WO2008029771A1 - Structure de guidage de sac de sable et procédé de construction par sacs de sable l'utilisant - Google Patents

Structure de guidage de sac de sable et procédé de construction par sacs de sable l'utilisant Download PDF

Info

Publication number
WO2008029771A1
WO2008029771A1 PCT/JP2007/067148 JP2007067148W WO2008029771A1 WO 2008029771 A1 WO2008029771 A1 WO 2008029771A1 JP 2007067148 W JP2007067148 W JP 2007067148W WO 2008029771 A1 WO2008029771 A1 WO 2008029771A1
Authority
WO
WIPO (PCT)
Prior art keywords
sandbag
guide frame
bag
sandbag bag
frame
Prior art date
Application number
PCT/JP2007/067148
Other languages
English (en)
Japanese (ja)
Inventor
Futoshi Nomoto
Original Assignee
Matsuoka, Hajime
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Matsuoka, Hajime filed Critical Matsuoka, Hajime
Publication of WO2008029771A1 publication Critical patent/WO2008029771A1/fr

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/12Revetment of banks, dams, watercourses, or the like, e.g. the sea-floor
    • E02B3/122Flexible prefabricated covering elements, e.g. mats, strips
    • E02B3/127Flexible prefabricated covering elements, e.g. mats, strips bags filled at the side

Definitions

  • the present invention relates to a sandbag bag used for ground reinforcement and the like and a sandbag bag construction method using the sandbag bag.
  • the present invention relates to a sandbag guide frame placed on the bottom of a sandbag bag for packing soil, sand, gravel, glass powder and other granular materials (hereinafter referred to as materials), and a sandbag bag construction method using the sandbag bag guide frame.
  • Sandbag bags filled with materials have been developed in recent years for disaster recovery work, tunnel pile mouth disaster recovery work, steep terrain reinforcement work, waterside embankment work, structure backfilling work, structure foundation work, soft ground Used for countermeasure construction and liquefaction countermeasure construction.
  • Such sandbags include a method of packing materials at the site and transporting them to the construction site, and a method of packing materials one bag at a time at the construction site.
  • the sandbag Since the sandbag is heavy, it becomes a heavy labor for workers.
  • the size of the sandbag bag and the quality of the sandbag bag may be slightly different, such as changes in the shape of the sandbag bag due to vibration during transportation, and tearing of the sandbag bag during loading and unloading. Is difficult.
  • the following is a conventional example of a method for bagging one bag at a construction site.
  • FIG. 9 is a view showing a molded sandbag disclosed in Patent Document 1.
  • FIG. 9 (A) is a perspective view showing a frame housed in the sandbag bag.
  • Fig. 9 (B) is a diagram showing how the frame is housed in the sandbag.
  • Fig. 9 (C) is a diagram showing the sandbag bag being completed.
  • FIG. 9 (A) is made of metal wires such as reinforcing bars and wire, and plastic.
  • Such a frame 61 is accommodated in a sandbag bag 62 as shown in FIG. 9 (B), and materials are packed in it, thereby obtaining a sandbag bag having a cubic shape as shown in FIG. 9 (C). It is done. In this way, by putting the frame 61 in the sandbag bag 62 and then packing the material, what was previously packed by two people can be packed by one person, reducing labor.
  • Fig. 9 (D) shows a hook on a part of the frame. In this way, by providing hooks 63 on the frame 61, if the hooks 62 are entangled with each other when the sandbags 62 are stacked, the sandbags 62 will pull each other and prevent further collapse. I can do it.
  • FIG. 10 is a view showing a sandbag bag having a sandbag bag bottom body according to a second conventional example.
  • the sandbag disclosed in this second conventional example is a rectangular bag having a perimeter that is the same as the waist circumference of the sandbag 71, as shown in FIG.
  • the bottom body 72 is inserted.
  • the bottom body 72 does not cause a chemical change, for example, a material conforming to a plate such as a synthetic resin foam.
  • the bottom body 72 is fixed to the bottom of the sandbag bag 71 so that the bottom body 72 does not come off the sandbag bag 71 after being inserted into the sandbag bag 71.
  • the cloth on the bottom of the sandbag 71 is bent at both ends with the triangular ear-shaped parts 74 inward at the both ends and fixed to the bottom.
  • Figure 10 (B) shows how sandbags 71 made in this way were stacked with the bottom facing sideways. Therefore, as an effect, it is possible to obtain a shape in which blocks are stacked.
  • Patent Document 1 JP-A-58-16215
  • Patent Document 2 Shoko 47-42301
  • the sandbag bag construction method of the first conventional example the sandbag bag 62 is set up, the frame 61 is put therein, and the material is packed in that state.
  • a plurality of sandbag bags 62 are arranged by carrying the sandbag bags thus produced sideways and transporting them to a place different from the place where the bags were packed.
  • it was necessary to transport the sandbag bag to a different location from where it was packed it had to be transported and the work volume was not reduced.
  • the hooks are entangled with each other. After all, work cannot be reduced.
  • the strength of one sandbag is generated by applying pressure to the sandbag.
  • sandbags of almost the same size can be manufactured.
  • pressure is applied to the sandbags.
  • the material is not compressed sufficiently and friction between materials (between particles) cannot be obtained.
  • the first conventional sandbag bag construction method since there is a hook, it is possible to connect the sandbags. Since the sandbags are individually installed and connected, there is a gap between the connected sandbags.
  • the bottom body 72 is inserted into each sandbag bag 71, the fixing band 73 is attached, and the cloth at the bottom of the sandbag bag 71 is attached to both ends.
  • the triangular ears 74 are bent inward and fixed to the bottom.
  • the work for attaching the bottom body 72 to each individual sandbag is required, and the work cannot be reduced.
  • the base 72 since the base 72 is used on its side, it is difficult to be a force S that is a gauge in a straight line or vertical direction, and a gauge (reference) in a horizontal direction.
  • the sandbags cannot be accurately arranged in a grid pattern because they are placed without any gaps.
  • the material of the bottom 72 is described as a hard material that is not easily deformed, it will hinder the necessary tension on the sandbag, and sufficient strength cannot be obtained.
  • the present invention places a sandbag bag guide frame on the bottom of each sandbag, and after connecting and aligning a plurality of sandbag guide frames in a grid pattern with connecting pieces,
  • the purpose of the present invention is to provide a sandbag bag guide frame and a sandbag bag construction method using the sandbag bag guide frame that do not require adjustment of the sandbag bag after installation.
  • the invention of claim 1 is arranged on the bottom of each sandbag, and each sandbag.
  • the plate-like ribs are formed on a rectangular hole formed in a central portion thereof and on the plate-like ribs. And a small hole formed on each outer side in the longitudinal direction of the rectangular hole.
  • the invention of claim 2 is characterized in that the sandbag guide frame includes a beam connecting the centers of the corresponding plate-shaped ribs to each other.
  • the invention of claim 3 is characterized in that a fixing piece having a pin inserted into the small hole on the plate-like rib is provided.
  • the invention of claim 4 includes a connecting piece having a claw that penetrates a rectangular hole formed in the center of the fixed piece and is inserted into the rectangular hole on the plate-like rib.
  • the invention of claim 5 comprises an upper frame and a lower frame formed in a rectangular shape for placing a sandbag bag guide frame placed in the sandbag bag, and the connecting piece is formed at an intermediate portion of the upper frame. And a base frame having a notch for joining together.
  • the invention of claim 6 arranges a plurality of sandbag bags with sandbag bag guide frames in them, and inserts a pin of a fixed piece into the small hole of the guide frame from the outside of the sandbag bag, Each guide frame is joined by inserting the claw of the connecting piece into the rectangular hole of the plate-like rib through the rectangular hole inside the fixed piece, and then the material is put into the sandbag,
  • the present invention is characterized in that a plurality of sandbag bags are arranged and arranged in a lattice pattern by pulling a fastening string and tightening an opening of the sandbag bag.
  • a plate-like shape including a rectangular hole formed in the center thereof and small holes formed on the plate-like ribs on the outer sides in the longitudinal direction of the rectangular hole.
  • Sandbag bag composed of ribs
  • the sandbag bag with the guide frame placed inside can be accurately arranged at a predetermined position on the reference line.
  • the sandbag bag contains no materials, so the work can be done in a lightweight state.
  • the material can be charged from the top of the bag, it is not necessary to move the bag from the position where the material is charged, and there are no knots on the four sides of the bag, resulting in improved horizontal adhesion and increased strength.
  • a gap is provided between the sandbag bags so that the necessary tension can be obtained in advance between the fixed piece and the connecting piece. Get in Therefore, the work which requires fine adjustment of the sandbag bag can be smoothly advanced. Therefore, the efficiency and accuracy of the work can be ensured, and the cost can be reduced by the work efficiency.
  • the sandbag bag guide frame can be provided with beams connecting the centers of the corresponding plate-shaped ribs to each other, so that the sandbag bags can be aligned in a grid pattern on a plane. it can.
  • the fixing piece having the pin inserted into the small hole on the plate-like rib is provided, the guide frame and the sandbag can be fixed by the fixing piece. . It can also be used as a guide for inserting fixed pieces on site, and the sandbags can be easily connected. Note that this pin may be attached when the guide frames are arranged in the factory or at the site.
  • the connecting piece having a claw penetrating the rectangular hole formed in the center of the fixing piece and inserted into the rectangular hole on the plate-like rib is provided, It is possible to secure in advance a gap necessary for contact with an appropriate pressure.
  • the adjacent guide frames are firmly fixed by this connecting piece, so that the sandbag bags are securely integrated with each other, and the strength of the sandbag bag after arrangement is increased. Position adjustment is not necessary.
  • the upper frame and the lower frame formed in a rectangular shape are connected to the intermediate portion of the upper frame. It has a base frame with a notch for joining the sandbags, so that when placing sandbags on mud etc., the bottom sandbag can be aligned without distortion and placed at the bottom. Since the base frames are also securely connected, the integration of the entire sandbag bag is increased, and even in extremely soft ground such as mud, dirt particles such as sludge infiltrate from the gaps between the sandbags. Since the sandbag is pushed inward by the earth pressure and the tension of the bag is lost, it is possible to prevent the phenomenon, which increases the certainty of strength reinforcement.
  • a plurality of sandbag bags with sandbag bag guide frames in them are arranged in a line, and the pin of the fixed piece is inserted into the small hole of the guide frame from the outside of the sandbag bag.
  • the guide frame and the sandbag bag are joined by inserting the claw of the connecting piece into the rectangular hole of the plate-like rib through the rectangular hole inside the fixed piece, and then the material is put into the sandbag bag,
  • Multiple sandbags are arranged in a grid by pulling the straps on the sandbag and tightening the opening of the sandbag.
  • the sandbag bag with the sandbag bag guide frame inside can be accurately arranged at a predetermined position on the reference line so that the desired strength can be obtained. Since there is no need to adjust the position of the sandbag after arrangement, there is an advantage that the position of the sandbag is not required to move.
  • FIG. 1 shows the overall structure of a sandbag guide frame according to the first embodiment of the present invention.
  • a sandbag bag guide frame 10 functions as a guide for aligning a plurality of sandbag bags placed on the bottom of the sandbag bag.
  • the sandbag guide frame 10 is formed by connecting the corners of the four plate-like ribs 11, and a connecting hole 13 is formed at the center of each plate-like rib 11.
  • Beams 12 are provided in the corresponding central portions of the plate-like ribs 11, and function to maintain the fixed shape of the guide frame when the sandbags are arranged in a lattice pattern.
  • the plate-like ribs are self-supporting like polypropylene resin, a material that can be easily deformed by a slight external force can be used.
  • Small holes 14 a and 14 b are formed at the longitudinal ends of the coupling holes 13 on each plate-like rib 11.
  • the coupling hole 13 may be formed in other shapes such as a force ellipse or a circle having a rectangular shape in the drawing.
  • the small hole 14 is a hole for inserting the pin 23 provided in the fixed piece 20, and the shape thereof may be other shapes such as a circle, an ellipse, and a rectangle.
  • FIG. 2 is a diagram showing a configuration of the fixed piece.
  • FIG. 2 (A) is a perspective view of the fixed piece 20.
  • FIG. 2B is a diagram showing a plan view, a front view, a side view, and a bottom view of the fixed piece 20.
  • the fixed piece 20 is formed of a fixed piece frame 21 having a rectangular hole 22 in the center of the fixed piece frame 21 and pins 23a and 23b on the side surfaces thereof. As will be described later, the pins 23a and 23b have a tapered shape and a thin tip.
  • the fixing piece 20 is joined to the sandbag bag guide frame 10 from the outside of the sandbag bag 40 after the sandbag bag guide frame 10 is placed on the bottom of the sandbag bag 40.
  • the fixing piece 20 has a role of fixing the sandbag bag guide frame 10 and the sandbag bag, and also has a role of facilitating the installation work of the connection piece 30 in the field.
  • the positions of the small holes 14a, 14b are estimated from the outside of the sandbag 40 (not shown) as shown by the two-dot chain arrows A and B in Fig. 1. And insert the pins 23a and 23b into the small holes 14a and 14b, respectively.
  • FIG. 2 (C) is a diagram showing a state where the fixed piece is coupled to the plate-like rib 11. According to FIG.
  • the pins 23a and 23b are inserted into the small holes 14a and 14b of the plate-like rib 11 from the top of the sandbag 40, respectively. Since the sandbag 40 is configured in a net shape, the pins 23a and 23b can be easily inserted from above the sandbag 40. As will be described later, since the fixing piece 20 is fixed by the connection piece 30, it is not necessary to firmly fit the plate-like rib 11. If it fits lightly enough not to come off, it will be good.
  • FIG. 3 is a diagram showing the configuration of the connection piece of the present invention.
  • the connection piece 30 is used to connect one sandbag guide frame 10 and the adjacent sandbag guide frame 10.
  • FIG. 3A is a perspective view showing the connection piece 30.
  • the connecting piece 30 is composed of the fixing portion 31 and the arms 32a, 32b and claws 33a, 33b and arms 34a, 34b and claws 35a, 35b formed on the J surface.
  • FIG. 3B is a view showing a state where the connection piece 30 is coupled to the plate-like rib 11.
  • the connecting piece 30 penetrates the fixed piece 20, and the claw 33a, 33b at the tip protrudes from the coupling hole 13 of the plate-like rib 11, and the claw 33a, 33b force S plate-like.
  • the claws 33 a and 33 b cannot be removed from the plate-like rib 11. It should be noted that the claws 35a and 35b are coupled to the other plate-like ribs 11. Here, the coupling is omitted.
  • This connecting piece 30 has a role of securing an appropriate gap so that a necessary strength is generated between adjacent sandbags when sandbags are arranged.
  • the connection piece 30 is usually a fixed-size connection piece. If the gap between sandbags needs to be narrowed or widened depending on the ground conditions, the connection piece 30 is used. Change the width of 30 and adjust the distance between sandbags with force S.
  • FIG. 4 is a view showing a state in which a plurality of sandbag bag guide frames are joined together.
  • a plurality of sandbag bags 40 with sandbag bag guide frames 10 are arranged, and each plate-like container is arranged from the outside of the sandbag bag 40.
  • FIG. 6 is a view showing a state in which fixed pieces 20 are attached to each surface of the hub 11 and the fixed pieces 20 are connected by connecting pieces 30.
  • the sandbag 40 is drawn with a one-dot chain line in order to clearly show the coupling relationship of the sandbag guide frame 10.
  • Fig. 4 (B) shows a case where a sandbag 40 is installed and a gap is created between the sandbags 40 after pressure is applied. In such a situation, the integrity of the sandbags weakens and the strength decreases. . Fig.
  • FIG. 4 (C) shows a case where sandbags are too close together, and even if pressure is applied, the sandbags will interfere with each other and sufficient tension cannot be obtained, so the required strength can be obtained. Absent. Therefore, it must be avoided that the sandbags 40 are too close together.
  • Fig. 4 (D) shows a case where sandbags adjacent to each other after installation are in proper contact with each other. In such a state, the sandbag bags 40 are sufficiently tensioned and the sandbags are integrated. The resulting strength is maximized.
  • FIG. 4 (E) is a diagram showing a coupling state in the case of the present application.
  • the distance between the sandbag bags 40 is previously set. Can be determined appropriately. Therefore, according to the configuration of the present application, a state similar to that shown in FIG. 4B can be realized, and further, the presence of the connection piece 30 enhances the integration between the sandbags 40.
  • Figures 5 (A) to 5 (F) show an example in which sandbags 40 formed in a cubic or rectangular parallelepiped form are laid on the ground and stacked in two or three layers.
  • Figures 5 (A) and 5 (B) are examples in which the layers are stacked while being stacked vertically. However, since this method is more advantageous in strength when the sandbags are integrated with each other, except in cases such as when only reducing vibrations or obtaining the required number of steps and responding to the size of the structure to be received. Is not used.
  • Figures 5 (C) and 5 (D) are examples of stacking in a staggered pattern while shifting each stage, and are most often used.
  • Figures 5 (E) and (F) are methods that combine the above (B) and (D), and are often used in building foundations. According to the conventional construction method, it is about 1000 bags / 3 people per day on flat ground, but if the sandbag guide frame of the present invention is used, work efficiency of 1500 bags / 3 people or more can be expected per day. . In addition, when the sandbag bags 40 are spread, pressure is applied to each sandbag bag 40 by applying a pressure with a vibration pressure device or the like for each spread sandbag bag 40.
  • FIG. 6 is a view showing a state in which the sandbag bag guide frame of the present invention is placed under the sandbag.
  • FIG. 6 (A) is a view showing a state in which the sandbag bag guide frame is placed at the lower part of the sandbag bag and the opening at the upper end of the sandbag bag 40 is opened.
  • the sandbag bag guide frame 10 is placed at the bottom of the sandbag bag 40 whose upper end is open, and then the sandbag bag is placed.
  • FIG. 6 (B) is a diagram showing a state in which the opening portion is closed and then the fastening string 41 is fixed by the stopper 42.
  • the sandbags 40 are aligned and placed, the sandbags 40 are put into the soil, and the strings 41 of the sandbags 40 are tightened to tighten the strings 41 of the sandbags 40. Can be obtained. Therefore, it is not necessary to adjust the position of each of the aligned rectangular parallelepiped bags 40 by simply fastening the strings 41 of the plurality of sandbags 40.
  • FIG. 7 is a diagram showing the configuration of the base frame according to the second embodiment of the present invention.
  • This base frame 50 prevents the sandbag bag guide frame 10 from sinking when the sandbag bag 40 is placed in a place where the ground is particularly soft, such as a soft sag, and the sandbag bag guide frame 10 tilts. Therefore, it is for laying on the part that touches the ground directly.
  • the base frame 50 is composed of a lower frame 51 formed in a rectangular shape and an upper frame 52 formed adjacent to the lower frame 51.
  • the base frame 50 is large enough to accommodate the fixed piece 20 in the center of the upper frame 52. Notch 53 is provided.
  • Fig. 7 (A) is a plan view of the base frame 50 as viewed from above, Fig.
  • FIG. 7 (B) is a side view of the base frame 50 as viewed from the side
  • Fig. 7 (C) is the base frame. It is the perspective view which looked at 50 from diagonally upward.
  • the bottom of the base frame 50 is an opening, and when the lower frame 51 bites into the soft ground, the soil below the opening 54 is inside the lower frame 51. Enter and ride on it. It will support the sandbag 40.
  • the next stage is stacked as it is. By repeating this, even if the ground is very bad, it will be stabilized in about 3 steps, but the level of subsidence at the bottom will vary, making it difficult to manage the level in the vertical direction.
  • the base frame 50 is used for the construction of such an ultra-soft ground, the soil enters the opening at the bottom of the base frame, and the 51 side frames of the base frame define and restrain the soil that has entered the base frame. Frictional force can be generated between the soil particles that have entered. As a result, the same situation is created as if there was another one-stage sandbag under the bottom sandbag.
  • the direction of compression with respect to the soil particles that have entered the base frame 51 is one vertical direction, and the side surfaces of the base frame 51 prevent the soil particles from spreading in the lateral direction, thus preventing shear failure of the soil particles.
  • the side of the soil particles in the frame is partitioned, water penetration is only on the bottom surface, and the soil particles in the base frame 51 can be locally compacted in a short time. Stable level and strength can be secured even in construction on soft ground.
  • FIG. 8 is a diagram showing a state in which the sandbag bag having the sandbag bag guide frame according to the second embodiment of the present invention is placed on the base frame.
  • FIG. 8 (A) is a view showing a sandbag 40 in which a plate-like rib 11 is arranged at the bottom and a material is put therein. Since the plate-like rib 11 is placed inside the sandbag 40, it is represented by a dotted line.
  • FIG. 8 (B) is a diagram showing the base frame 50 as viewed from the side. The sandbag 40 containing the soil is placed on the base frame 50 in the direction indicated by the arrow E in FIG.
  • FIG. 8C is a side view showing the base frame 50 placed on the base frame 50.
  • FIG. 8 (D) is a perspective view showing a state in which the sandbag 40 is placed on the base frame 50. At this time, the sandbag 40 is sandwiched between the plate-like rib 11 of the guide frame 10 and the upper frame 52 of the base frame 50, and is fixed firmly. In this way, by placing the sandbag bag 40 on the base frame 50, the lower frame 51 part bites into the soft ground, so that the deformation of the first-stage sandbag bag 40 is minimized. Therefore, it is possible to secure the installation accuracy of the sandbag bag 40 in the second and subsequent stages.
  • the sandbag bag 40 having the sandbag bag guide frame 10 is connected to the base frame 50.
  • the sandbags 40 are arranged in a lattice pattern by the connecting pieces 30, and then the material is put into each sandbag 40.
  • the ground is soft enough that people cannot walk, that is, a foothold cannot be secured, materials can be placed in the sandbag bag 40 with the fixed piece 20 connected to the base frame 50, and then installed.
  • a large number of sandbags 40 are connected in a grid with connecting pieces 30 and installed at the target location. Note that the number of sandbags that can be installed at one time varies depending on whether only human power is available or equipment can be used.
  • the force described for the square guide frame is not limited to this.
  • a guide frame such as a rectangle or a triangle can also be used.
  • the coupling hole 13 and the pins 23a and 23b have been described as round. However, these shapes can also be rectangular, triangular, or the like.
  • the fixed piece 20, the rectangular hole 22 and the like have been described with respect to a rectangular shape, the shape is not limited to this, and it may be a circle, an ellipse, a square, or the like.
  • the shapes of the drawn nails 33a, 33b, 35a, and 35b shown in FIG. 3 are merely examples, and are not limited to these shapes.
  • the present invention can be applied to a sandbag bag used for ground reinforcement and a sandbag bag guide frame used in a sandbag construction method using the sandbag bag.
  • FIG. 1 is a diagram showing a structure of a sandbag guide frame according to a first embodiment of the present invention.
  • FIG. 2 is a diagram showing a configuration of a fixing piece according to the first embodiment of the present invention.
  • FIG. 3 is a diagram showing a configuration of a connection piece according to the first embodiment of the present invention.
  • FIG. 4 is a view showing a state in which a plurality of sandbag bag guide frames according to the first embodiment of the present invention are coupled together.
  • FIG. 5 is a view showing a state in which a plurality of sandbag bag guide frames according to the first embodiment of the present invention are coupled together.
  • FIG. 6 is a view showing a state in which the sandbag bag guide frame of the first embodiment of the present invention is placed under the sandbag.
  • FIG. 7 is a diagram showing a configuration of a base frame according to a second embodiment of the present invention.
  • FIG. 8] A diagram showing how the sandbag bag having the sandbag guide frame is placed on the base frame in the second embodiment of the present invention.
  • FIG. 9 is a view showing a sandbag bag having a sandbag bag frame according to a first conventional example.
  • FIG. 10 is a view showing a sandbag bag having a sandbag bag bottom body according to a second conventional example.

Abstract

L'invention concerne une structure de guidage de sac de sable mise en place sous un sac de sable et permettant d'agencer et de relier une pluralité de sacs de sable. La structure de guidage de sac de sable rectangulaire (10) est formée d'un support plan (11) sur lequel repose un sac de sable (40). Des broches (23a, 23b) d'une pièce de fixation (20) sont insérées, par l'extérieur du sac de sable (40), dans des trous de petit diamètre ménagés dans le support plan (11) et des cliquets (33a, 33b) d'une pièce de raccord (30) sont insérés dans un trou rectangulaire (22) de la pièce de fixation (20) et un trou de liaison (13) du support plan (11), ce qui permet de relier une pluralité de structures de guidage de sac de sable (10) sous la forme d'un treillis. Chaque sac de sable (40) ainsi relié est alors rempli de matériau. L'invention concerne également un procédé de construction par sacs de sable permettant de réduire sensiblement le temps nécessaire à la pose des sacs de sable (40) et particulièrement avantageux du point de vue économique.
PCT/JP2007/067148 2006-09-07 2007-09-03 Structure de guidage de sac de sable et procédé de construction par sacs de sable l'utilisant WO2008029771A1 (fr)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2006243322A JP4019100B1 (ja) 2006-09-07 2006-09-07 土嚢袋ガイド枠および土嚢袋ガイド枠を用いた土嚢袋工法
JP2006-243322 2006-09-07

Publications (1)

Publication Number Publication Date
WO2008029771A1 true WO2008029771A1 (fr) 2008-03-13

Family

ID=38857813

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2007/067148 WO2008029771A1 (fr) 2006-09-07 2007-09-03 Structure de guidage de sac de sable et procédé de construction par sacs de sable l'utilisant

Country Status (2)

Country Link
JP (1) JP4019100B1 (fr)
WO (1) WO2008029771A1 (fr)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016196785A (ja) * 2015-04-06 2016-11-24 有限会社アルコイハラ 改良地盤構造体の製造方法、改良地盤構造体、地盤改良補助部材、地盤改良補助部材の作製キット
CN111006607A (zh) * 2019-12-31 2020-04-14 山东科技大学 一种基于光纤光栅传感的充填体横向变形在线监测系统
CN111006606A (zh) * 2019-12-31 2020-04-14 山东科技大学 基于光纤光栅传感的充填体变形在线监测系统及监测方法
CN111006605A (zh) * 2019-12-31 2020-04-14 山东科技大学 一种基于光纤光栅传感的预埋式充填体横向变形测量装置
WO2021068262A1 (fr) * 2019-10-12 2021-04-15 南京森淼环保科技有限公司 Élément de renforcement de fondation meuble de forme réglable à base d'arche de sol artificiel

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6718642B2 (ja) * 2016-02-03 2020-07-08 前田工繊株式会社 角型土嚢
CN111441207B (zh) * 2020-04-07 2021-06-22 安徽省交通规划设计研究总院股份有限公司 一种软基处理拼装式宾格网换填结构及施工方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS481121Y1 (fr) * 1969-09-17 1973-01-12
JPS5816215U (ja) * 1981-07-16 1983-02-01 日本植生株式会社 成形土のう用袋
JPH05171653A (ja) * 1991-12-24 1993-07-09 Oyo Kikaku:Kk 大型台形土嚢と盛土法面の形成方法
JP2000080637A (ja) * 1998-06-24 2000-03-21 Kuraray Co Ltd 地盤補強構造物及び地盤補強工法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS481121Y1 (fr) * 1969-09-17 1973-01-12
JPS5816215U (ja) * 1981-07-16 1983-02-01 日本植生株式会社 成形土のう用袋
JPH05171653A (ja) * 1991-12-24 1993-07-09 Oyo Kikaku:Kk 大型台形土嚢と盛土法面の形成方法
JP2000080637A (ja) * 1998-06-24 2000-03-21 Kuraray Co Ltd 地盤補強構造物及び地盤補強工法

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016196785A (ja) * 2015-04-06 2016-11-24 有限会社アルコイハラ 改良地盤構造体の製造方法、改良地盤構造体、地盤改良補助部材、地盤改良補助部材の作製キット
WO2021068262A1 (fr) * 2019-10-12 2021-04-15 南京森淼环保科技有限公司 Élément de renforcement de fondation meuble de forme réglable à base d'arche de sol artificiel
CN111006607A (zh) * 2019-12-31 2020-04-14 山东科技大学 一种基于光纤光栅传感的充填体横向变形在线监测系统
CN111006606A (zh) * 2019-12-31 2020-04-14 山东科技大学 基于光纤光栅传感的充填体变形在线监测系统及监测方法
CN111006605A (zh) * 2019-12-31 2020-04-14 山东科技大学 一种基于光纤光栅传感的预埋式充填体横向变形测量装置
CN111006606B (zh) * 2019-12-31 2021-01-05 山东科技大学 基于光纤光栅传感的充填体变形在线监测系统及监测方法
CN111006607B (zh) * 2019-12-31 2021-01-08 山东科技大学 一种基于光纤光栅传感的充填体横向变形在线监测系统
CN111006605B (zh) * 2019-12-31 2021-02-05 山东科技大学 一种基于光纤光栅传感的预埋式充填体横向变形测量装置

Also Published As

Publication number Publication date
JP4019100B1 (ja) 2007-12-05
JP2009287165A (ja) 2009-12-10

Similar Documents

Publication Publication Date Title
WO2008029771A1 (fr) Structure de guidage de sac de sable et procédé de construction par sacs de sable l'utilisant
RU2459903C2 (ru) Мешок, сохраняющий при подъеме форму прямого параллелепипеда
SK53198A3 (en) Cell confinement structure
US20070110522A1 (en) Retaining wall constructed using sandbags
AU2024201313A1 (en) Thin stabilized segmental wall blocks, soil reinforcing system, and methods
US7922426B2 (en) Tie linking filled sandbags and use in a barrier formed from filled sandbags
JP2983207B2 (ja) 土木構築物用施工石、土木構築物用施工石の使用方法及び土木構築物
KR101327166B1 (ko) 형상유지형 직육면체 백
CN104704178A (zh) 可堆叠互锁的建筑元件及包括此元件的系统
JP5100513B2 (ja) 補強土壁及びその構築方法
JP3476571B2 (ja) 仮設道路用合成樹脂発泡体ブロックおよびその連結体
US20130011208A1 (en) Retaining wall systems with sandbag attachment members
JP2007218077A (ja) 拘束補強材用シート部材
TWI558887B (zh) Construction methods and filling methods for weak sites and sites with liquefaction concerns, as well as structural bags
JP2000045302A (ja) 土木構築物用施工石、土木構築物用施工石の製造方法、土木構築物用施工石の使用方法、土木構築物用施工石ユニット及び土木構築物
JP7445819B1 (ja) 土木工事用袋体、土木工事用構造体、及び土木工事用構造体の製造方法
JP2000328577A (ja) 土留めかご枠及びそれを用いた急勾配盛土の築造法
JP3016009B2 (ja) パイルスぺーサ
JP3000434B2 (ja) 土のうの製造方法及びその装置
US11933012B2 (en) Shape-retaining hoist type rectangular parallelepiped bag having multistage configuration
JP3880682B2 (ja) 土のう等の吊上げ装置
JP2002081040A (ja) 土木構築物用施工石
JPH05106225A (ja) 補強盛土法面の植生基盤形成方法
JPH04161517A (ja) 急勾配盛土の築造法
KR101327171B1 (ko) 형상유지형 직육면체 백

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 07806616

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 07806616

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: JP