Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filedfiledCritical
Priority to JP12915087UpriorityCriticalpatent/JPH0432456Y2/ja
Publication of JPS6436469UpublicationCriticalpatent/JPS6436469U/ja
Application grantedgrantedCritical
Publication of JPH0432456Y2publicationCriticalpatent/JPH0432456Y2/ja
Lessons learned from performance of nonstructural components during the January 17, 1994 Northridge earthquake-Case studies of six instrumented multistory buildings