JP2010521362A5 - - Google Patents
Download PDFInfo
- Publication number
- JP2010521362A5 JP2010521362A5 JP2009553824A JP2009553824A JP2010521362A5 JP 2010521362 A5 JP2010521362 A5 JP 2010521362A5 JP 2009553824 A JP2009553824 A JP 2009553824A JP 2009553824 A JP2009553824 A JP 2009553824A JP 2010521362 A5 JP2010521362 A5 JP 2010521362A5
- Authority
- JP
- Japan
- Prior art keywords
- tool
- joining element
- insert
- fuselage
- tool insert
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 claims 14
- 238000005304 joining Methods 0.000 claims 5
- 239000000463 material Substances 0.000 claims 3
- 238000005094 computer simulation Methods 0.000 claims 2
- 238000004519 manufacturing process Methods 0.000 claims 2
- 238000005259 measurement Methods 0.000 claims 2
- 239000007787 solid Substances 0.000 claims 2
- 239000000835 fiber Substances 0.000 claims 1
- 238000007641 inkjet printing Methods 0.000 claims 1
- 238000003780 insertion Methods 0.000 claims 1
- 230000037431 insertion Effects 0.000 claims 1
- 230000013011 mating Effects 0.000 claims 1
- 238000003825 pressing Methods 0.000 claims 1
- 239000011347 resin Substances 0.000 claims 1
- 229920005989 resin Polymers 0.000 claims 1
Applications Claiming Priority (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US11/685,934 US7787979B2 (en) | 2007-03-14 | 2007-03-14 | Splicing fuselage sections without shims |
| US11/685,934 | 2007-03-14 | ||
| PCT/US2008/057085 WO2008113020A2 (en) | 2007-03-14 | 2008-03-14 | Splicing fuselage sections without shims |
Publications (3)
| Publication Number | Publication Date |
|---|---|
| JP2010521362A JP2010521362A (ja) | 2010-06-24 |
| JP2010521362A5 true JP2010521362A5 (enExample) | 2011-04-28 |
| JP5466954B2 JP5466954B2 (ja) | 2014-04-09 |
Family
ID=39760423
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2009553824A Active JP5466954B2 (ja) | 2007-03-14 | 2008-03-14 | シムを使わない胴体部分の接合 |
Country Status (5)
| Country | Link |
|---|---|
| US (2) | US7787979B2 (enExample) |
| EP (1) | EP2137580B1 (enExample) |
| JP (1) | JP5466954B2 (enExample) |
| CN (1) | CN101646983B (enExample) |
| WO (1) | WO2008113020A2 (enExample) |
Families Citing this family (41)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US8423430B2 (en) * | 2005-11-16 | 2013-04-16 | The Boeing Company | Integrated materials management for commercial aircraft fleets including access to real-time on-board systems information |
| DE102006026169B4 (de) * | 2006-06-06 | 2012-06-21 | Airbus Operations Gmbh | Flugzeugrumpfstruktur und Verfahren zu deren Herstellung |
| DE102006026168A1 (de) * | 2006-06-06 | 2008-01-31 | Airbus Deutschland Gmbh | Flugzeugrumpfstruktur und Verfahren zu deren Herstellung |
| DE102006026170B4 (de) * | 2006-06-06 | 2012-06-21 | Airbus Operations Gmbh | Flugzeugrumpfstruktur und Verfahren zu deren Herstellung |
| US7756321B2 (en) * | 2007-02-28 | 2010-07-13 | The Boeing Company | Method for fitting part assemblies |
| US7787979B2 (en) * | 2007-03-14 | 2010-08-31 | The Boeing Company | Splicing fuselage sections without shims |
| US8700191B2 (en) * | 2007-11-26 | 2014-04-15 | The Boeing Company | Controlled application of external forces to a structure for precision leveling and securing |
| DE102008010197B4 (de) * | 2008-02-20 | 2012-03-22 | Airbus Operations Gmbh | Verfahren zum Verbinden von zwei Rumpfsektionen unter Schaffung eines Querstoßes sowie Querstoßverbindung |
| DE102008043977A1 (de) * | 2008-11-21 | 2010-06-10 | Airbus Deutschland Gmbh | Strukturelement für eine Rumpfzellenstruktur eines Flugzeugs |
| US10203268B2 (en) | 2008-12-04 | 2019-02-12 | Laura P. Solliday | Methods for measuring and modeling the process of prestressing concrete during tensioning/detensioning based on electronic distance measurements |
| US8774971B2 (en) | 2010-02-01 | 2014-07-08 | The Boeing Company | Systems and methods for structure contour control |
| CN101913045B (zh) * | 2010-03-01 | 2012-07-04 | 浙江海洋学院 | 船体分段对接误差校对机 |
| CN101791761A (zh) * | 2010-04-07 | 2010-08-04 | 中国航空工业集团公司北京航空制造工程研究所 | 一种飞行器结构的骨架与蒙皮配合面间隙的补偿方法 |
| DE102010045588B4 (de) * | 2010-09-16 | 2017-04-06 | Airbus Operations Gmbh | Rumpfsegment für ein Luftfahrzeug |
| US8567722B2 (en) * | 2010-12-15 | 2013-10-29 | The Boeing Company | Splice and associated method for joining fuselage sections |
| US9102392B2 (en) * | 2010-12-15 | 2015-08-11 | The Boeing Company | Method and apparatus for air flow control in an aircraft sidewall volume |
| US8756792B2 (en) * | 2011-06-08 | 2014-06-24 | The Boeing Company | Digitally designed shims for joining parts of an assembly |
| US8985514B2 (en) * | 2012-06-20 | 2015-03-24 | The Boeing Company | Composite structural panels and aircraft fuselages |
| US9213786B2 (en) * | 2013-02-20 | 2015-12-15 | The Boeing Company | Manufacturing systems and methods |
| US10378892B2 (en) | 2014-04-21 | 2019-08-13 | Lockheed Martin Corporation | System and method for inspecting surface flushness |
| CN104308663A (zh) * | 2014-10-27 | 2015-01-28 | 湘潭大学 | 一种弧面凸轮廓面加工误差虚拟测量的方法 |
| CN107111658A (zh) * | 2014-10-29 | 2017-08-29 | 川崎重工业株式会社 | 零件加工支援系统及方法 |
| RU2685216C2 (ru) | 2014-11-24 | 2019-04-16 | Ют-Баттелле, Ллк | Способы реактивной трехмерной печати путем экструзии |
| US10275565B2 (en) | 2015-11-06 | 2019-04-30 | The Boeing Company | Advanced automated process for the wing-to-body join of an aircraft with predictive surface scanning |
| US10521551B2 (en) | 2015-11-16 | 2019-12-31 | The Boeing Company | Methods for shimming flexible bodies |
| US10590615B2 (en) | 2016-06-28 | 2020-03-17 | Vigor Industrial Llc | Orthotropic deck |
| US10518483B2 (en) | 2017-01-25 | 2019-12-31 | The Boeing Company | Compound shimming |
| CN106908972B (zh) * | 2017-05-11 | 2020-08-04 | 四川长虹电器股份有限公司 | 无边框液晶模组屏与面框装配的方法 |
| US10434704B2 (en) | 2017-08-18 | 2019-10-08 | Ppg Industries Ohio, Inc. | Additive manufacturing using polyurea materials |
| US12384097B2 (en) | 2017-08-18 | 2025-08-12 | Ppg Industries Ohio, Inc. | Additive manufacturing using reactive compositions |
| ES2713963B2 (es) * | 2017-11-17 | 2021-01-07 | Airbus Defence And Space Sau | Método de fabricación y ensamblaje y sistema de partes de una aeronave |
| US11851212B2 (en) | 2018-06-28 | 2023-12-26 | Bae Systems Plc | Method and apparatus for producing component parts of aircraft airframes |
| US10712730B2 (en) * | 2018-10-04 | 2020-07-14 | The Boeing Company | Methods of synchronizing manufacturing of a shimless assembly |
| KR102678558B1 (ko) | 2019-02-11 | 2024-06-25 | 피피지 인더스트리즈 오하이오 인코포레이티드 | 다층 시스템 및 다층 시스템을 제조하는 방법 |
| JP7386881B2 (ja) | 2019-02-11 | 2023-11-27 | ピーピージー・インダストリーズ・オハイオ・インコーポレイテッド | シールキャップの3d印刷 |
| EP3924165A1 (en) | 2019-02-11 | 2021-12-22 | PPG Industries Ohio Inc. | Methods of making chemically resistant sealing components |
| US11280222B2 (en) * | 2019-02-26 | 2022-03-22 | The Boeing Company | Bulkhead shims for curvilinear components |
| US10488185B1 (en) * | 2019-03-14 | 2019-11-26 | The Boeing Company | Methods and systems for characterizing a surface of a structural component |
| US11801946B2 (en) | 2019-04-25 | 2023-10-31 | The Boeing Company | System for sensing miniature gaps by inductive coupling |
| EP3972903B1 (en) | 2019-05-23 | 2025-01-01 | BAE SYSTEMS plc | A method and apparatus for producing at least part of a structural frame of a vehicle |
| JP2022080863A (ja) * | 2020-11-18 | 2022-05-30 | ザ・ボーイング・カンパニー | ラインで組み立てられる胴体セグメントのための輪郭強化 |
Family Cites Families (28)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US4642900A (en) * | 1985-07-08 | 1987-02-17 | Kent-Moore Corporation | Shim selector |
| US4945488A (en) * | 1987-04-14 | 1990-07-31 | Northrop Corporation | Integrated aircraft manufacturing system |
| ES2086290T3 (es) * | 1987-04-14 | 1996-07-01 | Northrop Grumman Corp | Sistema de fabricacion utilizando modelos graficos en tres dimensiones. |
| US5289267A (en) * | 1991-10-04 | 1994-02-22 | Kms Fusion, Inc. | Electro-optical system for gauging surface profile deviations |
| US5560102A (en) * | 1992-10-13 | 1996-10-01 | The Boeing Company | Panel and fuselage assembly |
| JPH1077609A (ja) * | 1996-09-02 | 1998-03-24 | Kawada Kogyo Kk | 鋼橋部材製作方法 |
| JP3640751B2 (ja) * | 1996-12-26 | 2005-04-20 | 富士重工業株式会社 | 複合材の成形型および複合材の成形方法 |
| US5880964A (en) * | 1997-01-31 | 1999-03-09 | Prosthetic Design, Inc. | Method for fabricating a cosmetic cover for a prosthetic limb |
| US6230382B1 (en) * | 1998-05-11 | 2001-05-15 | Vought Aircraft Industries, Inc. | System and method for assembling an aircraft |
| US6317954B1 (en) * | 1998-05-11 | 2001-11-20 | Vought Aircraft Industries, Inc. | System and method for aligning aircraft coordinate systems |
| US6618505B2 (en) * | 2000-03-09 | 2003-09-09 | The Boeing Company | Method, apparatus and computer program product for determining shim shape |
| US7225050B2 (en) * | 2001-01-04 | 2007-05-29 | Sutula Jr Daniel P | Method and apparatus for precisely fitting, reproducing, and creating 3-dimensional objects from digitized and/or parametric data inputs using computer aided design and manufacturing technology |
| US6922599B2 (en) * | 2001-08-13 | 2005-07-26 | The Boeing Company | System and method for producing an assembly by directly implementing three-dimensional computer-aided design component definitions |
| ATE357191T1 (de) * | 2001-08-31 | 2007-04-15 | Cynovad Inc | Verfahren zur herstellung von giessformen |
| EP1447644A1 (en) * | 2003-02-14 | 2004-08-18 | Metronor ASA | Measurement of spatial coordinates |
| DE10319926B4 (de) * | 2003-05-02 | 2006-09-28 | Airbus Deutschland Gmbh | Verfahren zum Ausgleichen eines Fügespaltes |
| JP4444033B2 (ja) * | 2004-08-10 | 2010-03-31 | 三菱重工業株式会社 | 航空機の機体の製造方法 |
| US7325771B2 (en) * | 2004-09-23 | 2008-02-05 | The Boeing Company | Splice joints for composite aircraft fuselages and other structures |
| GB0519364D0 (en) * | 2005-09-22 | 2005-11-02 | Airbus Uk Ltd | Assembly of aircraft components |
| US7783376B2 (en) * | 2006-05-10 | 2010-08-24 | The Boeing Company | Photogrammetric contrasting light for hole recognition |
| US7454265B2 (en) * | 2006-05-10 | 2008-11-18 | The Boeing Company | Laser and Photogrammetry merged process |
| US7587258B2 (en) * | 2006-05-10 | 2009-09-08 | The Boeing Company | Merged laser and photogrammetry measurement using precise camera placement |
| US7277811B1 (en) * | 2006-05-11 | 2007-10-02 | The Boeing Company | Calibration apparatus and process |
| US20070269098A1 (en) * | 2006-05-19 | 2007-11-22 | Marsh Bobby J | Combination laser and photogrammetry target |
| US7661199B2 (en) * | 2006-05-19 | 2010-02-16 | The Boeing Company | Coded target for use with combination laser and photogrammetry targets |
| US7730789B2 (en) * | 2006-11-01 | 2010-06-08 | Boeing Management Company | Device and method for measuring a gap between members of a structure for manufacture of a shim |
| US7756321B2 (en) * | 2007-02-28 | 2010-07-13 | The Boeing Company | Method for fitting part assemblies |
| US7787979B2 (en) * | 2007-03-14 | 2010-08-31 | The Boeing Company | Splicing fuselage sections without shims |
-
2007
- 2007-03-14 US US11/685,934 patent/US7787979B2/en active Active
-
2008
- 2008-03-14 EP EP08732264.0A patent/EP2137580B1/en active Active
- 2008-03-14 CN CN2008800083204A patent/CN101646983B/zh active Active
- 2008-03-14 WO PCT/US2008/057085 patent/WO2008113020A2/en not_active Ceased
- 2008-03-14 JP JP2009553824A patent/JP5466954B2/ja active Active
-
2010
- 2010-07-14 US US12/835,941 patent/US7957825B2/en active Active
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP2010521362A5 (enExample) | ||
| US8844599B2 (en) | Configurable tooling and molding method using the same | |
| JP2009083491A (ja) | 3次元大型造形物の作製方法 | |
| JP2017052237A (ja) | 繊維強化プラスチック成型品の製造装置及びその製造方法 | |
| JP2010521362A (ja) | シムを使わない胴体部分の接合 | |
| CN104428125A (zh) | 一种制造塑料产品的方法和通过该方法制造的产品 | |
| CN114030201B (zh) | 拓扑优化气囊辅助成型复合材料梯形夹芯结构制作工艺 | |
| JP2013533138A (ja) | 複合材料で作られたモールド及びこのモールドを用いたプロセス | |
| CN103826778B (zh) | 用于熔失模型模制成型的模型的组装装置和方法及对应的模制成型方法 | |
| JP2014237243A (ja) | 繊維強化プラスチック構造体の製造装置および製造方法 | |
| CN105150558A (zh) | 一种部件整体成型方法及飞行器的舵面及飞行器 | |
| US20020125613A1 (en) | Mandrel fabrication for cobond assembly | |
| CN108613620A (zh) | 一种基于3d打印的接触式位移传感器结构及其制作方法 | |
| JP6170347B2 (ja) | 繊維強化プラスチック構造体の製造方法および金型 | |
| CN110775171B (zh) | 一种方程式赛车空心翼片及其成型方法 | |
| CN104220225B (zh) | 树脂成型用模具、树脂成型方法和树脂成型品 | |
| Premarathna et al. | A novel fabrication method for rapid prototyping of soft structures with embedded pneumatic channels | |
| CN115489095B (zh) | 碳纤维复合材料外壳及其制备方法、电子设备 | |
| CN205071501U (zh) | 热塑一体成型的金属壳埋植贴合装置 | |
| CN113246493B (zh) | 一种闭角零件的成型模具及其制造与使用方法 | |
| WO2017126094A1 (ja) | 積層造形物およびそれを有する機器ならびに造形方法 | |
| CN104589661B (zh) | 具有侧墙的碳纤维外壳的制造方法 | |
| CN112718939B (zh) | 一种胶接模具及其制造方法 | |
| CN204284129U (zh) | 一种复合材料/金属梯形齿混合连接结构 | |
| JP2011194691A (ja) | 平面素材を粘土に付着させ一体化させて凹凸加工後凝固させた造形物作成手法 |