EP2007914B1 - Rohr aus kohlenstoffarmem legierungsstahl mit ultrahoher festigkeit und hervorragender zähigkeit bei niedriger temperatur und herstellungsverfahren dafür - Google Patents

Rohr aus kohlenstoffarmem legierungsstahl mit ultrahoher festigkeit und hervorragender zähigkeit bei niedriger temperatur und herstellungsverfahren dafür Download PDF

Info

Publication number
EP2007914B1
EP2007914B1 EP07734171.7A EP07734171A EP2007914B1 EP 2007914 B1 EP2007914 B1 EP 2007914B1 EP 07734171 A EP07734171 A EP 07734171A EP 2007914 B1 EP2007914 B1 EP 2007914B1
Authority
EP
European Patent Office
Prior art keywords
steel
steel tube
tubing
tube
ductile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
EP07734171.7A
Other languages
English (en)
French (fr)
Other versions
EP2007914A2 (de
Inventor
Edgardo Oscar Lopez
Eduardo Altschuler
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tenaris Connections BV
Original Assignee
Tenaris Connections BV
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tenaris Connections BV filed Critical Tenaris Connections BV
Publication of EP2007914A2 publication Critical patent/EP2007914A2/de
Application granted granted Critical
Publication of EP2007914B1 publication Critical patent/EP2007914B1/de
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D8/00Modifying the physical properties by deformation combined with, or followed by, heat treatment
    • C21D8/10Modifying the physical properties by deformation combined with, or followed by, heat treatment during manufacturing of tubular bodies
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/18Ferrous alloys, e.g. steel alloys containing chromium
    • C22C38/40Ferrous alloys, e.g. steel alloys containing chromium with nickel
    • C22C38/44Ferrous alloys, e.g. steel alloys containing chromium with nickel with molybdenum or tungsten
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D8/00Modifying the physical properties by deformation combined with, or followed by, heat treatment
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D9/00Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor
    • C21D9/08Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor for tubular bodies or pipes
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D9/00Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor
    • C21D9/50Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor for welded joints
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/02Ferrous alloys, e.g. steel alloys containing silicon
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/04Ferrous alloys, e.g. steel alloys containing manganese
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/06Ferrous alloys, e.g. steel alloys containing aluminium
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/18Ferrous alloys, e.g. steel alloys containing chromium
    • C22C38/20Ferrous alloys, e.g. steel alloys containing chromium with copper
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/18Ferrous alloys, e.g. steel alloys containing chromium
    • C22C38/22Ferrous alloys, e.g. steel alloys containing chromium with molybdenum or tungsten
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/18Ferrous alloys, e.g. steel alloys containing chromium
    • C22C38/24Ferrous alloys, e.g. steel alloys containing chromium with vanadium
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/18Ferrous alloys, e.g. steel alloys containing chromium
    • C22C38/28Ferrous alloys, e.g. steel alloys containing chromium with titanium or zirconium

Definitions

  • the present invention relates to low carbon alloy steel tubes having ultra high strength and excellent toughness at low temperature and also to a method of manufacturing such a steel tube.
  • the steel tube is particularly suitable for making components for containers for automotive restraint systems, an example of which is an automotive airbag inflator.
  • Japanese Publication No. 10-140249 [Application date Nov. 5, 1996] and Japanese Publication No. 10-140283 [Application date Nov. 12, 1996 ] illustrate in general terms steel chemistry considered useful for an automotive airbag inflator. These documents mention as a final condition the absence of heat treatment, a stress relieving, and a normalizing or a quenching and tempering. These publications do not mention the possibility of just a quenching as a heat treatment step. No mechanical properties are mentioned in the claims. In the various examples, only in example #21 is the steel quenched and tempered, but the reported UTS is only 686 MPa (99 ksi).
  • Japanese Publication No. 2001-49343 [Application date Oct. 8, 1999 ] is said to address only steels for use in making electric-resistance-welded tubes (the ERW process).
  • the claims specify various aspects of the ERW process and an optional heat treatment for a normalizing or quench and temper, an optional ulterior cold drawing, an optional ulterior heat treatment (normalizing or quench and temper).
  • This document addresses only two different, very general steel chemistry, one being a low carbon steel, the other noting common limits in various alloying elements. This document does not suggest the possibility of just a quenching heat treatment.
  • Various examples are given for a quench and temper material, but mechanical properties obtained are relatively low. The maximum result achieved is 852 MPa (123 ksi) in the quench and temper test #18.
  • Patent Publication US20020033591A1 broadly suggests the possibility of quenching without tempering
  • claims 6 and 7 do not mention the necessity of quenching in order to achieve the mechanical properties claimed and instead these claims require at least two heat treatments.
  • WO-A2005/035 800 relates to a steel requiring Ti and final tempering for achieving a ductile-to-brittle transition temperature below - 60°C.
  • Airbag inflators for vehicle occupant restraint systems are required to meet strict structural and functional standards. Therefore, strict procedures and tolerances are imposed on the manufacturing process. While field experience indicates that the industry has been successful in meeting past structural and functional standards, improved and/or new properties are necessary to satisfy the evolving requirements, while at the same time a continuous reduction in the manufacturing costs is also important.
  • Airbags or supplemental restraint systems are an important safety feature in many of today's vehicles.
  • air bag systems were of the type employing explosive chemicals, but they are expensive, and due to environmental and recycling problems, in recent years, a new type of inflator has been developed using an accumulator made of a steel tube filled with argon gas or the like, and this type is increasingly being used.
  • the above-mentioned accumulator is a container which at normal times maintains the gas or the like at a high pressure which is blown into an airbag at the time of the collision of an automobile, in a single or multiple stage burst. Accordingly, a steel tube used as such an accumulator is to receive a stress at a high strain rate in an extremely short period of time. Therefore, compared with a simple structure such as an ordinary pressure cylinder, the above-described steel tube is required to have superior dimensional accuracy, excellent workability, and weldability, and above all must have high strength, toughness, and excellent resistance to bursting. Dimensional accuracy also is important to ensure a very precise volume of gas will blow into the airbag.
  • Cold forming properties are very important in tubular members used to manufacture accumulators since they are formed to final shape after the tube is manufactured. Different shapes depending on the vessel configuration shall be obtained by cold forming. It is crucial to obtain pressure vessels without cracks and superficial defects after cold forming. Moreover, it is also vital to have very good toughness even at low temperatures after cold forming.
  • the steels disclosed herein have very good weldability, and do not require, for air bag accumulator applications, either a preheating prior to welding, or a post weld heat treatment.
  • the carbon equivalent, as defined by the formula, Ceq % C + % Mn / 6 + % Cr + % Mo + % V / 5 + % Ni + % Cu / 15 should be less than about 0.63% in order to obtain the required weldability. As Ceq diminishes, weldability improves.
  • the carbon equivalent as defined above should be less than about 0.60%, preferably less than about 0.56%, and most preferably less than about 0.52%, or even less than about 0.48%, in order to better guarantee weldability.
  • a cold-drawn tube made according to the present invention is cut to length and then cold formed using different known technologies (such as crimping, swaging, or the like) in order to obtain the desired shape.
  • a welded tube could be used.
  • an end cap and a diffuser are welded to each end of the container by any suitable technology such as friction welding, gas tungsten arc welding or laser welding.
  • the inflators are tested to assure that they retain their structural integrity during airbag deployment.
  • One of such tests is the so-called burst test. This is a destructive-type test in which a canister is subjected to internal pressures significantly higher than those expected during normal operational use, i.e., airbag deployment. In this test, the inflator is subjected to increasing internal pressures until rupture occurs.
  • ductile fracture occurs through different alternative ways: ductile fracture, brittle fracture, and sometimes a combination of these two modes. It has been observed that in ductile fracture an outturned rupture exemplified by an opened bulge (such as would be exhibited by a bursting bubble) occurs. The ruptured surface is inclined approximately 45 degrees with respect to the tube outer surface, and is localized within a subject area. In a brittle fracture, on the other hand, a non-arresting longitudinal crack along the length of the inflator is exhibited, which is indicative of a brittle zone in the material. In this case, the fracture surface is normal to the tube outer surface. These two modes of fracture have distinctive surfaces when observed under a scanning electron microscope--dimples are characteristic of ductile fracture, while cleavage is an indication of brittleness.
  • the present invention first relates to certain novel low carbon alloy steels suitable for cold forming having more than high tensile strength (UTS (145 ksi) 1000 MPa minimum) and preferably ultra high tensile strength (UTS (160 ksi) 1103 MPa minimum and possibly (175 ksi or 220 ksi) 1207 MPa or 1518 MPa and, consequently, a very high burst pressure.
  • the steel has excellent toughness at low temperature, with guaranteed ductile behavior at -60 °C., i.e., a ductile-to-brittle transition temperature (DBTT) below -60 °C., and possibly as low as -100 °C.
  • DBTT ductile-to-brittle transition temperature
  • the present invention also relates to a process of manufacturing such a steel tube which essentially comprises a novel rapid induction austenizing/high speed quench/no temper technique.
  • a novel rapid induction austenizing/high speed quench/no temper technique there is an extremely rapid induction austenizing with an ultra fast water quenching step that eliminates any tempering step, so as to create a low carbon alloy steel tube that also is suitable for cold forming having ultra high tensile strength (UTS (145 ksi) 1000 MPa minimum and up to (220 ksi), 1518 MPa) and, consequently, a very high burst pressure.
  • UTS ultra high tensile strength
  • the steel has excellent toughness at low temperature, with guaranteed ductile behavior at -60 °C, i.e., a ductile-to-brittle transition temperature (DBTT) that is below -60° C, and possibly even as low as -100 °C.
  • DBTT ductile-to-brittle transition temperature
  • the material of the present invention has particular utility in components for containers for automotive restraint system components, an example of which is an automotive airbag inflator.
  • the chemistry used to create each of the steels disclosed herein is novel, hereafter will be identified as Steel A, Steel B and Steel D, with the compositions for each being summarized: in Examples on page 18, 19 and 20.
  • the present invention relates to steel tubing to be used for stored gas inflator pressure vessels. More particularly, the present invention relates to a low carbon ultra high strength steel grade for seamless pressure vessel applications with guaranteed ductile behavior at -60 °C., i.e., a ductile-to-brittle transition temperature below -60 °C., and possibly even as low as -100 °.
  • the present invention relates to a chemical composition and a manufacturing process to obtain a seamless steel tubing to be used to manufacture an inflator.
  • a schematic illustration of a method of producing the seamless low carbon ultra high strength steel could be as follows:
  • One of the main objectives of the steel-making process is to refine the iron by removal of carbon, silicon, sulfur, phosphorous, and manganese.
  • sulfur and phosphorous are prejudicial for the steel because they worsen the mechanical properties of the material.
  • Ladle metallurgy is used before or after basic processing to perform specific purification steps that allow faster processing in the basic steel making operation.
  • the steel-making process is performed under an extreme clean practice in order to obtain a very low sulfur and phosphorous content, which in turn is crucial for obtaining the high toughness required by the product. Accordingly, the objective of an inclusion level of 2 or less --thin series--, and level 1 or less --heavy series--, under the guidelines of ASTM E45 Standard-Worst Field Method (Method A) has been imposed.
  • the maximum microinclusion content as measured according to the above-mentioned Standard should be: Inclusion Type Thin Heavy A 0.5 0 B 1.5 1.0 C 0 0 D 1.5 0.5
  • the extreme clean practice allows obtaining oversize inclusion content with 30 ⁇ m or less in size. These inclusion contents are obtained limiting the total oxygen content to 20 ppm.
  • C is an element that inexpensively raises the strength of the steel, but if its content is less than 0.06% it is difficult to obtain the desired strength. On the other hand, if the steel has a C content greater than 0.18%, then cold workability, weldability, and toughness decrease. Therefore, the C content range is 0.06% to 0.18%. A preferred range for the C content is 0.07% to 0.12%, and an even more preferred range is 0.10 to 0.12%.
  • Mn is an element which is effective in increasing the hardenability of the steel, and therefore it increases strength and toughness. If it content is less than 0.3% it is difficult to obtain the desired strength, whereas if it exceeds 1.5%, then banding structures become marked, and toughness decreases. Accordingly, the Mn content is 0.3% to 1.5%, with a preferred Mn range of 0.60 to 1.40%.
  • Si is an element which has a deoxidizing effect during steel making process and also raises the strength of the steel. If Si content is less than 0.05%, the steel is susceptible to oxidation, on the other hand if it exceeds 0.50%, then both toughness and workability decrease. Therefore, the Si content is 0.05% to 0.5%., and a preferred Si range of 0.05% to 0.40%.
  • S is an element that causes the toughness of the steel to decrease. Accordingly, the S content is limited to 0.015 % maximum. A preferred maximum value is 0.010%
  • P is an element that causes the toughness of the steel to decrease. Accordingly, the P content is limited to 0.025% maximum. A preferred maximum value is 0.02%,
  • Ni is an element that increases the strength and toughness of the steel, but it is very costly, therefore for cost reasons Ni is limited to 0.70% maximum. A preferred maximum value is 0.50%.
  • Cr is an element which is effective in increasing the strength, toughness, and corrosion resistance of the steel. If it exceeds 1% the toughness at the welding zones decreases markedly. Accordingly, the Cr content is limited to 1.0% maximum, and a preferred Cr maximum content is 0.80%,
  • Mo is an element which is effective in increasing the strength of the steel and contributes to retard the softening during tempering, but it is very costly.
  • the Mo content is limited to 0.7% maximum, and a preferred Mo maximum content is 0.50%
  • V is an element which is effective in increasing the strength of the steel, even if added in small amounts, and allows to retard the softening during tempering.
  • this ferroalloy is expensive, forcing the necessity to lower the maximum content. Therefore, V is limited to 0.3% maximum, with a preferred maximum of 0.20%
  • Residual elements in a single ladle of steel used to produce tubing or chambers shall be:
  • the next step is the steel casting to produce a solid steel bar capable of being pierced and rolled to form a seamless steel tube.
  • the steel is cast in the steel shop into a round solid billet, having a uniform diameter along the steel axis.
  • the solid cylindrical billet of ultra high clean steel is heated to a temperature of about 1200 °C. to 1300 °C., and at this point undergoes the rolling mill process.
  • the billet is heated to a temperature of about 1250 °C., and then passed through the rolling mill.
  • the billet is pierced, preferably utilizing the known Manessmann process, and subsequently the outside diameter and wall thickness are substantially reduced while the length is substantially increased during hot rolling. For example, a 148 mm outside diameter solid bar is hot rolled into a 48.3 mm outside diameter hot-rolled tube, with a wall thickness of 3.25 mm.
  • the cross-sectional area reduction measured as the ratio of the cross-sectional area of the solid billet to the cross-sectional area of the hot-rolled tube, is important in order to obtain a refined microstructure, necessary to get the desired mechanical properties. Therefore, the minimum cross-sectional area reduction is about 15:1, with preferred and most preferred minimum cross-sectional area reductions of about 20:1 and about 25:1, respectively.
  • the seamless hot-rolled tube of ultra high clean steel so manufactured is cooled to room temperature.
  • the seamless hot-rolled tube of ultra high clean steel so manufactured has an approximately uniform wall thickness, both circumferentially around the tube and longitudinally along the tube axis.
  • the hot-rolled tube is then passed through different finishing steps, for example cut in length into 2 to 4 pieces, and its ends cropped, straightened at known rotary straightening equipment if necessary, and non-destructively tested by one or more of the different known techniques, like electromagnetic testing or ultrasound testing.
  • each piece of hot-rolled tube is then properly conditioned for cold drawing.
  • This conditioning includes pickling by immersion in acid solution, and applying an appropriate layer of lubricants, like the known zinc phosphate and sodium estearathe combination, or reactive oil.
  • the seamless tube is cold drawn, pulling it through an external die that has a diameter smaller than the outside diameter of the tube being drawn.
  • the internal surface of the tube is also supported by an internal mandrel anchored to one end of a rod, so that the mandrel remains close to the die during drawing. This drawing operation is performed without the necessity of previously heating the tube above room temperature.
  • the seamless tube is so cold drawn at least once, each pass reducing both the outside diameter and the wall thickness of the tube.
  • the cold-drawn steel tube so manufactured has a uniform outside diameter along the tube axis, and a uniform wall thickness both circumferentially around the tube and longitudinally along the tube axis.
  • the so cold-drawn tube has an outside diameter preferably between 10 and 70 mm, and a wall thickness preferably from 1 to 4 mm.
  • the cold-drawn tube is then heat treated in an austenizing furnace at a temperature of at least the upper austenizing temperature, or Ac3 (which, for the specific chemistry disclosed herein, is about 880 °C.), but preferably above about 920 °C. and below about 1050 °C.
  • This maximum austenizing temperature is imposed in order to avoid grain coarsening.
  • This process can be performed either in a fuel furnace or in an induction-type furnace, but preferably in the latter.
  • the transit time in the furnace is strongly dependent on the type of furnace utilized. It has been found that the high surface quality required by this application is better obtained if an induction type furnace is utilized. This is due to the nature of the induction process, in which very short transit times are involved, precluding oxidation to occur.
  • the austenizing heating rate is at least about 100 °C. per second, but more preferably at least about 200 °C. per second.
  • the extremely high heating rate and, as a consequence, very low heating times, are important for obtaining a very fine grain microstructure, which in turn guarantees the required mechanical properties.
  • an appropriate filling factor defined as the ratio of the round area defined by the outer diameter of the tube to the round area defined by the coil inside diameter of the induction furnace, is important for obtaining the required high heating rates.
  • the minimum filling factor is about 0.16, and a preferred minimum filling factor is about 0.36.
  • the tube is quenched by means of an appropriate quenching fluid.
  • the quenching fluid is preferably water or water-based quenching solution.
  • the tube temperature drops rapidly to ambient temperature, preferably at a rate of at least about 100 °C. per second, more preferably at a rate of at least about 200 °C. per second. This extremely high cooling rate is crucial for obtaining a complete microstructure transformation.
  • the tempering step is eliminated and only a high speed quench using water or water based solutions, as described above, is employed.
  • the following equipment is preferred, but not required.
  • a Quenching line with a full capacity of 2200 kg per hour follows an induction furnace with a maximum power of inductor settled at 500 Kw.
  • a head quencher employs 42 lines with 12 nozzles on each line. Water quenching flow is adjusted into a range of 10 to 60 m3 per hour, and the advance speed of the tube is controlled from 5 to 25 meters per minute. Additionally, following pinch rollers are set up to produce a rotation over the tube.
  • the ultra high strength steel tube so manufactured is passed through different finishing steps, straightened at known rotary straightening equipment, and non-destructively tested by one or more of the different known techniques.
  • tubes should be tested by means of both known ultrasound and electromagnetic techniques.
  • the tubing after heat treatment can be chemically processed to obtain a tube with a desirable appearance and very low surface roughness.
  • the tube could be pickled in a sulfuric acid and hydrochloric acid solution, phosphated using zinc phosphate, and oiled using a petroleum-based oil, a water-based oil, or a mineral oil.
  • a steel tube obtained by the described method has the following minimum mechanical properties:
  • the yield strength, tensile strength, and elongation are to be performed according to the procedures described in the Standards ASTM E8.
  • a full size specimen for evaluating the whole tubular section is preferred.
  • the prior (sometimes referred to as former) austenitic grain size shall be preferably 7 or finer, and more preferably 9 or finer, as measured according to ASTM E-112 Standard. This is accomplished thanks to the extremely short heating cycle during austenitizing.
  • the steel tube obtained by the described method shall have the stated properties in order to comply with the requirements stated for the invention.
  • the demand of the industry is continuously pushing roughness requirements to lower values.
  • the present invention has a good visual appearance, with, for example, a surface finish of the finished tubing of 3.2 microns maximum, both at the external and internal surfaces. This requirement is obtained through cold drawing, short austenizing times, and an adequate surface chemical conditioning at different steps of the process.
  • a hydroburst pressure test shall be performed by sealing the ends of the tube section, for example, by welding flat steel plates to the ends of the tube. It is important that a 300 mm tube section remains constraint free so that full hoop stress can develop.
  • the pressurization of the tube section shall be performed by pumping oil, water, alcohol or a mixture of them.
  • the burst test pressure requirement depends on the tube size.
  • the ultra high strength steel seamless tube has a guaranteed ductile behavior at -60 °C.
  • Tests performed on the samples produced show that this grade has a guaranteed ductile behavior at -60 °C., with a ductile-to-brittle transition temperature below -60 °C.
  • the inventors have found that a far more representative validation test is the burst test, performed both at ambient and at low temperature, instead of Charpy impact test (according to ASTM E23). This is due to the fact that relatively thin wall thicknesses and small outside diameter in these products are employed, therefore no standard ASTM specimen for Charpy impact test can be machined from the tube in the transverse direction. Moreover, in order to get this subsize Charpy impact probe, a flattening deformation has to be applied to a curved tube probe. This has a sensible effect on the steel mechanical properties, in particular the impact strength. Therefore, no representative impact test is obtained with this procedure.
  • the Steels A, B, and D are alternative steels that were analyzed using the preferred method, wherein a very fast induction furnace austenizing with a high speed quench was used instead of adding a tempering step.
  • a very fast induction furnace austenizing with a high speed quench was used instead of adding a tempering step.
  • Steel D was discovered to be very promising because of the high performance to cost value it presented.
  • Steel D was selected to manufacture tubing according to the preferred method. Measured chemical composition of samples of Steel D that were used for high speed quench tests were as follows: Element % Value C 0.11 Mn 1.07 S 0.002 P 0.008 Si 0.08 V 0.08 Al 0.03 Nb 0.008
  • Figure IV shows that a high speed quench Steel D microstructure that presents Martensite at 100% and a completely quenched transformation. Likewise, burst tests at low temperature (- 60° C) were performed in order to observe the behavior and type of crack.
  • Figure V shows tested burst samples for Steel D. Both presented a ductile behavior.
  • Figure VI presents the core structures for Steel D using normal quenching process.
  • Steel B was selected to manufacture tubing according to the preferred method. Measured chemical composition of samples of Steel B that were used for high speed quench tests were as follows: Element % Value C 0.10 Mn 1.09 S 0.001 P 0.011 Si 0.28 V 0.038 Al 0.035 Cr 0.68 Mo 0.41 Nb 0.005
  • Steel A was selected to manufacture tubing according to the preferred method. Measured chemical composition of samples of Steel A that were used for high speed quench tests were as follows: Element % Value C 0.10 Mn 1.23 S 0.002 P 0.008 Si 0.27 V 0.002 Al 0.035 Cr 0.11 Mo 0.05 Ni 0.34
  • burst tests at low temperature were performed on Steel A in order to observe the behavior and type of crack.,. both presented a ductile behavior.
  • a tempering heat treatment was conducted at 580 °C for total time of 15 minutes.
  • the UTS average was (116 Ksi) 805 MPa, which do not meet the expected values

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Materials Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Crystallography & Structural Chemistry (AREA)
  • Manufacturing & Machinery (AREA)
  • Heat Treatment Of Articles (AREA)
  • Heat Treatment Of Steel (AREA)
  • Pressure Vessels And Lids Thereof (AREA)

Claims (15)

  1. Verfahren zum Herstellen einer Länge einer Stahlverrohrung, insbesondere für ein Druckgefäß einer Aufblaseinrichtung mit gespeichertem Gas, mit den folgenden Schritten:
    - Erzeugen einer Länge einer Verrohrung aus einem Stahlmaterial, das aus 0,07 Gew.-% bis 0,12 Gew.-% Kohlenstoff, 0,60 Gew.-% bis 1,40 Gew.-% Mangan, 0,05 Gew.-% bis 0,40 Gew.-% Silizium, bis zu 0,010 Gew.-% Schwefel, bis zu 0,02 Gew.-% Phosphor und zumindest einem der folgenden Elemente: bis zu 0,20 Gew.-% Vanadium, bis zu 0,07 Gew.-% Aluminium, bis zu 0,04 Gew.-% Niob, bis zu 0,8 Gew.-% Chrom, bis zu 0,50 Gew.-% Nickel, bis zu 0,50 Gew.-% Molybdän, bis zu 0,35 Gew.-% Kupfer, bis zu 0,15 Gew.-% restlichen Elementen, wobei die restlichen Elemente aus Sn, Sb, Pb oder As bis zu jeweils 0,05 Gew.-% bestehen, und dem Rest Eisen sowie zufälligen Unreinheiten besteht;
    - die Stahlverrohrung einem Kaltziehprozess ausgesetzt wird, um gewünschte Abmessungen zu erhalten;
    - durch Erwärmen der kaltgezogenen Stahlverrohrung in einem Austenitifizierofen vom Induktionstyp auf eine Temperatur von zumindest Ac3 bei einer Heizrate von zumindest 100°C pro Sekunde austenitisiert wird;
    - nach dem Austenitisierungsschritt die Stahlverrohrung in einer Abschreckflüssigkeit, bis die Verrohrung etwa Umgebungstemperatur erreicht, bei einer Kühlrate von zumindest 100°C pro Sekunde abgeschreckt wird,
    - wobei das Verfahren durch den Schritt zum Abschrecken ohne Bereitstellen eines anschließenden Schrittes eines Temperns vervollständigt wird,
    - wobei das Stahlrohr eine Zugfestigkeit von zumindest 1103 MPa (160 ksi) sowie eine Übergangstemperatur von duktil nach spröde unterhalb -60 °C aufweist.
  2. Verfahren nach Anspruch 1, wobei das Stahlrohr ein Kohlenstoffäquivalent von weniger als 0,52% aufweist, wobei das Kohlenstoffäquivalent gemäß der Formel bestimmt wird: Ceq = % C + % Mn / 6 + % Cr + % Mo + % V / 5 + % Ni + % Cu / 15.
    Figure imgb0005
  3. Verfahren nach Anspruch 2, wobei das Stahlrohr ein Kohlenstoffäquivalent von weniger als 0,48% aufweist, wobei das Kohlenstoffäquivalent gemäß der Formel bestimmt ist: Ceq = % C + % Mn / 6 + % Cr + % Mo + % V / 5 + % Ni + % Cu / 15.
    Figure imgb0006
  4. Verfahren nach Anspruch 1, wobei die fertiggestellte Stahlverrohrung eine Elongation bei Bruch von zumindest 9% aufweist.
  5. Verfahren nach Anspruch 1, wobei bei dem Erwärmungsschritt zum Austenitisieren die Stahlverrohrung auf eine Temperatur zwischen 860 - 1050°C erhitzt wird.
  6. Verfahren nach Anspruch 1, wobei bei dem Erwärmungsschritt zum Austenitisieren die Stahlverrohrung mit einer Rate von zumindest 200°C pro Sekunde erhitzt wird.
  7. Verfahren nach Anspruch 1, wobei bei dem Abschreckschritt die Stahlverrohrung mit einer Rate von zumindest 200°C pro Sekunde gekühlt wird.
  8. Verfahren nach Anspruch 1, wobei das Stahlrohr eine Übergangstemperatur von duktil nach brüchig von unterhalb -100°C aufweist.
  9. Nahtloses Stahlrohr, das mit dem Verfahren nach Anspruch 1 hergestellt ist, wobei das Stahlrohr eine Zugfestigkeit von zumindest 1103 MPa (160 ksi) und eine Übergangstemperatur von duktil nach brüchig unterhalb -60 °C aufweist.
  10. Nahtloses Stahlrohr nach Anspruch 9, wobei das Kohlenstoffäquivalent kleiner als 0,52% ist, wobei das Kohlenstoffäquivalent gemäß der Formel bestimmt ist: Ceq = % C + % Mn / 6 + % Cr + % Mo + % V / 5 + % Ni + % Cu / 15.
    Figure imgb0007
  11. Nahtloses Stahlrohr nach Anspruch 9, mit einer Übergangstemperatur von duktil nach brüchig unterhalb -100°C.
  12. Nahtloses Stahlrohr nach einem der Ansprüche 9 oder 10, wobei das Stahlrohr ein Druckgefäß für eine Aufblaseinrichtung mit gespeichertem Gas ist.
  13. Nahtloses Stahlrohr nach einem der Ansprüche 9 oder 10, wobei das Stahlrohr eine Airbagaufblaseinrichtung für Kraftfahrzeuge ist.
  14. Verwendung eines nahtlosen Stahlrohres nach Anspruch 9 in einem Druckgefäß für eine Aufblaseinrichtung mit gespeichertem Gas.
  15. Verwendung eines nahtlosen Stahlrohres nach Anspruch 9 in einer AirbagAufblaseinrichtung für Kraftfahrzeuge.
EP07734171.7A 2006-04-03 2007-04-02 Rohr aus kohlenstoffarmem legierungsstahl mit ultrahoher festigkeit und hervorragender zähigkeit bei niedriger temperatur und herstellungsverfahren dafür Active EP2007914B1 (de)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US11/395,322 US20060169368A1 (en) 2004-10-05 2006-04-03 Low carbon alloy steel tube having ultra high strength and excellent toughness at low temperature and method of manufacturing the same
PCT/IB2007/000850 WO2007113642A2 (en) 2006-04-03 2007-04-02 Low carbon alloy steel tube having ultra high strength and excellent toughness at low temperature and method of manufacturing the same

Publications (2)

Publication Number Publication Date
EP2007914A2 EP2007914A2 (de) 2008-12-31
EP2007914B1 true EP2007914B1 (de) 2017-10-04

Family

ID=38564023

Family Applications (1)

Application Number Title Priority Date Filing Date
EP07734171.7A Active EP2007914B1 (de) 2006-04-03 2007-04-02 Rohr aus kohlenstoffarmem legierungsstahl mit ultrahoher festigkeit und hervorragender zähigkeit bei niedriger temperatur und herstellungsverfahren dafür

Country Status (10)

Country Link
US (2) US20060169368A1 (de)
EP (1) EP2007914B1 (de)
JP (1) JP2009532584A (de)
KR (1) KR20090013769A (de)
CN (1) CN101448966A (de)
AR (1) AR060286A1 (de)
BR (1) BRPI0709458B1 (de)
CA (1) CA2650452A1 (de)
MX (1) MX2008012810A (de)
WO (1) WO2007113642A2 (de)

Families Citing this family (55)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4500259B2 (ja) * 2003-03-31 2010-07-14 日立金属株式会社 内燃機関用ピストン及びその製造方法
EP1627931B1 (de) 2003-04-25 2017-05-31 Tubos De Acero De Mexico, S.A. Nahtloses stahlrohr, das zur verwendung als führungsrohr vorgesehen ist, und herstellungsverfahren dafür
WO2008000300A1 (en) * 2006-06-29 2008-01-03 Tenaris Connections Ag Seamless precision steel tubes with improved isotropic toughness at low temperature for hydraulic cylinders and process for obtaining the same
US9014280B2 (en) 2006-10-13 2015-04-21 Qualcomm Incorporated Video coding with adaptive filtering for motion compensated prediction
MX2007004600A (es) * 2007-04-17 2008-12-01 Tubos De Acero De Mexico S A Un tubo sin costura para la aplicación como secciones verticales de work-over.
US7862667B2 (en) 2007-07-06 2011-01-04 Tenaris Connections Limited Steels for sour service environments
EP2238272B1 (de) * 2007-11-19 2019-03-06 Tenaris Connections B.V. Hochfester bainitischer stahl für octg-anwendungen
AT507596B1 (de) * 2008-11-20 2011-04-15 Voestalpine Tubulars Gmbh & Co Kg Verfahren und vorrichtung zur herstellung von stahlrohren mit besonderen eigenschaften
US8221562B2 (en) * 2008-11-25 2012-07-17 Maverick Tube, Llc Compact strip or thin slab processing of boron/titanium steels
JP4770922B2 (ja) * 2008-12-08 2011-09-14 住友金属工業株式会社 エアバッグ用鋼管とその製造方法
TWI381057B (zh) * 2009-03-20 2013-01-01 China Steel Corp Steel material suitable for preparing airbag device for airbag and its application
CN101693941B (zh) * 2009-08-13 2011-06-08 巨力索具股份有限公司 一种中、低碳合金结构钢制件的淬火方法
EP2325435B2 (de) 2009-11-24 2020-09-30 Tenaris Connections B.V. Verschraubung für [ultrahoch] abgedichteten internen und externen Druck
CN101792885B (zh) * 2010-03-30 2011-08-03 莱芜钢铁集团有限公司 一种高碳锰铬磨球用热轧圆钢及其制造方法
JP5234226B2 (ja) * 2010-06-03 2013-07-10 新日鐵住金株式会社 エアバッグ用鋼管の製造方法
CA2776984C (en) * 2010-06-03 2015-11-17 Yuji Arai Steel tube for airbags and a process for manufacturing same
CN101988170B (zh) * 2010-12-06 2012-03-28 周建安 一种铁水钒氮微合金化的方法
US9163296B2 (en) 2011-01-25 2015-10-20 Tenaris Coiled Tubes, Llc Coiled tube with varying mechanical properties for superior performance and methods to produce the same by a continuous heat treatment
IT1403689B1 (it) 2011-02-07 2013-10-31 Dalmine Spa Tubi in acciaio ad alta resistenza con eccellente durezza a bassa temperatura e resistenza alla corrosione sotto tensioni da solfuri.
IT1403688B1 (it) 2011-02-07 2013-10-31 Dalmine Spa Tubi in acciaio con pareti spesse con eccellente durezza a bassa temperatura e resistenza alla corrosione sotto tensione da solfuri.
US8636856B2 (en) 2011-02-18 2014-01-28 Siderca S.A.I.C. High strength steel having good toughness
US8414715B2 (en) 2011-02-18 2013-04-09 Siderca S.A.I.C. Method of making ultra high strength steel having good toughness
DE102011108162B4 (de) * 2011-07-20 2013-02-21 Salzgitter Flachstahl Gmbh Verfahren zur Herstellung eines Bauteils durch Warmumformen eines Vorproduktes aus Stahl
FI20115832L (fi) * 2011-08-26 2013-02-27 Rautaruukki Oyj Menetelmä erinomaisilla mekaanisilla ominaisuuksilla varustetun terästuotteen valmistamiseksi, menetelmällä valmistettu terästuote ja muokkauslujitetun teräksen käyttö
US9340847B2 (en) 2012-04-10 2016-05-17 Tenaris Connections Limited Methods of manufacturing steel tubes for drilling rods with improved mechanical properties, and rods made by the same
CN102605283B (zh) * 2012-04-18 2013-12-25 江苏省沙钢钢铁研究院有限公司 低成本高韧性低温压力容器钢及其制造方法
US9365944B2 (en) * 2012-05-18 2016-06-14 Tube-Mac Piping Technologies Ltd. Method of making hydralic tubing
CN104903538B (zh) 2013-01-11 2018-05-08 特纳瑞斯连接有限公司 抗磨损钻杆工具接头和相应的钻杆
US9187811B2 (en) 2013-03-11 2015-11-17 Tenaris Connections Limited Low-carbon chromium steel having reduced vanadium and high corrosion resistance, and methods of manufacturing
US9803256B2 (en) 2013-03-14 2017-10-31 Tenaris Coiled Tubes, Llc High performance material for coiled tubing applications and the method of producing the same
EP2789700A1 (de) 2013-04-08 2014-10-15 DALMINE S.p.A. Dickwandige vergütete und nahtlose Stahlrohre und entsprechendes Verfahren zur Herstellung der Stahlrohre
EP2789701A1 (de) 2013-04-08 2014-10-15 DALMINE S.p.A. Hochfeste mittelwandige vergütete und nahtlose Stahlrohre und entsprechendes Verfahren zur Herstellung der Stahlrohre
KR101505286B1 (ko) * 2013-05-30 2015-03-24 현대제철 주식회사 중공 부품의 제조 방법
KR102197204B1 (ko) 2013-06-25 2021-01-04 테나리스 커넥션즈 비.브이. 고크롬 내열철강
CN103320711B (zh) * 2013-06-26 2016-01-20 衡阳华菱钢管有限公司 无缝钢管及其制造方法
US9776592B2 (en) * 2013-08-22 2017-10-03 Autoliv Asp, Inc. Double swage airbag inflator vessel and methods for manufacture thereof
CN104046924B (zh) 2014-06-25 2017-01-04 宝山钢铁股份有限公司 一种汽车安全气囊用高强韧无缝钢管及其制造方法
JP5979334B1 (ja) * 2014-10-23 2016-08-24 Jfeスチール株式会社 エアバッグインフレータ用高強度溶接鋼管およびその製造方法
KR101639327B1 (ko) * 2014-12-16 2016-07-13 주식회사 세아베스틸 저온 충격특성이 우수한 에어백 팽창 튜브용 강재
KR101657827B1 (ko) * 2014-12-24 2016-09-20 주식회사 포스코 취성균열전파 저항성이 우수한 구조용 극후물 강재 및 그 제조방법
US11136656B2 (en) 2015-05-21 2021-10-05 Cleveland-Cliffs Steel Properties Inc. High manganese 3rd generation advanced high strength steels
CN106282831B (zh) * 2015-05-25 2018-11-06 宝钢湛江钢铁有限公司 一种高强度集装箱用耐大气腐蚀钢及其制造方法
GB2548175B (en) * 2016-03-09 2018-10-03 Goodwin Plc A steel, a welding consumable and a cast steel product
JP2018024915A (ja) * 2016-08-10 2018-02-15 豊田合成株式会社 インフレーター用ガス収納容器とその製造方法
US11124852B2 (en) 2016-08-12 2021-09-21 Tenaris Coiled Tubes, Llc Method and system for manufacturing coiled tubing
US10434554B2 (en) 2017-01-17 2019-10-08 Forum Us, Inc. Method of manufacturing a coiled tubing string
CN107236909B (zh) * 2017-06-16 2019-06-18 武汉钢铁有限公司 可用于-60℃低温环境的高强度、高韧性耐腐蚀钢及其生产方法
JP6981240B2 (ja) * 2017-12-26 2021-12-15 日本製鉄株式会社 継目無鋼管及び継目無鋼管の製造方法
CN110295313B (zh) 2018-03-21 2021-09-17 宝山钢铁股份有限公司 一种耐低温高强高韧油套管及其制造方法
CN110205558A (zh) * 2019-06-05 2019-09-06 盐城市联鑫钢铁有限公司 一种含Nb、V的HRB400合金钢及其冶炼工艺方法
CN110257722A (zh) * 2019-07-25 2019-09-20 南京钢铁股份有限公司 高强度s420nl-z35低温韧性钢板及制造方法
WO2021260026A1 (en) 2020-06-23 2021-12-30 Tenaris Connections B.V. Method of manufacturing high strength steel tubing from a steel composition and components thereof
DE102020133765A1 (de) 2020-12-16 2022-06-23 Benteler Steel/Tube Gmbh Hochfestes Stahlrohr und Verfahren zum Herstellen eines hochfesten Stahlrohr
CN116891971A (zh) * 2022-10-18 2023-10-17 广西柳钢中金不锈钢有限公司 含镍铬锰的碳素结构用钢的制造方法
CN115976409A (zh) * 2022-12-15 2023-04-18 攀钢集团攀枝花钢铁研究院有限公司 一种低成本中空锚杆焊管、热轧钢带及制备方法

Family Cites Families (26)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3645725A (en) * 1969-05-02 1972-02-29 Armco Steel Corp Austenitic steel combining strength and resistance to intergranular corrosion
JPS61130462A (ja) * 1984-11-28 1986-06-18 Tech Res & Dev Inst Of Japan Def Agency 降伏応力110kgf/mm↑2以上の耐応力腐蝕割れ性のすぐれた高靭性超高張力鋼
DE3666461D1 (en) * 1985-06-10 1989-11-23 Hoesch Ag Method and use of a steel for manufacturing steel pipes with a high resistance to acid gases
JPH01275739A (ja) * 1988-04-28 1989-11-06 Sumitomo Metal Ind Ltd 延性,靭性に優れた低Si高強度耐熱鋼管
JPH0772299B2 (ja) * 1990-06-19 1995-08-02 住友金属工業株式会社 低降伏比高張力鋼板の製造法
US5348344A (en) * 1991-09-18 1994-09-20 Trw Vehicle Safety Systems Inc. Apparatus for inflating a vehicle occupant restraint using a mixture of gases
US5454883A (en) * 1993-02-02 1995-10-03 Nippon Steel Corporation High toughness low yield ratio, high fatigue strength steel plate and process of producing same
US5388322A (en) * 1993-05-28 1995-02-14 Simon; Joseph A. Method of making a shatterproof air bag inflator pressure vessel
IT1271310B (it) * 1994-12-21 1997-05-27 Snam Progetti Procedimento per l'ottenimento di correnti distinte di metanolo ed etanolo,di n-propanolo,di isobutanolo,impiegabili nella sintesi di prodotti alto ottanici,da miscele contenti detti alcoli con acqua ed altri composti bassobollenti e altobollenti
US6056833A (en) * 1997-07-23 2000-05-02 Usx Corporation Thermomechanically controlled processed high strength weathering steel with low yield/tensile ratio
US6159312A (en) * 1997-12-19 2000-12-12 Exxonmobil Upstream Research Company Ultra-high strength triple phase steels with excellent cryogenic temperature toughness
JP3519966B2 (ja) * 1999-01-07 2004-04-19 新日本製鐵株式会社 低温靱性に優れた超高強度ラインパイプおよびその製造法
US6187117B1 (en) * 1999-01-20 2001-02-13 Bethlehem Steel Corporation Method of making an as-rolled multi-purpose weathering steel plate and product therefrom
DE10022463B4 (de) * 1999-05-12 2005-07-14 Trw Inc., Lyndhurst Verfahren zur Herstellung eines Behälters einer Aufblasvorrichtung einer Fahrzeuginsassenschutzvorrichtung
US6173495B1 (en) * 1999-05-12 2001-01-16 Trw Inc. High strength low carbon air bag quality seamless tubing
US20020033591A1 (en) * 2000-09-01 2002-03-21 Trw Inc. Method of producing a cold temperature high toughness structural steel tubing
US6386583B1 (en) * 2000-09-01 2002-05-14 Trw Inc. Low-carbon high-strength steel
US7481897B2 (en) * 2000-09-01 2009-01-27 Trw Automotive U.S. Llc Method of producing a cold temperature high toughness structural steel
JP3678147B2 (ja) * 2000-12-27 2005-08-03 住友金属工業株式会社 高強度高靱性エアバッグ用鋼管とその製造方法
WO2002079526A1 (fr) * 2001-03-29 2002-10-10 Sumitomo Metal Industries, Ltd. Tube en acier a haute resistance pour coussin d'air et procede pour la production de ce tube
WO2004003241A1 (ja) * 2002-06-26 2004-01-08 Jfe Steel Corporation エアバッグのインフレータ用継目無鋼管の製造方法
EP1627931B1 (de) * 2003-04-25 2017-05-31 Tubos De Acero De Mexico, S.A. Nahtloses stahlrohr, das zur verwendung als führungsrohr vorgesehen ist, und herstellungsverfahren dafür
US20050000601A1 (en) * 2003-05-21 2005-01-06 Yuji Arai Steel pipe for an airbag system and a method for its manufacture
US7278190B2 (en) * 2003-07-03 2007-10-09 Newfrey Llc Two component fuel and brake line clip
US20050076975A1 (en) * 2003-10-10 2005-04-14 Tenaris Connections A.G. Low carbon alloy steel tube having ultra high strength and excellent toughness at low temperature and method of manufacturing the same
US20050087269A1 (en) * 2003-10-22 2005-04-28 Merwin Matthew J. Method for producing line pipe

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
None *

Also Published As

Publication number Publication date
BRPI0709458A2 (pt) 2011-07-12
AR060286A1 (es) 2008-06-04
US20090101242A1 (en) 2009-04-23
BRPI0709458B1 (pt) 2014-09-09
KR20090013769A (ko) 2009-02-05
JP2009532584A (ja) 2009-09-10
CN101448966A (zh) 2009-06-03
US20060169368A1 (en) 2006-08-03
WO2007113642A3 (en) 2008-01-31
EP2007914A2 (de) 2008-12-31
CA2650452A1 (en) 2007-10-11
MX2008012810A (es) 2009-03-16
WO2007113642A2 (en) 2007-10-11

Similar Documents

Publication Publication Date Title
EP2007914B1 (de) Rohr aus kohlenstoffarmem legierungsstahl mit ultrahoher festigkeit und hervorragender zähigkeit bei niedriger temperatur und herstellungsverfahren dafür
EP1678335B1 (de) Rohr aus kohlenstoffarmem legierungsstahl mit ultrahoher festigkeit und hervorragender zähigkeit bei niedriger temperatur und herstellungsverfahren dafür
JP2007508452A6 (ja) 低温において超高強度と優秀な靭性を有する低炭素合金鋼管及びその製造法
EP1637619B1 (de) Stahlrohr für airbagsystem und herstellungsverfahren dafür
TWI410505B (zh) Seamless steel pipe for airbag accumulator and its manufacturing method
EP1375683A1 (de) Hochfestes stahlrohr für airbag und herstellungsverfahren dafür
JP5979334B1 (ja) エアバッグインフレータ用高強度溶接鋼管およびその製造方法
EP2857537A1 (de) Hohlstabilisator und stahlrohr für hohle stabilisatoren und verfahren zur herstellung davon
EP2484793B1 (de) Stahlrohr für einen airbag und herstellungsverfahren dafür
JPH10140250A (ja) 高強度高靭性エアーバッグ用鋼管の製造方法
CN100460527C (zh) 在低温下具有超高强度和极好韧性的低碳合金钢管及其制造方法
JP3220975B2 (ja) 高強度高靭性エアーバッグ用鋼管の製造方法
EP2578705A1 (de) Verfahren zur herstellung eines stahlrohrs für airbags
JP3318467B2 (ja) 加工性に優れた高強度高靭性鋼管の製造方法
JP2002194501A (ja) 高強度高靱性エアバッグ用鋼管とその製造方法
JP4197590B2 (ja) 高強度高靱性エアバッグ用鋼管と蓄圧器
JP2004076034A (ja) エアバッグ用高強度高靭性高加工性継目無鋼管の製造方法
MXPA02005390A (es) Tubo de acero soldado que tiene excelente hidroformabilidad y metodo para elaborar el mismo.
JP2005060796A (ja) エアバッグボトル用高強度高靭性溶接鋼管およびその製造方法
JP2004027303A (ja) エアバッグ用高強度高靱性高加工性継目無鋼管およびその製造方法
MXPA06003933A (en) Low carbon alloy steel tube having ultra high strength and excellent toughnes at low temperature and method of manufacturing the same
CA3235953A1 (en) Seamless steel pipe

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20081031

AK Designated contracting states

Kind code of ref document: A2

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC MT NL PL PT RO SE SI SK TR

RIN1 Information on inventor provided before grant (corrected)

Inventor name: LOPEZ, EDGARDO, OSCAR

Inventor name: ALTSCHULER, EDUARDO

DAX Request for extension of the european patent (deleted)
17Q First examination report despatched

Effective date: 20121217

RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: TENARIS CONNECTIONS LIMITED

RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: TENARIS CONNECTIONS B.V.

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

INTG Intention to grant announced

Effective date: 20170314

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC MT NL PL PT RO SE SI SK TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 934112

Country of ref document: AT

Kind code of ref document: T

Effective date: 20171015

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602007052566

Country of ref document: DE

REG Reference to a national code

Ref country code: SE

Ref legal event code: TRGR

REG Reference to a national code

Ref country code: RO

Ref legal event code: EPE

REG Reference to a national code

Ref country code: NL

Ref legal event code: MP

Effective date: 20171004

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG4D

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 934112

Country of ref document: AT

Kind code of ref document: T

Effective date: 20171004

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171004

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 12

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171004

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171004

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171004

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180104

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180105

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171004

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171004

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180204

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602007052566

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171004

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171004

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171004

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171004

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171004

26N No opposition filed

Effective date: 20180705

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171004

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171004

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

REG Reference to a national code

Ref country code: BE

Ref legal event code: MM

Effective date: 20180430

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20180402

REG Reference to a national code

Ref country code: IE

Ref legal event code: MM4A

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180402

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180430

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180430

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180402

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180430

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180402

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180402

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171004

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20070402

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171004

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171004

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: RO

Payment date: 20230328

Year of fee payment: 17

Ref country code: FR

Payment date: 20230321

Year of fee payment: 17

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: SE

Payment date: 20230327

Year of fee payment: 17

Ref country code: IT

Payment date: 20230322

Year of fee payment: 17

P01 Opt-out of the competence of the unified patent court (upc) registered

Effective date: 20230526

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20230321

Year of fee payment: 17