JPH0874271A - Method of work execution for foundation - Google Patents

Method of work execution for foundation

Info

Publication number
JPH0874271A
JPH0874271A JP21380294A JP21380294A JPH0874271A JP H0874271 A JPH0874271 A JP H0874271A JP 21380294 A JP21380294 A JP 21380294A JP 21380294 A JP21380294 A JP 21380294A JP H0874271 A JPH0874271 A JP H0874271A
Authority
JP
Japan
Prior art keywords
foundation
independent
concrete
pillar
precast concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP21380294A
Other languages
Japanese (ja)
Inventor
Shunichi Yoshino
俊一 吉野
Kazuhiro Otomori
一弘 乙守
Takashi Tanimoto
隆司 谷本
Kimihiro Yamamoto
公広 山本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujita Corp
Original Assignee
Fujita Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujita Corp filed Critical Fujita Corp
Priority to JP21380294A priority Critical patent/JPH0874271A/en
Publication of JPH0874271A publication Critical patent/JPH0874271A/en
Pending legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)

Abstract

PURPOSE: To improve the working efficiency and enhance the accuracy in work execution and shorten the term of works by manufacturing foundation members required for construction of foundation concentrically at one place within the site on which to build the foundation. CONSTITUTION: After foundation work, the position of installation of foundation member is set out, and PC independent foundation posts 1 are installed in the specified positions out of the PC(precast concrete) foundation members being manufactured on the manufacture yard of the precast member within the site, and a PC foundation beam 2 whose ends are cut is arranged between adjacent foundation posts. The foundation posts 1 and the foundation posts 2 are joined with each other through pillar rods a2 and b projected from the opposed faces and reinforcing rods, and a thin PC molding box 3 is set up for the foundation beam 2, and then concrete for joining is laid.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は建築物の基礎の施工法に
係るものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a construction method for a building foundation.

【0002】[0002]

【従来の技術】従来、建築物の基礎の施工は、建築物を
支承する杭地業を行い、掘削等の土工事の後、独立基
礎、基礎梁を構築するが、各基礎部材は墨出しののち、
予め加工された鉄筋の組立、型枠の組立、コンクリート
の打設、型枠の解体等の工程を経て余掘部分の埋め戻し
を行い、施工を完了する。
2. Description of the Related Art Conventionally, the foundation of a building is constructed by pile work supporting the building, and after the earthwork such as excavation, an independent foundation and a foundation beam are constructed. After that,
Through the steps of prefabricated rebar assembly, formwork assembly, concrete placement, formwork dismantling, etc., the overfilled part is backfilled and the construction is completed.

【0003】前記の工程の他に、基礎梁の一部をプレキ
ャストコンクリート(以下PCという)部材として製作
し、同部材を独立基礎の間に取付け、独立基礎は前記従
来工法によって施工し、基礎梁と一体化する施工法が行
われている。
In addition to the above steps, a part of the foundation beam is manufactured as a precast concrete (hereinafter referred to as PC) member, the member is attached between the independent foundations, and the independent foundation is constructed by the above-mentioned conventional method. There is a construction method that is integrated with.

【0004】[0004]

【発明が解決しようとする課題】しかしながら、前記従
来工法によれば、予め加工された鉄筋を独立基礎、基礎
杭を構築する場所に搬送して組み立てるので、組立作業
に要する足場を架設したり、個々の鉄筋を所定の位置に
配筋して組立作業を行う場合、周囲の作業空間が狭隘で
あったり、足もとが悪く作業がはかどらず能率が上がら
ないという難点があった。
However, according to the above-mentioned conventional method, since the pre-processed rebar is conveyed to the place where the independent foundation and the foundation pile are constructed and assembled, the scaffolding required for the assembly work is erected, In the case of assembling work by arranging individual reinforcing bars at predetermined positions, there is a problem that the surrounding work space is narrow, and the feet are bad and the work cannot be done efficiently and the efficiency cannot be improved.

【0005】また、独立基礎、基礎柱の形状に合わせて
型枠の組立、解体を繰り返す工程は煩雑な作業であり、
かつ専門の型枠工を必要とし、労働力の不足の折柄、手
不足となり、工事の進捗にも悪影響を及ぼす。本発明は
前記従来技術の有する問題点に鑑みて提案されたもの
で、その目的とする処は、基礎構築に要する基礎部材を
建築する場内の一個所で集中的に製作し、作業条件を改
良し、作業性を改善し、省力化を図り、施工精度を向上
し、工期の短縮を可能ならしめる基礎の施工法を提供す
る点にある。
Further, the process of assembling and disassembling the formwork in accordance with the shapes of the independent foundation and the foundation pillar is a complicated work,
Moreover, specialized formworkers are required, which causes a shortage of labor and a shortage of labor, which adversely affects the progress of construction. The present invention has been proposed in view of the above problems of the prior art, and the object thereof is to intensively manufacture the base member required for the foundation construction in one place in the building to improve the working condition. However, it is to provide a basic construction method that improves workability, saves labor, improves construction accuracy, and shortens the construction period.

【0006】[0006]

【課題を解決するための手段】前記の目的を達成するた
め、本発明に係る基礎の施工法によれば、所定の支持層
に杭を打設し、所定の基礎地盤を掘削して地業工事を行
ったのち、基礎部材設置位置の墨出しを行い、場内の所
定位置に設置されたプレキャスト部材の製作ヤードで製
作されたプレキャストコンクリート基礎部材のうちプレ
キャストコンクリート独立基礎柱を所定の位置に設置す
るとともに、両端部が一部欠截されたプレキャストコン
クリート基礎梁を前記所定の位置に設置されたプレキャ
ストコンクリート独立基礎柱の間に配置し、同独立基礎
柱と前記プレキャストコンクリート基礎梁とを、同梁欠
截部に突出された鉄筋と、前記独立基礎より突設された
鉄筋とを介して接合し、前記基礎梁に型枠を組立て、接
合コンクリートを打設して前記独立基礎柱と基礎梁とを
接合するものである。
In order to achieve the above-mentioned object, according to the foundation construction method of the present invention, a pile is driven into a predetermined support layer and a predetermined foundation ground is excavated to perform the ground work. After the construction work, mark the foundation member installation position, and make the precast concrete independent foundation pillars at the prescribed position among the precast concrete foundation members manufactured in the yard of the precast concrete foundation member that was installed at the prescribed position in the site. In addition, the precast concrete foundation beam with both ends partially cut off is arranged between the precast concrete independent foundation columns installed at the predetermined positions, and the independent foundation column and the precast concrete foundation beam are the same. Reinforcing bars projecting from the beam cutouts and the reinforcing bars projecting from the independent foundation are joined together to assemble the formwork on the foundation beams to join the joint concrete. It is intended to bonding the independent foundation pillar and foundation beams and set.

【0007】[0007]

【作用】本発明によれば前記したように、建築物を支持
する杭を所定の支持層に打設し、所定の基礎地盤を掘削
して地業工事を施し、掘削等の土工事の後、基礎部材設
置位置の墨出しを行い、予め場内で製作されたPC部材
のうち、PC独立基礎柱を設置し、両端が一部欠截され
たPC基礎梁を、相隣る独立基礎柱の間に設置し、同基
礎梁の欠截部とPC独立基礎柱との間を、両部材より突
設された鉄筋を介して接合し、前記基礎梁側面に型枠を
組み立てて、接合コンクリートを打設することによっ
て、前記独立基礎柱と基礎梁とを接合するものである。
According to the present invention, as described above, a pile for supporting a building is driven into a predetermined support layer, a predetermined foundation ground is excavated to perform geotechnical work, and after earthwork such as excavation. , The base member installation position is marked out, and among the PC members manufactured in advance in the site, the PC independent foundation pillars are installed, and the PC foundation beams with both ends partially cut away are separated from the adjacent independent foundation pillars. Installed in between, the gaps between the foundation beams and the PC independent foundation columns are joined together through the reinforcing bars protruding from both members, and the formwork is assembled on the side faces of the foundation beams to join the joint concrete. The independent foundation pillar and the foundation beam are joined by driving.

【0008】[0008]

【実施例】以下、本発明を図示の実施例について説明す
る。図1及び図2において1はPC独立基礎柱で格子状
に直交するXY軸の交点に配設され、相隣る独立基礎柱
1間に、両端が欠截されたPC基礎梁2が配設されてい
る。
The present invention will be described below with reference to the illustrated embodiments. In FIGS. 1 and 2, reference numeral 1 denotes a PC independent foundation pillar, which is arranged at an intersection of XY axes orthogonal to each other in a grid pattern, and a PC foundation beam 2 with both ends cut away is arranged between adjacent independent foundation pillars 1. Has been done.

【0009】PC独立基礎柱1には図3に示すように基
礎柱筋a1 とPC基礎梁2の梁筋の定着筋a2 とが配筋
され、夫々定着長分の鉄筋が突出されている。PC基礎
梁2は図4に示すように両端の一部が欠截されて接合部
が形成され、同欠截部に梁筋bの一部が突設されてい
る。前記PC独立基礎柱1とPC基礎梁2は建設現場の
場内の製作ヤードで鉄筋の組立と型枠の組立及びコンク
リートの打設が行われることによって製造されるもので
あり、他のPC部材も同様にして前記製作ヤードで製作
されるものであって、図5の3は前記柱1、梁2と同様
にして場内の製作ヤードで製作された薄肉PC型枠であ
る。
[0009] The PC independently foundation pillar 1 and fixing muscles a 2 beams muscle underlying pillar muscle a 1 and PC footing beams 2, as shown in FIG. 3 is Haisuji, protrude the respective fixing length min rebar There is. As shown in FIG. 4, a part of both ends of the PC foundation beam 2 is cut off to form a joint, and a part of the beam bar b is projected on the cutout. The PC independent foundation pillar 1 and the PC foundation beam 2 are manufactured by assembling the reinforcing bars, assembling the formwork and placing concrete in the production yard at the construction site. In the same manner, the thin-walled PC form 3 manufactured in the manufacturing yard is shown in FIG. 5 as in the case of the pillar 1 and the beam 2 and manufactured in the manufacturing yard on the premises.

【0010】次に本発明の工程を図6の施工フロー図と
図7乃至図10の工程図を参照して説明する。先ず割栗
や玉石の大型の粗骨材を混入しながらコンクリートを打
設してラッブルコンクリート(栗石コンクリート)Nを
PC独立基礎柱1の地盤に造成し、同PC独立基礎柱1
とPC基礎梁が設置されるように地盤Gを掘削する。M
は掘削地盤である。
Next, the process of the present invention will be described with reference to the construction flow diagram of FIG. 6 and the process diagrams of FIGS. 7 to 10. First, concrete is poured while mixing large-sized coarse aggregates such as split chestnuts and cobblestones, and rubbable concrete (kuriishi concrete) N is created on the ground of the PC independent foundation pillar 1, and the PC independent foundation pillar 1
And excavate the ground G so that the PC foundation beam is installed. M
Is the excavated ground.

【0011】次いで割栗地業を行い、捨コンクリートR
を打設し、同コンクリートR上にその硬化を待って基礎
柱と基礎梁の位置の墨出しを行う。Hは墨出中の作業員
である。(図7参照) この際、前記PC独立基礎柱1の設置位置には、同基礎
柱1のレベルを決める調整ボルト4を捨コンクリートR
上に埋設して、同基礎柱1のレベルを決めておく。
Next, split chestnut work is carried out, and waste concrete R
After placing the concrete on the concrete R and waiting for it to harden, the positions of the foundation columns and foundation beams are marked out. H is a worker who is in the process of being marked. (See FIG. 7) At this time, at the installation position of the PC independent foundation pillar 1, the adjustment bolt 4 for determining the level of the foundation pillar 1 is discarded and the concrete R
It is buried above and the level of the foundation pillar 1 is decided.

【0012】次いで建設現場の場内で製造されたPC独
立基礎柱1を後述のPC基礎梁2の場合と同様に駆動車
で牽引された牽引台車によって所定の設置位置の近傍に
搬送し、揚重機Fによって吊り上げて所定位置に設置す
る。(図8参照) 次いで前記同様に建設現場の場内で製造されたPC基礎
梁2を駆動車Tに牽引された牽引台車Sによって設置位
置の近傍に搬送し、揚重機Fによって吊り上げて、相隣
るPC基礎柱1間に設置する。(図9参照) 次いでPC独立基礎柱1と両端の一部が欠截されたPC
基礎梁2とを、両者の対向面に突設された基礎梁の梁筋
の定着筋a2 と梁筋bを肋筋で接合し、欠截されたPC
基礎梁2の側面を図5に示す薄肉PC型枠3で閉塞し、
接合コンクリート5を打設することによって、前記PC
独立基礎柱1とPC基礎梁2とを接合して、基礎を構築
する。図中Kは作業員である。(図10参照) なお前記PC基礎柱1のレベル調整は図11に示すよう
に、ラッブルコンクリートNの上にインサート6を固定
して捨コンクリートRを打設し、インサート6に調整ボ
ルト4を螺着してレベルを計測し、ボルト4の頂部を水
平に合わせて、PC独立基礎柱1を設置する直前に、ボ
ルト4の頂部よりやや盛り上げて敷モルタルUを敷き均
してPC独立基礎柱1を設置する。
Next, the PC independent foundation pillar 1 manufactured on the construction site is transported to the vicinity of a predetermined installation position by a towing truck towed by a driving vehicle as in the case of the PC foundation beam 2 described later, and the lifting machine is lifted. Suspend by F and install in place. (Refer to FIG. 8) Then, the PC foundation beam 2 manufactured in the construction site in the same manner as described above is conveyed to the vicinity of the installation position by the towing carriage S pulled by the drive vehicle T, and is lifted by the lifting machine F to be adjacent to each other. It will be installed between the PC foundation pillars 1. (See FIG. 9) Next, the PC independent foundation pillar 1 and the PC with both ends partially cut off
The foundation beam 2 is joined to the foundation beam projecting from the opposing surfaces of the foundation beam 2 by fixing the beam reinforcements a 2 and the beam reinforcement b of the foundation beam to the ribs, and the PC is cut out.
The side surface of the foundation beam 2 is closed with a thin-walled PC form 3 shown in FIG.
By placing the joint concrete 5, the PC
The foundation is constructed by joining the independent foundation pillar 1 and the PC foundation beam 2. In the figure, K is a worker. (Refer to FIG. 10) As shown in FIG. 11, the level adjustment of the PC foundation column 1 is performed by fixing the insert 6 on the rubbable concrete N and driving the waste concrete R, and then adjusting bolts 4 on the insert 6. Measure the level by screwing, align the tops of the bolts 4 horizontally, and immediately before installing the PC independent foundation columns 1, slightly raise the tops of the bolts 4 and spread the mortar U to evenly spread the PC independent foundation columns. Install 1.

【0013】かくして建築物の基礎は地盤掘削の後、捨
コンクリートRを打設して墨出しを行い、調整ボルト4
をレベル調整してPC独立基礎柱1を設置し、同PC独
立基礎柱1間に両端の一部が欠截されたPC基礎梁2を
設置し、同梁2の欠截部で前記柱梁より突設された鉄筋
2 、bで接合して接合コンクリート5を打設すること
によって、基礎の施工に際して建築現場での手作業は殆
どなくなり、省力化が図られ、安全且つ迅速に作業が行
われる。
Thus, the foundation of the building is excavated from the ground, and then the waste concrete R is placed to mark it and the adjusting bolt 4
The PC independent foundation pillar 1 is installed by adjusting the level, and the PC foundation beam 2 with a part of both ends cut off is installed between the PC independent foundation pillar 1 and the pillar beam is provided at the missing portion of the beam 2. By joining with the more protruding reinforcing bars a 2 and b and placing the joint concrete 5, almost no manual work is required at the construction site when constructing the foundation, labor saving is achieved, and safe and quick work is achieved. Done.

【0014】[0014]

【発明の効果】本発明によれば前記したように、建築現
場の予め決められた位置にPC部材製作ヤードを設置
し、同ヤードに装備されたPC部材の製作に必要な鉄筋
加工機や搬送機及びPC部材製作用型枠によって所要の
PC基礎部材が現場で製造されてストックヤードに搬送
され、必要な時機に適宜搬送手段によってPC基礎部材
の設置個所近傍にまで搬送して吊上重機等で所要の個所
に吊り上げ設置され、PC基礎部材が接合、組立てられ
るように構成されたので、従来のような足もとが不安定
でしかも狭隘な場所での作業に比して、PC基礎部材を
用いることによって現場作業を殆どなくし、大幅な省力
化が図られ、作業の安全性が向上され、工期が短縮され
る。
As described above, according to the present invention, a PC member manufacturing yard is installed at a predetermined position on a construction site, and a reinforcing bar processing machine and a conveyor required for manufacturing the PC member installed in the yard are installed. The required PC foundation member is manufactured on-site by the machine and the PC member manufacturing frame, and is transported to the stockyard. When necessary, the transportation means appropriately conveys it to the vicinity of the place where the PC foundation member is installed, and lifts heavy equipment. Since it was constructed so that it could be hung up and installed at the required location, and the PC base member could be joined and assembled, the PC base member could be used compared to the conventional work at a place where the feet are unstable and in a narrow space. As a result, on-site work is almost eliminated, labor is greatly saved, work safety is improved, and the construction period is shortened.

【0015】而して前記PC部材製作ヤードで製作され
る基礎部材のうち、PC独立基礎柱を所定の位置に設置
するとともに、両端部が一部欠截されたPC基礎梁を前
記PC独立基礎柱間に配設し、前記PC基礎柱及びPC
基礎柱より突設された鉄筋を介して接合し、前記基礎梁
に型枠を組み立てて接合コンクリートを打設することに
よって、前記PC基礎柱、梁を簡単でしかも確実に接合
して基礎を施工することができ、施工性を向上し、省力
化を図り工期を短縮しうるものである。
Among the basic members manufactured in the PC member manufacturing yard, the PC independent foundation pillars are installed at predetermined positions, and the PC independent beams with both ends partially cut away are used as the PC independent foundations. Arranged between pillars, and the PC foundation pillar and PC
The PC foundation columns and beams are simply and surely joined by joining them through the reinforcing bars protruding from the foundation columns, assembling the formwork to the foundation beams and placing the joining concrete to construct the foundation. It is possible to improve workability, save labor, and shorten the construction period.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の方法によって施工された基礎の部分平
面図である。
FIG. 1 is a partial plan view of a foundation constructed by the method of the present invention.

【図2】図1の断面図である。FIG. 2 is a cross-sectional view of FIG.

【図3】PC独立基礎柱の斜視図である。FIG. 3 is a perspective view of a PC independent foundation pillar.

【図4】PC基礎梁の斜視図である。FIG. 4 is a perspective view of a PC foundation beam.

【図5】薄肉PC型枠の斜視図である。FIG. 5 is a perspective view of a thin PC mold.

【図6】基礎施工工程のフロー図である。FIG. 6 is a flowchart of a basic construction process.

【図7】基礎部の掘削及び墨出し工程を示す斜視図であ
る。
FIG. 7 is a perspective view showing a process of excavating and marking out a base portion.

【図8】PC独立基礎柱の設置状況を示す斜視図であ
る。
FIG. 8 is a perspective view showing an installation situation of a PC independent foundation pillar.

【図9】PC基礎梁の搬送及び吊り上げ状況を示す斜視
図である。
FIG. 9 is a perspective view showing a transportation and lifting state of a PC foundation beam.

【図10】PC独立基礎柱とPC基礎梁の接合状態を示
す斜視図である。
FIG. 10 is a perspective view showing a joined state of a PC independent foundation column and a PC foundation beam.

【図11】PC独立基礎柱のレベル調整ボルト部分の要
部拡大断面図である。
FIG. 11 is an enlarged sectional view of an essential part of a level adjusting bolt portion of a PC independent foundation pillar.

【符号の説明】[Explanation of symbols]

1 PC独立基礎柱 2 PC基礎梁 3 薄肉PC型枠 4 調整ボルト 4a 調整ボルト頭部 5 接合コンクリート 6 インサート a1 基礎柱筋 a2 基礎梁の梁筋の定着筋 b 梁筋 F 揚重機 G 地盤 K 作業員 M 掘削地盤 N ラッブルコンクリート R 捨コンクリート S 牽引台車 T 駆動車 U 敷モルタル1 PC independent foundation pillar 2 PC foundation beam 3 Thin-walled PC form 4 Adjustment bolt 4a Adjustment bolt head 5 Joined concrete 6 Insert a 1 Foundation pillar reinforcement a 2 Foundation beam anchorage b Beam reinforcement F Lifting machine G Ground K Worker M Excavation Ground N Rubbable Concrete R Waste Concrete S Traction Truck T Drive Vehicle U Floor Mortar

───────────────────────────────────────────────────── フロントページの続き (72)発明者 山本 公広 東京都渋谷区千駄ヶ谷四丁目6番15号 株 式会社フジタ内 ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Inventor Kimihiro Yamamoto 4-6-15 Sendagaya, Shibuya-ku, Tokyo Fujita Co., Ltd.

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 所定の支持層に杭を打設し、所定の基礎
地盤を掘削して地業工事を行ったのち、基礎部材設置位
置の墨出しを行い、場内の所定位置に設置されたプレキ
ャスト部材の製作ヤードで製作されたプレキャストコン
クリート基礎部材のうちプレキャストコンクリート独立
基礎柱を所定の位置に設置するとともに、両端部が一部
欠截されたプレキャストコンクリート基礎梁を前記所定
の位置に設置されたプレキャストコンクリート独立基礎
柱の間に配置し、同独立基礎柱と前記プレキャストコン
クリート基礎梁とを、同梁欠截部に突出された鉄筋と、
前記独立基礎より突設された鉄筋とを介して接合し、前
記基礎梁に型枠を組立て、接合コンクリートを打設して
前記独立基礎柱と基礎梁とを接合することを特徴とする
基礎の施工法。
1. A pile is driven into a predetermined support layer, a predetermined foundation ground is excavated to perform earthwork work, and then a foundation member installation position is marked out and installed at a predetermined position in the site. Of precast concrete foundation members manufactured in the yard of precast members, precast concrete independent foundation columns are installed at predetermined positions, and precast concrete foundation beams with both ends partially cut are installed at the predetermined positions. Arranged between the precast concrete independent foundation columns, the independent foundation columns and the precast concrete foundation beams, the reinforcing bars projected in the beam cutouts,
Of the foundation characterized by joining through the reinforcing bars protruding from the independent foundation, assembling the formwork to the foundation beam, and placing the joining concrete to join the independent foundation pillar and the foundation beam Construction method.
JP21380294A 1994-09-07 1994-09-07 Method of work execution for foundation Pending JPH0874271A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP21380294A JPH0874271A (en) 1994-09-07 1994-09-07 Method of work execution for foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP21380294A JPH0874271A (en) 1994-09-07 1994-09-07 Method of work execution for foundation

Publications (1)

Publication Number Publication Date
JPH0874271A true JPH0874271A (en) 1996-03-19

Family

ID=16645294

Family Applications (1)

Application Number Title Priority Date Filing Date
JP21380294A Pending JPH0874271A (en) 1994-09-07 1994-09-07 Method of work execution for foundation

Country Status (1)

Country Link
JP (1) JPH0874271A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006291641A (en) * 2005-04-14 2006-10-26 Kajima Corp Pile foundation structure and its construction method
JP2012154042A (en) * 2011-01-24 2012-08-16 Shimizu Corp Site-precast construction method for footing beam
CN103015452A (en) * 2012-12-27 2013-04-03 鞍钢集团工程技术有限公司 Reclamation-area factory building column foundation and construction protection method thereof
JP2015200094A (en) * 2014-04-07 2015-11-12 株式会社竹中工務店 footing foundation structure
KR20180100127A (en) * 2015-12-04 2018-09-07 가브리엘레 모나키노 A concrete foundation element, in particular a mold for providing a horizontal rebar exposed to the plinth, a plinth provided with such a form, and a structure comprising such a plinth
JP2021080677A (en) * 2019-11-15 2021-05-27 株式会社安藤・間 Pile foundation structure

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006291641A (en) * 2005-04-14 2006-10-26 Kajima Corp Pile foundation structure and its construction method
JP2012154042A (en) * 2011-01-24 2012-08-16 Shimizu Corp Site-precast construction method for footing beam
CN103015452A (en) * 2012-12-27 2013-04-03 鞍钢集团工程技术有限公司 Reclamation-area factory building column foundation and construction protection method thereof
JP2015200094A (en) * 2014-04-07 2015-11-12 株式会社竹中工務店 footing foundation structure
KR20180100127A (en) * 2015-12-04 2018-09-07 가브리엘레 모나키노 A concrete foundation element, in particular a mold for providing a horizontal rebar exposed to the plinth, a plinth provided with such a form, and a structure comprising such a plinth
JP2021080677A (en) * 2019-11-15 2021-05-27 株式会社安藤・間 Pile foundation structure

Similar Documents

Publication Publication Date Title
JPH0874271A (en) Method of work execution for foundation
JP2022175669A (en) Construction method of mat foundation
JP2006207265A (en) Joining method of pile and column and its structure
JPH0711710A (en) Reinforced concrete column and steel frame beam jointing structure and building constructing method
JP3671344B2 (en) Joint structure between foundation pile and column base and its construction method
JP3586121B2 (en) Mixed structure of reinforced concrete column and steel beam and its construction method
JP3790310B2 (en) Construction method of the building by the prior construction of steel frame
JPH1077607A (en) Method of executing viaduct by using pca concrete member
JPH08253947A (en) Installation method for form-support in reverse placing method of concrete
JPH1096210A (en) Method of executing enlargement of bridge pier
JPS63280153A (en) Underground inverted lining method
JPH10299003A (en) Foundation work using precast concrete member
JPH0874265A (en) Precast concrete foundation pole and manufacture thereof
JPH0452815B2 (en)
JPH08120638A (en) Connecting structure of pile and beam and execution method of structure using connecting structure
JPH08291526A (en) Construction method for underground structure
JP3238510B2 (en) Construction method of preceding slab floor
JPH09296459A (en) Steel encased reinforced concrete
JP3360234B2 (en) Construction method of underground skeleton
JP3061934B2 (en) Retaining wall construction method
JP3020882B2 (en) Construction method of building structure with underground space
JP2000144757A (en) Preparation of foundation for building
JPH10195886A (en) Foundation construction method
JPH11324323A (en) Construction method for building
JPS61266732A (en) Reverse driving work