JP5351276B2 - 腕時計地板を製造する方法 - Google Patents
腕時計地板を製造する方法 Download PDFInfo
- Publication number
- JP5351276B2 JP5351276B2 JP2011532616A JP2011532616A JP5351276B2 JP 5351276 B2 JP5351276 B2 JP 5351276B2 JP 2011532616 A JP2011532616 A JP 2011532616A JP 2011532616 A JP2011532616 A JP 2011532616A JP 5351276 B2 JP5351276 B2 JP 5351276B2
- Authority
- JP
- Japan
- Prior art keywords
- bridge
- complementary member
- ground plane
- shape
- bearing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22D—CASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
- B22D25/00—Special casting characterised by the nature of the product
- B22D25/02—Special casting characterised by the nature of the product by its peculiarity of shape; of works of art
- B22D25/026—Casting jewelry articles
-
- G—PHYSICS
- G04—HOROLOGY
- G04B—MECHANICALLY-DRIVEN CLOCKS OR WATCHES; MECHANICAL PARTS OF CLOCKS OR WATCHES IN GENERAL; TIME PIECES USING THE POSITION OF THE SUN, MOON OR STARS
- G04B29/00—Frameworks
- G04B29/02—Plates; Bridges; Cocks
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21J—FORGING; HAMMERING; PRESSING METAL; RIVETING; FORGE FURNACES
- B21J1/00—Preparing metal stock or similar ancillary operations prior, during or post forging, e.g. heating or cooling
- B21J1/003—Selecting material
- B21J1/006—Amorphous metal
-
- C—CHEMISTRY; METALLURGY
- C22—METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
- C22F—CHANGING THE PHYSICAL STRUCTURE OF NON-FERROUS METALS AND NON-FERROUS ALLOYS
- C22F1/00—Changing the physical structure of non-ferrous metals or alloys by heat treatment or by hot or cold working
-
- G—PHYSICS
- G04—HOROLOGY
- G04B—MECHANICALLY-DRIVEN CLOCKS OR WATCHES; MECHANICAL PARTS OF CLOCKS OR WATCHES IN GENERAL; TIME PIECES USING THE POSITION OF THE SUN, MOON OR STARS
- G04B19/00—Indicating the time by visual means
- G04B19/06—Dials
-
- G—PHYSICS
- G04—HOROLOGY
- G04B—MECHANICALLY-DRIVEN CLOCKS OR WATCHES; MECHANICAL PARTS OF CLOCKS OR WATCHES IN GENERAL; TIME PIECES USING THE POSITION OF THE SUN, MOON OR STARS
- G04B29/00—Frameworks
- G04B29/02—Plates; Bridges; Cocks
- G04B29/027—Materials and manufacturing
Description
a)少なくとも1つの金属要素を含む地板を形成する材料を採用するステップと、
b)前記地板を形成するステップと、
c)少なくとも部分的に非晶質状態の上記時計地板を得るために、すべてを冷却するステップと、
d)上記地板を取り出すステップとを含むことを特徴とする、方法に関する。
Claims (25)
- 時計地板を作製する方法であって、次のステップ、すなわち、
a)少なくとも1つの金属要素を含む前記地板を形成する材料を採用するステップ(A1 、A2 )と、
b)前記地板を形成するステップ(B1 、B2 )と、
c)少なくとも部分的に非晶質状態の前記時計地板を得るために、すべてを冷却するステップ(C)と、
d)前記地板を取り出すステップ(D)と、
e)少なくとも1つの相補的な部材を前記地板内に熱間硬化によって挿入するステップ(E)を含むことを特徴とする、方法。 - 時計ブリッジを作製する方法であって、次ののステップ、すなわち、
a)少なくとも1つの金属要素を含む前記ブリッジを形成する材料を採用するステップ(A1 、A2 )と、
b)前記ブリッジを形成するステップ(B1 、B2 )と、
c)少なくとも部分的に非晶質状態の前記時計ブリッジを得るために、すべてを冷却するステップ(C)と、
d)前記ブリッジを取り出すステップ(D)と、
e)少なくとも1つの相補的な部材を前記ブリッジ内に熱間硬化によって挿入するステップ(E)を含むことを特徴とする、方法。 - ステップb)が、以下のステップ:
少なくとも部分的に非晶質のプレフォームを作製するステップと、
ダイを前記材料のガラス遷移温度と結晶化温度の間に加熱するステップと、
前記プレフォームを前記ダイの間に置くステップと、
ダイの形状を前記プレフォームの面の各々上に複製するために、所定の時間の間前記ダイを使用して前記プレフォーム上に圧力を作用させるステップとを含み、
ステップc)が、前記地板または前記ブリッジの少なくとも部分的な非晶質状態を維持するために、前記地板または前記ブリッジを冷却することに存することを特徴とする、請求項1または2に記載の方法。 - 前記ダイが、インサートを含むことを特徴とする、請求項3に記載の方法。
- 各インサートは、前記地板またはブリッジ内に形状を形成することが意図されていることを特徴とする、請求項4に記載の方法。
- 前記形状が、ベアリングであることを特徴とする、請求項5に記載の方法。
- 前記形状が、装飾であることを特徴とする、請求項5に記載の方法。
- 各インサートが、前記地板またはブリッジ内に組み込まれることが意図された相補的な部材を形成することを特徴とする、請求項4に記載の方法。
- 前記相補的な部材が、ベアリングであることを特徴とする、請求項8に記載の方法。
- 前記相補的な部材が、装飾であることを特徴とする、請求項8に記載の方法。
- ステップb)が、前記材料を金型内に流し込む鋳造成形によって前記地板または前記ブリッジを作製することに存し、ステップc)が、前記金属要素に非晶質構造を与えるために、すべてを冷却すること(C)に存することを特徴とする、請求項1または2に記載の方法。
- 前記鋳造成形が、射出成形であることを特徴とする、請求項11に記載の方法。
- 前記金型が、インサートを含むことを特徴とする、請求項11または12に記載の方法。
- 各インサートが、前記地板またはブリッジ内に形状を作製することが意図されていることを特徴とする、請求項13に記載の方法。
- 前記形状が、ねじ山であることを特徴とする、請求項14に記載の方法。
- 前記形状が、ベアリングであることを特徴とする、請求項14に記載の方法。
- 前記形状が、装飾であることを特徴とする、請求項14に記載の方法。
- 各インサートが、前記地板または前記ブリッジ内に組み込まれることが意図された相補的な部材を形成することを特徴とする、請求項13に記載の方法。
- 前記相補的な部材が、ベアリングであることを特徴とする、請求項18に記載の方法。
- 前記相補的な部材が、装飾であることを特徴とする、請求項18に記載の方法。
- 前記要素の挿入(E)が、以下のステップ:
前記相補的な部材を受け入れる前記地板またはブリッジの表面を、その前記ガラス遷移温度と結晶化温度の間に含まれる温度に加熱するステップと、
前記相補的な部材が前記地板または前記ブリッジ内に挿入されるように、前記相補的な部材上に圧力を及ぼすステップと
を含むことを特徴とする、請求項1または2に記載の方法。 - 前記要素の挿入(E)が、以下のステップ:
前記地板またはブリッジの前記表面上に受け入れられる前記相補的な部材を、前記ガラス遷移温度より高い温度まで加熱するステップと、
前記相補的な部材が前記要素内に挿入されるように、前記部材上に圧力を及ぼすステップとを含むことを特徴とする、請求項1または2に記載の方法。 - 前記少なくとも1つの相補的な部材が、ルビーベアリングを含むことを特徴とする、請求項20から22のいずれかに記載の方法。
- 前記ステップ(E)の次に、前記地板またはブリッジを結晶化するステップ(F)をさらに含むことを特徴とする、請求項1〜23のいずれかに記載の方法。
- 使用される前記材料は、非晶質な材料であることを特徴とする請求項1〜24のいずれかに記載の方法。
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP08167196A EP2180385A1 (fr) | 2008-10-21 | 2008-10-21 | Procédé de fabrication d'une platine de montre |
EP08167196.8 | 2008-10-21 | ||
PCT/EP2009/063782 WO2010046381A1 (fr) | 2008-10-21 | 2009-10-21 | Procédé de fabrication d'une platine de montre |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2012512384A JP2012512384A (ja) | 2012-05-31 |
JP5351276B2 true JP5351276B2 (ja) | 2013-11-27 |
Family
ID=40512475
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2011532616A Active JP5351276B2 (ja) | 2008-10-21 | 2009-10-21 | 腕時計地板を製造する方法 |
Country Status (7)
Country | Link |
---|---|
US (2) | US9207644B2 (ja) |
EP (2) | EP2180385A1 (ja) |
JP (1) | JP5351276B2 (ja) |
KR (1) | KR101292964B1 (ja) |
CN (1) | CN102224465B (ja) |
HK (1) | HK1163267A1 (ja) |
WO (1) | WO2010046381A1 (ja) |
Families Citing this family (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP2390732A1 (fr) * | 2010-05-27 | 2011-11-30 | Association Suisse pour la Recherche Horlogère | Ressort de barillet |
JP5555375B2 (ja) | 2010-06-22 | 2014-07-23 | ザ・スウォッチ・グループ・リサーチ・アンド・ディベロップメント・リミテッド | 機械組立体の第1及び第2の部分の相対位置を調節する方法 |
EP2400352A1 (fr) * | 2010-06-22 | 2011-12-28 | The Swatch Group Research and Development Ltd. | Système d'échappement pour pièce d'horlogerie |
EP2466394A1 (fr) * | 2010-12-17 | 2012-06-20 | The Swatch Group Research and Development Ltd. | Capsule pour instrument scientifique |
EP2708372A1 (fr) * | 2012-09-18 | 2014-03-19 | The Swatch Group Research and Development Ltd. | Instrument d'écriture |
EP2796066A1 (fr) * | 2013-04-26 | 2014-10-29 | Omega SA | Piece décorative réalisée par sertissage |
EP2934221B1 (fr) * | 2012-12-21 | 2017-03-22 | Omega SA | Piece decorative realisee par sertissage |
US10772396B2 (en) * | 2012-12-21 | 2020-09-15 | Omega S.A. | Decorative piece produced by setting on amorphous metal |
CN104597746A (zh) * | 2015-02-04 | 2015-05-06 | 乌鲁木齐史派玉源文化科技有限公司 | 玉石表表镜的热压镶嵌方法 |
CN206372035U (zh) * | 2016-10-10 | 2017-08-04 | 东莞市坚野材料科技有限公司 | 具有抗菌功能的非晶态合金制成的可穿戴设备 |
JP6512536B2 (ja) * | 2017-03-08 | 2019-05-15 | カシオ計算機株式会社 | 指針および時計 |
EP3502786A1 (fr) * | 2017-12-22 | 2019-06-26 | The Swatch Group Research and Development Ltd | Balancier pour pièce d'horlogerie et procédé de fabrication d'un tel balancier |
EP3879354A1 (fr) * | 2020-03-09 | 2021-09-15 | The Swatch Group Research and Development Ltd | Masse de remontage oscillante munie d'un element decoratif pour mouvement automatique de pièce d'horlogerie |
Family Cites Families (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS55145139A (en) * | 1979-04-26 | 1980-11-12 | Seiko Epson Corp | Exterior parts for watch |
JPS57108686A (en) * | 1980-12-25 | 1982-07-06 | Seiko Instr & Electronics Ltd | Hand for wrist watch |
JPH04124246A (ja) * | 1990-09-13 | 1992-04-24 | Alps Electric Co Ltd | 時計の文字盤 |
JP2001293551A (ja) * | 2000-04-14 | 2001-10-23 | Citizen Watch Co Ltd | アモルファス合金製部材の製造方法 |
WO2004047582A2 (en) * | 2002-11-22 | 2004-06-10 | Liquidmetal Technologies, Inc. | Jewelry made of precious amorphous metal and method of making such articles |
US20070034304A1 (en) | 2003-09-02 | 2007-02-15 | Akihisa Inoue | Precision gear, its gear mechanism, and production method of precision gear |
JP2005201789A (ja) * | 2004-01-16 | 2005-07-28 | Seiko Epson Corp | 部材の成形方法および時計外装部品並びに装飾品 |
CN100482406C (zh) * | 2007-04-13 | 2009-04-29 | 辽宁新华阳刃具复合材料有限公司 | 三层复合刀刃的刃具钢板的制造方法 |
-
2008
- 2008-10-21 EP EP08167196A patent/EP2180385A1/fr not_active Withdrawn
-
2009
- 2009-10-21 WO PCT/EP2009/063782 patent/WO2010046381A1/fr active Application Filing
- 2009-10-21 CN CN200980146378.XA patent/CN102224465B/zh active Active
- 2009-10-21 US US13/124,975 patent/US9207644B2/en active Active
- 2009-10-21 KR KR1020117011401A patent/KR101292964B1/ko active IP Right Grant
- 2009-10-21 JP JP2011532616A patent/JP5351276B2/ja active Active
- 2009-10-21 EP EP09736982A patent/EP2350746B1/fr active Active
-
2012
- 2012-04-18 HK HK12103837.7A patent/HK1163267A1/xx unknown
-
2015
- 2015-06-05 US US14/731,508 patent/US20150266089A1/en not_active Abandoned
Also Published As
Publication number | Publication date |
---|---|
US20120024432A1 (en) | 2012-02-02 |
KR101292964B1 (ko) | 2013-08-02 |
WO2010046381A8 (fr) | 2011-06-30 |
WO2010046381A1 (fr) | 2010-04-29 |
KR20110092278A (ko) | 2011-08-17 |
US9207644B2 (en) | 2015-12-08 |
CN102224465B (zh) | 2014-06-18 |
EP2350746A1 (fr) | 2011-08-03 |
EP2180385A1 (fr) | 2010-04-28 |
JP2012512384A (ja) | 2012-05-31 |
HK1163267A1 (en) | 2012-09-07 |
US20150266089A1 (en) | 2015-09-24 |
CN102224465A (zh) | 2011-10-19 |
EP2350746B1 (fr) | 2013-04-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP5351276B2 (ja) | 腕時計地板を製造する方法 | |
JP5457608B2 (ja) | 時計の文字盤押さえ | |
CN105319939B (zh) | 用于钟表的擒纵系统 | |
JP5475928B2 (ja) | 部品の組付け方法 | |
JP5747076B2 (ja) | コーティングされたアモルファス金属部品を製造する方法 | |
US10981223B2 (en) | Method for manufacturing an amorphous metal part | |
JP6770049B2 (ja) | 計時器用のバランス車を製造する方法 | |
JP2006044245A (ja) | 射出成形用金型及び射出成形方法 | |
CN102959478B (zh) | 制造包括至少两个部件的制表构件的方法 | |
CN102672138B (zh) | 压铸模具和压铸方法 | |
JP6982183B2 (ja) | 時計のためのテンプ輪およびそのようなテンプ輪の製造方法 | |
JP3706880B2 (ja) | レンズ貼付皿とその製作方法 | |
CH699783A2 (fr) | Procede de fabrication d'une platine de montre. | |
JPH09278456A (ja) | 光学素子の成形用型及びその製造方法及び光学素子の 成形方法 | |
KR101473077B1 (ko) | 부품 조립 방법 | |
KR20060089316A (ko) | 표면 형성 방법 및 이에 의해 제작된 성형물 | |
JP2001121244A (ja) | 眼鏡用中空装飾部品の製造方法 | |
JPS63252639A (ja) | リム成形用金型 | |
GB2137538A (en) | A method of producing cast metal dies patterns and core-boxes |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20130521 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20130620 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20130723 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20130822 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 5351276 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |