EP2021555B1 - Concrete beam - Google Patents

Concrete beam Download PDF

Info

Publication number
EP2021555B1
EP2021555B1 EP07718897.7A EP07718897A EP2021555B1 EP 2021555 B1 EP2021555 B1 EP 2021555B1 EP 07718897 A EP07718897 A EP 07718897A EP 2021555 B1 EP2021555 B1 EP 2021555B1
Authority
EP
European Patent Office
Prior art keywords
formations
structural
concrete
elements
formation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
EP07718897.7A
Other languages
German (de)
English (en)
French (fr)
Other versions
EP2021555A1 (en
EP2021555A4 (en
Inventor
Trevor Valaire
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Associated Valaire Pty Ltd
Original Assignee
Associated Valaire Pty Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from AU2006902631A external-priority patent/AU2006902631A0/en
Application filed by Associated Valaire Pty Ltd filed Critical Associated Valaire Pty Ltd
Publication of EP2021555A1 publication Critical patent/EP2021555A1/en
Publication of EP2021555A4 publication Critical patent/EP2021555A4/en
Application granted granted Critical
Publication of EP2021555B1 publication Critical patent/EP2021555B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/16Load-carrying floor structures wholly or partly cast or similarly formed in situ
    • E04B5/32Floor structures wholly cast in situ with or without form units or reinforcements
    • E04B5/36Floor structures wholly cast in situ with or without form units or reinforcements with form units as part of the floor
    • E04B5/38Floor structures wholly cast in situ with or without form units or reinforcements with form units as part of the floor with slab-shaped form units acting simultaneously as reinforcement; Form slabs with reinforcements extending laterally outside the element
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/16Load-carrying floor structures wholly or partly cast or similarly formed in situ
    • E04B5/17Floor structures partly formed in situ
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/16Load-carrying floor structures wholly or partly cast or similarly formed in situ
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/43Floor structures of extraordinary design; Features relating to the elastic stability; Floor structures specially designed for resting on columns only, e.g. mushroom floors
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • E04C3/20Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of concrete or other stone-like material, e.g. with reinforcements or tensioning members

Definitions

  • the present invention relates to structural engineering and more specifically to a structural member capable of use in the construction of structures such as concrete slabs and elements.
  • the invention further relates to methods of use of the structural member including its application in preparatory formwork and as an element in a composite structure including in layered concrete.
  • the invention also relates to structures which employ the structural member.
  • the invention further relates to lightweight structural members used in a variety of concrete structures.
  • Slab beam concrete constructions is widely used in civil and structural engineering.
  • the typical structure will comprise columns of a size dictated by applied such as dead loads and self weight and live loads and of a spacing dictated by loadings and slab spans.
  • Reinforced and pre stressed concrete floors for buildings are generally made in one of two methods.
  • the floors are either cast in situ using supporting temporary formwork, or are formed from pre-cast concrete planks supported on beams or walls which are then typically covered in a relatively thin in situ layer of concrete.
  • Most major construction work of concrete buildings typically relies on the first cast in situ method in which formwork is constructed as a temporary support for structural reinforcing steel over which is poured structural concrete.
  • Cast in situ reinforced concrete floors require extensive formwork, are relatively time consuming and labour intensive particularly with respect to the assembly and dismantling of formwork and the time required for the in situ concrete to achieve the required strength.
  • Existing construction systems using pre-cast elements have significant cost and other disadvantages including poor underside surface finish, ribbed profiles on the underside necessitating separate ceilings in many applications, difficulty of running services through and lack of flexibility of the type of structures which can be built. These disadvantages render in situ casting construction the preferred method of slab and floor construction.
  • the first system often known as "Hollow Core” relies on the use of extruded, pretensioned, concrete generally rectangular planks which include a series of cylindrical holes or voids extending longitudinally along the plank.
  • the planks are laid on the top of beams or walls and concrete is laid in situ over the top of the planks.
  • This construction system can span relatively long distances, but has the disadvantage that it typically has a very poor surface finish on the underside necessitating in many applications a false ceiling or cladding over the concrete finish.
  • the structural planks are typically produced in quite narrow strips requiring many joints and it is difficult to put services through the floor, as it is very difficult to access the voids.
  • the planks are relatively thick and the services typically have to be either hung on the underside, also necessitating false ceilings in some applications or the services may be hidden in thick topping concrete.
  • Ultrafloor employs pre-cast ribs in the shape of an inverted T and which are supported on walls or beams, and these ribs support a thin fibre cement panel such as a "Hardie panel” or the like extending between the ribs. A reinforced concrete floor is then laid over the ribs and panel.
  • This floor system produces a ribbed soffit which necessitates the provision of a cover ceiling in most applications, but it does have the advantage that it is relatively easy to run services through, prior to casting the in situ layer.
  • a further disadvantage of Ultrafloor is that it has a limited span both during concrete pouring and as a finished floor. Ultrafloor is limited in the types of floor structure which can be made from the basic panel and from the panel used in conjunction with the shell beam.
  • Transfloor Another prior art system of floor construction is known as "Transfloor” in which a relatively thin 50mm thick plank of concrete includes longitudinally extending steel reinforcing bars in triangular arrangements of groups of three, with one bar forming an 'apex' of the triangle spaced above the upper surface of the. concrete plank and joined to the other two bars with steel rods.
  • the planks are placed on top of walls or beams and void/void formers are placed on the concrete plank between the reinforcing and a concrete layer floor laid in situ on top of the plank.
  • void typically means an absence of concrete rather than an absence of material.
  • Void formers are most commonly formed by polystyrene blocks although other non cementitious materials such as pipe clay or the like can be used to form voids in concrete members.
  • This system has the disadvantage that it is limited to relatively short spans of about 7m or so. Also there is a requirement to support the floor with props and bearers at relatively close spacings of between 2 and 4m while insitu concrete is being poured and is gaining strength.
  • Any discussion of documents, acts, materials, devices, articles or the like which has been included in the present specification is solely for the purpose of providing a context for the present invention. It is not to be taken as an admission that any or all of these matters form part of the prior art base or were common general knowledge in the field relevant to the present invention as it existed before the priority date of each claim of this application.
  • WO-01/88297 discloses a process for producing a light alveolar plate which, by using the same type of sliding concrete molding machine with continuous production on prestress bench, intended to prefabricate a concrete slab of 120 cm wide by 3 cm thick, and with 4 or 5 vertical ribs, two of which being lateral.
  • the ribs are 4 cm thick with a small upper dovetail, and the two lateral ribs have an external face with the shape of the edge of the alveolar plate.
  • polystyrene arches with neckings at the upper angles are embedded between the ribs of the cast concrete, and up to the same height as the ribs, so that the concrete which will be cast in situ will adhere to the ribs thereby forming the alveolar plate itself, with the same height as the traditional substituted concrete floor slab and with the same qualities and applicable standards as the alveolar plate.
  • DE-538424 discloses a similar structural element.
  • the present invention seeks to provide an improved plank for use in forming concrete flooring which addresses and at least partially alleviates some of the problems of the prior art assemblies as discussed above.
  • the present invention provides a structural member capable of use in the construction of structures such as floor assemblies, concrete slabs and structural elements.
  • the invention further provides methods of uses for the structural member including its application in preparatory formwork and as an element in a composite structure including in situ layered concrete.
  • the invention also provides structures which employ lightweight structural concrete members.
  • load bearing pre formed structural element as claimed in claim 1.
  • the tapered recess has a wide portion at the upper surface of the base of the structural element and a narrow portion at or near the plateau of the formations.
  • the formations form longitudinal ribs along the length of the element.
  • each longitudinal rib is parallel to each other rib with even spacing therebetween.
  • the element may be tapered along its longitudinal axis such that the ribbed formations converge in the direction of one end and diverge in the direction of an opposite end.
  • each rib includes an outward taper such that the plateau of the formation is wider than a junction between the formation and the upper surface of the element.
  • the taper extends from the plateau of each formation at least part way towards the junction between the formation and the upper surface of the element.
  • the taper extends the full distance from the plateau to the upper surface of the base of element.
  • the taper is terminated short of the plateau.
  • there is provided a shoulder associated with the plateau which receives a cover over the recess thereby maintaining a void space in the element.
  • each formation has a generally dovetail geometry with a narrow portion at the junction between the upper surface of the element and the formation tapering out to a wide portion at the plateau.
  • each element when two elements having one formation are abutted the upper surfaces and adjacent walls of each element combine to define a void recess which receives either a void former or overlay concrete.
  • the overlay layer spans between the plateaus of each said formations closing said recess thereby forming voids in said slab.
  • the system is preferably used in the construction of a composite suspended beam and floor slab assembly.
  • the voids improve the structural performance of the element both during construction carrying wet concrete and in the permanent composite structure. They also provide through passages for services.
  • the structural elements are formed in a mould which includes a steel base which imparts a smooth high quality surface finish to the element soffit.
  • the voids reduce the weight of the element.
  • the structural geometry of the formations allow more efficient use of concrete in that the so formed composite has a large compression flange at the top of the formations imparting to the composite a high strength to weight ratio for a given span.
  • the elements may therefore be much thinner for a given span than a prior art conventional slab.
  • the side walls of the formations are generally planar and are inclined at an angle less than 90 degrees and around 40° to 70° to the upper surface of the element.
  • the structural element has a versatility allowing the voids to be filled with polystyrene, cement or concrete Alternatively the voids may be retained with empty spaces.
  • the base portion is preferably reinforced with fabric or steel rods and/or reinforcing fibres and may be pre -stressed respectively by pre tensioning or post- tensioning. Alternatively, the element may be non stressed.
  • the top of the formations receive and support a sheet of material.
  • the building slab elements may be supported on walls or transverse beams arranged to define a floor. Gaps between adjacent like elements are sealed with part of a composite layer. The void spaces in each element are sealed and an in situ layer is poured over the plateaus of each formation.
  • Figure 1 shows an end view of a pre-cast concrete element 1 comprising a base 2 having an underside surface 3 and upper surface 4.
  • Element 1 further comprises formations 5, 6 and 7 which define void spaces 8 and 9.
  • Void 8 is defined by upper surface 4 and side walls 10 and 11.
  • Void 9 is defined by upper surface 4 and side walls 12 and 13.
  • voids 8 and 9 are filled with polystyrene or similar lightweight material which maintains a lighter weight than an equivalent element with voids filled with concrete or cement.
  • Element 1 typically includes reinforcing (not shown) in base 2, typically reinforced with steel bars or prestressed reinforcement above which two or more polystyrene void formers 14 and 15 preferably in the shape of an isosceles trapezium are located.
  • Formations 5, 6 and 7 comprise ribs with longitudinal extent and whose width increases as the distance from surface 4 increases so that there is more material at the top of the formations 5, 6 and 7.
  • the embodiment of figure 1 shows a symmetrical intermediate formation 6 which is dove tail (or inverted trapezoidal) creating voids which are trapezoidal.
  • Increase in material at the top of the rib plateaus 16, 17 and 18 improves the performance of the element in bending in that it creates a compressive flange of higher capacity and which is more eccentric to the tensile reinforcement. This increase in bending capacity is in comparison to a prior art element having a rectangular formation were employed.
  • walls 11 and 12 of formation 6 for instance will be disposed at an angle to surface 4 of base 2 of other than 90 degrees.
  • Figure 1 shows an end view of the pre-cast concrete element 1 of figure 1 with corresponding numbering and incorporating an intermediate formation 6 and adjacent empty voids 8 to 9 with no void formers. The arrangement of figure 2 would typically be used as a spine beam.
  • Figure 3 shows an isometric view of the spine beam of Figure 2 with corresponding numbering.
  • Figure 4 shows a cross sectional view of a composite beam assembly 20 including an element 21 which is similar to element 1 of figure 1 .
  • Element 21 comprises formations 22, 23, 24 and 25 which define void spaces 26, 27 and 28. Void 26 is defined by upper surface 29 and side walls 30 and 31. Voids 27 and 28 are similarly defined.
  • voids 26, 27 and 28 are filled with polystyrene which maintains a lighter weight than an equivalent element with voids filled with concrete or cement.
  • Element 21 includes tensile reinforcing comprising a series of longitudinally extending reinforcing steel rods 32 which may, as required, be pretensioned, post-tensioned or unstressed depending on the application and the requirements for element 21 .
  • Element 21 includes three polystyrene void formers in respective voids 26, 27 and 28.
  • Formations 22, 23, 24 and 25 comprise ribs of longitudinal extent and whose width increases as the distance from surface 29 to respective plateaus 33, 34, 35 and 36 so there is more material at the top of the formations 22, 23, 24 and 25 .
  • the embodiment of figure 4 shows symmetrical intermediate formations 23 and 24 which are dove tail (or inverted trapezoidal) creating voids which are trapezoidal.
  • base 37 of element 21 is a sheet of mesh, loose reinforcement or fibre reinforced concrete 39 to provide resilience to handling of the element 21 and help resist cracking and breaking of the element.
  • element 21 would be manufactured in a mould or extruded.
  • a mould having a steel floor is used so that the underside or soffit 40 of base 37 remains smooth.
  • steel bars 32 will be pre-stressed along with an untensioned fabric 39.
  • An approximately 20mm to 80mm layer of concrete is poured into the base of the mould so as to cover the reinforcing steel bars 32.
  • Void formers are then put into position on the top of the base in voids 26, 27 and 28 and the remaining concrete is poured to bring the height of the rib formations ribs up to the top of the void formers. The concrete is then allowed to set before the composite is removed from the mould.
  • overlay layer 42 may be factory cast prior to site installation of the composite .
  • element 21 may be extruded through a die using a relatively stiff concrete mix. Extrusion is the preferred method where polystyrene void formers are not used, although either method may be used.
  • a plurality of concrete elements 21 are placed on top of beams or walls (not shown) and a layer of reinforcement 43 is placed on top of the elements 21 as required.
  • the element 21 is then covered with a relatively thin in situ layer of concrete 42. Because of the design of the elements 21 and in particular, the thickening of the ribs distal from the base 37, element 21 performs well in bending and can be much lighter than other known pre-formed elements. Thus, the system uses less concrete which reduces materials cost. Also, for a building of given height, the building will weigh less and this allows the columns and footings to be less extensive and consequently cheaper. Also as the floors are thinner, the space saved may be equivalent to one or more extra floors in a building.
  • Figure 5 shows a cross section of a composite beam assembly 50 including element 51 and an overlay layer 66 disposed over formation plateaus 53, 54 and 55 of formations 56, 57 and 58 which define voids 59 and 60.
  • Located and bearing on plateau 53 is a beam element 63 .
  • Located and bearing on plateau 55 is a second element beam 64.
  • the base 49 of the element 51 is relatively thin, it is possible to place reinforcing 67 inside the voids close to the base 49 of the resultant spine beam (element 51) to resist bending of the beam. It is also possible, to place reinforcement 65 at the top of the beam when concrete overlay layer 66 is poured in situ into the spine beam 51 and over adjacent elements 63 and 64.
  • the rib/formation shape of the elements may be varied.
  • the representations shown in figures 1-5 are of indefinite width and it will be appreciated that the elements may include more or less than the numbers of formations/ribs illustrated.
  • Figure 6 shows an abbreviated section of a flooring assembly including elements employed as form work prior to pouring of an overlay layer (not shown) but analogous to overlay layer 66 of figure 5 .
  • Banded beam flooring system 70 includes elements arranged for co operation with support columns 71, 72 , 73 and 74.
  • the arrangement of figure 6 provides formwork of elements which will provide a base for a composite slab and band beam system similar to the arrangement of figure 4 in the slab spanning direction and figure 5 in the band spanning direction.
  • System 70 comprises transverse elements 75 of a first span length determined according to structural design requirements. Elements 76 on the outside of columns 71 and 72 and columns 73 and 74 are abbreviated. Transverse elements 75 are supported at their ends on longitudinal spine beam elements 77 and 78. Elements 78 on the outside of columns have been abbreviated for clarity.
  • Figure 6 shows the assembly of panels prior to the placement of reinforcement along the spine beam elements 77 and 78 and over the entire assembly including elements 75 and 76 and the placement of a concrete layer over the entire assembly. In this arrangement, conventional formwork is used to form the drop panel 79.
  • Elements 77 and 78 may or may not incorporate void formers.
  • Columns 71 and 72 are either cast with the floor or are precast and are provided with shear keys and the spine beams 77 and 78 abut the columns.
  • a drop panel 79 formed by conventional formwork which connects the spine beams and adjacent slab beams to the column.
  • the in situ panel 79 produced with conventional formwork may be terminated at the underside plane of the precast panels 77 and 78 or may project below the general floor soffit.
  • soffit will betaken to mean an underside surface of a structural member.
  • Temporary supports 99 may be required as shown to support the whole floor assembly while concrete is being poured and until it acquires sufficient strength.
  • Figure 7 shows an enlarged abbreviated end view of a portion of a pre-cast concrete element 80 comprising a base 81 having an underside surface 82 and an upper surface 83. Extending from upper surface 83 are dove tail formations 84 and 85 which define void space 86. Wall 87 of formation 84 terminates at upper plateau 88 in shoulder 89. Likewise wall 90 of formation 85 terminates at upper plateau 91 in shoulder 92. A sheet 93 of fibre cement or the like can be rested on shoulders 89 and 92 spanning void space 86. This obviates the need to include a void former in void space 86. Formations 84 and 85 are generally in the shape of an inverted trapezium.
  • Figure 7a shows an enlarged abbreviated end view of a portion of a pre cast concrete element with alternative formation geometry including radiused walls.
  • Element 94 comprises a base 95 having an underside surface 96 and an upper surface 97. Extending from upper surface 97 is formation 98 including walls 98a and 98b which are substantially S shaped each with opposing radii of curvature.
  • FIG 8 shows an enlarged abbreviated end view of a portion of a pre-cast concrete element 100 with alternative formation geometry.
  • Element 100 comprises a base 101 having an underside surface 102 and an upper surface 103. Extending from upper surface 103 is formation 104 including walls 105 and 106. Walls 105 and 106 each have a first portion 108 disposed at an angle normal to the plane of surface 103 and a portion 107 at an angle to surface 103 other than normal.
  • Figure 9 shows an enlarged abbreviated end view of a portion of a pre-cast concrete element 110 with alternative formation geometry.
  • Element 110 comprises a base 111 having an underside surface 112 and an upper surface 113. Extending from upper surface 113 is formation 114 terminating in plateau 115 and including walls 116 and 117. Walls 116 and 117 are disposed at an angle less than normal to surface 113 and terminate in a perpendicular abbreviation 118.
  • Figure 10 shows the element of figure 9 with a radiused junction 119 between surface 113 and formation 114.
  • Figure 11 shows an enlarged end view of a portion of a pre-cast concrete element 120 with alternative formation 121 geometry including a radiused junction 122 between base 123 and formation 121.
  • FIG. 12 shows an enlarged end view of a portion of a pre-cast concrete element with alternative formation geometry including abutment shoulders and a radiused junction.
  • Element 130 comprises a base 131 having an underside surface 132 and an upper surface 133. Extending from upper surface 133 are dove tail formations 134 and 135 which define void space 136. Wall 137 of formation 134 terminates at upper plateau 138 in shoulder 139. Likewise wall 140 of formation 135 terminates at upper plateau 141 in shoulder 142. A sheet 143 of fibre cement or the like can be rested on shoulders 139 and 142 spanning void space 136. This obviates the need to include a void former in void space 136. Wall 137 terminates in a radiused portion at the junction of formation 134 and base 131. Likewise wall 140 of formation 135 terminates in a radiused portion 144 at the junction of formation 135 and base 131.
  • An advantage of the above elements is that where a floor is required to resist bending in a lateral as well as a longitudinal direction, and/or to locally enhance the elements shear capacity, it is possible to remove portions 143 of fibre reinforced cement formwork where present and simply fill the voids with concrete in those areas where such lateral resistance to bending and/or shear capacity, is required. Similarly it is possible, though not as convenient to remove the void formers of Figure 4 in order to allow the abovementioned local improvements of transverse bending and /or shear capacity to be implemented.
  • Figure 13 shows a cross sectional elevation of a composite slab assembly 150 including a structural element 151 and a reinforced overlay layer 152 and including an edge profile 153 on a formation 154 which transmits shear to an adjacent abutment member 155.
  • the arrangement of figure 13 is an example of one form of engagement between element 151 and an abutting support.
  • Element 151 includes dovetail formations 156 as described earlier defining voids 157.
  • Edge profile 153 of formation 154 opposes abutment 155 and is arranged to transmit shear forces between element 151 and abutment element 155.
  • Overlay layer 158 is laid over plateaus 159 of formations 154 and is preferably reinforced with a reinforcing steel 160.
  • Element 155 has its void formers terminated a short distance from its end to allow overlay in turn a shear connection with the edge profile 153 of Element 151.
  • a concrete layer 158 to be poured around the dovetail ribs 144 of element 155 and to thus create a shear connection between the overlay concrete 158 and the dovetail ribs 144 and in turn a shear connection is made between elements 155 and 151 as indicated by arrows 161 and 162.
  • Figure 14 shows element 155 rotated 90 degrees from its orientation in figure 13 .
  • Element 155 is incorporated with overlay layer 158 which forms a composite beam structure.
  • Layer 158 co operates with element 155 via dove tail formations 144 which define trapezoidal voids 147.
  • Void 147 includes walls 145 and 146 which receive shear forces transmitted by undercasting via overly layer 158 as shown by arrows 148 and 149. This structural effect is repeated in each void between formations 144.
  • Figure 15 shows a perspective view of a flooring assembly including an array of structural elements supported by columns according to one embodiment. Shown is a flooring system 170 including elements arranged for co operation with support columns 171, 172 , 173 and 174. The arrangement of figure 15 provides a formwork of elements which will provide a base for a composite slab similar to the arrangement of figures 4 and 5 .
  • System 170 comprises transverse elements 175 of a first span length determined according to structural design requirements. Elements 176 on the outside of columns 171 and 172 and columns 173 and 174 are abbreviated for clarity.
  • Transverse elements 175 are supported at their ends next to and with their soffits ( underside surface) in the same plane as the soffits of the longitudinal spine beam elements 177 and 178.
  • Elements 175 may be temporarily supported independently of the spine elements 177 and 178 or may be supported by temporarily connecting them to spine elements 177 and 178.
  • Figure 15 shows the assembly of panels prior to the placement of reinforcement along the spine beam elements 177 and 178 and over the entire assembly including elements 175 and 176 and the placement of a concrete layer over the entire assembly. In this arrangement, conventional formwork is used to form the drop panel 179. It should be noted that Elements 177 and 178 may or may not incorporate void formers.
  • the structure produced by this assembly of panels has a flat and planar soffit over the entire underside of the floor.
  • the in situ panel 179 produced with conventional formwork may be terminated at the underside plane of the precast panels 175, 176, 177 and 178 or may project below the general floor soffit.
  • Figure 16 shows a sectional elevation view of a column and composite slab flooring assembly of the type shown in perspective view Fig 15 taken perpendicular to the spine beams 177 and 178.
  • Assembly includes support columns 190 and 191 each supporting respective spine elements 192 and 193. Spanning therebetween are elements 194.
  • element 195 On opposite side of column 190 and extending from spine beam element 192 is element 195 abbreviated for clarity.
  • element 196 On opposite side of column 191 and extending from spine beam element 193 is element 196 abbreviated for clarity.
  • This arrangement shows the versatility and inter engagement of structural elements which on one hand may be used as a spine beam and on the other hand as transverse span beams. This also demonstrates how the elements can be arranged as formwork in advance of preparation of a composite structural slab.
  • Figure 17 shows with corresponding numbering for corresponding parts an enlarged sectional elevation view of the composite slab flooring assembly including structural elements and composite slab finish regime of figure 16 .
  • This view also shows overlay layer 197.
  • Void formers 187 have been terminated a short distance from the respective ends 185 and 186 of the panels 194 and 195 to allow the overlay concrete to flow around the dovetail ribs 188 and thus form a shear connection with the overlay concrete 197
  • Spine beam element 192 includes an end formation 198 having an outer profile 199 which co operates with element 194 to establish a shear connection therebetween.
  • Overlay layer 197 locks element 192 to element 194 and assists in transmission of loads.
  • Overlay layer 197 is in one embodiment supported by spine element 192 and covers the void formers or penetrates the voids (not shown) when the void former is absent in elements 194 and 195 thereby completing the layered composite floor structure.
  • Voids 189 of spine element 192 will receive concrete from overlay layer 197 but in a case where void formers are used, overlay layer will sit over (bridge) voids 189.
  • Figure 18 shows a perspective view of a flooring assembly 180 including an array of structural elements supported by columns.
  • Flooring assembly 180 includes transverse elements 240 arranged for co operation with support columns 181, 182 , 183 and 184.
  • the arrangement of figure 18 provides formwork for concrete to be supplied and a base for a composite slab similar to the arrangement of figure 15 .
  • Assembly 180 comprises transverse elements 240 of a first span length determined according to structural design requirements.
  • Elements 241 on the outside of columns 181 and 183 and elements 242 on the outside of columns 182 and 184 are abbreviated for clarity.
  • Elements 240 are supported at their ends by longitudinal elements 243 and 244 which are cast in situ on conventional formwork. Longitudinal beams 244 and 243 provide an abutment to receive elements 240, 241 and 242.
  • Figure 19 shows a sectional elevation view of a composite column slab flooring assembly of the type shown in perspective view Fig 18 .
  • Figure 19 shows according to an alternative embodiment, a sectional elevation view of a composite slab flooring assembly 200 including structural elements and composite slab finish regime about support columns. Shown are support columns 201 and 202 each supporting respective cast in situ spine beams 203 and 204 which are formed with conventional formwork. Spanning between columns 201 and 202 the supply are elements 205. On opposite side of column 201 and extending from spine beam element 203 is element 206 abbreviated for clarity. On opposite sides of column 202 and extending from spine beam element 204 is element 207 abbreviated for clarity.
  • Figure 20 shows with corresponding numbering an enlarged sectional elevation view of the composite slab flooring assembly 200 of Fig 19 including structural elements 205 206 and 203 and composite slab finish regime of figure 19 .
  • Figure 21 shows a sectional elevation view of a completed composite column slab flooring assembly 210 of the type shown in the perspective view of Figure 6 , when a section is taken through spine beams 77 and 78.
  • Composite slab flooring assembly 210 includes structural elements and composite slab retained about support columns.
  • Banded beam flooring system 210 shows two columns 211 and 212 with drop panels arranged for co operation with the support columns.
  • Flooring system 210 includes transverse elements 215 of a first span length determined according to structural design requirements. Elements 216 on the outside of columns 211 and elements 217 outside column 212 are abbreviated for clarity. Transverse elements 215 are supported at their ends on longitudinal beam elements 213 and 214.
  • Overlay layer 218 is placed over element 215 and beam elements 213 and 214 to complete the floor slab composite.
  • Figure 22 shows an enlarged sectional elevation view of the composite slab flooring assembly 210 of figure 21 with corresponding numbering .
  • Figure 23 shows a cross sectional view of a shear junction 220 between a composite slab assembly 221 and support wall/ column 222.
  • Column includes a recess 223 which provides a key in lock for shear transmission at the junction 220.
  • Composite assembly 221 includes structural element 224 having a base 225 and extending therefrom formations 226 defining voids 227.
  • a reinforcing ferrule 235 is embedded in column/wall 222 and engages reinforcing steel 228 which is embedded in overlay layer 229 which lies over plateaus 230.
  • Overlay layer 229 also fills recess 223 and gap 232 between recess 223 and outer profile 233 of formation 234. The co operation between profile 233 and recess 223 when gap 232 is filled in with concrete from overlay layer 229 results in transmission of shear between precast members 224 and column 222 as indicated by arrows 235 and 236.
  • Figure 24 shows a sectional view of a shear junction 250 between a composite slab assembly 251 and support wall/ column 252.
  • Column includes a recess 253 which provides a key in lock for shear transmission at the junction 250.
  • the void formers of composite assembly 251 are terminated a short distance from the end to facilitate the undercasting of concrete around the ribs 256 of assembly 251 to facilitate the transmission of shear in a manner alike to that demonstrated in figures 13 and 14 .
  • Composite assembly 251 includes structural element 254 having a base 255 and extending therefrom formations 256 defining voids 257.
  • a reinforcing ferrule 258 is embedded in column/wall 252 and engages reinforcing steel 259 which is embedded in overlay layer 260 which lies over plateaus 261.
  • Overlay layer 260 also fills recess 253 and gap 262 between recess 253 and the void around the outer profile 254 at the end of element 251 and outer profile of formation 263.
  • the co operation between recess 253 and profile formation 263 when gap 262 is filled in with concrete from overlay layer 260 results in transmission of shear between pre cast members 254 and column 252 as indicated by arrows 264 and 265.
  • the versatile use of the structural elements described above provides distinct advantages over existing pre- formed concrete elements .
  • the first advantage is that it is relatively easy to put services through the floor in voids between the formations / ribs of the elements.
  • the elements can be formed in a mould having a steel base which allows a high quality finish to the soffit of the element.
  • the provision of the voids reduces the weight of the element and the shape of the formations/ ribs provides more concrete at the upper reaches of the composite thereby providing a large compression flange at the top of the ribs where it is required which allows the elements to be much thinner for a given span.
  • the void formers may be removed to allow overlay concrete to flow around ( undercast) the dovetailed formations and engage them for shear connection. This allows these units to be readily joined to adjacent structural elements with in situ concrete producing both neat appearance and a joint which is readily fire rated as opposed to the external steel connections often employed which need to be separately fire protected.
  • the structural elements which form the composite floor slab have the capacity for long span without intermediate support both during construction when supporting wet concrete and when integral with the completed composite structure.
  • Element dimensions including depth, rib shape, rib spacing, panel width, and the plan shape of the panel may be varied according to design requirements. For instance, wide panels are not restricted by fixed extrusion equipment allowing quick erection of floors with fewer joints.
  • the elements may be tapered relative to their longitudinal axis, for instance in a case where the elements form a horizontal radiused corner. Reinforcement in both the tensile and compression regions may be varied according to design requirements. No extrusion tools are needed to fabricate panels and the formation/ rib shape and height is largely determined by the void former shape and size which may be readily changed.
  • the elements may be fabricated as plain reinforced, pre tensioned reinforced or post tensioned reinforced members allowing for flexibility of manufacture dictated by design requirements. Since the elements are lightweight pre cast elements, this allows economic transport and efficient lift by crane.
  • Each element has a smooth flat soffit over whole panel width which can be treated as a final finish with no mandatory need for separate suspended ceilings are claddings.
  • the flat soffit combined with shallow structural depth and lack of ceiling space realizes economic operation of air conditioning with no wasted "dead air" between ribs or in ceiling spaces.
  • a further advantage of the element is the access to voids during construction allowing the installation of services in the void areas and through the relatively thin base slab of the composite.
  • the dovetail formations with void blockouts removed provide shear connections to adjacent elements which are both neat, easily made and fire resistant as opposed to the conventional methods of other pre cast systems which either require bulky expensive and unsightly corbels or exposed steelwork which requires fire protection.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Building Environments (AREA)
  • Rod-Shaped Construction Members (AREA)
  • Floor Finish (AREA)
EP07718897.7A 2006-05-17 2007-05-16 Concrete beam Active EP2021555B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
AU2006902631A AU2006902631A0 (en) 2006-05-17 Preformed concrete plank and related construction method
PCT/AU2007/000651 WO2007131284A1 (en) 2006-05-17 2007-05-16 Structural element and methods of use thereof

Publications (3)

Publication Number Publication Date
EP2021555A1 EP2021555A1 (en) 2009-02-11
EP2021555A4 EP2021555A4 (en) 2012-01-18
EP2021555B1 true EP2021555B1 (en) 2021-04-21

Family

ID=38693452

Family Applications (1)

Application Number Title Priority Date Filing Date
EP07718897.7A Active EP2021555B1 (en) 2006-05-17 2007-05-16 Concrete beam

Country Status (7)

Country Link
US (1) US20100024332A1 (ru)
EP (1) EP2021555B1 (ru)
KR (1) KR20090013830A (ru)
AU (1) AU2007250534A1 (ru)
CA (1) CA2652410A1 (ru)
RU (1) RU2418917C2 (ru)
WO (1) WO2007131284A1 (ru)

Families Citing this family (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102016195B (zh) * 2008-02-18 2012-11-21 八路建设技术株式会社 栅格型托板结构及其建造方法
CN102312506A (zh) * 2010-06-29 2012-01-11 湖南华廷筑邦建材有限公司 网肋板用预制板单元
CN102312498A (zh) * 2010-06-29 2012-01-11 湖南华廷筑邦建材有限公司 网肋板用预制板单元
KR101012321B1 (ko) * 2010-11-15 2011-02-09 정도건설 주식회사 건축물 피씨화 시공용 아이엠티 슬래브
FR2973407B1 (fr) * 2011-03-30 2014-02-14 Capremib Plaque mince en beton fibre comportant des moyens de liaison avec une piece en beton, et element de construction comportant une telle plaque mince
KR101285487B1 (ko) * 2011-06-07 2013-07-12 한국건설기술연구원 비모듈 대응성 및 수평 전단 성능 향상을 위한 중공슬래브 및 이의 시공 방법
RU2495204C1 (ru) * 2012-04-06 2013-10-10 Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Уральский государственный университет путей сообщения" (УрГУПС) Плоское сборно-монолитное перекрытие
KR101370930B1 (ko) * 2012-04-18 2014-03-07 삼표건설 주식회사 구조물용 휨부재 및 이의 제조방법
EA026932B1 (ru) * 2012-07-12 2017-06-30 Республиканское Унитарное Предприятие По Инженерным Изысканиям, Проектированию Автомобильных Дорог, Аэродромов И Искусственных Сооружений На Них "Белгипродор" Составная сборно-монолитная железобетонная конструкция, сборный элемент для составной сборно-монолитной железобетонной конструкции, способ изготовления сборного элемента (варианты) и эластичный вкладыш
CN103541478B (zh) * 2013-09-24 2015-11-25 沈阳建筑大学 格构式叠合梁与板及其施工方法
CN103572874A (zh) * 2013-11-21 2014-02-12 西南科技大学 钢框架房屋的钢筋混凝土叠合楼板的建造方法
WO2016177979A1 (fr) * 2015-05-06 2016-11-10 Masurel Augustin Panneau de coffrage perdu, assemblage de tels panneaux et procede de realisation de dalle pour plancher en beton
CN106381951B (zh) * 2016-10-21 2019-03-26 王本淼 一种装配式建筑空腔楼板
US10106972B1 (en) * 2017-03-30 2018-10-23 Nandy Sarda Precast concrete building elements and assemblies thereof, and related methods
US10260224B1 (en) * 2017-12-29 2019-04-16 Mohammad Omar A. Jazzar Simplified precast concrete system with rapid assembly formwork
US10094101B1 (en) * 2017-12-29 2018-10-09 Mohammad Omar A. Jazzar Precast concrete system with rapid assembly formwork
PT3486392T (pt) * 2018-03-12 2021-11-17 Elastic Potential S L Elemento de piso pré-fabricado, estrutura compreendendo elementos de piso pré-fabricados e instalação para obter o elemento de piso pré-fabricado
CN210828440U (zh) * 2019-09-29 2020-06-23 丰和营造集团股份有限公司 一种建筑物到期前混凝土楼层加固结构
CN111962862B (zh) * 2020-08-19 2021-12-17 苏州建鑫建设集团有限公司 一种防止叠合板与后浇带基板错台结构及施工方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2142579A1 (ru) * 1971-06-21 1973-02-02 Areco
EP1350898A1 (en) * 2000-05-16 2003-10-08 Jaime Enrique Jimenez Sanchez Process for fabricating in situ a light alveolar plate, plate thus obtained and its application to the construction of houses
US6817150B1 (en) * 2003-03-20 2004-11-16 Patrick E. Boeshart Form system for poured concrete

Family Cites Families (30)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US505659A (en) * 1893-09-26 Ernest homan
DE538424C (de) * 1931-11-13 Oskar Arfeller Form zur Herstellung von Gipsrippendielen
US754783A (en) * 1902-11-29 1904-03-15 Gustav Liebau Fireproof construction.
US867251A (en) * 1906-09-17 1907-10-01 Lewis K Davis Building construction.
US1093653A (en) * 1912-02-20 1914-04-21 Berger Mfg Co Base for composition floors.
US1345156A (en) * 1919-02-17 1920-06-29 Flynn Dennis John Cementitious structure
US1508050A (en) * 1922-12-02 1924-09-09 Hugh C Carroll Metal lath
US1792491A (en) * 1923-02-06 1931-02-17 Goldsmith Metal Lath Company Structural element
US1768181A (en) * 1926-10-28 1930-06-24 Halbert E White Building material
US2017832A (en) * 1933-01-13 1935-10-15 Budd Edward G Mfg Co Flooring structure
US2270114A (en) * 1939-04-28 1942-01-13 Interlox Structures Ltd Shuttering board
US2579050A (en) * 1948-06-07 1951-12-18 Stark Ceramics Inc Enameling of concrete materials
US3496691A (en) * 1968-08-02 1970-02-24 Bethlehem Steel Corp Concrete forms
US3967426A (en) * 1972-05-08 1976-07-06 Epic Metals Corporation Reinforced composite slab assembly
DE2225344A1 (de) * 1972-05-25 1973-12-06 Siegfried Gutmann Fertigteildecke
DE2403364A1 (de) * 1974-01-24 1975-08-07 Kunz Alfred & Co Fertigteildecke
CA1012376A (en) * 1974-12-30 1977-06-21 Westeel-Rosco Limited Composite structural assembly
US4120131A (en) * 1976-09-03 1978-10-17 Carroll Research, Inc. Building structure
US4630414A (en) * 1980-09-17 1986-12-23 Ting Raymond M L Cellular steel decking
JPH06322923A (ja) * 1993-05-14 1994-11-22 Inax Corp 大型タイル,石材および該タイル等を用いたpc版
AUPM780694A0 (en) * 1994-09-01 1994-09-22 Broken Hill Proprietary Company Limited, The A composite beam
DE19605142C1 (de) * 1996-02-13 1999-10-14 Schlueter Systems Gmbh Fußbodenverbundkörper
US6194224B1 (en) * 1998-07-27 2001-02-27 Avitar, Inc. Diagnostic membrane containing fatty acid sarcosinate surfactant for testing oral fluid
US6272749B1 (en) * 1999-11-15 2001-08-14 Lite-Form International Cast-in-place concrete deck system
US20010045071A1 (en) * 2000-04-19 2001-11-29 Budge Paul William Concrete composite non-meshed wall finishing system over key lock grid substrated
US6578343B1 (en) * 2001-11-12 2003-06-17 Pipe Service, Inc. Reinforced concrete deck structure for bridges and method of making same
US6631599B1 (en) * 2002-04-01 2003-10-14 Fukuvi Usa, Inc. Precast panel insert and attachments thereto
US20090049778A1 (en) * 2004-12-03 2009-02-26 Bluescope Steel Limited Wall construction
US7810293B2 (en) * 2006-08-15 2010-10-12 Gibbar James H Multiple layer polymer foam and concrete system for forming concrete walls, panels, floors, and decks
ITVA20070053A1 (it) * 2007-06-19 2008-12-20 Plastedil Sa Manufatto composito per la costruzione di solai

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2142579A1 (ru) * 1971-06-21 1973-02-02 Areco
EP1350898A1 (en) * 2000-05-16 2003-10-08 Jaime Enrique Jimenez Sanchez Process for fabricating in situ a light alveolar plate, plate thus obtained and its application to the construction of houses
US6817150B1 (en) * 2003-03-20 2004-11-16 Patrick E. Boeshart Form system for poured concrete

Also Published As

Publication number Publication date
AU2007250534A1 (en) 2007-11-22
US20100024332A1 (en) 2010-02-04
CA2652410A1 (en) 2007-11-22
WO2007131284A1 (en) 2007-11-22
EP2021555A1 (en) 2009-02-11
KR20090013830A (ko) 2009-02-05
EP2021555A4 (en) 2012-01-18
RU2418917C2 (ru) 2011-05-20
RU2008149771A (ru) 2010-06-27

Similar Documents

Publication Publication Date Title
EP2021555B1 (en) Concrete beam
US5678378A (en) Joist for use in a composite building system
US6009677A (en) Building panels for use in the construction of buildings
WO2011021151A1 (en) Method and system for in-situ construction of civil structures
CN103797197A (zh) 预铸整体式墙与楼板的建筑结构
CN107905426B (zh) 一种双向空心叠合楼板的构造方法
KR20060127632A (ko) 멀티리브형 프리캐스트 콘크리트 패널을 이용한 슬래브구조체
EP0122268A1 (en) Structural members
US5146726A (en) Composite building system and method of manufacturing same and components therefor
CN111456227A (zh) 一种装配板构式建筑及其施工方法
KR200178874Y1 (ko) 조립식 pc콘크리트 벽체판넬
WO2016086948A1 (en) The modified hollow core slabs
AU2012247042B2 (en) Structural Elements and Methods of Use Therefore
EP0616091A1 (en) Cement blocks for masonry walls to buildings
CN220768613U (zh) 免支模构造柱、免支模圈梁与墙体结构
EP3719229B1 (en) Concrete floor panel, method of production of such panel and floor made of this panel
CN209760549U (zh) 单向密肋夹心自保温复合楼板
US20090064615A1 (en) Building Element and a Building Structure Comprising the Building Element
CN218541038U (zh) 一体化施工的柔性连接拼装蒸压加气混凝土外墙大板系统
CN217537490U (zh) 夹心保温楼板
RU2184816C1 (ru) Сборно-монолитный железобетонный каркас многоэтажного здания "казань-1000"
CN114790790A (zh) 一种薄壁钢管束-混凝土叠合楼板的构造及组装方法
JPH04144B2 (ru)
JPH0776901A (ja) 中空合成構造板およびその製造方法
KR960006904Y1 (ko) 복합 철골·프리캐스트 콘크리트

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20081216

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC MT NL PL PT RO SE SI SK TR

AX Request for extension of the european patent

Extension state: AL BA HR MK RS

A4 Supplementary search report drawn up and despatched

Effective date: 20111220

RIC1 Information provided on ipc code assigned before grant

Ipc: E04C 3/20 20060101ALI20111214BHEP

Ipc: E04B 5/16 20060101ALI20111214BHEP

Ipc: E04B 5/17 20060101AFI20111214BHEP

DAX Request for extension of the european patent (deleted)
17Q First examination report despatched

Effective date: 20131128

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: EXAMINATION IS IN PROGRESS

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

INTG Intention to grant announced

Effective date: 20201104

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE PATENT HAS BEEN GRANTED

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC MT NL PL PT RO SE SI SK TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602007061069

Country of ref document: DE

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 1384782

Country of ref document: AT

Kind code of ref document: T

Effective date: 20210515

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG9D

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 1384782

Country of ref document: AT

Kind code of ref document: T

Effective date: 20210421

REG Reference to a national code

Ref country code: NL

Ref legal event code: MP

Effective date: 20210421

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210421

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210421

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210421

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210421

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210721

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210823

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210421

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210421

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210421

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210421

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210821

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210722

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602007061069

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210421

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210421

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210421

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210421

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210421

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210421

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210531

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210516

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210531

REG Reference to a national code

Ref country code: BE

Ref legal event code: MM

Effective date: 20210531

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed

Effective date: 20220124

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210516

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210821

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210421

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210531

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20070516

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210421

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 20230530

Year of fee payment: 17

Ref country code: DE

Payment date: 20230530

Year of fee payment: 17

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20230524

Year of fee payment: 17