JPS63277342A - Reverse execution of underground story - Google Patents

Reverse execution of underground story

Info

Publication number
JPS63277342A
JPS63277342A JP62113218A JP11321887A JPS63277342A JP S63277342 A JPS63277342 A JP S63277342A JP 62113218 A JP62113218 A JP 62113218A JP 11321887 A JP11321887 A JP 11321887A JP S63277342 A JPS63277342 A JP S63277342A
Authority
JP
Japan
Prior art keywords
floor
excavation
serves
work
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP62113218A
Other languages
Japanese (ja)
Other versions
JPH0657958B2 (en
Inventor
敏行 佐藤
哲哉 森田
人見 亨
一郎 向井
田代 成海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Takenaka Komuten Co Ltd
Original Assignee
Takenaka Komuten Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Takenaka Komuten Co Ltd filed Critical Takenaka Komuten Co Ltd
Priority to JP62113218A priority Critical patent/JPH0657958B2/en
Publication of JPS63277342A publication Critical patent/JPS63277342A/en
Publication of JPH0657958B2 publication Critical patent/JPH0657958B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

(57)【要約】本公報は電子出願前の出願データであるた
め要約のデータは記録されません。
(57) [Summary] This bulletin contains application data before electronic filing, so abstract data is not recorded.

Description

【発明の詳細な説明】 〔産業上の利用分野〕 本発明は、地下階の逆打ち施工方法に関するものであり
、通常の地下階の階高よりも大きな階高を有する地下階
を構築するのに利用される。
[Detailed Description of the Invention] [Field of Industrial Application] The present invention relates to a reverse construction method for a basement floor, and is a method for constructing a basement floor with a floor height larger than that of a normal basement floor. used for.

〔従来の技術〕[Conventional technology]

柱の位置にビア基礎を設け、その上に構芯柱(H鋼など
)を建て込み、上部の躯体荷重を構芯柱に支持させなが
ら逆打ち工法によって地下階を構築する場合、構築され
た上位階の床構造体が山止め壁の支保工の役目を果たす
ので、切梁等の支保工を設けないのが普通である。
When constructing a basement floor using the reverse construction method, by setting a via foundation at the position of the column and erecting a structural column (H steel, etc.) on top of it, and supporting the upper frame load on the structural column, Since the floor structure on the upper floor serves as a support for the retaining wall, it is common to not provide support such as struts.

しかしながら、上記の逆打ち工法においても、地下階の
階高が通常の階高(3,5m〜4.5m)よりも太き(
、次の階の床構造体を構築するまでの掘削深度が深い場
合、山止め壁の強度(曲げ剛性など)を増大させてこれ
に対処するのでは、山止め壁の工事費が膨大なものとな
り、不経済であるから、次の地下階までの中間付近に切
梁を設置して山止め壁を支保することがある。
However, even in the above-mentioned reverse construction method, the height of the basement floor is thicker (3.5m to 4.5m) than the normal floor height (3.5m to 4.5m).
If the excavation depth is deep until the construction of the next floor structure, increasing the strength (flexural rigidity, etc.) of the retaining wall would result in an enormous construction cost. Since this is uneconomical, a strut is sometimes installed near the middle of the floor to the next basement floor to support the retaining wall.

従来、この切梁としては、H型鋼等の鋼製切梁が使用さ
れていた。この鋼製切梁は、構芯柱を避けた位置に格子
状に設けられ、長手方向の中間部適数箇所(格子状の交
差部など)を仮設の支持杭で支えて座屈を防止するよう
に構成される。
Conventionally, a steel strut such as an H-type steel has been used as the strut. These steel struts are installed in a lattice pattern at positions that avoid the alignment pillars, and are supported by temporary support piles at a suitable number of locations in the middle of the longitudinal direction (such as the intersections of the lattice pattern) to prevent buckling. It is configured as follows.

〔発明が解決しようとする問題点〕[Problem that the invention seeks to solve]

上記の従来例においては、次のような問題点があった、
即ち、逆打ち工法であるが故に切梁用の長尺鉄骨の搬入
、搬出が非常に困難であり、また階高が大きいが故に、
床構造体用型枠、鉄筋やその他の資材の搬入、転用等も
困難であり、安全確保の必要上、作業能率が低下し、工
事費が増大するなどの問題があった。
The above conventional example had the following problems:
In other words, because it is a reverse construction method, it is extremely difficult to carry in and out the long steel beams for the struts, and because the floor height is large,
It was difficult to bring in and repurpose formwork for the floor structure, reinforcing bars, and other materials, and due to the need to ensure safety, there were problems such as a decline in work efficiency and an increase in construction costs.

これらの問題点の多くは、切梁をコンクリートの現場打
ちによるRC造とすることによって解決することが可能
である。即ち、切梁をRC造とした場合は、地下階の床
構造体の構築後、切梁を破砕し、コンクリートのガラと
して取り扱えるので場外搬出が容易である。RC造切梁
の梁幅を任意に設定できるので、RC造切梁を幅広にし
て、階高中間部での作業床に兼用することが可能になる
等の利点が得られる。
Many of these problems can be solved by making the struts an RC structure made of cast-in-place concrete. That is, when the struts are made of RC construction, the struts can be crushed after the construction of the basement floor structure and can be handled as concrete blocks, making it easy to carry them out of the site. Since the beam width of the RC strut can be set arbitrarily, there are advantages such as making the RC strut wider so that it can also be used as a work floor in the middle of the floor height.

しかしながら、RC造切梁を作業床に兼用すべく構成し
た場合、次のような問題が生じる。
However, when the RC struts are configured to be used also as a work floor, the following problems occur.

即ち、切梁間には床構造体の梁を避けた位置に掘削用の
開口部を形成することが必要であるが、RC造の切梁兼
用作業床とした場合、鋼製切梁に比して幅広なものとな
るため、これを構芯柱を避けた位置に格子状に架設する
と切梁兼用作業床間に形成するの開口部の面積を大きく
とることができず、ブルドーザ−の吊り込みが困難にな
る等、切梁兼用作業床の下方の掘削作業に支障を来すこ
とになる。
In other words, it is necessary to form an opening for excavation between the struts at a position that avoids the beams of the floor structure, but when using an RC construction work floor that also serves as a strut, the openings for excavation are required to be formed between the struts. Since the structure is wide, if it is erected in a lattice pattern in a position that avoids the center pillars, it will not be possible to create a large opening between the struts and the work floor, making it difficult to suspend the bulldozer. Excavation work below the work floor that also serves as a strut will be hindered, such as making it difficult to do so.

また切梁兼用作業床の長手方向中間部を、泪製切梁の座
屈防止と同じように仮設の支持杭でのみ支えていたので
は、構芯柱と支持杭とが林立する結果、掘削作業が著し
く煩雑なものとなり、作業能率の低下は免れ得ない。
In addition, if the longitudinal middle part of the work floor that is also used as a sill beam was supported only with temporary support piles in the same way as to prevent buckling of a timber sill beam, the alignment columns and support piles would stand together, resulting in excavation. The work becomes extremely complicated and a decline in work efficiency is inevitable.

切梁兼用作業床を、躯体の床構造体と同じように、曲げ
剛性の高いものとすることによって、支持杭をなくすこ
とも不可能ではないが、この場合には、切梁兼用作業床
が使用後の破砕を前提とした仮設材であるにもかかわら
ず、本設の床構造体と同様な、或いはそれ以上の厚さを
もつものにする必要があり、コンクリートや鉄筋の使用
量が多(、解体撤去時のはつり作業が面倒なものとなり
、はつりガラの搬出量も膨大なものとなる。
It is not impossible to eliminate the support piles by making the working floor that also serves as a stub beam as high in bending rigidity as the floor structure of the frame, but in this case, the working floor that also serves as a sill Despite being a temporary material that is intended to be crushed after use, it needs to be as thick or thicker than the permanent floor structure, and requires a large amount of concrete and reinforcing steel. (The chiseling work during disassembly and removal becomes troublesome, and the amount of chiseled debris to be carried out becomes enormous.)

本発明の目的は、これらの問題点を解消することにある
An object of the present invention is to solve these problems.

〔問題点を解決するための手段〕[Means for solving problems]

上記の目的を達成するために、本発明が講じた技術的手
段は、次の通りである。即ち、本発明による地下階の逆
打ち施工方法は、山止め壁及び構芯柱を構築し、出止め
壁の内側の地盤を所定深度まで掘削して上位階の床構造
体を構築した後、前記地盤を所定深度まで掘り進め、掘
削底には前記構芯柱を含む位置に、土間コンクリートを
略格子状に打設して、RC造の切梁兼用作業床を前記構
芯柱で支持された状態に築造し、当該切梁兼用作業床の
下方の地盤を所定深度まで掘削して上位階の床構造体を
構築することを特徴としている。
The technical means taken by the present invention to achieve the above object are as follows. That is, in the basement floor reverse construction method according to the present invention, after constructing a retaining wall and a center column, excavating the ground inside the retaining wall to a predetermined depth and constructing the floor structure of the upper floor, The ground is excavated to a predetermined depth, and at the bottom of the excavation, concrete is poured in a substantially grid pattern at positions including the core pillars, and an RC construction work floor that also serves as a sill is supported by the core pillars. The structure is characterized in that the floor structure of the upper floor is constructed by excavating the ground below the strut and working floor to a predetermined depth.

〔作用〕[Effect]

上記の構成によれば、掘削底に土間コンクリートを略格
子状に打設してRC造の切梁兼用作業床を築造するので
、切梁兼用作業床の底型枠や当該底型枠のための支保工
が不要である。
According to the above configuration, since the RC construction work floor that also serves as a sill and beam is constructed by pouring concrete on the excavation floor in a substantially grid pattern, the bottom formwork of the work floor that also serves as a sill and the bottom formwork can be No shoring is required.

RC造の切梁兼用作業床を構芯柱によって支持された状
態に設けるので、仮設支持杭の省略あるいは本数削減が
可能であると共に、切梁兼用作業床の幅が広くても切梁
兼用作業床間に大きな開口部を形成することができる。
Since the RC construction work floor is supported by the structural pillars, it is possible to omit or reduce the number of temporary support piles, and even if the width of the work floor is wide, it is possible to perform the work as a stub. A large opening can be formed between the floors.

〔実施例〕〔Example〕

以下、本発明の実施例を図面に基づいて説明する。 Embodiments of the present invention will be described below based on the drawings.

第1図は全体の概略横断面図である。同図において、1
は柱列や連続壁等による山止め壁、2は構芯柱、3はR
C造の切梁兼用作業床で、構芯柱2どうしを結ぶ位置に
略格子状に架設されており、両端側は扇状に拡がってい
る。4はRC造の腹起こしである。5は掘削用の開口部
である。
FIG. 1 is a schematic cross-sectional view of the whole. In the same figure, 1
is a retaining wall made of columns or continuous walls, etc., 2 is a central column, and 3 is an R
It is a work floor of C construction that also serves as a cut beam, and is constructed in a substantially lattice-like manner at the positions connecting the structural pillars 2, with both ends expanding into a fan shape. 4 is an RC-made stand-up. 5 is an opening for excavation.

第2図は要部の縦断面図、第3図の要部の拡大図である
。同図において、6は地上1階の床構造体、7は階高の
低い地下1階の床構造体である。
FIG. 2 is a longitudinal sectional view of the main part, and FIG. 3 is an enlarged view of the main part. In the figure, 6 is a floor structure on the first floor above ground, and 7 is a floor structure on the first floor underground, which has a low floor height.

8は階高の大きい地下2階の床構造体、9は階高の大き
い地下3階の床構造体である。地下1階までの床構造体
6.7は在来工法と同じであるが、階高の大きい地下2
,3階の床構造体は、前記切梁兼用作業床3を設置して
施工される。 10は地中梁、11はピア基礎である。
8 is a floor structure on the second basement floor with a large floor height, and 9 is a floor structure on the third basement floor with a large floor height. The floor structure 6.7 up to the first basement floor is the same as the conventional construction method, but the second basement floor has a large floor height.
, the third floor floor structure is constructed by installing the working floor 3 which also serves as a strut. 10 is an underground beam, and 11 is a pier foundation.

aは1次掘削による掘削底、bは2次掘削による掘削底
、Cは3次掘削による掘削底、dは4次掘削による掘削
底、eは5次掘削による最終掘削底を示す。12・・・
は床構造体用の吊り型枠であり、上位階の床構造体に、
ねじ節鉄筋や両端部にねじ部を形成した鋼棒等の吊り棒
13・・・、六角ナンドや六角長ナツト(ねじ節鉄筋用
カップラー)等のナツト部材14・・・等より成る吊り
金物を介して吊り下げ支持されている。
a indicates the excavated bottom of the primary excavation, b indicates the excavated bottom of the secondary excavation, C indicates the excavated bottom of the tertiary excavation, d indicates the excavated bottom of the fourth excavation, and e indicates the final excavated bottom of the fifth excavation. 12...
is a suspended formwork for the floor structure, and for the floor structure on the upper floor,
Hanging hardware consisting of a hanging rod 13 such as a threaded reinforcing bar or a steel rod with threaded portions formed at both ends, a nut member 14 such as a hexagonal nut or a hexagonal long nut (a coupler for threaded reinforcing bars), etc. It is suspended and supported through.

前記切梁兼用作業床3は、前記吊り棒13・・・、ナツ
ト部材14・・・、座金15を介して上位階の床構造体
に吊り下げ支持され、さらに構芯柱2によっても支持さ
れている。即ち、第4図、第5図に示すように、各構芯
柱2の所定位置には周囲四方に定着用鉄筋16・・・が
溶接され、切梁兼用作業床3の荷重が構芯柱2に伝達さ
れるように構成されている。
The work floor 3 that also serves as a stub beam is suspended and supported by the floor structure of the upper floor via the hanging rods 13 . . . , nut members 14 . ing. That is, as shown in FIGS. 4 and 5, anchorage reinforcing bars 16 are welded to the four sides of each centering column 2 at predetermined positions, so that the load of the working floor 3 that also serves as a sill is transferred to the centering column 2. 2.

第5図中の17は腹起こし4の吊り筋である。Reference numeral 17 in FIG. 5 is a hanging muscle of the abdominal stand-up 4.

次に、地下階の逆打ち施工方法を工程順に説明する。Next, we will explain the reverse construction method for the basement floor step by step.

第6図(イ)に示すように、山止め壁1を構築した後、
構芯柱2を建て込み、支柱18を打設して構台19を組
み立てる。
As shown in Figure 6 (a), after constructing the retaining wall 1,
The structural pillars 2 are erected, the pillars 18 are cast, and the gantry 19 is assembled.

第6図(ロ)に示すように、構台19の上に乗り入れた
掘削機(図示せず)によりaまで1次掘削を行う。
As shown in FIG. 6(b), an excavator (not shown) mounted on the gantry 19 performs primary excavation up to point a.

第6図(ハ)に示すように、構芯柱2の上に柱鉄骨20
を接合すると共に、社用型枠21及び床構造体用型枠2
2を組み、配筋、コンクリート打設を行って、地上1階
の床構造体6と柱23の一部を構築する。
As shown in Fig. 6 (c), a column steel frame 20
At the same time, the corporate formwork 21 and the floor structure formwork 2 are joined.
2 are assembled, reinforcement is placed, and concrete is poured to construct the floor structure 6 and part of the columns 23 on the first floor above ground.

第6図(ニ)に示すように、構台19を撤去し、地上1
階の床構造体6を作業床として、当該床構造体6の一部
(前記開口部5と合致する位置)に設けられた開口部か
ら所定深度すまで2次掘削を行う。
As shown in Figure 6 (d), the gantry 19 is removed and the
Using the floor structure 6 of the floor as a working floor, secondary excavation is performed from an opening provided in a part of the floor structure 6 (a position that matches the opening 5) to a predetermined depth.

第6図(ホ)や第2図に示すように、地上1階の床構造
体6から吊り型枠12を吊り下げ、その内部に配筋、コ
ンクリート打設を行って地下1階の床構造体7を構築す
る。
As shown in Fig. 6 (E) and Fig. 2, the hanging formwork 12 is suspended from the floor structure 6 on the first floor above ground, and reinforcement and concrete are placed inside it to construct the floor structure on the first basement floor. Build body 7.

第6図(へ)に示すように、地下1階の床構造体7のコ
ンクリートに所要強度が発現した後、所定深度Cまで3
次掘削を行い、掘削底Cには、前記構芯柱2を含んで略
格子状に側型枠24・・・を置き、補強用鉄筋を配筋し
、土間コンクリートを打設して1段目の切梁兼用作業床
3を築造する。ここで土間コンクリートとは、掘削底C
に底型枠を敷設することなく直接的に打設するコンクリ
ートを意味するが、ビニール等の防水シートを敷設して
コンクリート打設を行う場合も包含している。尚、吊り
棒13・・・、ナツト部材14・・・等から成る吊り金
物は地下1階の床構造体7のコンクリートに所要強度が
発現した後、地上1階の床構造体6から撤去し、同図に
示すように、地下1階の床構造体7から側型枠24・・
・内に垂下させておく0図示しないが、前記座金15も
吊り棒13の下端部にナンド部材14で取り付けておく
As shown in FIG.
Next, excavation is carried out, and on the excavation bottom C, side formwork 24 is placed in a substantially lattice shape including the above-mentioned core pillars 2, reinforcing steel bars are arranged, and dirt floor concrete is poured. Build a work floor 3 that can also be used as a cross beam. Here, earthen floor concrete refers to excavated bottom C.
This refers to concrete that is poured directly without laying a bottom form, but it also includes cases where concrete is poured by laying a waterproof sheet such as vinyl. In addition, the hanging hardware consisting of the hanging rods 13..., nut members 14..., etc. will be removed from the floor structure 6 on the first floor above ground after the concrete of the floor structure 7 on the first basement floor has achieved the required strength. , as shown in the figure, from the floor structure 7 on the first basement floor to the side formwork 24...
・Although not shown, the washer 15 is also attached to the lower end of the hanging rod 13 with a NAND member 14.

第6図(ト)に示すように、1段目の切梁兼用作業床3
のコンクリートに所要強度が発現した後、所定深度dま
で4次掘削を行う、尚、掘削底dでは、同図に示すよう
に、地下2階の床構造体8に先立って2段目の切梁兼用
作業床3のコンクリート打設が行われるが、これは地下
2階の床構造体8の構築後に行ってもよい。同図に示す
ように、地下1階の床構造体7に地下2階の床構造体用
の吊り型枠12を、1段目の切梁兼用作業床3を貫通し
た吊り棒13及びこれに継ぎ足した吊り棒13゛をを介
して吊り下げ、荷重の全部又は大部分を地下1階の床構
造体7に支持させた状態で、配筋、コンクリート打設を
行って、第6図(チ)に示すように、地下2階の床構造
体8を構築する。
As shown in Figure 6 (G), the working floor 3 that also serves as the first stage strut
After the concrete has developed the required strength, a fourth excavation is performed to a predetermined depth d.At the excavation bottom d, as shown in the figure, a second stage of cutting is performed prior to the floor structure 8 on the second basement floor. Concrete pouring of the beam-cum-working floor 3 is performed, but this may be done after the floor structure 8 on the second basement floor is constructed. As shown in the figure, a hanging formwork 12 for the floor structure on the second basement floor is attached to the floor structure 7 on the first basement floor, and a hanging rod 13 that passes through the first stage strut-cum-working floor 3 and the hanging formwork 12 are attached to the floor structure 7 on the first basement floor. With the suspension suspended via the added hanging rods 13'' and all or most of the load supported by the floor structure 7 on the first basement floor, reinforcing and concrete placement were carried out as shown in Fig. ), a floor structure 8 on the second basement floor is constructed.

第6図(す)に示すように、2段目の切梁兼用作業床3
のコンクリートに所要強度が発現した後、所定深度eま
で5次掘削を行い、地中梁lO及び地下3階の床構造体
9を構築する。
As shown in Figure 6 (S), the second stage working floor 3
After the required strength is achieved in the concrete, a fifth excavation is performed to a predetermined depth e, and the underground beam IO and the floor structure 9 on the third basement floor are constructed.

しかる後、地中梁10及び地下3階の床構造体9のコン
クリートに所要強度が発現した後、2段目の切梁兼用作
業床3を撤去する6次いで1段目の切梁兼用作業床3を
撤去するが、これは予め適当な時点で撤去することも可
能である。
After that, after the underground beams 10 and the concrete of the floor structure 9 on the third basement floor have achieved the required strength, the second stage strut-cum-working floor 3 is removed.6 Then the first-stage strut-cum-working floor is removed. 3 will be removed, but this can also be removed at an appropriate time in advance.

尚、上記の実施例では、各段の切梁兼用作業床3が構芯
柱2で支持されると共に、上位階の床構造体に吊り棒1
3、ナツト部材14、座金15等を介して吊り下げられ
ているため、座屈防止用の仮設支持杭は全く使用されて
いないが、仮設支持杭を使用してもよい。この場合でも
、切梁兼用作業床3の格子状交差部が構芯柱2で支持さ
れているので仮設支持杭の使用本数は少なくて済むので
ある。
In the above embodiment, the working floor 3 that also serves as a stub beam at each level is supported by the center pillars 2, and the hanging rods 1 are attached to the floor structure of the upper floor.
3. Since it is suspended via the nut member 14, washer 15, etc., no temporary support piles are used to prevent buckling, but temporary support piles may be used. Even in this case, since the lattice-like intersections of the working floor 3 which also serves as a sill beam are supported by the centering columns 2, the number of temporary support piles used can be reduced.

また構芯柱2どうしの間隔や切梁兼用作業床3の断面形
状によっては仮設支持杭及び吊り棒を省略することも可
能である。
Furthermore, depending on the spacing between the core pillars 2 and the cross-sectional shape of the working floor 3 that also serves as a strut, it is possible to omit the temporary support piles and hanging rods.

前記RC造腹起こし4は、切梁兼用作業床3の下面と路
面−状をなす掘削底に土間コンクリートを打設して築造
することもできるが、この実施例では、第5図に示すよ
うに、山止め壁1の近傍部だけ切梁兼用作業床3の下面
位置よりも約80〜100cm程度深く且つ約80〜1
00c11程度の幅に掘削し、溝状掘削部25の上面開
口部を山止め壁lに取り付けたアングル材等のブラケッ
ト26と切梁兼用作業床3例の掘削底とにわたって!!
置したヘニャ等より成る底型枠27で閉塞し、当該底型
枠27の上に配筋、コンクリート打設を行って前記腹起
こし4を築造している。このようにすれば、溝状掘削部
25を掘削した時点で、当該溝状掘削部25の底面レベ
ルまで、山止め壁1の止水不良箇所の有無を確認し、必
要があれば、止水工事を行って出水がなくなったことを
確認した上で、腹起こし4及び切梁兼用作業床3を築造
することになる。
The RC surfacing 4 can also be constructed by pouring concrete on the excavation bottom which forms the shape of the road surface and the lower surface of the working floor 3 which also serves as a strut, but in this embodiment, as shown in FIG. In this case, only the vicinity of the retaining wall 1 is about 80 to 100 cm deeper than the lower surface position of the working floor 3 that also serves as a sill, and about 80 to 100 cm
Excavate to a width of about 00c11, and extend the upper opening of the trench-like excavation part 25 to the bracket 26, such as an angle material, attached to the retaining wall l, and the excavation bottom of the three examples of working floors that can also be used as struts! !
It is closed with a bottom formwork 27 made of a henier or the like placed thereon, and reinforcement and concrete placement are performed on the bottom formwork 27 to construct the raised-up part 4. In this way, when the trench-like excavation section 25 is excavated, it is possible to check whether there is a water stoppage defect in the retaining wall 1 up to the bottom level of the trench-like excavation section 25 and, if necessary, to stop the water. After completing the construction and confirming that the water has stopped flowing, the trundle 4 and the working floor 3 that can also be used as a strut will be constructed.

従って、地盤の上方が切梁兼用作業床3や腹起こし4に
よって広範囲にわたって覆われた状態にあっても、切梁
兼用作業床3の下方の地盤をブルドーザ−で山止め壁1
側に掘り進めて行く際、溝状掘削部25の底面よりも下
方での山止め壁1の止水不良による出水があっても、ブ
ルドーザ−を極力山土め壁lに近い位置まで進めること
ができ、止水工事を容易に行えるのである。
Therefore, even if the upper part of the ground is covered over a wide area by the strut-beam work floor 3 and the raised berth 4, the ground below the strut-beam work floor 3 is covered with a bulldozer.
When digging to the side, the bulldozer should be advanced to a position as close as possible to the soil retaining wall l even if water comes out due to failure of the retaining wall 1 below the bottom of the groove-shaped excavation part 25 to stop water. This allows water stoppage work to be carried out easily.

第7図、第8図は本発明の別実施例を示す。この実施例
は、各段の切梁兼用作業床3を吊り棒13、ナツト部材
14、座金15等で上位階の床構造体7゜8に吊り下げ
支持させ且つ当該切梁兼用作業床3と前記上位階の床構
造体7.8との間に、パイプサポート等の仮設支柱28
・・・を介在させ、山止め壁lに作用する土圧によって
、切梁兼用作業床3の中央部が上方へ変形することを防
止するようにした点に特徴がある。その他の構成は先の
実施例と同じであるため説明を省略する。
7 and 8 show another embodiment of the present invention. In this embodiment, the working floor 3 which also serves as a struver at each level is suspended and supported by the floor structure 7°8 of the upper floor using a hanging rod 13, a nut member 14, a washer 15, etc. A temporary support 28 such as a pipe support is installed between the floor structure 7.8 of the upper floor.
... is used to prevent the central part of the working floor 3 that also serves as a strut from being deformed upward due to the earth pressure acting on the retaining wall l. The other configurations are the same as those in the previous embodiment, so explanations will be omitted.

〔発明の効果〕〔Effect of the invention〕

本発明は、上述した構成よりなるから、次の効果を奏し
得るのである。
Since the present invention has the above-described configuration, it can achieve the following effects.

■RC造の切梁兼用作業床が山止め壁を支保する切梁と
しての役目を果たす他、作業通路や床構造体用型枠や鉄
筋等の資材置き場として利用されるので、地下階の階高
が大きくても容易かつ安全に構築できる。
■The RC construction work floor serves as a sill to support the retaining wall, and is also used as a work passageway and a storage area for materials such as formwork and reinforcing bars for the floor structure, so it is used as a storage area for materials such as formwork and reinforcing bars for the floor structure. Even if the height is large, it can be constructed easily and safely.

■掘削底に土間コンクリートを打設してRC造の切梁兼
用作業床を築造するので、切梁兼用作業床の底型枠や当
該底型枠のための支保工が不要である。
■Since the concrete floor is poured at the bottom of the excavation to construct the RC work floor that also serves as a sill and beam, there is no need for a bottom formwork for the work floor that also serves as a sill and support for the bottom form.

■掘削底に土間コンクリートを、構芯柱を含む位置に略
格子状に打設して、RC造の切梁兼用作業床を築造する
ので、切梁兼用作業床の幅が広くても、切梁兼用作業床
間に形成するの開口部の面積を大きくとることができ、
しかも前記切梁兼用作業床を構芯柱によって支持された
状態に設けるので、切梁兼用作業床の厚さを大きくしな
くても、仮設支持杭の省略あるいは本数削減が可能であ
り、これらの結果、地盤の掘削作業を容易に能率良く行
えるのである。
■Since we will construct an RC work floor that also serves as a sill and beam by pouring concrete on the excavation floor in a roughly grid pattern at locations including the core pillars, even if the width of the work floor that also serves as a sill and beam is wide, The area of the opening between the beam and work floor can be increased,
In addition, since the work floor that also serves as a sill and beam is provided in a state where it is supported by the center pillars, it is possible to omit or reduce the number of temporary support piles without increasing the thickness of the work floor that also serves as a sill. As a result, ground excavation work can be carried out easily and efficiently.

■RC造の切梁兼用作業床を構芯柱によって支持された
状態に設けるので、切梁兼用作業床としは比較的薄いも
ので足り、コンクリートや鉄筋の使用量が少なく、解体
撤去時のはつり作業やはつりガラの搬出が容易である。
■Since the RC construction work floor is supported by the structural columns, a relatively thin work floor is sufficient for the work floor, which requires less concrete and reinforcing bars, and is easy to chisel during demolition and removal. It is easy to work and transport the hanging glass.

【図面の簡単な説明】[Brief explanation of drawings]

第1図乃至第6図(イ)〜(す)は本発明の一実施例を
示し、第1図は全体の概略横断面図、第2図は縦断面図
、第3図は要部の拡大図、第4図は要部の平面図、第5
図は要部の縦断面図、第6図(イ)〜(す)は工程説明
図である。 第7図と第8図は本発明の別実施例を示し、第7図は概
略縦断面図、第8図は要部の縦断面図である。 l・・・山止め壁、2・・・構芯柱、3・・・切梁兼用
作業床、6,7,8.9・・・床構造体。
Figures 1 to 6 (A) to (S) show one embodiment of the present invention, in which Figure 1 is a schematic cross-sectional view of the whole, Figure 2 is a longitudinal sectional view, and Figure 3 is a main part. Enlarged view, Figure 4 is a plan view of the main part, Figure 5
The figure is a longitudinal sectional view of the main part, and FIGS. 6(A) to 6(S) are process explanatory views. 7 and 8 show another embodiment of the present invention, with FIG. 7 being a schematic longitudinal sectional view and FIG. 8 being a longitudinal sectional view of the main part. 1... Mountain retaining wall, 2... Center column, 3... Work floor that also serves as a strut, 6, 7, 8.9... Floor structure.

Claims (1)

【特許請求の範囲】[Claims] 山止め壁及び構芯柱を構築し、山止め壁の内側の地盤を
所定深度まで掘削して上位階の床構造体を構築した後、
前記地盤を所定深度まで掘り進め、掘削底には前記構芯
柱を含む位置に、土間コンクリートを略格子状に打設し
て、RC造の切梁兼用作業床を前記構芯柱で支持された
状態に築造し、当該切梁兼用作業床の下方の地盤を所定
深度まで掘削して下位階の床構造体を構築することを特
徴とする地下階の逆打ち施工方法。
After constructing the retaining wall and pillars, excavating the ground inside the retaining wall to a specified depth and constructing the upper floor floor structure,
The ground is excavated to a predetermined depth, and at the bottom of the excavation, concrete is poured in a substantially grid pattern at positions including the core pillars, and an RC construction work floor that also serves as a sill is supported by the core pillars. A reverse construction method for a basement floor, which is characterized by constructing a lower floor floor structure by excavating the ground below the strut and working floor to a predetermined depth.
JP62113218A 1987-05-08 1987-05-08 Reverse floor construction method Expired - Fee Related JPH0657958B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP62113218A JPH0657958B2 (en) 1987-05-08 1987-05-08 Reverse floor construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP62113218A JPH0657958B2 (en) 1987-05-08 1987-05-08 Reverse floor construction method

Publications (2)

Publication Number Publication Date
JPS63277342A true JPS63277342A (en) 1988-11-15
JPH0657958B2 JPH0657958B2 (en) 1994-08-03

Family

ID=14606567

Family Applications (1)

Application Number Title Priority Date Filing Date
JP62113218A Expired - Fee Related JPH0657958B2 (en) 1987-05-08 1987-05-08 Reverse floor construction method

Country Status (1)

Country Link
JP (1) JPH0657958B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008031682A (en) * 2006-07-27 2008-02-14 Shimizu Corp Aseismically supporting structure during temporary bearing of building, and aseismically supporting method during temporary bearing of building
JP2009263971A (en) * 2008-04-24 2009-11-12 Taisei Corp Construction method for temporary structure and underground structure

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5439121B2 (en) * 2009-11-05 2014-03-12 株式会社竹中工務店 Building upside-down method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008031682A (en) * 2006-07-27 2008-02-14 Shimizu Corp Aseismically supporting structure during temporary bearing of building, and aseismically supporting method during temporary bearing of building
JP2009263971A (en) * 2008-04-24 2009-11-12 Taisei Corp Construction method for temporary structure and underground structure

Also Published As

Publication number Publication date
JPH0657958B2 (en) 1994-08-03

Similar Documents

Publication Publication Date Title
KR100951097B1 (en) Slab and subgrade external wall structure and method for constructing underground slab and subgrade external wall, bracket
KR100531385B1 (en) Construction method of underground structure that enables continuous retaining wall using steel wale and diaphragm effect of concrete slab
KR101221970B1 (en) Construction Method for Basement Structure without Temporary Structure
JP5619646B2 (en) Construction method of underground structure and underground structure
JP5579635B2 (en) Underground structure and construction method of underground structure
KR20070052109A (en) Down-ward construction method of the underground slabs and retaining walls by the slim-type composit floor system consisted of the architectural conposit deep deck and unsymmetric h-beam without preliminary wall-attached support beams and sub-beams of the floor
JP5764245B2 (en) Construction method of underground structure and underground structure
JP5875651B2 (en) Underground structure and construction method of underground structure
JPS63277342A (en) Reverse execution of underground story
KR200370135Y1 (en) Forms for edge girder construction
JPH0684690B2 (en) Building basement extension method
JPS5829922A (en) Constructing method for underground outer wall
JPS63280153A (en) Underground inverted lining method
JPS63277341A (en) Reverse execution of underground story
KR100593203B1 (en) a deck supportframe and a construction methed
KR102279832B1 (en) Underground Bracket Type Aseismic Reinforcement Structure and Method
CN212801564U (en) Foundation ditch steel sheet pile supporting construction
JP3406370B2 (en) Horizontal shaft construction method
JPH07138972A (en) Construction method for underground skeleton
JP2571426B2 (en) Construction method of retaining wall
JP2894217B2 (en) Building structural frame
KR100767954B1 (en) Monowall with re-bar trussed wale
JPH03147926A (en) construction method for basement
JPH07103583B2 (en) Construction method for large span underground structure
JPH101957A (en) Underground construction method for building

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees