SG174509A1 - Steel pipe pile - Google Patents
Steel pipe pile Download PDFInfo
- Publication number
- SG174509A1 SG174509A1 SG2011068368A SG2011068368A SG174509A1 SG 174509 A1 SG174509 A1 SG 174509A1 SG 2011068368 A SG2011068368 A SG 2011068368A SG 2011068368 A SG2011068368 A SG 2011068368A SG 174509 A1 SG174509 A1 SG 174509A1
- Authority
- SG
- Singapore
- Prior art keywords
- pile
- steel pipe
- pipe pile
- ratio
- diameter
- Prior art date
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 205
- 239000010959 steel Substances 0.000 title claims abstract description 205
- 230000007423 decrease Effects 0.000 claims description 38
- 238000010276 construction Methods 0.000 description 115
- 238000000034 method Methods 0.000 description 24
- 239000002689 soil Substances 0.000 description 24
- 230000000052 comparative effect Effects 0.000 description 18
- 238000004519 manufacturing process Methods 0.000 description 8
- 238000012360 testing method Methods 0.000 description 8
- 238000012545 processing Methods 0.000 description 6
- 230000000694 effects Effects 0.000 description 5
- 239000011435 rock Substances 0.000 description 5
- 239000010410 layer Substances 0.000 description 4
- 239000004575 stone Substances 0.000 description 4
- 238000013459 approach Methods 0.000 description 2
- 238000005452 bending Methods 0.000 description 2
- 230000003247 decreasing effect Effects 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 230000000149 penetrating effect Effects 0.000 description 2
- 230000035515 penetration Effects 0.000 description 2
- 238000009412 basement excavation Methods 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 239000011178 precast concrete Substances 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
- 238000009751 slip forming Methods 0.000 description 1
- 239000002344 surface layer Substances 0.000 description 1
- 238000010998 test method Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/24—Prefabricated piles
- E02D5/28—Prefabricated piles made of steel or other metals
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/48—Piles varying in construction along their length, i.e. along the body between head and shoe, e.g. made of different materials along their length
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Piles And Underground Anchors (AREA)
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2009095734 | 2009-04-10 | ||
PCT/JP2010/002602 WO2010116758A1 (ja) | 2009-04-10 | 2010-04-09 | 鋼管杭 |
Publications (1)
Publication Number | Publication Date |
---|---|
SG174509A1 true SG174509A1 (en) | 2011-10-28 |
Family
ID=42936049
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SG2011068368A SG174509A1 (en) | 2009-04-10 | 2010-04-09 | Steel pipe pile |
Country Status (9)
Country | Link |
---|---|
JP (1) | JP4635114B2 (zh) |
KR (1) | KR101331703B1 (zh) |
CN (1) | CN102365409B (zh) |
AU (1) | AU2010235744B2 (zh) |
HK (1) | HK1163198A1 (zh) |
MY (1) | MY154167A (zh) |
SG (1) | SG174509A1 (zh) |
TW (1) | TWI384107B (zh) |
WO (1) | WO2010116758A1 (zh) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4988068B2 (ja) * | 2010-07-05 | 2012-08-01 | 新日本製鐵株式会社 | 鋼管杭及びその施工方法 |
TWI576488B (zh) * | 2014-12-23 | 2017-04-01 | 新日鐵住金股份有限公司 | 鋼管樁之制止旋轉構造 |
Family Cites Families (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5781526A (en) * | 1980-11-07 | 1982-05-21 | Masatoshi Sawaguchi | Tapered steel tubular pile |
JPS63236815A (ja) * | 1987-03-23 | 1988-10-03 | Kawasaki Steel Corp | ドリル鋼管杭 |
EP0758699B1 (de) * | 1995-07-31 | 2001-10-17 | Dipl.Ing. Helmut Hemmerlein GmbH & CO. Bau KG. | Verfahren zur Einbringung von sich verjüngenden Pfählen, zugehörige Pfähle, und daraus hergestellte Gründungen und Fundamentbildungen |
US6309143B1 (en) * | 1998-05-27 | 2001-10-30 | Stanley Merjan | Composite pile with tapering lower portion and method for driving pile into granular soil |
JP2003003465A (ja) * | 2001-06-20 | 2003-01-08 | Norio Moriya | テーパー基礎杭 |
JP4191451B2 (ja) * | 2002-09-30 | 2008-12-03 | 大和ハウス工業株式会社 | 回転圧入式鋼杭用の先端部品及び鋼杭 |
JP2004218235A (ja) * | 2003-01-14 | 2004-08-05 | Nakajima Steel Pipe Co Ltd | 鋼管杭および鋼管杭の製造方法 |
CN100453741C (zh) * | 2003-04-04 | 2009-01-21 | 株式会社奥特-塞特 | 组装式钢管桩 |
CN100507159C (zh) * | 2003-04-29 | 2009-07-01 | 立基工程有限公司 | 可加强水平抗弯强度和刚度的组合桩段及其施工方法 |
CN2729151Y (zh) * | 2004-09-16 | 2005-09-28 | 颜小荣 | 高强度空心增效桩尖 |
JP5069873B2 (ja) * | 2006-06-08 | 2012-11-07 | 住友林業株式会社 | 鋼管杭の施工方法 |
JP2008190116A (ja) * | 2007-01-31 | 2008-08-21 | Sumitomo Forestry Co Ltd | 建物の基礎地盤の液状化対策構造 |
JP5335200B2 (ja) * | 2007-04-09 | 2013-11-06 | 常郎 後藤 | スパイラル鋼管杭 |
KR20090050562A (ko) * | 2007-11-16 | 2009-05-20 | 백규호 | 테이퍼형 강관을 이용한 긴 말뚝 시공법 |
-
2010
- 2010-04-09 TW TW099111085A patent/TWI384107B/zh not_active IP Right Cessation
- 2010-04-09 CN CN201080014917.7A patent/CN102365409B/zh not_active Expired - Fee Related
- 2010-04-09 MY MYPI2011004408A patent/MY154167A/en unknown
- 2010-04-09 WO PCT/JP2010/002602 patent/WO2010116758A1/ja active Application Filing
- 2010-04-09 KR KR1020117023220A patent/KR101331703B1/ko active IP Right Grant
- 2010-04-09 JP JP2010525551A patent/JP4635114B2/ja active Active
- 2010-04-09 AU AU2010235744A patent/AU2010235744B2/en active Active
- 2010-04-09 SG SG2011068368A patent/SG174509A1/en unknown
-
2012
- 2012-04-19 HK HK12103867.0A patent/HK1163198A1/zh not_active IP Right Cessation
Also Published As
Publication number | Publication date |
---|---|
TWI384107B (zh) | 2013-02-01 |
CN102365409A (zh) | 2012-02-29 |
MY154167A (en) | 2015-05-15 |
JPWO2010116758A1 (ja) | 2012-10-18 |
AU2010235744B2 (en) | 2014-12-18 |
JP4635114B2 (ja) | 2011-02-16 |
HK1163198A1 (zh) | 2012-09-07 |
AU2010235744A1 (en) | 2011-10-13 |
CN102365409B (zh) | 2014-05-28 |
WO2010116758A1 (ja) | 2010-10-14 |
KR101331703B1 (ko) | 2013-11-20 |
TW201116672A (en) | 2011-05-16 |
KR20110132436A (ko) | 2011-12-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2141286B1 (en) | Spiral steel pipe pile | |
JP5136270B2 (ja) | 合成摩擦杭の造成方法 | |
JP4842350B2 (ja) | 地盤改良工法 | |
US10837154B2 (en) | Coupler for soil nail and method of emplacing same | |
SG174509A1 (en) | Steel pipe pile | |
US10072389B2 (en) | Coupler for soil nail and method of emplacing same | |
KR101714610B1 (ko) | 희생 강관케이싱 부분 인발식 강관말뚝 시공방법 | |
JP5177066B2 (ja) | 鋼管杭及びその施工方法 | |
JP7107723B2 (ja) | 場所打ちコンクリート杭の構築方法及び場所打ちコンクリート杭 | |
JP2006152799A (ja) | 多段拡径場所打ちコンクリート杭の製造方法、多段拡径場所打ちコンクリート杭の評価方法、及び多段拡径場所打ちコンクリート杭 | |
Qi et al. | Theoretical study on setup of expanded-base pile considering cavity contraction | |
JP2014231678A (ja) | 地盤の締め固め方法及び膨張杭 | |
CN210104733U (zh) | 一种高压旋喷扩大头锚索的端头结构 | |
JP6943633B2 (ja) | リング状先端金物およびそれを使用する中掘り杭工法 | |
CN101761348A (zh) | 多向锚桩一次成型的钻具 | |
KR20190032173A (ko) | 회전관입 말뚝유닛 | |
CN214993810U (zh) | 一种抗拔钢管土钉 | |
CN109750665A (zh) | 一种钻孔桩钢护筒下沉遇孤石的处理方法 | |
JP4596930B2 (ja) | 中掘り根固め工法用の杭体 | |
FI115151B (fi) | Kalliokärkirakenne teräsbetonista lyöntipaalua varten | |
Randolph | Keynote Lecture: Considerations in the design of piles in soft rock | |
Randolph | Design considerations for piles jacked or driven into strong soil or weak rock:(IPA 15th Anniversary Special Keynote Lecture) | |
JP2018021325A (ja) | 木材等を用いた地盤改良工法 | |
Piles | –Overview and Case History | |
Samokhvalov et al. | New method developed for foundation strengthening in silty-clayed soils |