GB1030619A - A process for the production of piles - Google Patents
A process for the production of pilesInfo
- Publication number
- GB1030619A GB1030619A GB47794/63A GB4779463A GB1030619A GB 1030619 A GB1030619 A GB 1030619A GB 47794/63 A GB47794/63 A GB 47794/63A GB 4779463 A GB4779463 A GB 4779463A GB 1030619 A GB1030619 A GB 1030619A
- Authority
- GB
- United Kingdom
- Prior art keywords
- casing
- concrete
- mandrel
- piles
- dec
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
- 238000004519 manufacturing process Methods 0.000 title abstract 2
- 238000000034 method Methods 0.000 title abstract 2
- 239000002689 soil Substances 0.000 abstract 2
- 239000004826 Synthetic adhesive Substances 0.000 abstract 1
- 238000005553 drilling Methods 0.000 abstract 1
- 239000002184 metal Substances 0.000 abstract 1
- 230000035515 penetration Effects 0.000 abstract 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D7/00—Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
- E02D7/28—Placing of hollow pipes or mould pipes by means arranged inside the piles or pipes
- E02D7/30—Placing of hollow pipes or mould pipes by means arranged inside the piles or pipes by driving cores
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D13/00—Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers
- E02D13/10—Follow-blocks of pile-drivers or like devices
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
- E02D5/46—Concrete or concrete-like piles cast in position ; Apparatus for making same making in situ by forcing bonding agents into gravel fillings or the soil
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/52—Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/52—Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments
- E02D5/523—Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments composed of segments
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/54—Piles with prefabricated supports or anchoring parts; Anchoring piles
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/62—Compacting the soil at the footing or in or along a casing by forcing cement or like material through tubes
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D7/00—Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
- E02D7/20—Placing by pressure or pulling power
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Piles And Underground Anchors (AREA)
Abstract
1,030,619. Concrete piles. ENTERPRISES H. COURBOT. Dec. 3, 1963 [Dec. 3, 1962; July 15, 1963; Aug. 23, 1963], No. 47794/63. Heading E1H. A process for the production of piles comprises forming a casing from hollow -tube portions whichare adhesively secured end-toend and then filled, the length of the casing being increased as the driving of the pile progresses. The casing is made from a number of prefabricated tubes e.g. of concrete or metal which are bonded together by a synthetic adhesive having good mechanical properties. After the casing has penetrated to the required depth it is filled with concrete 4 which may be reinforced. For penetration a mandrel (Fig. 4, not shown) is used inside the casing, a helmet being disposed at the upper end of the mandrel for a better distribution of the forces applied during the driving. An expandible mandrel (Fig. 12, not shown) may be used. Some of the hollow tube portions may have lateral orifices, each orifice being equipped with a ball-type valve (Fig. 8, not shown) which prevents soil entering the casing but allows concrete passed into the casing to flow through the orifices into the surrounding soil. In an embodiment illustrated in (Fig. 13, not shown) drilling is effected by means of an Archimedean screw.
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
FR917339A FR1340087A (en) | 1962-12-03 | 1962-12-03 | Process for manufacturing a pile, in particular for a foundation, as well as piles conforming to those obtained by the present process or similar process |
FR941503A FR83995E (en) | 1962-12-03 | 1963-07-15 | Method of manufacturing a pile, in particular for foundations, as well as piles conforming to those obtained by the present method or similar method |
FR945568A FR1366598A (en) | 1962-12-03 | 1963-08-23 | Process for manufacturing piles intended in particular for construction and piles conforming to those obtained by applying the present process or a similar process |
Publications (1)
Publication Number | Publication Date |
---|---|
GB1030619A true GB1030619A (en) | 1966-05-25 |
Family
ID=27246932
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
GB47794/63A Expired GB1030619A (en) | 1962-12-03 | 1963-12-03 | A process for the production of piles |
Country Status (4)
Country | Link |
---|---|
CH (1) | CH429606A (en) |
FR (3) | FR1340087A (en) |
GB (1) | GB1030619A (en) |
OA (1) | OA00032A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4966498A (en) * | 1989-08-16 | 1990-10-30 | Berkel & Company Contractors, Inc. | Pile-forming apparatus for use in low density overburden |
EP0505218A1 (en) * | 1991-03-22 | 1992-09-23 | Westpile Limited | Improvements in venting of landfill and control of leachate |
WO2002020186A1 (en) * | 2000-09-08 | 2002-03-14 | Permavoid Limited | Fluid movement apparatus |
CN104652408A (en) * | 2015-02-13 | 2015-05-27 | 福建省建专岩土工程有限公司 | Strip-shaped sand bag pile and construction method thereof |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2621627B2 (en) * | 1984-12-07 | 1990-02-02 | Crambes Michel | IMPROVEMENT OF THE COMPACTION-REINFORCEMENT-INJECTION AND DECOMPACTING-DRAINAGE PROCESS OF THE SOILS USING AUXILIARY TUBES |
EP0382774B1 (en) * | 1987-10-07 | 1991-11-27 | CRAMBES, Michel | Improvement to the method of compaction-reinforcement-injection or decompaction-draining of grounds by means of auxiliary tubes |
-
1962
- 1962-12-03 FR FR917339A patent/FR1340087A/en not_active Expired
-
1963
- 1963-07-15 FR FR941503A patent/FR83995E/en not_active Expired
- 1963-08-23 FR FR945568A patent/FR1366598A/en not_active Expired
- 1963-12-03 CH CH1486663A patent/CH429606A/en unknown
- 1963-12-03 GB GB47794/63A patent/GB1030619A/en not_active Expired
-
1964
- 1964-04-02 OA OA50046A patent/OA00032A/en unknown
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4966498A (en) * | 1989-08-16 | 1990-10-30 | Berkel & Company Contractors, Inc. | Pile-forming apparatus for use in low density overburden |
EP0505218A1 (en) * | 1991-03-22 | 1992-09-23 | Westpile Limited | Improvements in venting of landfill and control of leachate |
WO2002020186A1 (en) * | 2000-09-08 | 2002-03-14 | Permavoid Limited | Fluid movement apparatus |
US6913420B2 (en) * | 2000-09-08 | 2005-07-05 | Permavoid Limited | Fluid movement apparatus |
CN104652408A (en) * | 2015-02-13 | 2015-05-27 | 福建省建专岩土工程有限公司 | Strip-shaped sand bag pile and construction method thereof |
CN104652408B (en) * | 2015-02-13 | 2016-04-13 | 福建省建专岩土工程有限公司 | The stake of bar shaped sand pocket and construction method thereof |
Also Published As
Publication number | Publication date |
---|---|
FR1366598A (en) | 1964-07-10 |
FR83995E (en) | 1964-11-06 |
CH429606A (en) | 1967-01-31 |
FR1340087A (en) | 1963-10-11 |
OA00032A (en) | 1966-01-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
GB1323031A (en) | Method of reinforcing rock formation | |
GB1030619A (en) | A process for the production of piles | |
ES449858A1 (en) | Method for the production of piles cast in the ground and hollow auger for implementing the method | |
GB796262A (en) | Improvements in or relating to piles | |
GB796959A (en) | Improvements in or relating to the treatment of subterranean formations | |
GB1255128A (en) | Improvements in or relating to core sampling of rock or soil | |
ES387639A1 (en) | Anchor tie construction and method of setting an anchor tie in the ground | |
CN205422599U (en) | Strenghthened type drilling rod hole bottom blender | |
DE1904371B2 (en) | PROCEDURE FOR MANUFACTURING A BOLT ANCHOR AND SHEATHING FOR CARRYING OUT THE PROCEDURE | |
JPS55165314A (en) | Method and device for chemical grouting for improvement of ground | |
GB256150A (en) | Improvements in the construction of concrete piles | |
GB1340355A (en) | Method and apparatus for making a bore hole in the ground | |
FR2306307A1 (en) | Valved injection tube string for anchoring embankments - has helical boring rib on end tube and threaded connexions | |
GB1410126A (en) | Formation of piles in the ground | |
GB335101A (en) | Improvements in supporting piles for buildings | |
GB596408A (en) | Improvements relating to tunnelling and like subterranean operations | |
GB628795A (en) | Improvements in or relating to piles | |
GB1017241A (en) | Method for making holes in the ground | |
DE2039109A1 (en) | Method for producing a prestressed ground anchor | |
DE1093736B (en) | Process for the production of a sealing wall under dams or similar conditions in the foundation | |
GB1265708A (en) | ||
DE860175C (en) | Equipment for the production of reinforced in-situ concrete piles | |
GB976550A (en) | Method of securing anchor bolts in drill holes | |
GB1252321A (en) | ||
DE336019C (en) | Procedure for setting up straightening devices in boreholes |