CN110089353A CN201910384331.2A CN201910384331A CN110089353A CN 110089353 A CN110089353 A CN 110089353A CN 201910384331 A CN201910384331 A CN 201910384331A CN 110089353 A CN110089353 A CN 110089353A
Authority
CN
China
Prior art keywords
slope
side slope
soil
hard side
restoration method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910384331.2A
Other languages
Chinese (zh)
Inventor
黄轶
杨建新
张帆
金坤
赵海莲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China First Metallurgical Group Co Ltd
Original Assignee
China First Metallurgical Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China First Metallurgical Group Co Ltd filed Critical China First Metallurgical Group Co Ltd
Priority to CN201910384331.2A priority Critical patent/CN110089353A/en
Publication of CN110089353A publication Critical patent/CN110089353A/en
Pending legal-status Critical Current

Links

Classifications

    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G13/00Protecting plants
    • A01G13/02Protective coverings for plants; Coverings for the ground; Devices for laying-out or removing coverings
    • A01G13/0206Canopies, i.e. devices providing a roof above the plants
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G17/00Cultivation of hops, vines, fruit trees, or like trees
    • A01G17/005Cultivation methods
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G20/00Cultivation of turf, lawn or the like; Apparatus or methods therefor
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G22/00Cultivation of specific crops or plants not otherwise provided for
    • A01G22/60Flowers; Ornamental plants
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G24/00Growth substrates; Culture media; Apparatus or methods therefor
    • A01G24/10Growth substrates; Culture media; Apparatus or methods therefor based on or containing inorganic material
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G24/00Growth substrates; Culture media; Apparatus or methods therefor
    • A01G24/10Growth substrates; Culture media; Apparatus or methods therefor based on or containing inorganic material
    • A01G24/12Growth substrates; Culture media; Apparatus or methods therefor based on or containing inorganic material containing soil minerals
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G24/00Growth substrates; Culture media; Apparatus or methods therefor
    • A01G24/10Growth substrates; Culture media; Apparatus or methods therefor based on or containing inorganic material
    • A01G24/12Growth substrates; Culture media; Apparatus or methods therefor based on or containing inorganic material containing soil minerals
    • A01G24/15Calcined rock, e.g. perlite, vermiculite or clay aggregates
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G24/00Growth substrates; Culture media; Apparatus or methods therefor
    • A01G24/20Growth substrates; Culture media; Apparatus or methods therefor based on or containing natural organic material
    • A01G24/28Growth substrates; Culture media; Apparatus or methods therefor based on or containing natural organic material containing peat, moss or sphagnum
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G24/00Growth substrates; Culture media; Apparatus or methods therefor
    • A01G24/30Growth substrates; Culture media; Apparatus or methods therefor based on or containing synthetic organic compounds
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G25/00Watering gardens, fields, sports grounds or the like
    • A01G25/02Watering arrangements located above the soil which make use of perforated pipe-lines or pipe-lines with dispensing fittings, e.g. for drip irrigation
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • E02D17/202Securing of slopes or inclines with flexible securing means
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A40/00Adaptation technologies in agriculture, forestry, livestock or agroalimentary production
    • Y02A40/10Adaptation technologies in agriculture, forestry, livestock or agroalimentary production in agriculture
    • Y02A40/22Improving land use; Improving water use or availability; Controlling erosion

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Environmental Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Soil Sciences (AREA)
  • Inorganic Chemistry (AREA)
  • Chemical & Material Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Paleontology (AREA)
  • Botany (AREA)
  • Water Supply & Treatment (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Toxicology (AREA)
  • Cultivation Of Plants (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

The invention discloses a kind of hard side slope greening restoration methods, it cleared up including slope surface, setting anchor pole, be laid with galvanized wire mesh sheet, Red Sandstone is modified to planting soil, is laid with geomembrane, sows, establishing automatic irrigation system and operation and maintenance, it is improved to modifying agent is mixed in the red sand rock-soil layer of different content amount containing sandstone, spray head is installed in pre-buried spray system using automatic control system simultaneously, it is planted by spray head irrigating plant, spray irrigation system can be automatically controlled according to temperature humidity.The present invention provides a kind of hard slope greening recovery technique that Red Sandstone is modified to planting soil, long term growth condition is provided for vegetation, realize the restoration of the ecosystem demand of slope of rock mass, hard slope surface, slope protection greening cultivated plant is combined with traditional plant cover concrete ecological reestablishment, revegetation carries out simultaneously with anchoring fixation, can preferably realize the growth of vegetation and the fixation of side slope in side slope.

Description

A kind of hard side slope greening restoration method
Technical field
The present invention relates to Ecological Restoration Project and afforestation project fields, and in particular to hard side slope greening restoration method.
Background technique
China is more serious for vegetation deterioration since urban construction in recent years is accelerated, and green areas is caused to significantly reduce, Then attention of the people to environment and the ecological balance is caused.And novel ecological slope protection has begun large-scale popularization use.? Water power, municipal administration, in mine engineering, due to construction and excavation, forms a large amount of exposed slope of rock mass, some slope surfaces are using injection at traffic The engineering constructions such as concrete, stone masonry protect to form hard slope surface, these slope of rock mass, hard slope surface are due to lacking vegetation growth Condition, ecological environment is poor, and slope landscape effect demand fails to be settled properly for a long time.
Some Red Sandstone in hard side slope, mainly two kinds of typical structures of fragmental texture and pureed cement structure in pelletized form Form, because of the difference of binding material and rate of decay, the variation of intensity is big.Most Red Sandstones after excavation or explosion come out, Effect disintegratable by atmospheric environment is broken or even argillization, thus the size of its sillar and grain composition by with drying and watering cycle when Between process and change, physico-mechanical properties also by generate variation, in the prior art can not for the greening reparation of hard side slope Using original Red Sandstone, need to re-lay planting soil, cost is excessively high.
Summary of the invention
There are problems for above-mentioned, and the purpose of the present invention is to provide a kind of hard edges that Red Sandstone is modified to planting soil Recovery technique is afforested on slope, is provided long term growth condition for vegetation, is realized the restoration of the ecosystem demand of slope of rock mass, hard slope surface.Energy It is enough effectively to keep high steep hard side slope Afforestation Landscape.
To achieve the above object, the technical solution adopted by the present invention is that: a kind of hard side slope greening restoration method, feature It is: the following steps are included:
S1. slope surface is cleared up: on side slope slope of rock mass, being removed work surface sundries and is loosened sillar, soil block, to slope surface corner The corner angle of place and top of the slope are modified, and are allowed to arc-shaped, and part rock outstanding and soil block should remove or carry out to cut slope processing, and And it carries out snap the line grid division and is numbered;
S2., anchor pole is set: anchor pole being uniformly equidistantly inserted into the structure sheaf of hard side slope;
S3. lapped layup galvanized wire mesh sheet from top to bottom;
S4. incorporation modifying agent in red sand rock-soil layer and plain soil are improved, is modified to improvement plantation layer;
S5. it is laid with geomembrane, the improvement improved by Red Sandstone plantation layer is laid on geomembrane on geomembrane;
S6. improvement plantation layer made of Red Sandstone improvement is uniformly sowed, and grass-seed, nutritional agents, accelerator, takes root at flowering shrub The uniform mixing jetting of agent is conducive to taking root for plant on scar, after planting using cotton covering and timely water seasoning, morning and evening Each primary watering, heat and moisture preserving;Shading net is propped after emerging or heavy foliage branch carries out sunshade;
S7. cotton and shading net is raised to seedling 10CM or more to grow naturally by it;
S8. spray irrigation system is established, slope greening cultivated plant is automatically controlled according to temperature humidity and carries out spray maintenance.
S9. it runs and conserves.
Further, in the step S4, weight percentage of each component composition are as follows: Red Sandstone 70%, carragheen 15%- 17%, humus 4%-6%, plant ash 1-2%, then mix plain soil 8-10%.
Further, in the step S4, after modifying agent mixes in red sand rock-soil layer, stack is formed after making its uniform mix; Watering, makes its moisture content reach 30%~40%;It is covered, is macerated 2~3 days using cotton.
Further, in the step S2, longitudinal pitch and horizontal spacing between the anchor pole and anchor pole are 2-3m, anchor Pole length is 5-6m.
Further, in the step S3, the lap width of adjacent galvanized wire mesh sheet is at least 10cm, the galvanized iron The mesh of silk netting is 10cm × 10cm.
Further, in the step S6, according to operation side soil or scar property, local climate condition, construction season Section, and herbaceous plant and the Qiao, shrub of various plant growth characteristics selection well developed root system are combined, and species should be with endemic plant It is main;The seed activity of reply buying, purity are monitored before grass seeds sowing.
Further, it in the step S8, establishes spray irrigation system and is included in the spaced many places tank in top of the slope area, be used for The rainwater collected is stored, and is supplied water using automatic sprinkling system, automatic sprinkling system and tank use flexible duct between the two Connection, the automatic sprinkling system include main-supply, control valve are arranged in branch's water injection pipe and control system, main-supply, Each control valve controls the main-supply and branch's water injection pipe of automatic sprinkling system, sets on the main-supply and branch's water injection pipe There is spray head, the control system automatically controls spray head according to temperature and humidity and carries out spray maintenance.
Further, the confluence ditch and classification platform of several vertical interlaceds, the confluence ditch are additionally provided on hard side slope surface Slope of rock mass is separated into several green belt with classification platform, convenient for planting the spraying of raw substrate, the two sides of green belt are equipped with Waterwall, the bottom of slope are equipped with intercepting ditch, and intercepting ditch is connected with confluence ditch, and the top of the slope is equipped with pressure sheath, press sheath and position It is poured in the waterwall top of top layer into a single integrated structure.
Further, in the step S9, after the completion of construction, spray irrigation system is run for the first time will fill in tank, kept The water yield of system is run in maximum rating, fixed after soaking body formation and volume reaches the root zone volume for being enough to contain crop Phase measuring soil moisture, and control valve or tank water level control spray irrigation system filling pipe water yield, make gradient soil Humidity keeps 20~30%.
Compared with prior art, the beneficial effects of the present invention are:
1. red rock soil is modified to planting soil, after Red Sandstone improves planting soil improvement, the PH of red sand ground can be reduced, and effectively Organic matter, humic acid, nitrogen, phosphorus, potassium equal size in red sand ground are supplemented, taking root for plant is conducive to.Long-term life is provided for vegetation Elongate member.
2. the present invention combines slope protection greening cultivated plant with traditional plant cover concrete ecological reestablishment, revegetation It is carried out simultaneously with anchoring fixation, can preferably realize the growth of vegetation and the fixation of side slope in side slope.One can be formed A complete Eco-farming shelterbelt system, easy for construction, structural stability is good, and erosion resistibility is strong, and more effect solves exposed ragstone Slope surface can not growing plant problem, so that rock slope is reached complete greening.
3. installing spray head in pre-buried spray system, is planted by spray head irrigating plant, sprayed using automatic control system System can be automatically controlled according to temperature humidity.
Detailed description of the invention
Fig. 1 is overall structure diagram of the invention;
Fig. 2 is main view of the present invention;
Fig. 3 is galvanized wire mesh schematic diagram of the present invention;
Fig. 4 is that the present invention automatically controls spray irrigation system schematic diagram;
Fig. 5 is Red Sandstone improvement schematic diagram of the present invention;
In figure: 1- top of the slope, 2- pressure sheath, 3- bottom of slope, 4- intercepting ditch, 5- slope of rock mass, 6- galvanized wire mesh sheet, 7- geotechnique Film, 8- improvement plantation layer, 9- anchor pole, 10- automatic irrigation system, 11- tank, 12- confluence ditch, 13- waterwall, 14- original are red Sandstone soil layer, 15- main-supply, 16- branch water injection pipe, 17- control valve, 18- spray head.
Specific embodiment
The present invention provides a kind of hard side slope greening restoration method.Technical solution provided by the embodiment of the present invention is to solve Above-mentioned technical problem, in order to better understand the above technical scheme, below in conjunction with Figure of description and specific embodiment party The above described technique is demenstrated in detail for formula.
The present invention provides a kind of hard side slope greening restoration method, comprising the following steps:
S1. slope surface is cleared up: on side slope slope of rock mass 5, being removed work surface sundries and is loosened sillar, soil block, turn to slope surface At angle and the corner angle of top of the slope are modified, and are allowed to arc-shaped, and part rock outstanding and soil block should remove or carry out to cut slope processing, And it carries out snap the line grid division to be numbered;
S2., anchor pole 9 is set: will be in the anchor pole 9 uniformly structure sheaf of equidistant insertion hard side slope;
S3. lapped layup galvanized wire mesh sheet 6 from top to bottom;
S4. incorporation modifying agent in red sand rock-soil layer 14 and plain soil are improved, is modified to improvement plantation layer 8;
S5. it is laid with geomembrane 7, the improvement improved by Red Sandstone plantation layer 8 is laid on geomembrane 7 on geomembrane 7;
S6. improvement plantation layer 8 made of Red Sandstone improvement is uniformly sowed, and grass-seed, nutritional agents, accelerator, takes root at flowering shrub The uniform mixing jetting of agent is conducive to taking root for plant on scar, after planting using cotton covering and timely water seasoning, morning and evening Each primary watering, heat and moisture preserving;Shading net is propped after emerging or heavy foliage branch carries out sunshade;
S7. cotton and shading net is raised to seedling 10CM or more to grow naturally by it;
S8. spray irrigation system is established, slope greening cultivated plant is automatically controlled according to temperature humidity and carries out spray maintenance.
S9. it runs and conserves.
In the step S4, in step S4, weight percentage of each component composition are as follows: Red Sandstone 70%, carragheen 15%- 17%, humus 4%-6%, plant ash 1-2%, then mix plain soil 8-10%.
In the above-described embodiments, Red Sandstone is in grittiness, meets water and is easy to run off, and carragheen has certain gel effect, can The loss of soil before plant growth is prevented, plant ash has potassium, phosphoric acid and lime abundant.Humus is completely rotten warp The plant and animal residues of microorganism decomposition, have the cohesiveness of appropriateness, and sand coheres.Containing there are many nutrients, and there is stronger suction The property received, can improve soil fertilizer, water retention property, can also buffer soil ph variation, be conducive to microbial activities and plant is raw It is long.
Red Sandstone to be improved as after planting soil, organic fertilizer and inorganic builder are applied when fertilising, nitrogen, phosphorus, potash fertilizer compounding application, To improve chemical fertilizer utilization ratio, applied nitrogen can be made into ball fertilizer and apply deeply, and phosphate fertilizer wants row replacement, cave to apply, and concentrates and applies after mixing with farmyard manure, It is needed suitably to increase potash fertilizer according to plant growth.
As shown in Fig. 2, further preferred scheme is, in the step S2, between the longitudinal direction between the anchor pole 9 and anchor pole Away from being 2-3m, rock-bolt length 5-6m with horizontal spacing.
As shown in figure 3, further preferred scheme is in the step S3 on the basis of the above embodiments, it is adjacent zinc-plated The lap width of iron wire mesh sheet 6 is at least 10cm, and the mesh of the galvanized wire mesh sheet is 10cm × 10cm.
In the above-described embodiments, it in step S6, according to operation side soil or scar property, local climate condition, applies Work season, and herbaceous plant and the Qiao, shrub of various plant growth characteristics selection well developed root system are combined, and species should be planted with locality Based on object;The seed activity of reply buying, purity are monitored before grass seeds sowing, should ensure that the density 6 of seed when grass seeds broadcasts sowing ~9kg/hm2.Undesirable seed is forbidden using can sow grass seeds by duster different patterns, and bald spot occurs in reply when late maintaining Position repaired in time.
In the step S8, establishes spray irrigation system and be included in the spaced many places tank 11 in top of the slope area, for storing The rainwater of collection, and supplied water using automatic sprinkling system 10, automatic sprinkling system 10 and tank 11 use flexible pipe between the two Road connection, the automatic sprinkling system 10 on main-supply 15, branch's water injection pipe 16 and control system, main-supply 15 including setting Set control valve 17, the main-supply and branch's water injection pipe of each control valve control automatic sprinkling system, the main-supply and point Branch water injection pipe is equipped with spray head 18, and the control system automatically controls spray head according to temperature and humidity and carries out spray maintenance.
In the above-described embodiments, tank 11 can be arranged one at interval of 10m.
As shown in Figure 1, in the above-described embodiments, 12 He of confluence ditch of several vertical interlaceds is additionally provided on hard side slope surface It is classified platform, slope of rock mass is separated into several green belt with classification platform by the confluence ditch 12, convenient for planting the injection of raw substrate Operation, 3 bottom of slope be equipped with intercepting ditch 4, intercepting ditch 4 with confluence ditch 12 be connected, the top of the slope 1 be equipped with pressure sheath 2, press sheath 2 and Poured positioned at 13 top of waterwall of top layer into a single integrated structure, intercepting ditch 4 passed through and collects rainwater and make in the season that rainfall is plentiful For the water supply source of tank 11, when rainwater deficiency and artificial recharge is can be used as tank in plant recovery initial stage Resource of water supply.Pouring and the drainage problem of slope greening are can effectively solve.
In the above-described embodiments, in step S9, after the completion of construction, spray irrigation system is run for the first time will fill in tank, The water yield of holding system is run in maximum rating, when wetting body is formed and volume reaches and is enough to contain the root zone volume of crop Afterwards, results of regular determination soil moisture, and control valve or tank water level control spray irrigation system filling pipe water yield keep the gradient native The humidity of earth keeps 20~30%.It is conserved according to related requirement specification, the particular content of maintenance includes watering, applying fertilizer, repairing It cuts, sunshade, a series of activities measure such as disease pest and weed.Planting nursery stock is poured with natural water, must water within 48 hours later A time water, second time water then carries out, and notices that watering must be watered with and irrigates, is carried out in time with puggaree under burning sun after having poured Sunshade, to keep moisture in planting medium.
It is suitable for shrub, Climbing Plant that vegetation, which is selected, can be effectively improved the vegetative coverage of slope surface.When vegetation growth, root system Substantially it is limited in soil grid, in addition the effect of outer layer filling compressible material, reducing root system spalling may be to slope surface Adverse effect.
Specific embodiments of the present invention are described in detail above, but it is intended only as one such embodiment, The present invention is not restricted to particular embodiments described above.To those skilled in the art, any couple of present invention carries out Equivalent modifications and substitution also all among scope of the invention.Therefore, made without departing from the spirit and scope of the invention Equal transformation and modification, all should be contained within the scope of the invention.

Claims (9)

1. a kind of hard side slope greening restoration method, it is characterised in that: the following steps are included:
S1. slope surface is cleared up: on side slope slope of rock mass, remove work surface sundries and loosen sillar, soil block, to slope surface corner and The corner angle of top of the slope are modified, and are allowed to arc-shaped, and part rock outstanding and soil block should remove or carry out to cut slope processing, and into Row snap the line grid division is numbered;
S2., anchor pole is set: anchor pole being uniformly equidistantly inserted into the structure sheaf of hard side slope;
S3. lapped layup galvanized wire mesh sheet from top to bottom;
S4. incorporation modifying agent in red sand rock-soil layer and plain soil are improved, is modified to improvement plantation layer;
S5. it is laid with geomembrane, the improvement improved by Red Sandstone plantation layer is laid on geomembrane on geomembrane;
S6. improvement plantation layer made of Red Sandstone improvement is uniformly sowed, and grass-seed, flowering shrub, nutritional agents, accelerator, root-growing agent are equal Even mixing jetting is conducive to taking root for plant on scar, after planting using cotton covering and timely water seasoning, morning and evening each one Secondary watering, heat and moisture preserving;Shading net is propped after emerging or heavy foliage branch carries out sunshade;
S7. cotton and shading net is raised to seedling 10CM or more to grow naturally by it;
S8. spray irrigation system is established, slope greening cultivated plant is automatically controlled according to temperature humidity and carries out spray maintenance;
S9. it runs and conserves.
2. a kind of hard side slope greening restoration method according to claim 1, it is characterised in that: in the step S4, respectively Weight percentages of components composition are as follows: Red Sandstone 70%, carragheen 15%-17%, humus 4%-6%, plant ash 1-2%, then Mix plain soil 8-10%.
3. a kind of hard side slope greening restoration method according to claim 2, it is characterised in that: in the step S4, change After in good dose of incorporation red sand rock-soil layer, stack is formed after making its uniform mix;Watering, makes its moisture content reach 30%~40%; It is covered, is macerated 2~3 days using cotton.
4. a kind of hard side slope greening restoration method according to claim 1, it is characterised in that: in the step S2, institute Stating longitudinal pitch and horizontal spacing between anchor pole and anchor pole is 2-3m, rock-bolt length 5-6m.
5. a kind of hard side slope greening restoration method according to claim 1, it is characterised in that: in the step S3, phase The lap width of adjacent galvanized wire mesh sheet is at least 10cm, and the mesh of the galvanized wire mesh sheet is 10cm × 10cm.
6. a kind of hard side slope greening restoration method according to claim 1, it is characterised in that: in the step S6, root According to operation side soil or scar property, local climate condition, construction seasons, and various plant growth characteristics is combined to select root It is flourishing herbaceous plant and Qiao, shrub, and species should be based on endemic plant;The seed of reply buying is living before grass seeds sowing Property, purity are monitored, and should ensure that 6~9kg/hm of density of seed when grass seeds broadcasts sowing2
7. a kind of hard side slope greening restoration method according to claim 1, it is characterised in that: in the step S8, build Vertical spray irrigation system is included in the spaced many places tank in top of the slope area, for storing the rainwater collected, and uses automatic irrigation System water supply, automatic sprinkling system are connect with flexible duct between the two with tank, and the automatic sprinkling system includes main confession Control valve, the master of each control valve control automatic sprinkling system are set in water pipe, branch's water injection pipe and control system, main-supply Water supplying pipe and branch's water injection pipe, the main-supply and branch's water injection pipe are equipped with spray head, the control system according to temperature and Humidity Automatic Control spray head carries out spray maintenance.
8. a kind of hard side slope greening restoration method according to claim 1, it is characterised in that: on hard side slope surface also Slope of rock mass is separated into several green by confluence ditch and classification platform equipped with several vertical interlaceds, the confluence ditch with classification platform Change area, convenient for planting the spraying of raw substrate, the two sides of green belt are equipped with waterwall, and the bottom of slope is equipped with intercepting ditch, intercepting ditch It is connected with confluence ditch, the top of the slope is equipped with pressure sheath, and pressure sheath pours integral knot with the waterwall top for being located at top layer Structure.
9. a kind of hard side slope greening restoration method according to claim 1, it is characterised in that: in the step S9, apply After the completion of work, spray irrigation system is run for the first time will fill in tank, kept the water yield of system to run in maximum rating, worked as profit After wet body formation and volume reach the root zone volume for being enough to contain crop, results of regular determination soil moisture, and control valve or water storage Pool water level controls spray irrigation system filling pipe water yield, and the humidity of gradient soil is made to keep 20~30%.
CN201910384331.2A 2019-05-09 2019-05-09 A kind of hard side slope greening restoration method Pending CN110089353A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910384331.2A CN110089353A (en) 2019-05-09 2019-05-09 A kind of hard side slope greening restoration method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910384331.2A CN110089353A (en) 2019-05-09 2019-05-09 A kind of hard side slope greening restoration method

Publications (1)

Publication Number Publication Date
CN110089353A true CN110089353A (en) 2019-08-06

Family

ID=67447428

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910384331.2A Pending CN110089353A (en) 2019-05-09 2019-05-09 A kind of hard side slope greening restoration method

Country Status (1)

Country Link
CN (1) CN110089353A (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110512628A (en) * 2019-08-26 2019-11-29 中国水利水电科学研究院 A kind of side slope ecological renovation method
CN110604038A (en) * 2019-10-17 2019-12-24 林进国 Ecological slope protection greening water supply system
CN110714469A (en) * 2019-09-12 2020-01-21 中国一冶集团有限公司 Red sandstone hard slope ecological greening system and construction method thereof
CN111887138A (en) * 2020-08-31 2020-11-06 甘肃省科学院地质自然灾害防治研究所 Water distribution method for intercepting type slope green plant irrigation
CN111887139A (en) * 2020-08-31 2020-11-06 甘肃省科学院地质自然灾害防治研究所 Automatic water supply irrigation method for controlling slope green plants
CN111990185A (en) * 2020-08-31 2020-11-27 长江师范学院 Rock slope ecological restoration system
CN113062332A (en) * 2021-03-30 2021-07-02 广西北投交通养护科技集团有限公司 Vegetation concrete ecological slope protection and automatic maintenance method
CN114215075A (en) * 2021-11-10 2022-03-22 武汉景天园林有限公司 Slope greening restoration method
CN115007633A (en) * 2022-06-14 2022-09-06 贵州大学 In-situ repair method for lead-zinc waste residue storage yard
CN115130163A (en) * 2021-03-26 2022-09-30 安徽轩鸣新材料有限公司 Mountain greening construction scheme making system, making method and construction method
CN116235659A (en) * 2023-01-10 2023-06-09 陈广宇 River side slope soil fixing device and soil fixing method
CN116856432A (en) * 2023-05-26 2023-10-10 海南大学 Ecological slope protection system under combined action of vegetation and microorganism and construction method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102763535A (en) * 2012-06-26 2012-11-07 巫少芬 Side slope greening method
CN102992826A (en) * 2012-11-20 2013-03-27 厦门日懋城建园林建设有限公司 New improved substrate of slope, preparation method and application thereof
CN103641648A (en) * 2013-12-16 2014-03-19 北京东方园林股份有限公司 Sludge plant growth substrate and side slope sludge soil replacement greening method
CN104805845A (en) * 2015-04-21 2015-07-29 安徽农业大学 Flexible slope protection method for soft sandstone natural side slope

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102763535A (en) * 2012-06-26 2012-11-07 巫少芬 Side slope greening method
CN102992826A (en) * 2012-11-20 2013-03-27 厦门日懋城建园林建设有限公司 New improved substrate of slope, preparation method and application thereof
CN103641648A (en) * 2013-12-16 2014-03-19 北京东方园林股份有限公司 Sludge plant growth substrate and side slope sludge soil replacement greening method
CN104805845A (en) * 2015-04-21 2015-07-29 安徽农业大学 Flexible slope protection method for soft sandstone natural side slope

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110512628A (en) * 2019-08-26 2019-11-29 中国水利水电科学研究院 A kind of side slope ecological renovation method
CN110714469A (en) * 2019-09-12 2020-01-21 中国一冶集团有限公司 Red sandstone hard slope ecological greening system and construction method thereof
CN110604038B (en) * 2019-10-17 2021-07-16 绍兴市魏达机械有限公司 Ecological slope protection greening water supply system
CN110604038A (en) * 2019-10-17 2019-12-24 林进国 Ecological slope protection greening water supply system
CN111990185B (en) * 2020-08-31 2022-09-23 长江师范学院 Rock slope ecological remediation system
CN111887138B (en) * 2020-08-31 2022-11-01 甘肃省科学院地质自然灾害防治研究所 Water distribution method for intercepting type slope green plant irrigation
CN111887139A (en) * 2020-08-31 2020-11-06 甘肃省科学院地质自然灾害防治研究所 Automatic water supply irrigation method for controlling slope green plants
CN111990185A (en) * 2020-08-31 2020-11-27 长江师范学院 Rock slope ecological restoration system
CN115152595B (en) * 2020-08-31 2023-10-31 甘肃省科学院地质自然灾害防治研究所 Uniform water distribution type side slope green planting system
CN111887138A (en) * 2020-08-31 2020-11-06 甘肃省科学院地质自然灾害防治研究所 Water distribution method for intercepting type slope green plant irrigation
CN115152595A (en) * 2020-08-31 2022-10-11 甘肃省科学院地质自然灾害防治研究所 Uniform water distribution type slope green planting system
CN115130163A (en) * 2021-03-26 2022-09-30 安徽轩鸣新材料有限公司 Mountain greening construction scheme making system, making method and construction method
CN113062332A (en) * 2021-03-30 2021-07-02 广西北投交通养护科技集团有限公司 Vegetation concrete ecological slope protection and automatic maintenance method
CN114215075A (en) * 2021-11-10 2022-03-22 武汉景天园林有限公司 Slope greening restoration method
CN115007633B (en) * 2022-06-14 2023-03-14 贵州大学 In-situ repair method for lead-zinc waste residue storage yard
CN115007633A (en) * 2022-06-14 2022-09-06 贵州大学 In-situ repair method for lead-zinc waste residue storage yard
US11858018B1 (en) 2022-06-14 2024-01-02 Guizhou University In-situ remediation method for lead-zinc slag dump
CN116235659A (en) * 2023-01-10 2023-06-09 陈广宇 River side slope soil fixing device and soil fixing method
CN116235659B (en) * 2023-01-10 2024-06-14 陈广宇 River side slope soil fixing device and soil fixing method
CN116856432A (en) * 2023-05-26 2023-10-10 海南大学 Ecological slope protection system under combined action of vegetation and microorganism and construction method

Similar Documents

Publication Publication Date Title
CN110089353A (en) A kind of hard side slope greening restoration method
CN104255280B (en) A kind of high precipitous rock slope vegetation implantation methods
CN103931371B (en) A kind of biological control method of rock side-slope
CN101904261B (en) Method for restoring side slope ecology by adopting AB (Acinetobacter baumannii) bacterium plant growing bags
WO2015101295A1 (en) Water and soil conservation and ecological restoration method of high and steep, abandoned slag piles at high elevation with large temperature differential in dry, hot valley
CN103609303B (en) A kind of hillock near-nature forest ecological system reconstruction method
CN105981539A (en) Side slope greening method
CN208266847U (en) Quickly repair structure in Gullied suitable for Canal in Loess Area
CN101507391B (en) Rock slope-surface ecology treatment method
CN112064655A (en) Rapid restoration and greening method for limestone bare high and steep slope
CN105340507B (en) Sedum lineare roof greening planting method and roof greening planting structure
CN108547307A (en) Protecting slope ecology method based on artificial loam
CN108476649A (en) A kind of gardens abrupt slope plant landscape method
CN105210770B (en) Dust storm forward position Desert Regions sacsaoul Ecology method of forestation
CN109392582A (en) A kind of massif slope surface implantation methods
CN110447448A (en) A kind of beach saline land garden landscape plant cultivation method
CN106576474A (en) Efficient ecological restoration method for slope in South China
CN109328808A (en) A kind of the Northwest's ecological treatment of slope method
CN110506554A (en) A kind of Landscape Construction method
CN210946834U (en) Immersed net type ecological slope protection structure for mine restoration
CN1122183A (en) Sand land mulching film cultivation method for rice
CN109328805A (en) A kind of Rocky Desertification Region ecological treatment of slope method
CN106718607B (en) A method of directly repairing metal abandoned mine slag muck field using wet-land pine tree container seedling
CN111512840A (en) Moss plant block and method for establishing ecology by using moss plant block on concrete surface
CN101457525B (en) Loess slope heavy layer flaking diseases treatment method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190806

RJ01 Rejection of invention patent application after publication