JP7255384B2 - 三相負荷按分方法及び不平衡電圧計算方法 - Google Patents
三相負荷按分方法及び不平衡電圧計算方法 Download PDFInfo
- Publication number
- JP7255384B2 JP7255384B2 JP2019112005A JP2019112005A JP7255384B2 JP 7255384 B2 JP7255384 B2 JP 7255384B2 JP 2019112005 A JP2019112005 A JP 2019112005A JP 2019112005 A JP2019112005 A JP 2019112005A JP 7255384 B2 JP7255384 B2 JP 7255384B2
- Authority
- JP
- Japan
- Prior art keywords
- line
- current
- vector
- node
- load
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E40/00—Technologies for an efficient electrical power generation, transmission or distribution
- Y02E40/50—Arrangements for eliminating or reducing asymmetry in polyphase networks
Landscapes
- Supply And Distribution Of Alternating Current (AREA)
Description
また、線電流の電流ベクトルから構成される三角形の重心から当該三角形の各頂点へのベクトルを線間電流の電流ベクトルとする方法では、計算式が簡単であるという利点があるものの、負荷が極端に偏っている場合、各線間の電流の力率が相間毎に大きく異なってしまうので、実態から大きく乖離すると考えられる。
(1)三相配電線を有する配電系統の電圧不平衡を求めるための三相負荷按分方法において、前記配電系統を構成するノードであって、前記三相配電線の線間負荷が接続されるノードにおける線電流の計測値を、線間負荷を流れる線間電流の値に変換する変換ステップを有し、前記変換ステップは、前記線電流の電流ベクトルから構成される三角形において、単相負荷力率を固定し、無効電力が等しくなる中心点から、各頂点へのベクトルを線間電流とするステップである、三相負荷按分方法。
配電系統の不平衡電圧を計算するためには、区間消費電力の値が必要となる。この区間消費電力の計算には、線間負荷(相電流)の電流ベクトルが必要となり、線間負荷の電流ベクトルを求めるためには、線電流の計測値を線間負荷の電流ベクトルに変換する手順が必要となる。この変換として、線電流の電流ベクトルから構成される三角形において等力率等無効電力点を求め、この等力率等無効電力点から当該三角形の各頂点に伸ばしたベクトルを線間負荷の電流ベクトルとするのが、本発明の骨子である。
上記のように、不平衡電圧は、計測機能付き開閉器の測定値から、各区間の線間負荷を求め、この線間負荷を潮流計算の入力値とすることにより求める。
ΔPi+jΔQi=(Pi-1-Pi)+j(Qi-1-Qi) (1)
であり、Pi=(Piab Pibc Pica)、Qi=(Qiab Qibc Qica)とすると、以下の数式(2)及び(3)が成立する。
ΔPi=(P(i-1)ab-Piab P(i-1)bc-Pibc P(i-1)ca-Pica) (2)
ΔQi=(Q(i-1)ab-Qiab Q(i-1)bc-Qibc Q(i-1)ca-Qica) (3)
上記のように、区間iの消費電力を求めるためには、ノードiの区間通過電力を求める必要がある。ここで、ノードiでの区間通過電力Pi+jQiは、以下の数式(4)~((7)に示すように、線間電圧と線間電流との積となる。
この線電流の電流ベクトルから線間電流の電流ベクトルへの変換の際、次項で説明する按分方法を用いる。
線電流の電流ベクトルを線間電流の電流ベクトルに変換する際、線電流の電流ベクトルで構成される第1の三角形の各頂点から、等力率で直線を延ばして第2の三角形を形成し、第2の三角形の重心(ここでは、「「等力率等無効電力点」と呼称する)から、第1の三角形の各頂点に伸ばしたベクトルを、線間電流の電流ベクトルとする。
具体的な方法については、以下の通りである。
Iia=(x1,y1) (10)
であり、Iicを示すベクトルが、
Iic=(-x2,-y2) (-Iic=(x2,y2)) (11)
であり、Iibを示すベクトルが、
Iib=-Ic-Ia (12)
であるとする。また、力率がcosθであるとする。
Iiab=mabc-Iia=mabc-(x1,y1) (24)
Iibc=mabc-Iic=mabc-(x2,y2) (25)
Iica=mabc (26)
本実施形態による三相負荷按分方法は、三相配電線を有する配電系統の電圧不平衡を求めるための三相負荷按分方法であって、前記三相配電線の線間負荷が接続されるノードにおける線電流の計測値を、線間負荷を流れる線間電流の値に変換する変換ステップを有し、前記変換ステップは、前記線電流の電流ベクトルから構成される三角形において、単相負荷力率を固定し、無効電力が等しくなる中心点から、各頂点へのベクトルを線間電流とするステップである。
これにより、線間電流の電流ベクトルを計算する際、比較的低いコストしか発生しないと共に、実態からの乖離が比較的小さな三相負荷按分方法を提供することが可能となる。
これにより、計測点通過電力の無効電力と区間内消費電力の無効電力を、三相平衡にできる。
これにより、高価な電圧不平衡対策機器を設置する必要なく、相間に電圧の偏りがない良質の電気を供給可能になると共に、電圧管理業務が容易になる。
上記の実施形態では、数式を用いて等力率等無効電力点を求めたが、これとは異なる方法、例えば、作図をすることにより幾何学的に等力率等無効点を求めてもよい。
10 三相配電線
20 線間負荷
30 計測機能付き開閉器
mabc 等力率等無効電力点
Iiab,Iibc,Iica 相電流の電流ベクトル
Claims (3)
- 三相配電線を有する配電系統の電圧不平衡を求めるための三相負荷按分方法において、
前記三相配電線の線間負荷が接続されるノードにおける線電流の計測値を、線間負荷を流れる線間電流の値に変換する変換ステップを有し、
前記変換ステップは、前記線電流の電流ベクトルから構成される三角形において、単相負荷力率を固定し、無効電力が等しくなる中心点から、各頂点へのベクトルを線間電流とするステップである、三相負荷按分方法。 - 前記変換ステップは、
計測機能付き開閉器の計測値をベクトル値に変換する第1のサブステップと、
前記ベクトル値に含まれる線電流の電流ベクトルで構成される第1の三角形の各頂点から、等力率で直線を延ばして第2の三角形を形成する第2のサブステップと、
前記第2の三角形の重心を等力率等無効電力点とする第3のサブステップと、
前記等力率等無効電力点から前記第1の三角形の各頂点に伸ばしたベクトルを、各線間負荷の電流ベクトルとする第4のサブステップと、
を有する、請求項1に記載の三相負荷按分方法。 - 請求項1又は2に記載の三相負荷按分方法を用いて、線間電流の電流ベクトルを求めるステップと、
一次側の第1ノードでの前記線間電流と、二次側の第2ノードでの前記線間電流とから、前記第1ノードと前記第2ノードとの間の区間の通過電力を求めて該通過電力の差分をとり、前記区間の区間消費電力を求めるステップと、
前記区間消費電力を用いて不平衡電圧を計算するステップと、を有する不平衡電圧計算方法。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2019112005A JP7255384B2 (ja) | 2019-06-17 | 2019-06-17 | 三相負荷按分方法及び不平衡電圧計算方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2019112005A JP7255384B2 (ja) | 2019-06-17 | 2019-06-17 | 三相負荷按分方法及び不平衡電圧計算方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2020204512A JP2020204512A (ja) | 2020-12-24 |
JP7255384B2 true JP7255384B2 (ja) | 2023-04-11 |
Family
ID=73838357
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2019112005A Active JP7255384B2 (ja) | 2019-06-17 | 2019-06-17 | 三相負荷按分方法及び不平衡電圧計算方法 |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP7255384B2 (ja) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2012198033A (ja) | 2011-03-18 | 2012-10-18 | Mitsubishi Electric Corp | 相判別装置 |
JP2015099058A (ja) | 2013-11-18 | 2015-05-28 | 中国電力株式会社 | 位置推定装置、位置推定方法 |
JP2016182008A (ja) | 2015-03-24 | 2016-10-13 | 中国電力株式会社 | 電圧不平衡抑制支援方法、及び電圧不平衡抑制支援装置 |
JP2018164363A (ja) | 2017-03-27 | 2018-10-18 | 中国電力株式会社 | 電圧予測方法、負荷配分決定方法及び電圧予測システム |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS56137163A (en) * | 1980-03-28 | 1981-10-26 | Kansai Electric Power Co Inc:The | Ranging method of content of load of line and its device |
-
2019
- 2019-06-17 JP JP2019112005A patent/JP7255384B2/ja active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2012198033A (ja) | 2011-03-18 | 2012-10-18 | Mitsubishi Electric Corp | 相判別装置 |
JP2015099058A (ja) | 2013-11-18 | 2015-05-28 | 中国電力株式会社 | 位置推定装置、位置推定方法 |
JP2016182008A (ja) | 2015-03-24 | 2016-10-13 | 中国電力株式会社 | 電圧不平衡抑制支援方法、及び電圧不平衡抑制支援装置 |
JP2018164363A (ja) | 2017-03-27 | 2018-10-18 | 中国電力株式会社 | 電圧予測方法、負荷配分決定方法及び電圧予測システム |
Also Published As
Publication number | Publication date |
---|---|
JP2020204512A (ja) | 2020-12-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102651551B (zh) | 控制功率因数的方法、控制无功功率的方法和控制器 | |
US8775104B2 (en) | Method and system for protecting an electrical power transmission network | |
Chen et al. | Examination of the definitions of voltage unbalance | |
Ranković et al. | A three-phase state estimation in active distribution networks | |
JP5544517B2 (ja) | 電気機器おける漏洩電流測定装置及び測定方法 | |
US8849614B2 (en) | System and method for monitoring and managing three-phase power flows in electrical transmission and distribution networks | |
JP2018530300A (ja) | 配電網における高調波汚染の決定 | |
JP2010213513A (ja) | 発電機出力の推定方法および装置 | |
Chen et al. | Neutral current optimization control for smart transformer-fed distribution system under unbalanced loads | |
Meyer et al. | General definition of unbalanced power to calculate and assess unbalance of customer installations | |
JP7255384B2 (ja) | 三相負荷按分方法及び不平衡電圧計算方法 | |
Schwanz et al. | Some methods for harmonic emission determination in wind power plants | |
JP4576315B2 (ja) | 連系する発電機を探知する方法およびそのプログラム | |
JP3167620B2 (ja) | 高調波流出量の評価装置 | |
US20170343591A1 (en) | Method and system for measuring imbalances in an electrical grid | |
CN105244878A (zh) | 电力系统三相不平衡时的电力系统损耗增量的分配方法 | |
Kepka | Load modelling for power system analysis | |
JP2021145537A (ja) | 分散型電源システム及び有効電力推定方法 | |
RU2786122C1 (ru) | Способ симметрирования режима работы трехпроводной линии электропередачи | |
JP2019154133A (ja) | 高圧本線の電圧を求める方法およびシステム | |
Tugay et al. | Monitoring of loss power components in three-phase low-voltage power supply systems | |
RU2783634C1 (ru) | Устройство измерения активной и реактивной энергии нулевой последовательности трёхфазной сети | |
Astashev et al. | Toward the calculation of balancing devices for three-phase three-wire power-transmission lines | |
Bletterie et al. | A novel concept for combining distribution network and system support services for storage systems | |
Oyedokun et al. | Analysis and Compensation of Power Systems with Harmonics and Unbalance |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20220512 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20230228 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20230228 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20230313 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 7255384 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |