CN209323393U - 一种拉索桥主塔侧平面修补吊篮施工结构 - Google Patents
一种拉索桥主塔侧平面修补吊篮施工结构 Download PDFInfo
- Publication number
- CN209323393U CN209323393U CN201821844842.5U CN201821844842U CN209323393U CN 209323393 U CN209323393 U CN 209323393U CN 201821844842 U CN201821844842 U CN 201821844842U CN 209323393 U CN209323393 U CN 209323393U
- Authority
- CN
- China
- Prior art keywords
- king
- tower
- hanging basket
- side plane
- rope
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims abstract description 41
- 239000003381 stabilizer Substances 0.000 claims abstract description 19
- 230000008439 repair process Effects 0.000 claims abstract description 8
- 238000007689 inspection Methods 0.000 claims description 6
- 238000006073 displacement reaction Methods 0.000 abstract description 4
- 238000010586 diagram Methods 0.000 description 5
- 239000000725 suspension Substances 0.000 description 3
- 238000005260 corrosion Methods 0.000 description 1
- 230000007797 corrosion Effects 0.000 description 1
- 229910003460 diamond Inorganic materials 0.000 description 1
- 239000010432 diamond Substances 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000010355 oscillation Effects 0.000 description 1
- 150000003839 salts Chemical class 0.000 description 1
Landscapes
- Movable Scaffolding (AREA)
Abstract
Description
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821844842.5U CN209323393U (zh) | 2018-11-09 | 2018-11-09 | 一种拉索桥主塔侧平面修补吊篮施工结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821844842.5U CN209323393U (zh) | 2018-11-09 | 2018-11-09 | 一种拉索桥主塔侧平面修补吊篮施工结构 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209323393U true CN209323393U (zh) | 2019-08-30 |
Family
ID=67709728
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821844842.5U Active CN209323393U (zh) | 2018-11-09 | 2018-11-09 | 一种拉索桥主塔侧平面修补吊篮施工结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209323393U (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114855644A (zh) * | 2022-03-25 | 2022-08-05 | 浙江恒炜建设集团有限公司 | 一种便于维护的桥梁主塔结构及其施工方法 |
-
2018
- 2018-11-09 CN CN201821844842.5U patent/CN209323393U/zh active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114855644A (zh) * | 2022-03-25 | 2022-08-05 | 浙江恒炜建设集团有限公司 | 一种便于维护的桥梁主塔结构及其施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106012864B (zh) | 一种桥梁拱肋整体提升安装的方法 | |
CN201158933Y (zh) | 一种高层外挑结构维修脚手架装置 | |
CN201053106Y (zh) | 桥梁检测维护装置 | |
CN104695337A (zh) | 自提升滑翻施工系统及施工方法 | |
CN205954489U (zh) | 桥梁上跨营业线现浇空间钢构施工防护移动支架 | |
CN110258293A (zh) | 斜拉桥钢桁梁主塔墩顶架设施工方法 | |
CN201506952U (zh) | 无支架临时索配合挂篮建筑混凝土斜拉桥 | |
CN110468743B (zh) | 一种用于旧桥墩帽改造的移动式吊架及施工方法 | |
CN202544854U (zh) | 地铁车站衬砌台车 | |
CN202164546U (zh) | 高墩桥梁施工平台 | |
CN206233600U (zh) | 超长超大混凝土梁安装钢筋的可升降装置 | |
CN110512517B (zh) | 一种桥梁工程施工平台 | |
CN209323393U (zh) | 一种拉索桥主塔侧平面修补吊篮施工结构 | |
CN109267493A (zh) | 一种安装横跨河道钢盖梁的施工方法 | |
CN205917601U (zh) | 一种桥梁拱肋的整体提升装置 | |
CN204625045U (zh) | 一种钢结构吊装用门型支架式吊装装置 | |
CN202000265U (zh) | 桥梁高墩混凝土施工模板 | |
CN209210319U (zh) | 行车专用维保吊篮 | |
CN110184898A (zh) | 斜拉桥主塔锚固区的钢骨架节段及塔柱施工方法 | |
CN106120570A (zh) | 一种用于帽梁二次施工的作业平台 | |
CN209323394U (zh) | 一种拉索桥主塔内斜面修补吊篮施工结构 | |
CN205329550U (zh) | 悬索桥猫道系统 | |
CN108252218A (zh) | 一种大跨度提篮拱桥钢拱肋外包混凝土底模滑移装置 | |
CN203715115U (zh) | 一种用于门式起重机自提升系统的支撑点结构 | |
CN203755173U (zh) | 用于桥梁高墩液压爬升的模板装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of utility model: A construction structure of repairing hanging basket on the side plane of main tower of cable bridge Effective date of registration: 20220704 Granted publication date: 20190830 Pledgee: China Construction Bank Co.,Ltd. Fuyang Branch of Hangzhou Pledgor: GEOTECHNICAL TECHNOLOGY Co.,Ltd. Registration number: Y2022980009767 |
|
PC01 | Cancellation of the registration of the contract for pledge of patent right | ||
PC01 | Cancellation of the registration of the contract for pledge of patent right |
Granted publication date: 20190830 Pledgee: China Construction Bank Co.,Ltd. Fuyang Branch of Hangzhou Pledgor: GEOTECHNICAL TECHNOLOGY Co.,Ltd. Registration number: Y2022980009767 |