EP1059394A2 - Système de poteaux et traverses pour façades équipées de panneaux de remplissage - Google Patents
Système de poteaux et traverses pour façades équipées de panneaux de remplissage Download PDFInfo
- Publication number
- EP1059394A2 EP1059394A2 EP99121013A EP99121013A EP1059394A2 EP 1059394 A2 EP1059394 A2 EP 1059394A2 EP 99121013 A EP99121013 A EP 99121013A EP 99121013 A EP99121013 A EP 99121013A EP 1059394 A2 EP1059394 A2 EP 1059394A2
- Authority
- EP
- European Patent Office
- Prior art keywords
- bolt
- mullion
- channel
- transom system
- post
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/88—Curtain walls
- E04B2/96—Curtain walls comprising panels attached to the structure through mullions or transoms
- E04B2/965—Connections of mullions and transoms
Definitions
- the invention relates to a mullion-transom system for with Infill building facades, with in the assembled Condition vertical post and between each two Horizontal bars arranged with their posts Face sides abut these posts, with the Bolts protruding from the end faces of the bolts and these bolts receiving recesses are provided on the posts.
- a mullion-transom system is for example from DE 38 08 715 C2 known, in which the mullion and transom at the assembly of the building facade screwed together become.
- the second installation option is that first the vertical posts are set up and aligned.
- the known T-connectors are cut to length Latch inserted on the front sides and then jammed and / or glued.
- T-connector is in particular in that they are separate components with spring-loaded Bolts and expanding device are relatively expensive to manufacture and are to be assembled. For example, a curved one It is an advantage to straighten the post if tensile forces can be absorbed via the spring bolt. With the help of the glued-in T-connector this is almost as good not possible. Also pre-assembled for transport Facade parts, it would be an advantage if the spring bolts Can absorb tensile forces.
- An object of the present invention is that Attachment of those used to connect to the posts Improve bolts on the bolts so that at lower Higher strength and simpler assembly and cost Stability is achieved.
- each bolt inside has a length that extends along its length Has bolt channel in the from each end face the bolt from a bolt can be used, and that the pin channel in the area of each pin with a side Access for side insertion of a pull out of the bolt from the bolt channel Locking element is provided.
- the bolt channel can usually be used as an extrusion or other extruded profile trained bolt without realized significant additional costs in the production become.
- the bolt channel is expediently in the wall of the Riegel or molded in one piece on the wall String element arranged. Especially with the latter Execution advantageously forms a distant in particular milled section of the strand element lateral access to the bolt channel. This can be realized quickly and easily.
- a locking washer is particularly suitable as a locking element, and the bolt has a corresponding one for this Ring groove for mounting or for sliding on laterally this lock washer.
- the lateral access to the bolt channel is preferred a length and dimensioning next to the locking element allows the insertion of a compression spring, the the locking element resilient on the adjacent end face of the latch-facing side of the side access holds. This allows the bolt to be resilient against the force the compression spring are pressed into the bolt and then snaps when the corresponding recess is reached in the post automatically into this, making an irreversible and exact connection between mullion and transom is made.
- Is particularly suitable as a compression spring a coil spring or spreading spring encompassing the bolt.
- the area of the Bolzens is preferably in the assembled state in the Stud engaging bolt head formed, whereby an annular groove or groove-like depression on the bolt head connects, whose width is essentially the wall thickness of the post. This can be done after snapping of the bolt or bolt head in the post through lateral Movement of the bolt engages the wall of the post in the ring groove or groove-like recess be so that the connection now high tensile forces can record, for example, when straightening a bent post or pre-assembled for transport Facade areas are of great advantage.
- a mullion-transom system for realizing a building facade consists of a variety of vertical posts 10, which are arranged parallel to each other at intervals. Run as connecting elements between these posts 10 horizontal bars 11, which in turn are parallel to each other are arranged at intervals. The distances of the Posts are underneath each other and the transoms are underneath each other due to the size of the infills, e.g. window 12, determines whose width the post spacing and their Specify the height of the transom distances. Other ways to use Infills are e.g. B. panels to be opened Wings and the like.
- the latch 11 and the post 10th each designed as one-piece profile elements, e.g. Extruded parts made of a light metal or a light metal alloy. They each assign one in substantially rectangular cross-section and are as square tube-like hollow profiles.
- This strand element 12 is concentric a pin channel 13 for receiving pins 14 on that for fastening the transom 11 to the post 10 serve.
- the wall of the bolt channel 13 encompassing the Strangelements 12 is not completely closed, but has a slot 15, but in principle could also be omitted.
- Such a bolt 14 is shown enlarged in FIG. 5. It is designed as a cylindrical bolt and has a beveled bolt head 16 at one end with the same outside diameter. To the bolt head 16 follows an annular groove 17, the groove width of the Wall thickness of the post 10 corresponds to or slightly is bigger. Spaced from the annular groove 17 has Bolt 14 another annular groove 18 for receiving a Lock washer 19, which can be inserted laterally and then locked.
- the vertical posts 10 set up and aligned. Then the horizontal bar 11 cut so that it is exactly between two posts can be used. The end faces of the Bars 11 are then on opposite side walls one post 10 each, as shown in FIG. 2 emerges. After the bars 11 have been cut to length, there are milled portions 20 made in the strand element 12. The distance corresponds to such a milling 20 from the end face the distance between the two ring grooves 17, 18 in the bolt 14. The width of the milling 20 is dimensioned so that a compression spring 21 received around the bolt 14 can be. In the area of the milling 20 there is a section of the strand element 12 completely removed. Instead of by milling this section can of course also removed in other ways, e.g. by grinding.
- FIG. 2 For assembly, bolts are now used from both ends 14 inserted into the bolt channel 13, with FIG. 2 in each case only shows an edge region of the two bars 11.
- the compression springs previously inserted into the cutouts 20 21 thereby grasp the bolt 14 after insertion.
- a lock washer 19 is inserted into the annular groove 18 used. Since the compression spring 21 is resilient according to FIG. 2 bears against the locking washer 19, this is to the outside pressed and thus resilient at the outer end of the milling 20 held.
- the bolt head 16 protrudes over the end face of the respective bolt 11 out and can resiliently against the force of the compression spring 21 are pressed inwards.
- the compression spring 21 shown in FIGS. 1 and 2 is in 6 and 7 shown in two different views. It is bent as a V-shaped spreading spring, with the free Ends are curved like an arc. The circular arc embrace curved end regions 24 in the assembled state the bolt 14.
- FIG. 3 corresponds to the arrangement according to Fig. 2 with the only exception that instead of as Spreading springs designed compression springs 21 here as Coil springs formed compression springs 29 occur.
- the Assembly is done in the same way.
- FIG. 4 also largely corresponds the arrangement of FIG. 2 or of FIG. 3, however except that instead of a vertical section here the arrangement is shown in horizontal section is.
- the same components are again the same Provide reference numerals and not described again.
- Compression springs 30, with other known and usual Execution of compression springs can occur.
- Compression springs 30, with other known and usual Execution of compression springs can occur.
- With the recesses 22 in the post 10 for receiving the bolt heads 16 here are the larger, round plug-in area 31 and narrower, slit-like holding area 32 can be seen in the the bolt or the area of the annular groove 17 of the bolt 14 is inserted.
- the post 10 also has corresponding ones Holding channels 33, plastic strips 34 and a holding element 35 for fastening the window pane 25.
- the recesses 22 can also be circular through holes be formed, instead of the annular groove 17 a groove-like depression on one side of the bolt 14 can occur in the to absorb tensile forces in the assembled State an edge region of the round recess 22 intervenes.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Load-Bearing And Curtain Walls (AREA)
- Door And Window Frames Mounted To Openings (AREA)
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE29910027U DE29910027U1 (de) | 1999-06-09 | 1999-06-09 | Pfosten-Riegel-System für mit Ausfachungen versehene Gebäudefassaden |
DE29910027U | 1999-06-09 |
Publications (2)
Publication Number | Publication Date |
---|---|
EP1059394A2 true EP1059394A2 (fr) | 2000-12-13 |
EP1059394A3 EP1059394A3 (fr) | 2003-01-22 |
Family
ID=8074537
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP99121013A Withdrawn EP1059394A3 (fr) | 1999-06-09 | 1999-10-21 | Système de poteaux et traverses pour façades équipées de panneaux de remplissage |
Country Status (2)
Country | Link |
---|---|
EP (1) | EP1059394A3 (fr) |
DE (1) | DE29910027U1 (fr) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1795665A2 (fr) * | 2005-12-12 | 2007-06-13 | Reynaers Aluminium, naamloze vennootschap | Assemblage en T |
DE102021113458A1 (de) | 2021-05-25 | 2022-12-01 | VEKA Aktiengesellschaft | Verstärkungselement, Stoßverbindung und Verfahren zu deren Herstellung |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE19901775A1 (de) * | 1999-01-18 | 2000-07-20 | Schueco Int Kg | T-Verbindung zwischen einem Sprossen- und einem Pfostenprofil einer Fassade oder eines Lichtdaches |
DE29915623U1 (de) | 1999-09-04 | 1999-12-30 | Götz GmbH, 71636 Ludwigsburg | Pfosten-Riegel-System für mit Ausfachungen versehene Gebäudefassaden |
ATE317475T1 (de) * | 2000-10-19 | 2006-02-15 | Hartmann & Co W | Verbindungsvorrichtung zwischen einem pfostenprofil und einem riegelprofil für eine bauwerksfassade |
DE202008014975U1 (de) * | 2008-11-12 | 2010-04-01 | Raico Bautechnik Gmbh | T-Verbindung zwischen einem Pfosten- und Riegelprofil |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3808715C2 (fr) | 1988-03-16 | 1992-05-14 | Goetz Gmbh Metall- Und Anlagenbau, 7012 Fellbach, De |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3797191A (en) * | 1972-10-20 | 1974-03-19 | American Metal Climax Inc | Wall construction |
DE8603790U1 (de) * | 1986-02-13 | 1986-05-15 | Mühle, Manfred, 4972 Löhne | Vorgefertigte Metallprofilkonstruktion für Glasanbauten, Fassaden- oder Dachflächenteile |
DE3621408A1 (de) * | 1986-06-26 | 1988-01-07 | Hueck Fa E | Anschluss eines riegels an einen pfosten einer rahmen-konstruktion |
DE3808587C1 (fr) * | 1988-03-15 | 1989-06-22 | Wicona-Bausysteme Gmbh & Co Kg, 7900 Ulm, De | |
DE19510310A1 (de) * | 1995-03-22 | 1996-09-26 | Eberspaecher J | Riegel-Pfosten-Verbindung, insbesondere im Glasfassadenbau |
-
1999
- 1999-06-09 DE DE29910027U patent/DE29910027U1/de not_active Expired - Lifetime
- 1999-10-21 EP EP99121013A patent/EP1059394A3/fr not_active Withdrawn
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3808715C2 (fr) | 1988-03-16 | 1992-05-14 | Goetz Gmbh Metall- Und Anlagenbau, 7012 Fellbach, De |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1795665A2 (fr) * | 2005-12-12 | 2007-06-13 | Reynaers Aluminium, naamloze vennootschap | Assemblage en T |
BE1016889A3 (nl) * | 2005-12-12 | 2007-09-04 | Reynaers Aluminium Nv | Verbeterde t-verbinder. |
EP1795665A3 (fr) * | 2005-12-12 | 2010-01-13 | Reynaers Aluminium, naamloze vennootschap | Assemblage en T |
DE102021113458A1 (de) | 2021-05-25 | 2022-12-01 | VEKA Aktiengesellschaft | Verstärkungselement, Stoßverbindung und Verfahren zu deren Herstellung |
Also Published As
Publication number | Publication date |
---|---|
DE29910027U1 (de) | 1999-07-29 |
EP1059394A3 (fr) | 2003-01-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP0501994B1 (fr) | Piece moulee pour le raccordement de profiles de construction | |
EP1352134B1 (fr) | Construction a traverses et montants | |
DE9100099U1 (de) | Durch Schrauben mit einem Profilstab verbundener Tragstab | |
DE19849152C2 (de) | Pfosten-Riegelverbindung | |
DE202015104250U1 (de) | Pfosten-Riegel-Verbindung | |
DE2838163A1 (de) | Zerlegbares rahmensystem | |
EP3636844A1 (fr) | Cadre de construction sèche pour une porte coulissante | |
EP0976891B1 (fr) | Système de construction | |
EP2088337A2 (fr) | Profilé et système de profilés | |
EP1059394A2 (fr) | Système de poteaux et traverses pour façades équipées de panneaux de remplissage | |
WO1985004220A1 (fr) | Element de liaison | |
EP2708693B1 (fr) | Cadre de battant ouvrant-coulissant | |
DE19828382C2 (de) | Anordnung zum Befestigen eines einen Hohlquerschnitt aufweisenden Pfostens am Blendrahmen eines Fensters oder einer Türe aus Kunststoff oder Leichtmetall | |
DE102006004493B4 (de) | Führungsschienenbefestigung | |
DE19740603C2 (de) | Stulpschienenbefestigung | |
EP0067970B1 (fr) | Dispositif de fixation pour éléments de façade | |
EP1522668B1 (fr) | Raccord pour profilés d'encadrement de doubles vitrages | |
DE9420726U1 (de) | Schwellenhalter für Türrahmen zur Befestigung eines Rahmenprofiles an der Türschwelle | |
EP1035294A2 (fr) | Ensemble de montage d'un meneau dans un encadrement | |
EP2186959B1 (fr) | Connexion en T entre un poteau profilé et une traverse profilée | |
DE19752619A1 (de) | Verbindungsbauteil für eine Fassadenkonstruktion und Fassadenkonstruktion | |
DE4321466C2 (de) | Zarge für ein Fenster | |
AT520997B1 (de) | Montagehalter | |
EP3674508B1 (fr) | Élément d'insertion, installation de porte pourvue d'élément d'insertion et procédé de montage d'un élément d'insertion | |
DE10229272A1 (de) | Stoßverbinder zum winkeligen Verbinden von Hohlprofilen |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
AK | Designated contracting states |
Kind code of ref document: A2 Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE |
|
AX | Request for extension of the european patent |
Free format text: AL;LT;LV;MK;RO;SI |
|
19U | Interruption of proceedings before grant |
Effective date: 20000901 |
|
19W | Proceedings resumed before grant after interruption of proceedings |
Effective date: 20011210 |
|
PUAL | Search report despatched |
Free format text: ORIGINAL CODE: 0009013 |
|
AK | Designated contracting states |
Kind code of ref document: A3 Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE |
|
AX | Request for extension of the european patent |
Free format text: AL;LT;LV;MK;RO;SI |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN |
|
18D | Application deemed to be withdrawn |
Effective date: 20020503 |