JP2016081143A - エネルギープラニングシステム - Google Patents
エネルギープラニングシステム Download PDFInfo
- Publication number
- JP2016081143A JP2016081143A JP2014209401A JP2014209401A JP2016081143A JP 2016081143 A JP2016081143 A JP 2016081143A JP 2014209401 A JP2014209401 A JP 2014209401A JP 2014209401 A JP2014209401 A JP 2014209401A JP 2016081143 A JP2016081143 A JP 2016081143A
- Authority
- JP
- Japan
- Prior art keywords
- energy
- house
- unit
- information
- power
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000001514 detection method Methods 0.000 claims abstract description 62
- 238000005259 measurement Methods 0.000 claims description 29
- 238000000034 method Methods 0.000 claims description 28
- 230000008859 change Effects 0.000 claims description 22
- 230000008569 process Effects 0.000 claims description 11
- 230000033228 biological regulation Effects 0.000 claims description 2
- 238000010248 power generation Methods 0.000 description 29
- 230000006870 function Effects 0.000 description 28
- 238000010586 diagram Methods 0.000 description 11
- 238000004891 communication Methods 0.000 description 10
- 238000004364 calculation method Methods 0.000 description 9
- 230000000694 effects Effects 0.000 description 7
- 230000005611 electricity Effects 0.000 description 7
- 238000012545 processing Methods 0.000 description 7
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 7
- 238000007726 management method Methods 0.000 description 5
- 230000004044 response Effects 0.000 description 5
- 230000001629 suppression Effects 0.000 description 5
- 238000005265 energy consumption Methods 0.000 description 4
- 230000004048 modification Effects 0.000 description 4
- 238000012986 modification Methods 0.000 description 4
- 230000004622 sleep time Effects 0.000 description 4
- 238000004422 calculation algorithm Methods 0.000 description 3
- 239000000470 constituent Substances 0.000 description 3
- 239000000446 fuel Substances 0.000 description 3
- 230000002123 temporal effect Effects 0.000 description 3
- 238000004458 analytical method Methods 0.000 description 2
- 230000035606 childbirth Effects 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 230000007704 transition Effects 0.000 description 2
- HBBGRARXTFLTSG-UHFFFAOYSA-N Lithium ion Chemical compound [Li+] HBBGRARXTFLTSG-UHFFFAOYSA-N 0.000 description 1
- 238000007792 addition Methods 0.000 description 1
- 238000004590 computer program Methods 0.000 description 1
- 238000007599 discharging Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 229910001416 lithium ion Inorganic materials 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- 238000000926 separation method Methods 0.000 description 1
- 238000012800 visualization Methods 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B13/00—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion
- G05B13/02—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric
- G05B13/04—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric involving the use of models or simulators
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05F—SYSTEMS FOR REGULATING ELECTRIC OR MAGNETIC VARIABLES
- G05F1/00—Automatic systems in which deviations of an electric quantity from one or more predetermined values are detected at the output of the system and fed back to a device within the system to restore the detected quantity to its predetermined value or values, i.e. retroactive systems
- G05F1/10—Regulating voltage or current
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q30/00—Commerce
- G06Q30/02—Marketing; Price estimation or determination; Fundraising
- G06Q30/0201—Market modelling; Market analysis; Collecting market data
- G06Q30/0202—Market predictions or forecasting for commercial activities
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J13/00—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J13/00—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
- H02J13/00004—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by the power network being locally controlled
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J13/00—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
- H02J13/00006—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment
- H02J13/00028—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment involving the use of Internet protocols
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J13/00—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
- H02J13/00032—Systems characterised by the controlled or operated power network elements or equipment, the power network elements or equipment not otherwise provided for
- H02J13/00034—Systems characterised by the controlled or operated power network elements or equipment, the power network elements or equipment not otherwise provided for the elements or equipment being or involving an electric power substation
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/003—Load forecast, e.g. methods or systems for forecasting future load demand
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/004—Generation forecast, e.g. methods or systems for forecasting future energy generation
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/12—Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/12—Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
- H02J3/14—Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load by switching loads on to, or off from, network, e.g. progressively balanced loading
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B15/00—Systems controlled by a computer
- G05B15/02—Systems controlled by a computer electric
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2203/00—Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
- H02J2203/20—Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2310/00—The network for supplying or distributing electric power characterised by its spatial reach or by the load
- H02J2310/10—The network having a local or delimited stationary reach
- H02J2310/12—The local stationary network supplying a household or a building
- H02J2310/14—The load or loads being home appliances
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2310/00—The network for supplying or distributing electric power characterised by its spatial reach or by the load
- H02J2310/50—The network for supplying or distributing electric power characterised by its spatial reach or by the load for selectively controlling the operation of the loads
- H02J2310/56—The network for supplying or distributing electric power characterised by its spatial reach or by the load for selectively controlling the operation of the loads characterised by the condition upon which the selective controlling is based
- H02J2310/62—The condition being non-electrical, e.g. temperature
- H02J2310/64—The condition being economic, e.g. tariff based load management
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B70/00—Technologies for an efficient end-user side electric power management and consumption
- Y02B70/30—Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
- Y02B70/3225—Demand response systems, e.g. load shedding, peak shaving
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B90/00—Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
- Y02B90/20—Smart grids as enabling technology in buildings sector
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S20/00—Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S20/00—Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
- Y04S20/20—End-user application control systems
- Y04S20/222—Demand response systems, e.g. load shedding, peak shaving
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S50/00—Market activities related to the operation of systems integrating technologies related to power network operation or related to communication or information technologies
- Y04S50/10—Energy trading, including energy flowing from end-user application to grid
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S50/00—Market activities related to the operation of systems integrating technologies related to power network operation or related to communication or information technologies
- Y04S50/14—Marketing, i.e. market research and analysis, surveying, promotions, advertising, buyer profiling, customer management or rewards
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Power Engineering (AREA)
- Strategic Management (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Economics (AREA)
- Theoretical Computer Science (AREA)
- Marketing (AREA)
- General Business, Economics & Management (AREA)
- Finance (AREA)
- Entrepreneurship & Innovation (AREA)
- Development Economics (AREA)
- Accounting & Taxation (AREA)
- Health & Medical Sciences (AREA)
- Tourism & Hospitality (AREA)
- Human Resources & Organizations (AREA)
- Automation & Control Theory (AREA)
- Public Health (AREA)
- Radar, Positioning & Navigation (AREA)
- Primary Health Care (AREA)
- General Health & Medical Sciences (AREA)
- Water Supply & Treatment (AREA)
- Electromagnetism (AREA)
- Operations Research (AREA)
- Data Mining & Analysis (AREA)
- Game Theory and Decision Science (AREA)
- Quality & Reliability (AREA)
- Software Systems (AREA)
- Artificial Intelligence (AREA)
- Medical Informatics (AREA)
- Evolutionary Computation (AREA)
- Computer Vision & Pattern Recognition (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
- General Engineering & Computer Science (AREA)
Abstract
Description
以下、実施の形態について、図面を参照しながら説明する。ここで示す実施の形態は、いずれも本発明の一具体例を示すものである。従って、以下の実施の形態で示される数値、形状、材料、構成要素、構成要素の配置及び接続形態、並びに、ステップ(工程)及びステップの順序等は、一例であって本発明を限定するものではない。以下の実施の形態における構成要素のうち、独立請求項に記載されていない構成要素については、任意に付加可能な構成要素である。また、各図は、模式図であり、必ずしも厳密に図示されたものではない。
図1は、実施の形態に係るエネルギープラニングシステム10に関連する装置群を示すシステム概略図である。同図に示すエネルギープラニングシステム10では、各住宅(住宅20a、住宅20b、住宅20c等)に設置されたHEMS200とエネルギープラニングサーバ100と、携帯端末30とがネットワーク11で通信可能となるように構成されている。また、エネルギープラニングサーバ100は、外部サーバ群とネットワーク11を介して通信可能となっている。ネットワーク11は、例えばインターネット等の広域ネットワークを含む。
以下、上述の構成を備えるエネルギープラニングシステム10におけるエネルギープランの立案に係る動作について図7に即して説明する。ここでは、住宅20aについてのエネルギープランの立案を例として説明するが、住宅20b、住宅20c等についても同様である。
以下、ステップS3における生活スタイルの予測の具体例を示す。なお、予測方法は、例えばアンケートその他に基づく統計等に基づき予め決定されて利用される。
以下、ステップS6のエネルギープランの決定のためになされるエネルギーコストの算出の具体例を示す。このエネルギーコストの算出は、例えば提供を受けるべきエネルギー関連サービスを選定し、対応する契約内容に基づいてなされる。
以下、住宅20bの居住者の家族構成が、夫婦と18歳の長男と15歳の長女との4人家族であることを前提とし、住宅20bについてのエネルギープランの立案の一具体例を示す。前提として、住宅20bには、現在、ガス給湯器及びガソリン自動車が存在する。また、現在から5年後まで生活スタイルに大きな変化がなく、5年後から15年後までに電力契約の見直しをして、エネルギー設備を導入し、自動車を買い換える予定である。そして、15年後から25年後までに子供の独立により家族構成が変化し、またこの段階でもエネルギー設備の導入、電気自動車の購入等を行う予定である。また、住宅20bでの過去5年間の一ヶ月あたりの使用電力量の平均値はXb(kWh)であるものとする。ここでは、説明の便宜上、単純化して一ヶ月あたりの使用電力量及び時間帯毎の使用電力量比率に基づいてエネルギーコストの予測計算を行う例を示すが、季節、月、曜日等により分析した使用電力量の実績データを用いて予測の精度を高めてもよい。
以上、実施の形態1によりエネルギープラニングシステム10について説明したが、上述した実施の形態は一例にすぎず、各種の変更、付加、省略等が可能であることは言うまでもない。
20a、20b、20c 住宅
110 検知部
120 予測部
130 取得部
140 記憶部
150 提案部
160 検出部
31、201 入力受付部
202 収集部
203 測定部
Claims (11)
- 住宅におけるエネルギー設備の状態を検知する検知部と、
前記住宅の居住者の将来の生活スタイルを予測する予測部と、
前記検知部による検知結果及び前記予測部により予測された生活スタイルに基づいて前記住宅のためのエネルギープランに関する情報を決定して当該情報を出力する提案部とを備える
エネルギープラニングシステム。 - 前記エネルギープラニングシステムは、前記住宅におけるエネルギーの使用量を測定する測定部を備え、
前記提案部は、前記測定部による測定結果に基づいて、前記エネルギープランに関する情報を決定する
請求項1記載のエネルギープラニングシステム。 - 前記エネルギープラニングシステムは更に、エネルギーに関する現在の規定又は将来の計画を示すエネルギー施策情報を外部から取得する取得部を備え、
前記提案部は、前記エネルギー施策情報に基づいて1又は複数のエネルギー設備を特定して、特定したエネルギー設備を示す情報を前記エネルギープランに関する情報として決定する
請求項2記載のエネルギープラニングシステム。 - 前記エネルギー施策情報は、将来のエネルギー価格に関する情報であり、
前記提案部は、前記エネルギー施策情報に基づきエネルギーコストの抑制に有効なエネルギー設備を特定することにより前記決定を行う
請求項3記載のエネルギープラニングシステム。 - 前記エネルギープラニングシステムは更に、1又は複数のエネルギー設備の価格を示す設備価格情報を記憶する記憶部を備え、
前記提案部は、前記設備価格情報に基づいて1又は複数のエネルギー設備各々の価格対効果を算定し、算定した価格対効果が所定基準を満たす1又は複数のエネルギー設備を特定して、特定したエネルギー設備を示す情報を前記エネルギープランに関する情報として決定する
請求項1記載のエネルギープラニングシステム。 - 前記検知部によるエネルギー設備の状態の前記検知は、当該エネルギー設備の現在までの使用期間についての検知を含み、
前記提案部は、前記使用期間に基づいて前記エネルギープランに関する情報を決定する
請求項1記載のエネルギープラニングシステム。 - 前記エネルギープラニングシステムは、前記住宅における1以上のエネルギー設備について測定された稼動実績に係るデータを収集する収集部を備え、
前記検知部は、前記収集部により収集されたデータに基づいて前記検知を行い、
前記予測部は、前記収集部により収集されたデータに基づいて前記予測を行う
請求項1記載のエネルギープラニングシステム。 - 前記予測部は、前記住宅の居住者の生活スタイルの変化を予測し、
前記提案部は、前記予測部により予測された生活スタイルが変化する際に、導入されるべきエネルギー設備を示す情報又は提供を受けるべきエネルギー関連サービスを示す情報を、前記エネルギープランに関する情報として決定する
請求項1記載のエネルギープラニングシステム。 - 前記エネルギープラニングシステムは、前記住宅における居住者の将来の変化を示す情報の入力を受け付ける入力受付部を備え、
前記予測部は、前記入力受付部により受け付けられた入力に係る情報に基づいて前記予測を行う
請求項8記載のエネルギープラニングシステム。 - 1又は複数のコンピュータによって実行されるエネルギープラニング方法であって、
住宅におけるエネルギー設備の状態を検知する検知ステップと、
前記住宅の居住者の将来の生活スタイルを予測する予測ステップと、
前記検知ステップにおける検知結果及び前記予測ステップにおいて予測された生活スタイルに基づいて前記住宅のためのエネルギープランに関する情報を決定して当該情報を出力する提案ステップとを含む
エネルギープラニング方法。 - コンピュータにエネルギープラニング処理を実行させるための制御プログラムであって、
エネルギープラニング処理は、
住宅におけるエネルギー設備の状態を検知する検知ステップと、
前記住宅の居住者の将来の生活スタイルを予測する予測ステップと、
前記検知ステップにおける検知結果及び前記予測ステップにおいて予測された生活スタイルに基づいて前記住宅のためのエネルギープランに関する情報を決定して当該情報を出力する提案ステップとを含む
制御プログラム。
Priority Applications (5)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2014209401A JP5958921B2 (ja) | 2014-10-10 | 2014-10-10 | エネルギープラニングシステム |
PCT/JP2015/005130 WO2016056243A1 (ja) | 2014-10-10 | 2015-10-09 | エネルギープラニングシステム及びエネルギープラニング方法 |
AU2015329459A AU2015329459B2 (en) | 2014-10-10 | 2015-10-09 | Energy planning system and energy planning method |
US15/517,860 US10811902B2 (en) | 2014-10-10 | 2015-10-09 | Energy planning system and energy planning method considering a timing of a change in a total number of residents in a home |
JP2016057681A JP2016146199A (ja) | 2014-10-10 | 2016-03-22 | エネルギープラニングシステム |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2014209401A JP5958921B2 (ja) | 2014-10-10 | 2014-10-10 | エネルギープラニングシステム |
JP2016057681A JP2016146199A (ja) | 2014-10-10 | 2016-03-22 | エネルギープラニングシステム |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2016057681A Division JP2016146199A (ja) | 2014-10-10 | 2016-03-22 | エネルギープラニングシステム |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2016081143A true JP2016081143A (ja) | 2016-05-16 |
JP5958921B2 JP5958921B2 (ja) | 2016-08-02 |
Family
ID=61526211
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2014209401A Active JP5958921B2 (ja) | 2014-10-10 | 2014-10-10 | エネルギープラニングシステム |
JP2016057681A Pending JP2016146199A (ja) | 2014-10-10 | 2016-03-22 | エネルギープラニングシステム |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2016057681A Pending JP2016146199A (ja) | 2014-10-10 | 2016-03-22 | エネルギープラニングシステム |
Country Status (4)
Country | Link |
---|---|
US (1) | US10811902B2 (ja) |
JP (2) | JP5958921B2 (ja) |
AU (1) | AU2015329459B2 (ja) |
WO (1) | WO2016056243A1 (ja) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2021026373A (ja) * | 2019-08-01 | 2021-02-22 | 住友電気工業株式会社 | 蓄電池導入支援装置、蓄電池導入支援方法、およびコンピュータプログラム |
Families Citing this family (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US10523008B2 (en) * | 2015-02-24 | 2019-12-31 | Tesla, Inc. | Scalable hierarchical energy distribution grid utilizing homogeneous control logic |
US20170363666A1 (en) * | 2016-06-16 | 2017-12-21 | Enphase Energy, Inc. | Method and apparatus for energy flow visualization |
JP2018049321A (ja) * | 2016-09-20 | 2018-03-29 | ヤフー株式会社 | 推定装置、推定方法および推定プログラム |
CN111492558B (zh) * | 2017-12-25 | 2024-04-23 | 索尼公司 | 供电仲裁装置、供电装置、耗电装置、供电远程控制装置、供电仲裁方法及电力系统 |
JP2019164643A (ja) * | 2018-03-20 | 2019-09-26 | 本田技研工業株式会社 | 情報提供装置、情報提供方法及びシステム |
JP2019165584A (ja) * | 2018-03-20 | 2019-09-26 | 本田技研工業株式会社 | 情報提供装置、情報提供方法及びシステム |
DE102019106341A1 (de) * | 2019-03-13 | 2020-09-17 | Dr. Ing. H.C. F. Porsche Aktiengesellschaft | Verfahren und Vorrichtung für Energiemanagement für ein Elektrofahrzeug- Ladesystem |
EP3951695A4 (en) * | 2019-03-29 | 2022-10-12 | Nippon Gas Co., Ltd. | INFORMATION PROCESSING DEVICE, INFORMATION PROCESSING METHOD AND PROGRAM |
US11322944B2 (en) * | 2020-03-20 | 2022-05-03 | Arcadia Power, Inc. | Methods of optimizing energy usage from energy suppliers |
US11658491B2 (en) | 2019-08-15 | 2023-05-23 | Arcadia Power, Inc. | Methods of optimizing energy usage from energy suppliers |
JP2021039497A (ja) * | 2019-09-02 | 2021-03-11 | 旭化成株式会社 | ライフイベント解析装置およびプログラム |
KR20210077916A (ko) * | 2019-12-18 | 2021-06-28 | 엘지전자 주식회사 | 인공 지능을 이용한 가전 기기의 통합 제어 방법 및 그 시스템 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2003271801A (ja) * | 2002-03-18 | 2003-09-26 | Hitachi Ltd | 電気製品のマーケティング方法およびシステム |
JP2004030002A (ja) * | 2002-06-24 | 2004-01-29 | Hitachi Ltd | 需要予測方法およびシステム |
JP2005284852A (ja) * | 2004-03-30 | 2005-10-13 | Nifty Corp | 消費電力量データ処理方法 |
JP2014071654A (ja) * | 2012-09-28 | 2014-04-21 | Kddi Corp | ユーザ属性を考慮した電力消費関連支援装置、携帯端末、プログラム及び方法 |
Family Cites Families (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7274975B2 (en) | 2005-06-06 | 2007-09-25 | Gridpoint, Inc. | Optimized energy management system |
JP2008158701A (ja) | 2006-12-21 | 2008-07-10 | Showa Shell Sekiyu Kk | 表示装置、方法及びコンピュータプログラム |
US20110231320A1 (en) | 2009-12-22 | 2011-09-22 | Irving Gary W | Energy management systems and methods |
JP5587641B2 (ja) * | 2010-03-10 | 2014-09-10 | パナソニック株式会社 | 電力供給システム |
US8560133B2 (en) * | 2010-09-01 | 2013-10-15 | General Electric Company | Energy smart system |
US8510255B2 (en) * | 2010-09-14 | 2013-08-13 | Nest Labs, Inc. | Occupancy pattern detection, estimation and prediction |
US20120330472A1 (en) * | 2011-06-21 | 2012-12-27 | General Electric Company | Power consumption prediction systems and methods |
US9569804B2 (en) * | 2012-08-27 | 2017-02-14 | Gridium, Inc. | Systems and methods for energy consumption and energy demand management |
US9595070B2 (en) * | 2013-03-15 | 2017-03-14 | Google Inc. | Systems, apparatus and methods for managing demand-response programs and events |
US20150057820A1 (en) * | 2013-08-21 | 2015-02-26 | Fujitsu Limited | Building energy management optimization |
-
2014
- 2014-10-10 JP JP2014209401A patent/JP5958921B2/ja active Active
-
2015
- 2015-10-09 AU AU2015329459A patent/AU2015329459B2/en not_active Ceased
- 2015-10-09 US US15/517,860 patent/US10811902B2/en active Active
- 2015-10-09 WO PCT/JP2015/005130 patent/WO2016056243A1/ja active Application Filing
-
2016
- 2016-03-22 JP JP2016057681A patent/JP2016146199A/ja active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2003271801A (ja) * | 2002-03-18 | 2003-09-26 | Hitachi Ltd | 電気製品のマーケティング方法およびシステム |
JP2004030002A (ja) * | 2002-06-24 | 2004-01-29 | Hitachi Ltd | 需要予測方法およびシステム |
JP2005284852A (ja) * | 2004-03-30 | 2005-10-13 | Nifty Corp | 消費電力量データ処理方法 |
JP2014071654A (ja) * | 2012-09-28 | 2014-04-21 | Kddi Corp | ユーザ属性を考慮した電力消費関連支援装置、携帯端末、プログラム及び方法 |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2021026373A (ja) * | 2019-08-01 | 2021-02-22 | 住友電気工業株式会社 | 蓄電池導入支援装置、蓄電池導入支援方法、およびコンピュータプログラム |
JP7400252B2 (ja) | 2019-08-01 | 2023-12-19 | 住友電気工業株式会社 | 蓄電池導入支援装置、蓄電池導入支援方法、およびコンピュータプログラム |
Also Published As
Publication number | Publication date |
---|---|
JP2016146199A (ja) | 2016-08-12 |
US10811902B2 (en) | 2020-10-20 |
JP5958921B2 (ja) | 2016-08-02 |
AU2015329459A1 (en) | 2017-04-27 |
US20170310161A1 (en) | 2017-10-26 |
AU2015329459B2 (en) | 2018-06-28 |
WO2016056243A1 (ja) | 2016-04-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP5958921B2 (ja) | エネルギープラニングシステム | |
Hao et al. | Potentials and economics of residential thermal loads providing regulation reserve | |
Faruqui et al. | Arcturus: international evidence on dynamic pricing | |
Oprea et al. | Flattening the electricity consumption peak and reducing the electricity payment for residential consumers in the context of smart grid by means of shifting optimization algorithm | |
JP4938750B2 (ja) | 消費電力予測装置、消費電力予測方法およびプログラム | |
JP6786814B2 (ja) | 情報処理装置、情報処理方法、およびプログラム | |
Yamaguchi et al. | An integrated approach of estimating demand response flexibility of domestic laundry appliances based on household heterogeneity and activities | |
JP6676477B2 (ja) | 建物の消費電力予測システム、蓄電装置の制御システム、及び蓄電装置の制御方法 | |
Yang et al. | Quantifying the benefits to consumers for demand response with a statistical elasticity model | |
WO2016056248A1 (ja) | 行動管理装置、行動管理システムおよび行動管理方法 | |
Tanaka et al. | Voluntary electricity conservation of households after the Great East Japan Earthquake: A stated preference analysis | |
JP2016095598A (ja) | 電力管理装置、及び情報提示方法 | |
Jacquot et al. | Demand side management in the smart grid: An efficiency and fairness tradeoff | |
JP2016143319A (ja) | 管理装置、通信装置、管理方法、およびプログラム | |
US20180046159A1 (en) | Demand response control result presentation apparatus | |
US20160223601A1 (en) | Energy monitoring method and apparatus | |
WO2015064024A1 (ja) | 特典情報決定装置および特典情報決定システム | |
JP2005045899A (ja) | 電力取引システムおよび電力取引方法 | |
JP6437139B2 (ja) | 電力管理装置、サーバ、電力管理システム、電力管理方法、及び、プログラム | |
Arlt et al. | Impact of real-time pricing and residential load automation on distribution systems | |
JP2005070959A (ja) | 電力需要情報処理システム | |
JP2016154036A (ja) | 行動管理装置、行動管理方法およびプログラム | |
JP6626359B2 (ja) | 電力関連情報提示装置、電気関連情報提示方法及びプログラム | |
JP5984095B2 (ja) | 行動管理装置、行動管理方法およびプログラム | |
KR20220007429A (ko) | 통합 검침 정보 알림 시스템 및 방법 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A02 | Decision of refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A02 Effective date: 20151222 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20160322 |
|
A911 | Transfer to examiner for re-examination before appeal (zenchi) |
Free format text: JAPANESE INTERMEDIATE CODE: A911 Effective date: 20160405 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20160607 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20160613 |
|
R151 | Written notification of patent or utility model registration |
Ref document number: 5958921 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R151 |