungsmodul, im Besonderen für Bedieneinheiten wie etwa streckenseitige Anlagen von Eisenbahnsystemen oder dergleichen
EP2587752B1 (de) Datenaustausch in einem Transportsystem unter verwendung der positiven und der negativen Halbwellen eines Wechselsignals zur Übertragung der Daten
EP3819162B1 (de) Bahnenergieversorgungssystem und verfahren zur überwachung der integrität von mindestens einem rückanschlussleiter einer rückleitung für den bahnstrom
EP1380326A1 (de) Verfahren und Vorrichtung zur digitalen Steuerung von elektrischen Verbrauchern einer Modelleisenbahnanlage
WO2023161239A1 (de) Achszählverfahren und achszählsystem
EP2100793B1 (de) Verfahren und Einrichtung zum kontinuierlichen Auswerten von Empfangssignalen in Eisenbahngleisstromkreisen
DE2445397A1 (de) Gleisstromkreis, insbesondere fuer gleichstrombahnen mit chopper-gesteuerten triebfahrzeugen
EP3300201A1 (de) Verfahren und einrichtung zum überwachen einer energieübertragungseinrichtung
EP1256503A1 (de) Radsensoreinrichtung (Schienenkontakt) bei Gleisanlagen, mit Mitteln zum Schutz vor elektromagnetischen Störungen
EP2685581A1 (de) Versorgung eines Schienenfahrzeugs mit elektrischer Energie über eine abgeschirmte Energieversorgungsleitung
EP1473208B1 (de) Verfahren zur Detektion einer Gleisbelegung
EP0282932B1 (de) Frequenzmodulierter Gleisstromkreis
EP2809564B1 (de) Detektion des belegt- oder freizustandes eines gleisabschnitts mit zustandsbewertung der elektrischen trennung zum benachbarten gleisabschnitt
DE2444251A1 (de) Gleisstromkreis, insbesondere fuer gleichstrombahnen mit chopper-gesteuerten triebfahrzeugen
DE102011079385A1 (de) Verfahren und Vorrichtung zur Erkennung eines Schienenbruches
DE1801494C (de) Isolierstoßfreie, mit Wechselstrom gespeiste Gleisstromkreise für Eisenbahnsicherungsanlagen

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 07818881

Country of ref document: EP

Kind code of ref document: A2

REEP Request for entry into the european phase

Ref document number: 2007818881

Country of ref document: EP

WWE Wipo information: entry into national phase

Ref document number: 2007818881

Country of ref document: EP

NENP Non-entry into the national phase

Ref country code: DE