EP4642726A1 - Plattform für eine aufzugsanlage für ein sich im bau befindendes gebäude - Google Patents
Plattform für eine aufzugsanlage für ein sich im bau befindendes gebäudeInfo
- Publication number
- EP4642726A1 EP4642726A1 EP23817787.7A EP23817787A EP4642726A1 EP 4642726 A1 EP4642726 A1 EP 4642726A1 EP 23817787 A EP23817787 A EP 23817787A EP 4642726 A1 EP4642726 A1 EP 4642726A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- platform
- building
- elevator
- sealing
- shaft
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B11/00—Main component parts of lifts in, or associated with, buildings or other structures
- B66B11/0005—Constructional features of hoistways
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B19/00—Mining-hoist operation
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B19/00—Mining-hoist operation
- B66B19/007—Mining-hoist operation method for modernisation of elevators
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F17/00—Vertical ducts; Channels, e.g. for drainage
- E04F17/005—Lift shafts
Definitions
- the invention relates to a platform for an elevator system with an elevator shaft that becomes higher as the building height increases during the construction phase of the building, and to such an elevator system.
- This elevator system can be used in particular on construction sites for high-rise buildings.
- the elevator system includes an elevator cabin that can be used to access the floors that are already being used as residential or commercial premises during the building's construction phase.
- the construction phase elevator with this elevator cabin grows with the building to a certain extent, i.e. the usable lifting height of the construction elevator increases with the increasing height of the building or the elevator shaft. This makes it possible for construction workers and building materials or, if applicable, users of apartments or commercial premises that were already occupied before the building was completed to be transported in the elevator cabin during the building's construction period.
- Such an elevator system is known from US 2016/0152442 Al.
- the elevator system has a machine platform that can be moved along the elevator shaft and from which the elevator cabin is suspended via support means arranged in the elevator shaft.
- the machine platform is raised in each case in order to increase the usable lifting height of the elevator car in the elevator shaft.
- a platform that can be moved along the elevator shaft is provided to form a support structure that can be supported on the wall of the elevator shaft.
- This support structure arranged above the machine platform is raised in each case before the machine platform is raised by means of a first lifting device installed in the upper area of the elevator shaft to a height at which the platform supported by this support structure can be raised by a certain distance.
- a second lifting device arranged on the aforementioned support structure is used to raise the machine platform.
- the elevator car from the construction phase can continue to be used for normal use of the building after the building has been completed.
- concepts are also known in which the elevator car from the construction phase is replaced by a new elevator car after the building has been completed.
- the construction phase elevator car can be designed as a self-propelled elevator car.
- Such a self-propelled elevator car which is used in an elevator system for a building under construction with an elevator shaft that becomes higher as the building height increases during the construction phase of the building, has become known, for example, from WO 2019/238530 Al.
- Elevator shafts in buildings can be created using climbing formwork.
- Climbing formwork is a discontinuous formwork system and is used to create tower-like structures. It can be used to create concrete sections for the elevator shaft floor by floor. Water is used when concreting. Undesirable water can also enter the shaft due to weather conditions, for example during heavy rainfall. Concrete can also become dirty.
- Another problem with elevator systems with increasingly higher elevator shafts is that during the construction phase of the building, the construction phase elevators can be damaged by falling objects. People inside the elevator shaft, such as maintenance personnel in the elevator cabin, can also be injured by falling objects. People who are on an assembly platform, for example, from which the guide rails for guiding the elevator cabin are mounted, are also at risk.
- the platform should also protect against falling parts and dirt.
- the elevator system equipped with such a platform should be able to be adapted to the increasing height of the building in a simple and efficient manner.
- the platform for an elevator system for a building under construction with an elevator shaft that becomes higher as the building height increases during the construction phase of the building comprises a sealing arrangement for sealing or closing a gap between the platform and the elevator shaft.
- the elevator shaft can preferably be an elevator shaft that is essentially rectangular in plan view or in floor plan.
- the term "elevator shaft" is to be understood in the present document as a room in a building under construction, the height of which increases in accordance with the construction progress, the room being dimensioned and designed in such a way that at least one elevator car of an elevator, usually an elevator car and a counterweight of one elevator each, can move up and down along vertical travel paths in the room.
- Such an elevator shaft can be a single shaft enclosed by shaft walls with the aforementioned rectangular floor plan.
- the sealing arrangement has side elements for sealing with respect to the shaft walls.
- the sealing arrangement can have at least two, preferably at least three and particularly preferably four side elements for sealing with respect to the shaft walls, with one side element being assigned to each of the generally four shaft walls.
- the sealing arrangement also has corner elements for sealing with respect to the corner areas between the shaft walls. Depending on how many side elements are present, the sealing arrangement can have at least one, preferably at least two and particularly preferably three and ideally four corner elements.
- the side elements can be attached to the shaft walls using the corner elements.
- a number of advantages can be achieved because the platform has a sealing arrangement with side elements and corner elements, which sealing arrangement is designed in such a way that the side elements can be attached to the shaft walls using the corner elements.
- the gap mentioned can be reliably sealed. If necessary, the sealing effect can be easily created manually or by appropriate control and, if necessary, canceled.
- the platform described here is particularly suitable in connection with buildings in which the construction of elevator shafts is carried out using climbing formwork and in buildings in which rapid construction progress is particularly important.
- the platform with such a sealing arrangement can preferably be an upper protective platform.
- the sealing arrangement can be used in combination with various types of platforms, which are in principle used in the elevator system mentioned at the beginning with an elevator shaft that becomes higher as the building height increases during the construction phase of the building. It is also conceivable that platforms of such elevator systems can be retrofitted.
- the sealing arrangement can be designed in such a way that it can be brought between a rest position, in which the sealing arrangement is spaced from the elevator shaft or the adjacent shaft wall and thus enables trouble-free vertical movement of the platform, and the already mentioned active position, in which the sealing arrangement contacts the shaft wall so that the gap between the platform and the elevator shaft is completely or almost completely bridged to close it.
- the platform can be designed in such a way that a horizontal clamping element, in particular a quick release, is provided for each corner element. With just a few simple steps, a person can easily achieve a high sealing effect manually.
- the sealing arrangement equipped platform can be an upper protective platform that forms a protective roof for the assembly platform below.
- An elevator system for a building under construction with this protective platform can be operated very quickly and efficiently with regard to sealing the shaft. Downtimes during which the elevator cannot yet be operated or work cannot be carried out on the assembly platform due to the open gap can be significantly reduced.
- Quick-release clamps can be used to quickly and reliably prevent water from entering the shaft space below the platform.
- quick release clamps are connecting means that enable two adjacent elements to be connected quickly and easily; in this case, this involves connecting the corner element to the adjacent corner area of the elevator shaft.
- lever clamps are suitable for this, with which the corner element can be clamped against the corner of the shaft easily and with one hand and thus sealed.
- the clamping force can often be adjusted using a threaded rod on the clamping element.
- the horizontal clamping element can be designed as an angle clamp. Handling an angle clamp is very easy.
- the horizontal clamping element designed as an angle clamp and/or as a quick release can have a metal base body with two legs at right angles to each other and an adjusting body that is slidably mounted in the base body and can be moved for clamping via a quick release fastener that is articulated in the base body.
- the quick release fastener can include a backstop that blocks backward movement against the closing direction.
- the quick release can be tightened using a threaded rod, thus increasing the clamping force and thus the sealing effect.
- the horizontal clamping element can also be designed as a so-called metal angle clamp, which has an articulated spindle nut for moving a clamping jaw forwards and backwards with legs at right angles to each other.
- the respective corner element can comprise an angle profile part, preferably made of sheet metal.
- the angle profile part can have inclined drainage sections for draining water inwards.
- the respective corner element can thus comprise the angle profile part and the horizontal clamping element, preferably the quick release.
- the angle profile part of the sealing arrangement can have two vertical wall sections, preferably connected at right angles to one another, and inclined drainage sections arranged below the wall sections and connected to them via bevels for draining water in an inward direction. Inward is directed towards the central area of the elevator shaft or the platform, while outward refers to the direction of the shaft wall.
- the angle profile part made of sheet metal can also have stop sections which serve to stop the angle profile part against the shaft walls in the corner area. When in the active position, the respective stop section can contact the shaft wall directly or indirectly. In the preferred indirect case, the angle profile part has a flexible sealing body which ensures wall contact and thus an optimal sealing effect.
- the respective corner element of the sealing arrangement can be equipped with a flexible sealing body, preferably based on elastomers, and particularly preferably with a rubber seal.
- the sealing body can have an L-shape in plan view.
- the sealing body can be a flat sealing profile that is arranged on the stop section and is preferably fixed to the angle profile part via an adhesive connection, by a vulcanization process or by means of mechanical fastening means.
- the rubber seal can have a wall thickness of about 2 to 30 mm and preferably about 3 to 10 mm, whereby the seal can also withstand the high mechanical stresses during the construction phase, for example due to abrasion on the shaft wall.
- the sealing body can consist of an elastic polymer material, with elastomers and particularly preferably rubber being used as polymer materials for this purpose.
- the polymer material can be selected from the group of thermoplastic elastomers, for example olefin-based or urethane-based, cross-linked olefin-based thermoplastic elastomers, thermoplastic copolyesters, styrene block copolymers (SBS, SEBS, SEPS, SEEPS and MBS) and thermoplastic copolyamides.
- plasticizer-containing materials preferably polypropylene, acrylonitrile-butadiene-styrene copolymer, polycarbonate, polyvinyl chloride, polymethyl methacrylate, polyethylene terephthalate, polyurethane and the like, as well as mixtures of these materials.
- corner elements are designed in such a way that they protrude beyond the side elements in the vertical direction.
- a further embodiment relates to a platform in which the respective side element is a Sheet metal side part and a flexible sealing body.
- the side element can be made of a metal sheet and the side element can contain a flank wall that is inclined at least in an active position.
- the flexible sealing body is the elastomer-based sealing body already described above and particularly preferably the rubber seal.
- the sheet metal side part is pivotably attached to the platform. By pivoting, the side element can be brought to the shaft wall and removed from it again.
- the side element can essentially be constructed from just one component.
- the respective side element can have a flexible sealing body, preferably based on elastomers, whereby the sealing body not only contacts the shaft wall, but also forms a flank wall, so that water can be captured on the shaft wall side by means of the sealing body and guided via the sealing body to a lower drip edge.
- the flank wall is now no longer rigid, but flexible.
- the side element could thus consist more or less completely of rubber.
- the corner element can have attack sections that can be supported on the side elements. When the active position is created, the attack section pushes away the side element assigned to it or adjacent to it and ensures that the side element hits the shaft wall.
- the respective side element has an engagement piece for the corner element(s) created by a projection, for example by a hat profile, via which the corner element(s) can act on the side element to create the active position.
- the aforementioned engagement section can form the section of the corner element via which the corner element acts on the side element.
- the corner element instead of assigning the projection to the side element, it would be alternatively or possibly even additionally conceivable that the corner element, for example, has stamp-like engagement pieces for acting on the side elements to create the active position, via which engagement pieces the side elements can be moved outwards, e.g. in a pivoting movement, for striking the shaft walls.
- the platform can have a flat roof structure to form a protective roof, with a drainage gap that is rectangular in plan view being formed between the flat roof structure and the sealing arrangement. collected water can be easily drained away.
- the platform can be a preferably horizontal, walkable, plate-like flat roof structure.
- the platform can comprise a flat roof structure which is adapted to the shaft space and almost completely fills it in a plan view.
- This flat roof structure can be designed like a plate or have a plate. When the flat roof structure is installed or during the construction phase, it is preferably aligned horizontally.
- the sealing arrangement can be attached to the flat roof structure in an edge area on the top of the flat roof.
- the vertically movable platform in the elevator shaft which becomes higher as the building gets higher, with the sealing arrangement for sealing or closing the gap between the platform and the elevator shaft can also have a water collection container arranged below the sealing arrangement.
- the water collection container can be used to easily collect water and drain it away as needed.
- Such a water collection container could also be advantageous for a sealing arrangement without the solution claimed at the beginning with the side elements and corner elements separate from these.
- the water collection container can be designed as a circumferential gutter. This gutter can preferably be positioned below the drainage gap between the flat roof structure and the sealing arrangement in the platform.
- the flat roof structure can have a roof plate that provides a protective roof, with a drip edge arranged on the edge of the roof for controlled water drainage. Water can drip from the drip edge into the gutter.
- a pipe for example in the form of a water hose, can be connected to the water collection container and in particular to the gutter, via which pipe the water can be led away from the platform.
- the water collection container may have a closable water drain opening for draining the water collected in the water collection container.
- a further aspect of the invention relates to an elevator system for a building under construction with an elevator shaft that becomes higher as the building height increases during the construction phase of the building, comprising the platform described above.
- a further aspect of the invention relates to a method for establishing a Elevator system for a building under construction with an elevator shaft that becomes higher as the building height increases during the construction phase of the building, wherein a usable lifting height of the elevator system is adapted to an increasing height of the building by carrying out at least one lifting process, during which lifting process, for example, a machine platform with an elevator drive and an elevator car hanging on the machine platform via support means are lifted in the elevator shaft by means of a lifting device.
- the method comprises the use of a platform equipped with a sealing arrangement, which sealing arrangement comprises side elements for sealing with respect to the shaft walls and corner elements for sealing with respect to the corner areas between the shaft walls, wherein the side elements can be struck against the shaft walls by means of the corner elements.
- the seal is activated in the construction phase; in the corresponding active position, the sealing arrangement seals the gap between the platform and the elevator shaft.
- the active position is created in which the side elements hit the shaft walls using the corner elements so that the sealing arrangement closes the gap between the platform and the elevator shaft during the construction phase.
- the seal is brought into the rest position for a lifting process.
- the sealing arrangement is brought into the starting position in which the sealing arrangement is spaced away from the elevator shaft so that the platform can be moved upwards without any problems. After the lifting process, the seal is brought back into the active position to continue the construction phase.
- Fig. 1 is a schematic representation of an elevator system for a building under construction with an elevator shaft that becomes higher as the building height increases during the construction phase of the building,
- Fig. 2 is a plan view of a portion of a platform and a corner portion of the elevator shaft of the elevator system of the type shown in Fig. 1, wherein the platform comprises a sealing arrangement,
- Fig. 3 is a perspective view of the corner area of a platform with a sealing arrangement
- Fig. 4 is a perspective view of a vertically increasing building height movable platform of such an elevator system according to another embodiment
- Fig. 5 a detailed view of the platform from Fig. 4, and
- Fig. 6 a perspective view of another platform.
- Fig. 1 shows a schematic of an elevator system 1 for a building 10 under construction.
- the building 10 comprises an elevator shaft 2, which becomes higher as the building increases in height during the construction phase of the building.
- An elevator car 4 is installed in the elevator shaft 2.
- the elevator car 4 is guided on at least one guide rail strand 3 during vertical travel.
- the elevator system 1 has an arrangement above the elevator car 4 for equipping the elevator shaft 2, which grows upwards, in particular with guide rails for the guide rail strand 3.
- This arrangement comprises a protective platform 7, a machine platform 6 and an assembly platform 5 arranged between these two platforms 6, 7.
- the assembly platform 5 is the platform from which the guide rail strand 3 is extended upwards.
- the assembly platform 5 serves as a work platform for assembly personnel.
- the assembly platform 5 - in addition to the guide rails - can also be used as a means of transport for other elevator components to be assembled.
- each guide rail strand 3 is shown in Fig. 1.
- Two guide rail strands lying opposite one another are preferably used to guide the elevator car 4.
- the elevator mentioned last usually includes a counterweight (not shown here) in addition to the elevator car.
- a counterweight not shown here
- several guide rail strands are necessary, with each guide rail strand consisting of guide rail profile parts arranged in a row.
- the elevator shaft 2 is designed for an elevator with elevator car and counterweight.
- the elevator shaft 2 can also be designed for several elevators.
- the elevator shaft 2 could also be used for a self-propelled construction phase- Elevator cabin should be designed.
- the elevator car 4 enables the transport of people and goods to and from the lower floors during the construction phase of the building.
- the elevator car can be used to transport construction workers and building materials.
- users of apartments or business premises that have already been occupied before the building is completed can also be transported between at least the floors assigned to these rooms in accordance with regulations.
- the elevator shaft 2 is divided into several sections in the vertical direction. As a lower section of the elevator shaft 2, which is located below the machine platform 6 with a drive 8 for the elevator, the elevator shaft 2 is already installed with the necessary guide rails for the linear guidance of the elevator car and the counterweight of the elevator for the finished building.
- the elevator system 1 for the building 2 under construction has a conventional elevator car 4 and a counter-movable counterweight (not shown) in this section.
- the elevator car 4 presented here could also be replaced by a self-propelled construction phase elevator car 4 for the transport of people or goods for the duration of the construction phase of the building 10.
- the machine platform 6 could be replaced by another platform and in particular a platform without a drive machine for the elevator.
- a rail assembly phase at least one guide rail line 3 is extended upwards from the assembly platform 6.
- This rail assembly phase is shown in Fig. 1.
- further work for assembling the shaft equipment or other work steps can be carried out from the assembly platform 5.
- the assembly platform 5 can be moved up or down in a vertical direction to the desired position using ropes.
- the assembly platform 5 is suspended from the protective platform 7 via the rope-based lifting device 23.
- the protective platform designated 7 is temporarily fixed in an upper area of the currently existing elevator shaft 2.
- the protective platform 7 is designed as a support structure.
- the support structure serves, among other things, to support the lifting device 23, with which the assembly platform 6 can be moved up and down.
- the protective platform 7 also has means 24 for lifting the machine platform 6.
- the protective platform 7 also has the task of protecting people and equipment in the elevator shaft 2 - in particular in the aforementioned assembly platform 5 - from objects that fall down during the construction work taking place on the building 2. can.
- the rail assembly phase can be followed by a growth phase.
- the protective platform 7 After the rail assembly phase has ended and after the elevator shaft 2 has become sufficiently higher as construction of the building 2 progresses, the protective platform 7 must be positioned at the next higher level.
- the protective platform 7 is raised to the next higher level using a construction crane, for example, so that as the building height increases, it is possible to grow with the elevator shaft 2 as it becomes higher. However, it may also be possible to move the upper protective platform 7 to the next higher level using other means and without using a crane.
- the protective platform 7 After the next higher level has been reached, the protective platform 7 is temporarily fixed in the elevator shaft 2 again.
- the machine platform 6 can then be raised to the next higher level.
- the protective platform 7 has lifting devices 24, for example a chain hoist.
- the chain hoist is designed so that the machine platform 7, preferably together with the attached elevator car 4, can be raised for a lifting operation.
- the machine platform 7 could also be moved to the upper operating position by means of other lifting means such as a crane, winch, hydraulic jack or
- Strand jacks are used.
- Other elevator systems are also known for a building under construction with an elevator shaft that becomes higher as the building height increases during the construction phase of the building, which use additional or alternatively designed platforms.
- the special solution for sealing the shaft space shown below using the example of platform 7 and described in detail can basically be used for all types of platforms that are used in such elevator systems.
- the platform 7 of the elevator system according to Fig. 1 can also be assigned to a climbing formwork or even be part of a climbing formwork.
- the climbing formwork comprises formwork (not shown) for concreting.
- the platform 7 can thus be designed as a climbing formwork platform for the floor-by-floor production of concreting sections of the building core comprising the elevator shaft 2.
- the climbing formwork platform can have integrated climbing drives and be designed as a self-climbing formwork platform.
- the climbing formwork platform can be suspended floor-by-floor in anchors in the shaft walls.
- the platform 7 has a horizontal roof structure for covering the elevator shaft 2, on which a sealing arrangement designated 11 is arranged.
- the sealing arrangement 11 serves to seal or close the gap between the platform 7 and the elevator shaft 2.
- the seal designed as a circumferential sealing arrangement, is attached to the edge of the platform 7.
- the sealing arrangement 11 shown in Figures 2 to 4 and explained in detail below reliably and simply prevents water, concrete and objects from entering the shaft space below the platform.
- Fig. 2 shows a corner area of the elevator shaft 2, wherein the shaft walls 12, 13, which are at right angles to one another, enclose a corner.
- the sealing arrangement 11 of the platform 7 comprises side elements 14, 15 for sealing with respect to the shaft walls designated 12 and 13.
- the sealing arrangement 11 further comprises a corner element 16 for sealing with respect to the corner areas between the shaft walls 12, 13.
- the sealing arrangement 11 has four such side elements 12, 13, wherein each side element is assigned to a shaft wall; and four such corner elements 16, wherein each corner element is assigned to one of the four corner areas of the elevator shaft.
- the side elements 14, 15 can be struck against the shaft walls 12, 13 by means of the corner elements 16.
- the sealing arrangement 11 is in a position in which the side elements 14, 15 and the corner element 16 are in contact with the elevator shaft 2 and thus seal it. This position is also referred to below as the active position.
- the sealing arrangement 11 has a horizontal clamping element in the form of a quick-release clamp 16.
- the quick-release clamp 16 initially acts on the corner element 16, which then presses the two adjacent side elements 14, 15 against the respective shaft walls 12, 13 and thus ensures the sealing effect.
- the quick release 16 comprises a metal base body 34 with two legs 35, 36 at right angles to each other and an adjusting body 37 which is slidably mounted in the base body and which can be moved for clamping via a quick release fastener 38 which is articulated in the base body.
- the clamping force can be adjusted using a threaded rod 39 via a toggle handle 40.
- the platform 7 can be sealed manually very easily and quickly.
- other means could also be used to move the corner element 16 towards the corner so that the side elements strike against the shaft walls.
- Fig. 3 shows a platform 7 for an elevator system for a building under construction with an elevator shaft that becomes higher as the building height increases during the construction phase of the building, with a sealing arrangement 11 for sealing or closing the gap between the platform and the elevator shaft.
- the sealing arrangement 11 could be motor-operated.
- it can also be advantageous here to use a manual adjustment device such as the quick release of the embodiment according to Fig. 2.
- the respective corner element 16 comprises an angle profile part 19 made of sheet metal.
- This angle profile part 19, which forms an L in plan view, has two vertical wall sections 29 connected at right angles to which downwardly inclined drainage sections 28 are connected.
- the drainage sections 28 serve to drain water inwards.
- the angle profile part 19 also has stop sections 31, which serve to stop the angle profile part against the shaft walls in the corner area.
- a flat rubber seal 25 is attached to the outside of the stop sections 31. When in the active position, the stop sections 31 contact the respective shaft walls via this rubber seal 25.
- other elastic polymer materials are also conceivable for forming a flexible sealing body.
- Other shapes for the sealing body are also conceivable.
- a sealing body designed as a flat sealing profile or a sealing strip more complicated sealing bodies, such as hollow profile seals, would be conceivable.
- the angle profile part 19 with stop sections 31, wall sections 29 and deflection sections 28 can be made from two sheet metal cuts which are connected to one another by welding after bending processes.
- the wall sections 29 are then connected to one another via a diagonal reinforcement sheet to stiffen the angle.
- the side elements 14, 15 arranged further out on the platform 7 compared to the corner element 16 are constructed in a similar way.
- the side elements 14, 15 also have sheet metal parts.
- the respective side element 14, 15 consists of a sheet metal side part 45 made of sheet metal and a rubber seal 26.
- the sheet metal side part 45 has an inclined flank wall 30 and an adjoining upper vertical wall section which forms the stop section 32 of the side part 14, 15.
- a flat rubber seal 26 is attached to the outside of the stop section 31, which, when in the active position, contacts the respective shaft wall.
- the sheet metal side part 45 can be pivotably attached to the platform 7.
- the side element 14, 15 has an engagement piece for the corner element 16, created by a hat profile 27, via which the corner element 16 acts on the side elements 14, 15 to create the active position.
- the corner element 16 projects beyond the side elements 14, 15 in the vertical direction.
- FIG. 3 shows that between the simplified plate formed by a A drainage gap 21 is formed between the flat roof structure 33 and the sealing arrangement 11.
- This drainage gap which is rectangular in plan view, has the task of easily draining away water collected using the sealing arrangement 11.
- the water passes through the drainage gap 21 into the surrounding gutter 20. From this water collection container 20, water can be led away to the next floor via, for example, a hose-like drainage line and fed into the sewer system there.
- the flat roof structure could also be constructed in several parts and, for example, be constructed from planks arranged next to one another.
- FIGS 4 and 5 show a platform 7 with an alternative sealing arrangement 11.
- the corner elements 16 for sealing the corner areas between the shaft walls are designed similarly to the previous embodiment.
- the sealing arrangement 11 differs from this in particular in a different design of the side elements 14, 15 for sealing the shaft walls.
- the side elements 14, 15 here essentially consist of a flat rubber profile that extends vertically from the bottom of the platform 7 to the upper end.
- the respective side element 14, 15 thus has a rubber seal 43, whereby this rubber seal 43 not only contacts the shaft wall, but also forms a flank wall 44, so that water can be captured on the shaft wall side by means of the sealing body and guided via the rubber seal 43 to a lower drip edge.
- Fig. 4 shows a possible structural design of a protective platform 7 that can be used in elevator systems according to Fig. 1.
- the platform 7 has movable support elements that can be inserted into recesses in the shaft walls to secure the protective platform 7 or can be placed on the shaft floor on the shaft door side.
- the motorized lifting device 24 with the chain hoist can also be seen.
- the chain of the chain hoist is stored in a chain storage unit. The chain hoist can be used to move the movable machine platform and the elevator car from a lower temporary deployment position to the next upper deployment position.
- FIG. 5 Structural details of the sealing arrangement 11 can be seen in particular from Fig. 5.
- a box profile 27 is attached to the flat rubber seal 43 as an engagement piece for the corner element 16.
- the rubber seal 43 is enclosed in a sandwich-like manner between the inner box profile 27 and an outer flat profile.
- Fig. 5 also shows a drainage gap 21 between the flat roof structure 33 and the sealing arrangement 11.
- the water flows through the drainage gap 21 into a circumferential gutter (not shown here).
- the platform 7 has a substantially rectangular basic shape in relation to the top view.
- Several floor drains 41 are provided in the horizontal flat roof structure 33 (Fig. 4). It can also be seen that the flat roof structure 33 is divided into several compartments which are defined by partition walls 42. Water from the floor drains 41 can also be collected and directed into the water container and from there or possibly even directly via the drainage hose.
- planks (not shown here) can be provided, for example in the form of wooden boards. Thanks to such planks, it is ensured that the flat roof structure is safe to walk on.
- the partition walls 42 can reinforce and stiffen the floor. The planks can extend between the respective partition walls 42 and can be supported on these partition walls if the partition walls are designed as load-bearing components of the flat roof structure.
- the floor drains 41 shown in Fig. 4 can be arranged in rubber mats or other flexible flat floor elements. Due to the weight of the comparatively heavy floor drains 41 formed by metal components, the floor elements can be curved downwards in certain places so that water is not dammed and perfect drainage via the floor drains can be ensured.
- the sealing arrangement 11 In a rest position, the sealing arrangement 11 is spaced from the shaft wall, which enables the platform to move vertically without interference. For example, for the rail assembly phase, the shaft space must be secured and water must be prevented from entering the area below the platform.
- the sealing arrangement 11 is brought into the active position for this purpose. In the active position, the sealing arrangement 11 has been moved outwards compared to the rest position, so that the sealing arrangement 11 contacts the shaft wall by means of stops to close the gap between platform 7 and elevator shaft 2.
- Fig. 6 shows another platform 7 for an elevator system for a building under construction with an elevator shaft 2 that becomes higher as the building height increases during the construction phase of the building.
- the platform 7 has a sealing arrangement with side elements 14, 15 for sealing with respect to the shaft walls.
- the horizontal, walkable flat roof structure 33 has a plurality of planks.
- the planks can be formed by wooden boards.
- Flat roof structure 33 can also have a floor arranged beneath the planks, with which water seeping through between the planks can be collected. This floor (not shown here) can have floor drains (see Fig. 4).
- Flat roof structure 33 is surrounded by a gutter-like water collection container 20.
- a waterproof film can be arranged between the gutter and flat roof structure 33, which prevents water from seeping under the platform.
- the respective side element 14, 15 is - as the arrows indicate - designed to be pivotable and can be pivoted to stop against the shaft walls.
- the respective side element 14, 15 consists in the present case of a sheet metal part 45 defining a flank, to which a rubber seal 26 is connected at its upper end.
- the sealing arrangement of this platform 7 has no corner elements. Thanks to the water collection container 20 in combination with the side elements 14, 15, a very good protective and sealing effect can already be achieved. But this platform 7 could also be equipped with corner elements as previously described with reference to Figures 2 to 4 and thus retrofitted, whereby the sealing effect could be significantly improved again.
Landscapes
- Engineering & Computer Science (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
- Types And Forms Of Lifts (AREA)
Abstract
Description
Claims
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| EP22217140 | 2022-12-29 | ||
| PCT/EP2023/085135 WO2024141252A1 (de) | 2022-12-29 | 2023-12-11 | Plattform für eine aufzugsanlage für ein sich im bau befindendes gebäude |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| EP4642726A1 true EP4642726A1 (de) | 2025-11-05 |
| EP4642726B1 EP4642726B1 (de) | 2026-07-08 |
Family
ID=84689124
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| EP23817787.7A Active EP4642726B1 (de) | 2022-12-29 | 2023-12-11 | Plattform für eine aufzugsanlage für ein sich im bau befindendes gebäude |
Country Status (4)
| Country | Link |
|---|---|
| US (1) | US20260225855A1 (de) |
| EP (1) | EP4642726B1 (de) |
| CN (1) | CN120379920A (de) |
| WO (1) | WO2024141252A1 (de) |
Family Cites Families (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| ES2625760T3 (es) | 2013-07-10 | 2017-07-20 | Inventio Ag | Dispositivo de protección de caída para una plataforma |
| WO2019238530A1 (de) | 2018-06-14 | 2019-12-19 | Inventio Ag | Verfahren zum errichten einer aufzugsanlage |
| US11858778B2 (en) * | 2018-12-18 | 2024-01-02 | Inventio Ag | Method for operating a construction site device and construction site device |
| DE102019205164A1 (de) * | 2019-04-10 | 2020-10-15 | Thyssenkrupp Ag | Verfahren zur Änderung der Förderhöhe einer Aufzuganlage mittels einer Gleitschalung |
-
2023
- 2023-12-11 US US19/142,363 patent/US20260225855A1/en active Pending
- 2023-12-11 EP EP23817787.7A patent/EP4642726B1/de active Active
- 2023-12-11 WO PCT/EP2023/085135 patent/WO2024141252A1/de not_active Ceased
- 2023-12-11 CN CN202380089386.5A patent/CN120379920A/zh active Pending
Also Published As
| Publication number | Publication date |
|---|---|
| US20260225855A1 (en) | 2026-08-06 |
| EP4642726B1 (de) | 2026-07-08 |
| CN120379920A (zh) | 2025-07-25 |
| WO2024141252A1 (de) | 2024-07-04 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| DE202023104497U1 (de) | Werkzeug zum Umstürzen der Mauer von antiken Bauwerken | |
| DE202007014591U1 (de) | Kletterwand | |
| DE102014002480B4 (de) | Verfahren und Einrichtung zum Nivellieren und Verbinden von mindestens zwei in einer Reihe auf einem Untergrund abgestellten begehbaren Container-Modulen zu einem modularen Gebäude | |
| EP4499553B1 (de) | Plattform für eine aufzugsanlage für ein sich im bau befindendes gebäude | |
| EP2035314B1 (de) | Hubplattform und verfahren zum aufbauen einer hubplattform | |
| CH656171A5 (de) | Verfahren zum zusammenbau und ausschalen einer deckenschalung fuer betonierarbeiten sowie ausruestung zur durchfuehrung des verfahrens. | |
| DE10254771A1 (de) | Verfahren und Vorrichtung für die Materialbearbeitung und/oder den Materialumschlag im Hochhausbau | |
| EP2730717B1 (de) | Mobile Arbeitsplattform | |
| EP4642726B1 (de) | Plattform für eine aufzugsanlage für ein sich im bau befindendes gebäude | |
| DE3714053A1 (de) | Aufzug fuer personentransport | |
| DE1808989A1 (de) | Vorrichtung zur Herstellung von monolitischen,raumgrossen Bauwerken aus bewehrtem Beton,insbesondere von Stahlbetonfertiggaragen | |
| AT398103B (de) | Einrichtung zum befahren eines behälters oder kanals | |
| DE2057263C3 (de) | Vorrichtung zum Abstützen von Grabenwänden | |
| DE102011082841B4 (de) | Fallkopf für ein Deckenschalungssystem und Verfahren zum Entfernen von Deckenschalungselementen | |
| EP4406900A1 (de) | Verfahren zur gerüstlosen montage einer aufzugsanlage in einem aufzugsschacht | |
| EP0205063A2 (de) | Gleitverfahren und Gleitschalungsvorrichtung | |
| EP0060550B1 (de) | Garagenanlage | |
| DE102005007475B3 (de) | Personenlift | |
| DE1759873C3 (de) | Schalung zur serienmäßigen Fertigung von mindestens einseitig offenen Raumzellen aus Stahlbeton, wie Fertiggaragen o.dgl | |
| DE1531102C3 (de) | Schachtausrüstung für einen Aufzug | |
| DE2538520C3 (de) | Stauwand und mit einer derartigen Stauwand versehenes Schwimmbecken | |
| DE2355153A1 (de) | Parkvorrichtung fuer fahrzeuge, insbesondere kraftfahrzeuge | |
| CH635395A5 (en) | Double-storey garage | |
| DE2500862A1 (de) | Tuerzarge, insbesondere fuer feuerschutztueren | |
| DE19923307B4 (de) | Garagenbauwerk |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: UNKNOWN |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE |
|
| PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE |
|
| 17P | Request for examination filed |
Effective date: 20250624 |
|
| AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC ME MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
| DAV | Request for validation of the european patent (deleted) | ||
| DAX | Request for extension of the european patent (deleted) | ||
| GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
| GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
| GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE PATENT HAS BEEN GRANTED |
|
| INTG | Intention to grant announced |
Effective date: 20260527 |
|
| AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC ME MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
| REG | Reference to a national code |
Ref country code: CH Ref legal event code: F10 Free format text: ST27 STATUS EVENT CODE: U-0-0-F10-F00 (AS PROVIDED BY THE NATIONAL OFFICE) Effective date: 20260708 Ref country code: GB Ref legal event code: FG4D Free format text: NOT ENGLISH |
|
| REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D Free format text: LANGUAGE OF EP DOCUMENT: GERMAN |
|
| REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 502023004584 Country of ref document: DE |