EP3032002B2 - Combination of climbing console and lagging member - Google Patents

Combination of climbing console and lagging member

Info

Publication number
EP3032002B2
EP3032002B2 EP15003432.0A EP15003432A EP3032002B2 EP 3032002 B2 EP3032002 B2 EP 3032002B2 EP 15003432 A EP15003432 A EP 15003432A EP 3032002 B2 EP3032002 B2 EP 3032002B2
Authority
EP
European Patent Office
Prior art keywords
hook
formwork
formwork part
climbing
climbing bracket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
EP15003432.0A
Other languages
German (de)
French (fr)
Other versions
EP3032002B1 (en
EP3032002A1 (en
Inventor
Marc MÄGERT
Gottfried Mägert
Christof Mägert
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Magert & Co Innovation
Original Assignee
Magert & Co Innovation
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=54782396&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=EP3032002(B2) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by Magert & Co Innovation filed Critical Magert & Co Innovation
Publication of EP3032002A1 publication Critical patent/EP3032002A1/en
Publication of EP3032002B1 publication Critical patent/EP3032002B1/en
Application granted granted Critical
Publication of EP3032002B2 publication Critical patent/EP3032002B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/06Consoles; Brackets
    • E04G5/062Consoles; Brackets specially adapted for attachment to building walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G15/00Forms or shutterings for making openings, cavities, slits, or channels
    • E04G15/06Forms or shutterings for making openings, cavities, slits, or channels for cavities or channels in walls of floors, e.g. for making chimneys
    • E04G15/061Non-reusable forms

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Moulds, Cores, Or Mandrels (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • Hooks, Suction Cups, And Attachment By Adhesive Means (AREA)

Description

Gebiet der ErfindungField of invention

Die Erfindung betrifft eine Kombination einer Kletterkonsole mit einem Verschalungsteil, in welchem die Kletterkonsole einhängbar ist, für den Einsatz in einer Wand gemäss den unabhängigen Ansprüchen.The invention relates to a combination of a climbing bracket with a formwork part in which the climbing bracket can be suspended, for use in a wall according to the independent claims.

Hintergrundbackground

Beim Betonieren von hohen Wänden werden in der Regel sogenannte Kletterkonsolen eingesetzt, die in speziell dafür vorgesehene Wandaussparungen einhängbar sind. Die Konsolen weisen typischerweise einen dreieckigen Rahmen auf, dessen eine Seite bei eingehängter Konsole an der Wand anliegt und dessen zweite Seite zur Bildung eines Laufstegs senkrecht zur Wand absteht und/oder zur Auflage der Wandschalung dient. Der Laufsteg wird normalerweise durch auf benachbarte Konsolen aufgelegte Bretter gebildet. Die Wandschalung wird normalerweise direkt an der Wand auf mehrere Konsolen aufgelegt. Am äusseren Ende des Rahmens ist üblicherweise ein Pfosten für die Bildung einer Absturzsicherung einsteckbar.When concreting high walls, so-called climbing brackets are typically used, which can be hung in specially designed wall recesses. The brackets typically have a triangular frame, one side of which rests against the wall when the bracket is in place, while the other side projects perpendicular to the wall to form a walkway and/or to support the formwork. The walkway is usually formed by boards placed on adjacent brackets. The formwork is typically placed directly against the wall, supported by several brackets. A post for fall protection is usually inserted at the outer end of the frame.

Stand der TechnikState of the art

Aus EP 0 611 257 ist eine solche Konsole bekannt, bei der der Rahmen einen Haken umfasst, welcher in die Wandaussparung eingehängt wird und im Rahmen verschiebbar gelagert ist. Der Rahmen wird durch einen Querkeil, welcher in fluchtende Öffnungen des Rahmens und des Hakens einführbar ist, durch Verspannung des Querkeils in Richtung des Hakens gezogen bis er fest an der Wand anliegt. Ein Problem dieser Lösung ergibt sich aus der unzureichenden Sicherung der Konsole gegen Verschiebungen nach oben, was sich aus folgenden Gründen ergibt: um den Haken, welcher im Wesentlichen L-förmig ist, in die Wandaussparung einzuhängen muss diese eine solche Höhe haben, dass der einzuhängende Schenkel des Hakens in die Aussparung eingeführt werden kann. Wird dieser eingehängt, so bleibt ein freier Raum der Aussparung oberhalb des Hakens. Damit ist es möglich, beispielsweise bei einem Stoss von unten gegen die Konsole, dass der Haken herausspringt und die Konsole ungewollt ausgehängt wird. Diesem Problem wird damit begegnet, dass in den besagten freien Raum ein Keil hineingeschoben wird. Diese Lösung bringt aber ein neues Problem mit sich; es hat sich gezeigt, dass der Keil beim Auflegen der nächsten Wandschalung stört, da für diese unmittelbar an der Wand keine ebene Fläche vorliegt. Somit musste zusätzlich eine Unterlage verwendet werden.Out of EP 0 611 257 A bracket of this type is known in which the frame includes a hook that is inserted into the wall recess and is slidably mounted within the frame. The frame is pulled towards the hook by a transverse wedge, which can be inserted into aligned openings in the frame and the hook, until it rests firmly against the wall. A problem with this solution arises from the inadequate securing of the bracket against upward displacement, which This is due to the following reasons: in order to hook the hook, which is essentially L-shaped, into the wall recess, the recess must be high enough to allow the hook's leg to be inserted. Once inserted, a gap remains in the recess above the hook. This means that, for example, if the bracket is bumped from below, the hook could pop out and the bracket could be unintentionally dislodged. This problem is addressed by inserting a wedge into this gap. However, this solution introduces a new problem: it has been found that the wedge interferes with the placement of the next wall formwork, as there is no flat surface directly against the wall. Therefore, an additional support was required.

CH 705 227 beschreibt eine Kletterkonsole mit einem Haken an einem Rahmen, wobei der Haken in einem Verschalungsteil eingehängt werden kann. Dabei besitzt der Haken Verbreiterungsmittel mittels welchen er innerhalb des Verschalungsteils verbreitert werden kann, so dass nach dem Einhaken der Haken aufgrund einer dauerhaften kraftschlüssigen Verbindung nicht vom Verschalungsteil losgelöst werden kann. DE 3840761 A1 , GB 1360002 A und CH 66066 A beschreiben auch eine Kletterkonsole zum Einhängen in einem Verschalungsteil. CH 705 227 This describes a climbing bracket with a hook on a frame, whereby the hook can be inserted into a formwork element. The hook has extension means by which it can be widened within the formwork element, so that after insertion, the hook cannot be detached from the formwork element due to a permanent, force-fit connection. DE 3840761 A1 , GB 1360002 A and CH 66066 A They also describe a climbing bracket for hanging in a formwork component.

Darstellung der ErfindungDescription of the invention

Die Aufgabe der vorliegenden Erfindung besteht darin, eine noch sicherere und bedienungsfreundlichere Kletterkonsole bereitzustellen.The object of the present invention is to provide an even safer and more user-friendly climbing console.

Diese Aufgabe wird mit einer Kombination einer Kletterkonsole und einem Verschalungsteil nach Anspruch 1 gelöst.This problem is solved by a combination of a climbing bracket and a formwork part according to claim 1.

Die erfindungsgemässe Kletterkonsole der Kombination wird insbesondere beim Bau von Strukturen aus Beton zum Einhängen in mindestens einer mit einem erfindungsgemässen Verschalungsteil versehenen Wandaussparung verwendet.The climbing bracket of the combination according to the invention is used particularly in the construction of structures made of concrete. used for hanging in at least one wall recess provided with a formwork part according to the invention.

Das erfindungsgemässe Verschalungsteil der Kombination wird als verlorenes Element in einer Wandaussparung verwendet.The inventive formwork component of the combination is used as a lost element in a wall recess.

Kurze Beschreibung der ZeichnungenBrief description of the drawings

Bevorzugte Ausführungsformen der Erfindung ergeben sich aus den abhängigen Ansprüchen und aus der nachfolgenden Beschreibung und den Figuren. Dabei zeigen:

  • Figur 1 eine Explosionsansicht einer ersten Ausführungsform einer erfindungsgemässen Kombination einer Kletterkonsole mit einem Haken und einem Verschalungsteil zum Einhängen der Kletterkonsole sowie einem Verschlusszapfen,
  • Figur 2 eine Seitenansicht der ersten Ausführungsform der Kletterkonsole, wobei der Haken im Verschalungsteil eingehängt ist,
  • Figur 3 die Seitenansicht aus Fig. 2, wobei der Haken im Verschalungsteil gesichert ist,
  • Figur 4 eine Seitenansicht einer zweiten, nicht beanspruchten Ausführungsform der Kletterkonsole, wobei der Haken im Verschalungsteil eingehängt ist,
  • Figur 5 die Seitenansicht aus Fig. 4, wobei der Haken im Verschalungsteil gesichert ist,
  • Figur 6 eine Seitenansicht einer dritten Ausführungsform der Kletterkonsole, wobei der Haken im Verschalungsteil eingehängt ist,
  • Figur 7 die Seitenansicht aus Fig. 6, wobei der Haken im Verschalungsteil gesichert ist,
  • Figur 8 eine Seitenansicht einer vierten, nicht beanspruchten Ausführungsform der Kletterkonsole mit einem Sicherungshebel, wobei der Haken in einer Zwischenposition zwischen der eingeführten Position und der eingehängten Position angeordnet ist,
  • Figur 9 die Seitenansicht aus Fig. 8 wobei der Haken im Verschalungsteil eingehängt ist,
  • Figur 10 die Seitenansicht aus Fig. 9 wobei der Haken im Verschalungsteil gesichert ist,
  • Figur 11 die Seitenansicht aus Fig. 10 wobei der Haken im Verschalungsteil eingehängt ist und mit einer weiteren Ausführungsform des Sicherungshebels.
  • Figur 12 eine Seitenansicht einer fünften, nicht beanspruchten Ausführungsform der Kletterkonsole, wobei der Haken im Verschalungsteil eingeführt ist,
  • Figur 13 die Seitenansicht aus Fig. 12 wobei der Haken im Verschalungsteil gesichert ist,
  • Figur 14 eine perspektivische Ansicht einer sechsten, nicht beanspruchten Ausführungsform der Kletterkonsole nach Sicherung des Hakens im Verschalungsteil,
  • Figur 15 eine Seitenansicht einer siebten, nicht beanspruchten Ausführungsform der Kletterkonsole wobei der Haken eingehängt ist und zur Sicherung einen Riegel aufweist, und
  • Figur 16 die Seitenansicht aus Fig. 15 wobei der Haken im Verschalungsteil gesichert ist und der Riegel in das Verschalungsteil eingeschoben ist.
Preferred embodiments of the invention are described in the dependent claims, the following description, and the figures. These show:
  • Figure 1 an exploded view of a first embodiment of an inventive combination of a climbing bracket with a hook and a formwork part for hanging the climbing bracket as well as a locking pin,
  • Figure 2 a side view of the first embodiment of the climbing bracket, wherein the hook is hooked into the formwork part,
  • Figure 3 the side view from Fig. 2 , whereby the hook is secured in the casing part,
  • Figure 4 a side view of a second, unclaimed embodiment of the climbing bracket, wherein the hook is hooked into the formwork part,
  • Figure 5 the side view from Fig. 4 , whereby the hook is secured in the casing part,
  • Figure 6 a side view of a third embodiment of the climbing bracket, wherein the hook is hooked into the formwork part,
  • Figure 7 the side view from Fig. 6 , whereby the hook is secured in the casing part,
  • Figure 8 a side view of a fourth, unclaimed embodiment of the climbing console with a safety lever, wherein the hook is in an intermediate position is arranged between the inserted position and the hooked position,
  • Figure 9 the side view from Fig. 8 where the hook is attached to the formwork part,
  • Figure 10 the side view from Fig. 9 where the hook is secured in the casing part,
  • Figure 11 the side view from Fig. 10 wherein the hook is hooked into the casing part and with a further embodiment of the locking lever.
  • Figure 12 a side view of a fifth, unclaimed embodiment of the climbing bracket, wherein the hook is inserted in the formwork part,
  • Figure 13 the side view from Fig. 12 where the hook is secured in the casing part,
  • Figure 14 a perspective view of a sixth, unclaimed embodiment of the climbing bracket after securing the hook in the formwork part,
  • Figure 15 a side view of a seventh, unclaimed embodiment of the climbing console wherein the hook is attached and has a locking mechanism, and
  • Figure 16 the side view from Fig. 15 where the hook is secured in the formwork part and the bolt is inserted into the formwork part.

Wege zur Ausführung der ErfindungWays to implement the invention

Im Kontext dieses Dokuments ist der Begriff "passiv" dahingehend zu verstehen, dass ein passives Sicherungselement nur dann "sichert", wenn eine äussere Kraft ausgeübt wird. Dabei ist im Zusammenhang dieses Dokuments von einer äusseren Kraft die Rede, die vertikal nach oben oder schräg nach oben auf einem Haken der Kletterkonsole oder auf einem anderen Element der Kletterkonsole, durch das die äussere Kraft auf den Haken in oben genannter Richtung übertragbar ist, einwirkt.In the context of this document, the term "passive" is to be understood as meaning that a passive belay device only "secures" when an external force is applied. In the context of this document, this external force refers to one that acts vertically upwards or diagonally upwards on a hook of the climbing console or on another element of the climbing console through which the external force can be transmitted to the hook in the aforementioned direction.

Im gesamten nachfolgenden Text bezieht sich der Begriff "stirnseitig" bzw. "Stirnseite" auf eine dem Verschalungsteil zugewandten Seite des betreffenden Elements. Dementsprechend bezieht sich der Begriff "hinten" auf die der Stirnseite gegenüberliegende Seite.Throughout the following text, the term "front side" refers to the side of the element in question facing the formwork component. Accordingly, the term "rear" refers to the side opposite the front side.

Fig. 1 zeigt eine Explosionsansicht einer ersten Ausführungsform einer Kletterkonsole 1. Die Kletterkonsole 1 wird in einer hier nicht gezeigten Wand in einer dafür vorgesehenen Aussparung eingehängt und dient als Plattform und Abschalung für die fortführenden Bauarbeiten. Die Kletterkonsole 1 umfasst einen Rahmen 14. Ein solcher Rahmen 14 ist im Dokument CH 705 227 hinreichend beschrieben und wird daher hier nicht näher erläutert. Der Rahmen 14 ist nur in Fig. 1, 2, 14, 15 und 16 gezeigt, er soll aber für alle anderen Ausführungsformen der Kletterkonsole 1 als vorhanden angenommen werden. Zur Befestigung der Kletterkonsole 1 an der Wand ist ein Haken 2 vorgesehen, welcher in der nicht gezeigten Aussparung der Wand einhängbar ist. Der Haken 2 ist vorzugsweise unverlierbar an den Rahmen 14 befestigt, was für alle Ausführungsformen der Erfindung gilt. Optional weist die Kletterkonsole 1 am Rahmen 14 stirnseitig eine hier nicht gezeigte Tafel mit einer Öffnung auf, wobei die Tafel insbesondere eine Gummilippe ist. Die Gummilippe dient dazu, ein Eindringen von Schmutz, wie z.B. Betonmilch, in die Aussparung der Wand zu verhindern. Dies ist auch im Detail im Dokument CH 705 227 beschrieben. Weiter umfasst die Kletterkonsole 1 ein Spannmittel 16a, in den vorliegenden Beispielen als Querkeil ausgeführt, welcher zur Befestigung bzw. zum Verspannen des Hakens 2 am Rahmen 14 dient. Diese Befestigung wird dadurch erreicht, dass nach Einführen des Hakens 2 in den Rahmen 14 der Keil 16a durch eine seitliche Öffnung des Rahmens 14 und eine seitliche Öffnung 16 des Hakens 2 einführbar ist. Fig. 1 Figure 1 shows an exploded view of a first embodiment of a climbing bracket 1. The climbing bracket 1 is suspended in a recess provided for this purpose in a wall (not shown) and serves as a platform and formwork for the subsequent construction work. The climbing bracket 1 comprises a frame 14. Such a frame 14 is described in the document. CH 705 227 It is sufficiently described and therefore will not be explained in more detail here. Frame 14 is only in Fig. 1 , 2 , 14 , 15 and 16 The climbing bracket 1 is shown, but it should be assumed to be present in all other embodiments of the climbing bracket 1. A hook 2 is provided for attaching the climbing bracket 1 to the wall, which can be hooked into the recess in the wall (not shown). The hook 2 is preferably captive and attached to the frame 14, which applies to all embodiments of the invention. Optionally, the climbing bracket 1 has a panel with an opening (not shown) on its end face at the frame 14, the panel being, in particular, a rubber lip. The rubber lip serves to prevent the ingress of dirt, such as cement slurry, into the recess in the wall. This is also described in detail in the document. CH 705 227 described. The climbing bracket 1 further comprises a clamping device 16a, in the present examples designed as a transverse wedge, which serves to fasten or clamp the hook 2 to the frame 14. This fastening is achieved by the fact that, after the hook 2 has been inserted into the frame 14, the wedge 16a can be inserted through a lateral opening of the frame 14 and a lateral opening 16 of the hook 2.

Die Kletterkonsole 1 wird wie nachfolgend beschrieben in die Wand eingehängt. Zunächst wird beim Aufbau des hier als bereits bestehend angenommenen Wandstücks ein Verschlusszapfen 6 an die für den Aufbau des Wandstücks aufgestellten Schalungselemente derart angebracht, dass eine Öffnung 31 des Verschalungsteils 3 auf den Verschlusszapfen 6 aufgeschoben werden kann bis die Stirnseite des Verschalungsteil 3 am Verschlusszapfen 6 anliegt und die Öffnung 31 verschlossen ist. Dies verhindert dass während der nachfolgenden Auffüllung von Beton zwischen den Schalungselementen die Öffnung 31 verschlossen wird.Climbing bracket 1 is hung in the wall as described below. First, when setting up the wall section, which is assumed to already exist, a Locking pins 6 are attached to the formwork elements erected for the construction of the wall section in such a way that an opening 31 of the formwork part 3 can be slid onto the locking pin 6 until the end face of the formwork part 3 rests against the locking pin 6 and the opening 31 is closed. This prevents the opening 31 from being closed during the subsequent filling of concrete between the formwork elements.

Das Verschalungsteil 3 weist eine geschlossene Hinterseite 5 und im unteren Teil eine Absenkung 5a zur Aufnahme eines Teils des Hakens 2 auf.The formwork part 3 has a closed rear side 5 and a recess 5a in the lower part for receiving part of the hook 2.

Nach dem Aushärten des Betons ist das Verschalungsteil 3 als verlorenes Element fest im Beton verankert und bildet eine Aussparung darin, die durch die Öffnung 31 zugänglich ist. Um das Wandstück nach oben weiter aufzubauen, kann nun die Kletterkonsole 1 in die vom Verschalungsteil 3 gebildete Aussparung eingeführt werden, indem der Haken 2 der Kletterkonsole 1 zunächst durch die Öffnung 31 eingeführt und anschliessend im Verschalungsteil 3 eingehängt wird. Anschliessend wird der Haken 2 darin mittels Sicherheitselementen gegen ein Loslösen oder Aushängen gesichert. Danach werden allfällige weitere Elemente der Kletterkonsole 1 aufgebaut, wie z.B. Bretter, die als Plattform für die weitere Arbeit dienen.After the concrete has hardened, formwork section 3 is firmly anchored in the concrete as a permanent element, forming a recess accessible through opening 31. To continue constructing the wall section upwards, climbing bracket 1 can now be inserted into the recess formed by formwork section 3. This is done by first inserting hook 2 of climbing bracket 1 through opening 31 and then hooking it into formwork section 3. Hook 2 is then secured against loosening or disengagement using safety devices. Afterward, any additional elements of climbing bracket 1, such as boards that serve as a platform for further work, are installed.

Für die Positionen des Hakens 2 im Verschalungsteil 3 werden im gesamten Dokument die nachfolgenden Begriffe verwendet:

  • "eingeführt" bedeutet dass der Vorderteil des Hakens 2 in der Aussparung des Verschalungsteils 3 positioniert ist, er jedoch im Wesentlichen waagerecht wieder herausgezogen werden kann,
  • "eingehängt" bedeutet dass der Vorderteil des Hakens 2 zunächst in das Verschalungsteil 3 eingeführt und anschliessend nach unten gedrückt wurde, so dass er nicht mehr durch waagerechtes Herausziehen aus dem Verschalungsteil 3 entfernbar ist, sondern nur indem der Haken nach oben und anschliessend waagerecht gezogen wird (vgl. z.B. Fig. 2), und
  • "gesichert" bedeutet dass noch zu beschreibende Sicherungselemente des Hakens 2 und des Verschalungsteils 3 derart zueinander positioniert sind und zusammenwirken, dass sie bei Einwirkung einer äusseren Kraft vertikal oder schräg nach oben eine Loslösung bzw. ein Ausschlagen des Hakens aus dem Verschalungsteil verhindern.
The following terms are used throughout the document to refer to the positions of hook 2 in the casing part 3:
  • "Inserted" means that the front part of the hook 2 is positioned in the recess of the casing part 3, but it can be pulled out again essentially horizontally.
  • "Hooked in" means that the front part of the hook 2 was first inserted into the formwork part 3 and then pressed downwards, so that it can no longer be removed by pulling it horizontally out of the formwork part 3, but only by turning the hook after is pulled upwards and then horizontally (see e.g. Fig. 2 ), and
  • "secured" means that the securing elements of the hook 2 and the formwork part 3, which are yet to be described, are positioned relative to each other and interact in such a way that they prevent the hook from detaching or being knocked out of the formwork part when an external force is applied vertically or obliquely upwards.

Fig. 2 zeigt eine Seitenansicht einer ersten Ausführungsform der Konsole 1 in eingehängtem Zustand und Fig. 3 die Konsole aus Fig. 2 in gesichertem Zustand. Der Haken 2 weist auf einer ersten Fläche, die bei Zugbelastung des Hakens 2 mit einer zweiten Fläche des Verschalungsteils 3 zusammenwirkt, einen Vorsprung 4a als Sicherungselement auf. Entsprechend weist das Verschalungsteil 3 auf der zweiten Fläche eine Einbuchtung 4b als Sicherungselement auf. Fig. 2 shows a side view of a first embodiment of console 1 in the suspended state and Fig. 3 the console off Fig. 2 in a secured state. The hook 2 has a projection 4a as a securing element on a first surface which, when the hook 2 is subjected to tensile stress, interacts with a second surface of the formwork part 3. Correspondingly, the formwork part 3 has a recess 4b as a securing element on the second surface.

In Fig. 3 ist die Sicherung des Hakens 2 gezeigt. Sobald der Haken 2 in die untere Ausformung des Verschalungsteils 3 eingehängt worden ist, wird er entgegen der Einführrichtung x (die aus Klarheitsgründen nur in Fig. 1 und 2 eingezeichnet ist aber für alle Ausführungsformen als gegeben angenommen werden soll) gezogen, bis der Vorsprung 4a in die Einbuchtung 4b eintritt.In Fig. 3 The securing of hook 2 is shown. Once hook 2 has been hooked into the lower recess of the formwork part 3, it is turned in the opposite direction to the insertion direction x (which, for clarity, is only shown in the Fig. 1 and 2 (shown, but assumed to be given for all embodiments) is pulled until the projection 4a enters the indentation 4b.

Anschliessend wird die Kletterkonsole 1 mittels des Querkeils 16a (Fig. 1) fest an das Verschalungsteil 3 bzw. an die Wand gespannt, indem der Querkeil 16a in die fluchtenden Löcher 16 des Rahmens 14 und des Hakens 2 eingetrieben bzw. eingeschoben wird.The climbing console 1 is then attached using the transverse wedge 16a ( Fig. 1 ) firmly clamped to the formwork part 3 or to the wall by driving or inserting the cross wedge 16a into the aligned holes 16 of the frame 14 and the hook 2.

Wirkt nun eine äussere Kraft von unten auf die Kletterkonsole 1, so ist es nicht möglich den Haken 2 aus seiner gesicherten Position anzuheben, so dass er ggf. aus dem Verschalungsteil 3 herauskommen könnte, da der Haken 2 mit dem Vorsprung 4a in der Einbuchtung 4b "hängenbleibt". Aber auch wenn die Kletterkonsole nicht wie vorgängig beschrieben an das Verschalungsteil 3 bzw. an die Wand gespannt wird besteht die Sicherungswirkung. In diesem Fall vollzieht der Haken 2 bei Einwirkung der äusseren Kraft von unten eine Schwenkbewegung um den Eingriffspunkt zwischen Vorsprung 4a und Einbuchtung 4b, bis seine obere Vorderkante gegen die Hinterseite 5 anstösst. Dadurch verkeilt sich der Haken 2 in der unteren Ausformung des Verschalungsteils 3 und kann somit nicht ausgehängt werden.If an external force acts on the climbing bracket 1 from below, it is not possible to lift the hook 2 from its secured position, so that it could potentially come out of the formwork section 3, since the hook 2 with its projection 4a "gets caught" in the indentation 4b. However, the securing effect also exists if the climbing bracket is not clamped to the formwork section 3 or to the wall as previously described. In this case When external force is applied from below, hook 2 pivots around the point of engagement between projection 4a and indentation 4b until its upper front edge abuts the rear surface 5. This wedges hook 2 into the lower recess of the formwork part 3, preventing it from being unhooked.

Fig. 4 und 5 zeigen jeweils eine Seitenansicht einer zweiten, nicht beanspruchten Ausführungsform der Kletterkonsole, wobei in Fig. 4 der Haken 2 im Verschalungsteil 3 eingehängt ist und in Fig. 5 der Haken 2 im Verschalungsteil 3 gesichert ist. Diese Ausführungsform unterscheidet sich von der ersten Ausführungsform dadurch, dass andere Sicherungselemente vorgesehen sind. Das Verschalungsteil 3 weist als Sicherungselement eine Sicherungsklappe 8b und der Haken 2 auf einer oberen Kante eine Gegenfläche 8a zur Sicherungsklappe 8b auf. Die Sicherungsklappe 8b ist an einer der oberen Kante des Hakens 2 zugewandte Seite des Verschalungsteils 3 angebracht. Die Sicherungsklappe 8b ist zwischen einer vertikalen Position und einer schrägen oder waagerechten Position schwenkbar. Sie ist während der Einführung des Hakens 2 in das Verschalungsteil 3 in der schrägen oder waagerechten Position und nach der Einführung in der vertikalen Position angeordnet. Die Sicherungsklappe 8b verhindert in der vertikalen Position das Aushängen des Hakens 2, indem sie bei Verschiebung des Hakens 2 nach oben an der Gegenfläche 8a des Hakens 2 anstösst. Figs. 4 and 5 Each shows a side view of a second, unclaimed embodiment of the climbing console, wherein in Fig. 4 the hook 2 is hooked into the formwork part 3 and in Fig. 5 The hook 2 is secured in the casing part 3. This embodiment differs from the first embodiment in that different securing elements are provided. The casing part 3 has a securing flap 8b as a securing element, and the hook 2 has a mating surface 8a for the securing flap 8b on one of its upper edges. The securing flap 8b is attached to the side of the casing part 3 facing the upper edge of the hook 2. The securing flap 8b is pivotable between a vertical position and an inclined or horizontal position. It is in the inclined or horizontal position during the insertion of the hook 2 into the casing part 3 and in the vertical position after insertion. In the vertical position, the securing flap 8b prevents the hook 2 from disengaging by abutting the mating surface 8a of the hook 2 when the hook 2 is moved upwards.

Die Sicherungsklappe 8b ist aufgrund ihrer Formgebung und des elastischen Materials biegsam und kann beim Einführen des Hakens 2 in die waagerechte bzw. schräge Position gebracht werden, wobei sie im eingehängten oder gesicherten Zustand des Hakens 2 in die vertikale Position zurückfedert.Due to its shape and elastic material, the safety flap 8b is flexible and can be moved into the horizontal or inclined position when the hook 2 is inserted, springing back into the vertical position when the hook 2 is hooked or secured.

Die Gegenfläche 8a ist hier von einer Nut in der oberen Kante des Hakens 2 gebildet. Sie kann alternativ auch nur ein Abschnitt der oberen Kante des Hakens 2 sein.The opposite surface 8a is formed here by a groove in the upper edge of the hook 2. Alternatively, it can also be just a section of the upper edge of the hook 2.

Die Nut 8a limitiert ein seitliches Verrutschen der Sicherungsklappe 8b bei Einwirkung der äusseren Kraft. Der Spielraum ist dabei durch die Länge der Nut 8a gegeben bzw. einstellbar. Ferner kann die Sicherungsklappe bei jeder der im Zusammenhang von Fig. 1 bis 7 und 14 benannten Ausführungsformen als zusätzliches Sicherungselement zum Einsatz kommen.The groove 8a limits the lateral slippage of the locking flap 8b when external force is applied. The clearance is determined or adjustable by the length of the groove 8a. Furthermore, the locking flap can be adjusted in any of the ways in which it is related to Figs. 1 to 7 and 14 The named embodiments are used as an additional safety element.

Fig. 6 und 7 zeigen jeweils eine Seitenansicht einer dritten Ausführungsform der Kletterkonsole 1, wobei in Fig. 6 der Haken 2 im Verschalungsteil 3 eingehängt ist und in Fig. 7 der Haken 2 im Verschalungsteil 3 gesichert ist. Figs. 6 and 7 Each shows a side view of a third embodiment of the climbing console 1, wherein in Fig. 6 the hook 2 is hooked into the formwork part 3 and in Fig. 7 Hook 2 is secured in the casing part 3.

In dieser Ausführungsform sind die erste Fläche 4c des Hakens 2 und die zweite Fläche 4d des Verschalungsteils 3, die bei Zugbelastung des Hakens 2 zusammenwirken, in Einführrichtung x des Hakens 2 geneigt. Mit anderen Worten ist ein unterer Bereich der beiden Flächen 4c, 4d in Einführrichtung x weiter entfernt von der Hinterseite 5 des Verschalungsteils 3 als ein oberer Bereich beider Flächen 4c, 4d. Die Sicherungswirkung ist ähnlich wie bei der ersten Ausführungsform der Kletterkonsole 1 und des Verschalungsteils 3 und wird daher nicht noch einmal erläutert. Es ist jedoch zu bemerken, dass eine Kombination der ersten und der dritten Ausführungsform auch möglich ist. Ferner können bei einer Kombination der beiden Ausführungsformen oder auch nur bei der dritten Ausführungsform alleine die Sicherungsklappe 8b und die Nut 8a bzw. der Bereich 8a der oberen Kante des Hakens 2 auch verwendet werden.In this embodiment, the first surface 4c of the hook 2 and the second surface 4d of the formwork part 3, which interact when the hook 2 is subjected to tensile stress, are inclined in the insertion direction x of the hook 2. In other words, a lower region of the two surfaces 4c, 4d is located further away from the rear face 5 of the formwork part 3 in the insertion direction x than an upper region of both surfaces 4c, 4d. The locking effect is similar to that of the first embodiment of the climbing bracket 1 and the formwork part 3 and is therefore not described again. However, it should be noted that a combination of the first and third embodiments is also possible. Furthermore, in a combination of the two embodiments, or even in the third embodiment alone, the locking flap 8b and the groove 8a, or the area 8a of the upper edge of the hook 2, can also be used.

Fig. 8, 9 und 10 zeigen jeweils eine Seitenansicht einer vierten, nicht beanspruchten Ausführungsform der Kletterkonsole 1 mit einem Sicherungshebel 7, wobei in Fig. 8 der Haken 2 in einer Zwischenposition zwischen der eingeführten Position und der eingehängten Position ist, in Fig. 9 der Haken 2 im Verschalungsteil 3 eingehängt ist sowie in Fig. 10 der Haken 2 im Verschalungsteil 3 gesichert ist. In dieser Ausführungsform fungiert der Sicherungshebel 7 als Sicherungselement des Hakens 2 und die "Decke" 15 des Verschalungsteils 3 als Sicherungselement derselben. Diese Variante kann auch für sich alleine oder zusätzlich zu den im Zusammenhang von Fig. 1 bis 3, 6 bis 7 und 14 benannten Ausführungsformen verwendet werden. Fig. 8, 9 and 10 Each shows a side view of a fourth, unclaimed embodiment of the climbing console 1 with a safety lever 7, wherein in Fig. 8 Hook 2 is in an intermediate position between the inserted position and the hooked position, in Fig. 9 the hook 2 is hooked into the formwork part 3 as well as in Fig. 10 Hook 2 is secured in the casing part 3. In this embodiment, the locking lever 7 acts as a locking element for the hook 2, and the "cover" 15 of the casing part 3 acts as a locking element for the hook itself. This variant can also be used alone or in addition to the elements associated with Figs. 1 to 3 , 6 to 7 and 14 named embodiments are used.

Der Haken 2 weist also den Sicherungshebel 7 als Sicherungselement und das Verschalungsteil 3 die Decke 15 als Gegenfläche zum Sicherungshebel 7 als Sicherungselement auf. Der Sicherungshebel 7 ist zwischen einer vertikalen Position und einer schrägen oder waagerechten Position schwenkbar. Der Sicherungshebel 7 ist während der Einführung des Hakens 2 in das Verschalungsteil 3 in der schrägen oder waagerechten Position und nach dem Einhängen in der vertikalen Position angeordnet. Er verhindert in der vertikalen Position die Loslösung des Hakens 2 indem er bei Verschiebung des Hakens 2 nach oben an der Gegenfläche 15 des Verschalungsteils 3 anstösst.The hook 2 thus features the locking lever 7 as a locking element, and the formwork part 3 features the ceiling 15 as a counter surface to the locking lever 7. The locking lever 7 is pivotable between a vertical position and an inclined or horizontal position. During the insertion of the hook 2 into the formwork part 3, the locking lever 7 is in the inclined or horizontal position, and after the hook is engaged, it is in the vertical position. In the vertical position, it prevents the hook 2 from disengaging by abutting the counter surface 15 of the formwork part 3 when the hook 2 is moved upwards.

In einer Ausführungsform ist der Sicherungshebel 7 an einer hinteren unteren Kante, die der Eintrittsöffnung 31 des Verschalungsteils 3 zugewandt ist, derart abgerundet, dass während des Schwenkens der Sicherungshebel 7 auf dieser abgerundeten Kante abrollt, was in Fig. 8 ersichtlich ist.In one embodiment, the locking lever 7 is rounded at a rear lower edge facing the inlet opening 31 of the casing part 3 such that, during pivoting, the locking lever 7 rolls on this rounded edge, which in Fig. 8 as is evident.

Beim Einführen des Hakens 2 ins Verschalungsteil 3 wird der Sicherungshebel 7 entgegen der Einführrichtung x geneigt, was manuell geschehen kann. Dies ist aber nicht notwendig, da sich der Sicherungshebel 7 von selbst neigt, sobald sein oberer Abschnitt an die Oberkante der Öffnung 31 anstösst. Sobald der Haken 2 eingeführt ist und nach unten in die eingehängte Position gesenkt wird, richtet sich der Sicherungshebel 7 auf, da seine untere Kante auf die Auflage des Verschalungsteils 3 gedrückt wird. Die Bewegung des Sicherungshebels 7 wird einerseits mittels der abgerundeten, der Öffnung 31 zugewandten, unteren Kantenecke des Sicherungshebels 7 und andererseits mittels der Befestigung 7a, 7b bewirkt. Der Sicherungshebel 7 ist am Haken 2 mittels eines Stiftes 7a befestigt, der seitlich oder in der Mitte des Hakens 2 angebracht ist und in einem Langloch 7b des Sicherungshebels 7 verschiebbar ist. Die abgerundete Kantenecke ermöglicht das Schwenken des Sicherungshebels 7 in die schräge Position (vgl. Fig. 8). Wird der Haken 2 nun in die eingehängte Position nach unten gedrückt, so wird der vordere Bereich des Sicherungshebels 7 über den Stift 7a auch nach unten gedrückt, wobei der Sicherungshebel 7 dabei auf der abgerundeten Kantenecke abrollt und mit seiner unteren Kante auf der Auflagefläche des Verschalungsteils 3 zu liegen kommt.When the hook 2 is inserted into the formwork part 3, the locking lever 7 is tilted in the opposite direction of insertion x, which can be done manually. However, this is not necessary, as the locking lever 7 tilts itself as soon as its upper section abuts the top edge of the opening 31. Once the hook 2 is inserted and lowered into the engaged position, the locking lever 7 straightens up because its lower edge is pressed against the support of the formwork part 3. The movement of the locking lever 7 is effected on the one hand by the rounded lower edge corner of the locking lever 7 facing the opening 31 and on the other hand by the fastening 7a, 7b. The locking lever 7 is attached to the hook 2 by means of a pin 7a, which is mounted laterally or in the middle of the hook 2 and is slidable in an elongated hole 7b of the locking lever 7. The rounded edge corner allows the locking lever 7 to pivot into the inclined position (see figure). Fig. 8 If the hook 2 is now pressed downwards into the hooked position, the front area of the locking lever 7 is also pressed downwards via the pin 7a, whereby the locking lever 7 rolls down on the rounded edge corner and comes to rest with its lower edge on the support surface of the casing part 3.

Es ist zu bemerken dass der Haken 2 bevorzugt in allen Ausführungsformen der Kletterkonsole 1 auf der Auflagefläche des Verschalungsteils 3 aufliegt, wenn er in der gesicherten Position ruht.It should be noted that in all embodiments of the climbing bracket 1, the hook 2 preferably rests on the bearing surface of the formwork part 3 when it is in the secured position.

Fig. 11 zeigt die Seitenansicht aus Fig. 10 wobei der Haken 2 im Verschalungsteil 3 eingehängt ist. Hier kommt eine weitere Ausführungsform des Sicherungshebels 7 zum Einsatz. In dieser Ausführungsform weist der Sicherungshebel 7 eine erste Feder 12 auf, die derart ausgestaltet ist, dass sie den Sicherungshebel 7 in die vertikale Position schwenkt, sobald der Haken 2 eingehängt ist. Hier ist die erste Feder 12 um den Stift 7a gewickelt und mit einem Ende am Körper des Hakens 2 und mit dem anderen Ende am Sicherungshebel 7 befestigt. Dabei ist die erste Feder 12 so ausgestaltet, dass sie in der schrägen Position des Sicherungshebels 7 gespannt ist und sein Schwenken in die aufgerichtete Position unterstützt. Fig. 11 shows the side view Fig. 10 where the hook 2 is engaged in the casing part 3. Here, a further embodiment of the locking lever 7 is used. In this embodiment, the locking lever 7 has a first spring 12, which is designed such that it pivots the locking lever 7 into the vertical position as soon as the hook 2 is engaged. Here, the first spring 12 is wrapped around the pin 7a and attached at one end to the body of the hook 2 and at the other end to the locking lever 7. The first spring 12 is designed such that it is tensioned in the inclined position of the locking lever 7 and assists its pivoting into the upright position.

Es ist zu bemerken dass in den Ausführungsformen nach Fig. 8, 9, 10, 11 der Sicherungshebel 7 eine geeignete Höhe hat damit er innerhalb des Verschalungsteils 3 schwenken kann. Mit anderen Worten hat er in der aufgerichteten Position einen gewissen Abstand von der Gegenfläche 15.It should be noted that in the embodiments according to Fig. 8, 9 , 10, 11 The locking lever 7 has a suitable height so that it can pivot within the casing part 3. In other words, in the upright position it has a certain distance from the opposite surface 15.

Figur 12 und 13 zeigen jeweils eine Seitenansicht einer fünften, nicht beanspruchten Ausführungsform der Kletterkonsole, wobei in Fig. 12 der Haken 2 im Verschalungsteil 3 eingeführt ist und in Fig. 13 der Haken 2 im Verschalungsteil 3 gesichert ist. Figures 12 and 13 Each shows a side view of a fifth, unclaimed embodiment. the climbing console, whereby in Fig. 12 the hook 2 is inserted into the formwork part 3 and in Fig. 13 Hook 2 is secured in the casing part 3.

Bei dieser Ausführungsform weist der Haken 2 seitlich mindestens einen Vorsprung 17 als Sicherungselement auf und das Verschalungsteil 3 weist einen Führungskanal 17a als Sicherungselement auf. Der Führungskanal 17a ist derart ausgestaltet, dass er den Vorsprung 17 des Hakens 2 aufnimmt und den Haken 2 von einer Einführposition bis in die gesicherte Position des Hakens 2 im Verschalungsteil 3 führt, in der er bei einer Krafteinwirkung auf dem Haken 2 in vertikaler oder schräger Richtung gegen eine Wandung des Führungskanals 17a anstösst.In this embodiment, the hook 2 has at least one lateral projection 17 as a locking element, and the formwork part 3 has a guide channel 17a as a locking element. The guide channel 17a is designed such that it receives the projection 17 of the hook 2 and guides the hook 2 from an insertion position to the secured position of the hook 2 in the formwork part 3, in which, when a force is applied to the hook 2 in a vertical or oblique direction, it abuts a wall of the guide channel 17a.

Figur 14 zeigt eine perspektivische Ansicht einer sechsten, nicht beanspruchten Ausführungsform der Kletterkonsole 1 nach Sicherung des Hakens 2 im Verschalungsteil 3. In dieser Ausführungsform weist der Haken 2 oder der Rahmen 14 seitlich mindestens eine Schiebeschiene 18 als Sicherungselement auf und das Verschalungsteil 3 weist einen länglichen Kanal 18a als Sicherungselement auf. Die Schiebeschiene 18 ist derart ausgestaltet, dass sie nach Einhängen des Hakens 2 im Verschalungsteil 3 in den länglichen Kanal 18a bis zu einer Endposition einschiebbar ist, in der sie bei einer Krafteinwirkung auf dem Haken 2 in vertikaler oder schräger Richtung gegen eine Wandung des länglichen Kanals 18a anstösst. Im Folgenden wird die Vorgehensweise bei der Sicherung des Hakens 2 im Verschalungsteil 3 für die sechste Ausführungsform erläutert. Zunächst wird der Haken 2 wie vorgängig beschrieben in die Eintrittsöffnung 31 eingeführt. Dabei bleibt die Schiebeschiene 18, welche mittels eines Halters 18b verschiebbar am Haken 2 oder der Rahmen 14 angebracht ist, ausserhalb des Verschalungsteils 3. Anschliessend wird der Haken 2 in die eingehängte Position gebracht, wie bereits für andere Ausführungsformen beschrieben. Die Schiebeschiene 18 befindet sich immer noch ausserhalb des Verschalungsteils 3, jedoch fluchtet die Schiebeschiene 18 nun mit dem länglichen Kanal 18a, da sie mit dem Haken 2 nach unten gewandert ist. Nun wird die Schiebeschiene 18 in Einführrichtung x geschoben und dringt in den Kanal 18a ein, so dass der Haken 2 im Verschalungsteil 3 gesichert ist. In dieser Figur ist auch der Keil 16a eingezeichnet, der den Haken 2 am Rahmen 14 (vgl. Fig.2) fixiert. Figure 14 Figure 1 shows a perspective view of a sixth, unclaimed embodiment of the climbing bracket 1 after the hook 2 has been secured in the formwork part 3. In this embodiment, the hook 2 or the frame 14 has at least one sliding rail 18 laterally as a securing element, and the formwork part 3 has an elongated channel 18a as a securing element. The sliding rail 18 is designed such that, after the hook 2 has been inserted into the formwork part 3, it can be pushed into the elongated channel 18a to an end position in which, when a force is applied to the hook 2 in a vertical or oblique direction, it abuts a wall of the elongated channel 18a. The procedure for securing the hook 2 in the formwork part 3 for the sixth embodiment is explained below. First, the hook 2 is inserted into the entry opening 31 as described above. The sliding rail 18, which is slidably attached to the hook 2 or the frame 14 by means of a holder 18b, remains outside the formwork part 3. The hook 2 is then moved into the engaged position, as already described for other embodiments. The sliding rail 18 is still located outside the formwork part 3. However, the sliding rail 18 is now aligned with the elongated channel 18a, since it has moved downwards with the hook 2. The sliding rail 18 is now pushed in the insertion direction x and penetrates the channel 18a, so that the hook 2 is secured in the casing part 3. The wedge 16a, which secures the hook 2 to the frame 14 (see figure 1), is also shown in this figure. Fig. 2 ) fixed.

Figur 15 und Figur 16 zeigen eine Seitenansicht einer siebten, nicht beanspruchten Ausführungsform der Kletterkonsole 1, wobei hier ein Riegel 9 als Sicherungselement zum Einsatz kommt. In Fig. 15 ist der Haken 2 im Verschalungsteil 3 eingehängt und der Riegel 9 in die Kletterkonsole 1 eingeschoben. In Fig. 16 ist der Haken 2 im Verschalungsteil 3 gesichert und der Riegel 9 in das Verschalungsteil 3 eingeschoben. In dieser Ausführungsform fungiert der Riegel 9 als Sicherungselement oberhalb des Hakens 2 und die Decke 15 des Verschalungsteils 3 als Sicherungselement derselben. Diese Variante kann auch für sich alleine oder zusätzlich zu den im Zusammenhang von Fig. 1 bis 3, 6 bis 7 und 14 benannten Ausführungsformen verwendet werden. Im Folgenden wird die Vorgehensweise bei der Sicherung des Hakens 2 im Verschalungsteil 3 für die siebte Ausführungsform erläutert. Dabei sind zwei Varianten der Ausführung des Riegels 9 vorgesehen. Zunächst wird der Haken 2 in die Eintrittsöffnung 31 eingeführt und in die eingehängte Position gebracht. Figure 15 and Figure 16 Figure 1 shows a side view of a seventh, unclaimed embodiment of the climbing console 1, in which a bar 9 is used as a safety element. Fig. 15 Hook 2 is engaged in the formwork section 3 and bolt 9 is inserted into the climbing bracket 1. Fig. 16 The hook 2 is secured in the formwork part 3 and the bolt 9 is inserted into the formwork part 3. In this embodiment, the bolt 9 acts as a securing element above the hook 2, and the cover 15 of the formwork part 3 acts as a securing element for the hook 2 itself. This variant can also be used alone or in addition to the elements associated with Figs. 1 to 3 , 6 to 7 and 14 The named embodiments are used. The following explains the procedure for securing the hook 2 in the casing part 3 for the seventh embodiment. Two variants of the design of the bolt 9 are provided. First, the hook 2 is inserted into the entry opening 31 and brought into the engaged position.

In einer ersten Variante, die in Fig. 15 und 16 gezeigt ist, umfasst der Riegel einen Fuss 9a, auf dem er auf dem Haken 2 ruht. Der Fuss 9a ist auf dem Haken 2 in Richtung der Öffnung 31 und von der Öffnung 31 weg verschiebbar gelagert. Nach Anbringen des Rahmens 14 ist der Fuss zwischen Oberseite des Rahmens 14 und Haken eingeklemmt. Beim Einführen des Hakens 2 bleibt der Riegel 9, zunächst ausserhalb des Verschalungsteils 3. Anschliessend wird der Haken 2 eingehängt, wie bereits für andere Ausführungsformen beschrieben, und der Riegel 9 wir in die Eintrittsöffnung 31 eigeschoben. Dabei kann der Riegel 9 schon in der eingehängten Position eingeführt werden, oder erst wenn sich der Haken in der der gesicherten Position entsprechenden Endlage befindet. Dadurch wird der Haken 2 im Verschalungsteil 3 gesichert. Um nun den Haken 2 auszuhängen wird der Riegel 9 manuell nach hinten verschoben, so dass er aus dem Verschalungsteil 3 hinauskommt, und der Haken 2 wird in der bereits erläuterten Weise aus dem Verschalungsteil 3 hinausgezogen.In a first version, which in Figs. 15 and 16 As shown, the bolt includes a foot 9a on which it rests on the hook 2. The foot 9a is mounted on the hook 2 so that it can slide towards and away from the opening 31. After the frame 14 is attached, the foot is clamped between the top of the frame 14 and the hook. When the hook 2 is inserted, the bolt 9 initially remains outside the casing part 3. Subsequently, the hook 2 is engaged, as already described for other embodiments, and the bolt 9 is pushed into the entry opening 31. The bolt 9 can then be... The hook can be inserted either while already in the engaged position or only when it is in the end position corresponding to the secured position. This secures the hook 2 in the formwork section 3. To unhook the hook 2, the latch 9 is manually moved backward so that it comes out of the formwork section 3, and the hook 2 is pulled out of the formwork section 3 in the manner already described.

In einer zweiten Variante ist für den Riegel 9 eine zweite Feder vorgesehen (nicht gezeigt), die den Riegel 9 mit dem Haken 2 oder mit dem Fuss 9a verbindet und ihn in der in Fig. 15 und 16 gezeigten Positionen aufrecht hält. Beim Einschieben des Hakens 2 in die Eintrittsöffnung 31 wird der Riegel 9 nach hinten geschoben, sobald er mit der Decke 15 in Berührung kommt. Wenn sich der Haken 2 vom eingeschobenen Zustand in den eingehängten Zustand bewegt, verschiebt die zweite Feder den Riegel 9 wieder in seine aufrechte Position zurück und sichert somit den Haken 2 im Verschalungsteil 3, was in Fig. 16 dargestellt ist. Um nun den Haken 2 auszuhängen wird der Riegel 9 manuell umgeschwenkt und der Haken 2 wird in der bereits erläuterten Weise aus dem Verschalungsteil 3 hinausgezogen.In a second variant, a second spring is provided for the bolt 9 (not shown), which connects the bolt 9 to the hook 2 or to the foot 9a and secures it in the Figs. 15 and 16 The positions shown are maintained. When the hook 2 is inserted into the entry opening 31, the bolt 9 is pushed backward as soon as it comes into contact with the ceiling 15. When the hook 2 moves from the inserted state to the engaged state, the second spring pushes the bolt 9 back into its upright position, thus securing the hook 2 in the formwork section 3, which in Fig. 16 as shown. To unhook hook 2, the bolt 9 is manually swung over and hook 2 is pulled out of the formwork part 3 in the manner already explained.

Die hier beschriebene Kletterkonsole im Zusammenspiel mit dem Verschalungsteil bietet eine sichere Anbringung an einer Wand. Der Fokus dabei ist das Auftreten einer nach oben wirkenden äusseren Kraft auf die Konsole. Diese Richtung der Kraft vertikal oder schräg nach oben stellt die einzige Einwirkrichtung einer Kraft dar, die für eine Loslösung bzw. Aushängung der Kletterkonsole aus dem Verschalungsteil besonders kritisch ist. Eine solche Krafteinwirkung kann sich auf einer Baustelle ergeben, wenn Material von einem Krahn zur/von der Kletterkonsole gestützten Plattform gehoben wird. Dabei kann das Material oder Teile des Krahns an der Kletterkonsole hängen bleiben, während der Krahnmotor weiter aktiv ist und das hängengebliebene Material versucht, weiter nach oben zu heben. Einem solchen Problem begegnet die vorliegende Erfindung auf effektive Weise durch die verbesserte Kletterkonsole und dem verbesserten Verschalungsteil. Trotz zusätzlicher Elemente sind die zwei Teile sehr leicht und bedienfreundlich miteinander verbindbar.The climbing bracket described here, in conjunction with the formwork component, provides secure attachment to a wall. The focus here is on the occurrence of an upward external force acting on the bracket. This direction of force, vertical or obliquely upward, represents the only direction of action that is particularly critical for the climbing bracket detaching or becoming dislodged from the formwork component. Such a force can occur on a construction site when material is lifted by a crane to/from the platform supported by the climbing bracket. In this process, the material or parts of the crane can become stuck on the climbing bracket while the crane motor continues to operate and attempts to lift the stuck material further upward. The present invention addresses such a problem. This is achieved effectively through the improved climbing bracket and the improved formwork component. Despite the additional elements, the two parts are very easy and user-friendly to connect.

Obwohl bevorzugte Ausführungsformen der Erfindung beschrieben worden sind wird darauf hingewiesen, dass die Erfindung auf anderen Weisen im Rahmen der nachfolgenden Ansprüchen realisiert werden kann. Dabei beziehen sich in der Beschreibung verwendete Begriffe wie "bevorzugt", "insbesondere", "vorteilhaft", etc. nur auf optionale und beispielhafte Ausführungsformen.Although preferred embodiments of the invention have been described, it should be noted that the invention can be implemented in other ways within the scope of the following claims. Terms used in the description, such as "preferred," "in particular," "advantageous," etc., refer only to optional and exemplary embodiments.

Claims (4)

  1. Combination of a climbing bracket (1) for hooking up in a formwork part (3), with a formwork part (3), wherein the climbing bracket (1) has a frame (14) and a hook (2) displaceably mounted in the frame (14), wherein the hook (2) is hooked up in the formwork part (3) and is secured within the formwork part (3) against detachment from the formwork part (3), wherein the formwork part is inserted into a formwork to form a wall cavity and has an entry opening (31) to the outside, a closed rear side (5) and, in the lower part, a depression for receiving a part of the hook (2),
    characterized in that, for securing, the formwork part (3) and the hook (2) of the climbing bracket (1) each comprise at least one passive safety element (4a, 4b; 4c, 4d), wherein a respective securing element of the formwork part (3) engages with a respective securing element of the hook (2) during the action of a force on the hook (2) in a vertical or oblique upward direction in such a way that a detachment of the hook (2) from the formwork part (3) is preventable,
    wherein the hook (2) has a first surface and the formwork part (3) has a second surface cooperating with the first surface under tensile load of the hook (2), wherein
    - the hook (2) has a projection (4a) on the first surface and the formwork part (3) has a recess (4b) on the second surface as securing elements, and/or
    - the first surface (4c) of the hook (2) and the second surface (4d) of the formwork part (3), which interact when the hook (2) is subjected to tensile load, are inclined in the insertion direction (x) of the hook (2) in such a way that a lower region of the first and the second surface (4c, 4d) is further away from a vertical rear side (5) in an insertion direction (x), wherein the rear side is perpendicular to the insertion direction (x), of the formwork part (3) than an upper region of the first and second surfaces (4c, 4d).
  2. Combination according to claim 1, wherein the recess (4b) is arranged such that when the climbing bracket is secured, the hook (2) with the projection (4a) remains blocked in the recess (4b) of the formwork part (3) during an action of a force on the hook (2) in the vertical or oblique upward direction.
  3. Use of a climbing bracket (1) of the combination according to one of the claims 1 or 2 in the construction of structures made of concrete for hooking up in at least one wall cavity provided with a formwork part (3) of the combination according to one of the claims 1 or 2.
  4. Use of a formwork part (3) of the combination according to one of the claims 1 or 2 as a lost element in a wall cavity.
EP15003432.0A 2014-12-12 2015-12-02 Combination of climbing console and lagging member Active EP3032002B2 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CH01929/14A CH710500B1 (en) 2014-12-12 2014-12-12 Climbing console and formwork part for attaching the climbing console.

Publications (3)

Publication Number Publication Date
EP3032002A1 EP3032002A1 (en) 2016-06-15
EP3032002B1 EP3032002B1 (en) 2021-03-24
EP3032002B2 true EP3032002B2 (en) 2026-02-25

Family

ID=54782396

Family Applications (1)

Application Number Title Priority Date Filing Date
EP15003432.0A Active EP3032002B2 (en) 2014-12-12 2015-12-02 Combination of climbing console and lagging member

Country Status (3)

Country Link
EP (1) EP3032002B2 (en)
CH (1) CH710500B1 (en)
DK (1) DK3032002T3 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CH713434A2 (en) 2017-02-01 2018-08-15 Albanese Pino Anchor box for the temporary attachment of a console for scaffolding and shuttering slabs to a substructure and a plug-in cover for the temporary closing of an anchorage box.
CH714813A2 (en) 2018-03-20 2019-09-30 Albanese Pino System for temporary attachment of a climbing console, console and an anchorage box.
CH717032A2 (en) 2020-01-13 2021-07-15 Albanese Pino Method for automatically activatable, safe connection of a climbing console with an anchoring device, system for fastening a climbing console and climbing console.

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CH66066A (en) 1913-02-25 1914-08-01 Emil Schaerer Wall socket for scaffolding
AT69228B (en) 1913-05-20 1915-06-25 August Klumpp Scaffold girder anchorage.
US1141554A (en) 1913-11-26 1915-06-01 August Klumpp Scaffolld-support.
FR466605A (en) 1913-12-24 1914-05-19 Emil Schaerer scaffolding
GB1360002A (en) 1971-06-24 1974-07-17 Greater London Council Scaffolding and cable anchorages
DE3212634A1 (en) 1982-04-05 1983-10-13 Walter 4000 Düsseldorf Hoff Holding device for posts of railings
DE3317658A1 (en) 1983-05-14 1984-11-15 Omega Gerüste und Baugeräte GmbH, 4600 Dortmund Scaffold anchor
DE3840761A1 (en) 1988-12-03 1990-06-07 Wolfgang Baumann Device which is to be used in the building industry and is intended for retaining a scaffolding element
DE3931494A1 (en) 1989-09-21 1991-04-04 Baumann Verwertungs Gmbh Anchor bolt for concrete structure - is secured by housing which also prevents bolt from rotating
DE9301494U1 (en) 1993-02-04 1993-04-15 Mägert Bautechnik AG, Frutigen Climbing console
US5664391A (en) 1996-04-01 1997-09-09 Pfb Company Roof anchor and hanging scaffold system
CH705227B1 (en) 2011-07-05 2015-03-31 Mägert Bautechnik Ag Climbing scaffold and formwork part of such.

Also Published As

Publication number Publication date
CH710500B1 (en) 2020-03-13
DK3032002T3 (en) 2021-06-14
EP3032002B1 (en) 2021-03-24
EP3032002A1 (en) 2016-06-15
CH710500A2 (en) 2016-06-15

Similar Documents

Publication Publication Date Title
WO2014012681A1 (en) Attachable anchoring system for wall formwork, and method
WO2008122273A1 (en) Ceiling joist formwork with automatic stripping of the inner board
EP3543428B1 (en) Method for connecting a climbing bracket which is activatable automatically safe with an anchoring device, system with a climbing bracket and an anchoring device and climbing bracket
DE102015209735A1 (en) Scaffolding with scaffold holder and use of a recess in a scaffolding handle
DE102015223773A1 (en) Column head, ceiling support and slab formwork with such a ceiling support
EP3032002B2 (en) Combination of climbing console and lagging member
DE202024100688U1 (en) Device for attaching fall protection to scaffolding
EP2224074B1 (en) Scaffold with extraction prevention device for boards
DE3724873A1 (en) CONNECTING DEVICE FOR CONTROL PANELS
DE102010052492B4 (en) Device for receiving a pipe
DE102010028363A1 (en) Fastening device for fastening of sheet, particularly plate, at or with carrier such as bracket, is provided with clamp hook and clamping wedge moved parallel to surface area of sheet
DE102021213049A1 (en) Connection device and method for panel formwork elements
DE202007012830U1 (en) Vario carrier
DE102021101679A1 (en) Device for attaching a ceiling formwork panel, ceiling formwork, ceiling panel for a ceiling formwork, carrier strip, carrier unit, carrier connection and carrier holder
DE102020109530B3 (en) Formwork system
EP3179026B1 (en) Corner connector for door or window hollow profiles
CH707894B1 (en) Railing for mounting on the edge of a wall.
EP2447441A2 (en) Attachment device for cladding elements
DE102004039470A1 (en) Concrete encased lock comprises a first lock part having a hook and a second lock part having a receiving shoe for the hook
CH696403A5 (en) Anchor socket for anchoring console bracket in concrete wall has shaped opening allowing end of bracket to move only into assembly position which deviates from vertical work position
EP4441316A1 (en) Ceiling formwork element
EP3228778A1 (en) Formwork girder and formwork structure with such a formwork girder
CH705227B1 (en) Climbing scaffold and formwork part of such.
DE8800460U1 (en) Metal scaffolding
DE20113041U1 (en) Front side railings

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

17P Request for examination filed

Effective date: 20161212

RBV Designated contracting states (corrected)

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: EXAMINATION IS IN PROGRESS

17Q First examination report despatched

Effective date: 20200225

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

INTG Intention to grant announced

Effective date: 20201123

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE PATENT HAS BEEN GRANTED

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

Free format text: NOT ENGLISH

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

Ref country code: CH

Ref legal event code: NV

Representative=s name: E. BLUM AND CO. AG PATENT- UND MARKENANWAELTE V, CH

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

Free format text: LANGUAGE OF EP DOCUMENT: GERMAN

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 502015014424

Country of ref document: DE

Ref country code: AT

Ref legal event code: REF

Ref document number: 1374655

Country of ref document: AT

Kind code of ref document: T

Effective date: 20210415

REG Reference to a national code

Ref country code: NL

Ref legal event code: FP

REG Reference to a national code

Ref country code: DK

Ref legal event code: T3

Effective date: 20210607

REG Reference to a national code

Ref country code: SE

Ref legal event code: TRGR

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG9D

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210624

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210624

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210324

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210324

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210625

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210324

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210324

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210324

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210324

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210324

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210324

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210324

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210324

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210324

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210726

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210324

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210724

REG Reference to a national code

Ref country code: DE

Ref legal event code: R026

Ref document number: 502015014424

Country of ref document: DE

PLBI Opposition filed

Free format text: ORIGINAL CODE: 0009260

PLAX Notice of opposition and request to file observation + time limit sent

Free format text: ORIGINAL CODE: EPIDOSNOBS2

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210324

26 Opposition filed

Opponent name: ALBANESE BAUMATERIALIEN AG

Effective date: 20211221

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210324

PLBB Reply of patent proprietor to notice(s) of opposition received

Free format text: ORIGINAL CODE: EPIDOSNOBS3

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210724

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210324

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20211202

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20211202

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210324

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20151202

P01 Opt-out of the competence of the unified patent court (upc) registered

Effective date: 20230509

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210324

APAH Appeal reference modified

Free format text: ORIGINAL CODE: EPIDOSCREFNO

APBM Appeal reference recorded

Free format text: ORIGINAL CODE: EPIDOSNREFNO

APBP Date of receipt of notice of appeal recorded

Free format text: ORIGINAL CODE: EPIDOSNNOA2O

APBQ Date of receipt of statement of grounds of appeal recorded

Free format text: ORIGINAL CODE: EPIDOSNNOA3O

APBQ Date of receipt of statement of grounds of appeal recorded

Free format text: ORIGINAL CODE: EPIDOSNNOA3O

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210324

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210324

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210324

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: CH

Payment date: 20250101

Year of fee payment: 10

APBU Appeal procedure closed

Free format text: ORIGINAL CODE: EPIDOSNNOA9O

REG Reference to a national code

Ref country code: CH

Ref legal event code: U11

Free format text: ST27 STATUS EVENT CODE: U-0-0-U10-U11 (AS PROVIDED BY THE NATIONAL OFFICE)

Effective date: 20260101

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20251211

Year of fee payment: 11

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20251219

Year of fee payment: 11

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: AT

Payment date: 20251222

Year of fee payment: 11

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DK

Payment date: 20251224

Year of fee payment: 11

REG Reference to a national code

Ref country code: CH

Ref legal event code: W10

Free format text: ST27 STATUS EVENT CODE: U-0-0-W10-W00 (AS PROVIDED BY THE NATIONAL OFFICE)

Effective date: 20260114

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: NL

Payment date: 20251219

Year of fee payment: 11

Ref country code: FR

Payment date: 20251223

Year of fee payment: 11

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: BE

Payment date: 20251219

Year of fee payment: 11

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: SE

Payment date: 20251219

Year of fee payment: 11

PUAH Patent maintained in amended form

Free format text: ORIGINAL CODE: 0009272

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: PATENT MAINTAINED AS AMENDED

REG Reference to a national code

Ref country code: CH

Ref legal event code: M12

Free format text: ST27 STATUS EVENT CODE: U-0-0-M10-M12 (AS PROVIDED BY THE NATIONAL OFFICE)

Effective date: 20260128