WO2002044477A1 - Trou d'homme sans couvercle en acier et son procede de construction - Google Patents

Trou d'homme sans couvercle en acier et son procede de construction Download PDF

Info

Publication number
WO2002044477A1
WO2002044477A1 PCT/JP2001/010543 JP0110543W WO0244477A1 WO 2002044477 A1 WO2002044477 A1 WO 2002044477A1 JP 0110543 W JP0110543 W JP 0110543W WO 0244477 A1 WO0244477 A1 WO 0244477A1
Authority
WO
WIPO (PCT)
Prior art keywords
manhole
pavement
opening
fitting
iron
Prior art date
Application number
PCT/JP2001/010543
Other languages
English (en)
Japanese (ja)
Inventor
Shinichi Tsubakimori
Takashi Shimamura
Katsuya Sato
Masaru Murase
Original Assignee
Hanex Road Co., Ltd.
Hanex Co., Ltd.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hanex Road Co., Ltd., Hanex Co., Ltd. filed Critical Hanex Road Co., Ltd.
Priority to AU2002218525A priority Critical patent/AU2002218525A1/en
Publication of WO2002044477A1 publication Critical patent/WO2002044477A1/fr

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/12Manhole shafts; Other inspection or access chambers; Accessories therefor
    • E02D29/14Covers for manholes or the like; Frames for covers

Definitions

  • the present invention relates to a new iron lidless manhole that does not use an iron lid, and a method for constructing the same.
  • the entrance of the manhole is closed by an iron cover 2, and the iron cover 2 is attached to a lid receiving frame 20 installed on the upper part of the inclined wall 10 of the manhole so as to be openable and closable.
  • a hole is generally drilled at the installation location to construct a foundation, a prefabricated manhole is assembled on the foundation, and a manhole cover receiving frame is attached to the road surface on the upper surface of the uppermost member, the slope wall. They were adjusted and installed to match.
  • Manhole iron lids are animal and are different from the asphalt, concrete or stone, etc. pavement surface that forms the road surface, giving impact to passing vehicles, and the wet iron lid surface has friction. There is a risk of slipping because the coefficient is small.
  • the present invention does not use an iron lid, does not change the area directly above the manhole from the surrounding road pavement surface, increases the driving comfort of the car, and increases the work efficiency of pavement construction . Disclosure of the invention
  • An opening was provided in the pavement directly above the manhole, and a fitting that closed this opening was used as a lid, thereby making the manhole without an iron lid.
  • manhole iron covers are old and need to be repaired and replaced without being opened, and the frequency of opening and closing of the covers is not high, so the function as a road is more important than the benefit of easy opening and closing.
  • a fitting having a surface of the same quality as the pavement road surface is used as the manhole cover.
  • the fitting body is tapered so that it does not rattle even when receiving the load of the passing vehicle.Furthermore, it is necessary to remove the fitting body when entering or leaving the manhole. Provided.
  • the body of the fitting was manufactured at the factory, and the surface of the fitting was made of the same material as the surrounding pavement to reduce discomfort, and the fitting and the surrounding pavement were at the same level.
  • the pavement on the upper part of the manhole is cut and removed in a tapered shape to provide an opening.
  • the pavement surface can be seen as a single piece, and there is less foreign-body sensation compared to the conventional case where manhole iron covers are scattered.
  • pavement work can be performed continuously without interruption in the manhole. The construction efficiency can be increased, and the manhole does not become a protruding obstacle even if the road is temporarily opened during pavement construction, so that vehicles and passers-by can use the road safely.
  • Filler is filled into the fitting surface of the fitting body and the surrounding pavement.
  • the filler used is a pressure-sensitive adhesive that has an adhesion control layer consisting of a porous film, porous fabric, and porous paper in which a large number of circular holes and square holes are formed. When detached, it can be easily peeled off.
  • a release material is coated in advance on the fitting surface of the fitting body in order to facilitate peeling.
  • FIG. 1 is a construction process diagram of the iron lidless manhole.
  • FIG. 2 is a conceptual diagram of the manhole of the present invention.
  • Figure 3 is a conceptual diagram of a conventional manhole with an iron lid.
  • Figure 4 shows an example of a force cutter that forms a tapered cut surface on pavement.
  • a temporary cover 4 is installed in the manhole to temporarily close the hole so that pavement materials do not fall into the manhole and pave the upper surface.
  • the temporary lid 4 has a projection for preventing movement on the lower surface, and has a hole at the center. These holes are closed with easily breakable cloth or packing tape when installed in manholes. Since the position of the manhole is covered with pavement and cannot be determined, measure the distances from the multiple reference points at the road edge to the center of the manhole in advance and mark the pavement surface. If the mark cannot be found, use a metal detector or install a transmitter (not shown) on the temporary lid to detect the signal and obtain the position of the Manhorne.
  • the pavement is cut into a tapered shape using a cylindrical power cutter such as a hole saw or an end mill cutter 5 shown in FIG. Drill a hole in the center of the paving slab and drill through the cloth or packing tape that closed the hole in the temporary lid 4 from the top. An expandable anchor is inserted into this hole, and when the anchor passes through the hole of the temporary lid 4, the anchor is expanded, and the temporary lid 4 and the cut pavement slab are simultaneously pulled up and removed to form a tapered opening 3.
  • a cylindrical power cutter such as a hole saw or an end mill cutter 5 shown in FIG. Drill a hole in the center of the paving slab and drill through the cloth or packing tape that closed the hole in the temporary lid 4 from the top. An expandable anchor is inserted into this hole, and when the anchor passes through the hole of the temporary lid 4, the anchor is expanded, and the temporary lid 4 and the cut pavement slab are simultaneously pulled up and removed to form a tapered opening 3.
  • the asphalt fitting 1 is inserted into the tapered opening 3. As shown in FIG. 2, a through hole 11 is provided at the center of the fitting body 1, and a removable stopper 12 is formed in the through hole 11.
  • a filling layer coated with a filler having an adhesion control layer made of a pressure-sensitive adhesive and a porous film having a large number of circular holes is formed on the peripheral surface of the fitting body 1, and is tightly joined to the opening 3. It is integrated with the surrounding pavement. If it becomes necessary to enter or exit the manhole during work, remove the plug 12 from the through hole 11 of the fitting 1 and insert a pull-out tool (not shown), and then insert the pull-out tool by expanding its tip. Hook it on the lower part of the united unit 1 and lift it up with a crane.
  • Example 1 the pavement was cut into a tapered shape, and an opening was provided.
  • a through hole was provided in the center, the plug was closed with a plug, and a sealing material or the like was attached on the peripheral surface to form a filling layer.
  • the fitting 1 was fitted into the opening and the surface of the fitting was finished uniformly with asphalt to obtain a manhole without using an iron lid.
  • the hollow fitting body 1 was formed of a light metal such as aluminum, plastic, or fiber-reinforced plastic.
  • the upper surface of the fitting 1 has a rigid structure to withstand the weight of the vehicle, and a liquid inlet is provided.
  • the hollow part was left empty during storage and transportation, and the weight was reduced to make it easier to handle.
  • This hollow fitting is fitted to the opening 3 on the pavement above the manhole, and a liquid with a large specific gravity is injected from the injection port to increase the mass of the fitting 1 and the fitting 1 rises due to the impact of the vehicle Or not.
  • a liquid which is solid at normal temperature is injected as a liquid by heating and solidified by cooling naturally, or a liquid which is solidified by mixing a solidifying agent can also be used.
  • the manhole which is the entrance to the underground buried object, is not covered with an iron cover, but is covered with a fitting body of the same quality as the surrounding pavement, so that almost no impact like an iron cover is generated, and slip is reduced. lost.
  • the manhole can be temporarily closed and constructed integrally with the surrounding pavement, eliminating the need for manual rolling work around the manhole and improving construction efficiency.
  • the cut and removed part when the pavement has an opening can be diverted as a fitting body, which can reduce costs.

Landscapes

  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

L'invention concerne un procédé de construction de trou d'homme sans couvercle en acier afin d'uniformiser la partie trou d'homme avec la chaussée. Le confort lors de la marche et la circulation des voitures s'en trouvent améliorés, ainsi que l'efficacité fonctionnelle de la construction de la chaussée. Ledit procédé consiste à créer une ouverture (3) en découpant et en enlevant la chaussée juste au-dessus du trou d'homme de forme conique, en ajustant à l'ouverture (3) un corps adapté (1) du même matériau que celui de la chaussée, et en remplissant avec un élément de remplissage les espaces entre le corps adapté et la chaussée de façon à former un couvercle. Ainsi, la surface de la chaussée et le corps adapté (1) s'intégrant l'un à l'autre, on élimine le sentiment d'inconfort dû au couvercle en acier, on augmente l'efficacité fonctionnelle, puisque l'opération de revêtement de la chaussé n'est pas interrompue à la partie trou d'homme, et on empêche la survenue de glissades sur le couvercle en acier.
PCT/JP2001/010543 2000-12-01 2001-12-03 Trou d'homme sans couvercle en acier et son procede de construction WO2002044477A1 (fr)

Priority Applications (1)

Application Number Priority Date Filing Date Title
AU2002218525A AU2002218525A1 (en) 2000-12-01 2001-12-03 Steel cover-less manhole and method of constructing the manhole

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2000-367609 2000-12-01
JP2000367609A JP2002167787A (ja) 2000-12-01 2000-12-01 鉄蓋レスマンホール及びその構築方法

Publications (1)

Publication Number Publication Date
WO2002044477A1 true WO2002044477A1 (fr) 2002-06-06

Family

ID=18838001

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2001/010543 WO2002044477A1 (fr) 2000-12-01 2001-12-03 Trou d'homme sans couvercle en acier et son procede de construction

Country Status (3)

Country Link
JP (1) JP2002167787A (fr)
AU (1) AU2002218525A1 (fr)
WO (1) WO2002044477A1 (fr)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6799921B2 (en) * 2002-04-26 2004-10-05 Shiga Sangyo Kabushiki Kaisha Manhole cover/frame exchange method
DE202010015923U1 (de) 2010-10-07 2011-04-21 Irrgang, Eckhard Anordnung eines Revisionsschachtes eines Kanals in einer Straße

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH02101206A (ja) * 1988-10-09 1990-04-13 Shinichi Tsubakimori マンホール周囲の舗装工法及び舗装工法用切断装置
JPH05112957A (ja) * 1991-07-05 1993-05-07 Hokushin Kensetsu Kk 降雪地用マンホールの蓋及びその製造方法
JPH05179607A (ja) * 1991-12-30 1993-07-20 Shinichi Tsubakimori 切削オーバーレイ工法
JPH0657774A (ja) * 1992-08-07 1994-03-01 Tasutetsuku:Kk 道路設置物を備えた舗装道路の補修工法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH02101206A (ja) * 1988-10-09 1990-04-13 Shinichi Tsubakimori マンホール周囲の舗装工法及び舗装工法用切断装置
JPH05112957A (ja) * 1991-07-05 1993-05-07 Hokushin Kensetsu Kk 降雪地用マンホールの蓋及びその製造方法
JPH05179607A (ja) * 1991-12-30 1993-07-20 Shinichi Tsubakimori 切削オーバーレイ工法
JPH0657774A (ja) * 1992-08-07 1994-03-01 Tasutetsuku:Kk 道路設置物を備えた舗装道路の補修工法

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6799921B2 (en) * 2002-04-26 2004-10-05 Shiga Sangyo Kabushiki Kaisha Manhole cover/frame exchange method
DE202010015923U1 (de) 2010-10-07 2011-04-21 Irrgang, Eckhard Anordnung eines Revisionsschachtes eines Kanals in einer Straße
DE102010047728A1 (de) 2010-10-07 2012-04-12 Eckhard Irrgang Verfahren zum Herstellen und Anordnung eines Revisionsschachtes eines Kanals in einer Straße
DE102010047728B4 (de) * 2010-10-07 2015-03-12 Eckhard Irrgang Verfahren zum Herstellen und Anordnung eines Revisionsschachtes eines Kanals in einer Straße

Also Published As

Publication number Publication date
JP2002167787A (ja) 2002-06-11
AU2002218525A1 (en) 2002-06-11

Similar Documents

Publication Publication Date Title
WO2002044477A1 (fr) Trou d'homme sans couvercle en acier et son procede de construction
JP3263355B2 (ja) マンホールを含む路面の舗装方法
JP2623491B2 (ja) 切削オーバーレイ工法
JP2006022574A (ja) 道路補修工法及び道路用仮設材
JP3644949B2 (ja) オーバーレイ工法、切削オーバーレイ工法及び舗装工法
JP2004316187A (ja) 橋梁の排水性舗装覆工型伸縮設備とその施工法
JP4121069B2 (ja) 舗装工事における円形切断方法
WO2012051688A1 (fr) Procédé de construction de drain et drain
JP2000080602A (ja) 拡張地盤の盛土工法
JPH0312831Y2 (fr)
JP2001355208A (ja) 舗装方法
JP2773024B2 (ja) 蓋付き溝構造と溝蓋形成工法
JPH04194102A (ja) 道路用構造体および道路舗設方法
KR100433654B1 (ko) 도로의 미끄럼방지구간의 시공방법 및 그 구조물
JP3561866B2 (ja) 人孔蓋の高さ調整法
JP3045286U (ja) 断熱マンホール蓋
JP2006112075A (ja) マンホール及びマンホール蓋受枠の設置方法
JPH1136344A (ja) マンホール蓋受枠
KR200232865Y1 (ko) 도로의 미끄럼방지구간의 구조물
JP2859139B2 (ja) 歩車道境界ブロック及び歩車道境界部の施工構造
JP2000273940A (ja) コンクリート製側溝
JP3715250B2 (ja) 道路橋継ぎ目付近の排水性舗装構造
JPH10183655A (ja) マンホールの交換方法及びその方法に使用する二重ケーシング
KR960004915B1 (ko) 오버레이(overlay)공법
DK200100319U3 (da) Et trafikreguleringselement

Legal Events

Date Code Title Description
AK Designated states

Kind code of ref document: A1

Designated state(s): AU CA CN KR MX NZ TR US ZA

AL Designated countries for regional patents

Kind code of ref document: A1

Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LU MC NL PT SE TR

121 Ep: the epo has been informed by wipo that ep was designated in this application
DFPE Request for preliminary examination filed prior to expiration of 19th month from priority date (pct application filed before 20040101)
122 Ep: pct application non-entry in european phase