JP7434325B2 - エレベータシステムのエレベータ構成要素の設置の少なくとも部分的に自動化された計画のための方法 - Google Patents
エレベータシステムのエレベータ構成要素の設置の少なくとも部分的に自動化された計画のための方法 Download PDFInfo
- Publication number
- JP7434325B2 JP7434325B2 JP2021533536A JP2021533536A JP7434325B2 JP 7434325 B2 JP7434325 B2 JP 7434325B2 JP 2021533536 A JP2021533536 A JP 2021533536A JP 2021533536 A JP2021533536 A JP 2021533536A JP 7434325 B2 JP7434325 B2 JP 7434325B2
- Authority
- JP
- Japan
- Prior art keywords
- elevator
- shaft
- target
- support surface
- wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000009434 installation Methods 0.000 title claims description 63
- 238000000034 method Methods 0.000 title claims description 41
- 238000012360 testing method Methods 0.000 claims description 29
- 238000012545 processing Methods 0.000 claims description 6
- 238000005259 measurement Methods 0.000 description 17
- 238000011156 evaluation Methods 0.000 description 10
- 238000004088 simulation Methods 0.000 description 7
- 238000006073 displacement reaction Methods 0.000 description 5
- 230000001133 acceleration Effects 0.000 description 4
- 239000000463 material Substances 0.000 description 4
- NIPNSKYNPDTRPC-UHFFFAOYSA-N N-[2-oxo-2-(2,4,6,7-tetrahydrotriazolo[4,5-c]pyridin-5-yl)ethyl]-2-[[3-(trifluoromethoxy)phenyl]methylamino]pyrimidine-5-carboxamide Chemical compound O=C(CNC(=O)C=1C=NC(=NC=1)NCC1=CC(=CC=C1)OC(F)(F)F)N1CC2=C(CC1)NN=N2 NIPNSKYNPDTRPC-UHFFFAOYSA-N 0.000 description 2
- 230000000977 initiatory effect Effects 0.000 description 2
- 238000005192 partition Methods 0.000 description 2
- 239000007787 solid Substances 0.000 description 2
- 239000000725 suspension Substances 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000006978 adaptation Effects 0.000 description 1
- 230000002411 adverse Effects 0.000 description 1
- 238000004590 computer program Methods 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 230000003287 optical effect Effects 0.000 description 1
- 238000012805 post-processing Methods 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
- 238000000844 transformation Methods 0.000 description 1
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B19/00—Mining-hoist operation
- B66B19/002—Mining-hoist operation installing or exchanging guide rails
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B7/00—Other common features of elevators
- B66B7/02—Guideways; Guides
- B66B7/023—Mounting means therefor
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Computer Hardware Design (AREA)
- Evolutionary Computation (AREA)
- Geometry (AREA)
- General Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
Description
-シャフト壁のコースを記録するステップ、
-エレベータシャフトのドア開口部の位置を決定するステップ、
-ドア開口部の特定の位置に応じてガイドレールの目標コースを確立するステップ、および、
-ガイドレールの確立されたコースに応じて、自動化された方法でエレベータ構成要素の目標位置を確立するステップ、
である。
-第1の閾値よりも大きい、理想的な壁面から少し離れた壁点を決定するステップ、
-前述の条件を満たす、隣接する壁点を組み合わせるステップ、および、
-結合された壁点の面積が境界面積より大きい場合、第1の凹凸を認識するステップ、
である。
-第2の閾値よりも大きい理想的な壁面から少し離れた壁点を決定するステップ、
-前述の条件を満たす各壁点における第2の凹凸を認識するステップ、
である。
-シャフト壁のコースを記録するステップ、
-自動化された方法でエレベータシャフトのドア開口部の位置を決定するステップ、
-ドア開口部の特定の位置に応じてガイドレールの目標コースを確立するステップ、
-ガイドレールの確立されたコースに応じて自動化された方法でエレベータ構成要素の目標位置を確立するステップ、
であり、独立した発明を構成する。
-第1の閾値よりも大きい理想的な壁面から少し離れた壁点を決定するステップ、
-前述の条件を満たす隣接する壁点を組み合わせるステップ、および、
-結合された壁点の面積が境界面積より大きい場合、第1の凹凸を認識するステップ、
である。
-第2の閾値よりも大きい理想的な壁面から少し離れた壁点を決定するステップ、
-前述の条件を満たす各壁点における第2の凹凸を認識するステップ、
である。
Claims (13)
- シャフト壁(18a、18b、18c、18d)によって区切られたエレベータシャフト(10)のエレベータ構成要素(16)の設置の、少なくとも部分的に自動化された計画のための方法であって、
-シャフト壁(18a、18b、18c、18d)のコースを記録するステップと、
-エレベータシャフト(10)のドア開口部(52a、52b、52c)の位置を決定するステップと、
-ドア開口部(52a、52b、52c)の特定の位置に応じてガイドレール(86a、86b)の目標コースを確立するステップと、
-ガイドレール(86a、86b)の確立された経路に応じて自動化された方法でエレベータ構成要素(16)の目標位置を確立するステップと、
を備え、
設置されるエレベータ構成要素(16)の少なくともいくつかは、シャフト壁(18a、18b、18c、18d)に固定され得る固定可能部分(88)、および、固定可能部分(88)に対して確立された調整範囲(100)で可動な可動部分(90)を有する調整可能なエレベータ構成要素として設計され、可動部分(90)の目標位置は調整可能なエレベータ構成要素(16)のために決定され、
-調整可能なエレベータ構成要素(16)について、エレベータ構成要素(16)の可動部分(90)がその目標位置(102、108)に配置されたとき、前述の調整範囲(100)が固定可能部分(88)をシャフト壁(18a、18b、18c、18d)に固定するのに十分であるかどうかを決定するために、自動チェックが実行され、
-前述の試験の結果がさらなる処理のために出力されること、
を特徴とする方法。 - 調整可能なエレベータ構成要素(16)は、ガイドレール(86a、86b)をシャフト壁(18c、18d)に締結するためのレールブラケットとして設計され、レールブラケット(16)はそれぞれ、前記固定可能部分としてのレールブラケット下部(88)および前記可動部分としてのレールブラケット上部(90)を有することを特徴とする、請求項1に記載の方法。
- エレベータ構成要素(16)がシャフト壁(18c)の支持面(108)上で支持され、目標支持面(102、108)の表面輪郭が、シャフト壁(18a、18b、18c、18d)の記録されたコースおよびエレベータ構成要素(16)の目標位置から導出され、目標支持面(102、108)の表面輪郭が自動的にチェックされ、目標支持面(102、108)のチェックの結果がさらなる処理のために出力されることを特徴とする、請求項1または請求項2のいずれかに記載の方法。
- 第1の認識規則によって、目標支持面(102、108)の表面輪郭における第1の凹凸(106)が認識され、目標支持面(102、108)に第1の凹凸(106)がないかどうかについて、目標支持面(102、108)の試験の結果が出力されることを特徴とする、請求項3に記載の方法。
- 目標支持面(102、108)が第1の凹凸(106)を有さない場合、目標支持面(102、108)の表面輪郭の第2の凹凸(110)が第2の認識規則によって認識され、目標支持面(102、108)の試験の結果として、目標支持面(102、108)に第2の凹凸(110)がないかどうかが出力されることを特徴とする、請求項4に記載の方法。
- エレベータ構成要素(16)について否定的な結果が出力された場合、元の目標位置がエレベータ構成要素(16)の新しい目標位置に自動的にシフトされ、新しい目標位置がチェックされることを特徴とする、請求項1~5のいずれか一項に記載の方法。
- 目標位置の前述のシフトは、予め決められたシフト範囲内でのみ実行され、予め決められたシフト範囲内で適切な目標位置が見つけられることができない場合、否定的な結果が出力されることを特徴とする、請求項6に記載の方法。
- エレベータ構成要素(16)について否定的な結果が出力される場合、ガイドレール(86a、86b)の目標コースが自動的に変更されることを特徴とする、請求項1~7のいずれか一項に記載の方法。
- エレベータ構成要素(16)について調整範囲(100)のチェックの否定的な結果が出力される場合、前記エレベータ構成要素(16)の必要な調整範囲(100)が自動的に決定されて出力されることを特徴とする、請求項1~7のいずれか一項に記載の方法。
- エレベータシャフトのドア開口部(52a、52b、52c)の位置は、シャフト壁(18a、18b、18c、18d)の記録されたコースから自動的に決定されることを特徴とする、請求項1~9のいずれか一項に記載の方法。
- エレベータシャフト(10)のドア開口部(52a、52b、52c)の位置を決定するために、当初は大まかな位置が決定され、次いで大まかな位置の周りの領域でドア開口部(52a、52b、52c)の位置が決定されることを特徴とする、請求項10に記載の方法。
- ドア開口部(52a、52b、52c)の自動的に決定された位置は、オペレータによって変更されることができることを特徴とする、請求項10または請求項11のいずれかに記載の方法。
- 計画された設置は、自動取付装置(14)によって少なくとも部分的に実行され、計画中に、取付装置(14)がシャフト壁(18a、18b、18c、18d)上のそれぞれの目標位置にエレベータ構成要素(16)を設置することができるかどうかを決定するためにチェックが実行されることを特徴とする、請求項1~12のいずれか一項に記載の方法。
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP18212328.1 | 2018-12-13 | ||
EP18212328 | 2018-12-13 | ||
PCT/EP2019/083250 WO2020120190A1 (de) | 2018-12-13 | 2019-12-02 | Verfahren zur zumindest teilweise automatisierten planung einer installation von aufzugkomponenten einer aufzuganlage |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2022513461A JP2022513461A (ja) | 2022-02-08 |
JP7434325B2 true JP7434325B2 (ja) | 2024-02-20 |
Family
ID=64665331
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2021533536A Active JP7434325B2 (ja) | 2018-12-13 | 2019-12-02 | エレベータシステムのエレベータ構成要素の設置の少なくとも部分的に自動化された計画のための方法 |
Country Status (8)
Country | Link |
---|---|
US (1) | US20210395046A1 (ja) |
EP (1) | EP3894348B1 (ja) |
JP (1) | JP7434325B2 (ja) |
KR (1) | KR20210100626A (ja) |
CN (1) | CN113165848B (ja) |
AU (1) | AU2019399938A1 (ja) |
CA (1) | CA3117423A1 (ja) |
WO (1) | WO2020120190A1 (ja) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP4143679A1 (en) * | 2020-04-29 | 2023-03-08 | KONE Corporation | A solution for generating at least one installation operation for at least one ongoing installation process at an installation site |
WO2022248009A1 (en) * | 2021-05-24 | 2022-12-01 | Kone Corporation | A method and an arrangement for aligning elevator guide rails |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2018041815A1 (de) | 2016-08-30 | 2018-03-08 | Inventio Ag | Verfahren zur analyse und messsystem zum vermessen eines aufzugschachts einer aufzuganlage |
JP2019509955A (ja) | 2016-03-31 | 2019-04-11 | インベンテイオ・アクテイエンゲゼルシヤフトInventio Aktiengesellschaft | リフトシステムのリフトシャフト内で設置作業を実行するための方法および取付装置 |
Family Cites Families (44)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4345671A (en) * | 1980-03-12 | 1982-08-24 | Westinghouse Electric Corp. | Apparatus and method for installing elevator guide rails |
US5065843A (en) * | 1990-05-16 | 1991-11-19 | Otis Elevator Company | Method for installing elevator system components |
JP2829194B2 (ja) * | 1992-07-10 | 1998-11-25 | 東芝エフエーシステムエンジニアリング株式会社 | エレベータガイドレール芯出し固定作業装置及びその方法 |
US6595331B2 (en) * | 1999-09-27 | 2003-07-22 | Otis Elevator Company | Bracket for securing elevator components |
CA2451085A1 (en) * | 2001-07-06 | 2003-01-16 | Inventio Ag | Method and device for determining the rectilinearity of guide rails |
JP3961872B2 (ja) * | 2002-05-14 | 2007-08-22 | 株式会社日立ビルシステム | エレベータガイドレールの固定装置 |
JP2004043135A (ja) * | 2002-07-12 | 2004-02-12 | Hitachi Building Systems Co Ltd | エレベータのガイドレール固定装置 |
NZ546305A (en) * | 2005-04-27 | 2006-09-29 | Inventio Ag | Method and device for installation of guide rails in a lift shaft |
US20100133046A1 (en) * | 2007-03-12 | 2010-06-03 | Inventio Ag | Elevator system, suspension element for an elevator system, and device for manufacturing a suspension element |
US8291568B2 (en) * | 2008-11-28 | 2012-10-23 | Kone Corporation | Method of installing an elevator |
EP2521684B1 (en) * | 2010-01-08 | 2015-03-11 | Inventio AG | Elevator system with one pair of guide rails |
FI20100223A0 (fi) * | 2010-05-28 | 2010-05-28 | Kone Corp | Menetelmä ja hissijärjestely |
WO2012025353A1 (de) * | 2010-08-27 | 2012-03-01 | Inventio Ag | Aufzugsanlage mit einer selbstzentrierenden kabinentüraufhängung |
EP2524890B1 (en) * | 2011-05-20 | 2013-08-28 | Kone Corporation | Elevator with positon dependent braking force |
EP2657171B1 (de) * | 2012-04-26 | 2014-06-11 | Cedes AG | Aufzuganlage, Markierungsvorrichtung und Messeinrichtung |
DE102012104993A1 (de) * | 2012-06-11 | 2013-12-12 | Thyssenkrupp Elevator Ag | Verfahren und Montagesystem zur Montage von Aufzugskomponenten |
CN202729520U (zh) * | 2012-08-08 | 2013-02-13 | 北京升华电梯有限公司 | 可调导轨装置 |
WO2014053184A1 (en) * | 2012-10-04 | 2014-04-10 | Kone Corporation | Guide rail straightness measuring system for elevator installations |
EP2746210A1 (de) * | 2012-12-19 | 2014-06-25 | Inventio AG | Installationsverfahren für einen Aufzug |
CN103803376B (zh) * | 2014-02-28 | 2016-03-02 | 中山广都机电有限公司 | 一种可调节连接支架 |
EP2993153B1 (en) * | 2014-09-03 | 2022-01-19 | KONE Corporation | Guide rail installation arrangement and a method for installing guide rails |
US10689228B2 (en) * | 2015-02-04 | 2020-06-23 | Otis Elevator Company | Elevator system evaluation device |
DE102015206345A1 (de) * | 2015-04-09 | 2016-10-13 | Thyssenkrupp Ag | Führungsschiene für eine Aufzuganlage |
EP3085660B1 (en) * | 2015-04-23 | 2020-10-28 | Kone Corporation | A method and an arrangement for installing elevator guide rails |
EP3085658B8 (en) * | 2015-04-23 | 2017-09-20 | KONE Corporation | A method and an arrangement for automatic elevator installation |
EP3093262B1 (en) * | 2015-05-12 | 2018-10-31 | KONE Corporation | An arrangement and a method for parallel transport and installation of elevator components |
EP3093263A1 (en) * | 2015-05-12 | 2016-11-16 | Kone Corporation | An arrangement and a method for transporting material in an elevator shaft |
EP3118151B1 (en) * | 2015-07-17 | 2019-06-12 | KONE Corporation | Elevator guide rail bracket and method for securing a guide rail |
ES2910664T3 (es) * | 2015-07-24 | 2022-05-13 | Inventio Ag | Dispositivo de montaje automatizado para realizar instalaciones en un hueco de ascensor de un sistema de ascensor |
EP3127847B1 (en) * | 2015-08-07 | 2017-12-20 | KONE Corporation | An arrangement and a method for measuring the position of an installation platform in an elevator shaft |
AU2016355978B9 (en) * | 2015-11-19 | 2019-09-12 | Inventio Ag | Method for determining information relating to lift components received in a lift shaft |
CN205187554U (zh) * | 2015-12-09 | 2016-04-27 | 速捷电梯有限公司 | 一种电梯导轨支架 |
JP6782917B2 (ja) * | 2016-09-27 | 2020-11-11 | 清水建設株式会社 | 施工精度算出システム及び施工精度算出方法 |
AU2017368776B2 (en) * | 2016-11-30 | 2020-10-22 | Inventio Ag | Lift system and method for constructing such an elevator system |
EP3601137B1 (de) * | 2017-03-27 | 2021-06-02 | Inventio AG | Verfahren und montagevorrichtung zum durchführen eines installationsvorgangs in einem aufzugschacht einer aufzuganlage |
WO2019063356A1 (de) * | 2017-09-27 | 2019-04-04 | Inventio Ag | Ausrichtvorrichtung und verfahren zur montage einer führungsschiene in einem aufzugschacht einer aufzuganlage |
SG11202001101UA (en) * | 2017-09-27 | 2020-03-30 | Inventio Ag | Locating system and method for determining a current position in a lift shaft of a lift system |
CN207275948U (zh) * | 2017-10-12 | 2018-04-27 | 美迪斯智能装备有限公司 | 一种无需焊接的可调节导轨支架 |
CN208054675U (zh) * | 2018-02-02 | 2018-11-06 | 快意电梯股份有限公司 | 可调导轨支架 |
CN112272649A (zh) * | 2018-02-15 | 2021-01-26 | 安全工业责任有限公司 | 电梯安装方法及设备 |
CN113544072B (zh) * | 2019-03-26 | 2022-11-04 | 因温特奥股份公司 | 用于排齐电梯设备的导轨的排齐装置和方法 |
EP3766818B1 (en) * | 2019-07-16 | 2023-06-07 | KONE Corporation | A method and an arrangement for installing elevator guide rails into an elevator shaft |
EP3766819B1 (en) * | 2019-07-16 | 2023-06-07 | KONE Corporation | A method and an arrangement for installing elevator guide rails into an elevator shaft |
WO2021180510A1 (de) * | 2020-03-12 | 2021-09-16 | Inventio Ag | Verfahren zum bilden einer führungsstruktur zum führen einer aufzugkabine in einem aufzugschacht |
-
2019
- 2019-12-02 KR KR1020217017317A patent/KR20210100626A/ko not_active Application Discontinuation
- 2019-12-02 CA CA3117423A patent/CA3117423A1/en active Pending
- 2019-12-02 US US17/309,212 patent/US20210395046A1/en active Pending
- 2019-12-02 AU AU2019399938A patent/AU2019399938A1/en not_active Abandoned
- 2019-12-02 CN CN201980081713.6A patent/CN113165848B/zh active Active
- 2019-12-02 JP JP2021533536A patent/JP7434325B2/ja active Active
- 2019-12-02 EP EP19809110.0A patent/EP3894348B1/de active Active
- 2019-12-02 WO PCT/EP2019/083250 patent/WO2020120190A1/de unknown
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2019509955A (ja) | 2016-03-31 | 2019-04-11 | インベンテイオ・アクテイエンゲゼルシヤフトInventio Aktiengesellschaft | リフトシステムのリフトシャフト内で設置作業を実行するための方法および取付装置 |
WO2018041815A1 (de) | 2016-08-30 | 2018-03-08 | Inventio Ag | Verfahren zur analyse und messsystem zum vermessen eines aufzugschachts einer aufzuganlage |
Also Published As
Publication number | Publication date |
---|---|
BR112021007950A2 (pt) | 2021-07-27 |
US20210395046A1 (en) | 2021-12-23 |
EP3894348B1 (de) | 2022-08-17 |
CN113165848A (zh) | 2021-07-23 |
KR20210100626A (ko) | 2021-08-17 |
WO2020120190A1 (de) | 2020-06-18 |
CN113165848B (zh) | 2023-04-04 |
JP2022513461A (ja) | 2022-02-08 |
CA3117423A1 (en) | 2020-06-18 |
AU2019399938A1 (en) | 2021-06-24 |
EP3894348A1 (de) | 2021-10-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
AU2018340246B2 (en) | Orienting device and method for mounting a guide rail in an elevator shaft of an elevator system | |
ES2791486T3 (es) | Procedimiento y dispositivo de montaje para realizar un proceso de instalación en una caja de ascensor de una instalación de ascensor | |
US10745242B2 (en) | Method for analysis and measurement system for measuring an elevator shaft of an elevator system | |
JP7434325B2 (ja) | エレベータシステムのエレベータ構成要素の設置の少なくとも部分的に自動化された計画のための方法 | |
CN111268530B (zh) | 电梯井道测量、定位及电梯安装方法和设备 | |
US11480424B2 (en) | Locating system and method for determining a current position in an elevator shaft of an elevator system | |
JP7156896B2 (ja) | 昇降路内計測システム | |
US11708244B2 (en) | Method for planning and at least partially installing an elevator system in an elevator shaft | |
AU2019382726B2 (en) | Method and mounting device for automated determination of a drilling position of a drill hole | |
JP2010136563A (ja) | パンタグラフ型集電装置の検査装置及びパンタグラフ型集電装置の検査方法 | |
JP7444710B2 (ja) | 昇降路内計測装置、および、昇降路内計測システム | |
CA2797765C (en) | Method and device for installing an elevator in an elevator shaft | |
CA3232263A1 (en) | Method for controlling a construction robot and construction robot | |
JP6068703B1 (ja) | エレベータの昇降路形状計測装置 | |
BR112021007950B1 (pt) | Processo para planejamento pelo menos parcialmente automatizado de uma instalação de componentes de elevador de um sistema de elevador | |
JP2020132403A (ja) | エレベータの基準芯位置演算装置および基準芯演算方法 | |
JPH06286955A (ja) | 芯出し方法および芯出し装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20221201 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20230824 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20230905 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20231120 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20240109 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20240207 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 7434325 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |