EP4180742A1 - Dispositif à cycle de réfrigération - Google Patents

Dispositif à cycle de réfrigération Download PDF

Info

Publication number
EP4180742A1
EP4180742A1 EP20944786.1A EP20944786A EP4180742A1 EP 4180742 A1 EP4180742 A1 EP 4180742A1 EP 20944786 A EP20944786 A EP 20944786A EP 4180742 A1 EP4180742 A1 EP 4180742A1
Authority
EP
European Patent Office
Prior art keywords
heat exchanger
state
port
switching
switching valve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
EP20944786.1A
Other languages
German (de)
English (en)
Other versions
EP4180742A4 (fr
Inventor
Komei NAKAJIMA
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Corp
Original Assignee
Mitsubishi Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Corp filed Critical Mitsubishi Electric Corp
Publication of EP4180742A1 publication Critical patent/EP4180742A1/fr
Publication of EP4180742A4 publication Critical patent/EP4180742A4/fr
Pending legal-status Critical Current

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B13/00Compression machines, plants or systems, with reversible cycle
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B41/00Fluid-circulation arrangements
    • F25B41/20Disposition of valves, e.g. of on-off valves or flow control valves
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B41/00Fluid-circulation arrangements
    • F25B41/20Disposition of valves, e.g. of on-off valves or flow control valves
    • F25B41/26Disposition of valves, e.g. of on-off valves or flow control valves of fluid flow reversing valves
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2313/00Compression machines, plants or systems with reversible cycle not otherwise provided for
    • F25B2313/027Compression machines, plants or systems with reversible cycle not otherwise provided for characterised by the reversing means
    • F25B2313/02742Compression machines, plants or systems with reversible cycle not otherwise provided for characterised by the reversing means using two four-way valves
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2600/00Control issues
    • F25B2600/25Control of valves

Definitions

  • the present disclosure relates to a refrigeration cycle apparatus.
  • Japanese Patent Laying-Open No. 2005-134099 discloses a refrigeration cycle apparatus including a refrigerant circuit that includes a compressor, a first heat exchanger, a decompressing device, a second heat exchanger, and a flow path switching valve.
  • the state of the flow path switching valve is switched to thereby allow switching between the first operation and the second operation.
  • refrigerant circulates through the compressor, the first heat exchanger, the decompressing device, and the second heat exchanger sequentially in this order.
  • refrigerant circulates through the compressor, the second heat exchanger, the decompressing device, and the first heat exchanger sequentially in this order.
  • the pressure distribution of the refrigerant is different between the first operation and the second operation. Specifically, in the first operation, high-pressure refrigerant is distributed in the first heat exchanger and low-pressure refrigerant is distributed in the second heat exchanger. In contrast, in the second operation, high-pressure refrigerant is distributed in the second heat exchanger and low-pressure refrigerant is distributed in the first heat exchanger.
  • the pressure distribution of the refrigerant collapses. This leads to a concern that such a distribution collapse may increase the time required for the refrigeration cycle to stabilize after the operation is switched.
  • An object of the present disclosure is to reduce the time required for a refrigeration cycle to stabilize after an operation is switched in a refrigeration cycle apparatus switchable between a first operation and a second operation.
  • refrigerant circulates in order of a compressor, a first heat exchanger, a decompressing device, and a second heat exchanger.
  • refrigerant circulates in order of the compressor, the second heat exchanger, the decompressing device, and the first heat exchanger.
  • a refrigeration cycle apparatus is a refrigeration cycle apparatus switchable between a first operation and a second operation.
  • refrigerant circulates in order of a compressor, a first heat exchanger, a decompressing device, and a second heat exchanger.
  • the refrigerant circulates in order of the compressor, the second heat exchanger, the decompressing device, and the first heat exchanger.
  • the refrigeration cycle apparatus includes: a first switching valve connected to a discharge port of the compressor, one port of the first heat exchanger, one port of the second heat exchanger, and one port of the decompressing device; a second switching valve connected to a suction port of the compressor, the other port of the first heat exchanger, the other port of the second heat exchanger, and the other port of the decompressing device; and a controller configured to control the first switching valve and the second switching valve.
  • the first switching valve is configured to be switchable to one of a first state and a second state.
  • the discharge port of the compressor is connected to the one port of the first heat exchanger, and the one port of the second heat exchanger is connected to the one port of the decompressing device.
  • the discharge port of the compressor is connected to the one port of the second heat exchanger, and the one port of the first heat exchanger is connected to the one port of the decompressing device.
  • the second switching valve is configured to be switchable to one of a third state, a fourth state, and a fifth state.
  • the third state the other port of the first heat exchanger is connected to the other port of the decompressing device, and the other port of the second heat exchanger is connected to the suction port of the compressor.
  • the fourth state the other port of the second heat exchanger is connected to the other port of the decompressing device, and the other port of the first heat exchanger is connected to the suction port of the compressor.
  • the fifth state the other port of the decompressing device is connected to the suction port of the compressor, and the other port of the first heat exchanger is disconnected from the other port of the second heat exchanger.
  • the controller is configured to set the first switching valve to the first state and set the second switching valve to the third state during the first operation, and set the first switching valve to the second state and set the second switching valve to the fourth state during the second operation.
  • the controller When switching to the second operation is requested during the first operation, the controller is configured to perform a first switching operation to bring the first switching valve into the second state and bring the second switching valve into the fifth state, and switch an operation of the refrigeration cycle apparatus to the second operation after performing the first switching operation.
  • the time required for the refrigeration cycle to stabilize after switching of the operation can be reduced in the refrigeration cycle apparatus switchable between the first operation and the second operation.
  • refrigerant circulates in order of the compressor, the first heat exchanger, the decompressing device, and the second heat exchanger.
  • refrigerant circulates in order of the compressor, the second heat exchanger, the decompressing device, and the first heat exchanger.
  • Fig. 1 is a diagram schematically showing an example of an overall configuration of a refrigeration cycle apparatus 1 according to the present first embodiment.
  • Refrigeration cycle apparatus 1 includes a refrigerant circuit RC, a first air blower 80, a second air blower 90, and a controller 100.
  • Refrigerant circuit RC includes a compressor 10, a first heat exchanger 20, a decompressing device 30, a second heat exchanger 40, pipes 51 to 58, a first switching valve 60, and a second switching valve 70.
  • refrigerant circuit RC compressor 10, first heat exchanger 20, decompressing device 30, and second heat exchanger 40 are connected by pipes 51 to 58, first switching valve 60, and second switching valve 70 to thereby form a circulation flow path through which refrigerant circulates.
  • refrigerant involving a phase change such as carbon dioxide or R410A, circulates.
  • Compressor 10 has a suction port connected to pipe 58, and a discharge port connected to pipe 51. Compressor 10 suctions low-pressure refrigerant from pipe 58, compresses the suctioned refrigerant, and then discharges the compressed refrigerant as high-pressure refrigerant to pipe 51.
  • the rotation speed of compressor 10 is adjusted in response to a command from controller 100. Compressor 10 discharges refrigerant at a flow rate corresponding to the rotation speed.
  • the flow rate of the refrigerant circulating through refrigeration cycle apparatus 1 is controlled by adjusting the rotation speed (the discharge flow rate) of compressor 10.
  • First heat exchanger 20 and second heat exchanger 40 each are a heat exchanger having a flow path through which refrigerant flows. In each of first heat exchanger 20 and second heat exchanger 40, heat is exchanged between the refrigerant flowing through the flow path and the air outside the flow path.
  • Decompressing device 30 decompresses high-pressure refrigerant.
  • Examples of decompressing device 30 usable herein include a device having a valve body capable of adjusting a degree of opening in response to a command from controller 100, such as an electronic control type expansion valve.
  • First switching valve 60 is a four-way valve having: a port connected to the discharge port of compressor 10 via pipe 51; a port connected to one port of first heat exchanger 20 via pipe 52; a port connected to one port of second heat exchanger 40 via pipe 56; and a port connected to one port of decompressing device 30 via pipe 55.
  • First switching valve 60 is switched to one of the first state and the second state in response to a command from controller 100.
  • Fig. 1 illustrates the case where first switching valve 60 is set in the first state.
  • Second switching valve 70 is a four-way valve having: a port connected to the suction port of compressor 10 via pipe 58; a port connected to the other port of first heat exchanger 20 via pipe 53; a port connected to the other port of second heat exchanger 40 via pipe 57; and a port connected to the other port of decompressing device 30 via pipe 54.
  • Second switching valve 70 is switched to one of the third state, the fourth state, and the fifth state in response to a command from controller 100.
  • Fig. 1 illustrates the case where second switching valve 70 is set in the third state.
  • FIG. 2 is a perspective view showing an example of the internal structure of second switching valve 70.
  • Second switching valve 70 includes: a container 71 having a hollow cylindrical shape and provided with four ports connected to respective pipes 53, 54, 57, and 58; and a valve body 72 having a cylindrical shape and accommodated in container 71.
  • Valve body 72 is configured to be rotatable about a rotation axis 76 in response to a command from controller 100.
  • Fig. 3 is a diagram showing the rotational position of valve body 72 when second switching valve 70 is in the third state.
  • Fig. 4 is a diagram showing the rotational position of valve body 72 when second switching valve 70 is in the fourth state.
  • Fig. 5 is a diagram showing the rotational position of valve body 72 when second switching valve 70 is in the fifth state.
  • valve body 72 As shown in Figs. 3 to 5 , three flow paths 73, 74 and 75 independent of each other are provided inside valve body 72.
  • pipes 54 and 53 are connected to each other through flow path 73 of valve body 72, and pipes 57 and 58 are connected to each other through flow path 74 of valve body 72.
  • the other port of first heat exchanger 20 is connected to the other port of decompressing device 30, and the other port of second heat exchanger 40 is connected to the suction port of compressor 10.
  • first air blower 80 is configured to be capable of blowing air on the indoor side as a target to be cooled (the air will be hereinafter simply referred to as "indoor air"), in response to a command from controller 100. Further, first air blower 80 is configured to be capable of switching the supply destination of the indoor air between first heat exchanger 20 and second heat exchanger 40.
  • Second air blower 90 is configured to be capable of blowing air on the outdoor side as a target not to be cooled (the air will be hereinafter simply referred to as "outdoor air"), in response to a command from controller 100. Further, second air blower 90 is configured to be capable of switching the supply destination of the outdoor air between first heat exchanger 20 and second heat exchanger 40.
  • Controller 100 is configured to include a central processing unit (CPU), a memory, and an input/output port through which various signals are input and output. Based on signals from each sensor and device, a program stored in the memory, and the like, controller 100 controls each device (compressor 10, decompressing device 30, first switching valve 60, second switching valve 70, first air blower 80, second air blower 90, and the like) of refrigeration cycle apparatus 1. Note that the control performed by controller 100 is not limited to processing by software and may be performed by dedicated hardware (an electronic circuit).
  • first switching valve 60 and second switching valve 70 are switched to thereby allow switching between the first cooling operation and the second cooling operation.
  • Fig. 6 is a diagram showing the state during the first cooling operation of refrigerant circuit RC.
  • controller 100 operates compressor 10, and also, brings first switching valve 60 into the first state and brings second switching valve 70 into the third state.
  • the refrigerant circulates through compressor 10, first heat exchanger 20, decompressing device 30, and second heat exchanger 40 sequentially in this order, so that first heat exchanger 20 functions as a condenser and second heat exchanger 40 functions as an evaporator. More specifically, the high-temperature and high-pressure refrigerant discharged from compressor 10 flows into first heat exchanger 20 through first switching valve 60. The high-temperature and high-pressure refrigerant exchanges heat with the outside air in first heat exchanger 20, and thus, decreases in temperature and flows out of first heat exchanger 20.
  • the refrigerant flowing out of first heat exchanger 20 is decompressed by decompressing device 30, turns into low-temperature and low-pressure refrigerant, and then, flows into second heat exchanger 40.
  • the low-temperature and low-pressure refrigerant exchanges heat with the outside air in second heat exchanger 40, and thus, rises in temperature and flows out of second heat exchanger 40.
  • the refrigerant flowing out of second heat exchanger 40 is suctioned into compressor 10 through second switching valve 70.
  • the high-pressure refrigerant is distributed through pipes 51 and 52, first heat exchanger 20, and pipes 53 and 54, and the low-pressure refrigerant is distributed through pipes 55 and 56, second heat exchanger 40, and pipes 57 and 58.
  • controller 100 controls first air blower 80 and second air blower 90 such that the supply destination of the indoor air is set to second heat exchanger 40 and the supply destination of the outdoor air is set to first heat exchanger 20.
  • This facilitates exchange of heat between first heat exchanger 20 functioning as a condenser and the outdoor air not to be cooled, and also facilitates exchange of heat between second heat exchanger 40 functioning as an evaporator and the indoor air to be cooled. Thereby, the indoor air to be cooled can be efficiently cooled.
  • Fig. 1 illustrates the state during the first cooling operation.
  • Fig. 7 is a diagram showing the state during the second cooling operation of refrigerant circuit RC.
  • controller 100 operates compressor 10, and also, brings first switching valve 60 into the second state and brings second switching valve 70 into the fourth state.
  • the refrigerant circulates through compressor 10, second heat exchanger 40, decompressing device 30, and first heat exchanger 20 sequentially in this order, and thus, second heat exchanger 40 functions as a condenser and first heat exchanger 20 functions as an evaporator. More specifically, the high-temperature and high-pressure refrigerant discharged from compressor 10 flows into second heat exchanger 40 through first switching valve 60. The high-temperature and high-pressure refrigerant exchanges heat with the outside air in second heat exchanger 40, and thus, decreases in temperature and flows out of second heat exchanger 40.
  • the refrigerant flowing out of second heat exchanger 40 is decompressed by decompressing device 30, turns into low-temperature and low-pressure refrigerant, and then, flows into first heat exchanger 20.
  • the low-temperature and low-pressure refrigerant exchanges heat with the outside air in first heat exchanger 20, and thus, rises in temperature and flows out of first heat exchanger 20.
  • the refrigerant flowing out of first heat exchanger 20 is suctioned into compressor 10 through second switching valve 70.
  • the high-pressure refrigerant is distributed through pipes 51 and 56, second heat exchanger 40, and pipes 57 and 54, and the low-pressure refrigerant is distributed through pipes 55 and 52, first heat exchanger 20, and pipes 53 and 58.
  • controller 100 controls first air blower 80 and second air blower 90 such that the supply destination of the indoor air is set to first heat exchanger 20 and the supply destination of the outdoor air is set to second heat exchanger 40.
  • This facilitates exchange of heat between second heat exchanger 40 functioning as a condenser and the outdoor air not to be cooled, and also facilitates exchange of heat between first heat exchanger 20 functioning as an evaporator and the indoor air to be cooled.
  • the indoor air to be cooled can be efficiently cooled.
  • frost forms on second heat exchanger 40 which makes it difficult for air to flow therethrough, with the result that the heat exchange efficiency in second heat exchanger 40 may deteriorate.
  • controller 100 determines that switching to the second cooling operation is requested, and then, switches the operation to the second cooling operation.
  • second heat exchanger 40 functioning as an evaporator comes to function as a condenser, and thereby, frost forming on second heat exchanger 40 can be removed.
  • the supply destination of the indoor air is set to first heat exchanger 20 functioning as an evaporator during the second cooling operation, and therefore, cold air can be delivered to the indoor side also during the second cooling operation.
  • first heat exchanger 20 functioning as a condenser for example, when the temperature of the refrigerant in first heat exchanger 20 detected by a sensor (not shown) falls below a reference value close to 0 °C
  • controller 100 determines that switching to the first cooling operation is requested, and then, switches the operation to the first cooling operation.
  • first heat exchanger 20 functioning as an evaporator comes to function as a condenser, and thereby, frost forming on first heat exchanger 20 can be removed.
  • the high-pressure refrigerant is distributed in first heat exchanger 20, and the low-pressure refrigerant is distributed in second heat exchanger 40.
  • the high-pressure refrigerant is distributed in second heat exchanger 40, and the low-pressure refrigerant is distributed in first heat exchanger 20.
  • controller 100 when switching to the second cooling operation is requested during the first cooling operation, controller 100 according to the present embodiment performs the "first switching operation" to bring first switching valve 60 into the second state and bring second switching valve 70 into the fifth state. Then, after the first switching operation is performed for a certain time period, controller 100 switches the operation of refrigeration cycle apparatus 1 to the second cooling operation.
  • Fig. 8 is a diagram showing the state during the first switching operation of refrigerant circuit RC. As shown in Fig. 8 , during the first switching operation, controller 100 operates compressor 10, and also, brings first switching valve 60 into the second state and brings second switching valve 70 into the fifth state.
  • the first switching operation is performed before the first cooling operation is switched to the second cooling operation.
  • the refrigerant inside first heat exchanger 20 in which the pressure is raised high during the first cooling operation is recovered into compressor 10, so that the inside of first heat exchanger 20 can be set in the low pressure state.
  • the high-pressure refrigerant from compressor 10 is supplied into second heat exchanger 40 in which the pressure is reduced low during the first cooling operation, so that the inside of second heat exchanger 40 can be set in the high pressure state.
  • the inside of first heat exchanger 20 before switching to the second cooling operation, the inside of first heat exchanger 20 can be set in the low pressure state in advance and the inside of second heat exchanger 40 can be set in the high pressure state in advance.
  • second switching valve 70 is brought into the fifth state, and thereby, the other port of first heat exchanger 20 and the other port of second heat exchanger 40 are disconnected from each other by second switching valve 70.
  • This can prevent the high-pressure refrigerant and the low-pressure refrigerant from being mixed and equalized in pressure.
  • the inside of first heat exchanger 20 can be set in the low pressure state in the early stage, and the inside of second heat exchanger 40 can be set in the high pressure state in the early stage.
  • controller 100 stops blowing of air by first air blower 80 and second air blower 90.
  • blowing of air into first heat exchanger 20 and second heat exchanger 40 is stopped. Accordingly, the inside of first heat exchanger 20 can be set in the low pressure state in the earlier stage, and the inside of second heat exchanger 40 can be set in the high pressure state in the earlier stage.
  • controller 100 After performing the first switching operation for a certain time period, controller 100 switches the operation of refrigeration cycle apparatus 1 to the second cooling operation. This can reduce the time required for the refrigeration cycle to stabilize after switching to the second cooling operation.
  • controller 100 when switching to the first cooling operation is requested during the second cooling operation, controller 100 according to the present embodiment performs the "second switching operation" to bring first switching valve 60 into the first state and bring second switching valve 70 into the fifth state. Then, after performing the second switching operation for a certain time period, controller 100 switches the operation to the first cooling operation.
  • Fig. 9 is a diagram showing the state during the second switching operation of refrigerant circuit RC. As shown in Fig. 9 , during the second switching operation, controller 100 operates compressor 10, and also, brings first switching valve 60 into the first state and brings second switching valve 70 into the fifth state.
  • the second switching operation is performed before the second cooling operation is switched to the first cooling operation.
  • the refrigerant inside second heat exchanger 40 in which the pressure is raised high during the second cooling operation is recovered into compressor 10, so that the inside of second heat exchanger 40 can be set in the low pressure state.
  • the high-pressure refrigerant from compressor 10 is supplied into first heat exchanger 20 in which the pressure is reduced low during the second cooling operation, so that the inside of first heat exchanger 20 can be set in the high pressure state.
  • the inside of second heat exchanger 40 before switching to the first cooling operation, the inside of second heat exchanger 40 can be set in the low pressure state in advance and the inside of first heat exchanger 20 can be set in the high pressure state in advance.
  • second switching valve 70 is brought into the fifth state, and thereby, the other port of first heat exchanger 20 and the other port of second heat exchanger 40 are disconnected from each other by second switching valve 70.
  • This can prevent the high-pressure refrigerant and the low-pressure refrigerant from being mixed and equalized in pressure. Therefore, the inside of second heat exchanger 40 can be set in the low pressure state in the early stage, and the inside of first heat exchanger 20 can be set in the high pressure state in the early stage.
  • controller 100 stops blowing of air by first air blower 80 and second air blower 90. Thereby, during the second switching operation, blowing of air into first heat exchanger 20 and second heat exchanger 40 is stopped. Accordingly, the inside of second heat exchanger 40 can be set in the low pressure state in the earlier stage, and the inside of first heat exchanger 20 can be set in the high pressure state in the earlier stage.
  • controller 100 After performing the second switching operation for a certain time period, controller 100 switches the operation of refrigeration cycle apparatus 1 to the first cooling operation. This can reduce the time required for the refrigeration cycle to stabilize after switching to the first cooling operation.
  • Fig. 10 is a diagram showing an example of transition of the operation state of refrigeration cycle apparatus 1 controlled by controller 100.
  • the horizontal axis represents time while the vertical axis represents, sequentially from the top, the state of compressor 10, the state of first switching valve 60, the state of second switching valve 70, the supply destination of indoor air, and the supply destination of outdoor air.
  • controller 100 brings first switching valve 60 into the first state and brings second switching valve 70 into the third state. Further, controller 100 controls first air blower 80 such that the supply destination of the indoor air is set to second heat exchanger 40, and controls second air blower 90 such that the supply destination of the outdoor air is set to first heat exchanger 20.
  • controller 100 switches the operation of refrigeration cycle apparatus 1 from the first cooling operation to the first switching operation. Specifically, controller 100 switches first switching valve 60 from the first state to the second state, and switches second switching valve 70 from the third state to the fifth state. Further, controller 100 stops blowing of the indoor air by first air blower 80 and stops blowing of the outdoor air by second air blower 90.
  • controller 100 switches the operation of refrigeration cycle apparatus 1 from the first switching operation to the second cooling operation. Specifically, controller 100 switches second switching valve 70 from the fifth state to the fourth state while maintaining first switching valve 60 in the second state. Further, controller 100 controls first air blower 80 to switch the supply destination of the indoor air from second heat exchanger 40 to first heat exchanger 20, and also controls second air blower 90 to switch the supply destination of the outdoor air from first heat exchanger 20 to second heat exchanger 40.
  • controller 100 switches the operation of refrigeration cycle apparatus 1 from the second cooling operation to the second switching operation. Specifically, controller 100 switches first switching valve 60 from the second state to the first state, and switches second switching valve 70 from the fourth state to the fifth state. Further, controller 100 stops blowing of the indoor air by first air blower 80 and also stops blowing of the outdoor air by second air blower 90.
  • controller 100 switches the operation of refrigeration cycle apparatus 1 from the second switching operation to the first cooling operation. Specifically, controller 100 switches second switching valve 70 from the fifth state to the third state while maintaining first switching valve 60 in the first state. Further, controller 100 controls first air blower 80 to switch the supply destination of the indoor air from first heat exchanger 20 to second heat exchanger 40, and also controls second air blower 90 to switch the supply destination of the outdoor air from second heat exchanger 40 to first heat exchanger 20.
  • controller 100 when switching to the second cooling operation is requested during the first cooling operation, controller 100 according to the present embodiment performs the "first switching operation" to bring first switching valve 60 into the second state and bring second switching valve 70 into the fifth state, for a certain time period before switching to the second cooling operation.
  • the high-pressure refrigerant and the low-pressure refrigerant can be prevented from being mixed and equalized in pressure during switching of the operation, and also, the operation can be switched to the second cooling operation after the distribution state close to the pressure distribution in the second cooling operation is achieved in advance in the early stage. This can reduce the time required for the refrigeration cycle to stabilize after switching to the second cooling operation. As a result, wasteful energy consumed to stabilize the refrigeration cycle after switching to the second cooling operation can be reduced, to thereby allow energy saving for refrigeration cycle apparatus 1.
  • controller 100 when switching to the first cooling operation is requested during the second cooling operation, controller 100 according to the present embodiment performs the "second switching operation" to bring first switching valve 60 into the first state and bring second switching valve 70 into the fifth state, for a certain time period before switching to the first cooling operation.
  • the high-pressure refrigerant and the low-pressure refrigerant can be prevented from being mixed and equalized in pressure during switching of the operation, and also, the operation can be switched to the first cooling operation after the distribution state close to the pressure distribution in the first cooling operation is achieved in advance in the early stage. This can reduce the time required for the refrigeration cycle to stabilize after switching to the first cooling operation. As a result, wasteful energy consumed to stabilize the refrigeration cycle after switching to the first cooling operation can be reduced, to thereby allow energy saving for refrigeration cycle apparatus 1.
  • Figs. 11 to 14 each schematically show an example of the configuration of a refrigerant circuit RCa of a refrigeration cycle apparatus according to the present second embodiment.
  • Refrigerant circuit RCa according to the present second embodiment is obtained by adding a decompressing device 32 and a third heat exchanger 42 to refrigerant circuit RC according to the first embodiment.
  • Other configurations of refrigerant circuit RCa are the same as those of refrigerant circuit RC.
  • other configurations and operations of the refrigeration cycle apparatus according to the present second embodiment are the same as those of refrigeration cycle apparatus 1 shown in Fig. 1 described above.
  • Decompressing device 32 and third heat exchanger 42 are disposed between second switching valve 70 and the suction port of compressor 10.
  • Decompressing device 32 decompresses the refrigerant from second switching valve 70 and outputs the decompressed refrigerant to third heat exchanger 42.
  • Examples of decompressing device 32 usable herein include a device having a valve body capable of adjusting the degree of opening in response to a command from controller 100, such as an electronic control type expansion valve.
  • Third heat exchanger 42 exchanges heat between the refrigerant decompressed by decompressing device 32 and the outside air.
  • Fig. 11 is a diagram showing the state during the first cooling operation of refrigerant circuit RCa.
  • Fig. 12 is a diagram showing the state during the first switching operation of refrigerant circuit RCa.
  • Fig. 13 is a diagram showing the state during the second cooling operation of refrigerant circuit RCa.
  • Fig. 14 is a diagram showing the state during the second switching operation of refrigerant circuit RCa.
  • compressor 10 The states of compressor 10, first switching valve 60, second switching valve 70, first air blower 80, and second air blower 90 during each operation are controlled basically in the same manner as that in the above-described first embodiment.
  • refrigerant circuit RCa In refrigerant circuit RCa according to the present second embodiment, however, due to addition of decompressing device 32, during each operation, high-pressure refrigerant is distributed in the circuit extending from the discharge port of compressor 10 to decompressing device 30, medium-pressure refrigerant is distributed in the circuit extending from decompressing device 30 to decompressing device 32, and low-pressure refrigerant is distributed in the circuit extending from decompressing device 32 to the suction port of compressor 10.
  • refrigerant circuit RCa according to the present second embodiment is configured such that indoor air is blown through second heat exchanger 40 and third heat exchanger 42 sequentially in this order during the first cooling operation.
  • second heat exchanger 40 and third heat exchanger 42 function as evaporators, and the indoor air flows through second heat exchanger 40 and thereafter is blown to third heat exchanger 42.
  • the indoor air is blown through second heat exchanger 40 and third heat exchanger 42 sequentially in this order during the first cooling operation.
  • second heat exchanger 40 and third heat exchanger 42 each functioning as an evaporator during the first cooling operation (i.e., a heat exchanger on which frost may form)
  • second heat exchanger 40 functioning as a condenser after switching to the second cooling operation can be positively covered with frost
  • third heat exchanger 42 functioning as an evaporator also after switching to the second cooling operation can be less likely to be covered with frost.
  • the indoor air is blown through first heat exchanger 20 and third heat exchanger 42 sequentially in this order during the second cooling operation, as shown in Fig. 13 .
  • first heat exchanger 20 and third heat exchanger 42 function as evaporators, and the indoor air flows through first heat exchanger 20 and thereafter is blown to third heat exchanger 42.
  • first heat exchanger 20 and third heat exchanger 42 each functioning as an evaporator during the second cooling operation (i.e., a heat exchanger on which frost may form)
  • first heat exchanger 20 functioning as a condenser after switching to the first cooling operation can be positively covered with frost
  • third heat exchanger 42 functioning as an evaporator also after switching to the first cooling operation can be less likely to be covered with frost.
  • an adsorbent (a desiccant material or the like) that adsorbs moisture in air may be applied onto the surfaces of first heat exchanger 20 and second heat exchanger 40. Thereby, moisture in air is adsorbed in first heat exchanger 20 or second heat exchanger 40, so that third heat exchanger 42 can be prevented from being covered with frost.
  • first heat exchanger 20 functions as an evaporator
  • the moisture in the indoor air is adsorbed by the adsorbent of first heat exchanger 20 when the indoor air flows through first heat exchanger 20.
  • the indoor air flowing through first heat exchanger 20 and thereafter blown to third heat exchanger 42 is dried.
  • third heat exchanger 42 can be less likely to be covered with frost.
  • the operation is thereafter switched to the first cooling operation to cause first heat exchanger 20 to function as a condenser, and thereby, moisture contained in the adsorbent of first heat exchanger 20 can be released to outdoor air. As a result, the adsorbent of first heat exchanger 20 is dried. Accordingly, when the operation is again switched to the second cooling operation to cause first heat exchanger 20 to function as an evaporator, moisture in the indoor air can be adsorbed again by the adsorbent of first heat exchanger 20.
  • Figs. 15 to 18 each schematically show an example of the configuration of a refrigerant circuit RCb of a refrigeration cycle apparatus according to the present third embodiment.
  • Refrigerant circuit RCb according to the present third embodiment is obtained by adding a fourth heat exchanger 44 to refrigerant circuit RCa according to the above-described second embodiment.
  • Other configurations of refrigerant circuit RCb are the same as those of refrigerant circuit RCa.
  • other configurations and operations of the refrigeration cycle apparatus according to the present third embodiment are the same as those of refrigeration cycle apparatus 1 shown in Fig. 1 described above.
  • Fourth heat exchanger 44 is disposed between the discharge port of compressor 10 and first switching valve 60. Fourth heat exchanger 44 exchanges heat between the refrigerant discharged from compressor 10 and outside air.
  • Fig. 15 is a diagram showing the state during the first cooling operation of refrigerant circuit RCb.
  • Fig. 16 is a diagram showing the state during the first switching operation of refrigerant circuit RCb.
  • Fig. 17 is a diagram showing the state during the second cooling operation of refrigerant circuit RCb.
  • Fig. 18 is a diagram showing the state during the second switching operation of refrigerant circuit RCb.
  • compressor 10 The states of compressor 10, first switching valve 60, second switching valve 70, first air blower 80, and second air blower 90 during each operation are controlled basically in the same manner as that in the above-described second embodiment.
  • first heat exchanger 20 or second heat exchanger 40 functions as a condenser
  • the heat exchange efficiency of the condenser changes according to the amount of adherence of frost or moisture. Further, since the heat exchanger is used as a condenser, the amount of adherence of frost or moisture may change in accordance with the operation, so that the high pressure inside the condenser changes from moment to moment.
  • fourth heat exchanger 44 is additionally disposed between the discharge port of compressor 10 and first switching valve 60.
  • refrigerant circuit RCb according to the present third embodiment is configured such that, during the first cooling operation, the outdoor air flows through first heat exchanger 20 and thereafter is blown to third heat exchanger 42. This can facilitate exchange of heat by fourth heat exchanger 44 serving as a condenser.
  • first air blower 80 and second air blower 90 used in the refrigeration cycle apparatus according to each of the above-described first to third embodiments.
  • Figs. 19 and 20 each are a diagram showing a configuration example of first air blower 80 and second air blower 90 suitable for the refrigeration cycle apparatus according to the above-described first embodiment. Note that Fig. 19 shows the state during the first cooling operation (see Fig. 6 ) according to the first embodiment, and Fig. 20 shows the state during the second cooling operation (see Fig. 7 ) according to the first embodiment.
  • First air blower 80 includes a fan 81, an air path 82, and an air path switch 83.
  • Fan 81 operates in response to a command from controller 100, and blows indoor air into air path 82.
  • Air path 82 allows communication between the indoor space to be cooled and each of first heat exchanger 20 and second heat exchanger 40.
  • Air path switch 83 is configured to be capable of switching a supply destination of the indoor air between first heat exchanger 20 and second heat exchanger 40 by switching the path in air path 82 in response to a command from controller 100. Note that the state of air path switch 83 is switched, for example, by driving a motor (not shown).
  • Second air blower 90 includes a fan 91, an air path 92, and an air path switch 83 that is shared between first air blower 80 and second air blower 90.
  • Fan 91 operates in response to a command from controller 100, and blows outdoor air into air path 92.
  • Air path 92 allows communication between the outdoor space not to be cooled and each of first heat exchanger 20 and second heat exchanger 40.
  • Air path switch 83 is configured to be capable of switching a supply destination of the outdoor air between first heat exchanger 20 and second heat exchanger 40 by switching the path in air path 92 in response to a command from controller 100.
  • air path switch 83 is brought into the state shown in Fig. 19 while fans 81 and 91 are operated, and thereby, the supply destination of the indoor air can be set to second heat exchanger 40, and the supply destination of the outdoor air can be set to first heat exchanger 20.
  • air path switch 83 is brought into the state shown in Fig. 20 while fans 81 and 91 are operated, and thereby, the supply destination of the indoor air can be set to first heat exchanger 20 and the supply destination of the outdoor air can be set to second heat exchanger 40.
  • Figs. 21 and 22 each are a diagram showing a configuration example of a first air blower 80A and a second air blower 90A suitable for the refrigeration cycle apparatus according to the above-described second embodiment. Note that Fig. 21 shows the state during the first cooling operation (see Fig. 11 ) according to the second embodiment, and Fig. 22 shows the state during the second cooling operation (see Fig. 13 ) according to the second embodiment.
  • First air blower 80A is obtained by adding air paths 82a and 82b and air path switches 83a and 83b to the above-described first air blower 80.
  • Second air blower 90A is obtained by adding air paths 92a and 92b and air path switches 83a and 83b, which are shared between second air blower 90A and first air blower 80A, to the above-described second air blower 90.
  • Air path 82a is formed to supply the air having passed through first heat exchanger 20 to third heat exchanger 42.
  • Air path 82b is formed to supply the air having passed through second heat exchanger 40 to third heat exchanger 42.
  • Air path 92a is formed to supply the air having passed through first heat exchanger 20 to the outdoors.
  • Air path 92b is formed to supply the air having passed through second heat exchanger 40 to the outdoors.
  • Air path switch 83a is configured to be capable of switching, between air paths 82a and 92a, the supply destination of the air having passed through first heat exchanger 20, in response to a command from controller 100.
  • Air path switch 83b is configured to be capable of switching, between air paths 82b and 92b, the supply destination of the air having passed through second heat exchanger 40, in response to a command from controller 100. Note that the states of air path switches 83a and 83b are switched, for example, by driving a motor (not shown).
  • air path switches 83, 83a, and 83b are brought into the states shown in Fig. 21 while fans 81 and 91 are operated, and thereby, the supply destination of the outdoor air can be set to first heat exchanger 20 while the indoor air is blown through second heat exchanger 40 and third heat exchanger 42 sequentially in this order.
  • air path switches 83, 83a and 83b are brought into the states shown in Fig. 22 while fans 81 and 91 are operated, and thereby, the supply destination of the outdoor air can be set to second heat exchanger 40 while the indoor air is blown through first heat exchanger 20 and third heat exchanger 42 sequentially in this order.
  • Figs. 23 and 24 each are a diagram showing a configuration example of first air blower 80A and second air blower 90B suitable for the refrigeration cycle apparatus according to the above-described third embodiment. Note that Fig. 23 shows the state during the first cooling operation (see Fig. 15 ) according to the third embodiment, and Fig. 24 shows the state during the second cooling operation (see Fig. 17 ) according to the third embodiment.
  • First air blower 80A is the same as first air blower 80A shown in Fig. 21 described above.
  • Second air blower 90B is obtained by replacing air paths 92a and 92b of second air blower 90A shown in Fig. 21 with air paths 92c and 92d, respectively.
  • Air path 92c is formed to supply the air having passed through first heat exchanger 20 to fourth heat exchanger 44.
  • Air path 92d is formed to supply the air having passed through second heat exchanger 40 to fourth heat exchanger 44.
  • air path switches 83, 83a, and 83b are brought into the states shown in Fig. 23 while fans 81 and 91 are operated, and thereby, the outdoor air can be blown through first heat exchanger 20 and fourth heat exchanger 44 sequentially in this order while the indoor air is blown through second heat exchanger 40 and third heat exchanger 42 sequentially in this order.
  • air path switches 83, 83a, and 83b are brought into the states shown in Fig. 24 while fans 81 and 91 are operated, and thereby, the outdoor air can be blown through second heat exchanger 40 and fourth heat exchanger 44 sequentially in this order while the indoor air is blown through first heat exchanger 20 and third heat exchanger 42 sequentially in this order.
  • 1 refrigeration cycle apparatus 10 compressor, 20 first heat exchanger, 30, 32 decompressing device, 40 second heat exchanger, 42 third heat exchanger, 44 fourth heat exchanger, 51 to 58 pipe, 60 first switching valve, 70 second switching valve, 71. container, 72 valve body, 73 to 75 flow path, 76 rotation axis, 80, 80A, first air blower, 81, 91 fan, 82, 82a, 82b, 92, 92a, 92b, 92c, 92d air path, 83, 83a, 83b air path switch, 90, 90A, second air blower, 100 controller, RC, RCa, RCb refrigerant circuit.

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Mechanical Engineering (AREA)
  • Thermal Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Fluid Mechanics (AREA)
  • Compression-Type Refrigeration Machines With Reversible Cycles (AREA)
  • Air Conditioning Control Device (AREA)
EP20944786.1A 2020-07-07 2020-07-07 Dispositif à cycle de réfrigération Pending EP4180742A4 (fr)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2020/026569 WO2022009312A1 (fr) 2020-07-07 2020-07-07 Dispositif à cycle de réfrigération

Publications (2)

Publication Number Publication Date
EP4180742A1 true EP4180742A1 (fr) 2023-05-17
EP4180742A4 EP4180742A4 (fr) 2023-08-09

Family

ID=79552325

Family Applications (1)

Application Number Title Priority Date Filing Date
EP20944786.1A Pending EP4180742A4 (fr) 2020-07-07 2020-07-07 Dispositif à cycle de réfrigération

Country Status (6)

Country Link
US (1) US20230175744A1 (fr)
EP (1) EP4180742A4 (fr)
JP (1) JP7357793B2 (fr)
CN (1) CN115803571A (fr)
AU (1) AU2020457289B2 (fr)
WO (1) WO2022009312A1 (fr)

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6073071U (ja) * 1983-10-27 1985-05-23 株式会社東芝 ヒ−トポンプ式冷凍装置
JPH04254158A (ja) * 1991-01-31 1992-09-09 Daikin Ind Ltd ヒートポンプ式空気調和装置の冷凍サイクル
JP4254158B2 (ja) 2001-08-20 2009-04-15 東レ株式会社 炭素繊維基材の製造方法、プリフォームの製造方法および複合材料の製造方法
JP3668763B2 (ja) * 2003-10-09 2005-07-06 ダイキン工業株式会社 空気調和装置
US6817205B1 (en) 2003-10-24 2004-11-16 Carrier Corporation Dual reversing valves for economized heat pump
JP6073071B2 (ja) 2012-04-25 2017-02-01 京セラ株式会社 電子機器
JP6454465B2 (ja) * 2013-10-10 2019-01-16 日立アプライアンス株式会社 冷媒切替弁および冷媒切替弁を備える機器
JP6599002B2 (ja) 2016-06-14 2019-10-30 三菱電機株式会社 空気調和装置
JP6758500B2 (ja) 2017-06-27 2020-09-23 三菱電機株式会社 空気調和装置
US20220307736A1 (en) * 2021-03-23 2022-09-29 Emerson Climate Technologies, Inc. Heat-Pump System With Multiway Valve

Also Published As

Publication number Publication date
JPWO2022009312A1 (fr) 2022-01-13
US20230175744A1 (en) 2023-06-08
AU2020457289A1 (en) 2022-12-22
CN115803571A (zh) 2023-03-14
WO2022009312A1 (fr) 2022-01-13
AU2020457289B2 (en) 2023-11-23
EP4180742A4 (fr) 2023-08-09
JP7357793B2 (ja) 2023-10-06

Similar Documents

Publication Publication Date Title
KR100437804B1 (ko) 2배관식 냉난방 동시형 멀티공기조화기 및 그 운전방법
US9719708B2 (en) Air-conditioning apparatus with simultaneous heating and cooling operation
JP2003207218A (ja) 空調装置
KR20080019251A (ko) 냉동 장치
KR100554076B1 (ko) 냉동장치
JP2004170023A (ja) 多室形空気調和機の制御方法
EP4180742A1 (fr) Dispositif à cycle de réfrigération
JP2000346478A (ja) 冷凍装置
JP2001108345A (ja) 二段圧縮冷凍冷蔵装置
JP3426892B2 (ja) マルチエバポレータ冷蔵庫
JP2002188873A (ja) 空気調和機の冷凍装置
JP3998035B2 (ja) 冷凍装置
JP4270555B2 (ja) 再熱除湿型空気調和機
WO2018074370A1 (fr) Système de réfrigération et unité intérieure
JP6835055B2 (ja) 冷凍装置
GB2541607A (en) Refrigeration cycle device
JP2009115336A (ja) 冷凍装置
JPH0926219A (ja) 多室型冷暖房装置
WO2023139702A1 (fr) Dispositif à cycle frigorifique
US20240151425A1 (en) Air-conditioner
KR100666676B1 (ko) 멀티형 실내 열교환기를 가지는 공기조화기
JP2024080933A (ja) 空気調和装置
JP2000320908A (ja) 冷凍サイクル回路
JPH0339870A (ja) 空気調和装置
KR19980013637A (ko) 멀티에어컨용 실내기의 연결구조

Legal Events

Date Code Title Description
STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE

PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

17P Request for examination filed

Effective date: 20221228

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

A4 Supplementary search report drawn up and despatched

Effective date: 20230711

RIC1 Information provided on ipc code assigned before grant

Ipc: F25B 41/26 20210101ALI20230705BHEP

Ipc: F25B 1/00 20060101ALI20230705BHEP

Ipc: F25B 13/00 20060101AFI20230705BHEP

DAV Request for validation of the european patent (deleted)
DAX Request for extension of the european patent (deleted)
GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

INTG Intention to grant announced

Effective date: 20240228