- WO1998058139A1 WO1998058139A1 PCT/SE1997/001061 SE9701061W WO9858139A1 WO 1998058139 A1 WO1998058139 A1 WO 1998058139A1 SE 9701061 W SE9701061 W SE 9701061W WO 9858139 A1 WO9858139 A1 WO 9858139A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- beams
- ceiling
- supporting
- flange
- wall
- Prior art date
Links
- 238000010276 construction Methods 0.000 title claims abstract description 43
- 230000008093 supporting effect Effects 0.000 claims abstract description 73
- 239000004411 aluminium Substances 0.000 claims description 3
- XAGFODPZIPBFFR-UHFFFAOYSA-N aluminium Chemical compound [Al] XAGFODPZIPBFFR-UHFFFAOYSA-N 0.000 claims description 3
- 229910052782 aluminium Inorganic materials 0.000 claims description 3
- 229910052751 metal Inorganic materials 0.000 claims description 2
- 239000002184 metal Substances 0.000 claims description 2
- 238000005520 cutting process Methods 0.000 description 12
- 238000003801 milling Methods 0.000 description 9
- 238000007789 sealing Methods 0.000 description 6
- 239000000306 component Substances 0.000 description 4
- 239000000725 suspension Substances 0.000 description 2
- 238000004140 cleaning Methods 0.000 description 1
- 150000001875 compounds Chemical class 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000001914 filtration Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 238000003825 pressing Methods 0.000 description 1
- 230000008439 repair process Effects 0.000 description 1
- 230000003313 weakening effect Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
- E04B9/06—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation characterised by constructional features of the supporting construction, e.g. cross section or material of framework members
- E04B9/12—Connections between non-parallel members of the supporting construction
- E04B9/127—Connections between non-parallel members of the supporting construction one member being discontinuous and abutting against the other member
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
- E04B9/02—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation having means for ventilation or vapour discharge
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/74—Removable non-load-bearing partitions; Partitions with a free upper edge
- E04B2002/7498—Partitions for clean rooms
Definitions
- the present invention relates to a beam construction for walls and ceilings in clean rooms, comprising first and second beams, which are arranged essentially perpendicular to each other and essentially in parallel with the plane of extension of the wall and the ceiling, respectively, the first and the second beams comprising elongate flanges with supporting surfaces, which are essentially parallel with the plane of extension of the wall/ceiling, the wall/ceiling comprising wall and ceiling elements, respectively, which abut against the supporting surfaces.
- the invention is particularly well suited for construction and mounting of accessible clean room ceilings, where quick and flexible mounting is important.
- Clean rooms are increasingly used in, for instance, the production of electronic com- ponents and as surgical operating theatres.
- the clean room is erected inside an existing room in a building.
- the clean room is shut off from the existing room by means of special walls, ceiling and floor.
- Each wall often comprises a plurality of vertical and horizontal beams, which are interconnected to form a rectangular grid.
- projecting flanges are arranged on each side of the beam.
- the flanges comprise supporting surfaces, which are parallel with the plane of the wall and face away from the room.
- wall elements for instance in the form of flat rectangular panels, are arranged in such a manner that each wall element, along its circumference and with its surface facing the room, abuts against the supporting surfaces.
- the ceiling comprises a rectangular grid of horizontal beams arranged perpendicular to each other.
- the beams are usually suspended by means of wires from the ceiling of the existing room.
- a flange is arranged on each side of the beam.
- Each flange has a horizontal supporting surface directed upwards, away from the room.
- Ceiling elements which may consist of flat rectangular panels, are placed in the grid in such a manner that, along their circumference and with the surface facing the room, they abut against the supporting surfaces. This construction results m walls and ceiling which, seen from the inte ⁇ or of the clean room, have a smooth surface which is relatively free from irregularities and dirt traps.
- FR 2,173,078 discloses a beam construction which to some extent is suitable for this type of ceiling and walls.
- the construction comprises beams with a cross-section which has the general shape of an inverted T.
- the horizontal projecting parts of the beams constitute the flanges on which the supporting surfaces are arranged.
- That part of the beam cross-section which is perpendicular to the flanges constitutes the sup- porting part of the beam.
- This supporting part is along its sides formed with longitudinal grooves for receiving connecting means When building, for instance, a ceiling, the beams can be interconnected to form a rectangular grid.
- a plurality of first beams are suspended in parallel in one direction These first beams are linked to each other by a plurality of second beams, which are parallel with each other and perpendicular to the first beams.
- the transverse second beams are connected to the first beams, such that the ends of the second beams face the long sides of the first beams.
- a g ⁇ d or screen forms, which comp ⁇ ses longitudinal and transverse beams, which with their supporting surfaces arranged on the flanges encompass rectangular openings.
- the ceiling is completed by placing rectangular flat ceiling panels in the screen so as to abut against the supporting surfaces
- the supporting surfaces arranged on the flanges also constitute sealing surfaces, it is important for them to be positioned in one and the same plane
- the end of the transverse beam will therefore abut merely against the thin long side of the projecting flange of the longitudinal beam.
- the common abutment surface of the two beams will therefore be very small and, besides, is arranged at a distance corresponding to the width of the flange from the supporting part of the longitudinal beam.
- special connecting means which are arranged in the grooves in the supporting parts of the transverse and longitudinal beams.
- the connecting means are adapted to bridge the space arising between the end surface of the transverse beam and the long side of the supporting part of the longitudinal beam.
- This fairly complicated connecting operation entails a considerable amount of work, a great number of components and a weak ceiling or wall construction.
- the insufficient strength is particularly inconvenient in the cases where the clean room ceiling has to carry heavy filters, electric fittings and the like and where it must be possible to walk on the ceiling to enable repairs and maintenance.
- Swedish Patent 8700746-4 discloses a beam construction which allows a considerably more stable connection of longitudinal and transverse beams.
- the beams are hollow such that their general cross-section is box-shaped.
- the beam part closest to the room is formed with a hollow flange projecting on each side of the central part of the beam.
- Supporting surfaces are arranged on the flange surfaces facing away from the room.
- Inside the hollow flange on the transverse beam there is arranged a locking means in the vicinity of the beam end.
- the longitudinal and transverse beams are kept together by the box-shaped cross-section of the transverse beam abutting against the long side of the longitudinal beam and by the locking means in the transverse beam engaging in locking grooves on the long side of the longitudinal beam.
- This construction results in a considerably larger abutment surface between the longitudinal and transverse beams and therefore is more stable.
- the beams be formed with a hollow supporting part, whose cross-section is box-shaped, and with a thin flange comprising the supporting surface.
- the sup- porting part should, in its mounted state, be arranged outside the flange with the supporting surface, seen from inside the room.
- a transverse beam is connected to a longitudinal beam by the end surface of the hollow section of the transverse beam abutting against the long side of the longitudinal beam.
- a locking means is also arranged so as to cooperate with locking grooves on the long side of the longitudinal beam.
- each transverse beam must in fact be specially worked before mounting. Since both the longitudinal and the transverse beam are provided with projecting flanges, these flanges will prevent the box-shaped cross-section of the supporting part of the transverse beam from abutting against the long side of the longitudinal beam. Before mounting, a part of the flange either of the longitudinal beam or of the transverse beam must therefore be removed.
- mounting takes place by first cutting the transverse beam such that its longitudinal dimension corresponds to the distance between the two long sides, facing each other, of the supporting sections of the parallel longitudinal beams. Subsequently, that part of the flange on the transverse beam which prevents contact between the supporting parts of the two beams is milled off. This milling operation must be carried out in both ends of the transverse beam. After the cutting and milling operations, the transverse beam is mounted between the two longitudinal beams by a locking means at each end of the transverse beam being engaged with and tightened in the two longitudinal beams.
- the object of the present invention therefore is a beam construction for ceiling and walls, especially in clean rooms, which results in significantly simplified mounting when connecting the ceiling and the walls.
- this object is achieved by a beam construction of the kind stated by way of introduction, which is characterised in that at least the second beams comprise an elongate flange means formed with one or more supporting surfaces, and an elongate supporting means, that the flange means and the supporting means, at least before mounting, are separable and/or axially displaceable relative to each other, and that the supporting means, after mounting, is longer than the flange means and arranged so as to extend at both ends axially beyond the ends of the flange means.
- the invention allows that the length of the second beams is adjusted by performing a single cutting operation. The cutting and double milling operations that were necessary according to prior art are thus replaced, in a beam construction according to the invention, with a single cutting operation.
- the flange means can be connected to the supporting means by means of projections which are arranged on the one means and which cooperate with grooves formed in the other means.
- projections which are arranged on the one means and which cooperate with grooves formed in the other means.
- the flange means can be connected to the supporting means with the aid of separate connecting means.
- the flange means can be, for instance, screwed, riveted or glued to the supporting means. It is also possible that first the means are connected by means of grooves and projections and then separate connect- ing means are arranged.
- the supporting surfaces can be arranged in such a manner that, after mounting, they are directed away from the room.
- This embodiment permits easy outside mounting of wall and ceiling elements against the supporting surfaces. In respect of the ceiling, this embodiment makes it possible to use gravitation to fix the ceiling element to the beam grid.
- the flange means and/or the supporting means may consist of extruded sectional elements. This makes it possible to use, at relatively low cost, beams, whose cross-sec- tional geometries are specially adapted to different needs.
- the flange means and/or the supporting means can also be made of light metal.
- One example is aluminium which combines good mouldability with high strength and low weight.
- both the first and the second beams comprise identical flange means and identical supporting means.
- the advantage of this embodiment is that one and the same type of beam can be used for both the longitudinal and the transverse beams. In mounting, only the length of the flange means and the supporting means of the various beams is to be adjusted.
- Fig. 1 is a schematic perspective view of a beam construction for clean room ceilings according to an embodiment of the invention.
- Fig. 2 is a part-sectional enlargement of a portion of the perspective view shown in Fig. 1.
- Fig. 1 shows the composition of part of a ceiling for clean rooms.
- the ceiling comprises a beam construction 1.
- the beam construction comprises a plurality of first beams 2, which are horizontally suspended with the aid of suspension means 3 from the ceiling of the existing room, in which the clean room is accommodated.
- the beam construction can be suspended from a separate supporting frame structure (not shown).
- the first beams 2 are suspended in parallel and their longitudinal axes extend in a direction which below is referred to as the longitudinal direction.
- the second beams 4 are arranged horizontally, in parallel with each other and perpendicular to the longitudinal first beams 2. Moreover, the second beams 4 are at their ends 5 fixedly connected to the long sides 6 of the longitudinal first beams 2.
- the beam construction 1 forms a grid or a screen, in which the first 2 and the second 4 beams define the circumference of rectangular openings 7.
- the rectangular openings 7 are covered with rectangular ceiling elements 8.
- the ceiling elements 8 rest on supporting surfaces 9, which are arranged on the first 2 and the second 4 beams.
- the supporting surfaces 9 also constitute sealing surfaces, which sealingly cooperate with corresponding sealing surfaces (not shown) of the ceiling elements 8.
- Separate sealing means (not shown), for instance in the form of seals or a sealing compound, can be arranged between the supporting surfaces 9 and the ceiling elements 8.
- the Figure also indicates that all supporting surfaces 9 of the entire beam construction 1 are arranged essentially in one and the same plane. Exceptions may, of course, occur, for instance if the clean room ceiling has to be built on different levels.
- Fig. 2 shows in greater detail how a first longitudinal beam 2 is connected to a second transverse beam 4.
- the first longitudinal beam 2 is an extruded sectional element of aluminium.
- the beam 2 is essentially box-shaped in cross-section, with a vertical symmetry axis.
- a first axial T groove 10 is formed in the upwardly directed long side 11 of the beam. This first T groove 10 is used to attach the suspension means 3 (Fig. 1).
- the beam 2 In its downwardly directed long side 12, the beam 2 has a second T groove 13. This second T groove 13 is used to fix, from the interior of the clean room, com- ponents in the clean room ceiling.
- the parts of the second T groove 13 which are not used can, for aesthetical and cleaning purposes, be covered with a cover strip 14 which is inserted or snapped into this second T groove 13.
- a cover strip 14 which is inserted or snapped into this second T groove 13.
- the flanges 15a, 15b project perpendicularly in separate directions from the vertical symmetry plane of the beam 2.
- the downwardly directed surfaces of the flanges 15a, 15b are on a level with and constitute part of the downwardly directed long side 12 of the beam.
- the two flanges 15a, 15b project horizontally from the respective vertical long sides 6a, 6b of the beam 2.
- the two vertical long sides 6a, 6b are each provided with a locking groove 16a, 16b. Also these locking grooves 16a, 16b are designed as T grooves.
- the upwardly directed surfaces of the flanges 15a, 15b constitute the supporting surfaces 9 against which the ceiling elements 8 (Fig. 1) abut.
- the vertical thickness of the flanges 15a, 15b is relatively small, about 2-5 mm. Their horizontal width is dimensioned to constitute a perfect sealing surface and may, in the normal case, be about 15-50 mm.
- the second transverse beam 4 is arranged perpendicular to the first longitudinal beam 2.
- the second beam 4 is made up of two different elongate sectional elements 17, 18.
- the first sectional element 17 is a flange means and comprises a downwardly directed flat side 19.
- An upwardly directed flat side 20 is arranged opposite the downwardly directed side 19.
- Elongate projections 21 are arranged on the upwardly directed side 20 in parallel with the longitudinal axis of the flange means 17.
- the second sectional element 18 is the supporting means and consists of a square beam which is symmetrical about a vertical and a horizontal longitudinal symmetry plane.
- Each of the long sides 22a, 22b, 22c, 22d of the square beam has a flat surface, in which a T groove 23a, 23b, 23c, 23d, respectively, is arranged.
- a longitudinal cavity 24 extends centrally through the square beam 18.
- a locking means 25 with hooks 25a is arranged at each end of the square beam 18, partially within it and with the hooks 25a projecting from the cavity 24.
- the flange means 17 and the square beam 18 are interconnected by the elongate projections 21 engaging in the T groove 23d which is arranged in the downwardly directed long side 22d of the square beam 18. This engagement is effected by the projections 21 of the flange means 17 being inserted axially into the T groove 23d.
- the thus interconnected sectional elements 17, 18 constitute the second transverse beam 4.
- the supporting surfaces 7 of this beam 4 are formed of the parts of the upwardly directed side 20 of the flange means 17 which project beyond thedown- wardly directed long side 22d of the square beam 18.
- the square beam 18 is longer than the flange means 17 and therefore extends, with both ends, beyond the ends of the flange means 17.
- the end of the flange means 17 abuts against the long side of the flange 15a of the first longitudinal beam 2.
- the square beam 18, however, extends beyond the flange 15a of the first beam 2 with supporting surface 9 and abuts against the vertical long side 6a of the first beam 2.
- the transverse beam 2 is connected to the longitudinal beam 2 by the hooks 25a of the locking means 25 engaging in the locking grooves 16a of the first beam 2.
- the first longitu- dinal beams 2 are suspended in parallel and at a suitable distance from each other.
- the centre distance between the first beams 2 is preferably selected between 500 and 1500 mm, especially between 600 and 1200 mm.
- the length of the transverse second beams 4 is adjusted to the selected distance.
- the square beam 18 is cut such that its length corresponds to the distance between the two vertical long sides 6a and 6b, facing each other, of the first longitudinal beams 2.
- the flange means 17 is cut such that its length corresponds to the length of the square beam minus twice the width of the flange 15 of the longitudinal beam 2. This can be carried out by two cutting operations with the flange means 17 and the square beam 18 separated.
- both sectional elements 17, 18 can be cut in one and the same cutting operation. Then the two sectional elements 17, 18 are displaceably interconnected also during the cutting operation. Before cutting, the two sectional elements 17, 18 are displaced axially in relation to each other such that the square beam 18, at the end which is not to be cut, extends beyond the flange means 17 a distance corresponding to twice the width of the flange 15 of the first beam 2. Subsequently the two sectional elements 17, 18 are cut such that the square beam 18 obtains the correct length. After cutting, the flange means 17 is moved back half the previously displaced distance. Now the square beam 18 extends, at each end, beyond the end of the flange means a distance corresponding to the width of the flange 15 of the first longitudinal beam 2.
- each transverse beam must be adjusted in one cutting and two milling operations, one at each end. With a beam construction according to the present invention, all these operations are replaced by a single cutting operation.
- each end thereof is fixed to the locking means 25 in the locking grooves 16 of the longitudinal beams 2.
- beam constructions for ceilings in clean rooms is applicable also to beam constructions for walls in clean rooms.
- the only difference is that some of the directions stated in the above example are adjusted to apply to a vertical wall instead of a horizontal ceiling.
- the beam construction must also be supplemented with means pressing the wall elements against the supporting surfaces.
- the ceiling elements consist in the example shown of so-called blank panels, i.e. flat panels, the only purpose of which is to sealingly cover the openings 7.
- the ceiling elements 8 may, however, in practice also consist of a number of other components, for instance, filter elements for filtering supply air and lighting fittings. Such lighting fittings can also be arranged completely outside the clean room, a light- permeable sheet being sealingly arranged on the supporting surfaces in an opening.
- the ceiling elements are of course replaced by wall elements. These may consist of, apart from blank panels, e.g. window or door elements.
- That part of the second transverse beam which constitutes the supporting means need not extend up to the long side of the first longitudinal beam. Instead the supporting means can supportingly abut against the supporting surface of the first longitudinal beam.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Ventilation (AREA)
- Filtering Of Dispersed Particles In Gases (AREA)
- Building Environments (AREA)
- Roof Covering Using Slabs Or Stiff Sheets (AREA)
Priority Applications (5)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SE9504701A SE507573C2 (sv) | 1995-12-28 | 1995-12-28 | Balkkonstruktion för tak och väggar i rena rum |
PCT/SE1997/001061 WO1998058139A1 (en) | 1995-12-28 | 1997-06-17 | Beam construction in walls and ceilings of clean air rooms |
EP97932062A EP1012419A1 (en) | 1995-12-28 | 1997-06-17 | Beam construction in walls and ceilings of clean air rooms |
AU35611/97A AU3561197A (en) | 1995-12-28 | 1997-06-17 | Beam construction in walls and ceilings of clean air rooms |
JP50424399A JP2002504967A (ja) | 1997-06-17 | 1997-06-17 | 無塵室の壁体および天井のビーム構造 |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SE9504701A SE507573C2 (sv) | 1995-12-28 | 1995-12-28 | Balkkonstruktion för tak och väggar i rena rum |
PCT/SE1997/001061 WO1998058139A1 (en) | 1995-12-28 | 1997-06-17 | Beam construction in walls and ceilings of clean air rooms |
Publications (1)
Publication Number | Publication Date |
---|---|
WO1998058139A1 true WO1998058139A1 (en) | 1998-12-23 |
Family
ID=26662466
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/SE1997/001061 WO1998058139A1 (en) | 1995-12-28 | 1997-06-17 | Beam construction in walls and ceilings of clean air rooms |
Country Status (4)
Country | Link |
---|---|
EP (1) | EP1012419A1 (sv) |
AU (1) | AU3561197A (sv) |
SE (1) | SE507573C2 (sv) |
WO (1) | WO1998058139A1 (sv) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
BE1025019B1 (fr) * | 2017-07-28 | 2018-09-25 | Becarv Sa | Assemblage comprenant une ossature et au moins un premier element a relier |
WO2022047386A1 (en) * | 2020-08-31 | 2022-03-03 | Wayne Mcgee | Modular ceiling system |
US11821205B2 (en) | 2020-08-31 | 2023-11-21 | Porta-Fab Corporation | Modular ceiling system |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1055051A (en) * | 1962-07-24 | 1967-01-11 | Grecon Systems Ltd | Means for attaching nogging bars to flanged section rails in building |
DE2809674C2 (de) * | 1978-03-07 | 1983-11-17 | Metallbau Ritter-Trennwände GmbH, 7032 Sindelfingen | Unterdecke |
US4580387A (en) * | 1984-12-12 | 1986-04-08 | Crystaplex Plastics, Ltd. | Corrosive resistant grid construction for a suspended ceiling |
US5313759A (en) * | 1991-12-18 | 1994-05-24 | Chase Iii Francis H | Cleanroom ceiling system |
-
1995
- 1995-12-28 SE SE9504701A patent/SE507573C2/sv not_active IP Right Cessation
-
1997
- 1997-06-17 EP EP97932062A patent/EP1012419A1/en not_active Withdrawn
- 1997-06-17 AU AU35611/97A patent/AU3561197A/en not_active Abandoned
- 1997-06-17 WO PCT/SE1997/001061 patent/WO1998058139A1/en not_active Application Discontinuation
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1055051A (en) * | 1962-07-24 | 1967-01-11 | Grecon Systems Ltd | Means for attaching nogging bars to flanged section rails in building |
DE2809674C2 (de) * | 1978-03-07 | 1983-11-17 | Metallbau Ritter-Trennwände GmbH, 7032 Sindelfingen | Unterdecke |
US4580387A (en) * | 1984-12-12 | 1986-04-08 | Crystaplex Plastics, Ltd. | Corrosive resistant grid construction for a suspended ceiling |
US5313759A (en) * | 1991-12-18 | 1994-05-24 | Chase Iii Francis H | Cleanroom ceiling system |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
BE1025019B1 (fr) * | 2017-07-28 | 2018-09-25 | Becarv Sa | Assemblage comprenant une ossature et au moins un premier element a relier |
WO2022047386A1 (en) * | 2020-08-31 | 2022-03-03 | Wayne Mcgee | Modular ceiling system |
US11821205B2 (en) | 2020-08-31 | 2023-11-21 | Porta-Fab Corporation | Modular ceiling system |
EP4204637A4 (en) * | 2020-08-31 | 2024-03-13 | Porta-Fab Corporation | MODULAR CEILING SYSTEM |
Also Published As
Publication number | Publication date |
---|---|
EP1012419A1 (en) | 2000-06-28 |
SE9504701D0 (sv) | 1995-12-28 |
SE9504701L (sv) | 1997-06-29 |
AU3561197A (en) | 1999-01-04 |
SE507573C2 (sv) | 1998-06-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US2888113A (en) | Ceiling and lighting construction | |
US5086597A (en) | Work space management system hallway wall arrangement | |
US4937994A (en) | Counter ceiling comprising a suspended supporting skeleton | |
JP2001502391A (ja) | クリーンエアルームの天井の梁構造 | |
CN110528917A (zh) | 手术室八角型模块化装配式结构 | |
EP1012419A1 (en) | Beam construction in walls and ceilings of clean air rooms | |
JP3694697B2 (ja) | システム天井の吊持装置 | |
GB2152091A (en) | Suspended ceiling | |
JP3743778B2 (ja) | システム天井 | |
JP3849848B2 (ja) | カーテンウォールシステム | |
JP3849847B2 (ja) | カーテンウォールシステム | |
JP3352015B2 (ja) | ユニットルームの天井の構造 | |
JP2002349004A (ja) | カーテンウォールシステム | |
JP2900984B2 (ja) | 下り壁パネルの取付構造 | |
JP2002504967A (ja) | 無塵室の壁体および天井のビーム構造 | |
CA2696225C (en) | Suspended ceiling grid system | |
JP2602573Y2 (ja) | 張出床ユニットの接合構造 | |
JP2514036Y2 (ja) | クリ―ンル―ムの天井フレ―ムへの機器取付構造 | |
JP3103413B2 (ja) | 天井骨組用横架材 | |
JP2006233598A (ja) | 天井パネル用梁構造 | |
JP3837305B2 (ja) | カーテンウォールの出隅コーナー部構造 | |
JP2602963Y2 (ja) | ジョイント式カーテンボックス | |
JPH02292460A (ja) | 移動設置ブース | |
JPH05182508A (ja) | 天井に於ける照明装置 | |
JPH0627418B2 (ja) | 組立式グレーチング |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AK | Designated states |
Kind code of ref document: A1 Designated state(s): AL AM AT AU AZ BA BB BG BR BY CA CH CN CU CZ CZ DE DE DK DK EE ES FI FI GB GE GH HU IL IS JP KE KG KP KR KZ LC LK LR LS LT LU LV MD MG MK MN MW MX NO NZ PL PT RO RU SD SE SG SI SK TJ TM TR TT UA UG US UZ VN YU ZW |
|
AL | Designated countries for regional patents |
Kind code of ref document: A1 Designated state(s): GH KE LS MW SD SZ UG ZW AM AZ BY KG KZ MD RU TJ TM AT BE CH DE DK ES FI FR GB GR IE IT LU MC NL PT SE BF BJ CF CG CI CM GA GN ML MR NE SN TD TG |
|
DFPE | Request for preliminary examination filed prior to expiration of 19th month from priority date (pct application filed before 20040101) | ||
121 | Ep: the epo has been informed by wipo that ep was designated in this application | ||
WWE | Wipo information: entry into national phase |
Ref document number: 1997932062 Country of ref document: EP |
|
WWE | Wipo information: entry into national phase |
Ref document number: 09445806 Country of ref document: US |
|
REG | Reference to national code |
Ref country code: DE Ref legal event code: 8642 |
|
WWP | Wipo information: published in national office |
Ref document number: 1997932062 Country of ref document: EP |
|
NENP | Non-entry into the national phase |
Ref country code: CA |
|
WWW | Wipo information: withdrawn in national office |
Ref document number: 1997932062 Country of ref document: EP |