EP2299027B1 - Scaffolding structure, in particular for façade scaffolding - Google Patents

Scaffolding structure, in particular for façade scaffolding Download PDF

Info

Publication number
EP2299027B1
EP2299027B1 EP20100174512 EP10174512A EP2299027B1 EP 2299027 B1 EP2299027 B1 EP 2299027B1 EP 20100174512 EP20100174512 EP 20100174512 EP 10174512 A EP10174512 A EP 10174512A EP 2299027 B1 EP2299027 B1 EP 2299027B1
Authority
EP
European Patent Office
Prior art keywords
railing
floor
scaffolding
level
scaffolding structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
EP20100174512
Other languages
German (de)
French (fr)
Other versions
EP2299027A1 (en
Inventor
Jean-Charles Durand
Vincent Maisonneuve
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tubesca Comabi SAS
Original Assignee
Tubesca Comabi SAS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tubesca Comabi SAS filed Critical Tubesca Comabi SAS
Publication of EP2299027A1 publication Critical patent/EP2299027A1/en
Application granted granted Critical
Publication of EP2299027B1 publication Critical patent/EP2299027B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/14Railings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/14Comprising essentially pre-assembled two-dimensional frame-like elements, e.g. of rods in L- or H-shape, with or without bracing
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/14Railings
    • E04G5/147Railings specially adapted for mounting prior to the mounting of the platform

Definitions

  • the present invention relates to a scaffolding structure, in particular facade scaffolding.
  • a facade scaffolding comprises a structure formed of vertical elements, especially in the form of prefabricated or non-prefabricated superposed frames, with uprights and crosspieces, which are interconnected by floors at different levels, and also by permanent guardrails which provide protection against falls, at least on the outside of the scaffolding (supposedly installed in front of a building facade or other building).
  • guardrails designed for such a secure mounting have either end uprights extended downward or hinge fastening systems, facilitating their handling and attachment to the upper floor level, since the lower floor level, possibly by rotating the railing around an attachment point.
  • the present invention aims to avoid this drawback, and its main purpose, in addition to the use of railings that can be mounted from a lower floor level, to make mandatory the implementation in place of such a railing, before mounting the floor of the upper level (and not the other way around).
  • the subject of the invention is a scaffolding structure, in particular a facade scaffold, formed of vertical elements, in particular in the form of prefabricated or non-prefabricated frames, with uprights and crosspieces, which are interconnected.
  • a scaffolding structure in particular a facade scaffold, formed of vertical elements, in particular in the form of prefabricated or non-prefabricated frames, with uprights and crosspieces, which are interconnected.
  • these railings being designed to be mounted from the floor level immediately below the floor level to be protected
  • this structure of scaffolding being essentially characterized by the fact that the permanent guardrails comprise, in their lower part, at least one element directed inwards, with reference to the mounted position of the railing, this element taking place at the height of the floor of the level to be protected, so that if this floor is already in place the guardrail can no longer be installed, and said element near forming a recessed conformation to normally receive the longitudinal edge of the corresponding floor.
  • each guardrail there is provided on each guardrail an element which, if the floor is already installed at the level considered, forms a stop holding the railing away from its final mounting position, thus preventing the engagement fasteners of this railing in the complementary parts provided on the uprights of the scaffolding structure.
  • the or each element directed inwards, provided in the lower part of the railings is a "U" profile piece, the two branches of which are directed upwards. so as to normally receive between them a longitudinal profile bordering the corresponding floor.
  • the edge profile of the floor will take place “naturally” in the "U” profile piece, during the subsequent assembly of the floor.
  • the "U" profile piece will abut by its inner limb against an outer face of the longitudinal profile of the floor, thus preventing the installation of the guardrail. .
  • the element such as "U" profile piece is provided in the region of at least one of the two lower fasteners of the railing, and therefore towards one end of the railing.
  • This element may in particular be screwed or welded to a lower fastener of the railing, in particular on the bracket of the fastener in the case of a stirrup and key fastener. This caliper is thus used for an additional function.
  • the element such as "U" profile piece may also be provided at an intermediate point of the length of the railing, as long as this element can be rigidly attached to a part of this railing.
  • the invention also relates to a permanent scaffolding railing designed to be mounted from the floor level immediately below the floor level to be protected, this railing intended for a scaffolding structure as previously defined comprising, in its lower part, at least one element directed inwardly of this railing and intended to abut against the edge of a floor if the latter is installed before the railing, said element having a recessed configuration for normally receive the longitudinal edge of the corresponding floor.
  • the invention relates to a scaffolding whose structure comprises vertical elements 1, in the form of frames 2 superimposed, prefabricated or not, composed of vertical uprights 3 and cross members 4 horizontally connecting the uprights 3.
  • the vertical elements 1 and formed, spaced apart from each other in the longitudinal direction of the scaffold, are connected to each other by floors 5 at different levels, the floors 5 being hooked at their ends to the cross members 4 by means known per se.
  • At each floor level is placed at least one permanent guardrail placed on the outside of the scaffold (used as a facade scaffolding).
  • the protection provided by the railing 6 can be completed by a baseboard 7, located at the edge of the floor 5 in the longitudinal direction.
  • the configuration of the railing 6 is adapted for its safe assembly from the floor level located immediately below the level to be protected, and also adapted for the implementation of the baseboard 7.
  • the railing 6 comprises an upper rail 8 and a sub-rail 9, joined in a one-piece structure by two end uprights 10 and 11, which extend downward below the sub-rail 9.
  • the structure of the guard -body 6 further comprises two oblique elements 12 and 13 of bracing. These oblique elements 12 and 13 respectively depart from the lower part of the two end uprights 10 and 11; they converge towards a plate 14 connected to the median zone of the upper rail 8. All the constituent elements of the railing 6, described so far, are located substantially in the same vertical plane, designated as "railing plan" .
  • the two ends of the railing 6 are provided with fasteners designed for fastening this railing 6 to the structure of the scaffolding, the uprights 3 are provided, at different levels, sockets 15 vertical axis adapted to receive said fasteners.
  • These fasteners comprise, at the top of each of the two end posts 10 and 11 of the guardrail, respective hooks 16 and 17 directed downwards - see in particular the Figures 2 and 4 .
  • the hooks 16 and 17 are not located in the plane of the guardrail, but they are located in respective vertical planes which form an acute angle, for example about 45 °, with the plane of the guardrail.
  • the fasteners also comprise, at the base of the two end uprights 10 and 11 of the guardrail 6, stirrups 18 traversed vertically by movable keys 19, in particular -see in particular the figure 7 .
  • the stirrups 18 each have a vertical median plane which forms an acute angle, for example about 45 °, with the plane of the guardrail.
  • the four fasteners of the guardrail 6, namely the two hooks 16 and 17 and the two stirrups 18 with their keys 19, are thus oriented towards the same side of the plane of the guardrail, namely the inner side.
  • the guardrail 6 is equipped in its lower part with a "U" profile element 20 which is also directed towards the inner side of this railing 6.
  • the element 20 is a piece reported metal which has two branches directed upwards 21 and 22, connected by a horizontal portion 23 located at their base.
  • One of the branches 21 directed upwards, oriented vertically is fixed for example by welding or screwing, at a lower attachment (bracket 18) of the railing 6.
  • the other branch 22, which is free, is here an oblique branch deviating from the first branch 21.
  • the drawing illustrates the successive steps of mounting the railing 6 and the corresponding floor 5, mounting that is performed from the floor level immediately below.
  • the operator straightens the railing 6, and he positions the hook 17 of the other end of the railing 6 in a socket 15 located at same level, but on another amount 3.
  • the guardrail 6 is straightened horizontally, and its other upper fastener, in other words the other hook 17, is inserted into the sleeve 15 corresponding (see Figures 3 and 4 , as well as figure 6 ).
  • one of the lower caliper fasteners 18 is engaged on either side of a bushing 15 located at the same level, and the key 19 is depressed and locked to secure the stirrup 18 with the bushing 15. (see Figures 5 and 7 ).
  • the guardrail 6 is then fixed, by its four fasteners, on the structure of the scaffolding. More particularly, given the orientation of its fasteners, the guardrail 6 is thus positioned so that its vertical plane is located outside the plane of the uprights 3 of the scaffolding structure, thus completely releasing the space between these amounts 3.
  • the floor 5 of the level corresponding to the railing 6 can be brought and hooked to the cross members 4 of the scaffolding structure (see figure 8 ).
  • a plinth 7 is provided, it is placed in the free space formed between the uprights 3, by the offset to the outside of the plane of the guardrail 6.
  • the same procedure is followed for all additional floor levels, each time requiring the guardrail 6 to be raised before the floor 5.
  • the planned configuration requires to dismount each floor 5 before removing the railing 6 of the same level, and not the opposite, so that no floor 5 can remain in place without protection.
  • the figure 11 illustrates a first variant, relating to the shape of the element 20.
  • This again has a profile in the general form of "U”, but with two branches 21 and 22 of very unequal heights, connected at their base by a part 23 slightly sloping on the horizontal.
  • the branch 22 is here again oblique, but it approaches the first branch 21 instead of departing from it.
  • the figure 12 illustrates a second variant, also relating to the shape of the element 20. This again has a profile in the general shape of "U”, but rounded and not angular, especially in its part passing under the profile 24 from the edge of the floor 5.
  • the element 20 has a recessed configuration, to normally receive the profile 24 which forms the longitudinal edge of the floor 5, while prohibiting the assembly of the railing 6 after the establishment of the floor 5.
  • skirting 7 is here constituted by a profile carried by the longitudinal edge of the guardrail 6, but skirting of other shape, or differently fixed for example directly to the uprights 3, are also conceivable.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Description

La présente invention concerne une structure d'échafaudage, en particulier d'échafaudage de façade.The present invention relates to a scaffolding structure, in particular facade scaffolding.

D'une manière généralement connue, un échafaudage de façade comprend une structure formée d'éléments verticaux notamment sous la forme de cadres superposés préfabriqués ou non, avec montants et traverses, qui sont reliés entre eux par des planchers situés à différents niveaux, et aussi par des garde-corps permanents qui assurent la protection contre les chutes, au moins sur le côté extérieur de l'échafaudage (supposé installé devant une façade d'immeuble ou autre bâtiment).In a generally known manner, a facade scaffolding comprises a structure formed of vertical elements, especially in the form of prefabricated or non-prefabricated superposed frames, with uprights and crosspieces, which are interconnected by floors at different levels, and also by permanent guardrails which provide protection against falls, at least on the outside of the scaffolding (supposedly installed in front of a building facade or other building).

Pour réaliser un montage en sécurité d'un tel échafaudage, les garde-corps permanents de conception récente sont agencés de manière à pouvoir être mis en place à partir d'un niveau de plancher, pour le niveau de plancher immédiatement supérieur. Ce principe permet aux opérateurs d'accéder à un niveau de plancher supérieur en toute sécurité puisque les garde-corps de ce niveau supérieur sont alors déjà installés, depuis le niveau immédiatement inférieur qui était lui-même déjà protégé, et ainsi de suite... D'une manière générale, les garde-corps conçus pour un tel montage en sécurité possèdent soit des montants terminaux prolongés vers le bas, soit des systèmes d'attache avec articulation, facilitant leur manipulation et leur accrochage au niveau de plancher supérieur, depuis le niveau de plancher inférieur, éventuellement en faisant pivoter le garde-corps autour d'un point d'attache. A titre d'exemples de tels garde-corps permanents à montage en sécurité, il est ici fait référence aux brevets français FR 2516141 , FR 2743103 et FR 2887574 .In order to securely mount such a scaffold, the newly designed permanent guardrails are arranged so that they can be set up from a floor level for the next higher floor level. This principle allows operators to access a higher floor level in complete safety since the guardrails of this higher level are already installed, from the next lower level which was itself already protected, and so on. In general, guardrails designed for such a secure mounting have either end uprights extended downward or hinge fastening systems, facilitating their handling and attachment to the upper floor level, since the lower floor level, possibly by rotating the railing around an attachment point. By way of examples of such permanent safety-mounting guardrails, reference is made here to French patents FR 2516141 , FR 2743103 and FR 2887574 .

Toutefois, même si les garde-corps actuels sont conçus pour un montage depuis le niveau de plancher inférieur, rien n'oblige les monteurs à effectuer une telle opération, donc à sécuriser le niveau supérieur avant d'accéder à ce niveau, de manière à éviter les risques d'accidents. Autrement dit, il reste possible à un opérateur de monter d'abord le plancher du niveau supérieur, puis d'accéder à ce plancher sans être sécurisé et de n'installer qu'ensuite, depuis le plancher du niveau supérieur, le garde-corps destiné à la protection de ce niveau de plancher. Une telle situation n'est certainement pas satisfaisante, du point de vue de la sécurité.However, even if the current guardrails are designed for mounting from the lower floor level, there is no requirement for the assemblers to perform such an operation, so to secure the upper level before accessing this level, so that avoid the risk of accidents. In other words, it remains possible for an operator to first mount the floor of the upper level, then access this floor without being secure and then install, from the floor of the upper level, the guardrail intended for the protection of this floor level. Such a situation is certainly not satisfactory from the point of view of security.

La présente invention vise à éviter cet inconvénient, et elle a donc pour principal objectif, en complément de l'utilisation de garde-corps pouvant être montés depuis un niveau de plancher inférieur, à rendre obligatoire la mise en place d'un tel garde-corps, avant le montage du plancher du niveau supérieur (et non pas l'inverse).The present invention aims to avoid this drawback, and its main purpose, in addition to the use of railings that can be mounted from a lower floor level, to make mandatory the implementation in place of such a railing, before mounting the floor of the upper level (and not the other way around).

A cet effet, l'invention a pour objet une structure d'échafaudage, en particulier d'échafaudage de façade, formée d'éléments verticaux notamment sous la forme de cadres superposés préfabriqués ou non, avec montants et traverses, qui sont reliés entre eux par des planchers situés à différents niveaux, et aussi par des garde-corps permanents prévus aux différents niveaux de planchers, ces garde-corps étant conçus pour être montés depuis le niveau de plancher immédiatement inférieur au niveau de plancher à protéger, cette structure d'échafaudage étant essentiellement caractérisée par le fait que les garde-corps permanents comportent, dans leur partie inférieure, au moins un élément dirigé vers l'intérieur, par référence à la position montée du garde-corps, cet élément prenant place à hauteur du plancher du niveau à protéger, de telle sorte que si ce plancher est déjà en place le garde-corps ne puisse plus être installé, et ledit élément présentant une conformation évidée pour normalement recevoir la bordure longitudinale du plancher correspondant.For this purpose, the subject of the invention is a scaffolding structure, in particular a facade scaffold, formed of vertical elements, in particular in the form of prefabricated or non-prefabricated frames, with uprights and crosspieces, which are interconnected. by floors at different levels, and also by permanent guardrails provided at different levels of floors, these railings being designed to be mounted from the floor level immediately below the floor level to be protected, this structure of scaffolding being essentially characterized by the fact that the permanent guardrails comprise, in their lower part, at least one element directed inwards, with reference to the mounted position of the railing, this element taking place at the height of the floor of the level to be protected, so that if this floor is already in place the guardrail can no longer be installed, and said element near forming a recessed conformation to normally receive the longitudinal edge of the corresponding floor.

En d'autres termes, il est prévu sur chaque garde-corps un élément qui, si le plancher est déjà installé au niveau considéré, forme une butée maintenant le garde-corps à distance de sa position finale de montage, donc empêchant l'engagement des attaches de ce garde-corps dans les parties complémentaires prévues sur les montants de la structure d'échafaudage. Ceci contraint les monteurs à procéder de manière sécurisée, c'est-à-dire à sécuriser le niveau de plancher immédiatement supérieur en y installant le garde-corps, avant d'amener le plancher lui-même dont la bordure s'imbriquera alors dans ledit élément.In other words, there is provided on each guardrail an element which, if the floor is already installed at the level considered, forms a stop holding the railing away from its final mounting position, thus preventing the engagement fasteners of this railing in the complementary parts provided on the uprights of the scaffolding structure. This forces the assemblers to proceed in a secure manner, that is to say to secure the next higher floor level by installing the railing, before bringing the floor itself whose edge will then fit into said element.

Dans une forme de réalisation préférée de l'invention, le ou chaque élément dirigé vers l'intérieur, prévu dans la partie inférieure des garde-corps, est une pièce de profil en « U », dont les deux branches sont dirigées vers le haut de manière à normalement recevoir entre elles un profilé longitudinal bordant le plancher correspondant. Comme on le comprend, si le garde-corps est préalablement installé, le profilé de bordure du plancher va prendre place « naturellement » dans la pièce de profil en « U », lors du montage ultérieur du plancher. A l'inverse, si le plancher est installé avant le garde-corps, la pièce de profil en « U » va buter par sa branche intérieure contre une face extérieure du profilé longitudinal du plancher, empêchant ainsi la mise en place du garde-corps.In a preferred embodiment of the invention, the or each element directed inwards, provided in the lower part of the railings, is a "U" profile piece, the two branches of which are directed upwards. so as to normally receive between them a longitudinal profile bordering the corresponding floor. As it is understood, if the guardrail is previously installed, the edge profile of the floor will take place "naturally" in the "U" profile piece, during the subsequent assembly of the floor. Conversely, if the floor is installed before the guardrail, the "U" profile piece will abut by its inner limb against an outer face of the longitudinal profile of the floor, thus preventing the installation of the guardrail. .

Avantageusement, l'élément tel que pièce de profil en « U » est prévu dans la région de l'une au moins des deux attaches inférieures du garde-corps, donc vers une extrémité du garde-corps. Cet élément peut notamment être vissé ou soudé sur une attache inférieure du garde-corps, en particulier sur l'étrier de l'attache dans le cas d'une attache à étrier et à clavette. Cet étrier est ainsi mis à profit pour une fonction supplémentaire.Advantageously, the element such as "U" profile piece is provided in the region of at least one of the two lower fasteners of the railing, and therefore towards one end of the railing. This element may in particular be screwed or welded to a lower fastener of the railing, in particular on the bracket of the fastener in the case of a stirrup and key fastener. This caliper is thus used for an additional function.

En variante, l'élément tel que pièce de profil en « U » peut aussi être prévu en un point intermédiaire de la longueur du garde-corps, du moment que cet élément puisse être rigidement fixé à une partie de ce garde-corps.Alternatively, the element such as "U" profile piece may also be provided at an intermediate point of the length of the railing, as long as this element can be rigidly attached to a part of this railing.

L'invention a aussi pour objet un garde-corps permanent d'écahfaudage conçu pour être monté depuis le niveau de plancher immédiatement inférieur au niveau de plancher à protéger, ce garde-corps destiné à une structure d'échafaudage telle que précédemment définie comportant, dans sa partie inférieure, au moins un élément dirigé vers l'intérieur de ce garde-corps et prévu pour venir en butée contre la bordure d'un plancher si ce dernier est installé avant le garde-corps, ledit élément présentant une conformation évidée pour normalement recevoir la bordure longitudinale du plancher correspondant.The invention also relates to a permanent scaffolding railing designed to be mounted from the floor level immediately below the floor level to be protected, this railing intended for a scaffolding structure as previously defined comprising, in its lower part, at least one element directed inwardly of this railing and intended to abut against the edge of a floor if the latter is installed before the railing, said element having a recessed configuration for normally receive the longitudinal edge of the corresponding floor.

L'invention sera mieux comprise à l'aide de la description qui suit, en référence au dessin schématique annexé représentant, à titre d'exemple, une forme d'exécution de cette structure d'échafaudage et du garde-corps correspondant :

  • Figure 1 est une vue en perspective d'une structure d'échafaudage conforme à la présente invention avec un garde-corps en cours de montage, Figure 2 montre, à échelle agrandie, le détail A de la figure 1,
  • Figure 3 est une vue en perspective similaire à la figure 1, le garde-corps se trouvant en fin de montage,
  • Figure 4 montre, à échelle agrandie, le détail B de la figure 3,
  • Figure 5 est une vue en perspective similaire aux figures 1 et 3, le garde-corps se trouvant entièrement monté,
  • Figure 6 montre, à échelle agrandie, le détail C de la figure 5,
  • Figure 7 montre, à échelle agrandie, le détail D de la figure 5,
  • Figure 8 est une vue en perspective similaire aux précédentes, montrant l'échafaudage après mise en place du plancher au niveau protégé par le garde-corps précédemment monté,
  • Figure 9 est une vue de détail, de face, d'une partie de la structure d'échafaudage et du garde-corps avec son élément en « U »,
  • Figure 10 est une vue à échelle agrandie et en coupe, suivant la flèche F de la figure 8, montrant en particulier ledit élément en « U »,
  • Figure 11 est une vue similaire à la figure 10, illustrant une première variante de forme de l'élément en « U »,
  • Figure 12 est une autre vue similaire à la figure 10, illustrant une seconde variante de forme de l'élément en « U ».
The invention will be better understood with the aid of the description which follows, with reference to the appended schematic drawing representing, by way of example, an embodiment of this scaffolding structure and the corresponding guardrail:
  • Figure 1 is a perspective view of a scaffolding structure according to the present invention with a guard rail being assembled, Figure 2 shows, on an enlarged scale, detail A of the figure 1 ,
  • Figure 3 is a perspective view similar to the figure 1 , the railing being at the end of assembly,
  • Figure 4 shows, on an enlarged scale, detail B of the figure 3 ,
  • Figure 5 is a perspective view similar to Figures 1 and 3 , the guardrail being fully assembled,
  • Figure 6 shows, on an enlarged scale, the detail C of the figure 5 ,
  • Figure 7 shows, on an enlarged scale, the detail D of the figure 5 ,
  • Figure 8 is a perspective view similar to the previous ones, showing the scaffolding after placing the floor at the level protected by the previously mounted railing,
  • Figure 9 is a detail view, from the front, of a part of the scaffolding structure and the guardrail with its "U" element,
  • Figure 10 is an enlarged view in section, along the arrow F of the figure 8 , in particular showing said "U" element,
  • Figure 11 is a view similar to the figure 10 , illustrating a first variant form of the element in "U",
  • Figure 12 is another view similar to the figure 10 , illustrating a second variant of shape of the element in "U".

Comme le montre notamment la figure 1, l'invention est relative à un échafaudage dont la structure comprend des éléments verticaux 1, sous la forme de cadres 2 superposés, préfabriqués ou non, composés de montants 3 verticaux et de traverses 4 reliant horizontalement les montants 3. Les éléments verticaux 1 ainsi constitués, espacés les uns des autres dans la direction longitudinale de l'échafaudage, sont reliés les uns aux autres par des planchers 5 situés à différents niveaux, les planchers 5 étant accrochés à leurs extrémités aux traverses 4 par des moyens connus en soi. A chaque niveau de plancher, est mis en place au moins un garde-corps 6 permanent placé sur le côté extérieur de l'échafaudage (utilisé comme un échafaudage de façade). La protection réalisée par le garde-corps 6 peut être complétée par une plinthe 7, située en bordure du plancher 5 dans le sens longitudinal.As shown in particular figure 1 , the invention relates to a scaffolding whose structure comprises vertical elements 1, in the form of frames 2 superimposed, prefabricated or not, composed of vertical uprights 3 and cross members 4 horizontally connecting the uprights 3. The vertical elements 1 and formed, spaced apart from each other in the longitudinal direction of the scaffold, are connected to each other by floors 5 at different levels, the floors 5 being hooked at their ends to the cross members 4 by means known per se. At each floor level is placed at least one permanent guardrail placed on the outside of the scaffold (used as a facade scaffolding). The protection provided by the railing 6 can be completed by a baseboard 7, located at the edge of the floor 5 in the longitudinal direction.

La configuration du garde-corps 6 est adaptée pour son montage en sécurité à partir du niveau de plancher situé immédiatement au-dessous du niveau à protéger, et aussi adaptée pour la mise en place de la plinthe 7.The configuration of the railing 6 is adapted for its safe assembly from the floor level located immediately below the level to be protected, and also adapted for the implementation of the baseboard 7.

Le garde-corps 6 comprend une lisse supérieure 8 et une sous-lisse 9, réunies en une structure monobloc par deux montants terminaux 10 et 11, qui se prolongent vers le bas au-dessous de la sous-lisse 9. La structure du garde-corps 6 comprend encore deux éléments obliques 12 et 13 de contreventement. Ces éléments obliques 12 et 13 partent respectivement de la partie inférieure des deux montants terminaux 10 et 11; ils convergent vers une plaque 14 raccordée à la zone médiane de la lisse supérieure 8. Tous les éléments constitutifs du garde-corps 6, décrits jusqu'ici, sont situés sensiblement dans un même plan vertical, désigné comme « plan du garde-corps ».The railing 6 comprises an upper rail 8 and a sub-rail 9, joined in a one-piece structure by two end uprights 10 and 11, which extend downward below the sub-rail 9. The structure of the guard -body 6 further comprises two oblique elements 12 and 13 of bracing. These oblique elements 12 and 13 respectively depart from the lower part of the two end uprights 10 and 11; they converge towards a plate 14 connected to the median zone of the upper rail 8. All the constituent elements of the railing 6, described so far, are located substantially in the same vertical plane, designated as "railing plan" .

Les deux extrémités du garde-corps 6 sont pourvues d'attaches conçues pour la fixation de ce garde-corps 6 à la structure de l'échafaudage, dont les montants 3 sont pourvus, à différents niveaux, de douilles 15 d'axe vertical aptes à recevoir lesdites attaches.The two ends of the railing 6 are provided with fasteners designed for fastening this railing 6 to the structure of the scaffolding, the uprights 3 are provided, at different levels, sockets 15 vertical axis adapted to receive said fasteners.

Ces attaches comprennent, au sommet de chacun des deux montants terminaux 10 et 11 du garde-corps, des crochets respectifs 16 et 17 dirigés vers le bas -voir en particulier les figures 2 et 4. Les crochets 16 et 17 ne sont pas situés dans le plan du garde-corps, mais ils sont situés dans des plans verticaux respectifs qui forment un angle aigu, par exemple d'environ 45°, avec le plan du garde-corps.These fasteners comprise, at the top of each of the two end posts 10 and 11 of the guardrail, respective hooks 16 and 17 directed downwards - see in particular the Figures 2 and 4 . The hooks 16 and 17 are not located in the plane of the guardrail, but they are located in respective vertical planes which form an acute angle, for example about 45 °, with the plane of the guardrail.

Les attaches comprennent encore, à la base des deux montants terminaux 10 et 11 du garde-corps 6, des étriers 18 traversés verticalement par des clavettes mobiles 19 respectives -voir en particulier la figure 7. Les étriers 18 possèdent chacun un plan médian vertical qui forme un angle aigu, par exemple d'environ 45°, avec le plan du garde-corps.The fasteners also comprise, at the base of the two end uprights 10 and 11 of the guardrail 6, stirrups 18 traversed vertically by movable keys 19, in particular -see in particular the figure 7 . The stirrups 18 each have a vertical median plane which forms an acute angle, for example about 45 °, with the plane of the guardrail.

Les quatre attaches du garde-corps 6, à savoir les deux crochets 16 et 17 et les deux étriers 18 avec leurs clavettes 19, sont ainsi orientés vers le même côté du plan du garde-corps, à savoir le coté intérieur.The four fasteners of the guardrail 6, namely the two hooks 16 and 17 and the two stirrups 18 with their keys 19, are thus oriented towards the same side of the plane of the guardrail, namely the inner side.

Enfin, comme le montrent notamment les figures 8 et 9, le garde-corps 6 est équipé, dans sa partie inférieure, d'un élément 20 de profil en « U » qui est, lui aussi, dirigé vers le côté intérieur de ce garde-corps 6. L'élément 20 est une pièce métallique rapportée qui possède deux branches dirigées vers le haut 21 et 22, reliées par une partie horizontale 23 située à leur base.Finally, as shown in particular by Figures 8 and 9 the guardrail 6 is equipped in its lower part with a "U" profile element 20 which is also directed towards the inner side of this railing 6. The element 20 is a piece reported metal which has two branches directed upwards 21 and 22, connected by a horizontal portion 23 located at their base.

L'une des branches 21 dirigées vers le haut, orientée verticalement est fixée par exemple par soudage ou vissage, au niveau d'une attache inférieure (étrier 18) du garde-corps 6. L'autre branche 22, qui est libre, est ici une branche oblique s'écartant de la première branche 21.One of the branches 21 directed upwards, oriented vertically is fixed for example by welding or screwing, at a lower attachment (bracket 18) of the railing 6. The other branch 22, which is free, is here an oblique branch deviating from the first branch 21.

Le dessin illustre les étapes successives du montage du garde-corps 6 et du plancher 5 correspondant, montage qui est effectué depuis le niveau de plancher immédiatement inférieur.The drawing illustrates the successive steps of mounting the railing 6 and the corresponding floor 5, mounting that is performed from the floor level immediately below.

L'opérateur (non représenté) posté sur le plancher 5 de ce niveau inférieur saisit d'abord le garde-corps 6 et le fait pivoter « en l'air » (voir figures 1 et 2) de manière à l'incliner et à amener une attache supérieure, autrement dit l'un des crochets 16, en correspondance avec l'ouverture supérieure d'une douille 15 d'un montant 3. Le crochet 16 est ainsi positionné dans la douille 15, au niveau souhaité.The operator (not shown) posted on the floor 5 of this lower level first grabs the railing 6 and rotates it "in the air" (see Figures 1 and 2 ) so as to incline it and to bring an upper fastener, in other words one of the hooks 16, in correspondence with the upper opening of a bushing 15 of a post 3. The hook 16 is thus positioned in the bushing 15, at the desired level.

Ensuite, l'opérateur redresse le garde-corps 6, et il positionne le crochet 17 de l'autre extrémité du garde-corps 6 dans une douille 15 située au même niveau, mais sur un autre montant 3. A la fin de l'opération, le garde-corps 6 est redressé à l'horizontale, et son autre attache supérieure, autrement dit l'autre crochet 17, est introduite dans la douille 15 correspondante (voir figures 3 et 4, ainsi que la figure 6).Then, the operator straightens the railing 6, and he positions the hook 17 of the other end of the railing 6 in a socket 15 located at same level, but on another amount 3. At the end of the operation, the guardrail 6 is straightened horizontally, and its other upper fastener, in other words the other hook 17, is inserted into the sleeve 15 corresponding (see Figures 3 and 4 , as well as figure 6 ).

Dans une troisième étape, l'une des attaches inférieures à étrier 18 est engagée de part et d'autre d'une douille 15 située au même niveau, et la clavette 19 est enfoncée et bloquée pour solidariser l'étrier 18 avec la douille 15 (voir figures 5 et 7).In a third step, one of the lower caliper fasteners 18 is engaged on either side of a bushing 15 located at the same level, and the key 19 is depressed and locked to secure the stirrup 18 with the bushing 15. (see Figures 5 and 7 ).

Enfin, la même opération est répétée à l'autre extrémité du garde-corps 6, c'est-à-dire que l'autre étrier 18 est engagé sur la douille 15 située au même niveau mais sur l'autre montant 3, puis bloqué par enfoncement de la clavette 19 correspondante.Finally, the same operation is repeated at the other end of the railing 6, that is to say that the other stirrup 18 is engaged on the sleeve 15 located at the same level but on the other amount 3, then blocked by depression of the corresponding key 19.

Le garde-corps 6 se trouve alors fixé, par ses quatre attaches, sur la structure de l'échafaudage. Plus particulièrement, compte tenu de l'orientation de ses attaches, le garde-corps 6 est ainsi positionné de telle sorte que son plan vertical se situe à l'extérieur du plan des montants 3 de la structure d'échafaudage, libérant ainsi totalement l'espace situé entre ces montants 3.The guardrail 6 is then fixed, by its four fasteners, on the structure of the scaffolding. More particularly, given the orientation of its fasteners, the guardrail 6 is thus positioned so that its vertical plane is located outside the plane of the uprights 3 of the scaffolding structure, thus completely releasing the space between these amounts 3.

Une fois le garde-corps 6 monté, de la manière qui vient d'être décrite, le plancher 5 du niveau correspondant à ce garde-corps 6 peut être amené et accroché aux traverses 4 de la structure d'échafaudage (voir figure 8).Once the railing 6 mounted, in the manner just described, the floor 5 of the level corresponding to the railing 6 can be brought and hooked to the cross members 4 of the scaffolding structure (see figure 8 ).

Ce plancher 5 étant ainsi monté après mise en place préalable du garde-corps 6, donc à un niveau déjà sécurisé, la présence de l'élément 20 de profil en « U » rend impossible un mode opératoire inverse, qui consisterait à monter d'abord le plancher 5 et ensuite seulement le garde-corps 6. En effet, comme le montre la figure 10, les deux branches 21 et 22 de l'élément 20 reçoivent normalement entre elles un profilé longitudinal 24 qui borde le plancher 5 correspondant. Si le plancher 5 avec son profilé 24 était monté avant le garde-corps 6, ce dernier buterait par son élément 20 contre ledit profilé 24, lors d'une tentative de mise en place, empêchant ainsi le processus normal de montage du garde-corps 6.This floor 5 is thus mounted after prior establishment of the guardrail 6, so at an already secured level, the presence of the element 20 profile "U" makes it impossible to reverse procedure, which would consist of mounting d ' first floor 5 and then only the guardrail 6. Indeed, as shown in figure 10 the two branches 21 and 22 of the element 20 normally receive between them a longitudinal section 24 which borders the corresponding floor 5. If the floor 5 with its profile 24 was mounted before the railing 6, it would abut by its element 20 against said profile 24, during an attempt to set up, thus preventing the normal process of mounting the guardrail 6.

Enfin, si une plinthe 7 est prévue, celle-ci est mise en place dans l'espace libre ménagé, entre les montants 3, par le déport vers l'extérieur du plan du garde-corps 6.Finally, if a plinth 7 is provided, it is placed in the free space formed between the uprights 3, by the offset to the outside of the plane of the guardrail 6.

Si l'échafaudage doit être rehaussé, il est procédé de la même manière pour tous les niveaux de planchers supplémentaires, avec obligation à chaque fois de monter le garde-corps 6 avant le plancher 5. Bien entendu, lors du démontage de l'échafaudage selon un processus inverse, la configuration prévue oblige à démonter chaque plancher 5 avant de retirer le garde-corps 6 du même niveau, et non l'inverse, de sorte qu'aucun plancher 5 ne peut rester en place sans protection.If the scaffolding is to be raised, the same procedure is followed for all additional floor levels, each time requiring the guardrail 6 to be raised before the floor 5. Of course, when dismantling the scaffolding in a reverse process, the planned configuration requires to dismount each floor 5 before removing the railing 6 of the same level, and not the opposite, so that no floor 5 can remain in place without protection.

La figure 11 illustre une première variante, relative à la forme de l'élément 20. Celui-ci présente ici encore un profil en forme générale de « U », mais avec deux branches 21 et 22 de hauteurs très inégales, reliées à leur base par une partie 23 légèrement inclinée sur l'horizontale. La branche 22 est ici encore oblique, mais elle se rapproche de la première branche 21 au lieu de s'en écarter.The figure 11 illustrates a first variant, relating to the shape of the element 20. This again has a profile in the general form of "U", but with two branches 21 and 22 of very unequal heights, connected at their base by a part 23 slightly sloping on the horizontal. The branch 22 is here again oblique, but it approaches the first branch 21 instead of departing from it.

La figure 12 illustre une seconde variante, elle aussi relative à la forme de l'élément 20. Celui-ci présente ici encore un profil en forme générale de « U », mais arrondi et non pas anguleux, en particulier dans sa partie passant sous le profilé 24 de la bordure du plancher 5.The figure 12 illustrates a second variant, also relating to the shape of the element 20. This again has a profile in the general shape of "U", but rounded and not angular, especially in its part passing under the profile 24 from the edge of the floor 5.

Dans tous les cas, l'élément 20 présente une conformation évidée, pour normalement recevoir le profilé 24 qui forme la bordure longitudinale du plancher 5, tout en interdisant le montage du garde-corps 6 après la mise en place du plancher 5.In all cases, the element 20 has a recessed configuration, to normally receive the profile 24 which forms the longitudinal edge of the floor 5, while prohibiting the assembly of the railing 6 after the establishment of the floor 5.

Comme le montrent aussi les figures 10 à 12, la plinthe 7 est ici constituée par un profilé porté par la bordure longitudinale du garde-corps 6, mais des plinthes de forme autre, ou fixées différemment par exemple directement aux montants 3, sont aussi envisageables.As also shown by Figures 10 to 12 , skirting 7 is here constituted by a profile carried by the longitudinal edge of the guardrail 6, but skirting of other shape, or differently fixed for example directly to the uprights 3, are also conceivable.

Dans le même ordre d'idées on ne s'éloignerait pas du cadre de l'invention, telle que définie dans les revendications annexées :

  • par des modifications constructives de la structure du garde-corps, éventuellement même en supprimant les éléments de contreventement,
  • par une modification de la configuration des attaches du garde-corps,
  • en modifiant la forme de l'élément en « U » ;
  • en modifiant la position et le mode de fixation de cet élément sur le garde-corps, par exemple en fixant ledit élément en un point intermédiaire de la longueur du garde-corps (et non pas vers l'une de ses extrémités), et plus généralement en tout endroit du garde-corps se situant au niveau du plancher, du moment que ledit élément puisse être fixé,
  • en utilisant un tel garde-corps avec une structure d'échafaudage autre, comportant des douilles ou autres éléments récepteurs analogues de forme quelconque, ou encore des cadres de configuration quelconque, préfabriqués ou non, par exemple des cadres rectangulaires ou des cadres en « H »,
  • en appliquant l'invention à des structures d'échafaudage et/ou des planchers ne comportant pas de plinthes, ou comportant des plinthes intégrées aux garde-corps.
In the same vein, one would not depart from the scope of the invention, as defined in the appended claims:
  • by constructive modifications of the railing structure, possibly even by removing the bracing elements,
  • by a modification of the configuration of the fasteners of the railing,
  • by modifying the shape of the element in "U";
  • by modifying the position and the method of attachment of this element on the railing, for example by fixing said element at an intermediate point of the length of the railing (and not towards one of its ends), and more generally at any point of the guardrail located at the level of the floor, as long as said element can be fixed,
  • using such a railing with a scaffolding structure other, having sockets or other similar receiving elements of any shape, or any frames of any configuration, prefabricated or not, for example rectangular frames or frames "H""
  • by applying the invention to scaffolding structures and / or floors that do not have skirting boards, or skirting boards incorporated into the railings.

Claims (6)

  1. A scaffolding structure, in particular a facade scaffolding, formed of vertical elements especially in the form of superimposed frames (2) prefabricated or not, with mullions (3) and transoms (4), which are connected together by floors (5) situated at different levels, and also by permanent railings (6) provided at different floor levels, railings (6) being designed to be mounted from the floor level immediately lower at the floor level to be protected, characterized in that the permanent railings (6) include, in their lower part, at least one element (20) directed inwards, with reference to the mounted position of the railing (6), this element (20) taking place at the floor (5) height of the level to be protected, so that, if this floor (5) is already in place, the railing (6) cannot be installed anymore, and said element (20) having a recessed conformation to normally receive the longitudinal edge (24) of the corresponding floor (5).
  2. The scaffolding structure according to claim 1, characterized in that the or each element (20) directed inwards, provided in the lower part of the railings (6), is a "U" shaped profile part, two branches (21, 22) of which are directed upwards so as to normally receive therebetween a longitudinal profile (24) bordering the corresponding floor (5).
  3. The scaffolding structure according to claim 1 or 2, characterized in that the element (20) such as a "U" shaped profile part is provided in the region of at least one of the two lower attachments (18) of the railing (6), thus toward the ends of this railing (6).
  4. The scaffolding structure according to claim 3, characterized in that the element (20) such as a "U" shaped profile part is screwed or welded on a lower attachment of the railing (6), in particular on the bracket (18) of the attachment in the case of an attachment with bracket and wedge (19).
  5. The scaffolding structure according to claim 1 or 2, characterized in that the element (20) such as a "U" shaped profile part is provided at an intermediate point of the length of the railing (6), being rigidly fixed to a portion of this railing (6).
  6. A permanent scaffolding railing, the railing being designed to be mounted from the floor level immediately lower than the floor level to be protected, and this railing (6) being intended for a scaffolding structure according any of claims 1 to 5 , characterized in that it includes, in its lower part, at least one element (20) directed toward the inside of this railing (6) and provided to abut against the edge (24) of a floor (5) if the latter is installed before the railing (6), said element (20) having a recessed conformation to normally receive the longitudinal edge (24) of the corresponding floor (5).
EP20100174512 2009-09-01 2010-08-30 Scaffolding structure, in particular for façade scaffolding Active EP2299027B1 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
FR0955947A FR2949489B1 (en) 2009-09-01 2009-09-01 SCAFFOLDING STRUCTURE, IN PARTICULAR FACADE SCAFFOLDING

Publications (2)

Publication Number Publication Date
EP2299027A1 EP2299027A1 (en) 2011-03-23
EP2299027B1 true EP2299027B1 (en) 2014-07-02

Family

ID=42102066

Family Applications (1)

Application Number Title Priority Date Filing Date
EP20100174512 Active EP2299027B1 (en) 2009-09-01 2010-08-30 Scaffolding structure, in particular for façade scaffolding

Country Status (2)

Country Link
EP (1) EP2299027B1 (en)
FR (1) FR2949489B1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2976605B1 (en) * 2011-06-17 2019-04-12 Altrad Equipement SECURITY SCAFFOLD

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2516141B1 (en) 1981-11-10 1987-11-27 Philippe Robert METHOD OF ASSEMBLING A SCAFFOLDING AND ASSEMBLY DEVICE
FR2533610B1 (en) * 1982-09-23 1985-10-04 Somefran METHOD OF ASSEMBLING A SCAFFOLDING, BREATHING USED FOR THE IMPLEMENTATION OF THIS METHOD, AND SCAFFOLDING PROVIDED WITH SAID BRACKET
FR2743103B1 (en) 1995-12-27 1998-04-03 Hussor Erecta Sa SAFETY BODYWORK PANEL, PARTICULARLY FOR MULTIDIRECTIONAL SCAFFOLDING
JP2003247337A (en) * 2002-02-26 2003-09-05 Yoshiharu Miyoshi Fall preventive handrail device for prefabricated scaffolding and method for using the same
FR2887574B1 (en) * 2005-06-23 2009-01-16 Comabi Snc SAFELY ASSEMBLED SCAFFOLDING GUARD
FR2887907B1 (en) * 2005-06-30 2009-01-16 Comabi Sa PROVISIONAL GUARD FOR THE SAFETY ASSEMBLY OF SCAFFOLDS

Also Published As

Publication number Publication date
EP2299027A1 (en) 2011-03-23
FR2949489A1 (en) 2011-03-04
FR2949489B1 (en) 2011-09-02

Similar Documents

Publication Publication Date Title
FR3050749A1 (en) MODULE FOR REALIZING A ROTARY SITE STAIRCASE, ASSEMBLY COMPRISING AT LEAST ONE SUCH MODULE AND SITE STAIRCASE COMPRISING AT LEAST ONE SUCH ASSEMBLY
FR2934000A1 (en) Climbing protection device for masonry construction, has integration parts integrating respective posts or masts to masonry construction in vertical raised position in which posts or masts support guardrail element
FR2887574A1 (en) Balustrade for scaffolding of building, has articulated fixation finger cooperating with bush of vertical frame to permit pivoting of balustrade around horizontal axis while placing balustrade
EP2299027B1 (en) Scaffolding structure, in particular for façade scaffolding
FR2533610A1 (en) Method for installing a scaffold, bracing used for the implementation of this method and scaffold equipped with the said bracing.
FR2908804A1 (en) Fixed or rolling scaffolding guardrail, has operating handle articulated towards end of guardrail opposite to hook, where horizontal distance provided between inner edge of hooks is greater than distance between exterior of rod and post
FR2596794A1 (en) Improvements to guard-rails
FR2800768A1 (en) Building facade cantilever bracket assembly and fixing system esp for curtain walling uses solid plates sliding in metal framework members
EP0651112B1 (en) Modular railing with horizontal or inclined rails
FR2743103A1 (en) SECURITY GUARD PANEL, IN PARTICULAR FOR MULTIDIRECTIONAL SCAFFOLDING
FR2919009A1 (en) Parts assembling assembly for scaffolding level, has beam is connected to upright part along destination position, where assembly is arranged such that beam is connected to upright part in position lower than destination position
FR2949490A1 (en) Balustrade for use on facade scaffold in building, has fixation units oriented obliquely inward with respect to plane of balustrade in order to place balustrade, in mounted position, at outside of plane of posts of structure of scaffold
EP3901394A1 (en) Method for installing a temporary shoring tower
EP2706166B1 (en) Modular strutting tower for civil engineering and construction
EP3581735B1 (en) Railing and method of creating a security balustrade
EP2085537B1 (en) Method of securely installing and removing a rolling scaffold, secure guardrails used and scaffold obtained
EP0283416A2 (en) Security guard rail panel for scaffold
EP1686221A2 (en) Connecting device for parts of a scaffold
EP2492414B1 (en) Modular guardrail with adjustment device
FR2944305A1 (en) Balustrade for e.g. light tower hoist type scaffold, has inverted lower hook placed at lower part of panel, where inverted hook is positioned to be locked by cross-pieces that are fixed to nodes of posts at level of floor
BE851135A (en) BRACING FORMING RAILING OF A WORKING LEVEL OF A SCAFFOLDING
FR2516142A1 (en) Corner section for scaffolding - has single vertical support leg with angled bearing heel abutting against building
FR2820769A1 (en) Safety railing panel has lower and upper fixings at ends and intermediate support piece for temporary holding during mounting on scaffolding tubes
FR2934001A1 (en) Stake i.e. vertical stake, for safety guardrail, has arm including screw for tightening press with acroterion, where screw is provided with shroud at its end arranged between arms, and guard block made of elastomer is integrated to shroud
BE1013360A6 (en) Formwork support for a concrete staircase

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME RS

17P Request for examination filed

Effective date: 20110516

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

REG Reference to a national code

Ref country code: FR

Ref legal event code: CD

Owner name: TUBESCA-COMABI, FR

Effective date: 20140207

INTG Intention to grant announced

Effective date: 20140306

RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: TUBESCA-COMABI

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

Free format text: NOT ENGLISH

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 676026

Country of ref document: AT

Kind code of ref document: T

Effective date: 20140715

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

Free format text: LANGUAGE OF EP DOCUMENT: FRENCH

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602010017164

Country of ref document: DE

Effective date: 20140814

REG Reference to a national code

Ref country code: NL

Ref legal event code: T3

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 676026

Country of ref document: AT

Kind code of ref document: T

Effective date: 20140702

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG4D

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20141002

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20140702

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20140702

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20141103

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20141003

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20140702

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20140702

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20140702

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20141002

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20141102

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20140702

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20140702

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20140702

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20140702

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20140702

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 602010017164

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20140702

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20140702

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20140702

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20140702

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20140702

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20140702

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 602010017164

Country of ref document: DE

Effective date: 20150303

REG Reference to a national code

Ref country code: IE

Ref legal event code: MM4A

26N No opposition filed

Effective date: 20150407

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20141002

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20150303

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20141002

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20140830

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20140702

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20140702

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 7

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20140702

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20140830

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20100830

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20140702

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 8

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20140702

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 9

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20140702

P01 Opt-out of the competence of the unified patent court (upc) registered

Effective date: 20230509

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: NL

Payment date: 20230824

Year of fee payment: 14

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: CH

Payment date: 20230902

Year of fee payment: 14

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 20230811

Year of fee payment: 14

Ref country code: BE

Payment date: 20230824

Year of fee payment: 14