KR100593203B1 - a deck supportframe and a construction methed - Google Patents

a deck supportframe and a construction methed Download PDF

Info

Publication number
KR100593203B1
KR100593203B1 KR1020040048402A KR20040048402A KR100593203B1 KR 100593203 B1 KR100593203 B1 KR 100593203B1 KR 1020040048402 A KR1020040048402 A KR 1020040048402A KR 20040048402 A KR20040048402 A KR 20040048402A KR 100593203 B1 KR100593203 B1 KR 100593203B1
Authority
KR
South Korea
Prior art keywords
deck
support
concrete
side pressure
forming
Prior art date
Application number
KR1020040048402A
Other languages
Korean (ko)
Other versions
KR20050122763A (en
Inventor
유진오
최완규
Original Assignee
유진오
최완규
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 유진오, 최완규 filed Critical 유진오
Priority to KR1020040048402A priority Critical patent/KR100593203B1/en
Publication of KR20050122763A publication Critical patent/KR20050122763A/en
Application granted granted Critical
Publication of KR100593203B1 publication Critical patent/KR100593203B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/04Making large underground spaces, e.g. for underground plants, e.g. stations of underground railways; Construction or layout thereof
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0007Production methods using a mold
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0023Cast, i.e. in situ or in a mold or other formwork

Abstract

본 발명에 따른 측압지지보 형성용 데크 지지프레임 및 측압지지보 형성용 데크 지지프레임을 이용한 지하구조물의 시공방법(S.B.D(Strut Bracket Diaphragm)공법)은 흙막이벽 지지빔상에 지지돌출부를 고정하고, 제품 중간에 다수의 콘크리트타설공이 형성되어 있고 데크의 단부가 배치되는 데크고정부가 단부에 형성된 측압지지보 형성용 데크 지지프레임을 상기 지지돌출부 상에 설치하는 것으로, 여타 작업 공간을 용이하게 확보할 수 있게 됨과 아울러, 데크를 용이하게 고정시키고 측압지지보와의 연결철근을 용이하게 설치할 수 있게 되어 시공이 간편하고 품질확보가 가능하며, 수직벽과 측압지지보의 형성을 아래에서 위로 형성하게 됨으로 위에서 아래로 시공하는 기존의 방식에 비하여 시공이 월등히 간편하고 공사진행이 원활해 지며, 수직벽과 측압지지보를 형성하는 철근을 배선할 시 상기 측압지지보 형성용 데크 지지프레임의 상기 콘크리트타설공의 내부로 자유롭게 통과하여 배선하므로 철근의 배선작업이 대단히 용이하게 실시되고, 철근 및 콘크리트의 연속성을 확보하여 중요한 건축품질조건을 확보할 수 있으며, 또한 콘크리트슬래브층에 설치된 측압지지보 형성용 데크 지지프레임의 콘크리트타설공을 통하여 상부층에서 콘크리트를 타설시키면, 기존의 측압지지보 선시공법의 경우의 매립된 콘크리트 타설공을 이용한 타설에 비해, 훨씬 용이하고 콘크리트의 완벽한 충진이 가능하게 되어 측압지지보 및 수직벽의 형성이 대단히 용이하고 우수한 품질을 확보할 수 있게 되며, 콘크리트슬래브층의 설치구조가 획기적으로 간략히 변경되어 시공이 신속하 게 수행되어 공기를 월등히 단축시키는 것이 가능하게 되고 측압지지보와 수직벽 및 데크의 설치가 총체적으로 간략하고 용이하게 되어 사용인력이 월등히 절감되고 시공비용이 저렴하게 되며 공기를 획기적으로 감소시키는 것이 가능하게 되는 우수한 효과가 있다.The construction method of the underground structure using the deck support frame for forming the side pressure support and the deck support frame for forming the side pressure support according to the present invention (SBD (Strut Bracket Diaphragm) method) to fix the support projections on the support wall of the mud wall, the product Deck fixing part in which a plurality of concrete casting holes are formed in the middle and the end of the deck is arranged is installed on the support protrusion to form a deck support frame for forming the side pressure support on the end, so that other work spaces can be easily secured. In addition, the deck can be easily fixed and the connecting rebar with the side pressure support can be easily installed, so the construction is easy and the quality can be secured, and the vertical wall and the side pressure support are formed from the top to the bottom. Compared with the existing method of construction, construction is much simpler, smoother row of lines, vertical walls and sides When wiring the reinforcing bars forming the support beams, the free passage passes through the inside of the concrete placing hole of the side pressure support forming deck support frame to facilitate the wiring work of the reinforcing bar, ensuring the continuity of the reinforcement and concrete When the concrete is placed in the upper layer through the concrete placing hole of the deck support frame for the side pressure support formation installed on the concrete slab layer, it is possible to secure important building quality conditions. Compared to pour using pour ball, it is much easier and perfect filling of concrete is possible, so it is very easy to form side pressure support and vertical wall, and it is possible to secure excellent quality, and the installation structure of concrete slab layer is remarkably simplified. Changed and construction is performed quickly, It becomes possible side pressure support beam and the vertical wall and the installation is the overall simplicity and ease of use history of the deck is significantly reduced and the construction costs at low cost to have a superior effect that it is possible to reduce the air dramatically.

Description

측압지지보 형성용 데크 지지프레임 및 상기 측압지지보 형성용 데크 지지프레임을 이용한 지하구조물의 시공방법{a deck supportframe and a construction methed}       Construction method of underground structure using deck support frame for side pressure support formation and the deck support frame for side pressure support formation {a deck supportframe and a construction methed}

도1은 본 발명의 일실시예에 따른 측압지지보 형성용 데크 지지프레임을 이용한 지하구조물의 시공방법을 도시한 공정도1 is a process chart showing the construction method of the underground structure using the deck support frame for forming the side pressure support according to an embodiment of the present invention

도2는 본 발명의 일실시예에 따른 측압지지보 형성용 데크 지지프레임의 사시도Figure 2 is a perspective view of the deck support frame for forming the side pressure support according to an embodiment of the present invention

도3a,3b,3c,3d,3e,3f는 본 발명에 따른 방법에 의하여 시공되는 지하구조물의 개략적인 시공단면도Figures 3a, 3b, 3c, 3d, 3e, 3f is a schematic construction cross-sectional view of the underground structure constructed by the method according to the present invention

도4는 본 발명에 따른 방법에 의하여 시공되는 시공현장의 데크 지지프레임의 설치상태를 개략적으로 도시한 부분확대된 시공부분단면도Figure 4 is a partially enlarged construction partial cross-sectional view schematically showing the installation state of the deck support frame of the construction site constructed by the method according to the invention

도5는 본 발명의 일실시예에 따른 측압지지보 형성용 데크 지지프레임의 시공시의 측압지지보 형성용 데크 지지프레임이 배치된 상태가 도시된 개략적인 평면도5 is a schematic plan view showing a state in which a side support support forming deck support frame is disposed at the time of construction of the side support support forming deck support frame according to an embodiment of the present invention;

도6a,6b,6c는 본 발명의 측압지지보 형성용 데크지지프레임을 이용하여 수직벽 및 측압지지보를 형성하는 단계를 도시한 개략적인 부분단면도.Figure 6a, 6b, 6c is a schematic partial cross-sectional view showing the step of forming the vertical wall and the side pressure support using the deck support frame for forming the side pressure support of the present invention.

* 도면의 주요부분에 대한 부호의 설명 *Explanation of symbols on the main parts of the drawings

3. 콘크리트타설공 4.프레임본체3. Concrete pouring 4. Frame body

5. 데크고정부 6.보강대5. Deck High Government 6. Reinforcement

7. 콘크리트열주 8.지지빔7. Concrete column 8. Support beam

9. 지지돌출부 10.기둥지지빔9. Support protrusion 10. Column support beam

본 발명은 측압지지보 형성용 데크 지지프레임 및 상기 측압지지보 형성용 데크 지지프레임을 이용한 지하구조물의 시공방법에 관한 것으로, 더욱 구체적으로 설명하면, 도심이나 건물밀집지역 등에서 건물의 지하층 공사시 사용되는 지하구조물의 시공방법중 영구구조물 스트러트공법(Strut as Permanent System : 이하 '에스피에스공법'이라 함)에서 건물의 각층 슬라브를 구축하는 데크를 지지하고 지하층의 공사, 예를들면, 측압지지보 및 측벽의 철근배선, 거푸집 형성 및 콘크리트 타설 등의 공사를 용이하게 하여 건축물의 시공비용이 절감되고 건축물의 시공기간 이 단축되는 측압지지보 형성용 데크 지지프레임 및 상기 측압지지보 형성용 데크 지지프레임을 이용한 지하구조물의 시공방법에 관한 것이다.The present invention relates to a construction method of the underground structure using the deck support frame for forming the side pressure support and the deck support frame for forming the side pressure support, and more specifically, when used in the construction of the basement of the building in the city or building dense area, etc. Among the construction methods of underground structures, the Strut as Permanent System (hereinafter referred to as the “SP” method) supports the decks for building the slabs of each floor of the building, and the construction of the basement floors, for example, side pressure support and side walls. Using the deck support frame for side pressure support formation and the side support frame for side pressure support formation to reduce the construction cost and shorten the construction period by facilitating the construction of reinforcement wiring, formwork and concrete casting It relates to the construction method of underground structures.

일반적으로, 고층의 건물을 건축하고자 할 경우에는 건축물의 기초를 세우기 위하여 터파기를 하고 어쓰-앵커(Earth-Anchor)공법이나 H빔 등을 가설재로 이용한 스트럿(Strut)공법을 이용하여 흙막이 가시설을 구축하고 최하단의 지하에 기초를 형성하고 순차적으로 올라가면서 건물의 건축이 되며 가시설을 해체하는 것이 일반적인 기존의 건축방식이나, 근접건축물이 있는 도심의 공사에서는 근접건축물에 영향을 미치지 않고 터파기를 해야하므로 어쓰-앵커공법 등은 사용할 수 없고, 이 기존의 가설재 스트럿공법은 가시설물을 지하 구조체 공사단계에서 해체시 발생하는 위험성 및 구조체와의 상호간섭에 의한 시공의 어려움, 자재의 손실, 가설재의 설치 및 해체에 많은 인력과 자재의 소요와 해체공사 기간의 공기가 길어지는 등의 불합리성을 갖고 있고, 도심이나 지가가 비싼 건물밀집지역에서는 건축시에 필요한 건축자재를 쌓아 놓고 시공할 공간이 협소하고 분진이나 소음발생에 의한 분쟁발생이 있어, 이를 개선하며 흙막이 공사의 안전성을 확보하기 위한 방법으로, 흙막이벽을 시공한 후 터파기 공사전에 소구경(지름 600~800mm) 천공기를 이용하여 정확한 수직도로 본기둥(철골기둥)을 근입설치하고, 소정의 지지력을 갖도록 기둥의 기초부에 콘크리트를 타설하여 구근을 형성한 후, 매층 단위로 본 구조물(보)을 설치, 이용하여 토압을 지지하면서 목표 깊이까지 굴토 완료하고, 건물 기초 타설 후에는 지상과 지하층 골조 공사를 동시에 진행하여 지하구조물을 완공한 후에는 이를 본 구조물로 사용하여 토압과 연직하중에도 영구적으로 지지하게 되는 에스피에 스공법이 널리 이용되고 있다. 그러나, 이러한 에스피에스공법에서는 지하공사를 위에서 아래로 수행하면서 지반이 안정되지 않은 상태에서 각 층의 측압지지보와 그 위에 콘크리트슬래브층을 시공해가는 공법이므로 지반침하시 건축물의 안전을 담보하는 측압지지보가 손상될 우려가 크게 되며 측압지지보의 시공시 이후에 수행될 철근배선 및 콘크리트의 타설을 위하여 철근이 관통되게 배선되거나 콘크리트가 하부로 타설되는 상하로 관통되는 다수의 관통공(콘크리트타설공)이 형성된 상태로 시공이 되므로 측압지지보의 내력지지강도에 문제점이 발생되게 된다는 문제점이 있으며, 특히 이와 같은 각 층의 측압지지보의 시공에 시간이 전체공정의 약 30%가 소요될 정도로 오래 걸리게 되어 시공비용이 고가로 되는 가장 큰 원인이 된다는 문제점이 있다. 시공 순서를 상세히 살펴보면, 흙막이벽 설치 후 본 건축물의 기둥이 되는 에치빔을 지반에 타설한 상태에서 토사를 굴착하여 측압지지보를 먼저설치하고 지상 1층 레벨에 구조체인 철골거더와 철골보를 설치하여 데크를 설치하고 콘크리트를 타설하여 지상1층 슬래브를 형성한 후, 지하1층의 터를 파고 측압지지보를 먼저설치하고 지하1층의 구조체인 철골거더와 철골보 설치 후 데크를 설치하고 콘크리트를 타설하여 지하1층 슬래브층을 형성하고, 다시 아래지하층의 터를 파고 측압지지보를 먼저설치하고 데크를 설치하고 콘크리트를 타설하여 지하2층 슬래브층을 형성하고, 다시 아래지하층의 터를 파고 측압지지보와 데크를 설치하고 콘크리트를 타설하는 방식으로 수행되며, 목적하는 층까지 굴토하여 최하층에 건축물의 기초를 형성하고 나서 지하구조물의 연직 및 수평(토사측압)의 하중지지 및 건축물 형성을 위하여 최하층부터 기둥, 보(SRC보:철골철근보), 수직벽(건물측면의 보호벽 포함)과 각층의 측압지지보(슬래브 가장자리의 띠장보)를 연결형성하는 철근배선과 거푸집공사를 하고 상부에서 콘크리트를 타설하여 기둥, 보, 벽 및 측압지지보를 연결형성하고 다음 위층에 다시 철근배선과 거푸집공사를 하고 콘크리트를 타설하여 기둥, 보, 벽 및 측압지지보를 연결형성하는 방식으로 아래에서 위로 작업하여 최종에 지하1층의 기둥, 보, 벽 및 측압지지보를 연결형성하는 방식으로 수행하고 있다. 그러나, 종래의 에스피에스공법은 지하굴토시 측압을 지지하기 위한 본건축물의 구조체인 보와 슬라브용 데크를 설치하기 위해, 각층 슬래브 가장자리에 측면지지보를 먼저설치 하여 기둥과 연계되는 보를 지지보에 연결·거치하는 방식을 사용하므로 하부지지층이 없는 위에서 아래로의 굴토 상황에서 철근 연결 및 거푸집 형성 등 시공상의 어려움이 많고, 향후 측벽등의 철근연결배선 및 콘크리트 타설 시 작업이 어렵고 기 매립한 콘크리트타설공을 사용하거나 기 설치된 슬래브나 데크를 절개하여 시공하게 되므로, 공정의 안정성과 건축물의 품질을 확보하기 어려우며, 시공인력의 과다와 공사비 증가 및 공기 지연의 원인이 된다. 이 SPS공법의 경우 가설흙막이벽을 건축물 외벽으로 사용하므로 SPS공법의 일반적 가설흙막이의 방법인 CIP 공법이나 D/W공법이나 지하연속벽(Slurry Diaphragm Wall)공법에서 측면 흙막이벽 안쪽으로 측압지지보를 먼저설치하고 철골구조보를 연결하여 데크를 설치하여 슬래브 콘크리트를 타설게 되는데 측압지지보 상에 상하로 통하는 부분이 없게 되므로 지하의 최저층부터 위로 올라오면서 형성되는 기둥, 보, 벽의 형성작업시 측벽의 철근연계 배선 및 콘크리트타설을 하기 위해서는 측압지지보 선설치시 순차시공(아래서부터 위로의 기둥, 보, 벽 설치공사)시 연결하여야 할 철근이음부 를 뽑아놓거나 철근을 끼워서 작업할 곳을 만들어야 하고, 또한 콘크리트 타설을 할 콘크리트 타설공을 형성하여야 하는 등 작업이 번거롭게 되고 철근의 배선과 거푸집의 형성 또한 용이하지 않아 각층 측압지지보 및 슬라브 형성작업이 대단히 더디게 되고 순차시공(아래서부터 위로의 기둥, 보, 벽 설치공사)시 철근배선, 거푸집설치 후 콘크리트타설공을 사용하여 콘크리트를 타설하므로 각 거푸집내로 충분히 충진되지 않을 수 있어 건축물의 충분한 강도의 발현이 어려워 품질확보를 확신할 수 없고, 작업이 난해하여 공기가 지연되며 사용인력도 다수가 필요하고 시공비용이 과다하게 발생된다는 문제점이 있었다.In general, if you want to build a high-rise building, dig a temporary construction using a strut method using a strut method using earth-anchor method or H beam as a temporary material to lay the foundation of the building. The basement of the basement at the bottom of the basement and ascends in order to build the building and dismantling the provisional facilities is a common existing construction method, but in the construction work in the city where the adjacent buildings have to be destroyed without affecting the adjacent buildings. -The anchor construction method cannot be used, and this existing temporary construction strut construction method does not have the risk of dismantling the temporary installation in the construction stage of underground structure and the difficulty of construction due to mutual interference with the structure, material loss, installation and dismantling of temporary construction materials. Has unreasonable reasons such as the need for a lot of manpower and materials and a long air during the dismantling work. In high-density urban areas and in high-density building areas, the building materials needed for construction are stacked and construction spaces are narrow and there are disputes caused by dust or noise. After installing the earthen wall, install the main column (steel column) in the exact vertical direction by using a small diameter (diameter 600 ~ 800mm) perforator before excavating and install concrete at the base of the column to have a predetermined support force. After forming the bulbs, the structure (beam) is installed and used on a floor-by-floor basis to support the earth pressure and complete the excavation to the target depth.After the foundation of the building, the ground and the basement frame work is completed to complete the underground structure. Later, the SPSP method, which uses this as a structure and is permanently supported by earth pressure and vertical load, is widely used. However, in the SP method, the underground construction is carried out from top to bottom, and the side pressure support of each floor and the concrete slab layer are constructed on the ground in an unstable state. There is a high risk of damage to the beam, and a number of through-holes (concrete placing holes) through which the rebar is routed through or the concrete is laid down for reinforcement wiring and concrete placement to be performed after the construction of the side pressure support. There is a problem that a problem occurs in the strength bearing strength of the side pressure support because it is constructed in the formed state, in particular, it takes a long time so that the construction of the side pressure support of each layer takes about 30% of the entire process There is a problem that the construction cost is the biggest cause of the high price. In detail the construction sequence, after installing the earthen wall, excavate the earth and sand with the etch beam which is the pillar of this building on the ground, install the side pressure support beam first, and install the steel frame girders and steel frame beams on the ground floor level. After installing the first floor slab and installing concrete, dig the ground of the first floor, install the side pressure support first, install the steel girder and the steel golbo, which is the structure of the first floor, install the deck and install the concrete Form the first-floor slab layer, dig the foundation of the lower basement layer, install the side pressure support first, install the deck first, and install the concrete to form the second basement slab layer. After the installation of concrete and placing concrete, the foundation of the building on the lowest floor is excavated to the desired floor. In order to support the vertical and horizontal loads of the substructure and to form the building, the column, beam (SRC beam: steel reinforcement beam), vertical wall (including the protective wall on the side of the building), and side pressure support beam (slab edge) of each floor Reinforcement wiring and formwork to form the connection between the beams, and cast concrete from the top to form columns, beams, walls and side pressure support beams. The work is performed from the bottom up in the manner of connecting the beams, the wall and the side pressure support to form the connection of the columns, beams, walls and the pressure support of the first basement. However, in the conventional SP method, in order to install beams and slab decks, which are structures of the main building to support lateral pressure during underground excavation, side beams are first installed at the edges of slabs in each layer to connect beams connected with columns to support beams. Because of the mounting method, there are many difficulties in construction such as reinforcing bar connections and formwork in the pit soil from the top to the bottom without the lower support layer, and it is difficult to work in the future when reinforcing bar connections such as sidewalls and concrete placing, It is difficult to secure the stability of the process and the quality of the building because it is used to cut or install slabs or decks that have been used or already installed, and it causes excessive workforce, construction cost, and air delay. In this SPS method, the temporary wall is used as the exterior wall of the building, so the side pressure support is first introduced into the side wall in the CIP method, the D / W method or the slurry diaphragm wall method. Reinforcement of slab concrete is installed by connecting deck with steel structure beams, and there is no part that goes up and down on the side pressure support beam. In order to connect the wires and place the concrete, the rebar joints to be connected must be unplugged or installed in order to install the lateral pressure support during installation (from below, to the columns, beams and walls). The work becomes cumbersome, such as the need to form concrete pour holes for concrete pouring, and the wiring and formwork of the rebar It is also not easy to form, so it is very slow to form the side pressure support and slab on each floor.In the case of sequential construction (column, beam, wall installation work from the bottom up), concrete is laid using reinforcement wiring and formwork after installation. It could not be sufficiently filled into the formwork, so it is difficult to express sufficient strength of the building, so it is difficult to ensure the quality, and the problem is that the air is delayed due to the difficulty of work, and a large number of manpower is required and construction cost is excessively generated.

본 발명의 목적은 이러한 문제점을 해결하기 위한 것으로 흙막이의 목적인 공사 중 토압을 본 건축물 영구구조체에서 효과적으로 지지하고, 슬라브 형성이 대단히 용이하게 되며, 측압지지보의 시공이 흙막이 가설용 스트럿으로 대용되는 본구조물의 위에서 아래로의 시공시가 아닌 순차시공(아래에서 위로의 기둥, 보, 벽 설치공사)시 시공이 가능하게 되므로, 측압지지보 및 콘크리트슬래브의 설치구조가 획기적으로 변경되어 수직보호벽과 측압지지보의 철근배선이 용이하고 콘크리트 타설작업이 상부의 콘크리트 타설공의 설치나 기 설치된 슬래브층의 절개작업이 없이 수행되는 것이 가능하게 되므로 신속하게 수행되어 공기를 월등히 단축시키고 시공의 안정성과 품질을 확보함과 동시에, 슬래브 형성용 데크의 설치 및 슬래브 철근의 측면지지보 연결 작업이 용이하여 사용인력이 월등히 절감되고 시공비용이 저렴하게 되는 것이 가능하게 되는 측압지지보 형성용 데크 지지프레임 및 상기 측압지 지보 형성용 데크 지지프레임을 이용한 지하구조물의 시공방법(S.B.D공법:Strut of Bracket Diaphragm)을 제공하는 것이다.The object of the present invention is to solve this problem, and to effectively support the earth pressure during construction, which is the purpose of the earthquake in the building permanent structure, the slab formation is very easy, the construction of the side pressure support is replaced by the earthwork struts Since the construction can be performed sequentially rather than from the top to the bottom of the structure (bottom, beam, wall installation work from top to bottom), the installation structure of the side pressure support beam and the concrete slab is changed drastically and the vertical protective wall and side pressure Since the reinforcing wire of the support beam is easy and the concrete placing work can be performed without the installation of the upper concrete placing hole or the cutting work of the pre-installed slab layer, it is performed quickly, greatly reducing the air and improving the stability and quality of construction. At the same time, the installation of the deck for slab formation and the side support of the slab rebar Construction method of underground structure using deck support frame for side pressure support formation and deck support frame for side pressure support formation, which makes it possible to easily connect work, which greatly reduces the manpower and makes construction cost low (SBD method: Strut of Bracket Diaphragm).

본 발명의 이러한 목적은 건축물이 건립될 주위에 토사의 붕괴를 방지하기 위하여 흙막이용 지지빔이 내설되고 연이어 설치된 다수의 콘크리트열주가 설치되고 상기 콘크리트열주내에 건물의 기둥이될 부분에 다수의 기둥빔이 타설된 상태에서 위에서 아래로 내려가면서 차례로 각 층의 콘크리트슬래브층을 형성하는 단계와, 아래에서 위로 올라오면서 측압지지보와 수직벽을 시공하는 내력벽형성단계로 구성된 본 발명에 따른 에스비디공법(S.B.D(Strut of Bracket Diaphragm)공법, 이하 '에스비디공법'이라 함)을 이용한 지하구조물의 에스비디시공방법에 있어서,This object of the present invention is a plurality of pillar beams in the portion to be a pillar of the building in the concrete colonna is installed a plurality of concrete columns installed in succession and the support beam for the earth retaining to prevent the collapse of the soil around the building construction SBD method according to the present invention comprising the step of forming a concrete slab layer of each layer in order from the top to the bottom in the cast state, and the load-bearing wall forming step of constructing the side pressure support and the vertical wall from the bottom up ( In the construction method of SBD of the underground structure using the SBD (Strut of Bracket Diaphragm) method, hereinafter referred to as the "SBD method",

상기 위에서 아래로 내려가면서 각 층의 콘크리트 슬래브층을 형성하는 단계는 일정한 깊이로 지하층을 굴착하는 단계와, Forming a concrete slab layer of each layer while going down from the top to the bottom is to excavate the basement layer to a certain depth,

상기 콘크리트열주 내에 설치된 흙막이벽의 지지빔 상에 지지돌출부를 부착고정시키는 단계와,Attaching and fixing a support protrusion on the support beam of the retaining wall installed in the concrete column;

상기 콘크리트열주상에 고정된 지지돌출부상에 콘크리트타설공이 형성되고 데크고정부가 형성된 측압지지보 형성용 데크 지지프레임을 배치시키는 단계와,Arranging a deck support frame for forming a side pressure support on which a concrete casting hole is formed and a deck fixing part is formed on a support protrusion fixed on the concrete column;

상기 지지돌출부상에 배치된 상기 측압지지보 형성용 데크 지지프레임상의 데크고정부상에 데크를 배치하고 수평으로 배치된 데크상에 콘크리트를 타설하여 콘크리트슬래브층을 형성하는 단계를 포함하고,And placing a deck on a deck fixing part on the side support plate forming deck support frame disposed on the support protrusion, and placing concrete on a horizontally arranged deck to form a concrete slab layer.

상기 아래에서 위로 올라가면서 각 층의 기둥, 보, 수직벽 및 측압지지보를 시공하는 내력벽 형성단계는 Steps to build up the bearing wall for constructing the pillars, beams, vertical walls and side pressure support of each floor while going up from the bottom                         

콘크리트슬래브층에서 상방으로 수직벽과 측압지지보를 형성하는 철근이 상기 측압지지보 형성용 데크 지지프레임의 상기 콘크리트타설공을 지나게 배선하는 철근배선단계와,Reinforcing bar wiring step of reinforcing the reinforcing bar to form a vertical wall and side pressure support in the concrete slab layer passing through the concrete placing hole of the deck support frame for forming the side pressure support;

상기 수직벽과 측압지지보를 형성하게 거푸집을 형성하는 단계와,Forming a formwork to form the vertical wall and the side pressure support;

상기 측압지지보 형성용 데크 지지프레임의 상기 콘크리트타설공을 통하여 콘크리트를 타설하는 단계를 포함하는 본 발명에 따른 측압지지보 형성용 데크 지지프레임을 이용한 지하구조물의 시공방법에 의하여 달성된다.It is achieved by the construction method of the underground structure using the side support support forming deck support frame according to the present invention comprising the step of placing concrete through the concrete casting hole of the side support support forming deck support frame.

본 발명의 이러한 목적은 흙막이벽 지지빔상의 지지돌출부에 고정되고 중간에 다수의 콘크리트타설공이 형성된 프레임본체와, 상기 프레임본체의 일단부에 부착되며 데크의 단부가 배치되는 데크고정부가 형성된 본 발명에 따른 측압지지보 형성용 데크 지지프레임 의하여 달성된다.This object of the present invention is a frame body fixed to the support protrusion on the retaining wall support beam and formed with a plurality of concrete casting holes in the middle, and a deck fixing part attached to one end of the frame body and the end of the deck is formed It is achieved by the deck support frame for forming the side pressure support.

본 발명에 따른 측압지지보 형성용 데크 지지프레임 및 측압지지보 형성용 데크 지지프레임을 이용한 지하구조물의 시공방법인 에스비디공법은 첨부된 도면을 참고로 하여 이하에 상세히 기술되는 실시 예에 의하여 그 특징 및 장점들을 보다 명백하게 이해할 수 있을 것이다.The construction method of the underground structure using the deck support frame and the side pressure support forming deck support frame according to the present invention according to the embodiment described in detail below with reference to the accompanying drawings Features and advantages will be more clearly understood.

본 발명에 따른 측압지지보 형성용 데크 지지프레임을 이용한 지하구조물의 시공방법은, 도1에 도시된 바와 같이, 건축물이 건립될 주위에 토사의 붕괴를 방지하기 위하여 흙막이벽의 지지빔이 내설된 연이어 설치된 다수의 콘크리트열주가 설치되고 상기 콘크리트열주내에 본건물의 기둥이 될 부분에 다수의 기둥용 H빔이 타 설된 상태에서 위에서 아래로 내려가면서 차례로 각 층의 콘크리트슬래브층을 형성하는 단계(1)와, 아래에서 위로 올라오면서 각 층의 기둥 및 측압지지보와 수직벽을 시공하는 내력벽형성단계(2)로 구성된 이용한 지하구조물의 시공방법인 에스비디공법에 있어서,In the construction method of the underground structure using the deck support frame for forming the side pressure support according to the present invention, as shown in Figure 1, the support beam of the earthen wall is built in order to prevent the collapse of the earth and sand around the building construction Steps to form a concrete slab layer of each layer in turn while descending from top to bottom with a plurality of pillars H beam is installed in the portion to be the pillar of the building in the concrete colonnaces installed in succession (1 In the SBD method, which is a construction method of the underground structure, which is composed of a load-bearing wall forming step (2) of constructing pillars and side pressure support and vertical walls of each floor while rising from below,

상기 위에서 아래로 내려가면서 각 층의 콘크리트슬래브층을 형성하는 단계(1)는일정한 깊이로 지하층을 굴착하는 단계(11)와, Step (1) of forming a concrete slab layer of each layer while going down from the top to the bottom (11) to excavate the basement layer to a predetermined depth,

상기 콘크리트열주내에 설치된 지지빔상에 지지돌출부를 부착고정시키는 단계(12)와,Attaching and fixing a support protrusion on the support beam installed in the concrete column;

상기 콘크리트열주상에 고정된 지지돌출부상에 콘크리트타설공이 형성되고 데크고정부가 형성된 측압지지보 형성용 데크 지지프레임을 배치고정시키는 단계(13)와,(13) arranging and fixing a deck support frame for forming a side pressure support on which a concrete casting hole is formed and a deck fixing part is formed on a support protrusion fixed on the concrete column;

상기 측압지지보 형성용 데크 지지프레임의 데크고정부상에 데크를 배치하고 데크상에 콘크리트를 타설하여 콘크리트슬래브층을 형성하는 단계(14)를 포함하고,Placing the deck on the deck fixing part of the deck support frame for forming the side pressure support beam and placing concrete on the deck to form a concrete slab layer (14),

상기 아래에서 위로 올라가면서 각 층의 기둥 및 측압지지보와 수직벽을 시공하는 내력벽 형성단계(2)는 Step (2) of the bearing wall forming the vertical wall and the column and the side pressure support of each floor while going up from the bottom

콘크리트슬래브층에서 상방으로 수직벽과 측압지지보를 형성하는 철근이 상기 측압지지보 형성용 데크 지지프레임의 상기 콘크리트타설공을 지나게 배선하는 철근배선단계(21)와,Reinforcing bar step 21 for reinforcing the reinforcing bar forming the vertical wall and the side pressure support in the concrete slab layer passing through the concrete placing hole of the deck support frame for forming the side pressure support,

상기 수직벽과 측압지지보를 형성하게 거푸집을 형성하는 단계(22)와,Forming a formwork to form the vertical wall and the side pressure support (22),

상기 측압지지보 형성용 데크 지지프레임의 상기 콘크리트 타설공을 통하여 상부층에서 콘크리트를 타설하는 단계(23)를 포함한다.Placing concrete in the upper layer through the concrete placing hole of the deck support frame for forming the side pressure support (23).

상기 지지돌출부(9)는 H빔 또는 브라켓이 사용된다.The support protrusion 9 is an H beam or a bracket is used.

상기 지하구조물의 각 층의 바닥면에 배치되는 데크(D)는 지지프레임(A)의 데크고정부(5)에 일단부가 걸리고 타단부는 지하구조물의 바닥면상에 설치된 철골보나 철골거더상에 걸리게 되며 또한 바닥면의 가장자리가 아닌 바닥면의 중앙이나 내측부분에서 데크는 바닥면상에 설치된 철골보나 철골거더상에 설치되나 이러한 철골보나 철골거더는 이미 공지된 것으로 그에 대한 상세한 설명은 생략한다. Deck (D) disposed on the bottom surface of each layer of the underground structure is caught on one end of the deck fixing part (5) of the support frame (A) and the other end is caught on the cheolgolbo or steel frame girders installed on the bottom surface of the underground structure In addition, the deck in the center or the inner portion of the bottom surface, not the edge of the bottom surface is installed on the cheolgolbo or steel frame girders installed on the bottom surface, but such a cheolgolbo or steel frame girders are already known and detailed description thereof will be omitted.

본 발명의 일실시예에 따른 측압지지보 및 슬래브 형성용 데크 지지프레임(A)은, 도2에 도시된 바와 같이, 다수의 콘크리트타설공(3)이 형성된 프레임본체(4)와, 상기 프레임본체(4)의 일단부에 부착되며 데크(D)의 단부가 배치되는 데크고정부(5)가 형성되어 있다. 상기 데크고정부(5)의 하부에는 지지프레임(A) 및 데크고정부(5)의 휘어짐(좌굴)과 같은 변형이 방지되도록 보강대(6)가 하향으로 연장설치되어 있다. 상기 측압지지보 형성용 데크 지지프레임(A)은 상기 콘크리트열주(7)내에 설치된 지지빔(8)상에 고정된 지지돌출부(9)상에 배치고정된다.      The deck support frame (A) for side pressure support and slab formation according to an embodiment of the present invention, as shown in Figure 2, the frame body 4 is formed with a plurality of concrete placing holes (3), and the frame The deck fixing part 5 which is attached to one end of the main body 4 and in which the end part of the deck D is arrange | positioned is formed. The lower part of the deck fixing part 5 is provided with a reinforcing rod 6 extending downward to prevent deformation such as bending (buckling) of the support frame A and the deck fixing part 5. The deck support frame (A) for forming the side pressure support beam is fixed to the support protrusion (9) fixed on the support beam (8) installed in the concrete column (7).

본 실시예에서 상기 프레임본체(4)는 철재 4각 파이프재로 성형되고 횡방향으로 연장된 주프레임(41)과, 콘크리트타설공(3)이 형성되도록 상기 주프레임(41)의 측방으로 일정간격으로 이격되어 고정된 4개의 부프레임(42)으로 구성되어 있다. 본 실시예에서는 주프레임(41)이 1개가 설치되어 있으나 더 큰 횡압력을 받기위해서는 2개이상이 사용될 수 있으며 부프레임(42)이 4개가 설치되어 있으나 다소의 증감변동은 가능하다고 할 것이다. 또한 상기 부프레임(42)이 주프레임(41)에 직각으로 부착되게 성형되어 있으나 직각이 아닌 경사지게 성형될 수 있음은 물론 이다.In the present embodiment, the frame main body 4 is formed in a steel quadrilateral pipe material and extends in a lateral direction of the main frame 41 so that the main frame 41 and the concrete pouring hole 3 are formed in the transverse direction. It consists of four subframes 42 fixed and spaced apart from each other. In this embodiment, one main frame 41 is installed, but two or more may be used to receive a greater lateral pressure, and four subframes 42 may be installed, but some increase or decrease may be possible. In addition, the subframe 42 is formed to be attached to the main frame 41 at a right angle, but may be formed to be inclined rather than a right angle.

상기 부프레임(42)의 일단부에는 데크고정부(5)가 형성되어 있다. 상기 데크고정부(5)는 콘크리트슬라브의 하층을 지지하는 데크의 단부가 고정되도록 데크의 단부가 배치되며 상기 부프레임(42)의 일단에 고정되어 있다. 본 실시예에서는 상기 데크고정부(5)는 ㄴ자형 강이 사용되었으나 이에 제한되는 것은 아니고 다른 강재가 사용될 수 있음은 물론이다. 상기 보강대(6)는 철근이 지그재그로 고정되고 하단에 ㄴ자형 강이 사용되었으나 다른 형태로 사용될 수 있음은 물론이다.A deck fixing part 5 is formed at one end of the subframe 42. The deck fixing part 5 is disposed at the end of the deck so that the end of the deck for supporting the lower layer of the concrete slab is fixed to one end of the sub-frame 42. In the present embodiment, the deck fixing part 5 is used as the N-shaped steel, but is not limited to this, of course, other steel may be used. The reinforcing rod 6 is fixed in a zigzag reinforcing bar and used a c-shaped steel at the bottom, but can be used in other forms, of course.

이와 같은 구조를 갖는 본 발명에 따른 측압지지보 형성용 데크 지지프레임(A) 및 측압지지보 형성용 데크 지지프레임을 이용한 지하구조물의 시공방법을 이하에 상세히 기술한다.       The construction method of the underground structure using the deck support frame (A) for forming the side pressure support and the deck support frame for forming the side pressure support according to the present invention having such a structure will be described in detail below.

본 발명의 일실시예에 따른 측압지지보 형성용 데크 지지프레임을 이용한 지하구조물의 시공방법은, 도3a,3b,3c,3d,3e,3f에 도시된 바와 같이, 건축물이 건립될 주위에 토사의 붕괴를 방지하기 위하여 지지빔(8)이 내설되고 연이어 설치된 다수의 콘크리트열주(7)가 설치된다. 상기 콘크리트열주((7)에 의해 경계된 안쪽으로 건물의 기둥이 될 부분에 다수의 기둥H빔(10)이 타설되고 지면의 일정부분을 굴삭하고 콘크리트열주(7)의 지지빔(8)상에 수평으로 일정간격으로 이격되게 지지돌출부(9)를 부착고정시킨다. 이와 같이 일정간격으로 이격되게 고정된 지지돌출부(9)상에 콘크리트타설공(3)이 형성되고 데크고정부(5)가 형성된 측압지지보 형성용 데크 지지프레임(A)을 지상 1층바닥의 가장자리을 따라 연설되게 배치고정시킨다. 그 후, 본건물의 기둥H빔(10)과 콘크리트 열주(7)사이 그리고 기둥H빔(10)사이에 철골 보를 연결하여 지상1층 구조체를 형성하고 데크(D)의 일단부가 데크고정부(5)상에 배치되게 데크(D)를 배치하고 슬래브 철근을 배선한 후 슬래브 콘크리트를 타설하여 지상1층 바닥 작업장을 완성한다. 그 후에 위에서 아래로 내려가면서 지하1층 바닥을 굴삭하고(도3a에 도시) 지하1층의 바닥높이에 상기와 같은 방법으로 콘크리트열주(7)의 지지빔(8)상에 수평으로 일정간격으로 이격되게 지지돌출부(9)를 부착고정시킨다. 이와같이 일정간격으로 이격되게 고정된 지지돌출부(9)상에 콘크리트타설공(3)이 형성되고 데크고정부(5)가 형성된 측압지지보 형성용 데크 지지프레임(A)을 지하1층의 가장자리를 따라 연설되게 배치고정시킨다. 그 후, 본건물의 기둥H빔(10)과 콘크리트 열주(7)에 철골보를 연결하여 지하1층 구조체를 형성하고 데크(D)의 일단부가 데크고정부(5)상에 배치되게 데크(D)를 배치하고 슬래브 철근을 배선한 후 바닥에 콘크리트를 타설하면 지하1층의 콘크리트슬래브층이 형성되고(도3b에 도시) 이와 같은 과정을 순차적으로 반복하면서 지하 3층(도3c에 도시), 지하 5층(도3d에 도시)의 콘크리트슬래브층 형성이 순차적으로 완료되고 각 층의 콘크리트슬래브층의 형성작업이 완성되는 것이다. 즉, 이와 같은 각 층의 콘크리트슬래브층의 형성은 도4에 세부적으로 도시된 바와 같이 상부에서 하부로 순차적으로 수행되게 되는 것이다. 이와 같이 콘크리트타설공(3)이 형성되고 데크고정부(5)가 형성된 지지프레임(A)을 지지돌출부(9)상에 설치하는 것으로 토사의 측압을 효과적으로 보와 슬래브에 전달하여 가시설로서 이를 효율적으로 지지하는 역할을 해내고, 측면지지보와 수직벽의 철근배선 및 콘크리트를 타설하는 공간을 용이하게 확보할 수 있게 됨과 아울러 데크의 설치를 용이하게 고정시켜 슬래브의 형 성을 용이하게 하게 되는 것이다. 이와 같이 지하 각 층의 콘크리트슬래브층의 형성작업이 완료되면(도3e에 도시), 가장 바닥층에서 바로 상부의 콘크리트슬래브층에서 상방으로 수직벽(11)과 측압지지보(12)를 형성하는 철근(13)을 배선하여 상기 철근(13)의 상부는 상기 측압지지보 형성용 데크 지지프레임(A)의 상기 콘크리트타설공(3)을 지나게 배선한다(도6a,6b,및 6c에 도시). 이와 같이 철근(13)은 이미 상하가 관통되게 형성된 콘크리트타설공(3)상을 자유롭게 통과하는 것이 가능하므로 철근(13)의 배선작업이 대단히 용이하고 철근이 연속되게 설치되는 것이다. 이와 같이 철근(13)의 배선이 완료되면 상기 수직벽(11)과 측압지지보(12)의 윤곽을 형성하게 거푸집(14)을 형성하고, 상부의 콘크리트슬래브층에 설치된 측압지지보 형성용 데크 지지프레임(A)의 콘크리트타설공(3)을 통하여 상부층에서 콘크리트를 타설시키면 용이하게 수직벽과 측압지지보(12)의 타설작업이 완료되는 것이다. 이와 같이 반복적으로 아래에서 위로 각 층의 작업을 수행하면 건물의 지하구조물의 시공이 완료되게 되는 것이다(도3f에 도시). Construction method of the underground structure using the deck support frame for forming the side pressure support according to an embodiment of the present invention, as shown in Figures 3a, 3b, 3c, 3d, 3e, 3f, the earth and sand around the construction In order to prevent the collapse of the support beam (8) is built-in and a plurality of concrete columns 7 are installed in succession. A plurality of pillar H beams 10 are placed in the portion to be pillars of the building inwardly bounded by the concrete colonnades (7) and excavate a certain portion of the ground and onto the support beams 8 of the concrete colonnades 7. Attaching and fixing the support protrusions 9 to be horizontally spaced apart at regular intervals on the concrete in this way, the concrete placing hole (3) is formed on the support protrusions (9) fixed at regular intervals and the deck fixing part (5) The deck supporting frame A for forming the side pressure support beams is fixed to be oriented along the edge of the ground floor 1. Then, between the pillar H beam 10 and the concrete column 7 of the building and the pillar H beam ( 10) Connect the steel beams to form a ground-floor structure, place the deck (D) so that one end of the deck (D) is arranged on the deck fixing part (5), wire the slab reinforcement, then slab concrete Complete the ground floor floor workshop, then from above Excavation of the ground floor of the first floor under the excavation (shown in Figure 3a) and at the height of the ground of the first floor of the basement, the support projections are spaced horizontally at regular intervals on the support beam 8 of the concrete column 7 in the same manner as described above. (9) is fixed to the deck support frame (A) for forming a side pressure support beam formed with a concrete casting hole (3) and a deck fixing part (5) formed on the support protrusions (9) fixed at regular intervals. ) Is fixed along the edge of the first basement floor, and then the cheolgolbo is connected to the pillar H beam 10 and the concrete column 7 of the main building to form the first basement structure and the deck (D) Placing deck (D) so that one end is placed on deck fixing part (5), wiring slab reinforcement, and placing concrete on the floor, concrete slab layer of basement level 1 is formed (shown in Figure 3b). Sequentially repeating the 3rd basement floor (shown in Figure 3c), Formation of the concrete slab layer of the five underground layers (shown in Fig. 3d) is completed in sequence, and the work of forming the concrete slab layer of each layer is completed, that is, the formation of the concrete slab layer of each layer is detailed in FIG. As shown in FIG. 2, the support frame A on which the concrete placing hole 3 is formed and the deck fixing portion 5 is formed is installed on the support protrusion 9. It effectively transmits the lateral pressure of the soil to the beams and slabs, effectively supporting it as a temporary facility, making it easy to secure the space for reinforcing wires and concrete of the side support beams and vertical walls, and It is easy to fix the installation to facilitate the formation of the slab. When the work of forming the concrete slab layer of each basement layer is completed as shown in FIG. 3e, the reinforcing bars forming the vertical wall 11 and the side pressure support beam 12 upward from the concrete slab layer immediately above the bottom layer. (13) is wired so that the upper part of the reinforcing bar 13 passes through the concrete placing hole 3 of the deck support frame A for forming the side pressure bearing support (shown in FIGS. 6A, 6B, and 6C). In this way, the reinforcing bar 13 can pass freely through the concrete placing hole (3) is already formed so that the upper and lower through it is very easy wiring work of the reinforcing bar 13 is to be continuously installed rebar. As such, when the wiring of the reinforcing bar 13 is completed, the formwork 14 is formed to form the contour of the vertical wall 11 and the side pressure support 12, and the side pressure support formation deck installed in the upper concrete slab layer. When the concrete is poured from the upper layer through the concrete placing hole (3) of the support frame (A) is easy to finish the casting work of the vertical wall and the side pressure support (12). Repeatedly performing the operation of each floor from the bottom to complete the construction of the underground structure of the building (shown in Figure 3f).

이상과 같이 본 발명에 따른 측압지지보 형성용 데크 지지프레임 및 측압지지보 형성용 데크 지지프레임을 이용한 지하구조물의 시공방법은 흙막이벽 지지빔상에 H빔 또는 브라켓을 이용한 지지돌출부를 고정하고, 제품 중간에 다수의 콘크리트타설공이 형성되어 있고 데크의 단부가 배치되는 데크고정부가 단부에 형성된 측압지지보 형성용 데크 지지프레임을 상기 지지돌출부 상에 설치하는 것으로, 여타 작업 공간을 용이하게 확보할 수 있게 됨과 아울러, 데크를 용이하게 고정시키 고 측압지지보와의 연결철근을 용이하게 설치할 수 있게 되어 시공이 간편하고 품질확보가 가능하며, 수직벽과 측압지지보의 형성을 아래에서 위로 형성하게 됨으로 위에서 아래로 시공하는 기존의 방식에 비하여 시공이 월등히 간편하고 공사진행이 원활해 지며, 수직벽과 측압지지보를 형성하는 철근을 배선할 시 상기 측압지지보 형성용 데크 지지프레임의 상기 콘크리트타설공의 내부로 자유롭게 통과하여 배선하므로 철근의 배선작업이 대단히 용이하게 실시되고, 철근 및 콘크리트의 연속성을 확보하여 중요한 건축품질조건을 확보할 수 있으며, 또한 콘크리트슬래브층에 설치된 측압지지보 형성용 데크 지지프레임의 콘크리트타설공을 통하여 상부층에서 콘크리트를 타설시키면, 기존의 측압지지보 선시공법의 경우의 매립된 콘크리트 타설공을 이용한 타설에 비해, 훨씬 용이하고 콘크리트의 완벽한 충진이 가능하게 되어 측압지지보 및 수직벽의 형성이 대단히 용이하고 우수한 품질을 확보할 수 있게 되며, 콘크리트슬래브층의 설치구조가 획기적으로 간략히 변경되어 시공이 신속하게 수행되어 공기를 월등히 단축시키는 것이 가능하게 되고 측면지지보와 수직벽 및 데크의 설치가 총체적으로 간략하고 용이하게 되어 사용인력이 월등히 절감되고 시공비용이 저렴하게 되며 공기를 획기적으로 감소시키는 것이 가능하게 되는 우수한 효과가 있다.As described above, the construction method of the underground structure using the deck support frame for forming the side pressure support and the deck support frame for forming the side pressure support according to the present invention is to fix the support protrusion using the H beam or the bracket on the support wall of the brick wall, and the product Deck fixing part in which a plurality of concrete casting holes are formed in the middle and the end of the deck is arranged is installed on the support protrusion to form a deck support frame for forming the side pressure support on the end, so that other work spaces can be easily secured. In addition, the deck can be easily fixed and the connecting rebar with the side pressure support can be easily installed, so the construction is easy and quality can be secured, and the vertical wall and the side pressure support can be formed from the top to the bottom. Compared with the existing method of construction below, construction is much simpler, and the lines of the construction are smooth. When wiring the reinforcing bar to form the direct wall and the side pressure support, the free wire passes through the inside of the concrete casting hole of the side pressure support forming deck support frame, so the wiring work of the reinforcing bar is very easy, It is possible to secure important building quality conditions, and also when concrete is poured from the upper layer through the concrete placing hole of the side support frame for deck pressure supporting frame installed in the concrete slab layer, It is much easier and perfect filling of concrete is possible compared to the use of embedded concrete placing hole, so it is very easy to form side pressure support and vertical wall and ensure the excellent quality, and the installation structure of concrete slab layer Significant changes have been made to quickly perform construction It is possible to greatly shorten and the installation of side supports, vertical walls and decks is totally simple and easy, which greatly reduces the manpower, makes construction costs cheaper, and significantly reduces the air. have.

Claims (4)

건축물이 건립될 주위에 토사의 붕괴를 방지하기 위하여 지지빔이 내설되고 연이어 설치된 다수의 콘크리트열주가 설치되고 상기 콘크리트열주내에 건물의 기둥이될 부분에 다수의 기둥H빔이 타설된 상태에서 위에서 아래로 내려가면서 굴토하여 차례로 각 층의 콘크리트슬래브층을 형성하는 단계(1)와, 아래에서 위로 올라오면서 각 층의 기둥 및 측압지지보와 수직벽을 시공하는 내력벽형성단계(2)로 구성된 지하구조물의 시공방법에 있어서, In order to prevent the collapse of the earth and sand around the building, a support beam is installed and a plurality of concrete columns are installed in succession, and a plurality of pillar H beams are placed at the part to be a pillar of the building within the concrete column. Underground structure consisting of the step (1) to form a concrete slab layer of each layer in turn by going down to the bottom, and the load-bearing wall forming step (2) to construct a vertical wall and the pillar and side pressure support of each layer from the bottom up In the construction method of, 상기 위에서 아래로 내려가면서 각 층의 콘크리트슬래브층을 형성하는 단계(1)는Step (1) to form a concrete slab layer of each layer while going down from the top 일정한 깊이로 지하층을 굴착하는 단계(11)와, Excavating the basement layer to a constant depth (11), 상기 콘크리트열주내에 설치된 지지빔상에 지지돌출부를 부착고정시키는 단계(12)와,Attaching and fixing a support protrusion on the support beam installed in the concrete column; 상기 콘크리트열주상에 고정된 지지돌출부상에 콘크리트타설공이 형성되고 데크고정부가 형성된 측압지지보 형성용 데크 지지프레임을 배치시키는 단계(13)와,(13) disposing a deck support frame for forming a side pressure support formed with a concrete casting hole and a deck fixing part formed on a support protrusion fixed to the concrete column; 상기 측압지지보 형성용 데크 지지프레임 상에 데크를 설치하고 데크상에 콘크리트를 타설하여 콘크리트슬래브층을 형성하는 단계(14)를 포함하고,And installing a deck on the deck support frame for forming the side pressure support beam and placing concrete on the deck to form a concrete slab layer (14). 상기 아래에서 위로 올라가면서 각 층의 측압지지보와 수직벽을 시공하는 내력벽 형성단계(2)는 Steps (2) of the bearing wall forming the vertical pressure wall and the vertical wall of each layer while going up from the bottom 콘크리트슬래브층에서 상방으로 수직벽과 측압지지보를 형성하는 철근이 상기 측압지지보 형성용 데크 지지프레임의 상기 콘크리트타설공을 지나게 배선하는 철근배선단계(21)와,Reinforcing bar step 21 for reinforcing the reinforcing bar forming the vertical wall and the side pressure support in the concrete slab layer passing through the concrete placing hole of the deck support frame for forming the side pressure support, 상기 수직벽과 측압지지보를 형성하게 거푸집을 형성하는 단계(22)와,Forming a formwork to form the vertical wall and the side pressure support (22), 상기 측압지지보 형성용 데크 지지프레임의 상기 콘크리트타설공을 통하여 상부층에서 콘크리트를 타설하는 단계(23)를 포함하는 것을 특징으로 하는 지하구조물의 시공방법.Construction method of the underground structure comprising the step (23) of placing concrete in the upper layer through the concrete placing hole of the deck support frame for forming the side pressure support. 다수의 콘크리트타설공(3)이 형성된 프레임본체(4)와, 상기 프레임본체(4)의 일단부에 부착되며 데크(D)의 단부가 배치되는 데크고정부(5)가 형성된 것을 특징으로 하는 측압지지보 형성용 데크 지지프레임.Frame body 4 is formed with a plurality of concrete pouring hole 3, and the deck fixing part 5 is attached to one end of the frame body 4, the end of the deck (D) is formed Deck support frame for forming lateral pressure support. 제2항에 있어서, 상기 데크고정부(5)의 하부에는 지지프레임(A)과 데크고정부(5)의 변형이 방지되도록 보강대(6)가 하향으로 연장설치된 것을 특징으로 하는 측압지지보 형성용 데크 지지프레임.According to claim 2, wherein the lower side of the deck fixing portion 5, the support frame (A) and the side fixing support, characterized in that the reinforcement (6) is installed to extend downward to prevent deformation of the deck fixing portion (5) Deck support frame. 제2항에 있어서, 상기 프레임본체(4)는 데크고정부(5)와 평행하게 횡방향으로 연장된 주프레임(41)과, 콘크리트타설공(3)이 형성되도록 상기 주프레임(41)에 일정간격으로 이격되어 고정된 복수개의 부프레임(42)으로 구성된 것을 특징으로 하는 측압지지보 형성용 데크 지지프레임. According to claim 2, wherein the frame body (4) is a main frame (41) extending in the transverse direction in parallel with the deck fixing portion (5), and the concrete pouring hole (3) is formed in the main frame (41) Deck support frame for forming a side pressure support, characterized in that consisting of a plurality of sub-frames 42 fixed to be spaced apart at regular intervals.
KR1020040048402A 2004-06-25 2004-06-25 a deck supportframe and a construction methed KR100593203B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020040048402A KR100593203B1 (en) 2004-06-25 2004-06-25 a deck supportframe and a construction methed

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020040048402A KR100593203B1 (en) 2004-06-25 2004-06-25 a deck supportframe and a construction methed

Related Child Applications (1)

Application Number Title Priority Date Filing Date
KR20-2004-0018110U Division KR200369485Y1 (en) 2004-06-25 2004-06-25 a deck supportframe

Publications (2)

Publication Number Publication Date
KR20050122763A KR20050122763A (en) 2005-12-29
KR100593203B1 true KR100593203B1 (en) 2006-06-28

Family

ID=37294527

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020040048402A KR100593203B1 (en) 2004-06-25 2004-06-25 a deck supportframe and a construction methed

Country Status (1)

Country Link
KR (1) KR100593203B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20160133705A (en) 2015-05-13 2016-11-23 최완규 A deck support frame

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100722198B1 (en) * 2006-04-17 2007-05-29 (주) 씨엠파트너스 Strut system of temporary retaining wall and subgrade external wall construction method utilizing the same
CN104727324B (en) * 2015-03-20 2016-08-03 朱奎 Irregular basement construction method for supporting

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0754364A (en) * 1993-08-10 1995-02-28 Shimizu Corp Construction method of basement floor

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0754364A (en) * 1993-08-10 1995-02-28 Shimizu Corp Construction method of basement floor

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20160133705A (en) 2015-05-13 2016-11-23 최완규 A deck support frame

Also Published As

Publication number Publication date
KR20050122763A (en) 2005-12-29

Similar Documents

Publication Publication Date Title
JP3644605B2 (en) Reverse driving method of underground structure under road surface.
KR100967497B1 (en) Method for constructing an underground structure
KR101341679B1 (en) Device for constructing an underground structure and method thereof
KR100694493B1 (en) Downward construction method capable of using bracket support type temporary structure as working table
KR102286225B1 (en) Method for constructing underground structure busing PC integrating method without support
KR101169462B1 (en) Top-down construction method using post member
KR101187170B1 (en) Application of under pinning method in remodeling
KR101296857B1 (en) Underground structure having slab beam with enhanced bearing power against earth pressure and construction methods of the same
RU2220258C1 (en) Process of erection of multilevel underground structure ( variants )
KR100593203B1 (en) a deck supportframe and a construction methed
CN113266038B (en) Construction method for excavating underground building in foundation pit
KR20130100878A (en) Architecture using a complex steel pile and a constructing method thereof
KR20200122037A (en) The construction method using a exterio wall of undergound structure
KR20130021949A (en) Reinforcement structure for wall of underground structure and construction method of underground structure using the same
JP6855296B2 (en) Building foundation structure and its construction method
KR100967496B1 (en) Device for constructing an underground structure
KR100615149B1 (en) A method of construction top-down for the ground fabric construction
AU2020100004A4 (en) A Method Of Constructing A Column, A Subterranean Structure, And A Structure Made From The Method
JPH0684690B2 (en) Building basement extension method
KR200370135Y1 (en) Forms for edge girder construction
KR100663109B1 (en) Method for Constructing an Underground Structure Using Up-down Method
KR200369485Y1 (en) a deck supportframe
KR100679986B1 (en) Structure for plastic slab deck system and Downward construction method using the same
KR101106799B1 (en) Construction method of Top-down concrete slab
KR100757710B1 (en) Dowel bar construction method for downward construction of underground structures

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20131025

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20140610

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20150717

Year of fee payment: 10

FPAY Annual fee payment

Payment date: 20160708

Year of fee payment: 11

FPAY Annual fee payment

Payment date: 20170717

Year of fee payment: 12

FPAY Annual fee payment

Payment date: 20180719

Year of fee payment: 13

FPAY Annual fee payment

Payment date: 20190402

Year of fee payment: 14