JPH08253947A - Installation method for form-support in reverse placing method of concrete - Google Patents

Installation method for form-support in reverse placing method of concrete

Info

Publication number
JPH08253947A
JPH08253947A JP7059119A JP5911995A JPH08253947A JP H08253947 A JPH08253947 A JP H08253947A JP 7059119 A JP7059119 A JP 7059119A JP 5911995 A JP5911995 A JP 5911995A JP H08253947 A JPH08253947 A JP H08253947A
Authority
JP
Japan
Prior art keywords
floor
formwork
support
unit
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP7059119A
Other languages
Japanese (ja)
Other versions
JP3644606B2 (en
Inventor
Masanori Nakatome
正憲 中留
Kiyoisa Hamada
清勇 浜田
Takayoshi Oku
高儀 奥
Koji Sumiyoshi
浩二 住吉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujita Corp
Original Assignee
Fujita Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujita Corp filed Critical Fujita Corp
Priority to JP05911995A priority Critical patent/JP3644606B2/en
Publication of JPH08253947A publication Critical patent/JPH08253947A/en
Application granted granted Critical
Publication of JP3644606B2 publication Critical patent/JP3644606B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

PURPOSE: To reduce the construction period, noises at the operating time, and scattering dust, by excavating the ground corresponding to the upper one floor to install a form-support floor and hanging a suspension type form-unit on the support floor through a motor-driven chain block. CONSTITUTION: A pierced hole 9 is bored in a floor concrete N and a vertical tension bar 10 held by a horizontal material 5 is inserted in the pierced hole 9 and held by a stopper plate 11 and temporarily fixed with a nut 12. In this case, a hooking ring 15 fitting to the hook 14 of a motor-driven chain block 13 is provided at the upper part of tension bar 10. The motor-driven chain block 13 is suspended through a linking ring 18 equipped at the connection member 17 joining covering girders 16. In this state, concrete is placed in the slab N and then the ground is excavated in the state the suspension type form- unit H is hung to install a form-support floor on the ground corresponding to the lower one floor. Subsequently, the form-unit H is slid down to install it on the form-support floor and reinforcements are arranged in the form-unit H and a hollow steel pipe column is suspended and the slab concrete is placed.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は逆打工法による地下構築
物の構築における型枠支保工の設置方法に係るものであ
る。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of installing formwork supports for constructing an underground structure by a reverse driving method.

【0002】[0002]

【従来の技術】地下構造物、特に路面下に構築される地
下駐車場や地下鉄の駅舎における地下工事の施工に際し
ては、先ず周辺の地盤の崩壊を防止する山留めを行な
い、切梁、腹起し等よりなる山留支保工を水平に架設し
ながら所定の深さまで順次掘削し、地業後、基礎工事か
ら順次下層階より上層階へと構築する所謂順打工法が一
般的に行なわれている。
2. Description of the Related Art When constructing an underground structure, especially an underground parking lot constructed under the road or a subway station building, first perform a mountain retaining to prevent the surrounding ground from collapsing, a crossbeam, and an abdomen. A so-called progressive driving method is generally performed in which a mountain retaining structure consisting of etc. is horizontally erected and sequentially excavated to a predetermined depth, and after foundation work, the foundation work is sequentially constructed from the lower floor to the upper floor. .

【0003】また上層階より下層階へと構築していく逆
打工法が採用される場合もある。この逆打工法において
は、山留め後、1次掘削して捨てコンクリートを打設
し、上階のトップスラブの型枠を組み立て、更に鉄筋を
組立ててコンクリートを打設し、同打設コンクリートが
硬化して所要の強度を発現すると型枠を解体、撤去し、
更に2次掘削して前記の工程を反覆して下層階を構築
し、最後に基礎を構築する。
In some cases, the reverse construction method is employed in which the upper floors are constructed to the lower floors. In this reverse-placing method, after pile-mounting, primary excavation is performed and waste concrete is placed, the top slab formwork on the upper floor is assembled, and then rebar is assembled and concrete is placed, and the cast concrete is hardened. Then, when the required strength is developed, the formwork is disassembled and removed,
A second excavation is repeated to reverse the above steps to build a lower floor and finally a foundation.

【0004】[0004]

【発明が解決しようとする課題】地下構築物を構築する
際、前記順打ち工法、逆打ち工法のどちらを採用して行
うかは、工事現場の周囲の環境や、工期期間の要因によ
っていづれかを選択する。しかしながら、順打工法にお
いては、支保工を組み立てて型枠を組み立て、鉄筋を配
筋してコンクリートを打設し、同打設コンクリートが硬
化したのち型枠を解体して次の上階に搬送する。
[Problems to be Solved by the Invention] When constructing an underground structure, which one of the above-mentioned progressive construction method and reverse construction method is adopted is selected depending on the environment around the construction site and the factors of the construction period. To do. However, in the progressive casting method, the support work is assembled to assemble the formwork, the reinforcing bars are laid out and concrete is placed, and after the placed concrete has hardened, the formwork is dismantled and transported to the next upper floor. To do.

【0005】また逆打工法においては、コンクリート打
設後下階を更に掘削していくため、型枠資材は各階毎に
場外に搬出しなければならない。このような状況の下に
おいては、市街地、特に商店街の多い路面下に地下構築
物を構築する場合、建設資材の出し入れ、作業騒音が多
く、これらの所謂建設公害に対する防止対策に多大の費
用を要するのみならず、多くの作業員を必要とし、工事
の遅延する要因となり、また資材の回収場所に苦慮する
という問題があった。
Further, in the reverse driving method, since the lower floor is further excavated after the concrete is placed, the formwork material must be carried out to the outside of each floor. Under such circumstances, when constructing an underground structure in an urban area, especially under a road surface with many shopping streets, there is a lot of construction material loading and unloading and work noise, and a great deal of cost is required to prevent such so-called construction pollution. Not only that, it requires a large number of workers, which is a cause of delay in construction, and there is a problem in that it is difficult to collect materials.

【0006】本発明は前記従来技術の有する問題点に鑑
みて提案されたもので、その目的とするところは、逆打
工法による地下構築物の施工に当り、型枠工法の合理化
を図り資材の計画的な運用と省力化により、工期の短縮
と近隣に対する建設公害を軽減する逆打工法における型
枠支保工の設置方法を提供する点にある。
The present invention has been proposed in view of the above-mentioned problems of the prior art. The purpose of the present invention is to rationalize the formwork construction method when constructing an underground structure by the upside down construction method, and plan the material. The goal is to provide a method for installing formwork support in the reverse striking method that shortens the construction period and reduces construction pollution to the neighborhood by effective operation and labor saving.

【0007】[0007]

【課題を解決するための手段】前記の目的を達成するた
め、本発明に係る逆打工法における型枠支保工の設置方
法によれば、地下構築物を上層から下層に構築する逆打
工法において、上階1層階に相当する地盤を掘削して型
枠支持床を設け、同支持床に懸吊式型枠ユニットを設置
するものである。
In order to achieve the above-mentioned object, according to the method of installing the form support in the reverse driving method according to the present invention, in the reverse driving method of constructing an underground structure from the upper layer to the lower layer, The ground corresponding to the first floor of the upper floor is excavated to provide a formwork support floor, and the suspension formwork unit is installed on the support floor.

【0008】請求項2の発明によれば、前記懸吊式型枠
ユニットは前記支持床に立設された支保工の中間に支保
工懸吊用横架材を架設し、同支保工頂部に大引材を架設
し、根太を配設した型枠より構成するものである。請求
項3の発明によれは、前記懸吊式型枠ユニットは、適宜
間隔に配置された電動チエーンブロックによって支保工
懸吊用横架材が懸吊され、所要階層の構築後は下層階に
懸吊して型枠支持床に設置するものである。
According to the second aspect of the present invention, in the suspension formwork unit, a horizontal member for supporting and suspending work is installed in the middle of the supporting work standing on the support floor, and the supporting and suspending top frame is provided at the top of the supporting and support work. It is composed of a formwork in which a hauling material is installed and joists are arranged. According to the invention of claim 3, in the suspension formwork unit, the horizontal members for supporting and suspending are suspended by the electric chain blocks arranged at appropriate intervals, and after the construction of the required floor, it is located on the lower floor. It is suspended and installed on the formwork support floor.

【0009】[0009]

【作用】本発明によれば地下構築物を上層から下層に構
築する逆打工法において、上階1層階に相当する地盤を
掘削して型枠支持床を地下部に設け、同床に懸吊式ユニ
ットを設置して上層階の型枠とし、コンクリートを打設
することによって、1層階が構築されるものである。
According to the present invention, in the reverse driving method for constructing an underground structure from the upper layer to the lower layer, the ground corresponding to the first floor of the upper floor is excavated to provide a formwork support floor in the underground portion and suspend it on the same floor. The first floor is constructed by installing a type unit and using it as a formwork for the upper floor and placing concrete.

【0010】請求項2の発明によれば、前記支持床に支
保工を立設し、同支保工の中間に支保工を懸吊する横架
材を配設し、前記支保工頂部に大引材を架設して根太を
配設したことによって、支保工と型枠とが一体となり、
広範囲な型枠ユニットが形成される。請求項3の発明に
よれば、懸吊式型枠ユニットが、適宜間隔に配置された
複数の電動チエーンブロックによって、支保工を懸吊す
る横架材を懸吊し、当該階層を構築した後は下層階に吊
下げて型枠支持床を設置することによって、型枠の組
立、解体作業が不要となり、型枠工の手間が大幅に減少
し、資材の搬送が合理化され、省力化が図られる。
According to the second aspect of the present invention, a supporting work is erected on the support floor, and a horizontal member for suspending the supporting work is arranged in the middle of the supporting work. By installing the material and arranging joists, the support work and the formwork are integrated,
A wide range of formwork units are formed. According to the invention of claim 3, after the suspension formwork unit suspends the horizontal member for suspending the support work by the plurality of electric chain blocks arranged at appropriate intervals, and constructs the hierarchy. By installing the formwork support floor by suspending it on the lower floors, the work of assembling and dismantling the formwork is not required, the time and effort of formwork is greatly reduced, the transportation of materials is rationalized, and labor saving is planned. To be

【0011】[0011]

【実施例】以下、本発明を図示の実施例について説明す
る。図1は本発明の逆打工法によって構築される地下構
築物Aの縦断面図を示し、同地下構築物Aは2層階より
なり、基礎Kと外壁W、鋼管柱C及び各階床のスラブ梁
1 ,S2 ,S3 とから構成されている。
The present invention will be described below with reference to the illustrated embodiments. FIG. 1 shows a vertical cross-sectional view of an underground structure A constructed by the reverse striking method of the present invention. The underground structure A has two floors, a foundation K, an outer wall W, a steel pipe column C and a slab beam S of each floor. It is composed of 1 , S 2 , and S 3 .

【0012】前記地下構築物Aの施工に際しては周囲地
盤に山留め壁1を築造し、更に路盤と地下構築物Aを支
持する中間杭2を打設し、1次掘削a後、路盤Rを覆工
する。2次掘削b後、上層1層階に相当する地面に型枠
支持床3を設ける。(図2参照)図中Pは掘削機であ
る。次いで前記型枠支持床3に上階1層階の型枠を支持
する支保工4を設置し、同支保工4の中間に支保工を懸
吊する横架材5を架設し、補助支保工4aの頂部に大引
材6を架設し、根太7を配設したスラブ型枠8から構成
された懸吊式型枠ユニットHを組み立てる。
When constructing the above-mentioned underground structure A, a mountain retaining wall 1 is built on the surrounding ground, an intermediate pile 2 for supporting the roadbed and the underground structure A is further placed, and after the primary excavation a, the roadbed R is lined up. . After the secondary excavation b, the formwork support floor 3 is provided on the ground corresponding to the upper first floor. (See FIG. 2) In the figure, P is an excavator. Next, a supporting structure 4 for supporting the formwork on the upper and first floors is installed on the form supporting floor 3, and a horizontal member 5 for suspending the supporting structure is installed in the middle of the supporting structure 4 for auxiliary supporting structure. Suspended formwork unit H composed of slab formwork 8 in which joist 6 is installed on top of 4a and joists 7 are assembled.

【0013】なお図示の実施例では枠組足場と補助支保
工4aを使用しているが、例えば単管パイプによる支保
工ステージや、仮設梁を使用した支保工ステージにして
もよく、要は支保工(ステージ)を横架材で懸吊できる
ようにするものである。前記懸吊式型枠ユニットHを組
み立て、スラブ型枠8に鉄筋を配筋し、床コンクリート
Nを打設したのち前記ユニットの懸吊の準備をする。
Although the frame scaffolding and the auxiliary supporting work 4a are used in the illustrated embodiment, for example, a supporting stage using a single pipe or a supporting stage using a temporary beam may be used. The (stage) can be suspended by a horizontal member. The suspension formwork unit H is assembled, the reinforcing bars are arranged in the slab formwork 8 and the floor concrete N is placed, and then the suspension of the unit is prepared.

【0014】即ち床コンクリートNに貫通孔9を設け、
同孔9を縦貫するテンションバー10によって前記横架
材5より吊持して、貫通孔9を貫通し、2分割された止
板11で挟着し、ナット12で仮止めする。テンション
バー10の上部には電動チエーンブロック13のフック
14と係合する係止環15が装架されている。電動チエ
ーンブロック13は覆工桁16間を連結する繋ぎ材17
に設けた繋止環18を介して懸架されている。(図3参
照)次にこの状態でスラブS1 の床コンクリートNを打
設する。(図4参照)次いで図5に示す如く前記懸吊式
型枠ユニットHを懸吊したまま3次掘削cを行ったの
ち、下階1層階に相当する地面に型枠支持床3′を設け
る。
That is, a through hole 9 is provided in the floor concrete N,
A tension bar 10 vertically extending through the hole 9 suspends the horizontal member 5 from the horizontal member 5, penetrates the through hole 9 and sandwiches a stop plate 11 which is divided into two parts, and temporarily fixes it with a nut 12. A locking ring 15 that engages with the hook 14 of the electric chain block 13 is mounted on the upper portion of the tension bar 10. The electric chain block 13 is a connecting member 17 for connecting between the lining girders 16.
It is suspended via a locking ring 18 provided on the. (See FIG. 3) Next, in this state, the floor concrete N of the slab S 1 is poured. (See FIG. 4) Next, as shown in FIG. 5, after performing the tertiary excavation c while suspending the suspension formwork unit H, the formwork support floor 3'is placed on the ground corresponding to the lower one floor. Set up.

【0015】次いで前記懸吊式型枠ユニットHを電動チ
エーンブロック13によりスライドダウンして型枠支持
床3′に設置し、前記型枠ユニットHに配筋し、中空の
鋼管柱Cを上部梁下に懸吊し、スラブS2 のコンクリー
トを打設する。(図6参照)かくして前記1層階分を前
記した工程を反覆して上階から下階へと順次構築し、
(図7参照)最後に基礎を構築して、不要になった中間
杭2を撤去する。
Next, the suspension formwork unit H is slid down by the electric chain block 13 to be installed on the formwork support floor 3 ', and is arranged in the formwork unit H, and the hollow steel pipe column C is connected to the upper beam. It was suspended underneath, to pouring the concrete of the slab S 2. (Refer to FIG. 6) Thus, the above-mentioned steps of the first-floor floor are repeated, and the steps are constructed from the upper floor to the lower floor,
(See Fig. 7) Finally, the foundation is constructed and the unnecessary intermediate pile 2 is removed.

【0016】[0016]

【発明の効果】本発明によれば前記したように逆打工法
によって地下構築物を施工する際、上層1層階に相当す
る地盤を掘削して型枠支持床を設け、同床に懸吊式型枠
ユニットを設置することによって同型枠ユニットが上階
の型枠となりコンクリートが打設されることによって一
層階が構築され、下層階に転用されるので、型枠の組
立、解体作業が省略され、建設資材の運搬作業が大幅に
軽減され省力化と工期の短縮が図られるとともに、作業
に伴う騒音や塵埃の飛散が減少し、作業環境が改善され
る。
As described above, according to the present invention, when constructing an underground structure by the reverse construction method as described above, the ground corresponding to the upper first floor is excavated to form a form supporting floor, and the floor is suspended on the same floor. By installing the formwork unit, the same formwork unit becomes the formwork on the upper floor and concrete is placed to build a single floor, which is diverted to the lower floor, so that the work of assembling and dismantling the formwork is omitted. In addition, the work of transporting construction materials is greatly reduced, which saves labor and shortens the construction period, and also reduces the scattering of noise and dust associated with the work, improving the working environment.

【0017】請求項2の発明によれば、前記懸吊式型枠
ユニットが型枠支持床に立設された支保工の中間に支保
工懸吊用横架材を架設し、同支保工頂部に大引材を架設
し、根太を配設した型枠より構成されたことによって、
支保工と型枠とが一体化して広範囲な型枠ユニットが構
成される。請求項3の発明によれば、前記懸吊式型枠ユ
ニットは適宜間隔に配置された電動チエーンブロックに
よって支保工懸吊用横架材が懸吊され、所要階層の構築
後は下層階に懸吊して型枠支持床上に設置するようにし
たので、型枠の組立、解体作業が不要となり、同型枠工
の手間が大幅に減少し、資材の搬送の合理化、作業の省
力化が図られる。
According to the second aspect of the present invention, a horizontal member for supporting and suspending work is erected in the middle of the supporting work in which the suspension formwork unit is erected on the formwork support floor, and the supporting work top portion is provided. By arranging a hauling material on the
A wide range of formwork units are constructed by integrating the support work and the formwork. According to the invention of claim 3, in the suspension formwork unit, the horizontal members for supporting and suspending work are suspended by the electric chain blocks arranged at appropriate intervals. Since it is hung and installed on the form supporting floor, the work of assembling and dismantling the form is unnecessary, the labor of the form work is greatly reduced, the ratio of material transportation is rationalized, and the work is saved. .

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の方法によって構築される地下構築物の
縦断面図である。
FIG. 1 is a vertical cross-sectional view of an underground structure constructed by the method of the present invention.

【図2】地下を構築物を構築する地盤の山留めと中間杭
の打設並びに掘削工程を示す縦断面図である。
FIG. 2 is a vertical cross-sectional view showing a process of excavating the ground and placing intermediate piles and excavating the ground to construct a structure underground.

【図3】懸吊式型枠ユニットの要部を示す縦断面図であ
る。
FIG. 3 is a vertical cross-sectional view showing a main part of a suspension formwork unit.

【図4】懸吊式型枠ユニットにより上層階から構築する
実施例を示す縦断面図である。
FIG. 4 is a vertical cross-sectional view showing an example in which a suspended formwork unit is used to build from the upper floor.

【図5】第3次掘削をして前記懸吊式型枠ユニットが懸
吊されている状態を示す縦断面図である。
FIG. 5 is a vertical cross-sectional view showing a state in which the suspension formwork unit is suspended by a third excavation.

【図6】第3次掘削後、懸吊式型枠ユニットを吊下して
設置した状態を示す縦断面図である。
FIG. 6 is a vertical cross-sectional view showing a state where the suspension formwork unit is suspended and installed after the third excavation.

【図7】前記工程を反覆して、前記型枠ユニットを下階
に吊下ろして設置した状態を示す縦断面図である。
FIG. 7 is a vertical cross-sectional view showing a state in which the form unit is suspended and installed on the lower floor, reversing the above steps.

【符号の説明】[Explanation of symbols]

A 地下構築物 C 鋼管柱 H 懸吊式型枠ユニット N 床コンクリート P 掘削機 R 路盤 S1 ,S2 ,S3 スラブ W 外壁 1 山留め壁 2 中間杭 3,3′ 型枠支持床 4 支保工 4a 補助支保工 5 横架材 6 大引材 7 根太 8 スラブ型枠 9 貫通孔 10 テンションバー 11 止板 12 ナット 13 電動チエーンブロック 14 フック 15 係止環 16 覆工桁 17 繋ぎ材 18 繋止環 a 1次掘削 b 2次掘削 c 3次掘削A Underground structure C Steel pipe column H Suspended formwork unit N Floor concrete P Excavator R Roadbed S 1 , S 2 , S 3 Slab W Outer wall 1 Mountain retaining wall 2 Intermediate pile 3, 3'Form support floor 4 Supporting work 4a Auxiliary support 5 Horizontal material 6 Large pulling material 7 Jouta 8 Slab formwork 9 Through hole 10 Tension bar 11 Stop plate 12 Nut 13 Electric chain block 14 Hook 15 Locking ring 16 Lining girder 17 Connecting material 18 Locking ring a Primary drilling b Secondary drilling c Third drilling

───────────────────────────────────────────────────── フロントページの続き (72)発明者 住吉 浩二 東京都渋谷区千駄ヶ谷四丁目6番15号 株 式会社フジタ内 ─────────────────────────────────────────────────── ─── Continuation of front page (72) Inventor Koji Sumiyoshi 4-6-15 Sendagaya, Shibuya-ku, Tokyo Fujita Co., Ltd.

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 地下構築物を上層から下層に構築する逆
打工法において、上階1層階に相当する地盤を掘削して
型枠支持床を設け、同支持床に懸吊式型枠ユニットを設
置することを特徴とする逆打工法における型枠支保工の
設置方法。
1. In a reverse driving method for constructing an underground structure from an upper layer to a lower layer, the ground corresponding to the upper first floor is excavated to provide a formwork support floor, and a suspension formwork unit is provided on the support floor. A method for installing formwork support in a reverse driving method characterized by installing.
【請求項2】 前記懸吊式型枠ユニットは前記支持床に
立設された支保工の中間に支保工懸吊用横架材を架設
し、同支保工頂部に大引材を架設し、根太を配設した型
枠より構成されている逆打工法における型枠支保工の設
置方法。
2. The suspension formwork unit comprises a horizontal suspension member for suspending and suspending the support work installed in the middle of the support work erected on the support floor, and a hauling member is erected on the top of the support work. An installation method of formwork support work in a reverse striking method composed of formwork with joists.
【請求項3】 前記懸吊式型枠ユニットは、適宜間隔に
配置された電動チエーンブロックによって支保工懸吊用
横架材が懸吊され、所要階層の構築後は下層階に懸吊し
て型枠支持床に設置する請求項1または2記載の逆打工
法における型枠支保工の設置方法。
3. In the suspension formwork unit, horizontal chain members for supporting and suspending work are suspended by electric chain blocks arranged at appropriate intervals, and suspended on lower floors after a required floor is constructed. The method for installing formwork support in the reverse casting method according to claim 1 or 2, wherein the method is installed on the formwork support floor.
JP05911995A 1995-03-17 1995-03-17 Installation method of formwork support in reverse placement method Expired - Fee Related JP3644606B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP05911995A JP3644606B2 (en) 1995-03-17 1995-03-17 Installation method of formwork support in reverse placement method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP05911995A JP3644606B2 (en) 1995-03-17 1995-03-17 Installation method of formwork support in reverse placement method

Publications (2)

Publication Number Publication Date
JPH08253947A true JPH08253947A (en) 1996-10-01
JP3644606B2 JP3644606B2 (en) 2005-05-11

Family

ID=13104113

Family Applications (1)

Application Number Title Priority Date Filing Date
JP05911995A Expired - Fee Related JP3644606B2 (en) 1995-03-17 1995-03-17 Installation method of formwork support in reverse placement method

Country Status (1)

Country Link
JP (1) JP3644606B2 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010100436A (en) * 2010-02-08 2010-05-06 Tokyu Construction Co Ltd Method of installing escalator
CN103174294A (en) * 2013-03-18 2013-06-26 中天建设集团有限公司 Method for wall one-sided form erecting construction at deformation joint position
CN109488017A (en) * 2019-01-03 2019-03-19 中建南方投资有限公司 A kind of concrete structure rail road hanging mobile form frame system and construction method against the wind
CN113931661A (en) * 2021-11-02 2022-01-14 中铁二十四局集团有限公司 Secondary lining template device suitable for large-span cavity dome and construction method
CN114164860A (en) * 2021-10-21 2022-03-11 王树生 Sinking frame foundation, ground prefabrication equipment thereof and sinking device
CN115095163A (en) * 2022-06-23 2022-09-23 浙江大地钢结构有限公司 Construction method of inverted steel structure hanging frame and steel column positioning tool

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010100436A (en) * 2010-02-08 2010-05-06 Tokyu Construction Co Ltd Method of installing escalator
CN103174294A (en) * 2013-03-18 2013-06-26 中天建设集团有限公司 Method for wall one-sided form erecting construction at deformation joint position
CN109488017A (en) * 2019-01-03 2019-03-19 中建南方投资有限公司 A kind of concrete structure rail road hanging mobile form frame system and construction method against the wind
CN114164860A (en) * 2021-10-21 2022-03-11 王树生 Sinking frame foundation, ground prefabrication equipment thereof and sinking device
CN113931661A (en) * 2021-11-02 2022-01-14 中铁二十四局集团有限公司 Secondary lining template device suitable for large-span cavity dome and construction method
CN113931661B (en) * 2021-11-02 2023-10-27 中铁二十四局集团有限公司 Secondary lining template device suitable for large-span chamber dome and construction method
CN115095163A (en) * 2022-06-23 2022-09-23 浙江大地钢结构有限公司 Construction method of inverted steel structure hanging frame and steel column positioning tool
CN115095163B (en) * 2022-06-23 2024-04-19 浙江大地钢结构有限公司 Inverted steel structure hanging frame construction method and steel column positioning tool

Also Published As

Publication number Publication date
JP3644606B2 (en) 2005-05-11

Similar Documents

Publication Publication Date Title
KR100951097B1 (en) Slab and subgrade external wall structure and method for constructing underground slab and subgrade external wall, bracket
JP3644605B2 (en) Reverse driving method of underground structure under road surface.
KR100634726B1 (en) Form system for construction of underground slab and method for constructing underground slab and breast wall using the same
KR100531385B1 (en) Construction method of underground structure that enables continuous retaining wall using steel wale and diaphragm effect of concrete slab
KR200417438Y1 (en) Bracket structure for girder and slab construction
KR20060112504A (en) Downward construction system and method for 1-way girder and slab of underground structure
KR100313720B1 (en) Composite Underground Structure Construction Method
KR102286225B1 (en) Method for constructing underground structure busing PC integrating method without support
KR20100100193A (en) Form system for constructing rc-girder in rc top down method and the rc top down method using the same
RU2220258C1 (en) Process of erection of multilevel underground structure ( variants )
JP4037187B2 (en) Underground structure construction method and underground structure
KR20060096706A (en) Deck suspension top-down method of sub-structure
JPH08253947A (en) Installation method for form-support in reverse placing method of concrete
JP4083334B2 (en) Underground structure having arch roof and method for constructing the same
KR20020089690A (en) A pier structure of assembly elevated road for a vehicle under 4.5 ton
JP3390081B2 (en) How to build an underground parking
KR200390421Y1 (en) Top-down substructure by deck suspension
JPS6137692Y2 (en)
KR200219236Y1 (en) A mold assembly for reinforced concrete girders execution
JP2794330B2 (en) Method of erection of girder beam for underground structure
JP3236092B2 (en) Steel frame reinforced concrete reverse driving method
JP4045623B2 (en) Construction method of reinforced concrete underground floor and underground structure constructed by this method
JPH0988348A (en) Method for constructing foundation beam
JPH08291526A (en) Construction method for underground structure
JPH07103583B2 (en) Construction method for large span underground structure

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20040929

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20041004

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20041130

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20050128

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20050128

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080210

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110210

Year of fee payment: 6

LAPS Cancellation because of no payment of annual fees