EP0353309B1 - Verfahren zum bau eines lochs - Google Patents
Verfahren zum bau eines lochs Download PDFInfo
- Publication number
- EP0353309B1 EP0353309B1 EP89901623A EP89901623A EP0353309B1 EP 0353309 B1 EP0353309 B1 EP 0353309B1 EP 89901623 A EP89901623 A EP 89901623A EP 89901623 A EP89901623 A EP 89901623A EP 0353309 B1 EP0353309 B1 EP 0353309B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- diameter
- drilling
- profile
- bore hole
- borehole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000000034 method Methods 0.000 title claims abstract description 11
- 238000005516 engineering process Methods 0.000 claims description 6
- 239000002184 metal Substances 0.000 claims description 6
- 230000002787 reinforcement Effects 0.000 claims 1
- 238000005553 drilling Methods 0.000 abstract description 29
- 239000011435 rock Substances 0.000 abstract description 15
- 238000005096 rolling process Methods 0.000 abstract description 6
- 238000009434 installation Methods 0.000 abstract 1
- 239000007788 liquid Substances 0.000 description 8
- 238000004519 manufacturing process Methods 0.000 description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 3
- 239000012530 fluid Substances 0.000 description 2
- 238000011010 flushing procedure Methods 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 241001295925 Gegenes Species 0.000 description 1
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 239000004568 cement Substances 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000005520 cutting process Methods 0.000 description 1
- 230000003247 decreasing effect Effects 0.000 description 1
- 230000029087 digestion Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005755 formation reaction Methods 0.000 description 1
- 239000007789 gas Substances 0.000 description 1
- 230000002262 irrigation Effects 0.000 description 1
- 238000003973 irrigation Methods 0.000 description 1
- 230000035515 penetration Effects 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/02—Subsoil filtering
- E21B43/10—Setting of casings, screens, liners or the like in wells
- E21B43/103—Setting of casings, screens, liners or the like in wells of expandable casings, screens, liners, or the like
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B17/00—Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B29/00—Cutting or destroying pipes, packers, plugs or wire lines, located in boreholes or wells, e.g. cutting of damaged pipes, of windows; Deforming of pipes in boreholes or wells; Reconditioning of well casings while in the ground
- E21B29/10—Reconditioning of well casings, e.g. straightening
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/10—Sealing or packing boreholes or wells in the borehole
- E21B33/13—Methods or devices for cementing, for plugging holes, crevices or the like
- E21B33/14—Methods or devices for cementing, for plugging holes, crevices or the like for cementing casings into boreholes
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
Definitions
- the invention relates to a method for building a multi-tube tour bore of the type specified in the preamble of the claim.
- the invention can be effectively applied when drilling through rock layers that are critical in terms of drilling technology, i. H. of layers with abnormally high rock pressure and loose mountains, in which rock, liquid or gas are pressed into the drilling chamber.
- a method for producing a deep borehole in which the borehole wall in the area of critical mountain layers is covered by specially designed casing sections in order to prevent the penetration of liquids and solids into the borehole.
- casing pipe sections have cylindrical end pieces with a thread and a central part profiled by longitudinal recesses.
- casing pipes screwed together at their end pieces and closed off at the lower end by a shoe are lowered into the borehole to the depth of the critical mountain layers and hydraulically expanded in their middle longitudinally profiled sections to the borehole diameter.
- the drill pipe used for lowering is unscrewed and pulled.
- the diameter of the cylindrical end pieces of the casing pipes is then increased.
- drilling can only be carried out with a drill head of smaller diameter, which leads to a gradual reduction in the borehole width when drilling through several critical rock layers.
- the invention has for its object to provide a method for producing a multi-pipe tour bore with a constant inner diameter, which ensures a secure seal even of layers with particularly high rock pressure.
- the profile tube tour is securely fixed in the borehole by the hydraulic expansion of the upper and lower profile tubes.
- the expansion of the middle section tubes by rolling their inside diameter onto the inside diameter of the other section pipes causes the section pipes to solidify by changing the metal structure, which increases the resistance to very high rock pressures.
- profile tubes can be used as coverings of layers with an abnormally high deposit pressure and can be converted using cheaper means.
- a maximum increase in hardness of the tubular metal of 130 to 260 % can be achieved with a diameter increase of 3 to 5% achieved by rolling.
- an upper borehole section with a chisel of large diameter was drilled down according to FIG. 1 and lined with a guide tube tour 1. Thereupon, drilling continued with a chisel of smaller diameter and a casing was fixed in the borehole. Subsequently, drilling continued with a chisel with a constant diameter to the projected depth.
- a reamer was arranged above the chisel, with which the borehole diameter was expanded by an amount that corresponded to the outer diameter of a widened profile tube.
- a profile pipe tour was then lowered into the borehole section of the critical mountain layer using the drill pipe and widened by the pressure of a pressed-in liquid.
- the passage cross section of this pipe section was then calibrated to a diameter by means of a rolling device, which enables the bit to pass freely for further drilling.
- all other critical ones Mountain strata and complication zones were lined and solidified to the projected depth when the well was brought down, whereupon a conveyor pipe tour was finally installed and cemented.
- profiled tubes are arranged between these profiled tubes in a profiled tube tour, the outer diameter of which before the profiling is smaller than the borehole diameter and the length of which is greater than that Thickness of the rock layer with abnormally high reservoir pressure.
- these profiled tubes are rolled up to a diameter which exceeds their initial diameter by 3 to 5%.
- an exit bore for a guide tube tour 1 with a chisel of 394 mm in diameter was drilled to a depth of 6 m and solidified with conventional guide tubes with an outside diameter of 324 mm. Thereafter, drilling continued with a chisel with a diameter of 295 mm to a depth of 300 m while rinsing with a rinsing liquid of 1.1 g / cm 3 density. This bore was consolidated with a casing pipe 2 with a diameter of 245 mm. Subsequently, drilling continued with chisels with a diameter of 215.9 mm to the projected depth of 1800 m.
- profile tubes 4 were introduced, which were in an interval of 380 to 480 m by an internal liquid pressure of 10 to 12 MPa expanded and then pressed against the walls of the borehole by rolling.
- the drill hole had previously been broadened to a diameter of 335 mm using a reamer.
- the oil and water-bearing zone 3 ' was sealed at a depth of 600 to 640 m using a similar method, a profile tube tour 4' being installed at an interval of 534 to 650 m.
- Zone 3 "carrying pressurized water was sealed at a depth of 820 to 840 m with the help of a 4" profile tube tour in an interval of 800 to 900 m.
- drilling continued with a chisel of 215.9 mm in diameter using a drilling fluid with a density of 1.43 g / cm 3 , which corresponded to the geological conditions of the layer 5 to be digested.
- a conveyor tube tour 6 with a diameter of 146 mm was installed. Drilling was carried out in the depths of 380 to 800 m using a rinsing liquid with a density of 1.29 g / cm 3 and in the depths of 800 to 900 m with a rinsing liquid density of 1.6 g / cm 3 .
- an excess pressure is created in the interior of this profiled tube tour 4 by injecting a liquid with the aid of e.g. B. a irrigation pump or a cementing unit.
- a liquid with the aid of e.g. B. a irrigation pump or a cementing unit.
- the upper and lower profile tubes 4a and 4c are dressed and fixed.
- the middle, also dressed, profile tube 4b is given a diameter that is 3 to 5% smaller than the diameter of the widened borehole section 7.
- the drill pipe 11 is unscrewed from the upper profile tube 4a and removed.
- a rolling device 12 according to FIG. 3 is then moved in on the drill pipe 11, with which the profile tube tour 4 is rolled on.
- the upper and lower profile tubes 4a, 4c are calibrated, while the middle profile tube 4b is rolled up to a diameter increased by 3 to 5%.
- the middle profile tube 4b is expanded and pressed tightly against the borehole wall, the packer elements 8 separating the borehole section 7a to be sealed from the rest of the borehole.
- the shoe 9 is released from the lower profile tube 4c.
Landscapes
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- Physics & Mathematics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Mechanical Engineering (AREA)
- Earth Drilling (AREA)
- Nitrogen And Oxygen Or Sulfur-Condensed Heterocyclic Ring Systems (AREA)
- Vending Machines For Individual Products (AREA)
- Organic Low-Molecular-Weight Compounds And Preparation Thereof (AREA)
Description
- Die Erfindung bezieht sich auf ein Verfahren zum Bau einer Mehrrohrtourbohrung der im Oberbegriff des Patentanspruchs angegebenen Gattung.
- Die Erfindung kann wirksam angewendet werden beim Durchbohren von bohrtechnisch kritischen Gebirgsschichten, d. h. von Schichten mit anormal hohem Gebirgsdruck und lockerem Gebirge, in denen Gestein, Flüssigkeit oder Gas in den Bohrraum gedrückt werden.
- Bei herkömmlichen Tiefbohr-Verfahren wird eine Spülflüssigkeit in das verrohrte Bohrloch gedrückt, um das Bohrklein herauszuspülen und den Gebirgsdruck durch den Druck der Spülungssäule auszugleichen, der durch Einstellen des spezifischen Gewichtes der Spülung geregelt wird. Bei stark wechselnden Gebirgsdrücken in unterschiedlichen Schichten oder Formationen kann dieses Gleichgewicht durch Änderung des spezifischen Gewichtes der Spülung nicht mehr kompensiert werden. In diesen Fällen wird die aufgeschlossene Schicht vor dem Aufschluß der folgenden Schicht mit einer Futterrohrtour abgedeckt, die anschließend zementiert wird. Nach Einstellen eines geeigneten spezifischen Gewichts der Spülung wird das Niederbringen der Bohrung mit einem Bohrmeißel von kleinerem Durchmesser fortgesetzt. Dadurch wird die Bohrung bis zur produktiven Schicht mit einem stufenweise abnehmenden Durchmesser niedergebracht, wobei zur Abstützung der Bohrlochwandungen Futterrohre verwendet werden müssen. Konzentrisch in diesen Futterrohren werden spezielle Leitrohre, Zwischenrohre und Förderrohre eingebaut. Ein solches Bohrverfahren erfordert einen hohen Aufwand an Zeit, Zement und Futterrohren.
- Aus der SU-A-907 220 ist ein Verfahren zum Herstellen einer Tiefbohrung bekannt, bei dem die Bohrlochwand im Bereich von kritischen Gebirgsschichten durch speziell ausgebildete Futterrohrabschnitte abgedeckt wird, um das Eindringen von Flüssigkeiten und Feststoffen in das Bohrloch zu verhindern. Diese Futterrohrabschnitte haben zylindrische Endstücke mit Gewinde und einen durch längsgerichtete Einbauchungen profilierten Mittelteil. Mehrere an ihren Endstücken miteinander verschraubte und am unteren Ende durch einen Schuh abgeschlossene Futterrohre werden in das Bohrloch bis zur Tiefe der kritischen Gebirgsschichten abgesenkt und in ihren mittleren längsprofilierten Abschnitten hydraulisch bis auf den Bohrlochdurchmesser aufgeweitet. Nach der Aufweitung wird das zum Absenken verwendete Bohrgestänge abgeschraubt und gezogen. Anschließend wird der Durchmesser der zylindrischen Endstücke der Futterrohre vergrößert. Bei diesem Verfahren kann nach dem Einbringen der Futterrohrabschnitte nur mit einem Bohrkopf von kleinerem Durchmesser weitergebohrt werden, was beim Durchbohren von mehreren kritischen Gebirgsschichten zu einer stufenweisen Verringerung der Bohrlochweite führt.
- Aus der US-A-4 501 327 ist ein weiteres Verfahren zum Herstellen von verrohrten Tiefbohrungen bekannt, bei dem die Bohrlochwände in bestimmten gebirgstechnisch kritischen Abschnitten durch eine hohlzylindrische Einlage bzw. Kassette abgedichtet werden, welche nach dem Einbringen in das Bohrloch aufgeweitet und zementiert wird.
- Schließlich ist in der Fachzeitschrift "Neftjanoe chozjajstvo", Nr. 4, 1982, S. 26, 27, ein gattungsgemäßes Tiefbohrverfahren mit Abdichtung der Bohrlochwandung im Bereich kritischer Gebirgsschichten beschrieben, bei dem das Bohrloch im Bereich der kritischen Gebirgsschichten erweitert wird und ein durchgehender Futterrohrabschnitt in diesen erweiterten Bohrlochbereich mittels des Bohrgestänges abgesenkt wird. Der mittlere längsprofilierte Teil des Futterrohrabschnitts wird hydraulisch und anschließend durch ein geeignetes Werkzeug mechanisch bis zur Anlage an der Bohrlochwandung aufgeweitet. Nach dem anschließenden Aufbohren der schmaleren Endstücke kann mit einem Bohrkopf von gleichem Durchmesser weitergebohrt werden.
- Der Erfindung liegt die Aufgabe zugrunde, ein Verfahren zum Herstellen einer Mehrrohrtourbohrung mit konstantem Innendurchmesser aufzuzeigen, das eine sichere Abdichtung auch von Schichten mit besonders hohem Gebirgsdruck gewährleistet.
- Diese Aufgabe wird durch die im Patentanspruch angegebenen Maßnahmen gelöst.
- Durch das Niederbringen der Bohrung mit Meißeln desselben Durchmessers nach dem Einbau der Standrohrtour und des Futterrohrs kann der vorgegebene Bohrlochdurchmesser bis zu der projektierten Tiefe beibehalten werden, wodurch sich die Verwendung von Zwischenrohrtouren erübrigt und folglich der Materialaufwand reduziert und der Bau der Bohrungen beschleunigt werden. Durch das hydraulische Aufweiten der oberen und unteren Profilrohre wird die Profilrohrtour im Bohrloch sicher fixiert. Die Aufweitung der mittleren Profilrohre durch Aufwalzen ihres Innendurchmessers auf den Innendurchmesser der anderen Profilrohre bewirkt eine Materialverfestigung dieser Profilrohre durch Änderung des Metallgefüges, wodurch sich der Widerstand gegen sehr hohe Gebirgsdrücke erhöht. Somit können Profilrohre als Überdeckungen von Schichten mit einem anormal hohen Lagerstättendruck verwendet und mit billigeren Mitteln umgebaut werden. Je nach Metallsorte und Wanddicke kann bei einer durch das Aufwalzen erzielten Durchmesservergrößerung um 3 bis 5 % ein maximaler Härtezuwachs des Rohrmetalls um 130 bis 260 % erzielt werden.
- Weitere Besonderheiten und Vorteile der Erfindung werden nachstehend anhand eines in der Zeichnung dargestellten Ausführungsbeispiels näher erläutert. Es zeigen:
- Fig. 1
- eine fertige Tiefbohrung von gleichbleibendem Durchmesser, bei der mehrere bohrtechnisch kritische Gebirgsschichten gegen das Bohrlochinnere abgedichtet sind;
- Fig. 2
- einen Bohrlochabschnitt mit einer gemäß der Erfindung eingebauten Profilrohrtour, deren mittlerer Teil einen kleineren Außendurchmesser als der erweiterte Bohrlochdurchmesser aufweist;
- Fig. 3
- einen Bohrlochabschnitt mit einer im kritischen Bereich eingebauten Profilrohrtour;
- Fig. 4
- einen Schnitt IV-IV in Fig. 2;
- Fig. 5
- einen Schnitt V-V in Fig. 2.
- Zum Herstellen einer verrohrten Tiefbohrung wurde gemäß Fig. 1 ein oberer Bohrlochabschnitt mit einem Meißel von großem Durchmesser niedergebracht und mit einer Leitrohrtour 1 ausgekleidet. Daraufhin wurde mit einem Meißel von kleinerem Durchmesser weitergebohrt und ein Futterrohr im Bohrloch fixiert. Anschließend wurde mit einem Meißel mit gleichbleibendem Durchmesser bis zur projektierten Tiefe weitergebohrt. Bei einem Aufschluß von bohrtechnisch kritischen Gebirgsschichten wurde oberhalb des Meißels ein Räumer angeordnet, mit dem der Bohrlochdurchmesser um einen Betrag erweitert wurde, der dem Außendurchmesser eines aufgeweiteten Profilrohres entsprach. Anschließend wurde mittels des Bohrgestänges in den Bohrlochabschnitt der kritischen Gebirgsschicht eine Profilrohrtour abgesenkt und durch den Druck einer eingepreßten Flüssigkeit aufgeweitet. Danach erfolgte eine Kalibrierung des Durchgangsquerschnittes dieses Rohrabschnittes mittels einer Aufwalzvorrichtung bis auf einen Durchmesser, der einen freien Durchgang des Meißels zum weiteren Bohren ermöglicht. In ähnlicher Weise wurden alle weiteren kritischen Gebirgsschichten und Komplikationszonen beim Niederbringen der Bohrung bis zur projektierten Tiefe ausgekleidet und verfestigt, woraufhin schließlich eine Förderrohrtour eingebaut und zementiert wurde.
- Wird eine bohrtechnisch kritische Schicht aufgeschlossen, deren Gebirgsdruck die Druckfestigkeit eines der in der vorstehend angegebenen Weise eingebauten Profilrohres übersteigt, dann werden zwischen diesen Profilrohren in einer Profilrohrtour zusätzliche Profilrohre angeordnet, deren Außendurchmesser vor dem Profilieren kleiner als der Bohrlochdurchmesser ist und deren Länge größer als die Dicke der Gebirgsschicht mit anormal hohem Lagerstättendruck ist. Diese Profilrohre werden erfindungsgemäß bis zu einem Durchmesser aufgewalzt, der ihren Ausgangsdurchmesser um 3 bis 5 % übersteigt.
- Im folgenden wird ein konkretes Beispiel zum Herstellen einer verrohrten Tiefbohrung beschrieben.
- Gemäß Fig. 1 wurde eine Ausgangsbohrung für eine Leitrohrtour 1 mit einem Meißel von 394 mm Durchmesser bis zu einer Tiefe von 6 m gebohrt und mit herkömmlichen Leitrohren von 324 mm Außendurchmesser verfestigt. Danach wurde mit einem Meißel von 295 mm Durchmesser bis auf eine Tiefe von 300 m unter Spülung mit einer Spülflüssigkeit von 1,1 g/cm3 Dichte weitergebohrt. Diese Bohrung wurde mit einem Futterrohr 2 von 245 mm Durchmesser verfestigt. Anschließend wurde mit Meißeln von 215,9 mm Durchmesser bis zur projektierten Tiefe von 1800 m weitergebohrt. In einer wasserführenden Schicht 3 bei 460 bis 470 m wurden Profilrohre 4 eingebracht, die in einem Intervall von 380 bis 480 m durch einen inneren Flüssigkeitsdruck von 10 bis 12 MPa aufgeweitet sund anschließend durch Aufwalzen an die Wandungen des Bohrlochs angedrückt wurden. Zuvor wurde das Bohrloch mittels eines Räumers bis auf einen Durchmesser von 335 mm erweitert. Die Erdöl und Wasser führende Zone 3' wurde in einer Tiefe von 600 bis 640 m nach einem ähnlichen Verfahren abgedichtet, wobei eine Profilrohrtour 4' in einem Intervall von 534 bis 650 m eingebaut wurde. Die Druckwasser führende Zone 3" wurde in einer Tiefe von 820 bis 840 m mit Hilfe einer Profilrohrtour 4" in einem Intervall von 800 bis 900 m abgedichtet. Des weiteren wurde mit einem Meißel von 215,9 mm Durchmesser unter Verwendung einer Bohrspülung mit einer Dichte von 1,43 g/cm3 weitergebohrt, die den geologischen Verhältnissen der aufzuschließenden Schicht 5 entsprach. Abschließend wurde eine Förderrohrtour 6 mit einem Durchmesser von 146 mm eingebaut. In den Tiefen von 380 bis 800 m wurde unter Verwendung einer Spülflüssigkeit mit einer Dichte von 1,29 g/cm3 und in der Tiefe von 800 bis 900 m mit einer Spülflüssigkeitsdichte von 1,6 g/cm3 gebohrt.
- Auf diese Weise wurden die kritischen Zonen 3, 3', 3" nach ihrem jeweiligen Aufschluß durch den Einbau der Profilrohrtouren 4, 4' und 4" abgedichtet.
- Bei dem in Fig. 2 bis 4 dargestellten Verfahren gemäß der Erfindung werden beim Aufschließen einer Gebirgsschicht mit einem anormal hohen Lagerstättendruck die Enden eines mittleren Profilrohres 4b im bohrtechnisch kritischen Bohrlochabschnitt dieser Gebirgsschicht 7 mit Packerelementen 8 versehen und mit einem durch einen Schuh 9 abgeschlossenen unteren Profilrohr 4c sowie einem oberen Profilrohr 4a verbunden, das ein linksgängiges Anschlußgewinde 10 an seinem oberen Ende aufweist. Diese Profilrohrtour 4 wird an einem Bohrgestänge 11 bis in den kritischen Bohrlochabschnitt 7a abgesenkt, so daß sich im Bereich der kritischen Gebirgsschicht 7 die mittleren zu verfestigenden Profilrohre 4b befinden.
- Nach dem Einbau der Profilrohrtour 4 in den kritischen Bohrlochabschnitt 7a wird im Innenraum dieser Profilrohrtour 4 ein Überdruck durch Einpressen einer Flüssigkeit mit Hilfe z. B. einer Spülpumpe oder eines Zementieraggregates erzeugt. Unter der Wirkung dieses Innendruckes werden die oberen und unteren Profilrohre 4a und 4c abgerichtet und fixiert. Das mittlere ebenfalls abgerichtete Profilrohr 4b erhält dabei einen Durchmesser, der um 3 bis 5 % kleiner als der Durchmesser des aufgeweiteten Bohrlochabschnittes 7 ist. Nach einer Druckentlastung wird das Bohrgestänge 11 von dem oberen Profilrohr 4a abgeschraubt und ausgebaut. Anschließend wird an dem Bohrgestänge 11 eine Aufwalzvorrichtung 12 gemäß Fig. 3 eingefahren, mit welcher die Profilrohrtour 4 aufgewalzt wird. Dadurch werden das obere und das untere Profilrohr 4a, 4c kalibriert, während das mittlere Profilrohr 4b bis zu einem um 3 bis 5 % vergrößerten Durchmesser aufgewalzt wird. Dabei wird das mittlere Profilrohr 4b aufgeweitet und dicht an die Bohrlochwandung angedrückt, wobei die Packerelemente 8 den abzudichtenden Bohrlochabschnitt 7a vom übrigen Bohrloch trennen. Nach Abschluß des Kalibriervorgangs wird der Schuh 9 vom unteren Profilrohr 4c gelöst.
- Bei dem Auswalzen der Innenfläche des mittleren Profilrohrs 4b der Profilrohrtour 4 vollzieht sich eine Materialverformung in radialer Richtung, was zu einer Metallverfestigung führt, die in einer Erhöhung der Metallhärte zum Ausdruck kommt. Der Härtezuwachs beträgt je nach der Stahlsorte und der Wanddicke 130 bis 260 %.
Claims (1)
- Verfahren zum Herstellen einer verrohrten Tiefbohrung, bei welchem- ein Bohrlochabschnitt im Bereich einer bohrtechnisch kritischen Zone mittels eines Räumers erweitert wird,- eine aus Profilrohren gebildete Profilrohrtour (4) in diesem erweiterten Bohrlochabschnitt positioniert wird,- die positionierte Profilrohrtour mittels eines hydraulischen innendrucks aufgeweitet wird,- die hydraulisch aufgeweitete Profilrohrtour mittels einer Aufwalzvorrichtung (12) bis zur Anlage an die Bohrlochwandung weiter aufgeweitet und kalibriert werden und- danach mit einem Bohrmeißel gleichen Durchmessers weitergebohrt wird,dadurch gekennzeichnet, daß- die aus oberen, mittleren und unteren Profilrohren (4a, 4b, 4c) bestehende Profilrohrtour im erweiterten Bohrlochabschnitt (7a) so positioniert wird, daß die mittleren Profilrohre (4b) die bohrtechnisch kritische Gebirgsschicht (7) abdecken und sich die oberen Profilrohre (4a) oberhalb und die unteren Profilrohre (4c) unterhalb dieser kritischen Gebirgsschicht (7) befinden, die oberen und die unteren Profilrohre (4a, 4c) bis zur Druckanlage an der erweiterten Bohrlochwandung sowie die mittleren Profilrohre (4b) bis auf einen Durchmesser abgerichtet werden, der um 3 bis 5 % kleiner als der Durchmesser des aufgeweiteten Bohrlochabschnittes (7a) ist, und- mittels der Aufwalzvorrichtung anschließend die oberen und unteren Profilrohre (4a, 4c) kalibriert sowie die mittleren Profilrohre (4b) bis zur druckfesten Anlage an der Wandung des erweiterten Bohrlochabschnitts (7a) unter Metallverfestigung aufgewalzt werden.
Applications Claiming Priority (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| SU884366623A SU1679030A1 (ru) | 1988-01-21 | 1988-01-21 | Способ изол ции зон осложнений в скважине профильными перекрывател ми |
| SU4366623 | 1988-01-21 | ||
| PCT/SU1988/000234 WO1989006739A1 (fr) | 1988-01-21 | 1988-11-22 | Procede pour construire un puits |
Publications (3)
| Publication Number | Publication Date |
|---|---|
| EP0353309A1 EP0353309A1 (de) | 1990-02-07 |
| EP0353309A4 EP0353309A4 (en) | 1991-05-08 |
| EP0353309B1 true EP0353309B1 (de) | 1997-02-05 |
Family
ID=21350919
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| EP89901623A Expired - Lifetime EP0353309B1 (de) | 1988-01-21 | 1988-11-22 | Verfahren zum bau eines lochs |
Country Status (13)
| Country | Link |
|---|---|
| US (1) | US4976322A (de) |
| EP (1) | EP0353309B1 (de) |
| JP (1) | JP2530737B2 (de) |
| CN (1) | CN1015808B (de) |
| AU (1) | AU606777B2 (de) |
| CA (1) | CA1301635C (de) |
| DE (1) | DE3855787D1 (de) |
| HU (1) | HUT57371A (de) |
| IN (1) | IN170723B (de) |
| MX (1) | MX171802B (de) |
| NO (1) | NO300986B1 (de) |
| SU (1) | SU1679030A1 (de) |
| WO (1) | WO1989006739A1 (de) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US7798225B2 (en) | 2005-08-05 | 2010-09-21 | Weatherford/Lamb, Inc. | Apparatus and methods for creation of down hole annular barrier |
Families Citing this family (119)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO1990005833A1 (fr) * | 1988-11-22 | 1990-05-31 | Tatarsky Gosudarstvenny Nauchno-Issledovatelsky I Proektny Institut Neftyanoi Promyshlennosti | Dispositif pour obturer une zone de complications dans un puits |
| MY108743A (en) * | 1992-06-09 | 1996-11-30 | Shell Int Research | Method of greating a wellbore in an underground formation |
| WO1995003476A1 (en) * | 1993-07-23 | 1995-02-02 | Tatarsky Gosudarstvenny Nauchno-Issledovatelsky I Proektny Institut Neftyanoi Promyshlennosti | Method of finishing wells |
| US6868906B1 (en) | 1994-10-14 | 2005-03-22 | Weatherford/Lamb, Inc. | Closed-loop conveyance systems for well servicing |
| US6085838A (en) * | 1997-05-27 | 2000-07-11 | Schlumberger Technology Corporation | Method and apparatus for cementing a well |
| GB9714651D0 (en) | 1997-07-12 | 1997-09-17 | Petroline Wellsystems Ltd | Downhole tubing |
| MY122241A (en) * | 1997-08-01 | 2006-04-29 | Shell Int Research | Creating zonal isolation between the interior and exterior of a well system |
| US6029748A (en) * | 1997-10-03 | 2000-02-29 | Baker Hughes Incorporated | Method and apparatus for top to bottom expansion of tubulars |
| US6021850A (en) * | 1997-10-03 | 2000-02-08 | Baker Hughes Incorporated | Downhole pipe expansion apparatus and method |
| US6098717A (en) * | 1997-10-08 | 2000-08-08 | Formlock, Inc. | Method and apparatus for hanging tubulars in wells |
| US6098710A (en) * | 1997-10-29 | 2000-08-08 | Schlumberger Technology Corporation | Method and apparatus for cementing a well |
| GB9723031D0 (en) | 1997-11-01 | 1998-01-07 | Petroline Wellsystems Ltd | Downhole tubing location method |
| US6354373B1 (en) | 1997-11-26 | 2002-03-12 | Schlumberger Technology Corporation | Expandable tubing for a well bore hole and method of expanding |
| US6073692A (en) * | 1998-03-27 | 2000-06-13 | Baker Hughes Incorporated | Expanding mandrel inflatable packer |
| US6263972B1 (en) | 1998-04-14 | 2001-07-24 | Baker Hughes Incorporated | Coiled tubing screen and method of well completion |
| US6026900A (en) * | 1998-06-15 | 2000-02-22 | Keller; Carl E. | Multiple liner method for borehole access |
| US6640903B1 (en) | 1998-12-07 | 2003-11-04 | Shell Oil Company | Forming a wellbore casing while simultaneously drilling a wellbore |
| GB2343691B (en) | 1998-11-16 | 2003-05-07 | Shell Int Research | Isolation of subterranean zones |
| US7357188B1 (en) | 1998-12-07 | 2008-04-15 | Shell Oil Company | Mono-diameter wellbore casing |
| GB2384502B (en) | 1998-11-16 | 2004-10-13 | Shell Oil Co | Coupling an expandable tubular member to a preexisting structure |
| US7603758B2 (en) | 1998-12-07 | 2009-10-20 | Shell Oil Company | Method of coupling a tubular member |
| US6575240B1 (en) | 1998-12-07 | 2003-06-10 | Shell Oil Company | System and method for driving pipe |
| US6745845B2 (en) | 1998-11-16 | 2004-06-08 | Shell Oil Company | Isolation of subterranean zones |
| US6557640B1 (en) | 1998-12-07 | 2003-05-06 | Shell Oil Company | Lubrication and self-cleaning system for expansion mandrel |
| US7121352B2 (en) | 1998-11-16 | 2006-10-17 | Enventure Global Technology | Isolation of subterranean zones |
| US7231985B2 (en) | 1998-11-16 | 2007-06-19 | Shell Oil Company | Radial expansion of tubular members |
| US6634431B2 (en) | 1998-11-16 | 2003-10-21 | Robert Lance Cook | Isolation of subterranean zones |
| US6823937B1 (en) | 1998-12-07 | 2004-11-30 | Shell Oil Company | Wellhead |
| US6604763B1 (en) | 1998-12-07 | 2003-08-12 | Shell Oil Company | Expandable connector |
| US6712154B2 (en) | 1998-11-16 | 2004-03-30 | Enventure Global Technology | Isolation of subterranean zones |
| CA2310878A1 (en) | 1998-12-07 | 2000-12-07 | Shell Internationale Research Maatschappij B.V. | Lubrication and self-cleaning system for expansion mandrel |
| US7185710B2 (en) | 1998-12-07 | 2007-03-06 | Enventure Global Technology | Mono-diameter wellbore casing |
| US7363984B2 (en) | 1998-12-07 | 2008-04-29 | Enventure Global Technology, Llc | System for radially expanding a tubular member |
| GB2344606B (en) | 1998-12-07 | 2003-08-13 | Shell Int Research | Forming a wellbore casing by expansion of a tubular member |
| US6758278B2 (en) | 1998-12-07 | 2004-07-06 | Shell Oil Company | Forming a wellbore casing while simultaneously drilling a wellbore |
| US7195064B2 (en) | 1998-12-07 | 2007-03-27 | Enventure Global Technology | Mono-diameter wellbore casing |
| US7552776B2 (en) | 1998-12-07 | 2009-06-30 | Enventure Global Technology, Llc | Anchor hangers |
| US7188687B2 (en) | 1998-12-22 | 2007-03-13 | Weatherford/Lamb, Inc. | Downhole filter |
| EP1147287B1 (de) | 1998-12-22 | 2005-08-17 | Weatherford/Lamb, Inc. | Verfahren und vorrichtung zum profilieren und verbinden von rohren |
| EP1510651B1 (de) | 1998-12-22 | 2008-07-02 | Weatherford/Lamb, Inc. | Vorrichtung und Verfahren zum Expandieren eines Liner-Flickens |
| GB0224807D0 (en) | 2002-10-25 | 2002-12-04 | Weatherford Lamb | Downhole filter |
| AU770359B2 (en) | 1999-02-26 | 2004-02-19 | Shell Internationale Research Maatschappij B.V. | Liner hanger |
| US6415863B1 (en) | 1999-03-04 | 2002-07-09 | Bestline Liner System, Inc. | Apparatus and method for hanging tubulars in wells |
| US7055608B2 (en) | 1999-03-11 | 2006-06-06 | Shell Oil Company | Forming a wellbore casing while simultaneously drilling a wellbore |
| CA2306656C (en) | 1999-04-26 | 2006-06-06 | Shell Internationale Research Maatschappij B.V. | Expandable connector for borehole tubes |
| US6598677B1 (en) | 1999-05-20 | 2003-07-29 | Baker Hughes Incorporated | Hanging liners by pipe expansion |
| US7350563B2 (en) | 1999-07-09 | 2008-04-01 | Enventure Global Technology, L.L.C. | System for lining a wellbore casing |
| GB9921557D0 (en) | 1999-09-14 | 1999-11-17 | Petroline Wellsystems Ltd | Downhole apparatus |
| GB2374622B (en) | 1999-11-01 | 2003-12-10 | Shell Oil Co | Wellbore casing repair |
| GC0000211A (en) | 1999-11-15 | 2006-03-29 | Shell Int Research | Expanding a tubular element in a wellbore |
| US7234531B2 (en) | 1999-12-03 | 2007-06-26 | Enventure Global Technology, Llc | Mono-diameter wellbore casing |
| US6325148B1 (en) | 1999-12-22 | 2001-12-04 | Weatherford/Lamb, Inc. | Tools and methods for use with expandable tubulars |
| US6598678B1 (en) | 1999-12-22 | 2003-07-29 | Weatherford/Lamb, Inc. | Apparatus and methods for separating and joining tubulars in a wellbore |
| WO2001086111A1 (en) | 2000-05-05 | 2001-11-15 | Weatherford/Lamb, Inc. | Apparatus and methods for forming a lateral wellbore |
| US7100684B2 (en) | 2000-07-28 | 2006-09-05 | Enventure Global Technology | Liner hanger with standoffs |
| CA2416573A1 (en) | 2000-09-18 | 2002-03-21 | Shell Canada Ltd | LOST COLUMN SUSPENSION INCLUDING A SLEEVE VALVE |
| AU2001294802B2 (en) | 2000-10-02 | 2005-12-01 | Shell Internationale Research Maatschappij B.V. | Method and apparatus for casing expansion |
| US7100685B2 (en) | 2000-10-02 | 2006-09-05 | Enventure Global Technology | Mono-diameter wellbore casing |
| US7090025B2 (en) * | 2000-10-25 | 2006-08-15 | Weatherford/Lamb, Inc. | Methods and apparatus for reforming and expanding tubulars in a wellbore |
| US7121351B2 (en) * | 2000-10-25 | 2006-10-17 | Weatherford/Lamb, Inc. | Apparatus and method for completing a wellbore |
| GB2387405A (en) * | 2001-01-03 | 2003-10-15 | Enventure Global Technology | Mono-diameter wellbore casing |
| US7410000B2 (en) | 2001-01-17 | 2008-08-12 | Enventure Global Technology, Llc. | Mono-diameter wellbore casing |
| EP1375820B1 (de) * | 2001-03-09 | 2005-11-30 | Sumitomo Metal Industries, Ltd. | Stahlrohr zur verwendung als eingebettetes, aufgeweitetes rohr und verfahren zum einbetten eines ölfeldstahlrohrs |
| US7172027B2 (en) | 2001-05-15 | 2007-02-06 | Weatherford/Lamb, Inc. | Expanding tubing |
| GB2394979B (en) | 2001-07-06 | 2005-11-02 | Eventure Global Technology | Liner hanger |
| US7290616B2 (en) | 2001-07-06 | 2007-11-06 | Enventure Global Technology, L.L.C. | Liner hanger |
| US7258168B2 (en) | 2001-07-27 | 2007-08-21 | Enventure Global Technology L.L.C. | Liner hanger with slip joint sealing members and method of use |
| US20080093089A1 (en) * | 2001-09-06 | 2008-04-24 | Enventure Global Technology | System for Lining a Wellbore Casing |
| US7513313B2 (en) | 2002-09-20 | 2009-04-07 | Enventure Global Technology, Llc | Bottom plug for forming a mono diameter wellbore casing |
| WO2004081346A2 (en) | 2003-03-11 | 2004-09-23 | Enventure Global Technology | Apparatus for radially expanding and plastically deforming a tubular member |
| WO2004094766A2 (en) | 2003-04-17 | 2004-11-04 | Enventure Global Technology | Apparatus for radially expanding and plastically deforming a tubular member |
| GB2396646B (en) | 2001-09-07 | 2006-03-01 | Enventure Global Technology | Adjustable expansion cone assembly |
| GB2421257B (en) | 2001-11-12 | 2006-08-16 | Enventure Global Technology | Mono diameter wellbore casing |
| US7066284B2 (en) | 2001-11-14 | 2006-06-27 | Halliburton Energy Services, Inc. | Method and apparatus for a monodiameter wellbore, monodiameter casing, monobore, and/or monowell |
| CA2471875A1 (en) | 2001-12-27 | 2003-07-17 | Enventure Global Technology | Seal receptacle using expandable liner hanger |
| GB0131019D0 (en) * | 2001-12-27 | 2002-02-13 | Weatherford Lamb | Bore isolation |
| WO2004018823A2 (en) | 2002-08-23 | 2004-03-04 | Enventure Global Technology | Interposed joint sealing layer method of forming a wellbore casing |
| US7404444B2 (en) | 2002-09-20 | 2008-07-29 | Enventure Global Technology | Protective sleeve for expandable tubulars |
| WO2004018824A2 (en) | 2002-08-23 | 2004-03-04 | Enventure Global Technology | Magnetic impulse applied sleeve method of forming a wellbore casing |
| US6732806B2 (en) | 2002-01-29 | 2004-05-11 | Weatherford/Lamb, Inc. | One trip expansion method and apparatus for use in a wellbore |
| EP1485567B1 (de) | 2002-02-15 | 2008-12-17 | Enventure Global Technology | Bohrlochfutterrohr mit einem einzigen durchmesser |
| EP1501644B1 (de) | 2002-04-12 | 2010-11-10 | Enventure Global Technology | Schutzhülse für gewindeverbindungen für ausdehnbare liner-hänger |
| EP1501645A4 (de) | 2002-04-15 | 2006-04-26 | Enventure Global Technology | Schutzhülse für gewindeverbindungen für ausdehnbare liner-hänger |
| WO2003102365A1 (en) | 2002-05-29 | 2003-12-11 | Eventure Global Technology | System for radially expanding a tubular member |
| GB2418943B (en) | 2002-06-10 | 2006-09-06 | Enventure Global Technology | Mono Diameter Wellbore Casing |
| CA2499071C (en) | 2002-09-20 | 2014-06-03 | Enventure Global Technology | Self-lubricating expansion mandrel for expandable tubular |
| MXPA05003115A (es) | 2002-09-20 | 2005-08-03 | Eventure Global Technology | Evaluacion de formabilidad de un tubo para miembros tubulares expandibles. |
| US7886831B2 (en) | 2003-01-22 | 2011-02-15 | Enventure Global Technology, L.L.C. | Apparatus for radially expanding and plastically deforming a tubular member |
| GB2433281B (en) | 2003-01-27 | 2007-08-01 | Enventure Global Technology | Lubrication system for radially expanding tubular members |
| GB2415983B (en) | 2003-02-26 | 2007-09-05 | Enventure Global Technology | Apparatus for radially expanding and plastically deforming a tubular member |
| US7213643B2 (en) * | 2003-04-23 | 2007-05-08 | Halliburton Energy Services, Inc. | Expanded liner system and method |
| US7441606B2 (en) * | 2003-05-01 | 2008-10-28 | Weatherford/Lamb, Inc. | Expandable fluted liner hanger and packer system |
| RU2236557C1 (ru) * | 2003-05-29 | 2004-09-20 | Салахов Минзагит Мукатдисович | Устройство для отключения пластов друг от друга в скважине (варианты) |
| US20050166387A1 (en) | 2003-06-13 | 2005-08-04 | Cook Robert L. | Method and apparatus for forming a mono-diameter wellbore casing |
| CA2471053C (en) * | 2003-06-16 | 2007-11-06 | Weatherford/Lamb, Inc. | Borehole tubing expansion using two expansion devices |
| US7712522B2 (en) | 2003-09-05 | 2010-05-11 | Enventure Global Technology, Llc | Expansion cone and system |
| US7308944B2 (en) | 2003-10-07 | 2007-12-18 | Weatherford/Lamb, Inc. | Expander tool for use in a wellbore |
| RU2265115C1 (ru) * | 2004-05-24 | 2005-11-27 | Открытое акционерное общество "Татнефть" им. В.Д. Шашина | Способ установки перекрывателя из профильных и цилиндрических труб в скважине |
| RU2270323C1 (ru) * | 2004-07-16 | 2006-02-20 | Открытое акционерное общество "Татнефть" им. В.Д. Шашина | Устройство для перекрытия зон осложнения бурения в скважине |
| WO2006020960A2 (en) | 2004-08-13 | 2006-02-23 | Enventure Global Technology, Llc | Expandable tubular |
| CA2523106C (en) * | 2004-10-12 | 2011-12-06 | Weatherford/Lamb, Inc. | Methods and apparatus for manufacturing of expandable tubular |
| GB2438554A (en) * | 2005-02-14 | 2007-11-28 | Enventure Global Technology | Radial expansion of a wellbore casing against a formation |
| BRPI0613612A2 (pt) * | 2005-07-22 | 2012-11-06 | Shell Int Research | método para criar e testar uma barreira anular |
| RU2307231C1 (ru) * | 2006-03-27 | 2007-09-27 | Открытое акционерное общество "Татнефть" им. В.Д. Шашина | Способ ремонта обсадных колонн в скважинах |
| RU2307916C1 (ru) * | 2006-04-05 | 2007-10-10 | Открытое акционерное общество "Татнефть" им. В.Д. Шашина | Способ установки профильного перекрывателя в скважине |
| RU2315854C1 (ru) * | 2006-05-15 | 2008-01-27 | Общество с ограниченной ответственностью "Нефтяник" | Устройство для отключения пластов друг от друга в скважине |
| RU2315170C1 (ru) * | 2006-07-04 | 2008-01-20 | Открытое акционерное общество "Татнефть" им. В.Д. Шашина | Способ установки профильного перекрывателя в скважине |
| RU2335617C1 (ru) * | 2007-02-28 | 2008-10-10 | Открытое акционерное общество "Татнефть" им. В.Д. Шашина | Способ изоляции зон осложнений в скважине профильным перекрывателем |
| RU2339786C1 (ru) * | 2007-04-06 | 2008-11-27 | Открытое акционерное общество "Татнефть" им. В.Д. Шашина | Способ установки профильного перекрывателя в скважине |
| RU2346139C1 (ru) * | 2007-06-26 | 2009-02-10 | Открытое акционерное общество "Татнефть" им. В.Д. Шашина | Способ установки профильного перекрывателя в скважине |
| CA2715647C (en) | 2008-02-19 | 2013-10-01 | Weatherford/Lamb, Inc. | Expandable packer |
| US9551201B2 (en) | 2008-02-19 | 2017-01-24 | Weatherford Technology Holdings, Llc | Apparatus and method of zonal isolation |
| RU2379464C1 (ru) * | 2008-09-09 | 2010-01-20 | Открытое акционерное общество "Татнефть" им. В.Д. Шашина | Способ установки профильного перекрывателя в скважине |
| GB0823194D0 (en) * | 2008-12-19 | 2009-01-28 | Tunget Bruce A | Controlled Circulation work string for well construction |
| RU2386780C1 (ru) * | 2009-02-03 | 2010-04-20 | Открытое акционерное общество "Татнефть" им. В.Д. Шашина | Способ поинтервального вскрытия и крепления осложненных участков ствола скважины |
| US8360142B2 (en) * | 2009-06-15 | 2013-01-29 | Enventure Global Technology, Llc | High-ratio tubular expansion |
| RU2471969C1 (ru) * | 2011-07-08 | 2013-01-10 | Открытое акционерное общество "Татнефть" имени В.Д. Шашина | Способ крепления необсаженной части скважины методом диапазонного расширения труб |
| CN103161405B (zh) * | 2013-03-03 | 2015-07-29 | 中国矿业大学 | 矿用井下探放高压岩溶水钻孔施工的套管隔离地层破碎带方法 |
| US9453393B2 (en) | 2014-01-22 | 2016-09-27 | Seminole Services, LLC | Apparatus and method for setting a liner |
Family Cites Families (12)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US2237538A (en) * | 1939-02-25 | 1941-04-08 | John A Zublin | Swedge |
| US2214226A (en) * | 1939-03-29 | 1940-09-10 | English Aaron | Method and apparatus useful in drilling and producing wells |
| US2447629A (en) * | 1944-05-23 | 1948-08-24 | Richfield Oil Corp | Apparatus for forming a section of casing below casing already in position in a well hole |
| US3134442A (en) * | 1958-10-27 | 1964-05-26 | Pan American Petroleum Corp | Apparatus for lining wells |
| US3054455A (en) * | 1959-08-31 | 1962-09-18 | Keltner Haskell Owen | Tool for sealing a fissure along a mine shaft |
| US3191677A (en) * | 1963-04-29 | 1965-06-29 | Myron M Kinley | Method and apparatus for setting liners in tubing |
| US3326293A (en) * | 1964-06-26 | 1967-06-20 | Wilson Supply Company | Well casing repair |
| SU907220A1 (ru) * | 1980-05-21 | 1982-02-23 | Татарский Научно-Исследовательский И Проектныий Институт Нефтяной Промышленности | Способ установки профильного перекрывател в скважине |
| US4483399A (en) * | 1981-02-12 | 1984-11-20 | Colgate Stirling A | Method of deep drilling |
| SU1010252A1 (ru) * | 1982-01-21 | 1983-04-07 | Полтавское Отделение Украинского Научно-Исследовательского Геологоразведочного Института Министерства Геологии Усср | Способ креплени осложненных зон скважин |
| SU1008419A1 (ru) * | 1982-02-25 | 1983-03-30 | Ивано-Франковский Институт Нефти И Газа | Устройство дл локального креплени ствола скважины |
| US4501327A (en) * | 1982-07-19 | 1985-02-26 | Philip Retz | Split casing block-off for gas or water in oil drilling |
-
1988
- 1988-01-21 SU SU884366623A patent/SU1679030A1/ru active
- 1988-11-22 JP JP1501552A patent/JP2530737B2/ja not_active Expired - Lifetime
- 1988-11-22 US US07/423,418 patent/US4976322A/en not_active Expired - Lifetime
- 1988-11-22 EP EP89901623A patent/EP0353309B1/de not_active Expired - Lifetime
- 1988-11-22 WO PCT/SU1988/000234 patent/WO1989006739A1/ru not_active Ceased
- 1988-11-22 DE DE3855787T patent/DE3855787D1/de not_active Expired - Fee Related
- 1988-11-22 AU AU29395/89A patent/AU606777B2/en not_active Ceased
- 1988-11-22 HU HU89982A patent/HUT57371A/hu unknown
-
1989
- 1989-01-13 IN IN38/CAL/89A patent/IN170723B/en unknown
- 1989-01-20 CN CN89100302A patent/CN1015808B/zh not_active Expired
- 1989-01-23 CA CA000588874A patent/CA1301635C/en not_active Expired - Lifetime
- 1989-01-23 MX MX014920A patent/MX171802B/es unknown
- 1989-09-19 NO NO893732A patent/NO300986B1/no not_active IP Right Cessation
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US7798225B2 (en) | 2005-08-05 | 2010-09-21 | Weatherford/Lamb, Inc. | Apparatus and methods for creation of down hole annular barrier |
Also Published As
| Publication number | Publication date |
|---|---|
| IN170723B (de) | 1992-05-09 |
| WO1989006739A1 (fr) | 1989-07-27 |
| JPH02503097A (ja) | 1990-09-27 |
| DE3855787D1 (de) | 1997-03-20 |
| EP0353309A4 (en) | 1991-05-08 |
| US4976322A (en) | 1990-12-11 |
| AU606777B2 (en) | 1991-02-14 |
| CA1301635C (en) | 1992-05-26 |
| HU890982D0 (en) | 1990-12-28 |
| NO300986B1 (no) | 1997-08-25 |
| NO893732L (no) | 1989-09-19 |
| SU1679030A1 (ru) | 1991-09-23 |
| AU2939589A (en) | 1989-08-11 |
| CN1034973A (zh) | 1989-08-23 |
| HUT57371A (en) | 1991-11-28 |
| CN1015808B (zh) | 1992-03-11 |
| JP2530737B2 (ja) | 1996-09-04 |
| EP0353309A1 (de) | 1990-02-07 |
| NO893732D0 (no) | 1989-09-19 |
| MX171802B (es) | 1993-11-15 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| EP0353309B1 (de) | Verfahren zum bau eines lochs | |
| DE69602170T2 (de) | Verfahren zur herstellung einer verrohrung im bohrloch | |
| DE69808139T2 (de) | Verfahren zum herstellen und verrohren von ölproduktionsbohrlöchern | |
| EP0397870B1 (de) | Verfahren zur befestigung der produktiven schicht innerhalb einer bohrung | |
| DE69820153T2 (de) | Verfahren und Vorrichtung zur Zementierung eines Bohrloches | |
| DE2649488C2 (de) | Verfahren zur Gewinnung von Erdöl aus einer unterirdischen Formation | |
| DE60120409T2 (de) | Stabilisierung eines Bohrlochs | |
| DE69700771T2 (de) | Leitvorrichtung um Abzweigungen von einem Hauptbohrloch zu bewerkstelligen | |
| EP0768446B1 (de) | Verfahren und Bohrgerät zum Abteufen von Bohrungen in unterirdische Formationen | |
| DE3687166T2 (de) | Verfahren und vorrichtung zum auskleiden einer bohrlochswand. | |
| DE60309532T2 (de) | Verfahren und Vorrichtung zur Komplettierung und Sandrückpacken von Bohrlöchern | |
| DE19725996C2 (de) | Verfahren und Bohrlochsystem zur Förderung von Wasser aus einem im wesentlichen vertikalen Bohrloch | |
| DE602004011775T2 (de) | Verfahren zur herstellung einer erdwärmesonde | |
| DE3125035C2 (de) | ||
| DE3724165C2 (de) | ||
| DE3103762A1 (de) | Einrichtung zum regeln der geschwindigkeit einer geraetebewegung in der verrohrung eines bohrlochs | |
| AT392517B (de) | Verfahren und vorrichtung zur absicherung von nicht bzw. maessig standfesten kohaesionslosen bis leicht kohaesiven geologischen formationen | |
| WO1998021439A1 (de) | Verfahren und einrichtung zum gleichzeitigen bohren und auskleiden von löchern | |
| DE3416679C2 (de) | ||
| DE20306797U1 (de) | Hohlbohrkrone für Kernbohrmaschinen | |
| CH693934A5 (de) | Verfahren zum Bohren und Verfuellen von Loechern. | |
| DE3703534C2 (de) | ||
| EP3112580B1 (de) | Verfahren und vorrichtung zur bildung einer unterirdischen rohrleitung | |
| WO2003046330A1 (de) | Verfahren und vorrichtung zum bohren von löchern | |
| DE19721361C2 (de) | Verfahren zur Herstellung von Pfählen und solchermaßen hergestellte Pfähle |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
| 17P | Request for examination filed |
Effective date: 19890925 |
|
| AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): DE FR GB IT |
|
| A4 | Supplementary search report drawn up and despatched |
Effective date: 19910319 |
|
| AK | Designated contracting states |
Kind code of ref document: A4 Designated state(s): DE FR GB IT |
|
| RHK1 | Main classification (correction) |
Ipc: E21B 33/00 |
|
| 17Q | First examination report despatched |
Effective date: 19921109 |
|
| GRAG | Despatch of communication of intention to grant |
Free format text: ORIGINAL CODE: EPIDOS AGRA |
|
| GRAH | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOS IGRA |
|
| GRAH | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOS IGRA |
|
| ITF | It: translation for a ep patent filed | ||
| GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
| AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): DE FR GB IT |
|
| GBT | Gb: translation of ep patent filed (gb section 77(6)(a)/1977) |
Effective date: 19970211 |
|
| REF | Corresponds to: |
Ref document number: 3855787 Country of ref document: DE Date of ref document: 19970320 |
|
| ET | Fr: translation filed | ||
| PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
| 26N | No opposition filed | ||
| REG | Reference to a national code |
Ref country code: GB Ref legal event code: IF02 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 20051125 Year of fee payment: 18 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20061116 Year of fee payment: 19 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 20061122 Year of fee payment: 19 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: IT Payment date: 20061130 Year of fee payment: 19 |
|
| REG | Reference to a national code |
Ref country code: FR Ref legal event code: ST Effective date: 20070731 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20061130 |
|
| GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20071122 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20080603 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20071122 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20071122 |