KR100545132B1 - 굴곡진 하천 제방 측면 보강대 - Google Patents
굴곡진 하천 제방 측면 보강대 Download PDFInfo
- Publication number
- KR100545132B1 KR100545132B1 KR1020050093931A KR20050093931A KR100545132B1 KR 100545132 B1 KR100545132 B1 KR 100545132B1 KR 1020050093931 A KR1020050093931 A KR 1020050093931A KR 20050093931 A KR20050093931 A KR 20050093931A KR 100545132 B1 KR100545132 B1 KR 100545132B1
- Authority
- KR
- South Korea
- Prior art keywords
- air injection
- fixed
- river
- air
- wall surface
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
- E02B3/04—Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
- E02B3/10—Dams; Dykes; Sluice ways or other structures for dykes, dams, or the like
- E02B3/102—Permanently installed raisable dykes
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
- E02B3/04—Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
- E02B3/041—Structures or apparatus for, or methods of, protecting banks, coasts, or harbours using active mechanical means, e.g. fluidizing or pumping
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Revetment (AREA)
Abstract
Description
Claims (2)
- 굴곡진 하천 제방에 있어서,내부에 하나의 연결된 공간으로 공기주입주름부(11)가 이루어져 차수블럭(20)의 내측 하단과 고정되고, 상하로 여러번 접혀서 형성되는 공기주입주름부(11)의 양측부에 하나의 주름부마다 걸림가이드(14)가 고정되며, 걸림가이드(14)는 단부에 걸림턱(15)이 형성되어 이동가이드부(22)의 가이드홈(30)으로 삽입되어 고정되고, 공기주입주름부(11)의 상단에는 연결고리(17)에 의하여 상부프레임(12)이 연결 고정되며, 상부프레임(12)의 양단에는 바퀴(13)가 고정되며, 공기주입주름부(11) 하부에 공기주입공(16)이 형성되는 에어차수판(10);하단에 다수개의 볼트공(25)이 형성된 플랜지(24)가 형성되고, 내벽과 외벽으로 이루어져 그 사이에 수납공간부(27)가 형성되도록 지지벽면부(21)를 구성하며, 지지벽면부(21)의 양측부에 이동가이드부(22)가 일체로 형성되고, 지지벽면부(21)의 외벽면 하부 일측에 공기주입공(23)이 공기주입주름부(11)의 공기주입공(16)과 연통시키도록 형성되며, 공기주입공(23)에 캡(31)을 착탈가능하게 고정하는 차수블럭(20); 으로 구성되고,하천의 유량이 증가하면 공기주입공(23)(16)을 통하여 펌프(33)로 공기를 채워 공기주입주름부(11)를 위로 팽창시켜 이동가이드부(22) 사이인 비상차단공간부(34)를 차단하는 것을 특징으로 하는 굴곡진 하천 제방 측면 보강대.
- 제 1 항에 있어서, 공기주입주름부(11)는 물의 압력을 견딜수 있도록 내부에 보강철선이 삽입되고, 일측 이동가이드부(22)의 외측단에 돌출연결부(28)가 형성되며, 타측 이동가이드부(22)의 외측단부에는 삽입홈부(29)가 형성되며, 캡(31)은 나사식으로 형성되고, 이동가이드부(22)의 상단에 덮개(32)를 씌워 고정하는 것을 특징으로 하는 굴곡진 하천 제방 측면 보강대.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020050093931A KR100545132B1 (ko) | 2005-10-06 | 2005-10-06 | 굴곡진 하천 제방 측면 보강대 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020050093931A KR100545132B1 (ko) | 2005-10-06 | 2005-10-06 | 굴곡진 하천 제방 측면 보강대 |
Publications (1)
Publication Number | Publication Date |
---|---|
KR100545132B1 true KR100545132B1 (ko) | 2006-01-24 |
Family
ID=37178310
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020050093931A KR100545132B1 (ko) | 2005-10-06 | 2005-10-06 | 굴곡진 하천 제방 측면 보강대 |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100545132B1 (ko) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100707723B1 (ko) * | 2005-10-31 | 2007-04-16 | (주)화신엔지니어링 | 하천 제방 차수막 부재 시공 방법 |
CN110016889A (zh) * | 2019-04-17 | 2019-07-16 | 李恒森 | 一种水利工程垂直止水结构及其施工方法 |
-
2005
- 2005-10-06 KR KR1020050093931A patent/KR100545132B1/ko active IP Right Grant
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100707723B1 (ko) * | 2005-10-31 | 2007-04-16 | (주)화신엔지니어링 | 하천 제방 차수막 부재 시공 방법 |
CN110016889A (zh) * | 2019-04-17 | 2019-07-16 | 李恒森 | 一种水利工程垂直止水结构及其施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR102282034B1 (ko) | 리프트형 홍수 방어벽 | |
KR101709274B1 (ko) | 부력식 보강판을 구비하는 복합 차수벽 | |
KR101026253B1 (ko) | 플로팅월 | |
KR101176060B1 (ko) | 무동력으로 자동 가동되는 침수방지용 차수판 | |
KR101658067B1 (ko) | 유지보수가 용이한 승하강식 홍수벽 장치 | |
KR100545132B1 (ko) | 굴곡진 하천 제방 측면 보강대 | |
KR101005531B1 (ko) | 부력체를 이용한 홍수범람 방지장치 | |
KR200401284Y1 (ko) | 브이 노치형 사이폰 여수로 | |
KR100612720B1 (ko) | 하천제방의 곡면부 국소붕괴를 방지하는 방호대 | |
KR100473937B1 (ko) | 저수지의 보 및 제방용 방류관 | |
KR20170062658A (ko) | 도르래를 이용한 홍수 방지장치 | |
KR101202697B1 (ko) | 오탁방지막 구조물 | |
JP3717454B2 (ja) | 浮上式水防装置の排水構造 | |
CN109137846B (zh) | 防止泥沙进入取水口的外置排水泵潜浮式拦沙坎 | |
JP2008190196A (ja) | 雨水貯留システム | |
KR200483434Y1 (ko) | 부력체가 내장된 맨홀뚜껑 | |
CN110374055A (zh) | 水利护坡结构 | |
KR200341022Y1 (ko) | 하천 범람 방지를 위한 제방의 배수구조 | |
KR200367274Y1 (ko) | 하천의 수위조절용 옹벽 | |
CN219825548U (zh) | 一种市政路面排水盖板 | |
KR101369391B1 (ko) | 이동식 과속방지턱에 내장되어 자가 구동되는 차수막 | |
KR100965901B1 (ko) | 수해방재장치 | |
KR101050233B1 (ko) | 하천의 제방에서 부유물 걸름장치 | |
KR101213563B1 (ko) | 하천 제방용 월류 방지장치 | |
KR20040060633A (ko) | 저수지의 보 및 제방용 수문 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
A302 | Request for accelerated examination | ||
N231 | Notification of change of applicant | ||
N231 | Notification of change of applicant | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20130114 Year of fee payment: 8 |
|
FPAY | Annual fee payment |
Payment date: 20140106 Year of fee payment: 9 |
|
FPAY | Annual fee payment |
Payment date: 20150115 Year of fee payment: 10 |
|
FPAY | Annual fee payment |
Payment date: 20160118 Year of fee payment: 11 |
|
FPAY | Annual fee payment |
Payment date: 20170116 Year of fee payment: 12 |
|
FPAY | Annual fee payment |
Payment date: 20180112 Year of fee payment: 13 |
|
FPAY | Annual fee payment |
Payment date: 20190115 Year of fee payment: 14 |
|
FPAY | Annual fee payment |
Payment date: 20191205 Year of fee payment: 15 |