JPH0874265A - Precast concrete foundation pole and manufacture thereof - Google Patents
Precast concrete foundation pole and manufacture thereofInfo
- Publication number
- JPH0874265A JPH0874265A JP21380394A JP21380394A JPH0874265A JP H0874265 A JPH0874265 A JP H0874265A JP 21380394 A JP21380394 A JP 21380394A JP 21380394 A JP21380394 A JP 21380394A JP H0874265 A JPH0874265 A JP H0874265A
- Authority
- JP
- Japan
- Prior art keywords
- foundation
- concrete
- column
- reinforcement
- formwork
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Foundations (AREA)
Abstract
Description
【0001】[0001]
【産業上の利用分野】本発明は建築物におけるプレキャ
ストコンクリート基礎柱(以下PC基礎柱という)と、
その製造方法に係るものである。The present invention relates to a precast concrete foundation column (hereinafter referred to as a PC foundation column) in a building,
It relates to the manufacturing method.
【0002】[0002]
【従来の技術】建築物には上部の構築物を支持したり、
他の外力を受けて建築物を支持する基礎部があり、更に
は基礎部を支持する杭地業を地盤深く造成して基礎部を
掘削し、基礎部は基礎柱の基礎と、相隣る基礎柱間を繋
ぐ基礎梁で構成されている。基礎柱の基礎は前記杭地業
と掘削の後、基礎部の底面は地盤を突き固めて地業を行
い、更に捨コンクリートを打って基礎構築に備える。2. Description of the Related Art A building supports an upper structure,
There is a foundation part that supports the building by receiving other external force, and further, a pile land industry that supports the foundation part is deeply ground to excavate the foundation part, and the foundation part is adjacent to the foundation of the foundation pillar. It consists of foundation beams that connect the foundation columns. After foundation and excavation, the foundation of the foundation pillar is prepared by digging the ground on the bottom surface of the foundation, and then laying concrete to prepare for foundation construction.
【0003】基礎の造成は、前記捨コンクリートに、基
礎柱や基礎梁の墨出しを行い、先ず基礎柱筋を組立て、
更に基礎梁筋を組立て、基礎柱、梁筋に型枠を組み立て
てコンクリートを打設し、同打設コンクリートが所定の
強度を発現すると型枠を解体し、周囲の空隙を埋め戻し
て施工を完了する。この際、基礎の柱筋、基礎梁筋の組
立に必要な鉄筋足場を仮設し、組立が完了次第、解体し
て次の施工範囲に移動する。The foundation is constructed by marking out the foundation columns and beams on the waste concrete, and then assembling the foundation columns.
Further, assemble the foundation beam reinforcement, assemble the formwork to the foundation column and the beam reinforcement, and place the concrete.When the placed concrete develops the specified strength, the formwork is dismantled and the surrounding voids are refilled for construction. Complete. At this time, the rebar scaffolds necessary for the assembly of the foundation column reinforcements and foundation beam reinforcements are temporarily installed, and once the assembly is completed, they are dismantled and moved to the next construction area.
【0004】[0004]
【発明が解決しようとする課題】基礎の造成に要する掘
削幅については、基礎部の鉄筋足場、鉄筋の組立、更に
は型枠の組立をするため、作業ができる幅に周辺に可成
りの幅で余掘りをするので掘削量が増大し、掘削土の搬
出、埋め戻し等の処理のための費用が嵩む。また、基礎
の造成に要する鉄筋や型枠は、同基礎部の造成位置に夫
々運搬しなければならないので重労働が強いられ、また
組立も専門の鉄筋工や型枠工を現場に多数投入し、天候
にも左右されるので工程が不安定になるという問題があ
った。As for the excavation width required to construct the foundation, the rebar scaffold of the foundation, the rebar assembly, and the formwork assembly are carried out. Since extra digging is carried out, the amount of excavation increases, and the cost for carrying out excavated soil and processing such as backfilling increases. In addition, since the reinforcing bars and formwork required for building the foundation must be transported to the building position of the foundation, heavy labor is required, and a large number of reinforcing bars and formworkers specialized in assembling are put on site. There is a problem that the process becomes unstable because it depends on the weather.
【0005】本発明は前記従来技術の有する問題点に鑑
みて提案されたもので、基礎部材が鉄筋の組立て、型枠
の組立て、解体の作用を反覆する単純作業であることに
着目し、建設現場の敷地内に基礎部材を供給する製造ヤ
ードを設け、作業場所の環境を整備することによって、
余掘り、残土、処理土量を削減して土工事のコストを節
減し、天候に左右されることなく工程の安定したPC基
礎柱及びその製造方法を提供することを目的として提案
されたものである。The present invention has been proposed in view of the above-mentioned problems of the prior art, and paying attention to the fact that the foundation member is a simple work for reversing the actions of rebar assembly, formwork assembly and dismantling. By establishing a manufacturing yard that supplies basic materials on the site of the site and improving the environment of the work place,
It was proposed for the purpose of reducing excess dug, residual soil, and treated soil volume to reduce the cost of earthwork, and to provide a PC foundation pillar with a stable process and a manufacturing method thereof regardless of the weather. is there.
【0006】[0006]
【課題を解決するための手段】前記の目的を達成するた
め、本発明に係るプレキャストコンクリート基礎柱は、
基礎柱のベースと独立フーチングに、ベース筋と、基礎
梁及び柱筋の定着筋が配設されるとともに、基礎柱コン
クリートが打設され、同基礎柱コンクリート部に柱筋の
下端定着部及び基礎梁の基端定着筋が夫々定着されると
とに、前記柱筋及び基礎梁の延設方向に所要の定着長さ
突出されて構成されている。In order to achieve the above-mentioned object, a precast concrete foundation column according to the present invention comprises:
Base reinforcements and foundation reinforcements of foundation beams and reinforcements are placed in the base and independent footing of foundation reinforcements, and foundation reinforcement concrete is placed. When the base end fixing bars of the beam are respectively fixed, a required fixing length is projected in the extending direction of the column bar and the foundation beam.
【0007】請求項2の発明は、前記基礎柱における同
柱から延設される基礎梁との接合部に、同基礎梁の断面
に相当する部分が欠截されるとともに、同欠截部に隣っ
て前記基礎梁の施工用コンクリート型枠における側枠の
差込み溝を設けて構成されている。請求項3の発明によ
れば、基礎柱に鉄骨建方用アンカーボルトが植設されて
いる。According to a second aspect of the present invention, a portion corresponding to a cross section of the foundation beam is cut in a joint portion of the foundation column with the foundation beam extending from the pillar, and the joint portion is formed in the joint portion. Adjacent to each other, there is provided a groove for inserting a side frame in the concrete formwork for construction of the foundation beam. According to the invention of claim 3, anchor bolts for constructing a steel frame are planted in the foundation columns.
【0008】請求項4の発明は建設現場の敷地内に基礎
部材を供給する製造ヤードを設け、同製造ヤードにおい
て鉄筋の加工と供給を行って基礎柱底面の底型枠を設置
し、同底型枠にベース筋、柱筋と基礎梁の定着筋を配設
し、同底枠の側面に所定大の側型枠を一体に装架して型
枠内にコンクリートを打設し、所定のコンクリート強度
が発現された後、前記側型枠を脱型し、ストックヤード
に移動して養生することを特徴とするプレキャストコン
クリート基礎柱の製造方法に係るものである。According to a fourth aspect of the present invention, a manufacturing yard for supplying a base member is provided on the site of the construction site, and the reinforcing bar is processed and supplied in the manufacturing yard to install a bottom formwork for the bottom of the foundation pillar. Base reinforcements, pillar reinforcements and anchoring reinforcements for foundation beams are placed in the formwork, and a side formwork of a predetermined size is integrally mounted on the side surface of the bottom frame, concrete is placed in the formwork, and The present invention relates to a method for manufacturing a precast concrete foundation column, which comprises demolding the side formwork and moving to a stockyard for curing after the concrete strength is developed.
【0009】[0009]
【作用】本発明に係るPC基礎柱によれば前記したよう
に、基礎柱のベースには所要のベース筋が配筋され、独
立フーチングには所定の基礎柱筋と基礎梁の定着筋が配
筋され、基礎柱コンクリートが打設され、同コンクリー
ト部に柱筋の下端定着部及び基礎梁の基端定着部が定着
され、前記柱筋及び基礎梁の延設方向に所要の定着長突
設されているので、爾後の基礎柱、基礎梁の施工が容易
に行われる。As described above, according to the PC foundation column of the present invention, the base of the foundation column is provided with required base reinforcements, and the independent footing is provided with predetermined foundation column reinforcements and anchorages of foundation beams. Reinforcement is performed, the foundation column concrete is placed, the lower end anchorage part of the column reinforcement and the base end anchorage part of the foundation beam are anchored in the concrete part, and the required anchoring length projecting in the extension direction of the column reinforcement and foundation beam. Since this is done, it is easy to construct the foundation pillars and foundation beams after the earthquake.
【0010】請求項2の発明によれば、前記基礎柱にお
ける基礎梁との接合部に、同基礎梁の断面に相当する部
分が欠截されるとともに、同欠截部に隣って基礎梁の施
工用コンクリート型枠における側枠の差込み溝が設けら
れているので、梁側枠を同差込み溝に差込み、型枠内に
梁コンクリートを打設することによって、型枠端部が基
礎柱に固定される。According to the second aspect of the present invention, a portion corresponding to the cross section of the foundation beam is cut in the joint portion of the foundation column with the foundation beam, and the foundation beam is adjacent to the portion. Since the side groove of the concrete formwork for construction is provided, by inserting the beam side frame into the same groove and placing the beam concrete in the formwork, the formwork end becomes the foundation pillar. Fixed.
【0011】請求項3の発明によれば、基礎柱に鉄骨建
方用アンカーボルトを植設したことによって、鉄骨柱が
固定される。請求項4の発明によれば、建設現場の敷地
内に製作ヤードを設け、鉄筋を加工し、基礎柱底面の底
型枠を設置し、同底型枠にベース筋、柱筋と基礎梁の基
礎柱に対する定着筋を配筋し、同底の側面に所定大の側
型枠を一体に装架し、型枠内にコンクリートを打設し
て、同打設コンクリートが所定の強度を発現したのち脱
型し、ストックヤードに移動して同ストックヤードで養
生することによって、前記基礎柱と基礎梁とが一体化さ
れた構造的に信頼度が高く、品質の優れたPC基礎柱が
施工現場で能率よく製作されるものである。According to the third aspect of the present invention, the steel frame pillar is fixed by implanting the steel structure erection anchor bolt in the foundation pillar. According to the invention of claim 4, a manufacturing yard is provided in the site of the construction site, the reinforcing bar is processed, and the bottom formwork of the bottom of the foundation column is installed. Anchorings for the foundation columns are arranged, side molds of a certain size are integrally mounted on the side surface of the same bottom, concrete is placed in the formwork, and the cast concrete has given strength. After that, by removing the mold, moving to the stockyard and curing it in the stockyard, a PC foundation pillar with high structural reliability and excellent quality in which the foundation pillar and the foundation beam are integrated is constructed. It is manufactured efficiently.
【0012】[0012]
【実施例】以下、本発明を図示の実施例について説明す
る。図1は基礎柱内に配筋される鉄筋の構成を示す配筋
図で、AはPC基礎柱の外郭を示し、BはPC基礎梁の
外郭を示す。PC基礎柱Aのベースにはベース筋1が配
筋され、ベース筋1に柱筋2が基礎柱Aの外郭上部よ
り、所要の定着長を有する柱筋の定着筋2aが延設され
ている。The present invention will be described below with reference to the illustrated embodiments. FIG. 1 is a reinforcing bar diagram showing a structure of reinforcing bars arranged in a foundation column, where A indicates an outer contour of a PC foundation column and B indicates an outer contour of a PC foundation beam. The base reinforcement 1 is arranged on the base of the PC foundation pillar A, and the reinforcement 2 of the reinforcement having a required fixation length is extended from the outer upper portion of the foundation pillar A to the reinforcement 1 of the base reinforcement 1. .
【0013】更にフーチング部3に上下の梁筋4、5が
定着長に相当する長さ配筋される。4は梁上筋で4aは
後打ち梁の定着鉄筋、5aは後打ち梁の定着鉄筋、2b
は帯筋、4bは肋筋である。図4はPC基礎柱の完成図
で、前記のように配筋された鉄筋を所定の型枠にセット
し、コンクリートを打設し、同打設コンクリートが所定
の強度を発現したのち、型枠を脱型してPC基礎柱Aが
形成される。Further, upper and lower beam reinforcements 4 and 5 are arranged in the footing portion 3 in a length corresponding to the fixing length. Reference numeral 4 is an upper beam reinforcement, 4a is an anchored rebar of a post-beam, 5a is an anchored bar of a post-beam, 2b
Is a stirrup and 4b is a rib. Figure 4 is a completed drawing of a PC foundation column. The rebars arranged as described above are set in a predetermined formwork, concrete is placed, and the placed concrete develops a predetermined strength. Then, the PC basic pillar A is formed.
【0014】同PC基礎柱Aには相隣る同基礎柱間に配
設されるPC基礎梁Bとの接合部に、同梁の断面に相当
する欠截部7を設け、後から同部7に接合されるPC基
礎梁Bの両側面を閉塞する梁型枠の差込み溝6が配設さ
れ、同溝6に梁側壁の型枠端部を嵌着することによっ
て、型枠端部が固定される。なお鉄骨柱を取り付ける場
合は、基礎柱に鉄骨建方用アンカーボルト8を植設する
ことによって固定される。(図5参照) 次にPC基礎柱Aの製造方法を説明する。The PC foundation pillar A is provided with a cutout portion 7 corresponding to the cross section of the PC foundation beam B arranged between the adjacent foundation pillars, and the same portion is formed later. The insertion groove 6 of the beam form which closes both side surfaces of the PC base beam B joined to 7 is arranged, and by inserting the form end of the beam side wall into the groove 6, the form end is Fixed. In addition, when attaching a steel frame pillar, it is fixed by implanting the steel structure erection anchor bolt 8 in a foundation pillar. (See FIG. 5) Next, a method of manufacturing the PC foundation pillar A will be described.
【0015】PC部材の製造ヤードDは図6に示すよう
に、門型走行クレーンaが設けられ、部材搬送路bに軌
道c1 を走行する搬送台車cが設置されている。dは鉄
筋加工組立ヤード、eは前記PC基礎柱Aの製造ヤー
ド、fは基礎梁Bの製造ヤード、gは夫々に製造された
基礎PC部材のストックヤード、hは門型走行クレーン
の軌道である。As shown in FIG. 6, the PC member manufacturing yard D is provided with a gate-type traveling crane a, and a carrier carriage c which travels on a track c 1 is installed on a member carrier path b. d is a reinforcing bar processing and assembling yard, e is a manufacturing yard for the PC foundation pillar A, f is a manufacturing yard for the foundation beam B, g is a stock yard for the respective basic PC members manufactured, and h is a track of the portal crane. is there.
【0016】而して前記鉄筋加工組立ヤードdで加工さ
れた鉄筋は最寄りの搬送台車cに載せてPC基礎柱Aの
製造ヤードeに搬送される。同製作ヤードeには底型枠
9が設置されていて、同底型枠9は図2に示すように同
側枠9上にベース筋1、柱筋2、梁筋4、5の順に組立
て、柱筋2には帯筋2b、梁筋には肋筋4bを配筋して
組立が完了する。Then, the reinforcing bar processed in the reinforcing bar processing and assembling yard d is placed on the nearest transfer carriage c and transferred to the manufacturing yard e of the PC foundation pillar A. A bottom formwork 9 is installed in the manufacturing yard e, and the bottom formwork 9 is assembled on the same side frame 9 in the order of the base reinforcement 1, the column reinforcement 2, the beam reinforcements 4, 5 as shown in FIG. Assembling is completed by arranging the stirrup 2b on the columnar bar 2 and the rib 4b on the beam.
【0017】次いで前記のように組立てられた鉄筋にP
C基礎柱Aの4面に側型枠を組立てる。同側型枠は1枚
の側型枠10を三分割した側型枠10a、10bを組立
て、中央で分割した側型枠10bには梁筋4、5が貫通
するようになっていて、型枠外周はカラムクランプ11
で締結されている。12は梁の欠截部用型枠である。
(図3参照) なお鉄骨柱用のアンカーボルト8を所定位置に埋設固定
する。Next, P is attached to the reinforcing bar assembled as described above.
Assemble the side molds on the four sides of the C foundation pillar A. The same side mold is constructed by assembling side molds 10a and 10b obtained by dividing one side mold 10 into three parts, and beam bars 4 and 5 penetrate through the side mold 10b divided at the center. Column clamp 11 around the frame
It is concluded with. Reference numeral 12 is a formwork for the cutout portion of the beam.
(See FIG. 3) The anchor bolt 8 for the steel frame pillar is embedded and fixed in a predetermined position.
【0018】次に図3に示す如く前記型枠にコンクリー
ト打設ホース13を介してコンクリートPを打設する。
なお図4中、14は吊上用丸環である。かくして打設コ
ンクリートPが所要の強度を発現すると側型枠10を脱
型して、場内に設置されている図示せぬ移動クレーンに
よってストックヤードに搬送して養生後、搬送台車cに
よって建物基礎の所定位置に搬送し、クレーンによって
吊り上げ設置する。Next, as shown in FIG. 3, concrete P is poured into the above-mentioned mold via a concrete placing hose 13.
In FIG. 4, 14 is a round ring for lifting. Thus, when the poured concrete P develops the required strength, the side formwork 10 is demolded, transported to the stockyard by a mobile crane (not shown) installed in the site, and cured, and then the carrier truck c is used to remove the building foundation. It is transported to the specified position and lifted by a crane.
【0019】[0019]
【発明の効果】本発明に係るPC基礎柱は前記したよう
に、基礎ベース筋と基礎梁及び柱筋の定着筋が配設され
るとともに、基礎柱コンクリートが打設され、同基礎柱
コンクリート部に柱筋の下端定着部と基礎梁の基端が夫
々定着されるとともに、前記柱筋及び基礎梁の延設方向
に所定の定着長突出されているので、爾後の基礎柱、基
礎梁の施工が容易に行われ、鉄筋の配筋、コンクリート
の打設等の作業が簡単に行われ、掘削土土量も少なくて
すみ、省力化が図られ、工期が短縮される。As described above, in the PC foundation column according to the present invention, the foundation base reinforcement, the foundation beam and the anchorage of the column reinforcement are arranged, and the foundation support concrete is cast, and the foundation support concrete part is formed. Since the lower end anchoring part of the column reinforcement and the base end of the foundation beam are respectively anchored, and a predetermined anchoring length is projected in the extension direction of the column reinforcement and the foundation beam, the construction of the foundation column and foundation beam after the The work can be done easily, and the work such as reinforcing bar arrangement and concrete placement can be done easily, the amount of excavated soil is small, labor saving is achieved, and the construction period is shortened.
【0020】請求項2の発明は、前記PC基礎柱におけ
る同柱に接続される基礎梁との接合部に、基礎梁の断面
に相当する部分が欠截されるとともに、同欠截部に隣っ
て、前記基礎梁の施工用コンクリート型枠における側枠
の差込み溝を設けたことによって、前記PC基礎柱間に
施工される基礎梁の施工が精度よく容易に行なわれる。According to a second aspect of the present invention, a portion corresponding to the cross section of the foundation beam is cut off at a joint portion of the PC foundation column with the foundation beam connected to the same column, and the PC foundation column is adjacent to the joint portion. Thus, by providing the insertion groove of the side frame in the concrete formwork for constructing the foundation beam, the foundation beam constructed between the PC foundation columns can be accurately and easily constructed.
【0021】請求項3の発明は基礎柱に鉄骨柱建方用ア
ンカーボルトが植設されているので、鉄骨柱が確実に固
定される。請求項4の発明は、建設現場の敷地内に設け
た製作ヤードにおいてPC基礎柱のベース筋、柱筋、梁
筋を加工し、搬送手段によって最寄りの基礎柱製造ヤー
ドに搬送し、型枠内に前記各鉄筋を組み立ててコンクリ
ートを打設することによって建設現場においてPC基礎
柱が効率よく製造される。According to the third aspect of the present invention, since anchor bolts for erection of the steel frame columns are planted in the foundation columns, the steel frame columns are securely fixed. According to the invention of claim 4, the base reinforcement, the column reinforcement, and the beam reinforcement of the PC foundation pillar are processed in the production yard provided on the site of the construction site, and the PC reinforcement pillar is conveyed to the nearest foundation pillar production yard by the conveying means, and then, in the formwork. By assembling each of the above-mentioned reinforcing bars and placing concrete, the PC foundation columns can be efficiently manufactured at the construction site.
【0022】前記PC基礎柱によって同柱の設置位置周
囲の作業が殆どなく、掘削の余掘りも必要最小限にとま
り、掘削土量の削減、これに伴う残土処分が軽減される
ので、土工事の工費が節減される。またPC基礎柱の製
造は、前記のように建設現場内の一定の作業ヤードにお
いて行なわれ、鉄筋の組立、型枠の組立、コンクリート
の打設等の作業は単純化され、周囲は常に整理されてい
て作業環境がよく、従って鉄筋の組立作業能率が大幅に
向上され、省力化が図られる。Due to the PC foundation column, there is almost no work around the installation position of the column, the overdug of excavation is minimized, the amount of excavated soil is reduced, and the residual soil disposal associated therewith is reduced. Construction cost is reduced. In addition, the production of PC foundation columns is carried out in a certain work yard on the construction site as described above, and the work of assembling reinforcing bars, assembling formwork, placing concrete, etc. is simplified, and the surroundings are always organized. In addition, the working environment is good, and therefore, the work efficiency of assembling the reinforcing bars is significantly improved, and labor is saved.
【0023】また建設現場の敷地内にPC基礎部材製造
ヤードを設けて、鉄筋加工組立ヤードにおいて鉄筋を加
工し、PC基礎柱製作ヤードにおいて加工された鉄筋の
供給を受けてPC基礎柱のベース筋、柱筋、梁筋を型枠
に組み立てて配筋してコンクリートを打設し、同打設コ
ンクリートが強度を発現したのち脱型し、更にストック
ヤードにおいて養生してPC基礎柱部材を製造すること
によって、各工程は天候に左右されることなく、しかも
各工程毎に厳密な検査が行なわれ、PC基礎柱部材の品
質が大幅に向上する。Further, a PC foundation member manufacturing yard is provided on the site of the construction site, the reinforcing bars are processed in the reinforcing bar processing and assembly yard, and the reinforcing bars processed in the PC basic pillar manufacturing yard are supplied to the base bars of the PC basic pillars. Assembling the column reinforcement and the beam reinforcement in the formwork and arranging the concrete and then placing the concrete. After the placed concrete develops its strength, it is demolded and further cured in the stockyard to manufacture the PC foundation column member. As a result, each process is not affected by the weather, and a strict inspection is performed for each process, which significantly improves the quality of the PC foundation pillar member.
【図1】本発明に係るPC基礎柱の配筋を示す斜視図で
ある。FIG. 1 is a perspective view showing a bar arrangement of a PC foundation column according to the present invention.
【図2】前記PC基礎柱の製造過程を示す斜視図であ
る。FIG. 2 is a perspective view showing a manufacturing process of the PC foundation pillar.
【図3】前記PC基礎柱の型枠組立状態を示す斜視図で
ある。FIG. 3 is a perspective view showing a form-assembled state of the PC foundation pillar.
【図4】前記PC基礎柱の完成状態を示す斜視図であ
る。FIG. 4 is a perspective view showing a completed state of the PC foundation pillar.
【図5】前記PC基礎柱に鉄骨柱建方用のアンカーボル
トを植設した状態を示す斜視図である。FIG. 5 is a perspective view showing a state where anchor bolts for erection of a steel frame column are planted in the PC foundation column.
【図6】PC基礎部材の製造ヤードを示す平面図であ
る。FIG. 6 is a plan view showing a manufacturing yard for a PC base member.
【符号の説明】 A PC基礎柱 B PC基礎梁 D PC部材の製造ヤード a 門型走行クレーン b 部材搬送路 c 搬送台車 c1 軌道 e PC基礎柱の製造ヤード f PC基礎梁の製造ヤード g 基礎PC部材のストックヤード h 門型走行クレーンの軌道 1 ベース筋 2 柱筋 2a 柱筋の定着筋 2b 帯筋 3 フーチング部 4 梁筋 4a 後打ち梁の定着鉄筋 4b 肋筋 5 梁筋 5a 後打ち梁の定着鉄筋 6 型枠の差込み溝 7 欠截部 8 アンカーボルト 9 底型枠 10a 側型枠 10b 側型枠 11 カラムクランプ 12 梁の欠截部用型枠 13 コンクリート打設ホース 14 吊上用丸環[Explanation of symbols] A PC foundation pillar B PC foundation beam D PC member manufacturing yard a Gate-type traveling crane b Member conveying path c Carrier trolley c 1 track e PC foundation pillar manufacturing yard f PC foundation beam manufacturing yard g Foundation Stockyard of PC member h Track of gate type traveling crane 1 Base reinforcement 2 Column reinforcement 2a Column reinforcement anchor 2b Belt reinforcement 3 Footing part 4 Beam reinforcement 4a Post-strength anchored reinforcement 4b Rib 5 Beam reinforcement 5a Post-cast beam Fixing rebar 6 Insertion groove of formwork 7 Cutout section 8 Anchor bolt 9 Bottom formwork 10a Side formwork 10b Side formwork 11 Column clamp 12 Formwork for beam cutout section 13 Concrete placing hose 14 Lifting round ring
フロントページの続き (72)発明者 山本 公広 東京都渋谷区千駄ヶ谷四丁目6番15号 株 式会社フジタ内Front Page Continuation (72) Inventor Kimihiro Yamamoto 4-6-15 Sendagaya, Shibuya-ku, Tokyo Fujita Co., Ltd.
Claims (4)
ース筋と、基礎梁及び柱筋の定着筋が配設されるととも
に、基礎柱コンクリートが打設され、同基礎柱コンクリ
ート部に柱筋の下端定着部及び基礎梁の基端定着筋が夫
々定着されるととに、前記柱筋及び基礎梁の延設方向に
所要の定着長さ突出されてなることを特徴とするプレキ
ャストコンクリート基礎柱。1. A base reinforcement and an anchoring reinforcement of a foundation beam and a column reinforcement are arranged in a base and an independent footing of the foundation reinforcement, and the foundation concrete is placed and the concrete reinforcement of the foundation reinforcement is A precast concrete foundation column, characterized in that, when the bottom end anchoring portion and the base end anchoring bar of the foundation beam are anchored respectively, a required anchoring length is projected in the extending direction of the column bar and foundation beam.
基礎梁との接合部に、同基礎梁の断面に相当する部分が
欠截されるとともに、同欠截部に隣って前記基礎梁の施
工用コンクリート型枠における側枠の差込み溝を設けた
請求項1記載のプレキャストコンクリート基礎柱。2. A portion corresponding to a cross section of the foundation beam is cut out at a joint portion of the foundation pillar with a foundation beam extended from the pillar, and the foundation is provided adjacent to the cutout portion. The precast concrete foundation column according to claim 1, wherein a groove for inserting a side frame in a concrete formwork for constructing a beam is provided.
設された請求項1記載のプレキャストコンクリート基礎
柱。3. The precast concrete foundation column according to claim 1, wherein anchor bolts for constructing a steel frame are planted in the foundation column.
製造ヤードを設け、同製造ヤードにおいて鉄筋の加工と
供給を行って基礎柱底面の底型枠を設置し、同底型枠に
ベース筋、柱筋と基礎梁の定着筋を配設し、同底枠の側
面に所定大の側型枠を一体に装架して型枠内にコンクリ
ートを打設し、所定のコンクリート強度が発現された
後、前記側型枠を脱型し、ストックヤードに移動して養
生することを特徴とするプレキャストコンクリート基礎
柱の製造方法。4. A manufacturing yard for supplying a base member is provided on the site of a construction site, a reinforcing bar is processed and supplied in the manufacturing yard to install a bottom formwork on the bottom of a foundation pillar, and the base form is used for the bottom formwork. Reinforcing bars, columns, and anchoring beams for foundation beams are arranged, side molds of a specified size are integrally mounted on the sides of the bottom frame, and concrete is poured into the molds to develop the specified concrete strength. After that, the side formwork is demolded, and the precast concrete foundation column is manufactured by moving to a stockyard for curing.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP21380394A JPH0874265A (en) | 1994-09-07 | 1994-09-07 | Precast concrete foundation pole and manufacture thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP21380394A JPH0874265A (en) | 1994-09-07 | 1994-09-07 | Precast concrete foundation pole and manufacture thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
JPH0874265A true JPH0874265A (en) | 1996-03-19 |
Family
ID=16645310
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP21380394A Pending JPH0874265A (en) | 1994-09-07 | 1994-09-07 | Precast concrete foundation pole and manufacture thereof |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPH0874265A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2014095201A (en) * | 2012-11-08 | 2014-05-22 | Takenaka Komuten Co Ltd | Base isolation foundation construction method and precast concrete footing |
JP2020070605A (en) * | 2018-10-31 | 2020-05-07 | 日鉄エンジニアリング株式会社 | Foundation structure and foundation structure construction method |
KR102179542B1 (en) | 2020-07-08 | 2020-11-17 | 이형훈 | Steel boxe for connecting column structures and footing construction method using the same |
-
1994
- 1994-09-07 JP JP21380394A patent/JPH0874265A/en active Pending
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2014095201A (en) * | 2012-11-08 | 2014-05-22 | Takenaka Komuten Co Ltd | Base isolation foundation construction method and precast concrete footing |
JP2020070605A (en) * | 2018-10-31 | 2020-05-07 | 日鉄エンジニアリング株式会社 | Foundation structure and foundation structure construction method |
KR102179542B1 (en) | 2020-07-08 | 2020-11-17 | 이형훈 | Steel boxe for connecting column structures and footing construction method using the same |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR102208793B1 (en) | Under ground structure using column wall and construction method thereof | |
KR102269141B1 (en) | Deck plate wall installation method using underground pavement | |
JP2004232328A (en) | Structure of half precast type arch culvert and its construction method | |
CN100529274C (en) | Method of constructing strip, foundations with longitudinal socket | |
KR20060096706A (en) | Deck suspension top-down method of sub-structure | |
KR102149662B1 (en) | Method for constructing transfer layer of building using precast concrete slab | |
CN115262637B (en) | Subway station platform board assembled structure system | |
JPH0874265A (en) | Precast concrete foundation pole and manufacture thereof | |
JP3841493B2 (en) | Construction method of viaduct using PCa concrete member | |
JP2002030672A (en) | Structure of joining foundation pile to pier base and method of constructing the structure | |
JP3644606B2 (en) | Installation method of formwork support in reverse placement method | |
KR200390421Y1 (en) | Top-down substructure by deck suspension | |
JPH0874271A (en) | Method of work execution for foundation | |
JPH10299003A (en) | Foundation work using precast concrete member | |
JPH1096210A (en) | Method of executing enlargement of bridge pier | |
JPH09203053A (en) | Precast reinforced concrete foundation structure | |
KR100679986B1 (en) | Structure for plastic slab deck system and Downward construction method using the same | |
JPH03191116A (en) | Construction method of underground beam and underground beam driving form | |
CN211714178U (en) | Prefabricated reinforced concrete house frame | |
JPH04293824A (en) | Construction method for large span underground structure | |
JPH10131300A (en) | Execution method for building by preceding erection of steel frame | |
JP2763488B2 (en) | Prefabricated pillar and inverted ramen prefabricated construction method | |
KR20010091703A (en) | Precast Concrete hollow main post and construction method thereof | |
JP2000192664A (en) | Method for construction of building | |
JPH02248527A (en) | Constructing foundation structure |