JP2018193717A - トンネル用支保工設置装置 - Google Patents
トンネル用支保工設置装置 Download PDFInfo
- Publication number
- JP2018193717A JP2018193717A JP2017096519A JP2017096519A JP2018193717A JP 2018193717 A JP2018193717 A JP 2018193717A JP 2017096519 A JP2017096519 A JP 2017096519A JP 2017096519 A JP2017096519 A JP 2017096519A JP 2018193717 A JP2018193717 A JP 2018193717A
- Authority
- JP
- Japan
- Prior art keywords
- slide mechanism
- mode
- slide
- support
- valve
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 230000007246 mechanism Effects 0.000 claims abstract description 113
- 230000001360 synchronised effect Effects 0.000 claims abstract description 20
- 238000009434 installation Methods 0.000 claims description 26
- 238000010276 construction Methods 0.000 description 17
- 230000008602 contraction Effects 0.000 description 7
- 238000005507 spraying Methods 0.000 description 5
- 238000000034 method Methods 0.000 description 4
- 230000007935 neutral effect Effects 0.000 description 3
- 210000000078 claw Anatomy 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000004904 shortening Methods 0.000 description 2
- 230000009471 action Effects 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
Images
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
Description
まず、作業車両の左右に設けた一対のエレクタブームの先端にそれぞれ装備されたクランプ機構により一対の支保工を長手方向にて把持する。次いで、作業車両自体の移動およびエレクタブームの伸長作動により、左右の支保工を作業車両の前方へと移動させるとともにエレクタブームの回動作動を行い、左右の支保工をトンネルのアーチと対向する姿勢にする。次いで、左右の支保工の端部相互をアーチ中央部でボルトナット等により連結する。
これに対し、特許文献1に開示されるスライド移動機構部は、各支保工を作業車両の長手方向に搬送する際に用いるものである。つまり、支保工エレクタ全体をスライド移動する構造なので、上記最終段階でのトンネル支保工の建込位置への位置決め移動のように、左右の支保工の姿勢の微調整を伴う作業には不向きである。
そこで、本発明は、このような問題点に着目してなされたものであって、支保工建込み作業の最終段階での左右の支保工の位置決め操作をより確実に行い得るトンネル用支保工設置装置を提供することを課題とする。
なお、本実施形態の支保工設置装置100は、特に図示しないが、台車2には、支保工エレクタ10のほか、例えば、バケット機構や吹付け機構、削孔機構等が装備されていてもよい。また、車輪3、4に換えて、例えばクローラ機構等によって走行可能とされていてもよい。
各支保工エレクタ10は、図1ないし図3に示すように、エレクタブーム13と、エレクタブーム13の先端に装備されたエレクタ本体28とを備える。エレクタブーム13は、基端部11aが、上記エレクタベース82に支持されたアウターブーム11と、アウターブーム11に対して伸縮可能な入れ子状のインナーブーム12とを有する。
インナーブーム12は、アウターブーム11の先端開口からアウターブーム11内に挿入されている。インナーブーム12は、ブーム伸縮シリンダ17の伸縮によって軸方向に伸縮可能になっている。ブーム伸縮シリンダ17の基端側は、アウターブーム11の先端側下部に支持され、ブーム伸縮シリンダ17の先端部は、インナーブーム12の中央下部に支持されている。
両把持部31a,31bは同一構造とされ、両把持部31a,31bの中央に設けられた把持シリンダ32の伸縮駆動により、二つの把持爪33,34を開閉させることで、弓状の支保工Sを、二つの把持部31a,31bによる離隔した位置で安定して把持可能になっている。
ここで、「通常モード」にあっては、左右のスライド機構40それぞれに対応する操作レバー64L、64Rの操作量によって各スライド機構40をそれぞれスライド移動させる。一方、「同期モード」にあっては、操作レバー64L、64Rのうち、オペレータが任意に選択した一の操作レバー64の操作量によって左右のスライド機構40を同期して伸長作動させる。
各操作弁66L、66Rは、操作レバー64L、64Rを、例えば後側(同図シンボル左側)に傾倒操作すると、その操作量に応じて減圧弁66aで生成された操作パイロット圧を、操作パイロットライン93を介して作動弁74の受圧部74aに出力する。これにより、対応する操作レバー64L、64Rの操作量に比例して、作動弁74L、74Rのスプールが中立位置から同図シンボル左側(シリンダ短縮側)の作動位置へ向かうようにストロークする。
これにより、通常モード時には、チェック弁78、79を介する通常油路95を経由することにより、それぞれの操作レバー64L、64Rの操作量に比例して、各作動弁74L、74Rのスプールが中立位置から同図シンボル右側(シリンダ伸長側)の作動位置へ向かうようにそれぞれのストロークをする。
これにより、同期モード時には、圧油がシャトル弁77を介する同期油路96を経由するため、いずれか一方の操作レバー64L、64Rの傾倒操作量に比例して、各作動弁74L、74Rのスプールが同じ動作によって中立位置から同図シンボル右側(シリンダ伸長側)の作動位置へ向かうように同一のストロークをする。
支保工建込み作業を行うにあたっては、まず、作業車両1の台車2を走行させて支保工設置装置100を切羽近傍の所期位置に配置する。次いで、台車2前後のアウトリガ7を伸張して支保工設置装置100の姿勢を安定させる。次いで、不図示の吹付け機構により、コンクリート等の一次吹付けを行う。
2 台車
3、4 車輪
6 操作部
7 駆動部
9 アウトリガ
10 支保工エレクタ
11 アウターブーム
12 インナーブーム
13 エレクタブーム
15 ブーム旋回シリンダ
16 ブーム起伏シリンダ
17 ブーム伸縮シリンダ
19 姿勢上下動シリンダ
20 姿勢水平動シリンダ
21 姿勢傾動シリンダ
22 スライドシリンダ(スライド機構を駆動するための油圧シリンダ)
23 ガイドマウント
24 第一回動部
25 第二回動部
26 スライダ
28 エレクタ本体
30 クランプ機構
31 把持部本体
32 把持シリンダ
33、34 把持爪
40 スライド機構
50 姿勢調整機構
60 制御部
61 操作パネル
62 ディスプレイ
63 操作テーブル
64 操作レバー
65 モード切換スイッチ
66 操作弁
71 第一のモード切換弁
72 第二のモード切換弁
73 (油圧パイロット式の)制御弁
74 (スライドシリンダを比例制御する)作動弁
75 高圧(通常)用圧力制御弁
76 低圧(微速)用圧力制御弁
77 シャトル弁
78、79 チェック弁
80 ベース移動機構
81 スライドレール
82 エレクタベース
91 主油路
92 パイロット油路
93 操作パイロットライン
94 操作モード切換ライン
95 通常油路
96 同期油路
100 支保工設置装置
S 支保工
K 切羽
Claims (2)
- 左右一対の支保工エレクタを備えるトンネル用支保工設置装置であって、
各支保工エレクタは、作業車両の前方に起伏、伸縮および旋回可能に装着されるエレクタブームと、該エレクタブームの先端に設けられて支保工の保持およびその解除が可能なクランプ機構と、該クランプ機構と前記エレクタブームとの間に介装されて前記クランプ機構を切羽の前面側との対向方向にスライド移動可能に支持するスライド機構と、前記スライド機構の作動を油圧パイロット式のレバー操作に応じて制御するスライド機構制御手段と、を備え、
前記スライド機構制御手段は、傾倒動作される操作レバーの傾倒量に応じて比例動作する油圧パイロット式の操作弁と、該操作弁から導入されたパイロット圧油量に応じて前記スライド機構を駆動するための油圧シリンダを比例制御する作動弁と、前記スライド機構のスライド作動を通常モードと同期モードとに対応する油路に切り換える第一のモード切換弁と、を有し、
前記通常モードにあっては、左右のスライド機構それぞれに対応する前記操作レバーの操作によって各スライド機構をスライド移動させ、前記同期モードにあっては、オペレータが任意に選択した又は予め決められた一の操作レバーの操作によって左右のスライド機構を同期して伸長作動させることを特徴とするトンネル用支保工設置装置。 - 前記スライド機構のスライド作動を前記通常モードと建込モードとに対応する油路に切り換える第二のモード切り換え弁を更に有し、
前記建込モードにあっては、前記同期モードが設定されるとともに、前記伸長作動を通常速度よりも遅い速度で動作させる請求項1に記載のトンネル用支保工設置装置。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2017096519A JP6845080B2 (ja) | 2017-05-15 | 2017-05-15 | トンネル用支保工設置装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2017096519A JP6845080B2 (ja) | 2017-05-15 | 2017-05-15 | トンネル用支保工設置装置 |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2018193717A true JP2018193717A (ja) | 2018-12-06 |
JP6845080B2 JP6845080B2 (ja) | 2021-03-17 |
Family
ID=64568806
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2017096519A Active JP6845080B2 (ja) | 2017-05-15 | 2017-05-15 | トンネル用支保工設置装置 |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP6845080B2 (ja) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112160783A (zh) * | 2020-08-31 | 2021-01-01 | 中国有色金属工业昆明勘察设计研究院有限公司 | 一种地下破碎岩体隧道工程支护快速支撑装置 |
JPWO2021132608A1 (ja) * | 2019-12-27 | 2021-07-01 | ||
CN115419259A (zh) * | 2022-08-30 | 2022-12-02 | 中铁隧道局集团建设有限公司 | 一种箱梁现场浇筑用液压箱梁模具 |
JP7419199B2 (ja) | 2020-09-07 | 2024-01-22 | 鹿島建設株式会社 | トンネル用の支保工設置装置 |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5528624U (ja) * | 1978-08-10 | 1980-02-25 | ||
JPH07217392A (ja) * | 1992-07-24 | 1995-08-15 | Kajima Corp | トンネル工事用作業装置 |
JPH09242124A (ja) * | 1996-03-05 | 1997-09-16 | Hitachi Constr Mach Co Ltd | 建設機械の安全装置 |
JP2000160996A (ja) * | 1998-11-30 | 2000-06-13 | Ohbayashi Corp | トンネル支保工の設置装置 |
JP2001050208A (ja) * | 1999-08-05 | 2001-02-23 | Takeuchi Seisakusho:Kk | 作業機の油圧制御装置 |
JP2001082405A (ja) * | 1999-09-17 | 2001-03-27 | Hitachi Constr Mach Co Ltd | 建設機械の速度制御装置 |
JP2001182705A (ja) * | 1999-12-27 | 2001-07-06 | Komatsu Ltd | 油圧パイロット操作式油圧回路の暖気構造 |
JP2004324139A (ja) * | 2003-04-23 | 2004-11-18 | Ando Corp | トンネル支保の構築方法 |
JP2011038263A (ja) * | 2009-08-07 | 2011-02-24 | Hitachi Constr Mach Co Ltd | 油圧作業機 |
JP2014095262A (ja) * | 2012-11-12 | 2014-05-22 | Hitachi Constr Mach Co Ltd | 双腕型作業機械 |
US20150050088A1 (en) * | 2012-01-24 | 2015-02-19 | Sandvik Mining And Construction G.M.B.H. | Tunneling or extraction machine with an anchor-setting device and support manipulator or supporting device |
-
2017
- 2017-05-15 JP JP2017096519A patent/JP6845080B2/ja active Active
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5528624U (ja) * | 1978-08-10 | 1980-02-25 | ||
JPH07217392A (ja) * | 1992-07-24 | 1995-08-15 | Kajima Corp | トンネル工事用作業装置 |
JPH09242124A (ja) * | 1996-03-05 | 1997-09-16 | Hitachi Constr Mach Co Ltd | 建設機械の安全装置 |
JP2000160996A (ja) * | 1998-11-30 | 2000-06-13 | Ohbayashi Corp | トンネル支保工の設置装置 |
JP2001050208A (ja) * | 1999-08-05 | 2001-02-23 | Takeuchi Seisakusho:Kk | 作業機の油圧制御装置 |
JP2001082405A (ja) * | 1999-09-17 | 2001-03-27 | Hitachi Constr Mach Co Ltd | 建設機械の速度制御装置 |
JP2001182705A (ja) * | 1999-12-27 | 2001-07-06 | Komatsu Ltd | 油圧パイロット操作式油圧回路の暖気構造 |
JP2004324139A (ja) * | 2003-04-23 | 2004-11-18 | Ando Corp | トンネル支保の構築方法 |
JP2011038263A (ja) * | 2009-08-07 | 2011-02-24 | Hitachi Constr Mach Co Ltd | 油圧作業機 |
US20150050088A1 (en) * | 2012-01-24 | 2015-02-19 | Sandvik Mining And Construction G.M.B.H. | Tunneling or extraction machine with an anchor-setting device and support manipulator or supporting device |
JP2014095262A (ja) * | 2012-11-12 | 2014-05-22 | Hitachi Constr Mach Co Ltd | 双腕型作業機械 |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPWO2021132608A1 (ja) * | 2019-12-27 | 2021-07-01 | ||
WO2021132608A1 (ja) * | 2019-12-27 | 2021-07-01 | 古河ロックドリル株式会社 | 支保工建込装置およびこれを用いた支保工の建て込み方法 |
JP7328659B2 (ja) | 2019-12-27 | 2023-08-17 | 古河ロックドリル株式会社 | 支保工建込装置およびこれを用いた支保工の建て込み方法 |
CN112160783A (zh) * | 2020-08-31 | 2021-01-01 | 中国有色金属工业昆明勘察设计研究院有限公司 | 一种地下破碎岩体隧道工程支护快速支撑装置 |
CN112160783B (zh) * | 2020-08-31 | 2023-05-19 | 中国有色金属工业昆明勘察设计研究院有限公司 | 一种地下破碎岩体隧道工程支护快速支撑装置 |
JP7419199B2 (ja) | 2020-09-07 | 2024-01-22 | 鹿島建設株式会社 | トンネル用の支保工設置装置 |
CN115419259A (zh) * | 2022-08-30 | 2022-12-02 | 中铁隧道局集团建设有限公司 | 一种箱梁现场浇筑用液压箱梁模具 |
CN115419259B (zh) * | 2022-08-30 | 2023-06-16 | 中铁隧道局集团建设有限公司 | 一种箱梁现场浇筑用液压箱梁模具 |
Also Published As
Publication number | Publication date |
---|---|
JP6845080B2 (ja) | 2021-03-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP2018193717A (ja) | トンネル用支保工設置装置 | |
JP5052147B2 (ja) | 建設車両用ステアリング装置 | |
KR101753507B1 (ko) | 유압 셔블 | |
KR101975063B1 (ko) | 건설 기계 및 그 유압 회로 | |
JP6656913B2 (ja) | 作業機の油圧システム | |
JP6298716B2 (ja) | 作業機械 | |
US9481975B2 (en) | Construction machine | |
CN113330174A (zh) | 车辆 | |
WO2017175865A1 (ja) | クレーン | |
JP5601762B2 (ja) | アウトリガ装置 | |
CN113819097B (zh) | 控制阀组、液压系统、工程机械及工程机械的臂架翻转控制方法 | |
JP2013249197A (ja) | 高所作業車の油圧回路 | |
JP2019156313A (ja) | クランプアームを備えた解体機械 | |
AU720849B2 (en) | Multifunction valve stack | |
JP2008213999A (ja) | 移動式クレーンの油圧回路 | |
JPH08218443A (ja) | 建設機械の油圧駆動装置 | |
JPS63165300A (ja) | 油圧作業機における油圧制御装置の操作装置 | |
JP2002206510A (ja) | 作業機械の油圧制御回路 | |
JP4931336B2 (ja) | 高所作業車の作業台レベリング装置 | |
JP4818758B2 (ja) | マストガタつき防止装置 | |
JP4600148B2 (ja) | 自走式作業機械 | |
JPH082187Y2 (ja) | ブルドーザのブレード制御油圧回路 | |
JPH09235759A (ja) | 作業機械の作業機制御回路 | |
JPH0893000A (ja) | 油圧パイロット操作回路 | |
JPH0629251Y2 (ja) | 移動作業機における油圧回路 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20200402 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20210205 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20210216 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20210225 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 6845080 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
S531 | Written request for registration of change of domicile |
Free format text: JAPANESE INTERMEDIATE CODE: R313531 |
|
R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |