JPH07103583B2 - Construction method for large span underground structure - Google Patents

Construction method for large span underground structure

Info

Publication number
JPH07103583B2
JPH07103583B2 JP3083587A JP8358791A JPH07103583B2 JP H07103583 B2 JPH07103583 B2 JP H07103583B2 JP 3083587 A JP3083587 A JP 3083587A JP 8358791 A JP8358791 A JP 8358791A JP H07103583 B2 JPH07103583 B2 JP H07103583B2
Authority
JP
Japan
Prior art keywords
slab
underground
opening
root cutting
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP3083587A
Other languages
Japanese (ja)
Other versions
JPH04293824A (en
Inventor
川 浩 小
瀬 善 弥 加
田 昭 夫 富
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Original Assignee
Kajima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp filed Critical Kajima Corp
Priority to JP3083587A priority Critical patent/JPH07103583B2/en
Publication of JPH04293824A publication Critical patent/JPH04293824A/en
Publication of JPH07103583B2 publication Critical patent/JPH07103583B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、大スパン地下構造物の
構築工法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a construction method for a large span underground structure.

【0002】[0002]

【従来の技術】地下構造物を施工するには、従来、仮設
としての鉄骨柱を建込んだ後で、同じく仮設としての山
留め用の切梁や腹起材を架設し、掘削する。そして、根
切りの進行とともにこの切梁を2段、3段と順次増やし
ていくことで行っている。該地下構造物が大スパンで地
中深い何層にもおよぶ大型のものになると、当然この切
梁の段数も増加し、仮設材の量も多くなる。
2. Description of the Related Art Conventionally, in order to construct an underground structure, after a temporary steel frame column is built, a temporary timber girder and a ventilating material are also erected and excavated. Then, with the progress of root cutting, the number of cutting beams is gradually increased to two steps and three steps. When the underground structure has a large span and a large number of layers deep in the ground, naturally the number of steps of this girder also increases and the amount of temporary material also increases.

【0003】ところで、この仮設としての鉄骨柱、切梁
や腹起材の代わりに本設の柱・梁を前記山留め用の仮設
として兼用できれば著しく経済性が向上する。このよう
な本設切梁工法の一つとして、先ず本設の構真柱(鋼管
柱)を杭工事時に建込み、続いて従来の切梁に当たる鉄
骨ボックス梁を取付ける。このあと、その内部にコンク
リートを打設して山留め壁の支持架構を構築し、次の掘
削工事に移行する。さらに直下階の鉄骨ボックス梁を取
り付け、内部コンクリート打設、掘削を繰り返して順次
地下の躯体工事を進めていく。
By the way, it is possible to remarkably improve the economical efficiency if the main pillars / beams can also be used as the temporary fittings for the mountain retaining instead of the temporary steel pillars, the beams and the uprising members. As one of such permanent beam construction methods, first, a true structural column (steel tube column) is built during pile construction, and then a steel box beam, which corresponds to a conventional beam, is attached. After that, concrete is poured into the inside to construct a supporting structure for the retaining wall, and the next excavation work is started. Furthermore, a steel box beam on the floor directly below will be installed, and internal concrete pouring and excavation will be repeated to proceed with the underground structure work.

【0004】その他に、構真柱に十字型にH形鋼を組み
立てたクロスH形の柱を使用し、H形の鉄骨梁を架設
し、そのH形の梁の周囲と床スラブのコンクリートを打
設して山留め壁の支持架構を構築する方法もある。
In addition, a cross H-shaped column made by assembling a H-shaped steel in a cross shape is used as a structure column, and an H-shaped steel frame beam is erected, and concrete around the H-shaped beam and the floor slab is installed. There is also a method of constructing a supporting structure for the mountain retaining wall by casting.

【0005】[0005]

【発明が解決しようとする課題】本設切梁工法でも、逆
打ちに構真柱を含めた山留め壁の支持架構が必要であ
り、構真柱とそれに取付く梁の長さが構真柱の建入れ寸
法精度に影響されるなど、面倒な点が多い。本発明の目
的は前記従来例の不都合を解消し、山留め切梁、支保
工、構真柱等が不要で、施工が簡単かつ安全にでき、工
期の短縮とコストの低減が実現できる大スパン地下構造
物の構築工法を提供するとにある。
Even in the permanent beam construction method, it is necessary to provide a support frame for the mountain retaining wall including the structure columns in the reverse construction, and the length of the structure columns and the beams to be attached to them are the structure columns. There are many troubles such as being affected by the installation dimension accuracy. The object of the present invention is to eliminate the disadvantages of the above-mentioned conventional example, to eliminate the need for mountain beams, support works, structural columns, etc., to make construction simple and safe, and to shorten the construction period and reduce costs. It is said to provide a construction method for structures.

【0006】[0006]

【課題を解決するための手段】本発明は前記目的を達成
するため、地下連続壁に囲まれた内部に一次根切りを行
い、中央にスリット状の梁搬入用開口部を短スパン方向
に向けて形成し、また、端に土砂搬出用開口部を設けた
作業床を形成し、この作業床の下方を二次根切りし、二
次根切りの終わった部分から、前記梁搬入用開口部より
梁を搬入し、搬入した梁を横移動して前記地下連続壁の
短スパン方向に敷き並べてその上端に形成するコンクリ
ートスラブと一体化を図り、中央にスリット状の梁搬入
用開口部を短スパン方向に向けて形成し、また、端に土
砂搬出用開口部を設けた地下スラブを形成し、以下、同
様の根切り、開口部よりの梁の搬入、搬入した梁での地
下スラブの形成の各工程を繰り返し、数次根切りの後、
マットスラブを施工することを要旨とするものである。
In order to achieve the above object, the present invention performs a primary root cutting in the interior surrounded by a continuous underground wall, and directs a slit-like beam loading opening in the center in the short span direction. A work floor with an opening for loading and unloading earth and sand at the end, and a secondary root cutting is performed below the working floor, and the beam loading opening is formed from the part where the secondary root cutting is completed. The beam is carried in from above, the beam is moved laterally, laid side by side in the direction of the short span of the underground continuous wall and integrated with the concrete slab that forms at the upper end, and a slit-shaped beam loading opening is made short in the center. Formed in the span direction, and also formed an underground slab with an opening for loading and unloading sediment at the end, followed by the same root cutting, carrying in a beam from the opening, and forming an underground slab with the beam carried in. Repeat each step of, after several root cutting,
The main point is to construct a mat slab.

【0007】[0007]

【作用】本発明によれば、梁を地下連続壁の短スパン方
向に敷き並べ、かつスラブコンクリートと一体化を図
り、そのスラブを山留め切梁とした無柱空間を構築で
き、逆打ち工法に必要な山留め切梁、支保工、構真柱等
が不要となる。また、天候に左右されない地下作業空間
が確保できる。このように、型枠工事がなくなることも
作用して、工期の短縮およびコストの低減が図れる。
According to the present invention, the beams are laid out in the short span direction of the underground continuous wall and integrated with the slab concrete, and it is possible to construct a pillarless space using the slab as a mountain-cutting girder. Necessary mountain girders, supports, construction columns, etc. are unnecessary. Also, an underground work space that is not affected by the weather can be secured. In this way, the work of formwork is eliminated, and the work period and cost can be reduced.

【0008】[0008]

【実施例】以下、図面について本発明の実施例を詳細に
説明する。図1は本発明の大スパン地下構造物の構築工
法の第1工程を示す斜視図、図2は同上平面図である。
図中1は地下連続壁で、この地下連続壁1で囲まれた空
間を一次根切りとして梁せい高さ程度に掘下げ、ここに
作業床2を形成する。そしてこの作業床2の中央にスリ
ット状の梁搬入用開口部3aを短スパン方向に向けて設
け、また、両端に土砂搬出用開口部4aを設ける。図5
は開口部3a上に設置した梁搬入用のクレーン、6は開
口部4a上に設置した排土装置である。さらに、作業床
2上をPC部材ストックヤード18として、ここでPC梁
7の組立、プレストレスの導入等を行う。
Embodiments of the present invention will now be described in detail with reference to the drawings. FIG. 1 is a perspective view showing a first step of the construction method for a large-span underground structure of the present invention, and FIG. 2 is a plan view of the same.
In the figure, reference numeral 1 is an underground continuous wall, and the space surrounded by the underground continuous wall 1 is dug down to the height of a beam by using the primary root cutting as a primary root cutting, and a working floor 2 is formed there. A slit-shaped beam loading opening 3a is provided at the center of the work floor 2 in the short span direction, and earth and sand loading openings 4a are provided at both ends. Figure 5
Is a beam loading crane installed on the opening 3a, and 6 is an earth removing device installed on the opening 4a. Further, the work floor 2 is used as a PC member stock yard 18, where the PC beam 7 is assembled and prestress is introduced.

【0009】作業床2は、配筋およびコンクリートを打
設して現場施工の鉄筋コンクリート製のものとしてもよ
いが、図9、図10に示すように地下連続壁1の短スパン
方向にPC鋼線8を配したPC梁7を敷き並べ、このP
C梁7の上端にコンクリートスラブ9を形成し、このP
C梁7とコンクリートスラブ9を一体化して構成する。
図9は、PC梁7を型枠としてその隙間にコンクリート
を打設し、このコンクリートの上部でコンクリートスラ
ブ9を構成したもので、図中10はスラブ鉄筋である。図
10はPC梁7の上端にすて型枠11を配し、この型枠11を
用いてコンクリートスラブ9を構築し、合成梁としたも
のである。なお、PC梁7に代えて鉄骨梁を用いてもよ
い。
The work floor 2 may be made of reinforced concrete which is constructed on site by placing reinforcing bars and concrete, but as shown in FIGS. 9 and 10, the PC steel wire extends in the short span direction of the underground continuous wall 1. Laying out the PC beams 7 with 8 arranged,
A concrete slab 9 is formed on the upper end of the C beam 7,
The C beam 7 and the concrete slab 9 are integrally configured.
FIG. 9 shows a concrete slab 9 constructed by placing concrete in the gap using the PC beam 7 as a formwork, and 10 in the figure is a slab rebar. Figure
10 is a composite beam in which a formwork 11 is placed on the upper end of the PC beam 7 and a concrete slab 9 is constructed using this formwork 11. A steel frame beam may be used instead of the PC beam 7.

【0010】第2工程として図3に示すように、前記作
業床2の下方を二次根切りする。この二次根切りでは、
土砂搬出用開口部4aの他に梁搬入用開口部3aも土砂
搬出用に使用できる。
As a second step, as shown in FIG. 3, a secondary root is cut below the work floor 2. In this secondary root cutting,
In addition to the earth and sand carrying-out opening 4a, the beam carrying-in opening 3a can also be used for carrying out earth and sand.

【0011】第3工程として、図4に示すように二次根
切りの終わった部分から、前記作業床2のスリット状の
開口部3aよりPC梁7または鉄骨梁を搬入し、搬入し
た梁を横移動して地下連続壁1の短スパン方向に敷き並
べてその上端にコンクリートスラブ9を形成し、地下ス
ラブ12を構築する。この場合、PC梁7または鉄骨梁の
端部は図11に示すように地下連続壁1と接合させるが、
それには根切底13のPC梁受捨コンクリート14でPC梁
7を支承し、さきに図10に示したようにPC梁7の上端
にすて型枠11を配し、この型枠11を用いてコンクリート
スラブ9を構築して合成梁とする際に、せん断鉄筋15で
連続壁1と結合させる。なお、図9に示すようにPC梁
7を型枠としてその隙間にコンクリートを打設し、この
コンクリートの上部でコンクリートスラブ9を構成する
ようにしてもよい。
As a third step, as shown in FIG. 4, the PC beam 7 or the steel frame beam is carried in from the slit-shaped opening 3a of the work floor 2 from the portion where the secondary root cutting is completed, and the carried-in beam is removed. An underground slab 12 is constructed by laterally moving and laying them out in the short span direction of the underground continuous wall 1 and forming a concrete slab 9 on the upper end thereof. In this case, the end of the PC beam 7 or steel beam is joined to the underground continuous wall 1 as shown in FIG.
For that purpose, the PC beam 7 is supported by the PC beam receiving concrete 14 of the root cutting bottom 13, and the mold 11 is arranged on the upper end of the PC beam 7 as shown in FIG. When the concrete slab 9 is constructed using the composite slab 9 to form a composite beam, it is connected to the continuous wall 1 by the shear reinforcing bar 15. Alternatively, as shown in FIG. 9, the PC beam 7 may be used as a formwork and concrete may be placed in the gap so that the concrete slab 9 is formed on the concrete.

【0012】図5に示すように、地下スラブ12には作業
床2の梁搬入用開口部3aや土砂搬出用開口部4aに対
応させて、中央にスリット状の梁搬入用開口部3bを、
また、端に土砂搬出用開口部4bを設ける。そして、第
4工程として、この地下スラブ12の下方を三次根切り
し、根切りの終わった部分から、前記作業床2のスリッ
ト状の開口部3aよりPC梁7または鉄骨梁を搬入し、
搬入した梁を横移動して敷き並べてその上端にコンクリ
ートスラブ9を形成し、前記一地下階分に地下スラブ12
の下方に二地下階分の地下スラブ12を構築する。
As shown in FIG. 5, the underground slab 12 has a slit-shaped beam carrying-in opening 3b in the center thereof corresponding to the beam carrying-in opening 3a and the earth and sand carrying-out opening 4a of the work floor 2.
In addition, an opening 4b for carrying out earth and sand is provided at the end. Then, as a fourth step, a third root is cut below the underground slab 12, and the PC beam 7 or the steel beam is carried in from the slit-shaped opening 3a of the working floor 2 from the portion where the root cutting is completed,
The beams that have been carried in are laterally moved and laid side by side to form a concrete slab 9 on the upper end of the beams, and an underground slab 12 is provided on the basement floor.
Build an underground slab 12 for two basements below.

【0013】以下、該地下スラブ12の下方の根切り、P
C梁7または鉄骨梁を搬入、搬入した梁での地下スラブ
12の形成の各工程を繰り返す。図6に示すように、数次
例えば五次根切り後、床付けを行うが、先に中央部のマ
ットスラブ16aを施工し、アイランド切梁17で山留め壁
としての地下連続壁1を支持する。次いで図7、図8に
示すように中央部のマットスラブ16aの周囲のマットス
ラブ16bを施工して工事を完了させる。
Below, the root cutting below the underground slab 12, P
Underground slab with C-beam 7 or steel beam loaded and loaded
Repeat each step of forming twelve. As shown in FIG. 6, floor cutting is performed after root cutting after several orders, for example, the mat slab 16a in the central portion is first constructed, and the island continuous beam 17 supports the underground continuous wall 1 as a retaining wall. . Then, as shown in FIGS. 7 and 8, a mat slab 16b around the central mat slab 16a is installed to complete the construction.

【0014】このように本発明は、PC梁7または鉄骨
梁を敷き並べてその上端にコンクリートスラブ9を形成
してなる地下スラブ12で、これを山留め切梁代わりとし
た無柱空間を構築し、さらにこの地下スラブ12の下を掘
削して地下階を構築する逆打ち工法である。図2に矢印
で土圧力の流れを示すが、連続壁1の長スパン側に受け
る土圧力αは対面する土圧力αとバランスする。短スパ
ン側に受ける土圧力γに対しては、せん断力βにより側
面の土圧壁に伝達される。
As described above, the present invention is an underground slab 12 in which PC beams 7 or steel beams are laid side by side and a concrete slab 9 is formed at the upper end of the underground slab 12, and a pillar-free space is constructed by using the underground slab as a mountain-fixing beam. Furthermore, it is a reverse construction method in which the basement floor is constructed by excavating under the underground slab 12. The flow of soil pressure is shown by arrows in FIG. 2, and the soil pressure α received on the long span side of the continuous wall 1 is balanced with the facing soil pressure α. The earth pressure γ received on the short span side is transmitted to the side earth pressure wall by the shear force β.

【0015】[0015]

【発明の効果】以上述べた本発明の大スパン地下構造物
の構築工法は、天候に左右されない地下作業空間が確保
でき、また、山留め切梁、支保工、構真柱等が不要で、
これらが障害物となることもないので、施工性、安全性
が向上し、工期の短縮、コストの低減が実現できる。さ
らに型枠工事が一切なくなるので、職人不足に対応で
き、一層、工期の短縮およびコストの低減につながるも
のである。
The construction method of a large span underground structure of the present invention described above can secure an underground work space that is not affected by weather, and does not require mountain beams, support beams, or true columns.
Since these do not become obstacles, the workability and safety are improved, and the construction period and cost can be reduced. Furthermore, since no formwork is required, it will be possible to deal with the shortage of craftsmen, which will lead to a shorter construction period and lower costs.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の大スパン地下構造物の構築工法の第1
工程を示す斜視図である。
FIG. 1 is the first construction method of a large span underground structure of the present invention.
It is a perspective view showing a process.

【図2】本発明の大スパン地下構造物の構築工法の第1
工程を示す平面図である。
FIG. 2 is the first construction method of the large span underground structure of the present invention.
It is a top view which shows a process.

【図3】第2工程を示す縦断正面図である。FIG. 3 is a vertical sectional front view showing a second step.

【図4】第3工程を示す縦断正面図である。FIG. 4 is a vertical sectional front view showing a third step.

【図5】第4工程を示す縦断正面図である。FIG. 5 is a vertical cross-sectional front view showing a fourth step.

【図6】最終工程前の工程を示す縦断正面図である。FIG. 6 is a vertical sectional front view showing a step before the final step.

【図7】最終工程を示す縦断正面図である。FIG. 7 is a vertical sectional front view showing a final step.

【図8】図7のA−A線断面図である。8 is a cross-sectional view taken along the line AA of FIG.

【図9】作業床および地下スラブの一例を示す断面図で
ある。
FIG. 9 is a cross-sectional view showing an example of a work floor and an underground slab.

【図10】作業床および地下スラブの他例を示す断面図
である。
FIG. 10 is a cross-sectional view showing another example of the work floor and the underground slab.

【図11】地下連続壁と地下スラブの接合を示す縦断正
面図である。
FIG. 11 is a vertical cross-sectional front view showing joining of an underground continuous wall and an underground slab.

【符号の説明】[Explanation of symbols]

1…地下連続壁 2…作業床 3a,3b…梁搬入用開口部 4a,4b…土砂
搬出用開口部 5…クレーン 6…排土装置 7…PC梁 8…PC鋼線 9…コンクリートスラブ 10…スラブ鉄筋 11…すて型枠 12…地下スラブ 13…根切底 14…PC梁受捨コ
ンクリート 15…せん断鉄筋 16a,16b…マッ
トスラブ 17…切梁 18…PC部材スト
ックヤード 19…壁または柱
1 ... Basement continuous wall 2 ... Work floor 3a, 3b ... Beam loading opening 4a, 4b ... Sediment loading opening 5 ... Crane 6 ... Excavator 7 ... PC beam 8 ... PC steel wire 9 ... Concrete slab 10 ... Slab Reinforcing bar 11… Sterling formwork 12… Underground slab 13… Root cutting bottom 14… PC beam receiving concrete 15… Shearing rebar 16a, 16b… Mat slab 17… Cut beam 18… PC member stockyard 19… Wall or pillar

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 地下連続壁に囲まれた内部に一次根切り
を行い、中央にスリット状の梁搬入用開口部を短スパン
方向に向けて形成し、また、端に土砂搬出用開口部を設
けた作業床を形成し、この作業床の下方を二次根切り
し、二次根切りの終わった部分から、前記梁搬入用開口
部より梁を搬入し、搬入した梁を横移動して前記地下連
続壁の短スパン方向に敷き並べてその上端に形成するコ
ンクリートスラブと一体化を図り、中央にスリット状の
梁搬入用開口部を短スパン方向に向けて形成し、また、
端に土砂搬出用開口部を設けた地下スラブを形成し、以
下、同様の根切り、開口部よりの梁の搬入、搬入した梁
での地下スラブの形成の各工程を繰り返し、数次根切り
の後、マットスラブを施工することを特徴とする大スパ
ン地下構造物の構築工法。
1. A primary root cutting is performed in an interior surrounded by an underground continuous wall, and a beam-carrying opening having a slit shape is formed in the center in the short span direction, and a sand-carrying-out opening is provided at an end. The work floor provided is formed, the lower part of this work floor is subjected to secondary root cutting, the beam is loaded from the beam loading opening from the part where the secondary root cutting is completed, and the loaded beam is laterally moved. Aiming at integration with the concrete slab that is laid out in the short span direction of the underground continuous wall and formed at the upper end thereof, a slit-shaped beam loading opening is formed in the center in the short span direction, and
Forming an underground slab with an opening for loading and unloading sediment, repeat the same steps of root cutting, carrying in a beam from the opening, and forming an underground slab with the carried-in beam. After that, a construction method for a large-span underground structure is characterized by constructing a mat slab.
JP3083587A 1991-03-20 1991-03-20 Construction method for large span underground structure Expired - Lifetime JPH07103583B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP3083587A JPH07103583B2 (en) 1991-03-20 1991-03-20 Construction method for large span underground structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP3083587A JPH07103583B2 (en) 1991-03-20 1991-03-20 Construction method for large span underground structure

Publications (2)

Publication Number Publication Date
JPH04293824A JPH04293824A (en) 1992-10-19
JPH07103583B2 true JPH07103583B2 (en) 1995-11-08

Family

ID=13806628

Family Applications (1)

Application Number Title Priority Date Filing Date
JP3083587A Expired - Lifetime JPH07103583B2 (en) 1991-03-20 1991-03-20 Construction method for large span underground structure

Country Status (1)

Country Link
JP (1) JPH07103583B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100348835C (en) * 2005-06-07 2007-11-14 上海市城市建设设计研究院 Construction method of subsurface excavation and layer added by using top layer of existed basement as native cover board

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06193084A (en) * 1992-12-21 1994-07-12 Giken Seisakusho Co Ltd Construction method for undeground structure
CN102758449A (en) * 2011-04-26 2012-10-31 柳忠林 Large-span prestressed trough composite slab used as roof of air-defense basement
CN105507345A (en) * 2015-12-04 2016-04-20 嘉库智能停车系统(上海)有限公司 Reversed construction method for well type fully-automatic three-dimensional garage

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0730564B2 (en) * 1987-06-11 1995-04-05 大成建設株式会社 Construction method of underground structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100348835C (en) * 2005-06-07 2007-11-14 上海市城市建设设计研究院 Construction method of subsurface excavation and layer added by using top layer of existed basement as native cover board

Also Published As

Publication number Publication date
JPH04293824A (en) 1992-10-19

Similar Documents

Publication Publication Date Title
KR100951097B1 (en) Slab and subgrade external wall structure and method for constructing underground slab and subgrade external wall, bracket
US5383319A (en) Method of erecting a foundation structure for a building substructure
JP7386095B2 (en) Underground structure construction method
JP6855296B2 (en) Building foundation structure and its construction method
JPH07103583B2 (en) Construction method for large span underground structure
KR100640244B1 (en) Method for constructing underground slabs and walls using erection piles without preliminary wall-attached supports
JPH0684690B2 (en) Building basement extension method
JPS5829922A (en) Constructing method for underground outer wall
JP2979117B2 (en) Building foundation method
EP0151626A1 (en) Procedure for making foundations for a structure, and intermediate piece for use in the procedure.
JP3133598B2 (en) Construction method of small and medium-sized building with basement floor
JPS63280153A (en) Underground inverted lining method
JP2757209B2 (en) Cut-and-joint underground construction method using synthetic steel beams
JP2763488B2 (en) Prefabricated pillar and inverted ramen prefabricated construction method
JPH08291526A (en) Construction method for underground structure
JP2572680B2 (en) Underground structure by reverse strike method
JPH0657769A (en) Underground concrete structure and working method thereof
JPH0781274B2 (en) How to build a beam on an underground wall
JPS6217233A (en) Foundation base column
JPS63277342A (en) Reverse execution of underground story
JPH04360908A (en) Construction of underground continuous wall and formwork therefor
JPH0759813B2 (en) Underground construction method
JPH0748848A (en) Construction method for underground skeleton by inverted construction method
JPH06193084A (en) Construction method for undeground structure
JPS6172126A (en) Method of building protection wall body