KR100840375B1 - 건설 공사용 화물 차량 리프터 - Google Patents
건설 공사용 화물 차량 리프터 Download PDFInfo
- Publication number
- KR100840375B1 KR100840375B1 KR1020060101587A KR20060101587A KR100840375B1 KR 100840375 B1 KR100840375 B1 KR 100840375B1 KR 1020060101587 A KR1020060101587 A KR 1020060101587A KR 20060101587 A KR20060101587 A KR 20060101587A KR 100840375 B1 KR100840375 B1 KR 100840375B1
- Authority
- KR
- South Korea
- Prior art keywords
- cage
- hoist
- wire
- coupled
- guide wire
- Prior art date
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B9/00—Kinds or types of lifts in, or associated with, buildings or other structures
- B66B9/04—Kinds or types of lifts in, or associated with, buildings or other structures actuated pneumatically or hydraulically
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B11/00—Main component parts of lifts in, or associated with, buildings or other structures
- B66B11/04—Driving gear ; Details thereof, e.g. seals
- B66B11/0423—Driving gear ; Details thereof, e.g. seals actuated pneumatically or hydraulically
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B7/00—Other common features of elevators
- B66B7/06—Arrangements of ropes or cables
- B66B7/10—Arrangements of ropes or cables for equalising rope or cable tension
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B9/00—Kinds or types of lifts in, or associated with, buildings or other structures
- B66B9/16—Mobile or transportable lifts specially adapted to be shifted from one part of a building or other structure to another part or to another building or structure
- B66B9/187—Mobile or transportable lifts specially adapted to be shifted from one part of a building or other structure to another part or to another building or structure with a liftway specially adapted for temporary connection to a building or other structure
Abstract
Description
Claims (10)
- 삭제
- 삭제
- 다수의 호이스트 와이어를 승강시키며 서포트 프레임에 설치된 호이스트부와,상기 호이스트부의 호이스트 와이어에 시브로 결합되어 건설 공사용 화물 차량을 수직 방향의 지하 통로로 승강시키는 케이지부와,상기 서포트 프레임에 넛트로 길이 조절봉이 결합되고, 상기 길이 조절봉의 하단에 하단 브라켓이 결합되며, 상기 하단 브라켓에 로드 셀이 결합핀으로 고정되고, 상기 로드 셀에 결합핀으로 고정되는 동시에 상기 호이스트부 및 상기 케이지부를 통과한 호이스트 와이어의 끝단이 결합되는 상단 브라켓이 구비됨으로써, 상기 케이지의 총하중 및 편하중을 감지하는 하중 감지부와,상기 지하 통로의 바닥과 상부를 직선 형태로 연결하며, 상기 케이지부가 흔들림없이 안정적으로 승강되도록 가이드하는 다수의 가이드 와이어와,상기 지하 통로의 상부에 설치된 동시에 상기 가이드 와이어가 수직 방향으로 관통하는 유압 실린더가 구비되고, 상기 유압 실린더의 상단에 설치되어 상기 유압 실린더를 관통하는 상기 가이드 와이어가 자중에 의해 하강하지 않도록 협착부가 구비되며, 상기 협착부의 외주연에 설치되어 상기 가이드 와이어를 강하게 협착하는 아답터가 구비되고, 상기 아답터의 외주연에 설치되어 상기 협착부 및 아답터의 상승 거리를 제한하는 커버가 구비되어, 상기 가이드 와이어의 텐션을 조정하는 텐션 조정부로 이루어진 것을 특징으로 하는 건설 공사용 화물 차량 리프터.
- 제 3 항에 있어서, 상기 유압 실린더는내부에 오일이 채워져 있으며, 표면에 상승용 오일 주입구 및 하강용 오일 주입구가 형성된 몸체와,상기 몸체의 내부에 결합된 피스톤과,상기 피스톤의 상,하단으로부터 연장되어 상기 몸체의 상단 및 하단을 관통하여 형성된 일정 길이의 로드를 포함하고,상기 피스톤 및 로드에는 상기 가이드 와이어가 관통할 수 있도록 관통공이 형성된 것을 특징으로 하는 건설 공사용 화물 차량 리프터.
- 제 4 항에 있어서, 상기 유압 실린더의 상단에 설치된 협착부는내부 표면에 상기 가이드 와이어와의 접촉력이 커지도록 다수의 요철이 형성되고, 상기 유압 실린더의 중심으로부터 상부를 향하는 방향으로 갈수록 외경이 커지며, 다수개가 서로 분할 형성된 동시에 상기 로드의 상단에 안착된 죠(jaw)와,상기 죠의 상단에 결합되어 상기 다수의 죠가 분리되지 않도록 하는 오링과,상기 죠의 상단에 결합된 스프링과,상기 스프링의 외주연으로서 상기 죠의 상단에 결합된 콘을 포함하여 이루어진 것을 특징으로 하는 건설 공사용 화물 차량 리프터.
- 제 5 항에 있어서, 상기 아답터는 상기 죠 및 콘을 감싸며 형성된 것을 특징으로 하는 건설 공사용 화물 차량 리프터.
- 제 5 항에 있어서, 상기 커버는 하단이 상기 유압 실린더에 결합된 동시에, 외측 표면은 상기 아답터를 감싸며 형성된 것을 특징으로 하는 건설 공사용 화물 차량 리프터.
- 제 5 항에 있어서, 상기 협착부는 상기 유압 실린더의 하단에도 형성된 것을 특징으로 하는 건설 공사용 화물 차량 리프터.
- 제 8 항에 있어서, 상기 유압 실린더의 하단에 형성된 협착부는내부 표면에 상기 가이드 와이어와의 접촉력이 커지도록 다수의 요철이 형성되고, 상기 유압 실린더의 중심으로부터 하부를 향하는 방향으로 갈수록 외경이 작아지며, 다수개가 서로 분할 형성된 동시에 상기 로드의 하단에 안착된 죠(jaw)와,상기 죠의 상단에 결합되어 상기 다수의 죠가 분리되지 않도록 하는 오링과,상기 죠 및 로드의 하단을 감싸며 형성된 아답터를 포함하여 이루어진 것을 특징으로 하는 건설 공사용 화물 차량 리프터.
- 제 3 항에 있어서, 상기 케이지부에는상기 각각의 가이드 와이어와 대응되는 위치에 설치된 브라켓과,상기 각 브라켓에 회전 가능하게 설치되고, 상기 가이드 와이어에 접촉되어 회전하는 제1가이드 롤러와,상기 제1가이드 롤러의 바깥 방향으로서, 상기 브라켓에 회전 가능하게 설치되고, 상기 가이드 와이어에 접촉되어 상기 제1가이드 롤러와 함께 회전함으로써, 상기 가이드 와이어의 이탈을 방지하는 제2가이드 롤러로 이루어진 가이드부가 더 형성된 것을 특징으로 하는 건설 공사용 화물 차량 리프터.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020060101587A KR100840375B1 (ko) | 2006-10-18 | 2006-10-18 | 건설 공사용 화물 차량 리프터 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020060101587A KR100840375B1 (ko) | 2006-10-18 | 2006-10-18 | 건설 공사용 화물 차량 리프터 |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20080035222A KR20080035222A (ko) | 2008-04-23 |
KR100840375B1 true KR100840375B1 (ko) | 2008-06-23 |
Family
ID=39574243
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020060101587A KR100840375B1 (ko) | 2006-10-18 | 2006-10-18 | 건설 공사용 화물 차량 리프터 |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100840375B1 (ko) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102070057B (zh) * | 2011-01-30 | 2013-05-29 | 中建三局建设工程股份有限公司 | 一种自升式施工电梯 |
KR102178506B1 (ko) * | 2019-02-11 | 2020-11-13 | 김윤호 | 건설 현장 승강기의 중량 계측장치 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH07173943A (ja) * | 1993-12-20 | 1995-07-11 | Taisei Corp | 揚重物の吊り上げ方法 |
JPH08231155A (ja) * | 1995-02-28 | 1996-09-10 | Hitachi Building Syst Eng & Service Co Ltd | エレベータ主ロープの自動張力調整装置 |
KR20040011060A (ko) * | 2002-07-27 | 2004-02-05 | 오티스 엘리베이터 컴파니 | 엘리베이터 하중 측정장치 |
KR200414025Y1 (ko) * | 2006-02-06 | 2006-04-13 | 김휘숙 | 건설 공사용 화물 차량 리프터 |
-
2006
- 2006-10-18 KR KR1020060101587A patent/KR100840375B1/ko active IP Right Grant
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH07173943A (ja) * | 1993-12-20 | 1995-07-11 | Taisei Corp | 揚重物の吊り上げ方法 |
JPH08231155A (ja) * | 1995-02-28 | 1996-09-10 | Hitachi Building Syst Eng & Service Co Ltd | エレベータ主ロープの自動張力調整装置 |
KR20040011060A (ko) * | 2002-07-27 | 2004-02-05 | 오티스 엘리베이터 컴파니 | 엘리베이터 하중 측정장치 |
KR200414025Y1 (ko) * | 2006-02-06 | 2006-04-13 | 김휘숙 | 건설 공사용 화물 차량 리프터 |
Also Published As
Publication number | Publication date |
---|---|
KR20080035222A (ko) | 2008-04-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101760019B1 (ko) | 하부 구동 타워형 주차장치 | |
JP6263650B2 (ja) | 電車プラットホーム安全装置 | |
JP2014005117A (ja) | エレベータ昇降路内の長尺物点検装置及び長尺物点検方法 | |
KR100840375B1 (ko) | 건설 공사용 화물 차량 리프터 | |
JP2000229772A5 (ko) | ||
CN112978602B (zh) | 一种提升机构、升船机、船坞及提升机构的工作方法 | |
JP5894408B2 (ja) | 昇降機の停止調整装置を備えた機械式駐車設備 | |
KR100838228B1 (ko) | 건설 공사용 화물 차량 리프터 | |
JP2839872B2 (ja) | 立坑用ロープ式エレベータ | |
KR101930750B1 (ko) | 크레인 점검 장치 및 방법 | |
JP4929045B2 (ja) | 機械室レスエレベータのガイドレール据え付け工法 | |
JP5969861B2 (ja) | 昇降体着床検知制御装置とそれを備えた機械式駐車設備 | |
KR101647766B1 (ko) | 승강형 cctv 카메라 시스템 | |
JP6648247B2 (ja) | 乗客及び障害物検知機能を含む電車プラットフォーム安全装置 | |
KR200414025Y1 (ko) | 건설 공사용 화물 차량 리프터 | |
KR100446047B1 (ko) | 입체주차장치 | |
KR101830837B1 (ko) | 엘리베이터 조속기 로프 텐션 장치 | |
KR100739289B1 (ko) | 건설 공사용 화물 차량 리프터 | |
KR200237779Y1 (ko) | 입체주차장치 | |
KR20090006206U (ko) | 케이지의 승강 자동감지수단이 부설된 건설용 리프트의통신케이블 권설장치 | |
JP3556507B2 (ja) | スタッカークレーン | |
JP3452879B2 (ja) | 立体駐車装置 | |
JP4601771B2 (ja) | エレベーターの昇降路装置 | |
CN114671353B (zh) | 工件合装方法、合装件安装系统和工程机械装配线 | |
JP2008247568A (ja) | スタッカクレーンの昇降体落下防止装置およびスタッカクレーン |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
N231 | Notification of change of applicant | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20130603 Year of fee payment: 6 |
|
FPAY | Annual fee payment |
Payment date: 20140609 Year of fee payment: 7 |
|
FPAY | Annual fee payment |
Payment date: 20150601 Year of fee payment: 8 |
|
FPAY | Annual fee payment |
Payment date: 20160601 Year of fee payment: 9 |
|
FPAY | Annual fee payment |
Payment date: 20170601 Year of fee payment: 10 |
|
FPAY | Annual fee payment |
Payment date: 20180605 Year of fee payment: 11 |
|
FPAY | Annual fee payment |
Payment date: 20190604 Year of fee payment: 12 |