EP0851075B1 - Plate-forme surélevée ou charpente, plus particulièrement exécutée comme coffrage de dalles en béton - Google Patents

Plate-forme surélevée ou charpente, plus particulièrement exécutée comme coffrage de dalles en béton

Info

Publication number
EP0851075B1
EP0851075B1 EP97115368A EP97115368A EP0851075B1 EP 0851075 B1 EP0851075 B1 EP 0851075B1 EP 97115368 A EP97115368 A EP 97115368A EP 97115368 A EP97115368 A EP 97115368A EP 0851075 B1 EP0851075 B1 EP 0851075B1
Authority
EP
European Patent Office
Prior art keywords
openings
platform
main beam
bearing surface
beams
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
EP97115368A
Other languages
German (de)
English (en)
Other versions
EP0851075A1 (fr
Inventor
Niels Dipl.-Ing. Hollmann
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Alpi SpA
Original Assignee
Alpi SpA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Alpi SpA filed Critical Alpi SpA
Publication of EP0851075A1 publication Critical patent/EP0851075A1/fr
Application granted granted Critical
Publication of EP0851075B1 publication Critical patent/EP0851075B1/fr
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/36Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
    • E04G11/48Supporting structures for shutterings or frames for floors or roofs
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/36Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
    • E04G11/48Supporting structures for shutterings or frames for floors or roofs
    • E04G11/486Dropheads supporting the concrete after removal of the shuttering; Connecting means on beams specially adapted for dropheads
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/36Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
    • E04G11/48Supporting structures for shutterings or frames for floors or roofs
    • E04G11/50Girders, beams, or the like as supporting members for forms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G25/00Shores or struts; Chocks
    • E04G25/04Shores or struts; Chocks telescopic
    • E04G25/06Shores or struts; Chocks telescopic with parts held together by positive means
    • E04G25/061Shores or struts; Chocks telescopic with parts held together by positive means by pins

Definitions

  • Such slab formwork in which the main beam and the secondary beam form a support grid arranged in two levels are from FR-A-1532639 known.
  • the structure known from this document enables an arrangement the secondary beam in certain grids.
  • the invention has for its object a platform or stage of the beginning to create the type mentioned, in which an optimal subcarrier definition is realized with high variability of the location of the carrier.
  • DE 1434365 A proposes the attachment of flat board-like supports, which in the Level of the control panels are provided by means of pin-like projection elements on stands.
  • the main beam / secondary beam can be fixed with little Create workload, usually by simply putting on the secondary beam.
  • the form-fitting determination prevents a shift of the Secondary beam in the longitudinal direction of the main beam, in the longitudinal direction of the secondary beam and in all composite directions in the bearing surface plane.
  • the execution is such that even moments that are about Axis standing perpendicular to the bearing surface plane, form-fitting be included.
  • the platform or stage is very variable because of secondary beams in a variety of selectable locations on a main beam under consideration can be stored and because even with a secondary carrier considered under a variety of digits of its length for bearing on one Main carrier can be chosen. This variability is of great importance that the platform or stage, especially the ceiling formwork, adapted from standard components depending on the specific task can build.
  • openings is not just that Openings that are surrounded by material all around, but also openings that are open to one side, e.g. a Recess at an edge of the bearing surface of the main beam or In addition to the carrier.
  • short bolts made of plastic or metal as projecting elements on the carrier concerned (main carrier or secondary carrier) are attached.
  • the carrier concerned main carrier or secondary carrier
  • alternative versions are quite possible possible, in particular by bent from the storage area level Material areas of the carrier.
  • the Short bolts are attached in openings of the carrier concerned.
  • the main carrier in question and / or the secondary carrier in question has smaller openings therein attached protruding elements and larger engagement openings having.
  • the person concerned Main beam and / or the relevant secondary beam made of folded Sheet, preferably sheet steel, are made.
  • the openings are preferably stamped before folding. So the straps can be manufacture very efficiently. The construction is considerably cheaper than that Made from aluminum.
  • the main carrier in question and / or the secondary beam in question consisting of two essentially U-shaped profiles, those with their backs facing each other and at a distance from each other are connected.
  • the carriers get - in top view considered - an increased width, which is both for the main beam for
  • the cheap support of secondary beams is an advantage as well the secondary carrier to create increased security against Tipping over when erecting the platform or the stage.
  • the two profiles are preferably by screw connections connected to each other and by spacers, preferably made of Plastic, kept at a distance. This ensures a particularly rational Manufacturability.
  • the relevant Main carrier and / or the relevant secondary carrier openings are preferably in the vertical double web of the relevant Main carrier and / or the relevant secondary carrier openings provided, preferably in the form of one or more rows along the Carrier. Again, the provision of the openings in the Pitch particularly preferred.
  • the openings described can for a whole host of functions are used, in particular Fastening a nail bar between the two profiles, attachment of secondary structures such as parapets and attached walkways and much more.
  • the structure of the carrier from two spaced profiles has in particular also the following advantage, which is very important in practice.
  • the plates will be placed on the side beams that the bumps between adjacent panels - seen in plan view - approximately coincide with the longitudinal center line of the secondary beam. At the Concreting often runs through the plate joints and this no longer contaminates the wearer, but simply runs in between down through the two half beams.
  • At least one considerable part of the uprights / main girder support points positive determination between the relevant post and the the main beam concerned against forces in any direction in one direction Plane which is perpendicular to the longitudinal direction of the post and through which leads support point provided.
  • This positive definition can, but does not have to, according to described main girder / secondary girder definition principle take place, in particular by the engagement of protruding elements in Openings can be formed, the protruding elements from an upper The storage area of the upright in question protrudes and the Openings in a lower storage area of the main beam in question are trained or vice versa.
  • At least a significant part of the Auxiliary support / plate support points form-fitting determination between the secondary beam in question and the plate in question against forces of any direction in the support surface plane is provided.
  • At least a substantial part of the uprights is one equipped such a head that a main beam over it can be supported on the upright. This way you can get main beams not only support at their ends, but also in between.
  • At least a substantial part of the uprights is one Drop head equipped, at least one support point, in most Cases two support points, for a main beam and relative to the upper end of the post can be lowered.
  • this training can be the largest by lowering the drop head Part of the components of the slab formwork, namely main girders, Remove secondary beams, slabs, before the concrete is full Has reached final strength.
  • the supports remain for a while and with its upper end can the concrete ceiling in the form of a Support the point grid.
  • the other components of the slab formwork can already be used for other purposes.
  • trusses are attached as stiffening cross-connections with their ends on the relevant posts; that at least in a substantial part of the uprights / truss end connection points there is a positive connection between the relevant upright and the relevant truss end against forces in all three spatial directions; and that the post in question is free of transverse cantilever over its outer boundary at the connection point in question.
  • the platform according to the invention has or Stage a comprehensive, positive definition of the relevant Traverse on the stand in question, without any effort would be provided transverse cantilever.
  • the form-fitting Specification also leads in particular in the longitudinal direction of the upright in question to the fact that the trusses can also withstand high loads in the vertical direction, without taking a security risk.
  • the term "traverse” is also a Arrangement of two or more horizontal struts one above the other are connected to one another by connecting struts; such Arrangements are usually called frames, which as stiffening cross connections between posts are installed can.
  • the positive locking against forces is in Longitudinal direction of the relevant post by the intervention of a Projecting element formed in an opening, wherein the projecting element protrudes the relevant truss end and the opening on the relevant post is formed or vice versa.
  • the former of these two options is particularly preferred because one - dieas Looking at the entire platform or stage - more means of intervention the standers than at the end of the truss and because it Stand openings are particularly easy to manufacture.
  • protruding elements or openings along at least part of the post is intended to be one To be able to make the truss connection at a selectable height. It is particularly favorable if the projecting elements or openings in a grid spacing is provided; you can also be cheap provide that there are openings that are also for the Definition of two telescopically adjustable upright parts one Function.
  • the protruding element or one having the opening Element can be moved back and forth in one direction, which is essentially corresponds to the longitudinal direction of the truss. Because of this measure can the crossbar in question is particularly problematic between two Bring upright to be connected by e.g. the two Projecting elements are retracted at the two truss ends, see above that the traverse with the somewhat shortened length just between the fits two uprights. Then you can e.g. the two protruding elements Extend in the longitudinal direction of the truss and into the appropriate openings in use the two uprights. However, it is pointed out that there are also solutions without such relocability Protruding elements or the elements having the opening, e.g. a horizontal transverse insertion of the traverse, the Move the protruding elements into slot-like upright openings.
  • This type of positive determination has the advantage that they can be created easily and when dismantling the scaffolding can be solved.
  • the engagement part described in the last paragraph is preferably in the essentially shiftable back and forth in the longitudinal direction of the truss.
  • very similar considerations apply, especially with regard to The traverse in question can be inserted between two to be connected Stand, as described above in connection with the protruding element or the element having the opening has been described.
  • the protruding element or the opening educated. Because of this training, one can manipulate only the engaging part the favorable displacement of the protruding element or the element having the opening and the engagement part in Truss longitudinal direction and also the positive Determination against forces in all three spatial directions accomplish. Alternatively, it is possible that the Truss end associated protruding element or opening at from Bolt to provide spaced position and not in the bolt too integrate.
  • a cross element is preferably assigned to the engagement part, with which the engaging part is displaceable in its longitudinal direction and around its Longitudinal axis is rotatable. This cross element thus allows a comfortable Manipulation of the engaging part.
  • the bolt preferably has an elongated through opening and is a wedge element passing through the through hole provided by the movement of the bolt head in the undercut longitudinal recess is clamped.
  • the Bolts preferably in the state without applying wedge force of the wedge element rotatable about its longitudinal axis.
  • the wedge element met thus a double function, in that the bolt is initially without generation a wedge force is rotated about its axis and then by means of wedge force is pulled away from the relevant post.
  • appropriate training can be added as a third function that using the wedge element, the bolt back and forth in the longitudinal direction can shift.
  • fourth function to add that one by longitudinal displacement of the Bolt by means of the wedge element at the same time that on the bolt provided projection element in engagement with the desired opening of the stand can bring.
  • At least a substantial part of the uprights is preferably below Built using hollow sheet steel profile. Such upright are cheaper to manufacture than aluminum and are good Cross-sectional design and good material utilization are not essential heavier than aluminum stands.
  • At least a significant part of the uprights essentially at least part of its length square cross section with four undercut longitudinal recesses on.
  • the post in question preferably has at least two parts, which are telescopically adjustable relative to each other. In this way you can adjust different post lengths.
  • conventional components may also be present, such as Head plate, foot section, spindle height adjustment device for Fine adjustment.
  • the inner upright part preferably has one square cross section, which is particularly good too an outer upright part with a substantially square cross section and four undercut longitudinal recesses.
  • the crossmember in question preferably has at each end of the crossbar a truss head that is cast or forged Workpiece is and that of the definition of the relevant traverse contains the agent in question.
  • the invention Platform or stage also as a grandstand, especially a grandstand can be formed with panels at several levels.
  • a grandstand especially a grandstand
  • To this Purpose can e.g. diagonally from bottom to top Support main girders on uprights and side girders, e.g. with suitable intermediate parts, running horizontally Support the main beams.
  • the slab formwork shown is also an illustration of a scaffold, if you imagine that those to be described later Slabs are not formwork for concreting.
  • the section of a slab formwork drawn in Fig. 1 consists of following core components: vertical uprights 2, horizontal main beams 4, each with its two end regions on two uprights 2 support, horizontal secondary beams 6, which are normally each supported on two main beams 4, formwork panels 8, each on Supports 6 are supported, and trusses 10, which - if and where required for the stability of the slab formwork - as stiffening Cross connections of uprights 2 are provided.
  • the drawn one Post 2 is only drawn with an upper area of its length; on lower region of its length is drawn in Fig. 3.
  • the drawn section of the ceiling formwork shows only one post 2.
  • Stand 2 provided in a grid point pattern, for. B. with a Distance in the main beam longitudinal direction of 1.5 m and a distance in Longitudinal beam of 3 m.
  • the upright 2 has in its lower part 11 in FIG essential square cross section with four dovetail-shaped longitudinal recesses 14, each centered in one Square side.
  • the upright 2 In its upper part 12 in FIG. 1, the upright 2 has one square cross-section, with the inside of the post 2 facing surfaces of the longitudinal recesses 14 fits together.
  • the upper part 12 is telescopic in the lower part 11 of the post 2 inserted.
  • the upper part 12 has one in each of its square sides vertical row of openings 16, the lower part 11 has in Due to each longitudinal recess 14 also a distributed in the longitudinal direction Row of openings 18, the spacing of both Rows of openings is the same. You can continue the upper part 12 in the Push lower part 11 in or pull out further. By means of a can be pushed through two pairs of openings 16, 18 pin 20 to fix the post in the desired length.
  • the upright 2 has a head piece 22 with a plate-like, somewhat enlarged, upper end.
  • a piece below the head piece 22 is a drop head on the upright 2 24 attached, the cantilever on two sides of the post 2 Support surface 26, in each case for an end region of a main carrier 4 having.
  • Two short bolts 42 protrude from each support surface 26 Protruding elements upwards.
  • the head 22 if desired against a slightly modified headpiece with a reduced, plate-like, upper end can be replaced. Then you can with the drop head 24 shifted all the way to the top Create support surface 26 so that a leading over it Main beam can be supported in its central area.
  • Main beam 4 one of which is drawn in Fig. 1
  • Subcarrier 6 two of which are drawn in Fig. 1
  • Main beam 4 one of which is drawn in Fig. 1
  • Subcarrier 6 two of which are drawn in Fig. 1
  • They each consist of two half beams with in essential U-shaped profile open to the side.
  • the two Half beams 4a, 4b and 6a, 6b face one another with their backs and connected with each other at a distance.
  • the connection of the half beams is made by screws or bolts 30, wherein Spacers 32 made of plastic between the two half beams are interposed (Fig. 2).
  • Distributed over the length of the carrier 4, 6 are connecting bolts 30 and spacers 32 in several places intended.
  • an upper bearing surface 34 is formed in the main carrier 4.
  • a lower bearing surface 36 is formed in the secondary carrier 6.
  • the Secondary support 6 has an upper bearing surface 38, analogous to main support 4.
  • All four horizontal legs of the main beam 4 and all four horizontal legs of the secondary beam 6 are each with a row of circular openings 40 spaced apart in a grid dimension provided, the grid dimension a is the same everywhere.
  • Each in the middle between adjacent openings 40 are in all horizontal legs circular, further openings 41 of smaller diameter available.
  • short bolts 42 are preferred made of plastic (e.g. by shoulder system on top and Hot stamping at the bottom behind the further opening 41), which in its a circular cross-section fit into an opening 40 of the partner carrier, but slightly tapering upwards. It was the first Difference between the main beam 4 and the secondary beam 6 (the has no short bolts 42); a second difference is about twice the length of the secondary beam 6, as already further ahead indicated.
  • each of the subcarriers 6 shown with two Openings 40 in its lower bearing surface 36 two short bolts 42 has taken up from the upper bearing surface 34 of the main carrier 4th protrude upwards.
  • formwork panels 8 can be seen in FIG connect to each other.
  • the formwork panels 8 are on secondary beams 6 superimposed. It is shown that a formwork panel 8 with an edge the half beam 6a of the secondary beam 6 rests while the other Formwork sheet 8 with an edge on the other half beam 6b of the Subcarrier 6 rests in such a way that the joint 50 over the space comes to lie between the half beams 6a, 6b.
  • the formwork panels 8 in their support edges with down projecting short bolts 52 are provided, which in openings 40 in the upper bearing surface 38 of the secondary beam 6 are inserted so that the Formwork panels 8 are positively fixed.
  • Main beams 4 and 6 are secondary beams, with the exception of those described two differences, constructed identically. As a result, they can on the same production line are manufactured, the described Openings 40 and 41 and those to be described below Openings are punched out before the semi-beams are shaped into the U-shape Profiles are bent. In the upper bearing surface 34 only the Main beam 4, the short bolts 42 are then attached. It will expressly pointed out that when determining stander 2 / main beam 4, main beam 4 / secondary beam 6, secondary beam 6 / formwork panel 8 the role of protruding element 42 or 52 and opening 40 each can be reversed as described above. At the function this does not change anything.
  • openings 44 larger Diameter and further openings 45 of smaller diameter arranged in a total of three rows, in the vertical webs of the Beams 4 and 6.
  • FIG 3 is a lower region of the upright 2 from FIGS. 1 and 2 shown.
  • a foot part 94 is in the upright part 11 from below inserted, which has a square cross section like the upper part 12 has, and by means of a through openings 16, 18 inserted Pin 20 secured. At the lower end, the foot part 94 has one Spindle area 96 for precise adjustment of the length of the post 2.
  • the cross members 10 shown in FIG. 1 each have a U-shaped, cross section open to the side.
  • a truss head 60 attached, e.g. B. welded.
  • the Traverse heads 60 are each to the vertical plane 62-62 symmetrical and can be reoriented for both Truss ends are used. With the drawn The crosshead heads 60 are cast or cast forged parts. At that of the traverse 10 opposite end, each truss head 60 has two horizontal, protruding ribs 74.
  • the crosshead head 60 has a continuous one approximately in its center Bore in which a bolt 64 is longitudinally displaceable.
  • the longitudinal direction of the bolt 64 coincides with the longitudinal direction of the cross member 10 together.
  • the bolt 64 has a bolt head 66, which at the traverse 10 shown on the far right in FIG Rotational position of the bolt 64 measured in the horizontal direction is narrower than measured in the vertical direction. In this drawn rotational position, the bolt head 66, as below will be described in more detail from the beginning in one of the Introduce longitudinal recesses 14 in the upright 2. If you do that Bolt 64 rotates about 90 ° about its longitudinal axis, the locks Bolt head 66 in the dovetail undercut Longitudinal recess 14, but without already being clamped in it.
  • the protruding element 68 is from its diameter on the openings 18 and 16 in the upright 2 Voted. Furthermore, the dimensions are chosen so that the described rotation of the bolt 64 only about its longitudinal axis can complete if the bolt 64 so far to the right in Fig. 2 (after 1 in the right-hand traverse 10) there has been that the protruding element 68 in an opening 18 of the Stayer 2 is located.
  • the bolt 64 has an elongated through opening 70 which is shown in FIG. 4 is drawn with broken lines and the shape of a flat cuboids.
  • a wedge element 72 is provided that this Through opening 70 passes through.
  • the truss head 60 has one on the left side upper recess 78 and on the right side a lower recess 80.
  • the wedge element 72 can be seen from the right in FIG. 1 drawn, horizontal position in the drawn in Fig. 2, Turn the vertical position. It works in the vertical position Front surface 82 of the wedge element 72 with an abutment surface 84 of the Truss head 60 together. Therefore, the opposite of the Front surface 82 of oblique rear surface 86 of wedge element 72 in cooperation with one end 88 of the through opening 70 Longitudinal displacement of the bolt 64 to the left in Fig. 4 with wedge force cause.
  • the wedge element 72 is by a cross pin 90 on one its ends captive, whereby the bolt 64 is captive.
  • the wedge element 72 is rotated by approximately 90 degrees, the bolt head 66 becomes wider in the horizontal direction and blocks itself in the undercut longitudinal recess 14. Then from above in Fig. 4 struck with a hammer on the wedge element 72, whereby the bolt 64 is pulled to the left in Fig. 4 and the bolt head in the Longitudinal recess 14 is clamped (because the ribs 74 on the Form an abutment on the outside of the upright 2); the protruding element 68 is long enough so that it does not come out of the Opening 18 comes out. The loosening of the fixing of the traverse 10 the relevant post 2 takes place in reverse order.
  • Fig. 1 can also be called a framework, and one speaks of a framework if the initiation of Loads from the heads of the uprights 2 are in the foreground, and from a scaffolding when introducing loads from the trusses 10 ago is in the foreground.
  • the plates 8 not necessarily exist.
  • training as a scaffolding are preferably there at least in part of the trusses Working platforms stored.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Claims (15)

  1. Plate-forme ou échafaudage surélevé, réalisé en particulier comme coffrage de plafond pour le bétonnage, comportant :
    des montants verticaux (2) ;
    des poutres principales (4) qui prennent appui sur les montants (2) ;
    des poutres secondaires (6) qui, par appui d'une surface d'appui inférieure (36) sur une surface d'appui supérieure (34), soutiennent au moins une poutre principale (4) ;
    et des plaques (8) qui s'appuient sur des poutres secondaires (6),
    pour au moins une partie des points d'appui poutre principale/poutre secondaire, une fixation étant prévue, entre la poutre principale (4) concernée et la poutre secondaire (6) concernée, pour résister à des forces de direction quelconque dans le plan des surfaces d'appui défini par la surface d'appui supérieure (34) et par la surface d'appui inférieure (36) des poutres principales (4) ou poutres secondaires (6) concernées ;
    caractérisé en ce que
    la fixation est une fixation par complémentarité de formes qui est formée par engagement d'éléments saillants (42) avec des ouvertures (40) et/ou des bords de poutres (54), les éléments saillants (42) dépassant vers le haut de la poutre principale (4) concernée et les ouvertures (40) et/ou les bords de poutre d'engagement (54) étant prévus sur la poutre secondaire (6) concernée et/ou inversement ;
    dans la poutre secondaire (6) concernée une rangée longitudinale d'éléments saillants (42) ou d'ouvertures (40), dans la mesure où elles existent, est prévue le long de la poutre secondaire (6) ;
    et en ce que dans la poutre principale (4) concernée sont prévues plusieurs rangées longitudinales d'éléments saillants (42) ou d'ouvertures (40), côte à côte et mutuellement parallèles, dans la direction longitudinale de la poutre principale (4).
  2. Plate-forme ou échafaudage selon la revendication 1, caractérisé en ce que pour l'engagement par complémentarité de formes, les éléments saillants (42) sont prévus dans la surface d'appui supérieure (34) de la poutre principale (4) concernée et les ouvertures (40) dans la surface d'appui inférieure (36) de la poutre secondaire (6) concernée, ou inversement.
  3. Plate-forme ou échafaudage selon la revendication 1 ou 2, caractérisée en ce que les éléments saillants (42) sont des goujons courts en matière plastique ou métal qui sont placés sur la poutre (4 ; 6) concernée.
  4. Plate-forme ou échafaudage selon la revendication 3, caractérisé en ce que la poutre principale (4) concernée et/ou la poutre secondaire (6) concernée présentent, à côté des ouvertures (40), des ouvertures (41) plus petites avec des éléments saillants placés à l'intérieur.
  5. Plate-forme ou échafaudage selon l'une au moins des revendications 1 à 4, caractérisé en ce que la poutre principale (4) concernée et la poutre secondaire (6) concernée présentent des sections transversales identiques.
  6. Plate-forme ou échafaudage selon l'une au moins des revendications 1 à 5, caractérisé en ce que la poutre principale (4) concernée et/ou la poutre secondaire (6) concernée sont fabriquées dans une tôle pliée.
  7. Plate-forme ou échafaudage selon l'une au moins des revendications 1 à 6, caractérisé en ce que la poutre principale (4) concernée et/ou la poutre secondaire (6) concernée est constituée de deux profilés sensiblement en U qui se tournent le dos l'un l'autre et sont reliés ensemble à distance.
  8. Plate-forme ou échafaudage selon la revendication 7, caractérisé en ce que les deux profilés sont reliés entre eux par des liaisons filetées (30) et sont maintenus à distance par des écarteurs (32), de préférence en matière plastique.
  9. Plate-forme ou échafaudage selon l'une au moins des revendications 1 à 8, caractérisé en ce que au moins pour une partie des points d'appui montant/poutre principale, il est prévu une fixation par complémentarité de formes entre le montant (2) concerné et la poutre principale (4) concernée pou résister à des forces de direction quelconque dans un plan qui est perpendiculaire à la direction longitudinale du montant (2) et passe par le point d'appui concerné, la fixation par complémentarité de formes étant formée par l'engagement d'éléments saillants (42) avec des ouvertures (40), les éléments saillants (42) dépassant vers le haut d'une surface d'appui supérieure (26) du montant (2) concerné et les ouvertures (40) étant réalisées dans une surface d'appui inférieure de la poutre principale (4) concernée, ou inversement.
  10. Plate-forme ou échafaudage selon l'une au moins des revendications 1 à 9, caractérisé en ce que au moins pour une partie des points d'appui poutre secondaire/plaque, il est prévu une fixation par complémentarité de formes entre la poutre secondaire (6) concernée et la plaque (8) concernée pour résister à des forces de direction quelconque dans le plan de la surface d'appui, la fixation par complémentarité de formes étant formée par l'engagement d'éléments saillants (42) avec des ouvertures (40), les éléments saillants (52) dépassant vers le haut d'une surface d'appui supérieure de la poutre secondaire concernée et les ouvertures étant réalisées dans une surface d'appui inférieure de la plaque concernée, ou inversement.
  11. Plate-forme ou échafaudage selon l'une au moins des revendications 1 à 10, caractérisé en ce que au moins une partie des montants (2) est équipée d'une tête (22) d'un type tel qu'une poutre principale peut prendre appui sur le montant (2) et mener au-delà de celle-ci.
  12. Plate-forme ou échafaudage selon l'une au moins des revendications 1 à 11, caractérisé en ce que au moins une partie des montants (2) est équipée d'une tête tombante (24) qui présente au moins un point d'appui (26) pour une poutre principale (4) et peut être abaissée vers le bas par rapport à la terminaison supérieure du montant (2).
  13. Plate-forme ou échafaudage selon l'une au moins des revendications 1 à 12, caractérisé en ce que les éléments saillants (42) présentent une section transversale se rétrécissant en direction de l'extrémité libre.
  14. Plate-forme ou échafaudage selon l'une au moins des revendications 1 à 13, caractérisé en ce que au moins une partie des montants (2) est construite par utilisation d'un profilé creux en tôle d'acier.
  15. Plate-forme ou échafaudage selon l'une au moins des revendications 1 à 14, caractérisé en ce que au moins une partie des montants (2) comporte au moins deux éléments (11, 12, 94) qui sont réglables l'un par rapport à l'autre de manière télescopique.
EP97115368A 1996-09-05 1997-09-04 Plate-forme surélevée ou charpente, plus particulièrement exécutée comme coffrage de dalles en béton Expired - Lifetime EP0851075B1 (fr)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE19636091 1996-09-05
DE19636091A DE19636091A1 (de) 1996-09-05 1996-09-05 Erhöhte Plattform oder Bühne, insbesondere ausgebildet als Deckenschalung für das Betonieren

Publications (2)

Publication Number Publication Date
EP0851075A1 EP0851075A1 (fr) 1998-07-01
EP0851075B1 true EP0851075B1 (fr) 2004-07-21

Family

ID=7804738

Family Applications (1)

Application Number Title Priority Date Filing Date
EP97115368A Expired - Lifetime EP0851075B1 (fr) 1996-09-05 1997-09-04 Plate-forme surélevée ou charpente, plus particulièrement exécutée comme coffrage de dalles en béton

Country Status (3)

Country Link
EP (1) EP0851075B1 (fr)
AT (1) ATE271634T1 (fr)
DE (2) DE19636091A1 (fr)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1617013A1 (fr) * 2004-07-13 2006-01-18 CEDEMAT - Aluguer de Materiais de Construçao, Lda Système de coffrage horizontal
DE102005031152A1 (de) * 2005-07-04 2007-01-18 Peri Gmbh Deckenschalungssystem
KR100817883B1 (ko) * 2006-11-02 2008-04-01 안종식 슬래브 거푸집 설치구조
DE102007047438B4 (de) * 2007-10-04 2022-11-24 Doka Gmbh Schalungsanordnung für den Freivorbau von Brücken
DE102007047439A1 (de) * 2007-10-04 2009-04-16 Doka Industrie Gmbh Schalungsanrodnung für den Freivorbau von Brücken
GB2456642A (en) * 2008-01-24 2009-07-29 Absolute Steel Framing Ltd Building support structure for seating
ES2349602B1 (es) 2008-10-01 2011-11-21 Inveral, S.A. Viga porta - sopandas para el encofrado de forjados
DK3114292T3 (da) * 2014-03-04 2019-07-29 Form 700 Pty Ltd En forskallingsstøttestruktur
US11225802B2 (en) 2017-10-12 2022-01-18 George CHARITOU Prop head assembly
CN108868127A (zh) * 2018-07-03 2018-11-23 阳江市奇正建筑智能设备研究院 一种组合式早拆主梁
CN109944436A (zh) * 2019-04-18 2019-06-28 安钢集团华德重工装备有限公司 一种高强建筑支撑横梁及其制备装置

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE806391C (de) * 1948-10-02 1951-06-14 Wilhelm Hatting Dipl Ing Metall-, insbesondere Stahlbohlenschalung
DE1269326B (de) * 1958-10-03 1968-05-30 Amoul Alonzo Jones Deckenschalung
FR1532636A (fr) * 1967-06-02 1968-07-12 Fr Des Echafaudages Self Lock Table de coffrage
FR2153845A5 (fr) * 1971-09-23 1973-05-04 Tropimex Ag
GB2029483B (en) * 1978-09-08 1982-08-11 Kwikform Ltd Supporting soffit shuttering
GB2099902A (en) * 1981-06-08 1982-12-15 Acrow Eng Ltd Drop head for formwork prop
GB2119842A (en) * 1982-05-11 1983-11-23 Evans And Sons Ltd C Beams for decking sysems
GB2127082B (en) * 1982-09-16 1986-03-12 Kwikform Ltd Formwork soldier
DE3921064A1 (de) * 1989-06-28 1991-01-10 Udo Rose Betonschalungstraeger
DE4237516A1 (de) * 1992-11-06 1994-05-11 Peri Gmbh Deckenschalungsträger

Also Published As

Publication number Publication date
DE19636091A1 (de) 1998-03-12
EP0851075A1 (fr) 1998-07-01
DE59711788D1 (de) 2004-08-26
ATE271634T1 (de) 2004-08-15

Similar Documents

Publication Publication Date Title
DE1903129C3 (de) Vorrichtung zum Anschließen eines Trägers an eine Betonstütze
EP2253764B1 (fr) Treillis en forme de cadre
AT390111B (de) Schalung zur errichtung von baukoerpern aus gussfaehigen materialien, wie beispielsweise beton
DE2622840A1 (de) Klettergeruest mit zugehoeriger schalung
EP0851075B1 (fr) Plate-forme surélevée ou charpente, plus particulièrement exécutée comme coffrage de dalles en béton
DE3303190A1 (de) Bausatz zur erstellung mobiler bauten, insbesondere fuer messe- und ausstellungsbauten
DE2419394A1 (de) Montageschalung fuer den betonbau
DE19511847A1 (de) Tragstruktur-Element-Anordnung eines Gerüstes
EP2692964B1 (fr) Tour de cage d'escalier conçue de façon modulaire et module de cage d'escalier
EP2798133B1 (fr) Panneau pour un système de coffrage de plafond et système de coffrage de plafond
DE2109088C3 (de) Räumliches Bauelement zur Bildung von bezüglich ihrer Ausdehnung ein Vielfaches der größten Kantenlänge des Bauelementes aufweisenden, auf Biegung beanspruchbaren Trag- und Stützwerken
EP2697452B1 (fr) Élément de plancher en forme de plaque pour des échafaudages
EP0855483A1 (fr) Construction pour le bâtiment
WO2014167116A1 (fr) Lame de revêtement pour échafaudages
DE3043990A1 (de) Schalwand zur herstellung von mauern o.dgl.
EP0851074B1 (fr) Echafaudage pour plate-forme, charpente ou coffrage de dalle
DE3617020C2 (fr)
AT4624U1 (de) Verstellbare arbeitsbühne
DE2759088A1 (de) Kletterschalung zur herstellung einer geraden oder gekruemmten stahlbetonwand
DE1932393A1 (de) Verfahren zum Anheben einer monolithischen Zelle,welche Teil eines Gebaeudes,insbesondere dessen Abdeckung ist,auf eine bestimmte Hoehe zur Durchfuehrung dieses Verfahrens
EP0736648B1 (fr) Echafaudage
AT500952A4 (de) Gerüstträger aus aluminium
EP3839172B1 (fr) Longeron garde-corps destiné au montage d'un garde-corps avant, garde-corps avant destiné à la protection temporaire contre les chutes d'un nouvel étage d'un échafaudage à créer, échafaudage pour travaux de construction, de réparation et/ou de montage et processus de construction d'un échafaudage
AT403184B (de) Schalungstafel
DE2934424C2 (fr)

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE CH DE ES FR GB IT LI LU NL

AX Request for extension of the european patent

Free format text: AL;LT;LV;RO;SI

17P Request for examination filed

Effective date: 19981229

AKX Designation fees paid

Free format text: AT BE CH DE ES FR GB IT LI LU NL

RBV Designated contracting states (corrected)

Designated state(s): AT BE CH DE ES FR GB IT LI LU NL

17Q First examination report despatched

Effective date: 20020417

RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: ALPI AG

RIN1 Information on inventor provided before grant (corrected)

Inventor name: HOLLMANN, NIELS, DIPL.-ING.

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE CH DE ES FR GB IT LI LU NL

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20040721

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT;WARNING: LAPSES OF ITALIAN PATENTS WITH EFFECTIVE DATE BEFORE 2007 MAY HAVE OCCURRED AT ANY TIME BEFORE 2007. THE CORRECT EFFECTIVE DATE MAY BE DIFFERENT FROM THE ONE RECORDED.

Effective date: 20040721

Ref country code: GB

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20040721

Ref country code: FR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20040721

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

Free format text: NOT ENGLISH

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REF Corresponds to:

Ref document number: 59711788

Country of ref document: DE

Date of ref document: 20040826

Kind code of ref document: P

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20040904

Ref country code: AT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20040904

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20040930

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20040930

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20040930

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20041101

NLV1 Nl: lapsed or annulled due to failure to fulfill the requirements of art. 29p and 29m of the patents act
GBV Gb: ep patent (uk) treated as always having been void in accordance with gb section 77(7)/1977 [no translation filed]

Effective date: 20040721

BERE Be: lapsed

Owner name: ALPI AG

Effective date: 20040930

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20050401

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed

Effective date: 20050422

EN Fr: translation not filed
BERE Be: lapsed

Owner name: *ALPI A.G.

Effective date: 20040930