JP2022132093A - 鋼板の圧延工程のパススケジュール計算方法、鋼板の圧延工程のパススケジュール計算装置、及び鋼板の圧延方法 - Google Patents
鋼板の圧延工程のパススケジュール計算方法、鋼板の圧延工程のパススケジュール計算装置、及び鋼板の圧延方法 Download PDFInfo
- Publication number
- JP2022132093A JP2022132093A JP2022005438A JP2022005438A JP2022132093A JP 2022132093 A JP2022132093 A JP 2022132093A JP 2022005438 A JP2022005438 A JP 2022005438A JP 2022005438 A JP2022005438 A JP 2022005438A JP 2022132093 A JP2022132093 A JP 2022132093A
- Authority
- JP
- Japan
- Prior art keywords
- pass
- rolling
- pass schedule
- steel plate
- schedule
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000005096 rolling process Methods 0.000 title claims abstract description 92
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 91
- 239000010959 steel Substances 0.000 title claims abstract description 91
- 238000004364 calculation method Methods 0.000 title claims abstract description 56
- 238000000034 method Methods 0.000 title claims description 58
- 230000001105 regulatory effect Effects 0.000 abstract 1
- 230000010365 information processing Effects 0.000 description 26
- 238000005457 optimization Methods 0.000 description 8
- 238000011156 evaluation Methods 0.000 description 7
- 230000006870 function Effects 0.000 description 6
- 238000010586 diagram Methods 0.000 description 5
- 230000002411 adverse Effects 0.000 description 1
- 238000004590 computer program Methods 0.000 description 1
- 238000001816 cooling Methods 0.000 description 1
- 230000006866 deterioration Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000001788 irregular Effects 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
- 238000011144 upstream manufacturing Methods 0.000 description 1
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/30—Computing systems specially adapted for manufacturing
Abstract
Description
図3,4はそれぞれ、従来例及び本発明により計算されたパススケジュールで鋼板を圧延した際の板クラウン偏差分布の一例を示す図である。なお、本例では、板厚8~25mm、板幅2650~4600mmの鋼板1万5千本を計算対象とした。また、計算対象とした鋼板の化学成分や制御圧延の有無は考慮せず、全ての鋼板について同一の計算条件でパススケジュール計算を行った。図3及び図4の比較から明らかなように、本発明例(図4)によれば、従来例(図3)と比較して、平均板クラウン誤差を24.5μm(69.0%)、板クラウン偏差σを16.5μm(23.6%)改善できた。また、パス数については、図1に示すステップS4の処理を実行しなかった場合は、本発明例及び従来例共に平均16.0パスであった。一方、図1に示すステップS4の処理を実行した場合は、図5に示すように、本発明例によれば、従来例と比較して、パス数を2パス削減できた。なお、図5中の数字は何回目のパスであるかを示している。また、この時の従来例における板クラウン偏差は100μmであったのに対して、本発明例における板クラウン偏差は75μmであった。これにより、本発明によれば、圧延能率を向上させると共に板クラウンの低減も実現できることが確認された。
Claims (5)
- 圧延能率及び板クラウン比率を考慮して鋼板の圧延工程のパス毎の圧下量を規定したパススケジュールを計算する第一ステップと、
各パスにおける鋼板の平坦度誤差及び最終板クラウン誤差の和が所定条件を満足するように前記パススケジュールにおける各パスの圧下量を変更し、各パスの圧下量が変更されたパススケジュールを最終パススケジュールに設定する第二ステップと、
を含むことを特徴とする鋼板の圧延工程のパススケジュール計算方法。 - 前記最終パススケジュールのパス数を減らし、パス数が減らされた最終パススケジュールを用いて前記第二ステップを再実行するステップを含むことを特徴とする請求項1に記載の鋼板の圧延工程のパススケジュール計算方法。
- 処理対象の鋼板に応じて前記平坦度誤差及び前記最終板クラウン誤差に対する重み付けを変更するステップを含むことを特徴とする請求項1又は2に記載の鋼板の圧延工程のパススケジュール計算方法。
- 圧延能率及び板クラウン比率を考慮して鋼板の圧延工程のパス毎の圧下量を規定したパススケジュールを計算する第一手段と、
各パスにおける鋼板の平坦度誤差及び最終板クラウン誤差の和が所定条件を満足するように前記パススケジュールにおける各パスの圧下量を変更し、各パスの圧下量が変更されたパススケジュールを最終パススケジュールに設定する第二手段と、
を備えることを特徴とする鋼板の圧延工程のパススケジュール計算装置。 - 請求項1~3のうち、いずれか1項に記載の鋼板の圧延工程のパススケジュール計算方法によって設定された最終パススケジュールに従って鋼板を圧延するステップを含むことを特徴とする鋼板の圧延方法。
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2021029556 | 2021-02-26 | ||
JP2021029556 | 2021-02-26 |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2022132093A true JP2022132093A (ja) | 2022-09-07 |
JP7388459B2 JP7388459B2 (ja) | 2023-11-29 |
Family
ID=83153284
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2022005438A Active JP7388459B2 (ja) | 2021-02-26 | 2022-01-18 | 鋼板の圧延工程のパススケジュール計算方法、鋼板の圧延工程のパススケジュール計算装置、及び鋼板の圧延方法 |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP7388459B2 (ja) |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS51120954A (en) * | 1975-04-16 | 1976-10-22 | Kawasaki Steel Co | Method of controlling rolling mill |
JPS54139862A (en) * | 1978-04-21 | 1979-10-30 | Nippon Steel Corp | Controlling method for rolling mill |
JPS6453711A (en) * | 1987-08-21 | 1989-03-01 | Kawasaki Steel Co | Control method for thick plate rolling mill |
JPH0760320A (ja) * | 1993-08-26 | 1995-03-07 | Nippon Steel Corp | 厚板圧延方法 |
JP2001269703A (ja) * | 2000-03-24 | 2001-10-02 | Kawasaki Steel Corp | 厚板圧延の厚み出しパススケジュール決定方法 |
JP2003245706A (ja) * | 2002-02-26 | 2003-09-02 | Kobe Steel Ltd | 複数パス圧延における圧延中の再パススケジューリング方法 |
JP2004322118A (ja) * | 2003-04-22 | 2004-11-18 | Sumitomo Metal Ind Ltd | 厚鋼板の圧延方法 |
JP2006075896A (ja) * | 2004-09-13 | 2006-03-23 | Kobe Steel Ltd | 圧延パススケジュールの決定方法 |
JP2008238173A (ja) * | 2007-03-23 | 2008-10-09 | Nippon Steel Corp | 板圧延のパススケジュールの設定方法 |
JP2010075994A (ja) * | 2008-09-01 | 2010-04-08 | Nippon Steel Corp | 板圧延のパススケジュールの設定方法 |
JP2014042928A (ja) * | 2012-08-27 | 2014-03-13 | Kobe Steel Ltd | 圧延パススケジュールの決定方法 |
-
2022
- 2022-01-18 JP JP2022005438A patent/JP7388459B2/ja active Active
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS51120954A (en) * | 1975-04-16 | 1976-10-22 | Kawasaki Steel Co | Method of controlling rolling mill |
JPS54139862A (en) * | 1978-04-21 | 1979-10-30 | Nippon Steel Corp | Controlling method for rolling mill |
JPS6453711A (en) * | 1987-08-21 | 1989-03-01 | Kawasaki Steel Co | Control method for thick plate rolling mill |
JPH0760320A (ja) * | 1993-08-26 | 1995-03-07 | Nippon Steel Corp | 厚板圧延方法 |
JP2001269703A (ja) * | 2000-03-24 | 2001-10-02 | Kawasaki Steel Corp | 厚板圧延の厚み出しパススケジュール決定方法 |
JP2003245706A (ja) * | 2002-02-26 | 2003-09-02 | Kobe Steel Ltd | 複数パス圧延における圧延中の再パススケジューリング方法 |
JP2004322118A (ja) * | 2003-04-22 | 2004-11-18 | Sumitomo Metal Ind Ltd | 厚鋼板の圧延方法 |
JP2006075896A (ja) * | 2004-09-13 | 2006-03-23 | Kobe Steel Ltd | 圧延パススケジュールの決定方法 |
JP2008238173A (ja) * | 2007-03-23 | 2008-10-09 | Nippon Steel Corp | 板圧延のパススケジュールの設定方法 |
JP2010075994A (ja) * | 2008-09-01 | 2010-04-08 | Nippon Steel Corp | 板圧延のパススケジュールの設定方法 |
JP2014042928A (ja) * | 2012-08-27 | 2014-03-13 | Kobe Steel Ltd | 圧延パススケジュールの決定方法 |
Also Published As
Publication number | Publication date |
---|---|
JP7388459B2 (ja) | 2023-11-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP4504406B2 (ja) | 熱間タンデム圧延ミルのクラウン形状制御装置および方法 | |
EP3251763A1 (en) | Strip profile control method of hot finishing tandem rolling mill and hot finishing tandem rolling mill | |
JP2009113101A (ja) | 圧延荷重の学習制御方法および装置、ならびに鋼板の製造方法 | |
JP4847111B2 (ja) | 多段式圧延機及び多段式圧延機の制御方法 | |
TW201303539A (zh) | 帶材平坦度控制方法及帶材平坦度控制系統 | |
KR20120075246A (ko) | 강압하가 가능한 후강판의 조압연 방법 및 장치 | |
JP4701762B2 (ja) | 熱延鋼板の圧延方法 | |
JP2022132093A (ja) | 鋼板の圧延工程のパススケジュール計算方法、鋼板の圧延工程のパススケジュール計算装置、及び鋼板の圧延方法 | |
JP5727865B2 (ja) | 圧延モデル最適化装置 | |
JP2968332B2 (ja) | 連続圧延機におけるクラウンの制御方法 | |
JP4617929B2 (ja) | 熱延鋼板の圧延方法 | |
JP7364901B2 (ja) | 被矯正材の変形状態の推定方法及びローラレベラのロール押込量制御方法 | |
JP5347912B2 (ja) | 厚鋼板の製造方法 | |
JP4162622B2 (ja) | 冷間圧延におけるエッジドロップ制御方法 | |
JP6569691B2 (ja) | 不等辺不等厚山形鋼の製造方法 | |
CN115335158A (zh) | 控制辊轧材料的带材平整度的方法、控制系统和生产线 | |
JP2010172927A (ja) | 圧延材の先端反り制御方法 | |
JP4164306B2 (ja) | 冷間圧延におけるエッジドロップ制御方法 | |
JP5877770B2 (ja) | 圧延パススケジュールの決定方法 | |
JP2001269703A (ja) | 厚板圧延の厚み出しパススケジュール決定方法 | |
WO2023203691A1 (ja) | 板クラウン制御装置 | |
JP2002066635A (ja) | 熱延鋼帯の製造方法 | |
WO2024057454A1 (ja) | 連続式圧延機のキャンバー制御装置 | |
JP2003236605A (ja) | 複数パス圧延における板厚及び平坦度制御方法 | |
JP2008194740A (ja) | タンデム圧延機による金属帯の圧延方法およびそれを用いた金属帯の製造方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20220926 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20230726 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20230808 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20230928 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20231017 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20231030 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 7388459 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |