GB796789A - Improvements in piles for foundations of buildings - Google Patents
Improvements in piles for foundations of buildingsInfo
- Publication number
- GB796789A GB796789A GB2293855A GB2293855A GB796789A GB 796789 A GB796789 A GB 796789A GB 2293855 A GB2293855 A GB 2293855A GB 2293855 A GB2293855 A GB 2293855A GB 796789 A GB796789 A GB 796789A
- Authority
- GB
- United Kingdom
- Prior art keywords
- spigot
- shoulder
- tube
- shoe
- bars
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/72—Pile shoes
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Piles And Underground Anchors (AREA)
Abstract
796,789. Piles. SIME, DARBY & CO., Ltd. Aug. 7, 1956 [Aug. 9, 1955], No. 22938/55. Class 68(2) A tube, which is driven by means of a hammer, into the ground to form a bore in which is pile is cast or into which a pile is inserted, is provided with a reinforced concrete shoe which remains in the ground when the tube is withdrawn, the shoe having a pointed bottom 2 and a cylindrical upper part with spigot 4 to enter the tube 6 and a substantial shoulder 8 to engage the lower end of the tube 6 and having reinforcement in the form of a cage which follows the outline of the spigot, shoulder and bottom. The reinforcement may include four principal bars 10 lying in vertical planes at intervals of 45 degrees about the vertical axis of the shoe. Each bar 10 may extend across a diameter of the shoe just below shoulder 8 and across the pointed bottom to form a closed triangle. The principal bars are tied together by a spiral 14 and ring 15. Vertical bars 16 held by diametrical ties 18 reinforce the spigot 4. In a modification each of the principal bars runs from the spigot, under the shoulder. across the pointed bottom under the shoulder and back to the spigot.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
GB2293855A GB796789A (en) | 1955-08-09 | 1955-08-09 | Improvements in piles for foundations of buildings |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
GB2293855A GB796789A (en) | 1955-08-09 | 1955-08-09 | Improvements in piles for foundations of buildings |
Publications (1)
Publication Number | Publication Date |
---|---|
GB796789A true GB796789A (en) | 1958-06-18 |
Family
ID=10187498
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
GB2293855A Expired GB796789A (en) | 1955-08-09 | 1955-08-09 | Improvements in piles for foundations of buildings |
Country Status (1)
Country | Link |
---|---|
GB (1) | GB796789A (en) |
-
1955
- 1955-08-09 GB GB2293855A patent/GB796789A/en not_active Expired
Similar Documents
Publication | Publication Date | Title |
---|---|---|
GB1368895A (en) | Method for forming a body of concrete or similar material in the soil | |
GB796262A (en) | Improvements in or relating to piles | |
GB862630A (en) | Method of and apparatus for the construction of piles cast in situ from concrete | |
GB796789A (en) | Improvements in piles for foundations of buildings | |
GB882085A (en) | Improvements in or relating to the production of concrete foundation piles | |
GB798752A (en) | Improvements in reinforced concrete piles | |
JPS57151722A (en) | Filling work for space formed after drawing out sheet pile | |
GB975030A (en) | Reinforced concrete piles | |
GB469716A (en) | A process for forming concrete piles in situ | |
GB626005A (en) | Improvements in or relating to foundation piles | |
GB959660A (en) | Method of producing a concrete pile wall, pile walls produced by said method, and a piling tube adapted to be used in said method | |
GB637620A (en) | Improvements relating to reinforced concrete piles | |
GB998962A (en) | Improvements in or relating to piling | |
GB335101A (en) | Improvements in supporting piles for buildings | |
US2129336A (en) | Caisson | |
JPS56105016A (en) | Executing method for reinforced foundation pile and reinforcing steel pipe | |
GB699615A (en) | Improved two part foundation pile | |
GB366514A (en) | Improvements in and relating to foundation piles | |
JPS6417920A (en) | Construction of precast pile with bag | |
GB597303A (en) | Improvements in or relating to the casting and simultaneous fixing of concrete and like poles and columns | |
GB959265A (en) | Improvements in and relating to piles | |
GB690141A (en) | Method and devices for constructing foundation piles in the ground | |
GB924480A (en) | Improvements in and relating to the construction of underground dams | |
JPS56135627A (en) | Construction of foundation pile | |
GB551717A (en) | Improvements in or relating to the construction of concrete piles or the like |