CN210975843U - Concrete slope protection structure for greening - Google Patents

Concrete slope protection structure for greening Download PDF

Info

Publication number
CN210975843U
CN210975843U CN201921775076.6U CN201921775076U CN210975843U CN 210975843 U CN210975843 U CN 210975843U CN 201921775076 U CN201921775076 U CN 201921775076U CN 210975843 U CN210975843 U CN 210975843U
Authority
CN
China
Prior art keywords
protection structure
slope protection
main part
main body
soil
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921775076.6U
Other languages
Chinese (zh)
Inventor
陈新辉
黄汉仁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chen Xinhui
Shanghai Shunqiao Ecological Environment Engineering Co.,Ltd.
Original Assignee
Shanghai Shunqiao Construction And Installation Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Shunqiao Construction And Installation Engineering Co ltd filed Critical Shanghai Shunqiao Construction And Installation Engineering Co ltd
Priority to CN201921775076.6U priority Critical patent/CN210975843U/en
Application granted granted Critical
Publication of CN210975843U publication Critical patent/CN210975843U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Cultivation Receptacles Or Flower-Pots, Or Pots For Seedlings (AREA)

Abstract

The utility model discloses a concrete slope protection structure for afforestation, including main part, first contact segment and second contact segment, the main part slope sets up, and the inboard interlude of main part has the reinforcing bar, has seted up in the main part and has cultivated the hole, cultivates downthehole nutrient soil, grass seeds and the cover soil of filling in. This concrete slope protection structure for afforestation, first contact segment and second contact segment are fixed respectively at the both ends of main part, the reinforcing bar increases the intensity of main part, the main part is made by melon seed piece and cement stirring, main part bulk strength is high, it is comparatively simple to prepare simultaneously, it is reasonable to cultivate the hole position, cultivate the downthehole nutrient soil of loading and provide initial nutrient for the grass seeds, the covering soil is used for moisturizing, the while calcium phosphate in the covering soil can reduce the basicity of cement, be favorable to the growth of plant, when a plurality of solitary slope protection structure are assembled, only need two fasteners and another slope protection structure constant head tank cooperation with slope protection structure, slope protection structure installs and dismantles conveniently, effectual saving workman operating time, reduce the cost of labor.

Description

Concrete slope protection structure for greening
Technical Field
The utility model relates to a afforestation bank protection technical field specifically is a concrete slope protection structure for afforestation.
Background
The revetment refers to a general term for various pavements and plants on a slope, and is useful not only for a river bank but also for soil erosion prevention on both sides of a road. The bank protection is generally made by gravel concrete, and current concrete slope protection structure can only reach the effect of solid soil, but the afforestation rate on the concrete bank protection is very low, and it is not high to cast the concrete preparation bank protection feasibility in the place of some environment abominable areas, so need the bank protection of preparing to transport the field installation, but current concrete slope protection structure preparation and installation are inconvenient, and the workman's installation is wasted time and energy.
Disclosure of Invention
An object of the utility model is to provide a concrete slope protection structure for afforestation possesses the advantage of assembling the convenience and practicing thrift manpower installation cost simultaneously, can solve the problem among the prior art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a concrete slope protection structure for afforestation, includes main part, first contact segment and second contact segment are fixed respectively at the both ends of main part, and the main part slope sets up, and the reinforcing bar has been interlude to the inboard of main part, has seted up in the main part and has cultivated the hole, cultivate downthehole nutrition soil, grass seeds and the covering soil of being filled with, cultivate the hole evenly distributed in the main part, seted up first constant head tank and first piece that stretches out on the first contact segment, first constant head tank and first piece alternate distribution that stretches out, the one end that first stretches out is equipped with first fastener, has seted up second constant head tank and second piece that stretches out on the second contact segment, and the second constant head tank stretches out piece alternate distribution with the second, and the one end that the second stretches out is equipped with the second fastener, and the second fastener cooperatees with first constant head tank, and the cooperation of second constant head tank.
Preferably, the thickness of the nutrient soil is 7cm, and the covering soil is positioned above the nutrient soil.
Preferably, the main body is prepared by stirring melon seed slices and cement, and the particle size of the melon seed slices is 6-20 mm.
Preferably, the body has a compressive strength greater than or equal to 8 mpa.
Preferably, the diameter value of the culture wells is 60mm, the well depth of the culture wells is controlled to 70-80mm, and 80 culture wells are uniformly distributed per square meter of the main body.
Preferably, the cross section of the first clamping piece and the cross section of the second clamping piece are both isosceles trapezoids.
Compared with the prior art, the beneficial effects of the utility model are as follows:
this concrete slope protection structure for afforestation, first contact segment and second contact segment are fixed respectively at the both ends of main part, the reinforcing bar increases the intensity of main part, the main part is made by melon seed piece and cement stirring, main part bulk strength is high, it is comparatively simple to prepare simultaneously, it is reasonable to cultivate the hole position, cultivate the downthehole nutrient soil of loading and provide initial nutrient for the grass seeds, the covering soil is used for moisturizing, the while calcium phosphate in the covering soil can reduce the basicity of cement, be favorable to the growth of plant, when a plurality of solitary slope protection structure are assembled, only need two fasteners and another slope protection structure constant head tank cooperation with slope protection structure, slope protection structure installs and dismantles conveniently, effectual saving workman operating time, reduce the cost of labor.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic sectional view of the overall structure of the present invention;
fig. 3 is an enlarged schematic view of the position a-a of the present invention.
In the figure: 1. a main body; 11. cultivating holes; 2. a first contact section; 21. a first positioning groove; 22. a first projecting member; 23. a first engaging member; 3. a second contact section; 31. a second positioning groove; 32. a second projecting member; 33. a second engaging member; 4. nutrient soil; 5. covering with soil.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1 to 3, a concrete slope protection structure for greening includes a main body 1, a first contact section 2 and a second contact section 3, the first contact section 2 and the second contact section 3 are respectively fixed at two ends of the main body 1, the main body 1 is obliquely arranged, reinforcing bars are inserted into the inner side of the main body 1, the reinforcing bars increase the strength of the main body 1 and prevent the main body 1 from bending, the main body 1 is made by stirring melon seeds and cement, the particle size of the melon seeds is 6-20mm, the compressive strength of the main body 1 is greater than or equal to 8 mpa, the main body 1 has high overall strength and is relatively simple to prepare, breeding holes 11 are formed in the main body 1, the diameter value of the breeding holes 11 is 60mm, the hole depth of the breeding holes 11 is controlled to be 70-80mm, 80 breeding holes 11 are uniformly distributed on each square meter of the main body 1, the positions of the breeding holes 11 arranged in this way are reasonable, and simultaneously, vegetation can be reasonably cultivated in each breeding hole 11, the cultivation hole 11 is filled with nutrient soil 4, grass seeds and covering soil 5, the thickness of the nutrient soil 4 is 7cm, the covering soil 5 is located above the nutrient soil 4, the nutrient soil 4 provides initial nutrients for the grass seeds, the covering soil 5 is used for moisture preservation, meanwhile, the covering soil 5 contains a humectant, calcium superphosphate and a granular organic fertilizer, the granular organic fertilizer provides nutrients for the grass seeds, the humectant can keep moisture and nutrients for a long time, the calcium superphosphate is added to reduce the alkalinity of cement and facilitate the growth of plants, the cultivation hole 11 is uniformly distributed on the main body 1, the first contact section 2 is provided with a first positioning groove 21 and a first extending piece 22, the first positioning groove 21 and the first extending piece 22 are alternately distributed, one end of the first extending piece 22 is provided with a first clamping piece 23, the second contact section 3 is provided with a second positioning groove 31 and a second extending piece 32, the second positioning groove 31 and the second extending piece 32 are alternately distributed, the one end that the second stretches out piece 32 is equipped with second fastener 33, second fastener 33 cooperatees with first constant head tank 21, first fastener 23 cooperatees with second constant head tank 31, the cross section of first fastener 23 all is isosceles trapezoid with the cross section of second fastener 33, when a plurality of solitary slope protection structure are assembled, only need two fasteners and another slope protection structure constant head tank cooperation with slope protection structure, slope protection structure installation dismantlement is convenient, effectual saving workman operating time, reduce the cost of labor.
The concrete slope protection structure for greening comprises a first contact section 2 and a second contact section 3 which are respectively fixed at two ends of a main body 1, the main body 1 is obliquely arranged, reinforcing steel bars are inserted into the inner side of the main body 1 and increase the strength of the main body 1, the main body 1 is made by stirring melon seeds and cement, the main body 1 is high in overall strength and simple to prepare, uniformly distributed cultivation holes 11 are formed in the main body 1, the positions of the cultivation holes 11 are reasonable, vegetation can be reasonably cultivated in each cultivation hole 11, nutrient soil 4, grass seeds and covering soil 5 are filled in the cultivation holes 11, the covering soil 5 is located above the nutrient soil 4, the nutrient soil 4 provides initial nutrients for grass seeds, the covering soil 5 is used for moisture preservation, the covering soil 5 contains humectant, calcium superphosphate and granular organic fertilizer, the granular organic fertilizer provides nutrients for the grass seeds, and the humectant can preserve moisture and nutrients for a long term, add the basicity that superphosphate can reduce cement, be favorable to the growth of plant, constant head tank and fastener have all been seted up to two contact sections simultaneously, when a plurality of solitary slope protection structure are assembled, only need two fasteners and another slope protection structure constant head tank cooperation with slope protection structure, slope protection structure installation dismantles conveniently, effectual saving workman operating time, reduces the cost of labor.
In summary, the following steps: this concrete slope protection structure for afforestation, first contact segment 2 and second contact segment 3 are fixed respectively at the both ends of main part 1, the reinforcing bar increases main part 1's intensity, main part 1 is made by melon seed piece and cement stirring, 1 bulk strength of main part is high, it is comparatively simple to prepare simultaneously, it is reasonable to cultivate 11 positions in the hole, it provides initial nutrient to cultivate 4 nutrient soil of loading in the hole 11 for the grass seeds, covering soil 5 is used for moisturizing, calcium phosphate in covering soil 5 can reduce the basicity of cement simultaneously, be favorable to the growth of plant, when a plurality of solitary slope protection structures are assembled, only need two fasteners and another slope protection structure constant head tank cooperation with slope protection structure, slope protection structure installs and dismantles conveniently, effectual saving workman operating time, reduce the cost of labor.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a concrete slope protection structure for afforestation, includes main part (1), first contact segment (2) and second contact segment (3), its characterized in that: the first contact section (2) and the second contact section (3) are respectively fixed at two ends of the main body (1), the main body (1) is obliquely arranged, reinforcing steel bars are inserted into the inner side of the main body (1), a cultivation hole (11) is formed in the main body (1), nutrient soil (4), grass seeds and covering soil (5) are filled in the cultivation hole (11), the cultivation holes (11) are uniformly distributed on the main body (1), a first positioning groove (21) and a first extending piece (22) are formed in the first contact section (2), the first positioning groove (21) and the first extending piece (22) are alternately distributed, a first clamping piece (23) is arranged at one end of the first extending piece (22), a second positioning groove (31) and a second extending piece (32) are formed in the second contact section (3), the second positioning groove (31) and the second extending piece (32) are alternately distributed, and a second clamping piece (33) is arranged at one end of the second extending piece (32), the second clamping piece (33) is matched with the first positioning groove (21), and the first clamping piece (23) is matched with the second positioning groove (31).
2. A concrete slope protection structure for afforestation according to claim 1, wherein: the thickness of the nutrient soil (4) is 7cm, and the covering soil (5) is located above the nutrient soil (4).
3. A concrete slope protection structure for afforestation according to claim 1, wherein: the main body (1) is prepared by stirring melon seed slices and cement, and the particle size of the melon seed slices is 6-20 mm.
4. A concrete slope protection structure for afforestation according to claim 1, wherein: the body (1) has a compressive strength greater than or equal to 8 MPa.
5. A concrete slope protection structure for afforestation according to claim 1, wherein: the diameter value of the culture holes (11) is 60mm, the hole depth of the culture holes (11) is controlled to be 70-80mm, and 80 culture holes (11) are uniformly distributed on each square meter of the main body (1).
6. A concrete slope protection structure for afforestation according to claim 1, wherein: the cross section of the first clamping piece (23) and the cross section of the second clamping piece (33) are both isosceles trapezoids.
CN201921775076.6U 2019-10-22 2019-10-22 Concrete slope protection structure for greening Active CN210975843U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921775076.6U CN210975843U (en) 2019-10-22 2019-10-22 Concrete slope protection structure for greening

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921775076.6U CN210975843U (en) 2019-10-22 2019-10-22 Concrete slope protection structure for greening

Publications (1)

Publication Number Publication Date
CN210975843U true CN210975843U (en) 2020-07-10

Family

ID=71453987

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921775076.6U Active CN210975843U (en) 2019-10-22 2019-10-22 Concrete slope protection structure for greening

Country Status (1)

Country Link
CN (1) CN210975843U (en)

Similar Documents

Publication Publication Date Title
CN105178337B (en) Raw groove is planted for one kind to sow grass seeds by duster with linked network the protecting slope ecology method combined
CN102511272A (en) Revegetation method for mine slopes
CN101099441A (en) Method for culturing grape in arid Gobi desert area
CN110089353A (en) A kind of hard side slope greening restoration method
CN105210494B (en) Loess steep slope is mixed to hand over Afforestation method
CN106538340A (en) A kind of implantation methods of summer Black Grape
CN105706690B (en) Winter in Yunnan Province potato production integrated planting method
CN102318533A (en) A kind of quick-growing cultivation method of southern magnolia
CN106258142A (en) Fruit tree water-fertilizer integral fertilizing method
CN103703970A (en) Method for planting tea trees in greenhouse
CN107211785A (en) It is a kind of that large area site preparation and the method for rice cultivation are carried out to desert area
CN104025886B (en) A kind of mulch film covers the method for cave artificial cistanche inoculation
CN111802183A (en) Ecological slope protection and vertical greening process
CN104186056A (en) Furrow straw ridge cultivation method
CN206433446U (en) A kind of cultivation cave of big plant type Paeonia papaveracea
CN210975843U (en) Concrete slope protection structure for greening
CN105103698B (en) Soil preparation method for improving production performance of soil in sandy soil matrix greenhouse
CN204047408U (en) A kind of protection pipe fitting applying to Haloxylon plant protection
CN102550356A (en) Method for managing blackberry orchard by pit storage of nutritive water and mulching film covering
CN202969395U (en) Flexible ecological wall
CN1985571A (en) Seedling growing process for raising the survival rate of transplanted seedling tree
CN110495355B (en) Water-fertilizer integrated cultivation method for sesame in Xinjiang area through drip irrigation under mulch
CN101663948B (en) Artificial planting method of liquorice
CN114097596A (en) Method for planting vegetables in saline-alkali soil by utilizing nutrient medium
CN203860129U (en) Seedling cultivating device used for cultivating forestry tree deep-root seedlings and capable of being repeatedly used

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 226265 No. 21, Group 12, Beiwei Village, Huilong Town, Nantong City, Jiangsu Province

Patentee after: Chen Xinhui

Patentee after: Shanghai Shunqiao Ecological Environment Engineering Co.,Ltd.

Address before: 226265 No. 21, Group 12, Beiwei Village, Huilong Town, Nantong City, Jiangsu Province

Patentee before: Chen Xinhui

Patentee before: Shanghai Shunqiao construction and Installation Engineering Co.,Ltd.

CP01 Change in the name or title of a patent holder