EP0886007A1 - Transport wagon for the unloading of long railway rails - Google Patents

Transport wagon for the unloading of long railway rails Download PDF

Info

Publication number
EP0886007A1
EP0886007A1 EP98108986A EP98108986A EP0886007A1 EP 0886007 A1 EP0886007 A1 EP 0886007A1 EP 98108986 A EP98108986 A EP 98108986A EP 98108986 A EP98108986 A EP 98108986A EP 0886007 A1 EP0886007 A1 EP 0886007A1
Authority
EP
European Patent Office
Prior art keywords
rail loading
rail
loading crane
long rails
crane
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP98108986A
Other languages
German (de)
French (fr)
Other versions
EP0886007B1 (en
Inventor
Bruno Ströbel
Josef Hertelendi
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ROBEL GMBH & CO. KG
Original Assignee
Georg Robel GmbH and Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Georg Robel GmbH and Co filed Critical Georg Robel GmbH and Co
Publication of EP0886007A1 publication Critical patent/EP0886007A1/en
Application granted granted Critical
Publication of EP0886007B1 publication Critical patent/EP0886007B1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61DBODY DETAILS OR KINDS OF RAILWAY VEHICLES
    • B61D15/00Other railway vehicles, e.g. scaffold cars; Adaptations of vehicles for use on railways
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00Laying, rebuilding, or taking-up tracks; Tools or machines therefor
    • E01B29/16Transporting, laying, removing, or replacing rails; Moving rails placed on sleepers in the track
    • E01B29/17Lengths of rails assembled into strings, e.g. welded together

Definitions

  • the invention relates to a rail loading wagon for unloading long rails, with a carriage frame supported by rail bogies on a track, with rails running in the longitudinal direction of the carriage for moving of a rail loading crane with a drive, the drive Height and side adjustable gripping elements for gripping a long rail assigned.
  • Such a rail loading wagon is already known from DE 27 34 748, the one at the front end with respect to the direction of pulling out the rails Wagons formed rail transport train is positioned.
  • the rails of the rail loading wagon are longitudinal two rail loading cranes can be moved, each for gripping a long rail are equipped with height and side adjustable gripping elements.
  • a rail loading wagon is also known from DE 1 208 326, on which a rail loading crane with gripping elements for gripping the long rails can be moved is.
  • the long rails are in the area of the transport wagons Supported rail supports, which are supported by a long rail, in Carriage crosswise working position in a longitudinal direction of the carriage running inoperative position are pivotable. To the for that Pull off the long rails to reduce the required pulling force the rail supports roll up to support the long rails.
  • DE 297 01 016 U1 is yet another rail loading wagon known in which the rail loading crane as a form-fitting in a Trolley longitudinal direction and connected to the trolley frame Guided crane sled is formed. This is due to a sliding drive Can be moved lengthways for positive power transmission trained and with gripping organs for grasping the to be removed Long rails connected. Through the form-fitting power transmission very high tensile forces can be applied, so that only on wooden intermediate layers supported long rails are removable.
  • the object of the present invention is to create a Rail loading wagon of the generic type, with the minimal constructive effort an increase in pulling off the long rails required pull-off force can be achieved.
  • the achievement of this task is characterized by a pull rope attached to the rail loading crane or to the wagon frame with a winch that can be unwound to produce a winch a cable connection that can be changed in length by winding up between Trolley frame and rail loading crane.
  • a rail loading wagon 1 shown in part in FIGS. 1 to 6 consists of two connected by a coupling 2, each loader wagons 4 supported on rail trolleys 3 together. Every loading wagon 4 has a carriage frame running in the longitudinal direction of a track 5 6 and two rails 7 for moving a rail loading crane 8 on.
  • the rail loading crane 8 At the front end of the rail loading crane with respect to the rail pulling direction (arrow 9) 8 are two spaced apart in the transverse direction of the carriage, by drives 10 height and side adjustable gripping members 11 for gripping provided by long rails 12.
  • the rail loading crane 8 is also with a driver's cab 14 and a control device 13 equipped with a drive 15.
  • a cable winch 16 attached by a drive 17 to a rotatable normal to the longitudinal direction of the carriage and horizontal axis is trained.
  • One of the cable winch 16 is a first cable connection 26 forming - traction rope 18 can be unwound or wound up by one at the front Fixed end of the loading wagon 4 deflected roller 19 and with a Cable end 20 is attached to the rail loading crane 8.
  • the mentioned pulley 19 is rotatable about a vertical axis 21 on the carriage frame 6 stored.
  • Rope 24 attached to its rear end by a quick release fastener 25 can be positively connected to a long rail 12 to be removed is.
  • For simultaneous removal of two long rails 12 are in Carriage transverse direction spaced apart from each other two ropes 24, each with one own quick release 25 provided.
  • FIG. 1 are front sections 31 of the mounted on transport wagons 27 Long rails 12 spaced from the adjacent rail loading wagon 1 so that the possibility of elastic bending of the long rails 12th consists.
  • the long rails 12 are made in layers by intermediate layers 28 Wood spaced apart.
  • the unwound from the cable winch 16 of the rail loading crane 8 and around the pulley 19 deflected rope end 20 of the traction rope 18 is used for production the first cable connection 26 connected to the rail loading crane 8.
  • the rail loading crane 8 is in its - with respect to Rail pull direction - rear end position at the rear end of the rail loading wagon 1 (see Figs. 1 and 2).
  • With the rear rope 24 is a second Rope connection 23 made by the two quick fasteners 25 with two pull-off long rails 12 are brought into engagement.
  • the cable winch 16 could also be used instead of the deflection roller 19 be attached to the carriage frame 6.

Landscapes

  • Engineering & Computer Science (AREA)
  • Transportation (AREA)
  • Mechanical Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Machines For Laying And Maintaining Railways (AREA)
  • Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)
  • Fittings On The Vehicle Exterior For Carrying Loads, And Devices For Holding Or Mounting Articles (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
  • Leg Units, Guards, And Driving Tracks Of Cranes (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The waggon (1) is for long rails (12). It has a bogie frame (6) with rails for a rail loading crane (8) with drive. A cable winch (16) for a traction cable (18) with free end is fastened to bogie frame or crane. The cable is wound on/off, to form a length-adjustable connection between bogie and crane. If the winch is fastened to the frame, a rotating deflection pulley at one end of the bogie frame, is fastened to the waggon.

Description

Die Erfindung betrifft einen Schienenladewagen zum Abladen von Langschienen, mit einem durch Schienenfahrwerke auf einem Gleis abgestützten Wagenrahmen, mit in Wagenlängsrichtung verlaufenden Schienen zum Verfahren eines einen Antrieb aufweisenden Schienenladekranes, dem durch Antriebe höhen- und seitenverstellbare Greiforgane zum Erfassen einer Langschiene zugeordnet sind.The invention relates to a rail loading wagon for unloading long rails, with a carriage frame supported by rail bogies on a track, with rails running in the longitudinal direction of the carriage for moving of a rail loading crane with a drive, the drive Height and side adjustable gripping elements for gripping a long rail assigned.

Durch DE 27 34 748 ist bereits ein derartiger Schienenladewagen bekannt, der bezüglich der Schienenabziehrichtung am vorderen Ende eines aus mehreren Waggons gebildeten Schienentransportzuges positioniert ist. Auf in Wagenlängsrichtung verlaufenden Schienen des Schienenladewagens sind zwei Schienenladekräne verfahrbar, die jeweils zum Erfassen einer Langschiene mit höhen- und seitenverstellbaren Greiforganen ausgestattet sind. Durch die Anordnung zweier Schienenladekräne wird zwar die Abzugskraft verstärkt, durch die Limitierung der Achslasten sind jedoch Grenzen gesetzt.Such a rail loading wagon is already known from DE 27 34 748, the one at the front end with respect to the direction of pulling out the rails Wagons formed rail transport train is positioned. On in The rails of the rail loading wagon are longitudinal two rail loading cranes can be moved, each for gripping a long rail are equipped with height and side adjustable gripping elements. By arranging two rail loading cranes, the pulling force is reinforced, but there are limits due to the limitation of the axle loads.

Auch durch die DE 1 208 326 ist ein Schienenladewagen bekannt, auf dem ein Schienenladekran mit Greiforganen zum Erfassen der Langschienen verfahrbar ist. Die Langschienen sind im Bereich der Transportwaggons auf Schienenauflager abgestützt, die von einer die Langschienen tragenden, in Wagenquerrichtung verlaufenden Arbeitsposition in eine in Wagenlängsrichtung verlaufende Außerbetriebstellung verschwenkbar sind. Um die für das Abziehen der Langschienen erforderliche Abzugskraft zu reduzieren, weisen die Schienenauflager Rollen zur Abstützung der Langschienen auf.A rail loading wagon is also known from DE 1 208 326, on which a rail loading crane with gripping elements for gripping the long rails can be moved is. The long rails are in the area of the transport wagons Supported rail supports, which are supported by a long rail, in Carriage crosswise working position in a longitudinal direction of the carriage running inoperative position are pivotable. To the for that Pull off the long rails to reduce the required pulling force the rail supports roll up to support the long rails.

Schließlich ist durch DE 297 01 016 U1 noch ein weiterer Schienenladewagen bekannt, bei dem der Schienenladekran als formschlüssig in einer in Wagenlängsrichtung verlaufenden und mit dem Wagenrahmen verbundenen Führung gelagerter Kranschlitten ausgebildet ist. Dieser ist durch einen Verschiebeantrieb für eine formschlüssige Leistungsübertragung längsverschiebbar ausgebildet und mit Greiforganen zum Erfassen der abzuziehenden Langschienen verbunden. Durch die formschlüssige Leistungsübertragung sind sehr hohe Zugkräfte aufbringbar, so daß auch lediglich auf Holzzwischenlagen abgestützte Langschienen abziehbar sind.Finally, DE 297 01 016 U1 is yet another rail loading wagon known in which the rail loading crane as a form-fitting in a Trolley longitudinal direction and connected to the trolley frame Guided crane sled is formed. This is due to a sliding drive Can be moved lengthways for positive power transmission trained and with gripping organs for grasping the to be removed Long rails connected. Through the form-fitting power transmission very high tensile forces can be applied, so that only on wooden intermediate layers supported long rails are removable.

Die Aufgabe der vorliegenden Erfindung liegt nun in der Schaffung eines Schienenladewagens der gattungsgemäßen Art, mit dem durch minimalen konstruktiven Aufwand eine Erhöhung der zum Abziehen der Langschienen erforderlichen Abzugskraft erzielbar ist.The object of the present invention is to create a Rail loading wagon of the generic type, with the minimal constructive effort an increase in pulling off the long rails required pull-off force can be achieved.

Die erfindungsgemäße Lösung dieser Aufgabe ist gekennzeichnet durch eine am Schienenladekran oder am Wagenrahmen befestigte, ein Zugseil mit einem abwickelbaren Seilende aufweisende Seilwinde zur Herstellung einer durch Aufwickeln längenmäßig veränderbaren Seilverbindung zwischen Wagenrahmen und Schienenladekran.The achievement of this task is characterized by a pull rope attached to the rail loading crane or to the wagon frame with a winch that can be unwound to produce a winch a cable connection that can be changed in length by winding up between Trolley frame and rail loading crane.

Mit dieser Ausbildung kann unabhängig von der Adhäsion zwischen Schienenladekran und den Schienen eine wesentliche Erhöhung der Abzugskraft erreicht werden. Somit sind auch besonders lange Langschienen problemlos abziehbar, die durch Auflage lediglich auf Holzzwischenlagen eine besonders hohe Abzugskraft erfordern. Dabei ist von besonderem Vorteil, daß der konstruktive Mehraufwand lediglich minimal und eine Nachrüstung von bereits im Einsatz befindlichen Schienenladewagen relativ einfach durchführbar ist.With this training can be independent of the adhesion between rail loading crane and the rails a significant increase in the pull-off force can be achieved. This means that especially long long rails are no problem peelable, which is a special by only laying on wooden intermediate layers require high pull-off force. It is particularly advantageous that the constructive additional effort only minimal and retrofitting already Rail loading wagons in use can be carried out relatively easily is.

Vorteilhafte Weiterbildungen der Erfindung ergeben sich aus den Unteransprüchen und der Zeichnung.Advantageous developments of the invention result from the subclaims and the drawing.

Im folgenden wird die Erfindung anhand eines in der Zeichnung dargestellten Ausführungsbeispieles näher beschrieben.In the following the invention with reference to one shown in the drawing Embodiment described in more detail.

Es zeigen:

  • Fig. 1, 2 bzw. Fig. 3, 4 sowie Fig. 5 und 6 jeweils eine Seitenansicht bzw. eine Draufsicht des Schienenladewagens zum Abladen von Langschienen, wobei ein Schienenladekran in verschiedenen Arbeitspositionen ersichtlich ist.
  • Show it:
  • FIGS. 1, 2 and 3, 4 and FIGS. 5 and 6 each show a side view and a top view of the rail loading wagon for unloading long rails, a rail loading crane being visible in different working positions.
  • Ein in den Fig. 1 bis 6 jeweils zum Teil dargestellter Schienenladewagen 1 setzt sich aus zwei durch eine Kupplung 2 miteinander verbundenen, jeweils auf Schienenfahrwerken 3 abgestützten Ladewagen 4 zusammen. Jeder Ladewagen 4 weist einen in Längsrichtung eines Gleises 5 verlaufenden Wagenrahmen 6 sowie zwei Schienen 7 zum Verfahren eines Schienenladekranes 8 auf.A rail loading wagon 1 shown in part in FIGS. 1 to 6 consists of two connected by a coupling 2, each loader wagons 4 supported on rail trolleys 3 together. Every loading wagon 4 has a carriage frame running in the longitudinal direction of a track 5 6 and two rails 7 for moving a rail loading crane 8 on.

    Am bezüglich der Schienenabziehrichtung (Pfeil 9) vorderen Ende des Schienenladekranes 8 sind zwei in Wagenquerrichtung voneinander distanzierte, durch Antriebe 10 höhen- und seitenverstellbare Greiforgane 11 zum Erfassen von Langschienen 12 vorgesehen. Der Schienenladekran 8 ist außerdem mit einer eine Steuereinrichtung 13 aufweisenden Fahrkabine 14 sowie mit einem Antrieb 15 ausgestattet.At the front end of the rail loading crane with respect to the rail pulling direction (arrow 9) 8 are two spaced apart in the transverse direction of the carriage, by drives 10 height and side adjustable gripping members 11 for gripping provided by long rails 12. The rail loading crane 8 is also with a driver's cab 14 and a control device 13 equipped with a drive 15.

    Am bezüglich der Schienenabziehrichtung vorderen Ende des Schienenladekranes 8 ist eine Seilwinde 16 befestigt, die durch einen Antrieb 17 um eine normal zur Wagenlängsrichtung und horizontal verlaufende Achse rotierbar ausgebildet ist. Von der Seilwinde 16 ist ein - eine erste Seilverbindung 26 bildendes - Zugseil 18 ab- bzw. aufwickelbar, das um eine am vorderen Ende des Ladewagens 4 befestigte Umlenkrolle 19 umgelenkt und mit einem Seilende 20 am Schienenladekran 8 befestigt ist. Die genannte Umlenkrolle 19 ist um eine senkrecht verlaufende Achse 21 rotierbar am Wagenrahmen 6 gelagert.At the front end of the rail loading crane with respect to the rail pulling direction 8 is a cable winch 16 attached by a drive 17 to a rotatable normal to the longitudinal direction of the carriage and horizontal axis is trained. One of the cable winch 16 is a first cable connection 26 forming - traction rope 18 can be unwound or wound up by one at the front Fixed end of the loading wagon 4 deflected roller 19 and with a Cable end 20 is attached to the rail loading crane 8. The mentioned pulley 19 is rotatable about a vertical axis 21 on the carriage frame 6 stored.

    An einem - bezüglich der Schienenabziehrichtung gemäß Pfeil 9 - hinteren Ende 22 des Schienenladekranes 8 ist ein eine zweite Seilverbindung 23 bildendes Seil 24 befestigt, das an seinem hinteren Ende durch einen Schnellverschluß 25 mit einer abzuziehenden Langschiene 12 formschlüssig verbindbar ist. Zum gleichzeitigen Abziehen von zwei Langschienen 12 sind in Wagenquerrichtung voneinander distanziert zwei Seile 24 mit jeweils einem eigenen Schnellverschluß 25 vorgesehen. Wie insbesondere in Fig. 1 ersichtlich, sind vordere Abschnitte 31 der auf Transportwaggons 27 gelagerten Langschienen 12 vom angrenzenden Schienenladewagen 1 distanziert, so daß die Möglichkeit einer elastischen Verbiegung der Langschienen 12 besteht. Die Langschienen 12 sind lagenweise durch Zwischenlagen 28 aus Holz voneinander distanziert.On one - with respect to the direction of pulling the rail according to arrow 9 - at the rear The end 22 of the rail loading crane 8 is a second cable connection 23 Rope 24 attached to its rear end by a quick release fastener 25 can be positively connected to a long rail 12 to be removed is. For simultaneous removal of two long rails 12 are in Carriage transverse direction spaced apart from each other two ropes 24, each with one own quick release 25 provided. As can be seen in particular in FIG. 1, are front sections 31 of the mounted on transport wagons 27 Long rails 12 spaced from the adjacent rail loading wagon 1 so that the possibility of elastic bending of the long rails 12th consists. The long rails 12 are made in layers by intermediate layers 28 Wood spaced apart.

    Im folgenden wird die Funktionsweise des erfindungsgemäßen Schienenladewagens 1 näher beschrieben.The mode of operation of the rail loading wagon according to the invention is described below 1 described in more detail.

    Das von der Seilwinde 16 des Schienenladekranes 8 abgewickelte und um die Umlenkrolle 19 umgelenkte Seilende 20 des Zugseiles 18 wird zur Herstellung der ersten Seilverbindung 26 mit dem Schienenladekran 8 verbunden. Dabei befindet sich der Schienenladekran 8 in seiner - bezüglich der Schienenabziehrichtung - hinteren Endposition am hinteren Ende des Schienenladewagens 1 (s. Fig. 1 und 2). Mit dem hinteren Seil 24 wird eine zweite Seilverbindung 23 hergestellt, indem die beiden Schnellverschlüsse 25 mit zwei abzuziehenden Langschienen 12 in Eingriff gebracht werden.The unwound from the cable winch 16 of the rail loading crane 8 and around the pulley 19 deflected rope end 20 of the traction rope 18 is used for production the first cable connection 26 connected to the rail loading crane 8. The rail loading crane 8 is in its - with respect to Rail pull direction - rear end position at the rear end of the rail loading wagon 1 (see Figs. 1 and 2). With the rear rope 24 is a second Rope connection 23 made by the two quick fasteners 25 with two pull-off long rails 12 are brought into engagement.

    Zur Einleitung des Abziehvorganges wird der Antrieb 17 beaufschlagt und in weiterer Folge das Zugseil 18 auf die Seilwinde 16 aufgewickelt, wodurch der Schienenladekran 8 mitsamt den beiden durch die Schnellverschlüsse 25 erfaßten Langschienen 12 in Schienenabziehrichtung (Pfeil 9) gezogen wird (Fig. 1 und 2).To initiate the removal process, the drive 17 is acted upon and in further consequence the traction rope 18 is wound onto the winch 16, whereby the rail loading crane 8 together with the two through the quick-release fasteners 25 detected long rails 12 pulled in the rail pulling direction (arrow 9) will (Fig. 1 and 2).

    Sobald die vorderen Abschnitte der abgezogenen Langschienen 12 im Bereich der Kupplung 2 zu liegen kommen (s. Fig. 3,4), wird der Antrieb 17 der Seilwinde 16 drucklos geschaltet und der Schienenladekran 8 entgegengesetzt der Schienenabziehrichtung mit Hilfe des Antriebes 15 zurück in die hintere Ausgangsposition verfahren. Dabei kann der Schienenladekran 8 durch eine portalrahmenartige Ausbildung problemlos über die vorderen Abschnitte 31 der Langschienen 12 verfahren werden. Sobald die hintere Endposition durch den Schienenladekran 8 erreicht ist, werden die vorderen Abschnitte 31 der beiden Langschienen 12 durch die Greiforgane 11 des Schienenladekranes 8 erfaßt. Gleichzeitig wird hinter dem Schienenladekran 8 mit Hilfe der beiden Schnellverschlüsse 25 wiederum eine formschlüssige Verbindung mit den beiden Langschienen 12 hergestellt. Anschließend erfolgt wiederum eine Beaufschlagung des Antriebes 17 der Seilwinde 16, wodurch der Schienenladekran 8 mitsamt den beiden sowohl durch die Greiforgane 11 als auch durch die Schnellverschlüsse 25 erfaßten Langschienen 12 in Schienenabziehrichtung bewegt wird (s. Fig. 3 und 4).As soon as the front sections of the pulled-off long rails 12 are in the area the clutch 2 come to rest (see Fig. 3,4), the drive 17 of the Cable winch 16 is depressurized and the rail loading crane 8 opposed the rail pulling direction with the help of the drive 15 in the Move the rear starting position. The rail loading crane 8 through a portal frame-like design without problems over the front sections 31 of the long rails 12 can be moved. Once the rear end position is reached by the rail loading crane 8, the front sections 31 of the two long rails 12 by the gripping members 11 of the rail loading crane 8 recorded. At the same time, behind the rail loading crane 8 With the help of the two quick fasteners 25, in turn, a positive connection made with the two long rails 12. Then follows in turn an action on the drive 17 of the cable winch 16, whereby the rail loading crane 8 together with the two both by the gripping members 11 as well as through the quick fasteners 25 long rails 12 in Rail pulling direction is moved (see Fig. 3 and 4).

    Sobald der vordere Ladewagen 4 erreicht ist, werden die vorderen Abschnitte 31 der beiden Langschienen 12 unter Beaufschlagung der Antriebe 10 in Schienenlängsführungen 30 eingeführt und abgelegt (s. Fig. 5 und 6). Im Bereich der Kupplung 2 vorgesehene, um eine senkrechte Achse rotierbare Umlenkrollen 29 dienen zur seitenmäßigen Umlenkung der abzuziehenden Langschienen 12. Sobald die vorderen Enden der beiden Langschienen 12 das Gleis 5 berühren, erfolgt eine lösbare Verbindung mit diesem. Die Geiforgane 11 sowie die Schnellverschlüsse 25 werden von den Langschienen 12 gelöst. Diese werden in weiterer Folge durch ein Vorwärtsbewegen des Schienenladewagens 1 und der Transportwaggons 27 mit Hilfe einer nicht näher dargestellten Lok von den Transportwaggons 27 abgezogen.As soon as the front loading wagon 4 is reached, the front sections 31 of the two long rails 12 under the action of the drives 10 in Rail longitudinal guides 30 inserted and stored (see. Fig. 5 and 6). In the area the coupling 2 provided, rotatable about a vertical axis Deflection rollers 29 are used for the lateral deflection of those to be removed Long rails 12. As soon as the front ends of the two long rails 12 touch the track 5, there is a detachable connection with it. The Geiforgane 11 and the quick fasteners 25 are from the long rails 12 solved. These are subsequently increased by moving the Rail loader 1 and the transport wagons 27 with the help of a non Locomotive shown deducted from the transport wagons 27.

    Alternativ könnte natürlich die Seilwinde 16 auch anstelle der Umlenkrolle 19 am Wagenrahmen 6 befestigt sein.Alternatively, of course, the cable winch 16 could also be used instead of the deflection roller 19 be attached to the carriage frame 6.

    Claims (3)

    Schienenladewagen (1) zum Abladen von Langschienen (12), mit einem durch Schienenfahrwerke (3) auf einem Gleis abgestützten Wagenrahmen (6), mit in Wagenlängsrichtung verlaufenden Schienen (7) zum Verfahren eines einen Antrieb (15) aufweisenden Schienenladekranes (8), dem durch Antriebe (10) höhen- und seitenverstellbare Greiforgane (11) zum Erfassen einer Langschiene (12) zugeordnet sind, gekennzeichnet durch eine am Schienenladekran (8) oder am Wagenrahmen (6) befestigte, ein Zugseil (18) mit einem abwickelbaren Seiende (20) aufweisende Seilwinde (16) zur Herstellung einer durch Aufwickeln längenmäßig veränderbaren Seilverbindung zwischen Wagenrahmen (6) und Schienenladekran (8).Rail loading wagon (1) for unloading long rails (12) with a carriage frame supported by rail running gear (3) on a track (6), with rails (7) running in the longitudinal direction of the carriage for moving of a rail loading crane (8) having a drive (15), the by drives (10) height and side adjustable gripping members (11) for gripping are assigned to a long rail (12), characterized by a a pull rope attached to the rail loading crane (8) or to the carriage frame (6) (18) with a windable end (20) having a cable winch (16) for Production of a rope connection that can be changed in length by winding between carriage frame (6) and rail loading crane (8). Schienenladewagen nach Anspruch 1, dadurch gekennzeichnet, daß die Seilwinde (16) am Schienenladekran (8) befestigt ist und an einem Längsende des Wagenrahmens (6) eine rotierbar am Schienenladewagen (1) gelagerte Umlenkrolle (19) zur Umlenkung des mit einem Seiende (20) am Schienenladekran (8) befestigten Zugseiles (18) vorgesehen ist.Rail loading wagon according to claim 1, characterized in that the cable winch (16) is attached to the rail loading crane (8) and on one Longitudinal end of the carriage frame (6) rotatable on the rail loading carriage (1) mounted deflection roller (19) for deflecting the with one end (20) on Rail loading crane (8) attached pull cable (18) is provided. Verfahren zum Abladen von Langschienen mit Hilfe eines auf einem Schienenladewagen (1) längsverfahrbaren Schienenladekranes (8), wobei der Schienenladewagen (1) an mit Langschienen (12) beladene Transportwaggons (27) angekuppelt ist, gekennzeichnet durch folgende Schritte: a) Herstellung einer ersten Seilverbindung (26) am in Abziehrichtung vorderen Ende des Schienenladewagens (1) zwischen diesem und dem Schienenladekran (8), b) Herstellung einer zweiten Seilverbindung (23) zwischen Schienenladekran (8) und abzuziehenden Langschienen (12), c) Aufwickeln eines Zugseiles (18) der ersten Seilverbindung (26) und damit Bewegen des Schienenladekranes (8) mitsamt den durch die zweite Seilverbindung (23) erfaßten Langschienen (12), d) Rückbewegen des Schienenladekranes (8) in zur Abziehrichtung entgegengesetzten Richtung über einen vorderen Abschnitt (31) der abgezogenen Langschienen (12), e) Erfassen der vorgezogenen Langschienen (12) durch die Greiforgane (11) des Schienenladekranes (8), und f) wiederholtes Aufwickeln des Zugseiles (18) der ersten Seilverbindung (26) und damit eine Bewegung des Schienenladekranes (8) mitsamt den erfaßten Langschienen (12) in Abziehrichtung. Method for unloading long rails with the aid of a rail loading crane (8) which can be moved longitudinally on a rail loading wagon (1), the rail loading wagon (1) being coupled to transport wagons (27) loaded with long rails (12), characterized by the following steps: a) producing a first cable connection (26) at the front end of the rail loading wagon (1) in the pulling direction between the latter and the rail loading crane (8), b) production of a second cable connection (23) between the rail loading crane (8) and the long rails (12) to be pulled off, c) winding up a traction cable (18) of the first cable connection (26) and thus moving the rail loading crane (8) together with the long rails (12) gripped by the second cable connection (23), d) moving the rail loading crane (8) back in the opposite direction to the pulling direction over a front section (31) of the pulled-off long rails (12), e) Detecting the advanced long rails (12) by the gripping members (11) of the rail loading crane (8), and f) repeated winding of the traction cable (18) of the first cable connection (26) and thus a movement of the rail loading crane (8) together with the detected long rails (12) in the pulling direction.
    EP98108986A 1997-06-18 1998-05-18 Transport wagon for the unloading of long railway rails Expired - Lifetime EP0886007B1 (en)

    Applications Claiming Priority (2)

    Application Number Priority Date Filing Date Title
    DE19725700 1997-06-18
    DE19725700A DE19725700A1 (en) 1997-06-18 1997-06-18 Rail loading wagons for unloading long rails

    Publications (2)

    Publication Number Publication Date
    EP0886007A1 true EP0886007A1 (en) 1998-12-23
    EP0886007B1 EP0886007B1 (en) 2002-09-18

    Family

    ID=7832806

    Family Applications (1)

    Application Number Title Priority Date Filing Date
    EP98108986A Expired - Lifetime EP0886007B1 (en) 1997-06-18 1998-05-18 Transport wagon for the unloading of long railway rails

    Country Status (11)

    Country Link
    EP (1) EP0886007B1 (en)
    JP (1) JP3054993U (en)
    AT (1) ATE224479T1 (en)
    CZ (1) CZ291416B6 (en)
    DE (2) DE19725700A1 (en)
    ES (1) ES2182174T3 (en)
    HR (1) HRP980336A2 (en)
    HU (1) HU220751B1 (en)
    PL (1) PL193186B1 (en)
    SK (1) SK284314B6 (en)
    YU (1) YU49033B (en)

    Cited By (5)

    * Cited by examiner, † Cited by third party
    Publication number Priority date Publication date Assignee Title
    CN1113011C (en) * 1999-04-06 2003-07-02 罗贝尔铁路建筑机械有限责任公司 Dual purpose vehicles for unloading steel rails, capable of using on road and railway
    WO2005095715A1 (en) * 2004-03-30 2005-10-13 Franz Plasser Bahnbaumaschinen- Industriegesellschaft Mbh Transport vehicle and method for transporting and unloading long rails
    AT413394B (en) * 2002-08-01 2006-02-15 Haertensteiner Leopold RAIL PULLER & TORCH
    WO2007065500A1 (en) 2005-12-06 2007-06-14 Robel Bahnbaumaschinen Gmbh Rail carrying train for transporting longitudinally welded rails
    FR3036356A1 (en) * 2015-05-18 2016-11-25 Transalp Renouvellement VEHICLE COMPRISING A DEVICE FOR LOADING AND UNLOADING METAL BARS.

    Families Citing this family (4)

    * Cited by examiner, † Cited by third party
    Publication number Priority date Publication date Assignee Title
    DE202008008711U1 (en) 2008-06-28 2008-10-02 Robel Bahnbaumaschinen Gmbh Rail loading wagons
    DE202010013957U1 (en) 2010-10-05 2011-01-13 Robel Bahnbaumaschinen Gmbh Rail transport vehicle
    DE202013004729U1 (en) * 2013-05-18 2013-07-19 Robel Bahnbaumaschinen Gmbh Schienenladezug
    JP6283387B2 (en) * 2016-03-29 2018-02-21 東進産業株式会社 Track slab conveyor

    Citations (4)

    * Cited by examiner, † Cited by third party
    Publication number Priority date Publication date Assignee Title
    DE1208326B (en) 1963-04-20 1966-01-05 Robel & Co G Loading and unloading device for rails, especially long rails
    DE2734748A1 (en) 1977-08-02 1979-02-22 Robel Georg Gmbh & Co MOBILE DEVICE FOR TRANSPORT AND LOADING AND UNLOADING OF RAILS, IN PARTICULAR LONG RAILS
    WO1989005254A1 (en) * 1987-12-08 1989-06-15 Swedish Rail System Ab Srs A method and a loading machine for loading and/or unloading railway cars
    DE29701016U1 (en) 1997-01-09 1997-03-20 Georg Robel GmbH & Co, 81371 München Rail-movable trolley for pulling long-welded rails from transport trolleys

    Patent Citations (4)

    * Cited by examiner, † Cited by third party
    Publication number Priority date Publication date Assignee Title
    DE1208326B (en) 1963-04-20 1966-01-05 Robel & Co G Loading and unloading device for rails, especially long rails
    DE2734748A1 (en) 1977-08-02 1979-02-22 Robel Georg Gmbh & Co MOBILE DEVICE FOR TRANSPORT AND LOADING AND UNLOADING OF RAILS, IN PARTICULAR LONG RAILS
    WO1989005254A1 (en) * 1987-12-08 1989-06-15 Swedish Rail System Ab Srs A method and a loading machine for loading and/or unloading railway cars
    DE29701016U1 (en) 1997-01-09 1997-03-20 Georg Robel GmbH & Co, 81371 München Rail-movable trolley for pulling long-welded rails from transport trolleys

    Cited By (5)

    * Cited by examiner, † Cited by third party
    Publication number Priority date Publication date Assignee Title
    CN1113011C (en) * 1999-04-06 2003-07-02 罗贝尔铁路建筑机械有限责任公司 Dual purpose vehicles for unloading steel rails, capable of using on road and railway
    AT413394B (en) * 2002-08-01 2006-02-15 Haertensteiner Leopold RAIL PULLER & TORCH
    WO2005095715A1 (en) * 2004-03-30 2005-10-13 Franz Plasser Bahnbaumaschinen- Industriegesellschaft Mbh Transport vehicle and method for transporting and unloading long rails
    WO2007065500A1 (en) 2005-12-06 2007-06-14 Robel Bahnbaumaschinen Gmbh Rail carrying train for transporting longitudinally welded rails
    FR3036356A1 (en) * 2015-05-18 2016-11-25 Transalp Renouvellement VEHICLE COMPRISING A DEVICE FOR LOADING AND UNLOADING METAL BARS.

    Also Published As

    Publication number Publication date
    ATE224479T1 (en) 2002-10-15
    HU9801296D0 (en) 1998-08-28
    PL326720A1 (en) 1998-12-21
    CZ291416B6 (en) 2003-03-12
    ES2182174T3 (en) 2003-03-01
    DE59805580D1 (en) 2002-10-24
    HU220751B1 (en) 2002-05-28
    SK84598A3 (en) 1999-01-11
    DE19725700A1 (en) 1998-12-24
    EP0886007B1 (en) 2002-09-18
    JP3054993U (en) 1998-12-22
    SK284314B6 (en) 2005-01-03
    HUP9801296A2 (en) 2001-01-29
    YU49033B (en) 2003-07-07
    CZ190498A3 (en) 1999-01-13
    HRP980336A2 (en) 1999-04-30
    YU23598A (en) 1999-09-27
    PL193186B1 (en) 2007-01-31

    Similar Documents

    Publication Publication Date Title
    EP0853160B1 (en) Wagon for unloading long railway rails from a transport wagon
    CH687333A5 (en) Tamping machine.
    EP0886007B1 (en) Transport wagon for the unloading of long railway rails
    EP0773074A1 (en) Horizontal strip-accumulator
    EP1028194A1 (en) Device for unloading rails
    EP1043448B1 (en) Dual way vehicle for unloading rails
    DE29701016U1 (en) Rail-movable trolley for pulling long-welded rails from transport trolleys
    DE69427110T2 (en) Device and method for driving and moving rail or road vehicles
    DE3017637C2 (en) Anchoring and catching-up device for longitudinally movable conveyors, in particular chain scraper conveyors, behind mining and loading machines in excavations in underground mining
    DE29712216U1 (en) Rail loading wagons for unloading long rails
    DE10143287B4 (en) Method and arrangement for positioning trolleys
    DE4108993A1 (en) AUXILIARY LIFTING DEVICE FOR RAILWAY RAILWAYS
    DE19524062C1 (en) Bridge-laying vehicle using sections of different lengths
    DE3744184C2 (en)
    DE19519606C2 (en) Shunting device for rail vehicles
    DE3244017C2 (en) Transport system for rail-bound wagons on inclined routes
    DE1807555C3 (en) Pull rope drive, in particular for railways in mining routes
    AT396451B (en) DEVICE FOR MOVING RAILWAYS
    DE9005485U1 (en) Drill carriage
    DE1530302C (en) Push trolley for shunting rail cars or other rail-bound vehicles
    DE1913834C3 (en) Device for pushing rail vehicles together with a push-back carriage running between the rails without a profile
    DE19500592C1 (en) Method for shunting of rail vehicles
    DE2637072B1 (en) DEVICE FOR THE REMOVAL OF DANGEROUS PEOPLE IN A MULTI-STRAND CASTING PLANT, ESPECIALLY IN A TWO-STRIP STEEL SLAM CASTING PLANT
    AT210306B (en) Closure device for uncovered rooms or vehicles, e.g. B. ship hatches, uncovered rail freight cars or the like.
    DE921944C (en) Railway master car

    Legal Events

    Date Code Title Description
    PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

    Free format text: ORIGINAL CODE: 0009012

    AK Designated contracting states

    Kind code of ref document: A1

    Designated state(s): AT BE CH DE ES FI FR GB IT LI NL SE

    AX Request for extension of the european patent

    Free format text: AL;LT;LV;MK;RO;SI

    RAP1 Party data changed (applicant data changed or rights of an application transferred)

    Owner name: ROBEL GMBH & CO. KG

    17P Request for examination filed

    Effective date: 19990422

    AKX Designation fees paid

    Free format text: AT BE CH DE ES FI FR GB IT LI NL SE

    AXX Extension fees paid

    Free format text: RO PAYMENT 19990529

    RAP1 Party data changed (applicant data changed or rights of an application transferred)

    Owner name: ROBEL BAHNBAUMASCHINEN GMBH

    GRAG Despatch of communication of intention to grant

    Free format text: ORIGINAL CODE: EPIDOS AGRA

    17Q First examination report despatched

    Effective date: 20011218

    GRAG Despatch of communication of intention to grant

    Free format text: ORIGINAL CODE: EPIDOS AGRA

    GRAH Despatch of communication of intention to grant a patent

    Free format text: ORIGINAL CODE: EPIDOS IGRA

    GRAH Despatch of communication of intention to grant a patent

    Free format text: ORIGINAL CODE: EPIDOS IGRA

    GRAA (expected) grant

    Free format text: ORIGINAL CODE: 0009210

    AK Designated contracting states

    Kind code of ref document: B1

    Designated state(s): AT BE CH DE ES FI FR GB IT LI NL SE

    AX Request for extension of the european patent

    Free format text: RO PAYMENT 19990529

    REF Corresponds to:

    Ref document number: 224479

    Country of ref document: AT

    Date of ref document: 20021015

    Kind code of ref document: T

    REG Reference to a national code

    Ref country code: GB

    Ref legal event code: FG4D

    Free format text: NOT ENGLISH

    REG Reference to a national code

    Ref country code: CH

    Ref legal event code: EP

    REF Corresponds to:

    Ref document number: 59805580

    Country of ref document: DE

    Date of ref document: 20021024

    GBT Gb: translation of ep patent filed (gb section 77(6)(a)/1977)

    Effective date: 20021217

    ET Fr: translation filed
    REG Reference to a national code

    Ref country code: ES

    Ref legal event code: FG2A

    Ref document number: 2182174

    Country of ref document: ES

    Kind code of ref document: T3

    PLBE No opposition filed within time limit

    Free format text: ORIGINAL CODE: 0009261

    STAA Information on the status of an ep patent application or granted ep patent

    Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

    26N No opposition filed

    Effective date: 20030619

    PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

    Ref country code: FI

    Payment date: 20100520

    Year of fee payment: 13

    PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

    Ref country code: IT

    Payment date: 20100527

    Year of fee payment: 13

    Ref country code: AT

    Payment date: 20100520

    Year of fee payment: 13

    PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

    Ref country code: CH

    Payment date: 20100525

    Year of fee payment: 13

    PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

    Ref country code: SE

    Payment date: 20100521

    Year of fee payment: 13

    REG Reference to a national code

    Ref country code: CH

    Ref legal event code: PL

    REG Reference to a national code

    Ref country code: SE

    Ref legal event code: EUG

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: CH

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20110531

    Ref country code: LI

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20110531

    Ref country code: FI

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20110518

    REG Reference to a national code

    Ref country code: AT

    Ref legal event code: MM01

    Ref document number: 224479

    Country of ref document: AT

    Kind code of ref document: T

    Effective date: 20110518

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: IT

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20110518

    Ref country code: AT

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20110518

    PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

    Ref country code: NL

    Payment date: 20120523

    Year of fee payment: 15

    Ref country code: DE

    Payment date: 20120511

    Year of fee payment: 15

    PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

    Ref country code: FR

    Payment date: 20120608

    Year of fee payment: 15

    Ref country code: BE

    Payment date: 20120522

    Year of fee payment: 15

    Ref country code: GB

    Payment date: 20120522

    Year of fee payment: 15

    PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

    Ref country code: ES

    Payment date: 20120525

    Year of fee payment: 15

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: SE

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20110519

    BERE Be: lapsed

    Owner name: *ROBEL BAHNBAUMASCHINEN G.M.B.H.

    Effective date: 20130531

    REG Reference to a national code

    Ref country code: NL

    Ref legal event code: V1

    Effective date: 20131201

    GBPC Gb: european patent ceased through non-payment of renewal fee

    Effective date: 20130518

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: DE

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20131203

    REG Reference to a national code

    Ref country code: DE

    Ref legal event code: R119

    Ref document number: 59805580

    Country of ref document: DE

    Effective date: 20131203

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: BE

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20130531

    Ref country code: NL

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20131201

    REG Reference to a national code

    Ref country code: FR

    Ref legal event code: ST

    Effective date: 20140131

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: GB

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20130518

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: FR

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20130531

    REG Reference to a national code

    Ref country code: ES

    Ref legal event code: FD2A

    Effective date: 20140606

    PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

    Ref country code: ES

    Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

    Effective date: 20130519