Method for measuring and displaying the track geometry of a track system Download PDFInfo
- Publication number
- US10119227B2 US10119227B2 US15/513,152 US201515513152A US10119227B2 US 10119227 B2 US10119227 B2 US 10119227B2 US 201515513152 A US201515513152 A US 201515513152A US 10119227 B2 US10119227 B2 US 10119227B2
- Authority
- US
- United States
- Prior art keywords
- track
- image
- perspective
- permanent
- superelevation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims abstract description 28
- 238000005259 measurement Methods 0.000 claims abstract description 28
- 238000012937 correction Methods 0.000 claims description 11
- 230000009471 action Effects 0.000 claims description 5
- 238000013459 approach Methods 0.000 claims description 3
- 238000011156 evaluation Methods 0.000 claims description 2
- 230000001502 supplementing effect Effects 0.000 claims 1
- 230000007704 transition Effects 0.000 description 10
- 238000010276 construction Methods 0.000 description 4
- 230000008439 repair process Effects 0.000 description 4
- 229910000831 Steel Inorganic materials 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 230000006872 improvement Effects 0.000 description 2
- 238000012423 maintenance Methods 0.000 description 2
- 239000000203 mixture Substances 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- 235000004522 Pentaglottis sempervirens Nutrition 0.000 description 1
- 238000010521 absorption reaction Methods 0.000 description 1
- 230000003321 amplification Effects 0.000 description 1
- 238000004458 analytical method Methods 0.000 description 1
- 230000001174 ascending effect Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 230000036461 convulsion Effects 0.000 description 1
- 230000001934 delay Effects 0.000 description 1
- 230000001419 dependent effect Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 230000010354 integration Effects 0.000 description 1
- 230000001788 irregular Effects 0.000 description 1
- 238000000691 measurement method Methods 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- 238000003199 nucleic acid amplification method Methods 0.000 description 1
- 238000012958 reprocessing Methods 0.000 description 1
- 239000002352 surface water Substances 0.000 description 1
- 230000001360 synchronised effect Effects 0.000 description 1
- 230000009897 systematic effect Effects 0.000 description 1
- 238000012546 transfer Methods 0.000 description 1
- 230000000007 visual effect Effects 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B27/00—Placing, renewing, working, cleaning, or taking-up the ballast, with or without concurrent work on the track; Devices therefor; Packing sleepers
- E01B27/12—Packing sleepers, with or without concurrent work on the track; Compacting track-carrying ballast
- E01B27/13—Packing sleepers, with or without concurrent work on the track
- E01B27/16—Sleeper-tamping machines
- E01B27/17—Sleeper-tamping machines combined with means for lifting, levelling or slewing the track
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B35/00—Applications of measuring apparatus or devices for track-building purposes
- E01B35/06—Applications of measuring apparatus or devices for track-building purposes for measuring irregularities in longitudinal direction
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B29/00—Laying, rebuilding, or taking-up tracks; Tools or machines therefor
- E01B29/04—Lifting or levelling of tracks
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61K—AUXILIARY EQUIPMENT SPECIALLY ADAPTED FOR RAILWAYS, NOT OTHERWISE PROVIDED FOR
- B61K9/00—Railway vehicle profile gauges; Detecting or indicating overheating of components; Apparatus on locomotives or cars to indicate bad track sections; General design of track recording vehicles
- B61K9/08—Measuring installations for surveying permanent way
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L23/00—Control, warning or like safety means along the route or between vehicles or trains
- B61L23/04—Control, warning or like safety means along the route or between vehicles or trains for monitoring the mechanical state of the route
- B61L23/042—Track changes detection
- B61L23/047—Track or rail movements
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L23/00—Control, warning or like safety means along the route or between vehicles or trains
- B61L23/04—Control, warning or like safety means along the route or between vehicles or trains for monitoring the mechanical state of the route
- B61L23/042—Track changes detection
- B61L23/048—Road bed changes, e.g. road bed erosion
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B33/00—Machines or devices for shifting tracks, with or without lifting, e.g. for aligning track, for shifting excavator track
- E01B33/02—Machines or devices for shifting tracks, with or without lifting, e.g. for aligning track, for shifting excavator track for slewing, i.e. transversely shifting, in steps
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B33/00—Machines or devices for shifting tracks, with or without lifting, e.g. for aligning track, for shifting excavator track
- E01B33/06—Machines or devices for shifting tracks, with or without lifting, e.g. for aligning track, for shifting excavator track for slewing in a continuous operation, e.g. for tracks which carry excavators
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B35/00—Applications of measuring apparatus or devices for track-building purposes
- E01B35/06—Applications of measuring apparatus or devices for track-building purposes for measuring irregularities in longitudinal direction
- E01B35/08—Applications of measuring apparatus or devices for track-building purposes for measuring irregularities in longitudinal direction for levelling
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B35/00—Applications of measuring apparatus or devices for track-building purposes
- E01B35/06—Applications of measuring apparatus or devices for track-building purposes for measuring irregularities in longitudinal direction
- E01B35/10—Applications of measuring apparatus or devices for track-building purposes for measuring irregularities in longitudinal direction for aligning
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01C—MEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
- G01C7/00—Tracing profiles
- G01C7/02—Tracing profiles of land surfaces
- G01C7/04—Tracing profiles of land surfaces involving a vehicle which moves along the profile to be traced
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01D—MEASURING NOT SPECIALLY ADAPTED FOR A SPECIFIC VARIABLE; ARRANGEMENTS FOR MEASURING TWO OR MORE VARIABLES NOT COVERED IN A SINGLE OTHER SUBCLASS; TARIFF METERING APPARATUS; MEASURING OR TESTING NOT OTHERWISE PROVIDED FOR
- G01D1/00—Measuring arrangements giving results other than momentary value of variable, of general application
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01D—MEASURING NOT SPECIALLY ADAPTED FOR A SPECIFIC VARIABLE; ARRANGEMENTS FOR MEASURING TWO OR MORE VARIABLES NOT COVERED IN A SINGLE OTHER SUBCLASS; TARIFF METERING APPARATUS; MEASURING OR TESTING NOT OTHERWISE PROVIDED FOR
- G01D1/00—Measuring arrangements giving results other than momentary value of variable, of general application
- G01D1/10—Measuring arrangements giving results other than momentary value of variable, of general application giving differentiated values
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06T—IMAGE DATA PROCESSING OR GENERATION, IN GENERAL
- G06T15/00—3D [Three Dimensional] image rendering
- G06T15/10—Geometric effects
- G06T15/20—Perspective computation
- G06T15/205—Image-based rendering
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B2203/00—Devices for working the railway-superstructure
- E01B2203/01—Devices for working the railway-superstructure with track
- E01B2203/012—Devices for working the railway-superstructure with track present, i.e. in its normal position
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B2203/00—Devices for working the railway-superstructure
- E01B2203/10—Track-lifting or-lining devices or methods
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B2203/00—Devices for working the railway-superstructure
- E01B2203/12—Tamping devices
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B2203/00—Devices for working the railway-superstructure
- E01B2203/16—Guiding or measuring means, e.g. for alignment, canting, stepwise propagation
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B27/00—Placing, renewing, working, cleaning, or taking-up the ballast, with or without concurrent work on the track; Devices therefor; Packing sleepers
- E01B27/12—Packing sleepers, with or without concurrent work on the track; Compacting track-carrying ballast
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06T—IMAGE DATA PROCESSING OR GENERATION, IN GENERAL
- G06T7/00—Image analysis
- G06T7/70—Determining position or orientation of objects or cameras
- G06T7/73—Determining position or orientation of objects or cameras using feature-based methods
- G06T7/74—Determining position or orientation of objects or cameras using feature-based methods involving reference images or patches
Definitions
- the invention relates to a method for measuring and displaying the track geometry of a track system by means of a track-driveable permanent-way machine having a control measurement system for measuring the track position to be corrected before a lifting and lining device, an acceptance measurement system for measuring the corrected track position after the lifting and lining device, and associated output units for displaying the measured values, wherein the lifting and lining device is controlled depending on the measured values of the control measurement system and the acceptance measurement system for the purpose of achieving a specified target track geometry, which is predetermined especially in form of a curvature image, longitudinal level image and superelevation image.
- ballasted tracks Most tracks for railways are arranged as ballasted tracks.
- the sleepers lie in the ballast.
- the ballast is provided for dissipating the wheel forces into the subgrade, the absorption of transverse forces acting on the rail and the sleepers, and the drainage of the surface water. Irregular subsidence in the ballast and displacements in the lateral positional geometry of the track are caused by the acting wheel forces of the trains that travel over said ballast.
- the subsidence in the ballast bed causes errors in the longitudinal level, the superelevation (in the curve), the twist and the track lining position.
- the permanent-way railway machines are equipped with so-called acceptance measurement systems and acceptance recording systems.
- So-called acceptance tolerances have been determined by the railway authorities for the quality of the track position after the improvement by the permanent-way machines or other methods. They represent the minimum requirements placed on the quality of the implemented geometric improvements. They are proven by acceptance measurement systems and acceptance recording systems.
- the recorded results represent official safety-relevant documents. That is why such acceptance measurement systems and acceptance recording systems are subjected to regular calibration and acceptance by authorised parties.
- the parameters to be disclosed, corrected and recorded are the twisting of the track, longitudinal level of the track, direction or lateral position of the track, the track gauge, and the transverse inclination or superelevation of the track.
- the target geometries of the railway tracks are available in form of track plans and can be used after input into the control computer for calculating the systematic errors with knowledge of the behaviour of the measurement systems.
- On track construction machines there is the front section operator who is responsible for controlling the machine concerning the target geometry and also concerning the acceptance by the data recorder. In the event of an error that is displayed by the acceptance recorder, the machine must travel back for example and repair the error so that the acceptance tolerances are maintained.
- the front section operator of track construction machines sees the track geometry according to the currently used methods in form of curvature progressions of the track over the arc length.
- the illustration occurs visually on a computer screen in form of diagrams.
- the machine operator is shown diagrams on a separate additional screen which represent the deviations of the individual parameters from the target position.
- the machine operator can enter additional corrective values depending on these deviations. If the track springs back, the machine operator can allow the track to be slightly overpressed by the machines.
- the effects of the corrective value are only visible with delays because the acceptance recorder records the track position only approximately 10 m after the location where the track position is processed.
- the recording of geometric track positions currently occurs as a standard mostly with asymmetric cord measurement systems (cord sections a, b).
- a steel cord is centrally tensioned in this process between a front and a rear measuring carriage which is pressed onto the track on one side.
- a measuring carriage is arranged and pressed on one side between these tensioning carriages.
- the measuring carriage carries a scanning apparatus which measures of the position of the steel cord from the centre position. This value is known as arrow height.
- the carriages are pressed to the outside of the bend for the direction.
- the inner curved rail is used as a reference for the height.
- the target curvature image is converted by means of the following arrow height formula into a target arrow height image (proportional to the curvature image).
- the progression of the thus calculated target arrow height is compared with the measured actual arrow height during the measurement and the differences are recorded.
- Acceptance limit values are specified for these differences by the railway administration authorities. This procedure is also used similarly for the longitudinal inclination curvature image.
- the superelevation can be stated directly as a reference via the centroid axis and can be measured via a pendulum or other inclinometers, and the deviations can be stated by comparison with the target superelevations. Acceptance limit values also apply to the superelevation deviations.
- Arrow height measurements are subjected to a so-called transfer function, i.e. the amplification and phase position of the measured errors are dependent on wavelength and correspond only qualitatively to the actual track geometry errors.
- the invention is thus based on the object of providing a method of the kind mentioned above with which the target track geometry, the actual track geometry and the deviations from the target track geometry caused by imprecision in the work are to be illustrated in such a clear fashion that the probabilities for operating errors of the machine are reduced and intuitive control of the machine is enabled.
- This object is achieved in accordance with the invention in such a way that first a three-dimensional position image is calculated from the curvature image, the longitudinal level image and the superelevation image of the target track geometry, that the three-dimensional position image is put into a perspective display and is displayed by means of the output unit, and that the perspective position image is supplemented by the measured error curves for the track parameters of track direction, superelevation, twist, and longitudinal level.
- the target track geometry, the actual track geometry and the deviations from the target track geometry produced by imprecision in the work are shown in perspective in an image, in addition to the effects of corrective action by the machine operator, which image is substantially congruent with the view from his window in the working direction.
- certain track markers synchronisation points
- switch positions, bridge positions or main points of the curvature positions in the track in which the direction curvature image, the longitudinal inclination image or the superelevation image change
- Synchronisation points are associated for this purpose with the target track geometry, which synchronisation points are illustrated at the respective positions of the respective illustration of the track progression, wherein a synchronisation of the actual synchronisation points on the track system is made with the virtual synchronisation points of the perspective display upon reaching the synchronisation points with the permanent-way machine.
- the position of the permanent-way machine in the display of the output unit and the display of the current error values occurs continuously with the progression of the machine.
- the view of the machine operator from his window in the working direction is thus always substantially congruent with the perspective illustration.
- the progression of the residual errors is pre-calculated depending on the measured error curves and the performed control interventions are also displayed in the perspective illustration.
- the track position in front of the permanent-way machine can be recorded with an image recording device
- the position of the rails can be calculated with an image evaluation unit
- the calculator position of the rails and the target track geometry can be displayed in perspective in the position image.
- the machine operator can thus consider in advance any required corrective actions that need to be made by the operator. It is recommended for this purpose that the progression of the deviations of the track position to be corrected is calculated from the target position and trends are calculated and are displayed on the output unit in order to ensure adherence to the tolerances by timely intervention on the lifting and lining device.
- Corrections of calculated deviations of the track position to be corrected from the target position in front of the lifting and lining device can be carried out in an automated manner by a control system of the lifting and lining device.
- the machine Since the permanent-way machines mostly measure the arc length via odometers and they are provided with slightly imprecise values as a result of slippage, soiling of the wheel etc, the machine is synchronised at the synchronisation points with the target arc length.
- synchronisation points in front of the permanent-way machine can be recorded with an image recording device and can be displayed in the perspective image from a preselected approach for synchronisation.
- the synchronisation prevents the adding up of the measurement errors of the arc length.
- the synchronisation can be carried out manually or automatically.
- the target track geometry which is predetermined by the curvature images for the lateral position, the longitudinal inclination images for the height position and the superelevation images for the track superelevation is converted into a three-dimensional space curve and the target track geometry is subsequently displayed visually in perspective, on a screen or the like.
- the detected deviations of the generated track position from the target position are entered in the perspective image and used for correction via the control unit, either in an automatic mode or manual mode.
- Synchronisation points of the track which are used for synchronisation of the measured arc length of the track construction machine with the actual arc length are also shown in perspective with respect to their position, similar to other important track points such as switches, bridges, level crossings etc.
- Automatic correction of the residual track geometry errors can occur for example by calculating the mean values of the recorded errors of the longitudinal level, the direction and superelevation (e.g. over the last 10 m), in that the average value of the respective errors is returned to the control unit of the permanent-way machine for correction (feedback loop). If the mean value of the superelevation error is at ⁇ 2 mm for example, the superelevated side is lifted higher by 2 mm by the permanent-way machine in order to compensate this error. The same also applies to the other measurement parameters.
- the perspective image can be projected via a head-up projector onto the front window screen of the permanent-way machine and/or displayed with data goggles. Furthermore, the perspective image can be transmitted by a radio data line to a control centre remote from the operations site of the permanent-way machine for the purpose of monitoring the progress of the work, wherein the work can optionally be carried out in a remote-controlled manner from the control centre.
- FIG. 1 shows a monitor display of a target curvature image, a superelevation image and a longitudinal inclination image as well as the synchronisation points according to the prior art
- FIG. 2 shows an illustration of a screen image of a measurement recording after completed maintenance work according to the prior art
- FIG. 3 shows a perspective view in accordance with the invention of the track geometry, the remaining track errors and the synchronisation points
- FIG. 4 shows a landscape view of a track position in a layout plan with asymmetric cord measurement
- FIG. 5 shows an illustration of a track system in a layout plan with indication of the curvature radius, track curve angle and the adjoining tangent
- FIG. 6 shows an illustration of the composition of the three-dimensional display coordinates consisting of the layout plan, height position and superelevation, and
- FIG. 7 shows a detailed view of the composition of the three-dimensional display coordinates consisting of the layout plan, height position and superelevation.
- FIG. 1 shows a schematic monitor display A of a track geometry computer according to the prior art by way of example.
- the first column 1 shows the stationing in kilometers of the arc length.
- the next column 2 shows the progression of the so-called curvature image k(s).
- the curvature 5 corresponds to the reciprocal value of the track radius 1/R i .
- transition curves are implemented.
- the simplest form of the transition curve is the linear transition curve, in which the curvature increases continuously with the arc length until it has reached the curvature which corresponds to the track radius. The following applies to the progression of the curvature of the linear transition curve:
- the linear transition curve represents a clothoid.
- this transition curve there are also other embodiments such as the so-called Bloss transition curve, with a progression of the curvature according to the equation:
- Cosine-shaped or sinusoidal as well as biquadratic (Helmert) transition curves and other shapes are known. It is a general property thereof that analytical methods cannot be applied for determining Cartesian coordinates for the layout plan, but approximation methods or numerical methods must be used instead.
- the display of the curvature over the arc length k(s) requires double integration for the representation in a Cartesian coordinate system.
- the next column 3 shows the progression of the superelevation 6 u(s).
- the superelevation is usually stated in millimeters. It is the dimension by which the outer curved rail is laid in a lifted manner in relation to the inner track curve as a reference.
- the last column 4 shows the longitudinal inclination image h(s) 7, which is also indicated as a curvature image. Since the inclinations in railways are relatively small, no transition curves are necessary for the longitudinal level. Usually, only very low vertical curves of the transition occur from one inclination to another, or none at all.
- Column 1 also displays synchronisation points on the main curve points 15 or for special points such as for bridges 34 or switches 34 in form of symbols. The position of the machine 22 is illustrated in the geometry during the work as a horizontal line.
- FIG. 2 schematically shows the monitor screen B of a digital recorder of the geometric track position according to the prior art after the track-position correction work.
- the lowermost line 1 shows the stationing in kilometers (arc length).
- the uppermost line 8 shows the progression of the measured arrow height (direction) and the permissible tolerances 14 around said measured value. If these tolerances are exceeded, the machine operator is warned via a signal.
- the second line 9 from above represents the progression of the measured superelevation and the tolerance lines. There is an overshoot in the downward direction in 16 . In this case, the machine must retract and correct this region again until the tolerances match.
- the third line from above 10 shows the progression of the longitudinal level of the tolerance lines. An overshoot is present in 12 in this case too.
- a quantity derived from the superelevation i.e. the twist
- the twist is a quantity which due to its relevance for safety against derailment is especially safety-critical.
- the illustrated overshoot in 13 requires reprocessing by the tamping machine.
- the position of the perpendicular line 28 represents the position of the current measurement recording.
- FIG. 3 shows the perspective image of machine guidance in accordance with the invention.
- the aforementioned two monitor images for the track position computer A and the acceptance recorder B in curvature images over the arc length are integrated in an image in form of a perspective illustration.
- a three-dimensional position image is calculated from the target track geometry default values, the curvature image k (s) , 2, longitudinal level image h (s) , 4, and superelevation image u (s) , 3 of the target track geometry.
- the three-dimensional position image 19 is brought to a perspective view and is displayed with the output unit.
- the perspective position image is supplemented by the measured error curves for the track parameters of track direction 39 , superelevation 23 , twist 49 and longitudinal level 20 .
- a spatial target curve is calculated in Cartesian coordinates and it is converted into a perspective view and presented.
- 19 shows the calculated track of the target position of the track.
- 29 symbolically displays the working position of the machine.
- 28 shows the current position of the permanent-way machine.
- 22 shows the position of the recording of the recorder.
- 20 shows the deviation of the longitudinal level from the target track height position.
- 21 shows the current last deviation. The value of this deviation is indicated in field 40 .
- 31 shows the predicted value which would be obtained by the correction.
- Line 44 shows the previously calculated progression in the event of manual action of the machine operator via the compensation potentiometer. In the automatic mode, the computer would calculate and carry out the necessary correction itself.
- 48 shows the permitted limit values for the measured acceptance parameter.
- R stands for the deviation of the track lining position in mm
- H stands for the deviations of the height position in mm
- u stands for the deviation of the superelevation in mm
- % o for the permissible limit value of the twist in per mil.
- the line 39 indicates the horizontal track position deviations relating to the target curve of the track.
- the deviation present at the current measurement point is output in 38 in numerical values.
- 43 indicates the progression of the previously calculated curve in a manual or automatic correction.
- the previously calculated value of the deviation is indicated in 37 .
- 23 represents the deviation of the superelevation.
- the angle of the hatched area indicates whether it is an upward or downward superelevation error.
- the adjoining 50 represents the current deviation in numerical values.
- 24 represents the superelevation as a symbol.
- the right rail is superelevated.
- the deviation of the track lining position is always shown in the rail that is on the outside in the curve and the longitudinal level on the rail that is on the inside of the curve because it is the reference rail for the height.
- 42 is the predicted curve of the development of the superelevation error at respective manual or automatic correction.
- 35 is the value which would presumably be obtained during the subsequent measurement.
- 27 is the current deviation of the superelevation at the measuring point.
- 49 represents the deviation curve of the twist.
- 25 is the symbol for the twist.
- 26 is the current deviation at the measuring point.
- 45 is the previously calculated curve of the manual or automatic corrective action.
- 33 is the value which would be obtained with the current corrective values at the working point.
- One of the signs 17 appears upon exceeding one of the limit values of the acceptance curves or if the progression of the acceptance curves is satisfactory.
- the symbol to the right would indicate a flawless progression, the middle one would represent an impermissible exceeding of the tolerances, while the one on the left would indicate that the trend of the deviation indicates an imminent exceeding of the limit values.
- 36 indicates the synchronisation points of the main curve points.
- Other potential synchronisation points such as a bridge 34 or a switch 41 are illustrated in an “expressive” manner.
- 32 shows the horizon. If the machine, apart from a preset threshold value, approaches a synchronisation point (e.g. 5 m), a visual and/or acoustic warning is made and the image of the synchronisation point video camera is displayed in 30 .
- a synchronisation point e.g. 5 m
- the synchronisation occurs by the machine operator by means of the video image or by inspection from the window manually via a push button.
- the synchronisation points are usually marked on the rail. If the front tension carriage is precisely above the synchronisation point, synchronisation is carried out. From a perspective view, the image C is shown from a slight bird's eye perspective, with a vanishing point in infinity common to both rails. The progression of the rails is only calculated and displayed up to a finite length (e.g. 50 m).
- FIG. 4 shows an arc 46 in a layout plan.
- So-called arrow height measurement methods are commonly used in permanent-way machines for measuring the track position.
- the calculated target arrow height f ab is compared by the machine with the measured arrow height f′ ab . This leads to the deviation F which is compensated by the machine by respective lining.
- Asymmetric cords with section lengths a and b are usually used.
- the arrow height is then obtained from
- FIG. 5 schematically shows an arc 46 in the plan view (x, y coordinates) and the correlation between arc angle ⁇ and radian measure s.
- the following mathematical correlations apply to the calculation of the coordinative illustration:
- FIG. 6 shows how the three-dimensional progression of the rails can be calculated from the layout plan (in the x, y plane), the vertical plan view (y, z plane), the superelevation u and the track gauge d.
- FIG. 7 represents the assembly in detail.
- a calculated point (P i,0 ) with the coordinates (x i , y i ) in the x, y plane is supplemented by the z coordinate from the vertical plan view to form the three-dimensional point P i,1 with the coordinates (x i , y i , z i ). Since it concerns a right-hand arc, the superelevation u must be entered on the left rail.
- the point P i,2 with the coordinates (x i , y i , z i +u i ) is obtained.
- the track gauge d is deducted perpendicularly ( ⁇ 1/k si ) on the tangent t (ascending gradient k si ) in the layout plan. This leads to the point P′ i,0 with the coordinates (x′ i , y′ i ).
- the z coordinate is supplemented to form the coordinates (x′ i , y′ i , z′ i ).
- the superelevation on the outside curve
- This deviation F′ is irrelevant for the perspective illustration and is therefore disregarded.
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Computing Systems (AREA)
- Geometry (AREA)
- Computer Graphics (AREA)
- Multimedia (AREA)
- Radar, Positioning & Navigation (AREA)
- Remote Sensing (AREA)
- Machines For Laying And Maintaining Railways (AREA)
- Length Measuring Devices With Unspecified Measuring Means (AREA)
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
ATA50758/2014 | 2014-10-22 | ||
ATA50758/2014A AT516278B1 (de) | 2014-10-22 | 2014-10-22 | Verfahren zur Messung und Darstellung der Gleisgeometrie einer Gleisanlage |
PCT/AT2015/050261 WO2016061602A1 (de) | 2014-10-22 | 2015-10-19 | Verfahren zur messung und darstellung der gleisgeometrie einer gleisanlage |
Publications (2)
Publication Number | Publication Date |
---|---|
US20170306568A1 US20170306568A1 (en) | 2017-10-26 |
US10119227B2 true US10119227B2 (en) | 2018-11-06 |
Family
ID=54539759
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US15/513,152 Active US10119227B2 (en) | 2014-10-22 | 2015-10-19 | Method for measuring and displaying the track geometry of a track system |
Country Status (9)
Country | Link |
---|---|
US (1) | US10119227B2 (ja) |
EP (1) | EP3209832B1 (ja) |
JP (1) | JP6549708B2 (ja) |
CN (1) | CN106794851B (ja) |
AT (1) | AT516278B1 (ja) |
AU (1) | AU2015336917B2 (ja) |
CA (1) | CA2964803C (ja) |
RU (1) | RU2682953C2 (ja) |
WO (1) | WO2016061602A1 (ja) |
Families Citing this family (29)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106192631B (zh) * | 2016-08-10 | 2018-01-30 | 中铁第一勘察设计院集团有限公司 | 测量尺度空间的构建维护方法 |
AT519218B1 (de) * | 2017-02-06 | 2018-05-15 | Hp3 Real Gmbh | Verfahren zur Optimierung einer Gleislage |
AT519575B1 (de) * | 2017-02-15 | 2018-08-15 | Plasser & Theurer Export Von Bahnbaumaschinen Gmbh | Gleismessfahrzeug und Verfahren zur Erfassung einer vertikalen Gleislage |
AT520559B1 (de) * | 2017-10-03 | 2019-05-15 | Plasser & Theurer Export Von Bahnbaumaschinen Gmbh | Verfahren zum Betreiben einer schienengeführten Oberbaumaschine sowie Oberbaumaschine |
CN107642014B (zh) * | 2017-10-23 | 2023-02-10 | 福州大学 | 铁路轨道外轨超高测量系统及方法 |
FR3074343B1 (fr) * | 2017-11-30 | 2020-02-28 | Sncf Reseau | Procede et systeme de detection des defauts de geometrie d'une voie ferree |
US20180194380A1 (en) * | 2018-01-09 | 2018-07-12 | Saleh Akbari | Method and system of railway track parameter measurement and calculation |
AT520894B1 (de) * | 2018-01-22 | 2021-01-15 | Hp3 Real Gmbh | Verfahren zur Gleislageverbesserung durch eine gleisfahrbare Gleisstopfmaschine |
US10953899B2 (en) * | 2018-11-15 | 2021-03-23 | Avante International Technology, Inc. | Image-based monitoring and detection of track/rail faults |
US11208130B2 (en) * | 2018-11-30 | 2021-12-28 | Westinghouse Air Brake Technologies Corporation | Method and apparatus to improve unmonitored switch position reporting |
CN109883317B (zh) * | 2019-03-06 | 2020-10-13 | 株洲太昌电子信息技术股份有限公司 | 一种基于卫星定位的铁路弯道测绘方法 |
AT522405B1 (de) * | 2019-03-27 | 2024-04-15 | System 7 Ballast Regulator Gmbh | Schotterplaniermaschine |
DE102019117377A1 (de) * | 2019-06-27 | 2020-12-31 | Khs Gmbh | Vorrichtung und Verfahren zum Transportieren von Behältern |
AT522764B1 (de) * | 2019-08-29 | 2021-01-15 | Plasser & Theurer Export Von Bahnbaumaschinen Gmbh | Verfahren und Messfahrzeug zur Ermittlung einer Ist-Lage eines Gleises |
CN111216763B (zh) * | 2020-03-26 | 2024-06-14 | 唐山昆铁科技有限公司 | 铁轨爬行观测装置 |
AT17147U1 (de) * | 2020-05-04 | 2021-07-15 | Hp3 Real Gmbh | Verfahren zur Generierung eines sicherheitsrelevanten Abnahmeschriebes einer Gleisinstandhaltungsmaschine |
CN111785338B (zh) * | 2020-07-16 | 2023-06-27 | 山东交通学院 | 适用于再生沥青混合料的级配方法、系统、介质及设备 |
CN111896028B (zh) * | 2020-07-23 | 2023-09-19 | 中国铁道科学研究院集团有限公司城市轨道交通中心 | 一种地铁轨道几何检测数据矫正方法及系统 |
AT523627B1 (de) * | 2020-09-16 | 2021-10-15 | Plasser & Theurer Export Von Bahnbaumaschinen Gmbh | Verfahren und System zur Ermittlung eines Soll-Gleisverlaufs für eine Lagekorrektur |
AT524435B1 (de) * | 2020-11-25 | 2022-06-15 | Plasser & Theurer Export Von Bahnbaumaschinen Gmbh | Verfahren und System zur Ermittlung von Korrekturwerten für eine Lagekorrektur eines Gleises |
CN112880636B (zh) * | 2021-01-28 | 2022-07-08 | 华东交通大学 | 一种轨道线路沉降的智能监测方法 |
CN113280786B (zh) * | 2021-05-21 | 2022-10-21 | 中铁二局集团有限公司 | 一种通过路面旋转轴获取路面特征点高程的方法 |
AT525210A1 (de) * | 2021-07-07 | 2023-01-15 | Ait Austrian Inst Tech Gmbh | Verfahren zur dreidimensionalen Rekonstruktion des Verlaufs der Schienenmittellinie von Schienen eines Schienennetzes für Schienenfahrzeuge |
AT525090B1 (de) | 2021-08-12 | 2022-12-15 | Hp3 Real Gmbh | Verfahren zum Stabilisieren der Schotterbettung eines Gleises |
CN113737587A (zh) * | 2021-09-16 | 2021-12-03 | 广州地铁设计研究院股份有限公司 | 盾构隧道预制轨道板落板的复核方法 |
CN115610479B (zh) * | 2022-09-23 | 2023-09-15 | 北京京天威科技发展有限公司 | 一种铁路线路状态巡检系统和方法 |
AT526338B1 (de) | 2022-10-25 | 2024-02-15 | Hp3 Real Gmbh | Verfahren zur automatischen Auswertung von Gleismessdaten |
CN116142260A (zh) * | 2023-04-21 | 2023-05-23 | 中铁第五勘察设计院集团有限公司 | 一种轨道自动化变形监控系统及其监控方法 |
CN116446227B (zh) * | 2023-06-19 | 2023-08-25 | 中国铁建高新装备股份有限公司 | 弦测设备、轨道线路还原方法、装置、设备及系统 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3227724A1 (de) | 1981-12-23 | 1983-06-30 | Franz Plasser Bahnbaumaschinen-Industriegesellschaft mbH, 1010 Wien | Fahrbare gleiskorrekturmaschine mit mess-bezugssystem |
US20060032063A1 (en) | 2004-08-16 | 2006-02-16 | Fabrication Technology Associates, Inc., Also Known As Fab Tech | Method and system for controlling railroad surfacing |
US20100100268A1 (en) * | 2008-04-24 | 2010-04-22 | Gm Global Technology Operations, Inc. | Enhanced clear path detection in the presence of traffic infrastructure indicator |
US20120300060A1 (en) | 2011-05-24 | 2012-11-29 | Board Of Regents Of The University Of Nebraska | Vision system for imaging and measuring rail deflection |
US20150368865A1 (en) * | 2014-06-18 | 2015-12-24 | System 7 - Railsupport GmbH | Apparatus for improving the track position by residual error compensation |
Family Cites Families (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AT335502B (de) * | 1973-05-25 | 1977-03-10 | Plasser Bahnbaumasch Franz | Maschine und verfahren zum stopfen und nivellieren eines gleises |
AT371170B (de) * | 1981-01-16 | 1983-06-10 | Plasser Bahnbaumasch Franz | Gleisverfahrbare maschine zum verdichten, insbesondere gleisnivellierstopfmaschine, mit stabilisitationsaggregat |
JP3544703B2 (ja) * | 1994-06-16 | 2004-07-21 | 東日本旅客鉄道株式会社 | 巡回検査装置及び巡回検査のための表示方法 |
US5867404A (en) * | 1996-04-01 | 1999-02-02 | Cairo Systems, Inc. | Method and apparatus for monitoring railway defects |
ATA18499A (de) * | 1999-02-10 | 2000-04-15 | Plasser Bahnbaumasch Franz | Verfahren zur lagekorrektur eines gleises |
RU2226672C2 (ru) * | 2002-06-06 | 2004-04-10 | Московский государственный университет путей сообщения | Способ контроля состояния железнодорожного пути |
ES2313109T3 (es) * | 2004-11-22 | 2009-03-01 | Franz Plasser Bahnbaumaschinen-Industriegesellschaft M.B.H. | Procedimiento para corregir errores de posicion en altura de una via. |
US8139108B2 (en) * | 2007-01-31 | 2012-03-20 | Caterpillar Inc. | Simulation system implementing real-time machine data |
CN102259653B (zh) * | 2011-08-10 | 2013-08-14 | 中国铁道科学研究院铁道建筑研究所 | 基于激光扫描技术的铁路限界检测装置 |
JP5476450B1 (ja) * | 2012-11-19 | 2014-04-23 | 株式会社小松製作所 | 掘削機械の表示システム及び掘削機械 |
US8918246B2 (en) * | 2012-12-27 | 2014-12-23 | Caterpillar Inc. | Augmented reality implement control |
JP2014194503A (ja) * | 2013-03-29 | 2014-10-09 | Funai Electric Co Ltd | ヘッドアップディスプレイ装置 |
-
2014
- 2014-10-22 AT ATA50758/2014A patent/AT516278B1/de active
-
2015
- 2015-10-19 AU AU2015336917A patent/AU2015336917B2/en active Active
- 2015-10-19 CN CN201580055156.2A patent/CN106794851B/zh active Active
- 2015-10-19 US US15/513,152 patent/US10119227B2/en active Active
- 2015-10-19 WO PCT/AT2015/050261 patent/WO2016061602A1/de active Application Filing
- 2015-10-19 RU RU2017116347A patent/RU2682953C2/ru active
- 2015-10-19 CA CA2964803A patent/CA2964803C/en active Active
- 2015-10-19 JP JP2017521087A patent/JP6549708B2/ja active Active
- 2015-10-19 EP EP15793683.2A patent/EP3209832B1/de active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3227724A1 (de) | 1981-12-23 | 1983-06-30 | Franz Plasser Bahnbaumaschinen-Industriegesellschaft mbH, 1010 Wien | Fahrbare gleiskorrekturmaschine mit mess-bezugssystem |
US4497255A (en) | 1981-12-23 | 1985-02-05 | Franz Plasser Bahnbaumaschinen Industriegesellschaft M.B.H. | Mobile track alignment machine |
US20060032063A1 (en) | 2004-08-16 | 2006-02-16 | Fabrication Technology Associates, Inc., Also Known As Fab Tech | Method and system for controlling railroad surfacing |
US20100100268A1 (en) * | 2008-04-24 | 2010-04-22 | Gm Global Technology Operations, Inc. | Enhanced clear path detection in the presence of traffic infrastructure indicator |
US20120300060A1 (en) | 2011-05-24 | 2012-11-29 | Board Of Regents Of The University Of Nebraska | Vision system for imaging and measuring rail deflection |
US20150368865A1 (en) * | 2014-06-18 | 2015-12-24 | System 7 - Railsupport GmbH | Apparatus for improving the track position by residual error compensation |
Also Published As
Publication number | Publication date |
---|---|
CA2964803C (en) | 2020-07-28 |
RU2017116347A (ru) | 2018-11-22 |
EP3209832A1 (de) | 2017-08-30 |
EP3209832B1 (de) | 2018-06-27 |
JP6549708B2 (ja) | 2019-07-24 |
AT516278B1 (de) | 2016-04-15 |
AT516278A4 (de) | 2016-04-15 |
JP2017534784A (ja) | 2017-11-24 |
AU2015336917B2 (en) | 2018-02-01 |
CN106794851B (zh) | 2018-09-11 |
US20170306568A1 (en) | 2017-10-26 |
CA2964803A1 (en) | 2016-04-28 |
CN106794851A (zh) | 2017-05-31 |
AU2015336917A1 (en) | 2017-04-06 |
WO2016061602A1 (de) | 2016-04-28 |
RU2017116347A3 (ja) | 2019-02-06 |
RU2682953C2 (ru) | 2019-03-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10119227B2 (en) | Method for measuring and displaying the track geometry of a track system | |
US9631325B2 (en) | Apparatus for improving the track position by residual error compensation | |
US7850395B1 (en) | Smoothness indicator analysis system | |
EP3358079A1 (de) | Verfahren und vorrichtung zur optimierung einer gleislage | |
CN102953304B (zh) | 地铁轨道结构施工的精密测量控制方法 | |
US9719217B2 (en) | Self-propelled construction machine and method for visualizing the working environment of a construction machine moving on a terrain | |
CA3189965A1 (en) | Method and system for determining a target profile of the track to correct the geometry | |
ITUD980071A1 (it) | Metodo ed apparato per rilevare le anomalie di armamenti ferroviari e tranviari | |
JP2016133857A (ja) | 鉄道保守作業支援用情報処理装置および情報処理方法、ならびにプログラム | |
ES2222680T3 (es) | Procedimiento para la correccion de posicion de una via. | |
CN105040557A (zh) | 摊铺厚度测量系统、摊铺机以及摊铺厚度测量方法 | |
EP4168627A1 (de) | Verfahren zum vermessen einer gleislage | |
JP2019190858A (ja) | レーザー式長波長軌道検測器及びレーザー式長波長軌道検測方法 | |
US20180327004A1 (en) | Course correction procedure generation device, course correction procedure generation system, course correction procedure generation method, and program | |
US20230406377A1 (en) | Method and system for determining correction values for correcting the position of a track | |
CN105780634B (zh) | 摊铺厚度测量系统、方法及摊铺机 | |
EP4177130A1 (en) | Onboard rail auscultation system | |
RU2320801C1 (ru) | Способ выправки железнодорожного пути в плане, продольном профиле и по уровню и устройство для его осуществления | |
JP2004333140A (ja) | スラブ軌道の縦断線形策定計算方法 | |
RU2465385C1 (ru) | Способ проведения ремонтов и реконструкции железнодорожной инфраструктуры с использованием цифровой модели пути | |
DE102010035655A1 (de) | RPMS Office | |
JP4304681B2 (ja) | 軌道の曲線線形データ作成方法 | |
JP2008266947A (ja) | 軌道補修装置、軌道補修システム | |
JP2022167563A (ja) | マルチプルタイタンパの操作訓練装置、操作訓練方法及び操作訓練プログラム | |
DE3424606A1 (de) | Steuereinrichtung fuer den unterirdischen vortrieb bei beliebiger trasse |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: HP3 REAL GMBH, AUSTRIA Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:LICHTBERGER, BERNHARD;REEL/FRAME:041669/0901 Effective date: 20170303 |
|
STCF | Information on status: patent grant |
Free format text: PATENTED CASE |
|
MAFP | Maintenance fee payment |
Free format text: PAYMENT OF MAINTENANCE FEE, 4TH YR, SMALL ENTITY (ORIGINAL EVENT CODE: M2551); ENTITY STATUS OF PATENT OWNER: SMALL ENTITY Year of fee payment: 4 |