EP3167141A2 - Procede de forage d'un sol a l'aide d'un bras robotise - Google Patents
Procede de forage d'un sol a l'aide d'un bras robotiseInfo
- Publication number
- EP3167141A2 EP3167141A2 EP15754263.0A EP15754263A EP3167141A2 EP 3167141 A2 EP3167141 A2 EP 3167141A2 EP 15754263 A EP15754263 A EP 15754263A EP 3167141 A2 EP3167141 A2 EP 3167141A2
- Authority
- EP
- European Patent Office
- Prior art keywords
- drill pipe
- drilling
- gripping member
- ground
- drill
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/02—Drilling rigs characterised by means for land transport with their own drive, e.g. skid mounting or wheel mounting
- E21B7/023—Drilling rigs characterised by means for land transport with their own drive, e.g. skid mounting or wheel mounting the mast being foldable or telescopically retractable
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B19/00—Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
- E21B19/08—Apparatus for feeding the rods or cables; Apparatus for increasing or decreasing the pressure on the drilling tool; Apparatus for counterbalancing the weight of the rods
- E21B19/087—Apparatus for feeding the rods or cables; Apparatus for increasing or decreasing the pressure on the drilling tool; Apparatus for counterbalancing the weight of the rods by means of a swinging arm
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B19/00—Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
- E21B19/14—Racks, ramps, troughs or bins, for holding the lengths of rod singly or connected; Handling between storage place and borehole
- E21B19/15—Racking of rods in horizontal position; Handling between horizontal and vertical position
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B19/00—Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
- E21B19/16—Connecting or disconnecting pipe couplings or joints
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B19/00—Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
- E21B19/20—Combined feeding from rack and connecting, e.g. automatically
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B19/00—Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
- E21B19/24—Guiding or centralising devices for drilling rods or pipes
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/04—Directional drilling
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/04—Directional drilling
- E21B7/046—Directional drilling horizontal drilling
Definitions
- the present invention relates to the field of geotechnical work, including soil drilling methods, in all types of terrain, the drilling may be in particular horizontal, vertical or inclined
- a slide forms both a guide in translation and a support for the drill pipe, being underlined that the drill member is most often constituted of a plurality of drill pipes. put end to end.
- the slide has a length substantially greater than the unitary element of the drill pipe, that is to say generally of the order of five meters.
- the slide since the slide forms a guide having a larger size than each unitary element of a drill pipe, it has a very important weight. Indeed, the slide must support both the weight of the unit drill pipe unit but also its own weight, as well as the weight of the drill head and efforts related to drilling. It follows that the slide is very heavy and particularly bulky.
- the drilling machine Because of the weight and the large size of the slide, the drilling machine must be equipped with a mechanism of movement and orientation of the slide which is complex, heavy and bulky.
- the carrier must also be dimensioned to be able to carry both the movement mechanism and orientation, the slide and the first tube, which requires the use of a powerful carrier that will be cumbersome and expensive.
- An object of the present invention is to provide a method of drilling in the soil whose implementation is easier and less cumbersome.
- the invention relates to a method of drilling a soil in a drilling direction, in which:
- first and a second drill pipe each having a first end and a second end opposite the first end, the second end of the second drill pipe being integral with the first end of the first drill pipe;
- an articulated manipulation arm having at least three points of articulation, the manipulation arm being motorized and provided with a gripping member and being devoid of slide;
- the first drill pipe is gripped by its first end with the aid of the gripping member
- the gripping member is moved in the drilling direction by operation of the manipulator arm to drive the first drill pipe into the ground;
- the gripping member releases the first drill pipe
- the second drill pipe is gripped by its first end with the aid of the gripping member
- the gripping member is moved in the drilling direction to drive the second drill pipe attached to the first drill pipe into the ground.
- drill pipe also means drilling rods which may have a smaller diameter than the drill pipes.
- the actuation of the manipulator arm makes it possible, in particular, to grip the first and second drill tubes, to align them with the drilling direction, to fasten them to one another in order to to form a tubular drilling assembly of great length and to introduce into the ground said assembly.
- the actuation of the articulated manipulation arm which makes it possible to move the gripping member, consists of at least one deformation of the manipulation arm.
- the gripping member is moved, according to the drilling direction, by deformation of the handling arm.
- the alignment step is to align the longitudinal axis of the drill pipe with the drill direction.
- Fixing the second drill pipe to the first drill pipe is performed by acting on the gripping member, for example by a translation of the gripping member in the case of clamping, or by a rotation in the case of a screwing.
- the second drill pipe is also aligned with the drilling direction before being secured to the first drill pipe.
- the manipulation arm is an articulated robot, having a number of degrees of freedom sufficient to allow to position and move the gripping member, in particular along a rectilinear path coincident with the direction of drilling.
- the actuation of the manipulation arm is effected by deformation and movement of the arm.
- the introduction of the drill pipe into the ground does not require the presence of a slide, since it is the manipulation arm which ensures the alignment of the drill pipe with the direction of drilling.
- the thrust in the drilling direction is advantageously obtained by moving the gripping member in the drilling direction. More specifically, the actuation of the manipulating arm, by deformation, has the effect of moving the gripping member according to the drilling direction, and thus pushing the first drill pipe in the drilling direction.
- the gripper exerts a thrust on the first drill pipe according to the drill direction.
- the soil to be drilled can be horizontal, vertical, or even inclined.
- the method according to the invention may be implemented in the case of drilling a substantially vertical wall.
- the first and second drill tubes are stored in at least one storage zone disposed near the handling arm. It is understood that the gripping member comes to successively seek the first and second drill pipe in the storage area. It will be understood that, thanks to the invention, the drill pipes can be stored in a manner that is not necessarily ordered, the handling arm being arranged to take the drill pipes at one of their ends, whatever their orientation, before to align them.
- the method according to the invention can be repeated in order to introduce into the ground a tubular drilling assembly composed of a number of drill pipes greater than two.
- the gripping member is also used to extract the tubular drilling assembly by uncoupling the drill pipes from each other in order to remove them successively from the ground, and finally to deposit them in the storage area.
- the drilling method according to the invention is faster and easier to implement than the methods of the prior art in which complementary and specific tools are generally required to go and find the drill tubes in the slideway. .
- the first drill pipe is pushed into the ground by rotating it while pushing it in the direction of drilling.
- the first drill pipe is pushed into the ground by vibrating it while pushing it in the direction of drilling.
- the vibration setting is combined with a rotation of the first drill pipe.
- a retaining member having an axis which is substantially parallel to the direction of drilling, the retaining member is placed facing the soil to be drilled, and the first tube is pushed in drilling in the soil after introducing the second end of the first drill pipe through the retaining member.
- the retainer has the function of axially blocking the displacement of the first drill pipe, for example to maintain the first drill pipe in the soil during its attachment to the second drill pipe.
- the retaining member is previously fixed to the ground.
- the retaining member is attached to the wall to be drilled.
- the retaining member comprises guiding means for facilitating the guidance of the first drill pipe.
- the retaining member is disposed opposite the wall to be drilled without being fixed thereto.
- the first drill pipe is maintained in alignment with the drilling direction by adjusting, if appropriate, the position and / or the orientation of the gripping member. .
- control of the alignment of the first drill pipe makes it possible to correct the trajectory of the borehole. Adjustment of the position and / or orientation of the gripper is performed periodically, preferably in real time, as a result of which the drilling path is corrected periodically during drilling.
- the invention also relates to a drilling installation of a soil, according to a drilling direction, implementing the drilling method according to the invention, which comprises:
- an articulated manipulation arm having at least three points of articulation, and the manipulation arm being devoid of slide and comprising:
- a gripping member configured to grip one or the other of the first and second drill pipes at their first ends; alignment means for aligning the first drill pipe with the drilling direction;
- the handling arm is deformable and has several degrees of freedom to guide and move the gripping member, in particular in a rectilinear direction.
- the actuation of the manipulator arm is therefore performed by deformation and / or movement of said arm, this displacement being able to be a rotation.
- the means for driving one or the other of the first and second drilling tubes into the ground are arranged to move in the drilling direction the gripping member which holds the drill pipe by its first end.
- the gripping member exerts a thrust on the drill pipe, oriented in the drilling direction.
- the manipulation arm comprises an arm which exerts a thrust on the gripping member, this thrust being directed in the drilling direction.
- the handling arm is devoid of longiform guide slide of the drill pipes.
- the handling arm does not include a slide such as that of Figure 12 whose length is substantially equal to or greater than that of the drill pipe.
- the thrust exerted by the gripping member on the first drill pipe is determined, and preferably corrected, during the drilling.
- the penetration rate of the first drill pipe is determined, and preferably corrected, during the duration of drilling.
- the handling arm comprises displacement sensors and force sensors for determining the penetration rate of the drill pipe, as well as the forces applied to said drill pipe. These values can be compared periodically, preferably in real time, with target values. The operator can then change the thrust force or the speed of movement of the gripping member to correct these values. According to an advantageous variant, the corrections are performed automatically.
- the alignment means have the function of aligning the longitudinal axis of the drill pipes with the drilling direction.
- the installation further comprises measuring means for determining the position and the spatial orientation of the gripping member, and the alignment means use the measurement data provided by the measuring means.
- the alignment means also make it possible to correct the trajectory of the drill pipe during the drilling period, in order to ensure that the trajectory of the drilling remains rectilinear during drilling.
- the measuring means make it possible to periodically determine, preferably in real time, the position and orientation of the gripping member, and consequently the position and orientation of the drill pipe held by the gripping member. .
- the manipulation arm is slaved in trajectory, speed and effort.
- the alignment means advantageously comprise a sensor adapted to follow a laser beam defining the drilling direction.
- the installation according to the invention further comprises a retaining member having an axis which is substantially parallel to the direction of drilling, the retaining member being arranged to be traversed by one or the other of the first and second drill pipe.
- the retaining member further comprises a controllable locking device for blocking the translation of the first drill pipe relative to the ground in the drilling direction.
- the blocking device will be operated to lock the first drill pipe in the soil while the gripping solidarisera, for example by clamping or screwing, the second drill pipe to the first drill pipe.
- the locking device may also be actuated during the withdrawal phase of the drill pipe, in order to keep in place the first drill pipe while the gripping member disengages the second drill pipe from the second drill pipe.
- the retaining member further comprises a rotating head for rotating at least the first drill pipe when said first drill pipe cooperates with the retaining member.
- the gripping member only exerts a thrust on the drill pipe, oriented in the drilling direction, while the rotating head of the retaining member rotates it.
- the handling arm further comprises an actuating head for rotating and / or vibrating at least the first drill pipe.
- the gripping member comprises said actuating head.
- the installation further comprises at least one drill pipe
- the gripping member is further configured to grasp the drill pipe and insert it into the first drill pipe introduced into the ground.
- the first drill pipe is first inserted into the soil prior to introducing the drill pipe into the first drill pipe.
- the drill pipe is inserted into the first drill pipe before introducing the assembly into the ground.
- the manipulation arm is an articulated robot having at least three points of articulation.
- FIG. 1 illustrates the installation according to the invention before the start of drilling operations
- FIG. 2 illustrates the step of gripping the first drill pipe by the gripping member
- FIG. 3 illustrates the step of aligning the first drill pipe with the drilling direction
- FIG. 4 illustrates the step of driving the first drill pipe into the ground
- FIG. 5 illustrates the step of moving the second drill pipe after it has been gripped by the gripping member
- FIG. 7 illustrates the step of driving the second drill pipe, attached to the first drill pipe, in the ground
- FIG. 8 illustrates an alternative embodiment in which the installation comprises a retaining member provided with a rotary actuating head
- FIG. 9 illustrates another variant in which the retaining member is placed in front of the wall to be drilled
- - Figure 10 illustrates an embodiment of the retainer used when the drilling direction is horizontal
- - Figure 11 illustrates an embodiment of the retainer used when the drilling direction is vertical
- FIG. 12 illustrates an example of a drilling installation according to the prior art. Detailed description of the invention
- FIG 1 there is illustrated an exemplary embodiment of a drilling rig 10 of a soil S according to the present invention. As will be described in more detail below, this installation makes it possible in particular to drill holes in a vertical wall P in a horizontal drilling direction D.
- the wall P may have another configuration, while the drilling direction D may be inclined relative to the horizontal, or be vertical.
- the installation 10 comprises an articulated and motorized manipulation arm 12 which, in this example, is a robot presenting several axes. hinge referenced XI, X2, X3, X4, X5.
- the manipulation arm has three points of articulation.
- the manipulation arm comprises a first portion 14 which can pivot about a vertical axis of rotation XI, a second portion 16 which can pivot relative to the first portion 14 about an axis of rotation X2, a third portion 18 which is pivotable relative to the second portion 16 about an axis of rotation X3, a fourth portion articulated with respect to the third portion 18.
- the manipulator arm is devoid of slide.
- the manipulation arm 12 further comprises a gripping member 30 which is articulated with respect to the fourth portion 20. As can be seen, the gripping member is disposed at the end of the handling arm.
- the manipulation arm 12 comprises operating means, not shown here, which make it possible to set the different portions in motion relative to one another so as to deform the manipulating arm and thus to orient and move in the space. gripping member 30.
- This type of handling arm is especially manufactured by KUKA or FANUC companies. On the other hand, the use of such a manipulator arm in the context of drilling a soil according to the present invention is not described in the prior art.
- the joints and the different portions are presented schematically. It is understood that the handling arm is configured to allow in particular a rectilinear movement of the movable gripping member, and in particular according to the drilling direction D.
- the installation 10 also comprises several drill pipes, namely in this example, a first drill pipe 40 having a length L, a second drill pipe 42 and a third drill pipe 44.
- Each of the first second and third drill pipe has a first end 40a, 42a, 44a and a second end 40b, 42b, 44b opposite the first end.
- Each of these drill pipes has a longitudinal axis.
- These tubes are intended to be secured to each other, end to end, to form a tubular drill assembly of great length. Of course, without out of the scope of the present invention, these tubes could be in the form of drill pipes.
- the handling arm does not have a long guide rail for drilling tubes that can be seen in FIG. 12 illustrating an installation of the prior art.
- the second end 40b of the first drill pipe 40 carries a drilling tool 41, in this example a bit.
- the second end 42b of the second drill pipe 42 is securable with the first end 40a of the first drill pipe 40.
- the first drill pipe is joined to the second drill pipe by screwing.
- the gripping member 30 is configured to grip one or the other of the first, second and third drill pipes at their first ends.
- the gripping member 30 grasps the first drill pipe 40 at its first end 40a.
- the gripping member 30 comprises clamp means 31 which clamp the first end 40a of the first tube 40.
- the first drill tube 40 then forms an extension of the gripping member 30.
- the gripping member 30 further comprises an actuating head 32 which, in this example, allows the rotation and vibration of the first drill pipe 40.
- the installation 10 further comprises a retaining member 50 having an axis A which is substantially parallel to the drilling direction D.
- the retaining member 50 is fastened integrally to the wall P by means of fixing means 52, 54.
- the retaining member 50 has the shape of a sleeve so that it can be crossed by one or the other of the first, second and third drill pipe. Still in the example of Figure 1, the retaining member 50 further comprises a controllable locking device 56, which will be described in more detail below, to block the translating the first drill pipe relative to the ground according to the drilling direction D.
- the manipulator arm 12 further comprises means 60 for driving the first drill pipe 40 into the ground S in the drilling direction D.
- the means for driving the first drill pipe comprise the different portions 14, 16 , 18, 20 constituting the manipulation arm and the actuating means for moving the different portions relative to each other, so as to exert a rectilinear thrust on the gripping member, this thrust being directed in the direction of drilling D.
- the manipulation arm further comprises alignment means 70 for aligning the first drill pipe 40 with the drilling direction D, the alignment means comprising in this example the various constituent portions of the handling arm and the means for actuation, the latter making it possible to align the longitudinal axis of the first drill pipe with the drilling direction D.
- the installation further comprises measuring means 69, illustrated in FIG. 4, for determining the position and the spatial orientation of the gripping member 30, these measuring means comprising in this example one or more gyroscopes, or any other position and spatial orientation sensor.
- the alignment means uses the measurement data provided by the measuring means 69 to align the longitudinal axis of the first drill pipe 40 with the drill direction D.
- the gripping member 30 is moved so that the drill bit 41 is engaged in the retaining member 50.
- the handling arm is then actuated so as to exert a rectilinear thrust on the gripping member 30 directed in the drilling direction D so as to drive the first drill pipe into the ground S.
- the actuating head 32 Concomitantly with the thrust exerted on the first tube 40 by the gripping member 30, the actuating head 32 is actuated so as to rotate the first tube 40.
- the actuation head also comprises a vibration generator for vibrating the first drill pipe 40.
- the first drill pipe is pushed into the ground by rotating it while vibrating and pushing it along the drilling direction D, as shown in FIG. 4.
- the blocking device 56 is actuated to prevent axial displacement of the first drill pipe 40.
- the gripping member 30 releases the first end 40a of the first drill pipe 40. drilling 40, and fetching the second drill pipe 42 by grasping its first end 42a.
- the manipulator arm is then actuated to align the longitudinal axis of the second drill pipe 42 with the drill direction D.
- the gripping member 30 is then moved so as to bring the second end 42b of the second drill pipe 42 opposite the first end 40a of the first drill pipe 40.
- the second drill pipe 42 is then secured with the first drill pipe 40, by screwing, by rotating with the actuating head 32 the second drill pipe 42 to screw the second end of the second drill pipe to the end piece of the first pipe of drilling 40 blocked in the ground by the blocking device 56.
- manipulation arm 12 also comprises means 80 for fixing the second end 42b of the second tube 42 to the first end 40a of the first drill tube 40, in this example, said means including in particular the actuating head of the gripping member 30.
- the blocking device 56 is released. in order to allow the free translation of the first drill pipe 40 in the direction of drilling D.
- the gripping member 30 is then moved along the drilling direction D in order to drive the second drill pipe into the ground. drill fixed to the first drill pipe. This displacement movement is therefore a translation made according to the direction of drilling D.
- a first and a second drill pipe 40, 42 each having a first end 40a, 42a and a first end are provided.
- the first drill pipe 40 is gripped by its first end
- the grip member 30 is moved in the drilling direction to drive the first drill pipe 40 into the ground while rotating the first drill pipe;
- the second drill pipe 42 is gripped by its first end
- the gripping member 30 is moved to bring the second end of the second drill pipe opposite the first end of the first drill pipe;
- the second end 42b of the second drill pipe 42 is fixed by screwing with the first end 40a of the first drill pipe 40 by rotating the actuating head 32;
- the gripping member 30 is moved along the drilling direction D in order to drive the second drill pipe attached to the first drill pipe into the ground. Moreover, during the driving of the first drill pipe 40 into the ground and also during the driving of the second drill pipe into the ground, the first and second drill pipes are maintained in alignment with the drill direction in periodically comparing the actual trajectory of the borehole with the desired drilling direction D and adjusting, as appropriate, the position and spatial orientation of the gripping member 30 to correct the path.
- FIG. 8 illustrates an embodiment in which the retaining member 50 further comprises a rotating head 55 which allows the first drill pipe 40 to be rotated when the first drill pipe 40 cooperates with the retaining member 50.
- the rotating head is located in the retaining member 50 and not in the gripping member 30.
- the rotary head 55 is arranged to rotate the first drill pipe 40 while the gripping member 30 moves so as to drive the first guide tube 40 into the ground.
- the retaining member 50 is disposed opposite the wall P to drill, without being fixed.
- the retaining member 50 is placed on the ground by means of a foot 57.
- the retainer 50 when drilling is horizontal.
- the retaining member 50 comprises hydraulic jaws 56 mounted on a plate 57.
- the retaining member 50 comprises a folding guillotine system 59 with frictional retention of the first guide tube 40.
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Mechanical Engineering (AREA)
- Earth Drilling (AREA)
Description
Claims
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| FR1456602A FR3023577B1 (fr) | 2014-07-09 | 2014-07-09 | Procede de forage d'un sol a l'aide d'un bras robotise |
| PCT/FR2015/051884 WO2016005701A2 (fr) | 2014-07-09 | 2015-07-08 | Procede de forage d'un sol a l'aide d'un bras robotise |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| EP3167141A2 true EP3167141A2 (fr) | 2017-05-17 |
| EP3167141B1 EP3167141B1 (fr) | 2018-09-12 |
Family
ID=52016686
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| EP15754263.0A Active EP3167141B1 (fr) | 2014-07-09 | 2015-07-08 | Procede de forage d'un sol a l'aide d'un bras robotise |
Country Status (5)
| Country | Link |
|---|---|
| US (1) | US10941617B2 (fr) |
| EP (1) | EP3167141B1 (fr) |
| JP (1) | JP6675377B2 (fr) |
| FR (1) | FR3023577B1 (fr) |
| WO (1) | WO2016005701A2 (fr) |
Families Citing this family (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106586837B (zh) * | 2016-12-19 | 2017-11-24 | 四川宏华电气有限责任公司 | 一种关节吊机自动抓放钻杆系统及方法 |
| EP3361039A1 (fr) * | 2017-02-13 | 2018-08-15 | Epiroc Rock Drills Aktiebolag | Dispositif de guidage de train de tiges et procédé d'assemblage de composants de train de tiges avec un tel dispositif |
| JP7116957B2 (ja) * | 2018-09-28 | 2022-08-12 | ソイルメックジャパン株式会社 | 二重管ローディング機と削孔機の併用使用方法 |
| JP7110054B2 (ja) * | 2018-09-28 | 2022-08-01 | ソイルメックジャパン株式会社 | 二重管ローディング機 |
| WO2025179394A1 (fr) * | 2024-03-01 | 2025-09-04 | Hoffos Kelsey Leroy | Guide d'engagement de tubage robotique |
Family Cites Families (27)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US3833071A (en) * | 1973-05-03 | 1974-09-03 | R Koosman | Apparatus and process for soil dewatering |
| FR2452587A1 (fr) * | 1979-03-26 | 1980-10-24 | Montabert Roger | Bras-support articule pour glissiere d'appareil de foration |
| GB8428285D0 (en) * | 1984-11-08 | 1984-12-19 | Lam M L | Pile driver drawer/drilling machine |
| CN1008382B (zh) * | 1984-11-08 | 1990-06-13 | 林明鸾 | 打桩、拔桩和/或钻孔机 |
| US4750571A (en) * | 1986-10-08 | 1988-06-14 | Geeting Marvin D | Screen placement method and apparatus |
| JPH07139662A (ja) * | 1993-11-15 | 1995-05-30 | Kazunori Sugimoto | 地下埋設管の布設方法 |
| US5752789A (en) * | 1995-12-15 | 1998-05-19 | The Boeing Company | Right angle peck drill |
| US6234260B1 (en) * | 1997-03-19 | 2001-05-22 | Coast Machinery, Inc. | Mobile drilling apparatus |
| JP2000104474A (ja) * | 1998-09-28 | 2000-04-11 | Chuo Jidosha Kogyo Kk | 補助アーム及びオーガ出力装置並びにアースオーガ |
| FI107182B (fi) * | 1998-12-09 | 2001-06-15 | Tamrock Oy | Menetelmä asemointivirheiden korjaamiseksi kallionporauksessa ja kallionporauslaitteisto |
| JP2000337079A (ja) * | 1999-05-31 | 2000-12-05 | Drill Machine Kk | 二重管方式削孔工法及びその装置並びに埋設管押し込みアダプタ |
| AT411781B (de) * | 2000-08-23 | 2004-05-25 | Techmo Entw & Vertriebs Gmbh | Verfahren und vorrichtung zum zusammenbauen, insbesondere verlängern, eines rohres bzw. gestänges |
| AUPR576501A0 (en) * | 2001-06-18 | 2001-07-12 | Russell Mineral Equipment Pty Ltd | Rock bolting apparatus and method |
| US6641332B1 (en) * | 2002-07-10 | 2003-11-04 | Appalachian Structural Systems, Inc. | Foundation support and process for structures |
| JP4068926B2 (ja) * | 2002-09-09 | 2008-03-26 | 日本車輌製造株式会社 | 鋼管チャック装置 |
| JP2005220627A (ja) * | 2004-02-06 | 2005-08-18 | Enzan Kobo:Kk | 削岩機搭載台車における穿孔位置決め制御方法 |
| FI121025B (fi) * | 2004-12-07 | 2010-06-15 | Sandvik Mining & Constr Oy | Menetelmä putkiporaukseen, porausyksikkö sekä adapterilaite |
| US7416367B2 (en) * | 2005-05-13 | 2008-08-26 | St Onge Gene | Lateral force resistance device |
| JP4657996B2 (ja) * | 2006-07-14 | 2011-03-23 | 古河ロックドリル株式会社 | 支保工キャッチャー |
| US7832496B2 (en) * | 2007-03-19 | 2010-11-16 | Goei Co., Ltd. | Deep-hole boring machine and deep-hole boring guide device |
| JP2008255603A (ja) * | 2007-04-03 | 2008-10-23 | Toda Constr Co Ltd | 低空頭制限下における中掘杭の打設方法 |
| DE102010004287A1 (de) * | 2010-01-11 | 2011-07-14 | TERRA AG für Tiefbautechnik | Verfahren und Anordnung zum Herstellen und/oder Aufweiten einer Erdbohrung |
| DE102010013723A1 (de) * | 2010-03-31 | 2011-10-06 | Gdf Suez | Verfahren zum Betrieb einer Horizontalbohrvorrichtung und Horizontalbohrvorrichtung |
| JP5717537B2 (ja) * | 2011-05-18 | 2015-05-13 | ライト工業株式会社 | 削孔ロッドの配置角管理システム及び配置角管理方法 |
| JP5921209B2 (ja) * | 2012-01-25 | 2016-05-24 | 古河ロックドリル株式会社 | さく孔機用ロッド脱着装置 |
| SE537968C2 (sv) * | 2012-07-09 | 2015-12-22 | Atlas Copco Rock Drills Ab | Förfarande och anordning vid bultinstallation i berg |
| JP6124586B2 (ja) * | 2012-12-27 | 2017-05-10 | 西松建設株式会社 | 管支持装置および管の支持方法 |
-
2014
- 2014-07-09 FR FR1456602A patent/FR3023577B1/fr not_active Expired - Fee Related
-
2015
- 2015-07-08 JP JP2017500341A patent/JP6675377B2/ja active Active
- 2015-07-08 EP EP15754263.0A patent/EP3167141B1/fr active Active
- 2015-07-08 US US15/323,775 patent/US10941617B2/en not_active Expired - Fee Related
- 2015-07-08 WO PCT/FR2015/051884 patent/WO2016005701A2/fr not_active Ceased
Also Published As
| Publication number | Publication date |
|---|---|
| FR3023577A1 (fr) | 2016-01-15 |
| JP6675377B2 (ja) | 2020-04-01 |
| US10941617B2 (en) | 2021-03-09 |
| JP2017519922A (ja) | 2017-07-20 |
| WO2016005701A2 (fr) | 2016-01-14 |
| US20170159361A1 (en) | 2017-06-08 |
| WO2016005701A3 (fr) | 2016-05-19 |
| EP3167141B1 (fr) | 2018-09-12 |
| FR3023577B1 (fr) | 2019-07-12 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| EP3167141B1 (fr) | Procede de forage d'un sol a l'aide d'un bras robotise | |
| EP2035178B1 (fr) | Pince a enserrer des toles, utilisee en association avec un bras manipulateur, et a module d'equilibrage electromecanique | |
| EP1569058A1 (fr) | Procédé et dispositif d'usinage par fenêtrage de panneaux minces non-développables | |
| CH652799A5 (fr) | Dispositif pour la reception des boulons et leur maintien en cours de pose. | |
| EP3031548B1 (fr) | Module de sertissage et procédé de distribution de bagues avec barillet de stockage | |
| FR3016674A1 (fr) | Dispositif pousseur de colis | |
| EP2851503B1 (fr) | Machine de forage comprenant un barillet muni de plusieurs carrousels | |
| FR3043770B1 (fr) | Dispositif de mesure pour determiner des angles de reglage, dispositif de reglage pour regler des angles de reglage, ainsi que procede d'assemblage et procede d'ajustement s'y rapportant | |
| FR2507520A1 (fr) | Pince pour dispositif de levage destine a la manutention de pieces | |
| EP0829614A1 (fr) | Procédé et appareil de forage | |
| EP1775072B1 (fr) | Dispositif de préhension et de manipulation de pièces cylindriques, ligne d'assemblage avec un tel dispositif et procédé d'assemblage associé | |
| FR3110103A1 (fr) | dispositif de saisie d’outil | |
| EP2206876B1 (fr) | Tête de forage pour machine de forage | |
| FR2845938A1 (fr) | Procede pour l'extraction et/ou le changement des electrodes d'une pince a souder ou d'un appareil de soudage | |
| EP3088144B1 (fr) | Solution de variation de l'espacement dans un dispositif d'ajustement | |
| CA2360005C (fr) | Dispositif d'alimentation de tiges de forage | |
| FR2870149A1 (fr) | Dispositif pour extraire automatiquement une electrode usee d'une pince de soudure d'un robot de soudure par points | |
| FR2532358A1 (fr) | Guide-foret pour appareil a forer a tige de rallonge | |
| EP0263763B1 (fr) | Machine pour la préparation automatique des extrémités à raccorder des tuyaux souples en caoutchouc armé | |
| EP3335824A1 (fr) | Système pour extraire une électrode à souder | |
| FR3077518A1 (fr) | Prehenseur polyvalent de pieces de carrosserie | |
| FR2892044A1 (fr) | Mandrin prehenseur, par exemple d'une semelle de poteau, robot de manipulation equipe d'un tel mandrin prehenseur et ligne d'assemblage associe. | |
| EP4717419A1 (fr) | Dispositif prehenseur | |
| HK1237388A1 (en) | Method of drilling a ground using a robotic arm | |
| FR3017063A1 (fr) | Machine pour la finition de l'usinage d'une ebauche d'un objet |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE |
|
| PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE |
|
| 17P | Request for examination filed |
Effective date: 20170206 |
|
| AK | Designated contracting states |
Kind code of ref document: A2 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
| AX | Request for extension of the european patent |
Extension state: BA ME |
|
| DAV | Request for validation of the european patent (deleted) | ||
| DAX | Request for extension of the european patent (deleted) | ||
| GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
| INTG | Intention to grant announced |
Effective date: 20180302 |
|
| REG | Reference to a national code |
Ref country code: HK Ref legal event code: DE Ref document number: 1237388 Country of ref document: HK |
|
| GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
| GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE PATENT HAS BEEN GRANTED |
|
| AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
| REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D Free format text: NOT ENGLISH |
|
| REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
| REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D Free format text: LANGUAGE OF EP DOCUMENT: FRENCH |
|
| REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602015016215 Country of ref document: DE |
|
| REG | Reference to a national code |
Ref country code: AT Ref legal event code: REF Ref document number: 1040801 Country of ref document: AT Kind code of ref document: T Effective date: 20181015 |
|
| REG | Reference to a national code |
Ref country code: NL Ref legal event code: MP Effective date: 20180912 |
|
| REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG4D |
|
| REG | Reference to a national code |
Ref country code: SE Ref legal event code: TRGR |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181212 Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181212 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180912 Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180912 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181213 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180912 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180912 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180912 Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180912 |
|
| REG | Reference to a national code |
Ref country code: AT Ref legal event code: MK05 Ref document number: 1040801 Country of ref document: AT Kind code of ref document: T Effective date: 20180912 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180912 Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180912 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190112 Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180912 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180912 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180912 Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180912 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180912 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190112 Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180912 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180912 |
|
| REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 602015016215 Country of ref document: DE |
|
| PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180912 |
|
| 26N | No opposition filed |
Effective date: 20190613 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180912 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180912 |
|
| REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
| GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20190708 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180912 |
|
| REG | Reference to a national code |
Ref country code: BE Ref legal event code: MM Effective date: 20190731 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190708 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190708 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190731 Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190731 Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190731 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190708 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180912 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO Effective date: 20150708 Ref country code: MT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180912 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180912 |
|
| REG | Reference to a national code |
Ref country code: DE Ref legal event code: R082 Ref document number: 602015016215 Country of ref document: DE Representative=s name: CBDL PATENTANWAELTE GBR, DE Ref country code: DE Ref legal event code: R082 Ref document number: 602015016215 Country of ref document: DE Representative=s name: CBDL PATENTANWAELTE EGBR, DE |
|
| P01 | Opt-out of the competence of the unified patent court (upc) registered |
Effective date: 20230528 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 20250620 Year of fee payment: 11 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: SE Payment date: 20250619 Year of fee payment: 11 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20250620 Year of fee payment: 11 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: IT Payment date: 20250619 Year of fee payment: 11 |