JPS6026107A - 廃熱変換装置一体型発電プラント - Google Patents
廃熱変換装置一体型発電プラントInfo
- Publication number
- JPS6026107A JPS6026107A JP57137834A JP13783482A JPS6026107A JP S6026107 A JPS6026107 A JP S6026107A JP 57137834 A JP57137834 A JP 57137834A JP 13783482 A JP13783482 A JP 13783482A JP S6026107 A JPS6026107 A JP S6026107A
- Authority
- JP
- Japan
- Prior art keywords
- steam
- turbine
- stage
- pressure
- storage section
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F01—MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
- F01K—STEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
- F01K3/00—Plants characterised by the use of steam or heat accumulators, or intermediate steam heaters, therein
- F01K3/02—Use of accumulators and specific engine types; Control thereof
- F01K3/04—Use of accumulators and specific engine types; Control thereof the engine being of multiple-inlet-pressure type
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Engine Equipment That Uses Special Cycles (AREA)
Abstract
(57)【要約】本公報は電子出願前の出願データであるた
め要約のデータは記録されません。
め要約のデータは記録されません。
Description
【発明の詳細な説明】
本発明は、ある段階における出力が次の段階における入
力となるような、以下において先述型の発電プラントと
略称する多段階タービンを利用するすぐれた発電プラン
トに関する〇 先述型の種々の工業的発電プラントにおいて、循環的な
電気負荷はボイラーによシ生ずるスチームの量を制御す
ることによシ、或いはタービン各段階に対する入口圧力
を制御することによシ調整される。発電プラントの電気
負荷がその所定(定格)出力である時は、ボイラーはス
チームを所定温度、圧力及び流動速度で発生する。一方
、発電プラントの電気負荷が所定値以下に減すると、タ
ービン出力は減じなければりらない。ピークタービン効
率が所定負荷で発生するため、発電プラントによ)見ら
れる電力の費用は、所定負荷以下で作動が行われる場合
悪影響をうける。更にタービン出力を減するための従来
の方法は全体的なシステムを非効率的なものとする。従
ってタービン出力を減するためタービン入口圧力を減す
る(絞る)ことは燃料を浪費する不可逆的な過程を導く
ことになる。
力となるような、以下において先述型の発電プラントと
略称する多段階タービンを利用するすぐれた発電プラン
トに関する〇 先述型の種々の工業的発電プラントにおいて、循環的な
電気負荷はボイラーによシ生ずるスチームの量を制御す
ることによシ、或いはタービン各段階に対する入口圧力
を制御することによシ調整される。発電プラントの電気
負荷がその所定(定格)出力である時は、ボイラーはス
チームを所定温度、圧力及び流動速度で発生する。一方
、発電プラントの電気負荷が所定値以下に減すると、タ
ービン出力は減じなければりらない。ピークタービン効
率が所定負荷で発生するため、発電プラントによ)見ら
れる電力の費用は、所定負荷以下で作動が行われる場合
悪影響をうける。更にタービン出力を減するための従来
の方法は全体的なシステムを非効率的なものとする。従
ってタービン出力を減するためタービン入口圧力を減す
る(絞る)ことは燃料を浪費する不可逆的な過程を導く
ことになる。
またボイラーをその設計条件以下で作動して物質の流動
を減するととも、燃料の効率的な使用を減する結果とな
る。
を減するととも、燃料の効率的な使用を減する結果とな
る。
従って本発明の目的は、上述欠陥を克服するか実質的に
減する先述型の新規ですぐれた発電プラントを提供する
ことである。
減する先述型の新規ですぐれた発電プラントを提供する
ことである。
本発明による発電プラントにおいては、所定の温度及び
圧力で所定量の高圧スチームを、高圧段階及び高圧段階
から排気される低圧スチームによシ駆動される少くとも
一つの低圧段階を有するスチームタービンに供給するよ
うに作動する。スチームタービンによシ駆動される主発
電機は電気を種々の負荷で発生する。負荷が所定値以下
に減するとボイラー作動は維持されるがタービンの高圧
段階から排出される低圧スチームは低圧段階から蓄熱部
に移動する。蓄熱部は例えば大量の水を保容してお)、
その量は所定負荷以下で発電フリントが作動する間低圧
スチーム中の熱を貯めるのに十分な量である。それ自体
の発電機を有する廃熱変換装置は蓄熱部で貯められる低
圧熱に応動し、発電プラントの出力を補足するため負荷
に対する電力を供給するよう選択的に作動しうる。廃熱
変換装置の出力はピーク電力を得るために使用するとと
ができ、かくして主発電プラントの閉止中低レベル電力
を供給することができるだけでなく主発電プラントのサ
イズを減することができる。更に作動中は、ボイラー及
びタービンの高圧段Rhピーク効率で作動し、その結果
、本発明による発電プラントの燃料コストを同じサイズ
の従来の発電プラントの燃料コスト以下にすることがで
きる。
圧力で所定量の高圧スチームを、高圧段階及び高圧段階
から排気される低圧スチームによシ駆動される少くとも
一つの低圧段階を有するスチームタービンに供給するよ
うに作動する。スチームタービンによシ駆動される主発
電機は電気を種々の負荷で発生する。負荷が所定値以下
に減するとボイラー作動は維持されるがタービンの高圧
段階から排出される低圧スチームは低圧段階から蓄熱部
に移動する。蓄熱部は例えば大量の水を保容してお)、
その量は所定負荷以下で発電フリントが作動する間低圧
スチーム中の熱を貯めるのに十分な量である。それ自体
の発電機を有する廃熱変換装置は蓄熱部で貯められる低
圧熱に応動し、発電プラントの出力を補足するため負荷
に対する電力を供給するよう選択的に作動しうる。廃熱
変換装置の出力はピーク電力を得るために使用するとと
ができ、かくして主発電プラントの閉止中低レベル電力
を供給することができるだけでなく主発電プラントのサ
イズを減することができる。更に作動中は、ボイラー及
びタービンの高圧段Rhピーク効率で作動し、その結果
、本発明による発電プラントの燃料コストを同じサイズ
の従来の発電プラントの燃料コスト以下にすることがで
きる。
次に本発明を添付図面と関連しつつ更に詳細に説明する
。
。
第1図に関し番号10は本発明の発電プラントを概括的
に示し、これは廃熱変換装置12が接続している先述型
の発電プラント11をふぐb0発発電プラント格子従来
型のスチームボイラー18、電力を発電プラント格子(
図示せず)に供給する発電機15を駆動する多段階スチ
ームタービン14、復水器16及び供給ポンプ17を有
する。
に示し、これは廃熱変換装置12が接続している先述型
の発電プラント11をふぐb0発発電プラント格子従来
型のスチームボイラー18、電力を発電プラント格子(
図示せず)に供給する発電機15を駆動する多段階スチ
ームタービン14、復水器16及び供給ポンプ17を有
する。
ボイラー1Bに供給される熱によってボイラーは高圧ス
チームを高圧タービン段階18に供給し、その排気は弁
19を経由して低圧スチームタービン20に導かれ、低
圧タービン20は復水器16に排気する。流路21を通
る冷JII水は低圧タービン20からの排気を冷却し、
生ずる液水はポンプ17によって再びボイラーに戻シ、
かくしてこの循環が完成する。
チームを高圧タービン段階18に供給し、その排気は弁
19を経由して低圧スチームタービン20に導かれ、低
圧タービン20は復水器16に排気する。流路21を通
る冷JII水は低圧タービン20からの排気を冷却し、
生ずる液水はポンプ17によって再びボイラーに戻シ、
かくしてこの循環が完成する。
所定量の熱がボイラー13に供給されると所定量の温度
及び圧力で所定量のスチーム流が生じる。
及び圧力で所定量のスチーム流が生じる。
発電プラン)11が作動状態になると、発電機15は所
定電力を発電プラント格子に供給する。
定電力を発電プラント格子に供給する。
この状態のもとてタービン14i1、その設計点で作動
し、その効率のみならず全発電プラントの効率は最大と
表る。発電機15によシ供給される負荷が所定値よシ下
まわる場合、タービン14の出力を減する従来の方法は
、高圧タービンに導かれるスチームの量を絞ることであ
シ、また低圧タービンに導かれるスチームの量を絞るこ
とである。
し、その効率のみならず全発電プラントの効率は最大と
表る。発電機15によシ供給される負荷が所定値よシ下
まわる場合、タービン14の出力を減する従来の方法は
、高圧タービンに導かれるスチームの量を絞ることであ
シ、また低圧タービンに導かれるスチームの量を絞るこ
とである。
このことはタービンによる仕事量を減するけれどもその
効率も低下せしめる。更にタービンがその所定負荷以外
の状態で作動している時にはこのタービンの効率減少に
よる損失のほか、スチーム路における絞シにより発電プ
ラントの効率を更に減する不可逆的な過程を生ずる。そ
の結果、この発電プラントによシ生みだされる電力コス
トに占める燃料割合は、システムが所定条件以上に作動
する場合でも以下に作動する場合でも増加する。
効率も低下せしめる。更にタービンがその所定負荷以外
の状態で作動している時にはこのタービンの効率減少に
よる損失のほか、スチーム路における絞シにより発電プ
ラントの効率を更に減する不可逆的な過程を生ずる。そ
の結果、この発電プラントによシ生みだされる電力コス
トに占める燃料割合は、システムが所定条件以上に作動
する場合でも以下に作動する場合でも増加する。
システムの負荷が発電所の所定条件と異なる場合におけ
るこの非効率的な作動状態を解消するため、廃熱変換装
置12及び蓄熱部22が本発明発電プラントに組み込ま
れている。具体的には、蓄熱部22には大量水が保蔵さ
れ、選択的に作動可能なバイパス弁19を低圧タービン
20から蓄熱部22に通ずるよう開いた時にこの大量水
が加熱されるようにする。即ち弁19を開いて高圧ター
ビン18から排気される低圧スチームを低圧タービン2
0から蓄熱部22に通し、低圧スチーム中の熱り低圧タ
ービンによる仕事に変換されるがわシに蓄熱部22に収
容される水に移動する。
るこの非効率的な作動状態を解消するため、廃熱変換装
置12及び蓄熱部22が本発明発電プラントに組み込ま
れている。具体的には、蓄熱部22には大量水が保蔵さ
れ、選択的に作動可能なバイパス弁19を低圧タービン
20から蓄熱部22に通ずるよう開いた時にこの大量水
が加熱されるようにする。即ち弁19を開いて高圧ター
ビン18から排気される低圧スチームを低圧タービン2
0から蓄熱部22に通し、低圧スチーム中の熱り低圧タ
ービンによる仕事に変換されるがわシに蓄熱部22に収
容される水に移動する。
必要な場合、弁19の作動は自動化してもよい。
この場合、発電機16の出力に応動する負荷センサー4
0は制御信号を発生することができ、この信号は弁19
を駆動して、発電プラント11の負荷における所定減少
値に応動してタービン20から蓄熱部22への流動をそ
らせる。
0は制御信号を発生することができ、この信号は弁19
を駆動して、発電プラント11の負荷における所定減少
値に応動してタービン20から蓄熱部22への流動をそ
らせる。
バイパス弁19の選択的作動による蓄熱部22に加えら
れる水は、供給ポンプ17の作動にょシ混合弁24と接
続する通路28を経由して除去され、かくしてボイラー
18に至る水の流動は維持される。仁のようにして高圧
スチームタービン18とボイラー18は共に所定条件下
で作動を継続し、かくしてこれら二つの素子の作朶効率
を最大にしうる。
れる水は、供給ポンプ17の作動にょシ混合弁24と接
続する通路28を経由して除去され、かくしてボイラー
18に至る水の流動は維持される。仁のようにして高圧
スチームタービン18とボイラー18は共に所定条件下
で作動を継続し、かくしてこれら二つの素子の作朶効率
を最大にしうる。
タービン14中で使用されない熱はかくして蓄熱炉に貯
められる。
められる。
上述の条件は第2図に図示されておシ、この図において
第2A図の曲線人は代表的な時間である24時間内にお
ける負荷に対する時間変化を示す。
第2A図の曲線人は代表的な時間である24時間内にお
ける負荷に対する時間変化を示す。
曲線Aはプラント格子のための代表的な需要曲線を単に
説明したにすぎないことが理解されるべきである。図示
の状態において発電プラン1−10は所定負荷を約2時
間、fftflo、00a、m、からはff 12.0
0 (正午)tで生ずる。そして次の10時間は所定負
荷よシも低い負荷が生じることが必要である。正午から
1O−00p、mまでの間に発電プラント10によシ供
給されるべき負荷がタービン14の高圧段階18の定格
出力であるとすると、ボイラー18により発生する過剰
熱は低圧段FR20によシ仕事に変換されるかわシにバ
イパス19の作動によシ蓄熱部22に転換される。従っ
て次の10時間ボイラー18とタービン18、はビーク
効率で作動する。
説明したにすぎないことが理解されるべきである。図示
の状態において発電プラン1−10は所定負荷を約2時
間、fftflo、00a、m、からはff 12.0
0 (正午)tで生ずる。そして次の10時間は所定負
荷よシも低い負荷が生じることが必要である。正午から
1O−00p、mまでの間に発電プラント10によシ供
給されるべき負荷がタービン14の高圧段階18の定格
出力であるとすると、ボイラー18により発生する過剰
熱は低圧段FR20によシ仕事に変換されるかわシにバ
イパス19の作動によシ蓄熱部22に転換される。従っ
て次の10時間ボイラー18とタービン18、はビーク
効率で作動する。
はPi 10.00 p−mで発電プラント10によシ
供給される負荷がその最低レベルに低下し、この最低レ
ベルは第2図においては廃熱発電機25の能力でおり、
ボイラー18の作動は停止し、廃熱変換装置12が作動
する。
供給される負荷がその最低レベルに低下し、この最低レ
ベルは第2図においては廃熱発電機25の能力でおり、
ボイラー18の作動は停止し、廃熱変換装置12が作動
する。
第1図に示すように廃熱変換装置12は蒸発器27の形
の閉鎖ランキン循環有機流体発電プラント26、有機流
体タービン28及び復水器29を含むことが好ましい。
の閉鎖ランキン循環有機流体発電プラント26、有機流
体タービン28及び復水器29を含むことが好ましい。
廃熱変換装置12の作動を開始するにあたってはポンプ
82を開いて加熱水を蓄熱部22から導出せしめ蒸発器
中の熱交換器80を通過せしめる。例えば7レオンその
他蒸発器27中に収容されている流体はこの加熱水によ
シ蒸発し、蒸気に変わシ、これは有機流体タービン28
の入口に達し、タービン28は発電機25を慣用の方法
で駆動する。タービン28から排気される蒸気は復水器
29に達し、ここで流路81を通過する冷却水がタービ
ン28から排気される蒸気を復水する;そして供給ポン
プLかくして得られる有機流体を蒸発器27に戻しかく
して循環が完成する。
82を開いて加熱水を蓄熱部22から導出せしめ蒸発器
中の熱交換器80を通過せしめる。例えば7レオンその
他蒸発器27中に収容されている流体はこの加熱水によ
シ蒸発し、蒸気に変わシ、これは有機流体タービン28
の入口に達し、タービン28は発電機25を慣用の方法
で駆動する。タービン28から排気される蒸気は復水器
29に達し、ここで流路81を通過する冷却水がタービ
ン28から排気される蒸気を復水する;そして供給ポン
プLかくして得られる有機流体を蒸発器27に戻しかく
して循環が完成する。
発電プラント10における負荷が定格負荷以下である間
ボイラー18が作動しているため、十分な熱が蓄熱部2
2に貯められ、それによシ廃熱変換装置12は探ff1
o:00p−mから翌朝の峰は6:00a、mまで作動
し、発電機25の出力からのプラント格子の要求に応え
るように表っている。探l′f6:00a、mに廃熱変
換装置12の作vbは、ポンプ82を閉じることによっ
て終シ、弁19を作動してタービン18の排気が、熱を
ボイラー18に供給するととによって発電プラント11
を作動させると同時にタービン200Å口に導かれる。
ボイラー18が作動しているため、十分な熱が蓄熱部2
2に貯められ、それによシ廃熱変換装置12は探ff1
o:00p−mから翌朝の峰は6:00a、mまで作動
し、発電機25の出力からのプラント格子の要求に応え
るように表っている。探l′f6:00a、mに廃熱変
換装置12の作vbは、ポンプ82を閉じることによっ
て終シ、弁19を作動してタービン18の排気が、熱を
ボイラー18に供給するととによって発電プラント11
を作動させると同時にタービン200Å口に導かれる。
かくして発電プラント10により供給されるエネルギー
は発電機26から発雷1機15へ転流し、定格負荷が再
び発電プラントによル供給される。
は発電機26から発雷1機15へ転流し、定格負荷が再
び発電プラントによル供給される。
第2図に示すようにnFIF3:OOsL−mで発電プ
ラント10によル供給される実負荷は約2時間ピークに
達する◎そしてこのピーク時間の間廃熱変換装置12は
再び作動しそれにょシ発電機16及び25は同時にエネ
ルギーをプラント格子に供給する。
ラント10によル供給される実負荷は約2時間ピークに
達する◎そしてこのピーク時間の間廃熱変換装置12は
再び作動しそれにょシ発電機16及び25は同時にエネ
ルギーをプラント格子に供給する。
第2B図における曲線は廃熱変換装置12が作動してい
る期間を示し、また第20図はタービン18の高圧段階
における作動期間を示す。最後に第2D図の曲線はター
ビンの低圧段階が作動する期間を示す。廃熱変換装置の
作動及び多段階タービン14の各段階の作動の結果、第
2図の曲ahに示される負荷特性が生じる。
る期間を示し、また第20図はタービン18の高圧段階
における作動期間を示す。最後に第2D図の曲線はター
ビンの低圧段階が作動する期間を示す。廃熱変換装置の
作動及び多段階タービン14の各段階の作動の結果、第
2図の曲ahに示される負荷特性が生じる。
蓄熱部22は開いている水タンクであってよく、高圧タ
ービン18から排気される低圧スチームが蓄熱部におけ
る水と直接的な接触をするような配置とする◇或いは蓄
熱部は水以外の液体であシ、熱は低圧スチームから適当
な熱交換器(図示せず)によシ蓄熱液中に移すことがで
きる。
ービン18から排気される低圧スチームが蓄熱部におけ
る水と直接的な接触をするような配置とする◇或いは蓄
熱部は水以外の液体であシ、熱は低圧スチームから適当
な熱交換器(図示せず)によシ蓄熱液中に移すことがで
きる。
閉鎖ランキン−循環型有機流体発電プラントが第1図に
示されているけれども、他の型の発電プラントも利用で
きる。例えば低圧スチームタービンも高熱変換装置の一
部も利用できる。仁のような場合蒸発器はフラッジ−蒸
発器であってもよく、7ラツシーすべき水を蓄熱部22
からとシ出しスチームにすることができ、スチームをま
スチームタービン駆動発電機25に供給される。
示されているけれども、他の型の発電プラントも利用で
きる。例えば低圧スチームタービンも高熱変換装置の一
部も利用できる。仁のような場合蒸発器はフラッジ−蒸
発器であってもよく、7ラツシーすべき水を蓄熱部22
からとシ出しスチームにすることができ、スチームをま
スチームタービン駆動発電機25に供給される。
本発明による方法及び装置によシ得られる利点及びすぐ
れた結果は、本発明の好ましい実施態様に基ずく以上の
説明によシ明らかであると信じる。
れた結果は、本発明の好ましい実施態様に基ずく以上の
説明によシ明らかであると信じる。
本発明の精神及び範囲をへ脱することなく種々の変更及
び修正が考えられることが理解されるべきである。
び修正が考えられることが理解されるべきである。
m1図り本発明による発電プラントのブロックダイヤグ
ラム; 第2A−2D図は、ボイラーと高熱変換装置の作動によ
る負荷の変化を示す時間ダイヤグラムである。 図中、番号10は発電プラント全体、12は廃熱変換装
置、1Bはボイラー、14はタービン全体、15は発電
機、16L復水器、171よポンプ、18は高圧段階タ
ービン、19は分岐弁、2Gは低圧段階タービン、21
は流路、22は蓄熱部、25は発電機、26は閉鎖ラン
キン−循環型有機流体発電プラント、27は蒸発器、2
8は有機流体タービン、29は復水器、81は冷却水コ
イル、82社供給ポンプである。 特許出願人 オルマット タービンズ リミテッド 手続補正書 昭和57年 9月20日 2、発明の名称 多段階タービンを有する発電プラント 3、補正をする者 事件との関係 特許出願人 氏名(名称) オルマット タービンズ リミテッド4
、代理人 住 所 東京都文京区白山5丁目14番7号32−
ラム; 第2A−2D図は、ボイラーと高熱変換装置の作動によ
る負荷の変化を示す時間ダイヤグラムである。 図中、番号10は発電プラント全体、12は廃熱変換装
置、1Bはボイラー、14はタービン全体、15は発電
機、16L復水器、171よポンプ、18は高圧段階タ
ービン、19は分岐弁、2Gは低圧段階タービン、21
は流路、22は蓄熱部、25は発電機、26は閉鎖ラン
キン−循環型有機流体発電プラント、27は蒸発器、2
8は有機流体タービン、29は復水器、81は冷却水コ
イル、82社供給ポンプである。 特許出願人 オルマット タービンズ リミテッド 手続補正書 昭和57年 9月20日 2、発明の名称 多段階タービンを有する発電プラント 3、補正をする者 事件との関係 特許出願人 氏名(名称) オルマット タービンズ リミテッド4
、代理人 住 所 東京都文京区白山5丁目14番7号32−
Claims (1)
- 【特許請求の範囲】 1 種々の負荷で電力を生ずる主発電機を駆動する多段
階スチームタービンに、所定の圧力及び温度で所定量の
高圧スチームを供給するボイラーを有する発電プラント
において、 電気負荷が主発電機の所定値以下に降下した時に、蓄熱
部へ、スチームタービンの少くとも一つの中間段階から
低圧スチームを選択的に通すための選択的に作動するバ
イパスを設け、それによL[j気負筒とは独立にスチー
ムタービンに所定温度及び圧力で所定量のスチームをボ
イラーが供給しつづけるようにし、 更に前記負荷で電気を選択的に発生せしめるため蓄熱部
におりる低圧熱に応動する廃熱変換装置を設けたことを
特徴とする発電プラント。 区 特許請求の範囲第1項記載のプラントであって、廃
熱変換装置が閉鎖ランキン−循m型有機流体発電プラン
トであることを4f徴とするプラント。 a 特許請求の範囲第2項記載のプラントであって、低
圧スチームが電気負荷に応動して蓄熱部に自動的に分路
されるようにしたプラント。 生 特許請求の範囲第2項記載のプラントであって、蓄
熱部が大量水をIUi容しているプラント。 丘 下記素子: 0)高圧段階、及び高圧段階から排気される低圧スチー
ムによシ駆動される少くとも一つの低圧段階を有するス
チームタービンに所定温度及び圧力で所定量の高圧スチ
ームを供給する作動のできるスチームボイラー; ←)種々の負荷で電気を発生するためスチームタービン
によシ駆動される主発布1機;(→ 低圧熱を保蔵する
ための蓄熱部;に)前記低圧スチームを蓄熱部へ選択的
に分岐させるための作動手段;及び (ホ)種々の負荷で電気を発生するため、蓄熱部中の低
圧熱に応動する廃熱変換装置; を一体的に有する発電プラント。 6 特許請求の範囲第5項記載の発電プラントであって
、廃熱変換装置が閉鎖ランキン−循環型有機流体発電プ
ラントであることを特徴とするプラント0 ? 特許請求の範囲第6項記載の発電プラントであって
、電気負荷のレベルに応動して蓄熱部へ低圧スチームを
選択的に分岐させるための前記作動手段を自動的に駆動
し電気負荷を制御する手段を有するプラント。 & 下記段階; 0フ 電気負荷に独立して所定高圧スチームを生ぜしめ
; ←)低圧段階を有する多段階スチームタービンの高圧入
口に前記スチームを供給し; (ハ)スチームを低圧段階から蓄熱部に選択的に分岐せ
しめ; に)蓄熱部からの熱で使用して電気を発生させるための
廃熱変換装置を選択的に作動させる段階; を含む電気発生方法。 a 特許請求の範囲第8項記載の方法であって、低圧段
階からのスチームは、電気負荷に応動して蓄熱部から分
岐するようにした方法。 1α管rF請求の範囲第8項記載の方法であって、廃熱
変換装置は、電気負荷が多段階タービンの所定能力を越
える場合に作動するようにした方法。
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US06/291,084 US4428190A (en) | 1981-08-07 | 1981-08-07 | Power plant utilizing multi-stage turbines |
US291084 | 1994-08-18 |
Publications (2)
Publication Number | Publication Date |
---|---|
JPS6026107A true JPS6026107A (ja) | 1985-02-09 |
JPH0436244B2 JPH0436244B2 (ja) | 1992-06-15 |
Family
ID=23118753
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP57137834A Granted JPS6026107A (ja) | 1981-08-07 | 1982-08-07 | 廃熱変換装置一体型発電プラント |
Country Status (10)
Country | Link |
---|---|
US (1) | US4428190A (ja) |
JP (1) | JPS6026107A (ja) |
DE (1) | DE3229344A1 (ja) |
FR (1) | FR2511210B1 (ja) |
GB (1) | GB2102889B (ja) |
IL (1) | IL66481A0 (ja) |
IT (1) | IT1149043B (ja) |
MX (1) | MX156374A (ja) |
NL (1) | NL8203126A (ja) |
PH (1) | PH20057A (ja) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2019078185A (ja) * | 2017-10-20 | 2019-05-23 | 松尾 栄人 | 蓄熱型太陽熱発電システム |
Families Citing this family (66)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO1986005234A1 (en) * | 1985-03-15 | 1986-09-12 | Tch Thermo-Consulting-Heidelberg Gmbh | A combined steam-gas turbine installation |
WO1997013961A1 (en) * | 1995-10-07 | 1997-04-17 | Jae Hwan Kim | Power generating system by use of fluid |
DE19750589C2 (de) | 1997-11-17 | 1999-09-09 | Ziegler | Wärmekraftmaschine mit verbessertem Wirkungsgrad |
US6052996A (en) * | 1998-02-13 | 2000-04-25 | Clark; John C. | Heat-work cycle for steam cycle electric power generation plants |
US6192687B1 (en) | 1999-05-26 | 2001-02-27 | Active Power, Inc. | Uninterruptible power supply utilizing thermal energy source |
US6960839B2 (en) * | 2000-07-17 | 2005-11-01 | Ormat Technologies, Inc. | Method of and apparatus for producing power from a heat source |
US6854273B1 (en) * | 2003-10-20 | 2005-02-15 | Delphi Technologies, Inc. | Apparatus and method for steam engine and thermionic emission based power generation system |
JP2006233931A (ja) * | 2005-02-28 | 2006-09-07 | Miura Co Ltd | ボイラ駆動電力供給システム |
US7997077B2 (en) * | 2006-11-06 | 2011-08-16 | Harlequin Motor Works, Inc. | Energy retriever system |
US7997076B2 (en) * | 2008-03-31 | 2011-08-16 | Cummins, Inc. | Rankine cycle load limiting through use of a recuperator bypass |
US7866157B2 (en) * | 2008-05-12 | 2011-01-11 | Cummins Inc. | Waste heat recovery system with constant power output |
US9181930B2 (en) * | 2008-09-23 | 2015-11-10 | Skibo Systems, LLC | Methods and systems for electric power generation using geothermal field enhancements |
US8186935B2 (en) * | 2009-01-12 | 2012-05-29 | General Electric Company | Steam turbine having exhaust enthalpic condition control and related method |
US8616323B1 (en) | 2009-03-11 | 2013-12-31 | Echogen Power Systems | Hybrid power systems |
WO2010121255A1 (en) | 2009-04-17 | 2010-10-21 | Echogen Power Systems | System and method for managing thermal issues in gas turbine engines |
DE102009021924B4 (de) * | 2009-05-19 | 2012-02-23 | Alstom Technology Ltd. | Verfahren zur Primärregelung einer Dampfturbinenanlage |
US9441504B2 (en) | 2009-06-22 | 2016-09-13 | Echogen Power Systems, Llc | System and method for managing thermal issues in one or more industrial processes |
US20110000210A1 (en) * | 2009-07-01 | 2011-01-06 | Miles Mark W | Integrated System for Using Thermal Energy Conversion |
US8544274B2 (en) * | 2009-07-23 | 2013-10-01 | Cummins Intellectual Properties, Inc. | Energy recovery system using an organic rankine cycle |
US9316404B2 (en) | 2009-08-04 | 2016-04-19 | Echogen Power Systems, Llc | Heat pump with integral solar collector |
US20110048013A1 (en) * | 2009-08-31 | 2011-03-03 | Joseph S Spagnuolo | Power plant |
US8627663B2 (en) * | 2009-09-02 | 2014-01-14 | Cummins Intellectual Properties, Inc. | Energy recovery system and method using an organic rankine cycle with condenser pressure regulation |
US8794002B2 (en) * | 2009-09-17 | 2014-08-05 | Echogen Power Systems | Thermal energy conversion method |
US8813497B2 (en) | 2009-09-17 | 2014-08-26 | Echogen Power Systems, Llc | Automated mass management control |
US8613195B2 (en) | 2009-09-17 | 2013-12-24 | Echogen Power Systems, Llc | Heat engine and heat to electricity systems and methods with working fluid mass management control |
US8869531B2 (en) | 2009-09-17 | 2014-10-28 | Echogen Power Systems, Llc | Heat engines with cascade cycles |
EP2333254B1 (en) * | 2009-12-05 | 2015-11-25 | Alstom Technology Ltd | Steam power plant with heat reservoir and method for operating a steam power plant |
WO2011119409A2 (en) | 2010-03-22 | 2011-09-29 | Skibo Systems Llc | Systems and methods for an artificial geothermal energy reservoir created using hot dry rock geothermal resources |
WO2011119413A2 (en) * | 2010-03-22 | 2011-09-29 | Skibo Systems Llc | Systems and methods for integrating concentrated solar thermal and geothermal power plants using multistage thermal energy storage |
DE112011102629T5 (de) | 2010-08-05 | 2013-05-08 | Cummins Intellectual Properties, Inc. | Emissionskritische Ladekühlung unter Verwendung eines organischen Rankine-Kreislaufes |
DE112011102672B4 (de) | 2010-08-09 | 2022-12-29 | Cummins Intellectual Properties, Inc. | Abwärmerückgewinnungssystem und Verbrennungsmotorsystem zum Einfangen von Energie nach Motornachbehandlungssytemen |
US9470115B2 (en) | 2010-08-11 | 2016-10-18 | Cummins Intellectual Property, Inc. | Split radiator design for heat rejection optimization for a waste heat recovery system |
EP2603673B1 (en) | 2010-08-13 | 2019-12-25 | Cummins Intellectual Properties, Inc. | Rankine cycle condenser pressure control using an energy conversion device bypass valve |
EP2441926A1 (en) | 2010-10-14 | 2012-04-18 | ABB Research Ltd. | Thermo electric energy storage system |
US8549838B2 (en) | 2010-10-19 | 2013-10-08 | Cummins Inc. | System, method, and apparatus for enhancing aftertreatment regeneration in a hybrid power system |
US20140360192A1 (en) * | 2010-11-15 | 2014-12-11 | D. Stubby Warmbold | Systems and Methods for Electric and Heat Generation from Biomass |
US8616001B2 (en) | 2010-11-29 | 2013-12-31 | Echogen Power Systems, Llc | Driven starter pump and start sequence |
US8783034B2 (en) | 2011-11-07 | 2014-07-22 | Echogen Power Systems, Llc | Hot day cycle |
US8857186B2 (en) | 2010-11-29 | 2014-10-14 | Echogen Power Systems, L.L.C. | Heat engine cycles for high ambient conditions |
US8742701B2 (en) | 2010-12-20 | 2014-06-03 | Cummins Inc. | System, method, and apparatus for integrated hybrid power system thermal management |
US8826662B2 (en) | 2010-12-23 | 2014-09-09 | Cummins Intellectual Property, Inc. | Rankine cycle system and method |
DE112011104516B4 (de) | 2010-12-23 | 2017-01-19 | Cummins Intellectual Property, Inc. | System und Verfahren zur Regulierung einer EGR-Kühlung unter Verwendung eines Rankine-Kreisprozesses |
DE102012000100A1 (de) | 2011-01-06 | 2012-07-12 | Cummins Intellectual Property, Inc. | Rankine-kreisprozess-abwärmenutzungssystem |
US9021808B2 (en) | 2011-01-10 | 2015-05-05 | Cummins Intellectual Property, Inc. | Rankine cycle waste heat recovery system |
EP3214296B1 (en) | 2011-01-20 | 2018-09-12 | Cummins Intellectual Properties, Inc. | Rankine cycle waste heat recovery system and method with improved egr temperature control |
WO2012150994A1 (en) | 2011-02-28 | 2012-11-08 | Cummins Intellectual Property, Inc. | Engine having integrated waste heat recovery |
US20120319410A1 (en) * | 2011-06-17 | 2012-12-20 | Woodward Governor Company | System and method for thermal energy storage and power generation |
US9062898B2 (en) | 2011-10-03 | 2015-06-23 | Echogen Power Systems, Llc | Carbon dioxide refrigeration cycle |
US9003798B2 (en) * | 2012-03-15 | 2015-04-14 | Cyclect Electrical Engineering Pte. | Organic rankine cycle system |
US8893495B2 (en) | 2012-07-16 | 2014-11-25 | Cummins Intellectual Property, Inc. | Reversible waste heat recovery system and method |
EP2893162B1 (en) | 2012-08-20 | 2017-11-08 | Echogen Power Systems LLC | Supercritical working fluid circuit with a turbo pump and a start pump in series configuration |
US9118226B2 (en) | 2012-10-12 | 2015-08-25 | Echogen Power Systems, Llc | Heat engine system with a supercritical working fluid and processes thereof |
US9341084B2 (en) | 2012-10-12 | 2016-05-17 | Echogen Power Systems, Llc | Supercritical carbon dioxide power cycle for waste heat recovery |
US9140209B2 (en) | 2012-11-16 | 2015-09-22 | Cummins Inc. | Rankine cycle waste heat recovery system |
US20140165930A1 (en) * | 2012-12-17 | 2014-06-19 | Conocophillips Company | Heating for indirect boiling |
WO2014117068A1 (en) | 2013-01-28 | 2014-07-31 | Echogen Power Systems, L.L.C. | Methods for reducing wear on components of a heat engine system at startup |
KR20150122665A (ko) | 2013-01-28 | 2015-11-02 | 에코진 파워 시스템스, 엘엘씨 | 초임계 이산화탄소 랭킨 사이클 중에 동력 터빈 스로틀 밸브를 제어하기 위한 프로세스 |
JP2016519731A (ja) | 2013-03-04 | 2016-07-07 | エコージェン パワー システムズ エル.エル.シー.Echogen Power Systems, L.L.C. | 高正味電力の超臨界二酸化炭素回路を有する熱機関システム |
US9845711B2 (en) | 2013-05-24 | 2017-12-19 | Cummins Inc. | Waste heat recovery system |
WO2015017873A2 (en) | 2013-08-02 | 2015-02-05 | Gill Martin Gordon | Multi-cycle power generator |
US9500185B2 (en) * | 2014-08-15 | 2016-11-22 | King Fahd University Of Petroleum And Minerals | System and method using solar thermal energy for power, cogeneration and/or poly-generation using supercritical brayton cycles |
WO2016073252A1 (en) | 2014-11-03 | 2016-05-12 | Echogen Power Systems, L.L.C. | Active thrust management of a turbopump within a supercritical working fluid circuit in a heat engine system |
CN106437876B (zh) * | 2016-08-29 | 2018-03-27 | 华电电力科学研究院 | 一种热电联产机组深度调峰系统及其运行方法 |
US11187112B2 (en) | 2018-06-27 | 2021-11-30 | Echogen Power Systems Llc | Systems and methods for generating electricity via a pumped thermal energy storage system |
US11435120B2 (en) | 2020-05-05 | 2022-09-06 | Echogen Power Systems (Delaware), Inc. | Split expansion heat pump cycle |
CN116568910A (zh) | 2020-12-09 | 2023-08-08 | 超临界存储公司 | 三罐电热蓄能系统 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5464241A (en) * | 1977-10-31 | 1979-05-23 | Mitsubishi Heavy Ind Ltd | Hot water regenerative type generator |
JPS54147339A (en) * | 1978-05-09 | 1979-11-17 | Bbc Brown Boveri & Cie | Method of and apparatus for compensating for fluctuation in load of feeder net |
JPS5823207A (ja) * | 1981-07-31 | 1983-02-10 | Central Res Inst Of Electric Power Ind | 蒸気貯蔵発電系統を有する火力発電プラント |
JPS5823208A (ja) * | 1981-07-31 | 1983-02-10 | Central Res Inst Of Electric Power Ind | 蒸気貯蔵発電系統を有する火力発電プラントの運転制御装置 |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
BE557965A (ja) * | ||||
GB296023A (en) * | 1927-08-23 | 1929-07-25 | Siemens Ag | Multi-stage steam power plant |
DE852246C (de) * | 1951-02-20 | 1952-10-13 | Siemens Ag | Einrichtung zur Speichersteuerung einer Frischdampf-Speicherdampfturbine mit einem Gefaellespeicher |
FR1593817A (ja) * | 1968-11-29 | 1970-06-01 | ||
FR2235606A5 (en) * | 1973-06-27 | 1975-01-24 | Electricite De France | Steam power generation system - uses surplus steam for second system utilising condensing liquid, e.g. ammonia |
-
1981
- 1981-08-07 US US06/291,084 patent/US4428190A/en not_active Expired - Lifetime
-
1982
- 1982-08-05 IL IL66481A patent/IL66481A0/xx not_active IP Right Cessation
- 1982-08-05 FR FR8213719A patent/FR2511210B1/fr not_active Expired
- 1982-08-06 MX MX193929A patent/MX156374A/es unknown
- 1982-08-06 NL NL8203126A patent/NL8203126A/nl not_active Application Discontinuation
- 1982-08-06 IT IT48951/82A patent/IT1149043B/it active
- 1982-08-06 DE DE19823229344 patent/DE3229344A1/de not_active Withdrawn
- 1982-08-06 PH PH27688A patent/PH20057A/en unknown
- 1982-08-07 JP JP57137834A patent/JPS6026107A/ja active Granted
- 1982-08-09 GB GB08222877A patent/GB2102889B/en not_active Expired
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5464241A (en) * | 1977-10-31 | 1979-05-23 | Mitsubishi Heavy Ind Ltd | Hot water regenerative type generator |
JPS54147339A (en) * | 1978-05-09 | 1979-11-17 | Bbc Brown Boveri & Cie | Method of and apparatus for compensating for fluctuation in load of feeder net |
JPS5823207A (ja) * | 1981-07-31 | 1983-02-10 | Central Res Inst Of Electric Power Ind | 蒸気貯蔵発電系統を有する火力発電プラント |
JPS5823208A (ja) * | 1981-07-31 | 1983-02-10 | Central Res Inst Of Electric Power Ind | 蒸気貯蔵発電系統を有する火力発電プラントの運転制御装置 |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2019078185A (ja) * | 2017-10-20 | 2019-05-23 | 松尾 栄人 | 蓄熱型太陽熱発電システム |
Also Published As
Publication number | Publication date |
---|---|
GB2102889A (en) | 1983-02-09 |
MX156374A (es) | 1988-08-15 |
IT1149043B (it) | 1986-12-03 |
PH20057A (en) | 1986-09-18 |
FR2511210B1 (fr) | 1988-05-27 |
JPH0436244B2 (ja) | 1992-06-15 |
FR2511210A1 (fr) | 1983-02-11 |
IT8248951A0 (it) | 1982-08-06 |
DE3229344A1 (de) | 1983-03-17 |
GB2102889B (en) | 1985-10-02 |
IL66481A0 (en) | 1982-12-31 |
US4428190A (en) | 1984-01-31 |
NL8203126A (nl) | 1983-03-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JPS6026107A (ja) | 廃熱変換装置一体型発電プラント | |
CA2292488C (en) | Waste heat recovery in an organic energy converter using an intermediate liquid cycle | |
JPH0610705A (ja) | ガスタービン群の操作方法 | |
US4961311A (en) | Deaerator heat exchanger for combined cycle power plant | |
WO2011082949A2 (en) | Combined cycle power plant and method of operating such power plant | |
CN111878183A (zh) | 一种燃煤发电机组热力储能调频系统及方法 | |
JP2971378B2 (ja) | 水素燃焼ガスタービンプラントおよびその運転方法 | |
JP2000297657A (ja) | 電力貯蔵型ガスタービン発電設備 | |
JP3961653B2 (ja) | 発電プラント | |
JPH05248260A (ja) | 石炭ガス化複合発電プラント | |
JPH1167240A (ja) | 多段タービン圧縮機を備えた燃料電池発電装置 | |
JPH0333890B2 (ja) | ||
JP3697476B2 (ja) | ガス圧力エネルギを利用した複合発電システム | |
JPH05240004A (ja) | 熱回収型発電システムプラントの最適運転方法 | |
EP4350213A1 (en) | Power generation facility | |
CN215057596U (zh) | 一种煤矿瓦斯发电机组余热梯级利用系统 | |
JPS5823206A (ja) | 蒸気貯蔵発電系統を有する火力発電プラント | |
CN219366121U (zh) | 一种ccpp机组热电联产系统 | |
CN213743549U (zh) | 一种背压机组和凝汽机组两机组串联供热系统 | |
CN111852592B (zh) | 基于火电中间再热式凝汽机组的无蒸汽运行系统及方法 | |
JPS6359005B2 (ja) | ||
JPH0233845B2 (ja) | Jokitaabinpurantonontenhoho | |
JPH03115707A (ja) | 複合発電プラント | |
JPS59131709A (ja) | コンバインドプラント起動方式 | |
JP2708758B2 (ja) | 排熱回収ボイラおよびその運転方法 |