CN209323394U - 一种拉索桥主塔内斜面修补吊篮施工结构 - Google Patents
一种拉索桥主塔内斜面修补吊篮施工结构 Download PDFInfo
- Publication number
- CN209323394U CN209323394U CN201821844845.9U CN201821844845U CN209323394U CN 209323394 U CN209323394 U CN 209323394U CN 201821844845 U CN201821844845 U CN 201821844845U CN 209323394 U CN209323394 U CN 209323394U
- Authority
- CN
- China
- Prior art keywords
- king
- tower
- plane
- hanging basket
- outer inclined
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims abstract description 45
- 230000008439 repair process Effects 0.000 claims abstract description 10
- 239000003381 stabilizer Substances 0.000 claims abstract description 10
- 238000007689 inspection Methods 0.000 claims description 5
- 238000012423 maintenance Methods 0.000 claims description 2
- 239000000725 suspension Substances 0.000 description 6
- 238000010586 diagram Methods 0.000 description 5
- 238000006073 displacement reaction Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 238000005260 corrosion Methods 0.000 description 1
- 230000007797 corrosion Effects 0.000 description 1
- 229910003460 diamond Inorganic materials 0.000 description 1
- 239000010432 diamond Substances 0.000 description 1
- 150000003839 salts Chemical class 0.000 description 1
Landscapes
- Movable Scaffolding (AREA)
Abstract
Description
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821844845.9U CN209323394U (zh) | 2018-11-09 | 2018-11-09 | 一种拉索桥主塔内斜面修补吊篮施工结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821844845.9U CN209323394U (zh) | 2018-11-09 | 2018-11-09 | 一种拉索桥主塔内斜面修补吊篮施工结构 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209323394U true CN209323394U (zh) | 2019-08-30 |
Family
ID=67709707
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821844845.9U Active CN209323394U (zh) | 2018-11-09 | 2018-11-09 | 一种拉索桥主塔内斜面修补吊篮施工结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209323394U (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114855644A (zh) * | 2022-03-25 | 2022-08-05 | 浙江恒炜建设集团有限公司 | 一种便于维护的桥梁主塔结构及其施工方法 |
-
2018
- 2018-11-09 CN CN201821844845.9U patent/CN209323394U/zh active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114855644A (zh) * | 2022-03-25 | 2022-08-05 | 浙江恒炜建设集团有限公司 | 一种便于维护的桥梁主塔结构及其施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203923882U (zh) | 单侧背索钢结构斜拉桥 | |
CN110258293A (zh) | 斜拉桥钢桁梁主塔墩顶架设施工方法 | |
CN204151664U (zh) | 一种斜拉式开启栈桥 | |
CN209323394U (zh) | 一种拉索桥主塔内斜面修补吊篮施工结构 | |
CN103669217A (zh) | 一种后支点挂篮及其整体换幅横移方法 | |
CN204474193U (zh) | 一种定柱式旋臂起重机 | |
CN206233600U (zh) | 超长超大混凝土梁安装钢筋的可升降装置 | |
CN202298476U (zh) | 桥梁变截面箱梁表面作业台车 | |
CN207776210U (zh) | 高空铝板分组整提的吊顶结构 | |
CN209323393U (zh) | 一种拉索桥主塔侧平面修补吊篮施工结构 | |
CN205329550U (zh) | 悬索桥猫道系统 | |
CN206233120U (zh) | 折形钢腹板连续箱梁移动吊机模架悬浇结构 | |
CN206797638U (zh) | 一种新型上层建筑翼桥 | |
CN203938403U (zh) | 一种手动吊具 | |
CN206529691U (zh) | 桥梁检修系统钢结构检修平台 | |
CN205775791U (zh) | 一种升降式便桥 | |
CN205114881U (zh) | 造船用门式起重机 | |
CN205591115U (zh) | 悬挂式猫道面网安装系统 | |
CN205369044U (zh) | 一体化预应力张拉框架结构 | |
CN201943006U (zh) | 辅助不变幅架梁吊机架设钢箱梁用主塔区活动支架 | |
CN107217588A (zh) | 一种悬索桥加劲梁施工期支座 | |
CN208136727U (zh) | 一种三塔悬索桥施工缆索吊塔顶鞍索结构 | |
CN211713715U (zh) | 一种波形钢腹板悬浇桥同步异位法施工挂篮装置 | |
CN202849925U (zh) | 架设于受潮汐影响河流中的钢栈桥 | |
CN206571416U (zh) | 实用型变配电专用登高装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of utility model: A construction structure of hanging basket for repairing inclined plane in main tower of cable bridge Effective date of registration: 20220704 Granted publication date: 20190830 Pledgee: China Construction Bank Co.,Ltd. Fuyang Branch of Hangzhou Pledgor: GEOTECHNICAL TECHNOLOGY Co.,Ltd. Registration number: Y2022980009767 |
|
PC01 | Cancellation of the registration of the contract for pledge of patent right | ||
PC01 | Cancellation of the registration of the contract for pledge of patent right |
Granted publication date: 20190830 Pledgee: China Construction Bank Co.,Ltd. Fuyang Branch of Hangzhou Pledgor: GEOTECHNICAL TECHNOLOGY Co.,Ltd. Registration number: Y2022980009767 |